Sei sulla pagina 1di 1

SUMMARY OF COMPRESSIVE STRENGTH TEST(CST) ON CASTED CONCRETE FOR JRMP II PROJECT

LAB. No. Actual Compressive Strength


Crushing Date(Days)
Psi
Concrete Design (psi) Actual Volume
Sample Sample I.D./ Poured Structure Admixture Cement Fly Ash
Class Specs @ 3 Specs @ 7 Specs @ 14 Specs @ 28
Date Lab. No. (m3) 3 7 14 28 3 7 14 28
days psi days psi days psi days psi

- 2958 2556 2934


Alibunan Catch Dam - 2646 1846 2952 2262 2630 2600
NC-001A
5-Jun-19 D3 2600 Dental Concrete 13-Jun-19 19-Jun-19 3-Jul-19 GCCI Emperor
0613-19050(2) Block-6 - 2213 2560 2811
- Average 2606 Passed 2689 Passed 2792 Passed
90 - 2774 2558 2797
- 2376 1846 2579 2262 2574 2600
NC-001A Alibunan Catch Dam
5-Jun-19 0613-19050(3) D3 2600 Dental Concrete - 2749 2534 3296 13-Jun-19 19-Jun-19 3-Jul-19 GCCI Emperor
Block-6
- Average 2633 Passed 2557 Passed 2889 Passed
- 1925 2622 2861
- 1876 1846 2386 2262 2211 2600
NC-002A Alibunan Catch Dam
7-Jun-19 D3 2600 - 1951 2541 3189 14-Jun-19 21-Jun-19 5-Jul-19 GCCI Emperor
0614-19054(2) Dental Concrete
Block-6
- Average 1918 Passed 2516 Passed 2754 Passed
- 2096 2717 3097
NC-002A Alibunan Catch Dam - 2145 1846 2245 2262 3145 2600
7-Jun-19 D3 2600 126 14-Jun-19 21-Jun-19 5-Jul-19 GCCI Emperor
0614-19054(3) Dental Concrete - 2152 2723 2671
Block-6
- Average 2131 Passed 2562 Passed 2971 Passed
- 2425 2323 3009
- 2618 1846 2719 2262 3219 2711.8 @34 Days
NC-002A Alibunan Catch Dam
7-Jun-19 D3 2600 - 2466 2107 3121 13-Jun-19 20-Jun-19 11-Jul-19 GCCI Emperor
0614-19054(1) Dental Concrete
Block-6
- Average 2503 Passed 2383 Passed 3116 Passed
- 2335 1992 2567
Alibunan Catch Dam - 2260 1924 @ 8 2149 2293.2 2659 2626 @ 29
NC-003A days @15 days days
9-Jun-19 D3 2600 Denatl Concrete 17-Jun-19 24-Jun-19 8-Jul-19 GCCI Emperor
0617-19058(1) - 2043 1980 2829
Block 5
- Average 2213 Passed 2040 Passed 2685 Passed
1638 2083 2785 1802
NC-003B Alibunan Catch Dam 1482 @ 4 1924 @8 2293.2 2626 @ 29
1949 2160 2623 3114
9-Jun-19 0613-19050(4) D3 2600 Denatl Concrete days days @15 days days 17-Jun-19 24-Jun-19 8-Jul-19 GCCI Emperor
194 1348 2011 2075 2333
0617-19058(2) Block 5
1645 Average 2085 Passed 2494 Passed 2416 Failed
1657 2615 2457 1984
NC-003C Alibunan Catch Dam 1482 @ 4 1924 @8 2293.2 2675.2 @
1711 2143 2168 2539
9-Jun-19 0613-19050(5) D3 2600 Denatl Concrete days days @15 days 32 days 13-Jun-19 17-Jun-19 24-Jun-19 11-Jul-19 GCCI Emperor
0617-19058(3) Block 5 1292 2225 2188 1788
1553 Average 2328 Passed 2271 Failed 2104 Failed
1846 2132 2601 2988
NC-004A Alibunan Catch Dam 1646 1274 2350 1846 2597 2262 3107 2600
10-Jun-19 0613-19050(6) D3 2600 Denatl Concrete 13-Jun-19 17-Jun-19 24-Jun-19 8-Jul-19 GCCI Emperor
0617-19059(1) Block 5 1960 2197 2797 3069
1817 Average 2226 Passed 2665 Passed 3055 Passed
114
1567 2306 2979 2914
NC-004B Alibunan Catch Dam 1670 2077 2804 2760 2657.2 @
1274 1846 2262
10-Jun-19 0613-19050(7) D3 2600 Denatl Concrete 31 days 13-Jun-19 17-Jun-19 24-Jun-19 11-Jul-19 GCCI Emperor
0617-19059(2) Block 5 1717 2308 2493 2659
1652 Average 2230 Passed 2759 Passed 2778 Passed
- 1933 3109 3658
Dam Body, Block 5 - 1274 1930 1846 2776 2262 3976 2600
21-Jul-19 NC-008A "C" 2600 29-Jul-19 5-Aug-19 19-Aug-19 Conmix Conch Ikonnik
(1st Lift) - 2734 2635 3692
- Average 2199 Passed 2840 Passed 3775 Passed
- 2425 2323 3479
Dam Body, Block 5 - 1274 2618 1846 2719 2262 2971 2600
21-Jul-19 NC-008A "C" 2600 252 29-Jul-19 5-Aug-19 19-Aug-19 Conmix Conch Ikonnik
(1st Lift) - 2466 2107 3397