Sei sulla pagina 1di 2

CHECK LIST

Design, Construction, Completion and Maintenance


Project Name Employer Abu Dhabi General Services PJSC (Musanada)
of Court at Madinate Zayed, AL Dhafra Region.

PMC N/A Engineer Consolidated consultants Group

Contractor National innovative gen. maintenance l.l.c.

Checklist Title: Fiberglass Insulation and Foster works Checklist No. MZC-00SIT-AL-NIM-MEC-0014-

MZC-00SIT-AL-NIM-MEC-ITP 0
Works Location: Madinat zayed court project Related ITP # Rev.00

MZC-00SIT-AL-NIM-MEC-MST
Related MS # Rev.00
Related Drawing(s)

Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA

Check applicable submittals (Shop drawing, Method statement, Material


1
submittal & Subcont prequalifcation (If required) have been approved

2 Dimension within tolerance

3 Molds cleaned and free from dust

4 Fiberglass rigid rolls applies properly

5 Foster 30-36 cloth applied

6 Surface found smooth and good

Finish and repair works done according to manufacturer's


7
reccomendation ( If applicable )

8 Dimension checked as per the drawing and under tolerence

9 Erection done as per approved method statement

Remarks:

Accompanying document :

For Contractor
For Supervision Consulatnt (Engineer)
Quality Inspector Quality Engineer
Name
Designation
Date

Form Ref: TMT114, Rev-1, Date: 09-Feb-17


CHECK LIST

Abu Dhabi General Services PJSC (Musanada)

Consolidated consultants Group

MZC-00SIT-AL-NIM-MEC-0014-00-Rev.00

MZC-00SIT-AL-NIM-MEC-ITP 0014-00-
Rev.00

MZC-00SIT-AL-NIM-MEC-MST 0014-00-
Rev.00

Remarks

For Supervision Consulatnt (Engineer)

Form Ref: TMT114, Rev-1, Date: 09-Feb-17

Potrebbero piacerti anche