Disassembly and Assembly


D9R Track-Type Tractor Power Train
Media Number -SENR5387-11 Publication Date -01/01/2010 Date Updated -28/01/2010

i02140464

Final Drive - Assemble


SMCS - 4050-016

Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7575 Link Bracket 3
C 138-7573 Link Bracket 3
D 1P-0520 Driver Group 1
F 138-7574 Link Bracket 2
G 1U-5934 Duo-Cone Seal Installer As 1
H 140-2286 Spacer 1
J 169-0503 Installation Kit 1

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 340... Page 2 of 15

Illustration 1 g00642301

Note: Lower the temperature of the sleeve bearing. Use Tooling (D) to install sleeve
bearing (35) .

1. Inspect all of the parts for damage. Make replacements, if necessary. Ensure that all of the
parts are clean.

Illustration 2 g01096508

2. Install lip seal (34) in the hub with Tooling (D) .

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 340... Page 3 of 15

Illustration 3 g00627559

3. Raise bearing cone (33) to a maximum temperature of 135 °C (275 °F). Install bearing cone
(33) on hub (28) .

Note: Before you install any of the Duo-Cone seals, see Installation of the Duo-Cone
Floating Seals in this module. Use Tooling (J) for preparation of the seal.

Illustration 4 g01096509

4. Use Tooling (G) to install Duo-Cone seal (32) on the hub, as shown.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 340... Page 4 of 15

Illustration 5 g00627562

5. Lower the temperature of bearing cups (30) and (31). Install bearing cups (30) and (31) in
hub (24). Check with a 0.038 mm (0.0015 inch) feeler gauge. Ensure that the bearing cup is
seated against the bottom of the bore all the way around.

Illustration 6 g01096510

6. Use Tooling (G) to install Duo-Cone seal (29) in hub (24) .

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 340... Page 5 of 15

Illustration 7 g01086876

Note: Do not put hub (24) on the Duo-Cone seal when the hub is turned over.

7. Turn over hub (24). Install Tooling (F) in the hub and fasten a suitable lifting device to the
Tooling. Put hub (24) in position on hub (28), as shown.

Illustration 8 g00627566

8. Raise bearing cone (27) to a maximum temperature of 135 °C (275 °F). Install bearing cone
(27) on the hub.

Illustration 9 g01096511

9. Put Tooling (H) in position while the bearing cone is still hot. Install retainer (20). Turn the
hub while the bolts that hold the retainer are tightened to a torque of 135 ± 15 N·m (100 ±
11 lb ft). Permit the bearing cone to return to room temperature before the retainer and
Tooling (F) are removed.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 340... Page 6 of 15

Illustration 10 g01086875

10. Install Tooling (A) on hub (25). Fasten an suitable lifting device to Tooling (A). Put hub
(25) in position in ring gear (24) .

Illustration 11 g01096464

11. Install retainer ring (23) in the groove in ring gear (24) .

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 340... Page 7 of 15

Illustration 12 g01087059

12. Turn over the hub and the gear. Install Tooling (A) onto hub (25). Fasten an suitable lifting
device to Tooling (A). Install ring gear (24) and the hub as a unit.

Illustration 13 g00627576

13. Put pins (22) in position in the hub.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 340... Page 8 of 15

Illustration 14 g00627578

14. If a replacement is needed, use Tooling (A) and a suitable press to install ring (21) in
retainer (20) .

15. Put retainer (20) in position on the hub.

Illustration 15 g00627580

16. Install bolts (35) that hold retainer (20) in position. Tighten the bolts to a torque of 135 ± 15
N·m (100 ± 11 lb ft).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 340... Page 9 of 15

Illustration 16 g00627582

17. Use feeler gauge (36) to measure the distance between retainer (20) and pins (22). The
clearance must be 0.08 ± 0.05 mm (0.003 ± 0.002 inch).

Note: There must be metal to metal contact between hub (28) and retainer (20). If there is
no gap, bearing cone (27) was not pressed correctly with Tooling (H). See step 9. A gap
between pins (22) and retainer (20) allows metal to metal contact between retainer (20) and
hub (28) .

Illustration 17 g00627583

18. Install lockring (18) in gears (15) .

Illustration 18 g00627522

19. Lower the temperature of bearing cups (17). Install bearing cups (17) in gears (15) .

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 3... Page 10 of 15

Illustration 19 g00627520

20. Install bearing cones (16) in gears (15) .

Illustration 20 g00627584

21. Put gears (15) and the bearing cones in position in planetary carrier (9) .

22. Lower the temperature of shafts (14) and install the shafts in the carrier and the gears. Use a
press, if necessary. Install shafts (14) until the small end of the shaft extends 0.08 ± 0.05
mm (0.003 ± 0.002 inch) past the surface of the carrier. Ensure that there is a metal to metal
contact between shafts (14) and the plates.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 3... Page 11 of 15

Illustration 21 g00627585

23. Install plates (13) and bolts (12). Tighten the bolts to a torque of 50 ± 10 N·m (37 ± 7 lb ft).

Note: There must be metal to metal contact between shafts (14) and plates (13). Use a feeler
gauge to ensure that there is a gap of 0.08 ± 0.05 mm (0.003 ± 0.002 inch) between plates
(13) and the surface of the carrier.

24. Use a suitable press to push the plates even with the surface of the carrier after plates (13)
have been installed.

Illustration 22 g01086870

25. Fasten an suitable lifting device to planetary carrier (9). Lower the planetary carrier into
position on the sun gear (10), as shown.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 3... Page 12 of 15

Illustration 23 g00627588

26. Install spiral ring (11) that holds sun gear (10) to planetary carrier (9) .

Illustration 24 g00627589

27. Install sun gear (19) .

28. Install Tooling (C) on the planetary carrier. Fasten an appropriate lifting device to Tooling
(C). Install planetary carrier (9) in the gear and onto the sun gear.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 3... Page 13 of 15

Illustration 25 g00627592

29. Lower the temperature of bearing cups (8). Install bearing cups (8) in gears (7) .

Illustration 26 g00627593

30. Install bearing cones (6) in gears (7) .

Illustration 27 g00627595

31. Put gears (7) in position in planetary carrier (2) .

32. Lower the temperature of shafts (5). Install the shafts in planetary carrier (2) and the gears.
If necessary, use a press to install the shafts. Install the shafts until the small end of the shaft
extends 0.08 ± 0.05 mm (0.003 ± 0.002 inch) past the surface of the planetary carrier.
Ensure that there is a metal to metal contact between shafts (5) and the plates.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 3... Page 14 of 15

Illustration 28 g01096516

33. Put O-ring seals (37) in position in plates (4) .

34. Install plates (4) and bolts (3). Tighten the bolts to a torque of 134 ± 20 N·m (99 ± 15 lb ft).

Note: There must be metal to metal contact between shafts (5) and plates (4). Use a feeler
gauge to ensure that there is a gap of 0.08 ± 0.05 mm (0.003 ± 0.002 inch) between plates
(4) and the surface of the carrier.

35. After plates (4) have been installed, use a suitable press to push the plates even with the
surface of the carrier.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015
D9R TRACK-TYPE TRACTOR WDM00001-UP (MACHINE) POWERED BY 3... Page 15 of 15

Illustration 29 g01086838

36. Fasten Tooling (A) and a suitable lifting device to planetary carrier (2) .

37. Make an alignment of the drain hole in the planetary carrier with the drain hole in the hub.

38. Install bolts (1). Tighten bolts (1) to a torque of 430 ± 60 N·m (320 ± 45 lb ft).

End By: Install the final drives. See Disassembly and Assembly, "Final Drive - Install".

Copyright 1993 - 2015 Caterpillar Inc. Tue M ar 24 09:33:58 U TC+ 0800 2015
AllRights Reserved.
Private N etw ork For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 3/24/2015

Potrebbero piacerti anche