Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
UNSWAGATI CIREBON
JOURNAL OF GREENSCIENCE AND TECHNOLOGY
ANALYSIS AND DESIGN STRUCTURE OF BUILDING OFFICE AND
ADMINISTRATIVE AL-BAHJAH CIREBON
*) Student of Civil Engineering Departement Faculty of Engineering Universitas Swadaya Gunung Jati Cirebon
**) Lecturer at Civil Engineering Departement Faculty of Engineering Universitas Swadaya Gunung Jati Cirebon
ABSTRACT
Al-Bahjah is a formal and non-formal educational institution that combines general education with
Al-Quran which is located on Pangeran Cakrabuana Street, Sumber, Cirebon District. The construction of
Building Office and Administration Al-Bahjah is indispensable as a center for management and
administration.
The planning of the Building Office and Administrative Al-Bahjah has a floor size of 30 m x 14 m
with 5 floors of structure and building height of 19.60 m. The building structure is designed with reference
to SNI 1727 - 2013, PPIUG 1987, SNI 2847 - 2013 and SNI 1726 - 2012. The static equivalent analysis
method is used in analyzing earthquakes. The structure lies in the class of medium land sites (SD) and is
included in the type D Seismic Design Category, so the earthquake force on the structure is planned using
a configuration of the structure of the Special Moment Resisting Frame (SMRF). ETABS v9.6 structure
analysis program is used to help structure modeling and calculate internal forces acting on the structure,
with the material used is concrete f'c 25 Mpa, reinforcement fy 400 Mpa and fy 240 Mpa.
Keyword: SNI 1727-2013, PPIUG 1987, SNI 2847-2013, SNI 1726-2013, Seismic Design Category D,
Lateral Equivalent Analysis, SMRF, ETABS v9.6.0
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 319
Analysis and Design Structure of Building Office and Administrative Al-Bahjah Cirebon
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 320
Rama Bhakti Wibawa, Arief Firmanto
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 321
Analysis and Design Structure of Building Office and Administrative Al-Bahjah Cirebon
a. Vertical Load
1) Dead Load
The dead load is the weight of all
building construction materials installed,
including walls, floors, roofs, ceilings, stairs,
partition walls remain, finishing, buildings
kladding and other structural and
architectural components as well as other Figure 2.1 Peta gerak tanah seismik dan koefisien
connected equipment including heavy resiko
serviceability tap. (SNI 1727:2013 pasal
Site class = Categories SD (medium)
3.1.1)
Earthquake acceleration parameter
Table 2.1 Building materials PPIUG 1987 (Ss,S1) for the location of Al-Bahjah
Sendang, Sumber - Cirebon with latitude
-6,755881204105325 and longitude
108,5034334695764 is Ss = 0,733 g and
S1 = 0,296 g
Earthquake acceleration response
parameter SMS = 0,889 and SM1 = 0,535
Seismic design category
SDS = 0,593 ≥ 0,50 (Category D, high
2) Live Load seismic risk level)
Life load is the load caused by the users Structur system, the type of building
and occupants of buildings or other structure that was reviewed used Special
structures Moment Resisting Frame (SMRF)
Table 2.2 Live Load SNI 1727-2013
Earthquake analysis procedure used
lateral equivalent analysis.
Table 2.3 Seismic effective weight the
structure
Additional Reduction Seismic
Self
Group Dead 25 % Live Weight
weight
Load (kN) load (kN) (W)
14276,896 22480,371
2) Wind Load
b. Horizontal Load Wind load acting on a building depends
1) Earthquake Load on the average speed of the wind at the
location of the building. The wind load input
Earthquake load is the load arising
using reference ASCE 07 (Pasal 6. SNI
from the movement of the ground where the
1727-2013)
structure is standing. Because the building
structure has mass, the mass inertia from the Wind velocity (mph)
top of the building provides resistance to
Average wind velocity in the area
movements. Therefore the earthquake load
is very dependents on the mass of a building, building at Sendang – Sumber, Cirebon.
and the movement of the earthquake to reach V = 8,6992 mph (meteo.bmkg.co.id)
the surface of the land is affected by local Wind direction factor
soil conditions. Kd = 0,85 (pasal 26.6 SNI 1727-2013)
Exsposure type = Category B
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 322
Rama Bhakti Wibawa, Arief Firmanto
Topographic factor
Kzt = 1.00 (pasal 26.8.1 SNI 1727- c. Column
2013) Column is the vertical rod of the frame
structure that carries the load from the roof,
5. Basic Calculations beam, and its own weight which is forwarded to
a. Slab the foundation. Column calculation uses the
Slab are horizontal elements structure following formula:
that support dead loads and live loads and
distribute them to the vertical frame in a Load Ultimate
structural system. Slab designed are two way Pu = 1,2 DL + 1,6 LL
system. Slab calculation uses the following Moment Ultimate
formula: Mu = 1,2 MDL + 1,6MLL
Eccentricity value (e)
Dimension (thickness) of slab 𝑀𝑢
ln(0,8+
fy
)
e =
1400
for (0.2 <αfm <2.0 ) 𝑃𝑢
36+5𝛽(α𝒇𝒎−0,2)
Dimension
𝐿 𝑓𝑦
hmin = 𝑥(0,4 + )
16 700
bmin = ½ h s/d ⅔ h
Load Ultimate
Qu = 1,2 DL + 1,6 LL
Moment Ultimate
Picture 2.2 Diagram interaksi kolom
(Tabel momen primer-croos / soemono)
d. Principle of SMRF/ SPRMK
Longitudinal rebar 1) eam
𝑓𝑦2
0,8𝑓𝑦−√(0,8𝑓𝑦)2 −4𝑥(0,4704𝑥
𝑀𝑢
)𝑥( 2) Dimension must comply the
=
𝑓𝑐 𝑏𝑑
𝑓𝑦2 requirements. Pasal 21.5.1 , Pasal
2x(0,4704x )
𝑓𝑐
21.5.1.2 , Pasal 21.5.1.3
As (rebar area) = ρ x b x d’
Logitudinal reinforcement. Pasal
Shear rebar
1 12.5.2
Vc = ϕ (6 √𝑓𝑐 ҆ ) 𝑥𝑏𝑥𝑑’ , with Ø = 0,75
Shear reinorcement. Pasal 21.5.3.2 ,
Requirements Pasal 21.5.3.3 , Pasal 21.5.3.4
Ø Mn ≥ Mu, with Ø = 0,90
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 323
Analysis and Design Structure of Building Office and Administrative Al-Bahjah Cirebon
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 324
Rama Bhakti Wibawa, Arief Firmanto
C. FLOW OF RESEARCH A
POT A-A
A B C D E F G
B B
A
POT A-A
A B C D E F G
44
B B
33
22
11
A
POT A-A
A B B
POT A-A
A B C D E F G
3
B B 2
2
A
POT A-A
1
Figure 3.6 4th Floor Elv. + 15.80 m
A
POT A-A
A
POT A-A
A B C D E F G
A B C D E F G B B
3
4
B B
2
3
2 1
A
POT A-A
1
Figure 3.7 4th Floor Elv. + 19.60 m
A
POT A-A
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 325
Analysis and Design Structure of Building Office and Administrative Al-Bahjah Cirebon
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 326
Rama Bhakti Wibawa, Arief Firmanto
1. Structure Reinforcement
Longitudinal (D)
Longitudinal
Longitudinal
Shear (Ø)
In calculating structure reinforcement (there are
(mm2)
(mm2)
(mm2)
(mm2)
Shear
Shear
Beam, Column, Slab, Pile Cap, Bored Pile) used
output ETABS analysis and manual analysis as
comparison.
Support
296 267 2 D 16
SA (250 x 400)
Table 4.4 Comparison force of beam in ETABS
analysis with Manual analysis 0,35 0,466 10 - 150
Field
ETABS Analysis Manual Analysis 247 250 2 D 16
(Story)
Label
Code
Validasi
(%)
M3 Vu δmax Mu Vu δ
Support
83,33 93,61 10,98 563 626 4 D 16
(Lt. 2)
S1 (300 x 500)
B81
B1
Field
(Lt. 2)
610 680 4 D 16
B40
B2
Support
(Lt. 3)
B79
B3
BA (250 x 450)
-140,67 -149,97 6,20
0,35 0,557 10 - 150
86,40 97,68 11,55
(Lt. 3)
B64
B4
Field
106,08 1,22 108,93 3,59
205 172 2 D 16
-130,95 -133,16 1,66
Support
796 942 5 D 16
B1 (300 x 550)
859 1021 6 D 16
B2 (300 x 550)
20
1,32 1,18 10 - 150
0
B1 B2 B3 B4
Field
593 608 4 D 16
ETABS MANUAL
Support
856 1019 6 D 16
B3 (300 x 550)
527 517 4 D 16
-80,00 B1 B2 B3 B4
0,99 0,92 10 - 150
-100,00
Field
555 647 4 D 16
-120,00
-131,23 -130,95
-133,16
-140,00 -139,41
Support
-150,33
-160,00
0,43 0,214 10 - 150
ETABS MANUAL
Field
101 83 2 D 16
0,571 10 - 150
Field
377 314 2 D 16
Table 4.5 Recapitulation of Beam reinforcement Table 4.6 Maximum value of Axial force (Pu)
ETABS Manual
and Momen (Mu) Column
m
T
Applied reinforcement
ti
p
n
y
a
a
o
e
c
e
s
Analysis Analysis
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 327
Analysis and Design Structure of Building Office and Administrative Al-Bahjah Cirebon
Momen (Mu)
Type Foundation
Column Type
Gaya Aksial
Name Label
(Pu) kN
Combo
kNm
Validasi
Load Load FZ (%)
Pu (kN)
Combination Combination (kN)
Shear
rebar
213,703
Column Type
215,00 208,11
Avs ,aktual
Avs perlu
As aktual
As perlu
210,00
Cek
Cek
201,345
205,00
200,00 195,14
Jarak
n Ø Ø 195,00
190,00
185,00
BASE (P1) BASE (P2)
K1 (500 x 500)
Aman
2500 8 22 3041 0,49 10 100 1,57 ETABS 201,345 213,703
Aman
Aman
3025 8 22 3041 0,64 10 100 1,57 Table 4.10 Bearing capacity bored pile with various
diameters
D Ap O W N- Qd Qg Qijin
(m) (m2) (m) (ton) SPT (ton) (ton) (Ton)
Table 4.8 Recapitulation of Slab reinforcement 0,6 0,28 0,47 6,78 50 212,05 117,81 103,17
Type Reinforcement
Function 0,5 0,19 0,39 4,71 50 147,26 98,17 77,10
Pelat X - direction (mm) Y - direction (mm)
0,4 0,12 0,31 3,01 50 94,24 78,54 54,58
S1-1
(5 x 2,5m) Ø 12 - 150 Ø 12 - 150
Table 4.11 Group pile efficiency
S1-2
Office
(4 x 2,5m) Ø 12 - 150 Ø 12 - 150 N Efisiensi Efisiensi
Poer Effisiensi Qall Cek
S1-3 (TP) 1 Tiang Group
(2,5 x 2m) Ø 12 - 150 Ø 12 - 150
S2-1 1 0,86 3 77,10 66,56 199,69 NO
(5 x 2,5m) Meeting Ø 12 - 150 Ø 12 - 1502 0,80 4 77,10 61,29 245,18 YES
S2-2 room 3 0,76 6 77,10 58,66 351,96 YES
(4 x 2,5m) Ø 12 - 150 Ø 12 - 1504 0,74 8 77,10 57,34 458,74 YES
S3-1 *Note :
(5 x 2,5) Ø 12 - 150 Ø 12 - 150
The value of group pile efficiency at poer 1 was tried
S3-2
with the number of pile as much as 4 , shown Vtotal <
(4 x 2,5) Guest Ø 12 - 150 Ø 12 - 150
Vefisiensi (213,7 < 245,18) means comply the
S3-3 House
requirements (YES)
(3,75 x 2,5m) Ø 12 - 150 Ø 12 - 150
S3-4
(2,5 x 1,25m) Ø 12 - 150 Ø 12 - 150
S4-1
(5 x 2,5m) Ø 10 - 175 Ø 10 - 175
Rooftop
S4-2
(4 x 2,5m) Ø 10 - 175 Ø 10 - 175
Table 4.12 Cost plan of structure building
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 328
Rama Bhakti Wibawa, Arief Firmanto
03 - 09
14
Sep-18
10 - 16
15
17 - 23
16
24 - 30
17
01 - 07
18
08 - 14
19
Okt-18
15 - 21
20
22 - 28
21
29 - 04
22
05 - 11
23
Nov-18
12 - 18
24
19 - 25
25
26 - 02
26
03 - 09
27
Des-18
10 - 16
28
17 - 23
29
KET 7. Cost plan of building structure obtained Rp.
100%
1. PERSIAPAN
2.
A1. PEMBERSIHAN LAHAN
SUB STRUCTURE
B1. PEKERJAAN TANAH
B2. PEKERJAAN BORED PILE
B3. PEKERJAAN PILECAP
B4. PEKERJAAN TIEBEAM
Rp
Rp
Rp
Rp
Rp
3.360.000,00
51.954.088,51
325.033.933,22
534.961.044,86
240.767.379,72
0,05
0,71
4,44
7,31
3,29
0,023 0,023
0,178
0,741
0,178
0,741
1,219
0,549
0,178
0,741
1,219
0,549
0,178
0,741
1,219
0,549
0,741
1,219
0,549
0,741
1,219
0,549
1,219
0,549
80%
7.313.963.000,00
B5. PEKERJAAN LANTAI DASAR Rp 309.297.741,39 4,23 0,705 0,705 0,705 0,705 0,705 0,705
3. UPPER STRUCTURE
C1. LANTAI 1 ELV +4.00
C1.1 KOLOM Rp 244.867.613,51 3,35 0,837 0,837 0,837 0,837
CI..2 BALOK Rp 334.733.959,47 4,58 0,915 0,915 0,915 0,915 0,915 60%
C1.3 SLAB Rp 608.124.415,92 8,31 1,663 1,663 1,663 1,663 1,663
C2. LANTAI 2 ELV +8.00
C2.1 KOLOM Rp 244.867.613,51 3,35 0,837 0,837 0,837 0,837
C2.2 BALOK Rp 334.733.959,47 4,58 0,915 0,915 0,915 0,915 0,915
C2.3 SLAB Rp 608.124.415,92 8,31 1,663 1,663 1,663 1,663 1,663
C3. LANTAI 3 ELV +12.00
B. SUGGESTION
C3.1 KOLOM Rp 240.462.023,51 3,29 0,822 0,822 0,822 0,822 40%
C3.2 BALOK Rp 344.719.616,74 4,71 0,786 0,786 0,786 0,786 0,786 0,786
C3.3 SLAB Rp 608.124.415,92 8,31 1,386 1,386 1,386 1,386 1,386 1,386
C4. LANTAI 4 ELV +15.80
C4.1 KOLOM Rp 232.624.232,83 3,18 0,795 0,795 0,795 0,795
C4.2 BALOK Rp 351.553.935,38 4,81 0,961 0,961 0,961 0,961 0,961
RENCANA MINGGUAN
RENCANA MINGGUAN KUMULATIF
0,023
0,023
0,941
0,964
3,391
4,355
4,228
8,583
4,228
12,810
6,628
19,439
7,465
26,904
5,888
32,792
5,993
38,785
6,815
45,601
3,400
49,001
5,571
54,572
5,571
60,144
2,966
63,110
2,966
66,077
5,616
71,692
5,616
77,308
2,649
79,957
3,285
83,243
4,030
87,273
2,949
90,222
2,949
93,171
2,949
96,120
2,313
98,432
1,568
100,000
would be more appropriate to understand in
Grafik 4.3 S-Curve of structure building advance the applicable regulations.
2. Before carrying out structural planning should
to make an initial estimate of the size of the
structural elements, so that there is no
repeated a decision of structural elements.
3. In design the structural elements such us
V. CONCLUSION AND SUGGESTION determining the reinforcements of slab, beam,
A. CONCLUSION
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 329
Analysis and Design Structure of Building Office and Administrative Al-Bahjah Cirebon
and column should be used that are almost Soelarso, Baihaki, Akhmad Mursyidan. 2017.
similiar in size to facilitate of work in the field. Jurnal. Analisis Struktur Gedung
4. In planning the foundation should be use data Bertingkat di Lima Wilayah Indonesia
from the actual location, so that the planning Terhadap Beban Gempa dan Beban Angin
results can be in accordance with the berdasarkan SNI 1726-2012 dan SNI 1727-
conditions of the soil structure. 2013. UNTIRTA, Tangerang.
5. In inputting data on the ETABS program, it
should be done carefully in accordance with Chairullah, Banta. 2013. Jurnal. Analisa Daya
the assumption or regulation that have been Dukung Pondasi dengan Metoda SPT,
set previously so that a structural analysis can CPT, dan Mayerhoff pada Lokasi Rencana
be produced that approaches the actual Kontruksi PLTU Nagan Raya Provinsi
situation. Aceh. Universitas Syiah Kuala, Aceh.
6. The used of structural analysis application Badan Standarisasi Nasional. Persyaratan Beton
accompanied by manual analysis as a Struktural untuk Bangunan Gedung (SNI
comparison, to avoid input or modeling in 2847 – 2013)
application, doe to lack of thoroughness of the
user. Badan Standarisasi Nasional. Beban Minimum
untuk Perancangan Bangunan Gedung
REFERENCES dan Struktur Lain (SNI 1727 – 2013)
Saputera, Aries. 2017. Thesis. ANALISIS
Badan Standarisasi Nasional. Tata Cara
STRUKTUR RUMAH SAKIT PERMATA
Perencanaan Ketahanan Gempa untuk
CIREBON. Swadaya Gunung Jati
Struktur Bangunan Gedung dan Non-
University, Cirebon.
Gedung (SNI 1726 – 2012)
Permana, Dede Apip. 2018. Thesis. ANALISIS
Pedoman Perencanaan Pembebanan untuk Rumah
PERENCANAAN RUMAH SAKIT
dan Gedung (PPIURG 1987)
CIDERES. Swadaya Gunung Jati
University, Cirebon. PBI 1971 (Tabel Momen Plat Persegi Akibat
Beban Merata)
Arrozaq. 2018. Thesis. PERENCANAAN
PEMBANGUNAN PUSKESMAS TABEL MOMEN PRIMER – CROOS
PABUARAN DI KABUPATEN (SOEMONO)
CIREBON. Swadaya Gunung Jati,
University, Cirebon. Data Tanah Pembangunan Kantor CPDP Wil.
Kabupaten Cirebon 1 Sumber
Asroni, Ali. 2010. Book. BALOK PELAT BETON
BERTULANG. Graha Ilmu, Yogyakarta. Kecapatan Angin Dasar BMKG
Journal of Green Science and Technology, Vol. III, No. 3, September 2019 | 330