SAUDI ARAMCO INSPECTION CHECKLIST
Asphalt Pavement Prime Coat & Tack Coating Inspection SAIC-Q-1041 15-Nov-17 MAH-SA-C5441
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

HAWIYAH AND HARADH DEVELOPMENT SATELLITE GAS COMPRESSIO10 - 01996 / 0007 MOFARREH AL-HARBI & PARTNERS
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-Q-006-02 3.5
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
W H
ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

A Prime Coat

Note: To verify that the area/material being inspected was tested by a SA


approved third party testing agency, the test results attached with this
RFI shall be verified by the relevant PID inspection Unit if copy of the test
results had been received directly from the 3rd party lab. If not available
.
in the PID inspection Unit, the inspector shall contact the third party lab
rep and request for an explanation. If explanation is not reasonable, NCR
shall be issued to the 3rd party lab through the Batch Plants & Civil
Testing Group.

The prime coat shall consist of MC-70 or MC-250 conforming to the


requirements in MOT Table 4.01-2A:

I) Cutback Asphalt - MC-70


Test Guarantee Method
Min Max

to 437(225) - 20
Distillation:°F (°C) Distillate, %
by volume of Total Distillate to
680 (360) to 500(260) 20 60
AASHTO T-78
to 600(316) 65 90

Residue from Distillation to


680°F (360°C), % Volume by Min 55
Difference
Flash point (Tag Open Cup),
Min 100 (38) AASHTO T-79
°F (°C)
Kinematic Viscosity, @ 140°F, Min 325 (70)
AASHTO T-201
SUS (60°C, cSt) Max 650 (140)
A1
Tests on Residue from Distillation:
Penetration @ 77°F, (25°C)
120-250 AASHTO T-49
100G, 5 Sec
Ductility @ 77°F, (25°C), cm Min 100 AASHTO T-51
Solubility in trichloroethylene, % Min 99.0 AASHTO T-44
Water, Vol. % Max 0.2 AASHTO T-55 SAES-Q-006
.
Sec. 5.4.1.A
II) Cutback Asphalt - MC-250
Test Guarantee Method
Min Max

to 437(225) - 10
Distillation:°F (°C) Distillate, %
by volume of Total Distillate to
680 (360) to 500(260) 15 55
AASHTO T-78
to 600(315) 60 87

Residue from Distillation to


Min 67
680°F (360°C), % Vol. by Diff.

Flash point (Tag Open Cup),


Min 150 (66) AASHTO T-79
°F (°C)

Kinematic Viscosity, @ 140°F, Min 1161 (250)


AASHTO T-201
SUS (60°C, cSt) Max 2322 (500)

Tests on Residue from Distillation:

Penetration @ 77°F, (25°C)


120-250
100G, 5 Sec AASHTO T-49

Ductility @ 77°F, (25°C), cm Min 100 AASHTO T-51


SAES-Q-006
.
Sec. 5.4.1.A
SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Asphalt Pavement Prime Coat & Tack Coating Inspection SAIC-Q-1041 15-Nov-17 MAH-SA-C5441
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

HAWIYAH AND HARADH DEVELOPMENT SATELLITE GAS COMPRESSIO10 - 01996 / 0007 MOFARREH AL-HARBI & PARTNERS
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-Q-006-02 3.5
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
W H
ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

Solubility in trichloroethylene, % Min 99.0 AASHTO T-44

Water, Vol. % Max 0.2


AASHTO T-55
SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Asphalt Pavement Prime Coat & Tack Coating Inspection SAIC-Q-1041 15-Nov-17 MAH-SA-C5441
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

HAWIYAH AND HARADH DEVELOPMENT SATELLITE GAS COMPRESSIO10 - 01996 / 0007 MOFARREH AL-HARBI & PARTNERS
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-Q-006-02 3.5
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
W H
ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

A prime coat shall consist of the initial application of liquid asphalt into the SAES-Q-006
A2 .
surface of non-asphalt base course. Sec. 5.4.1.A
SAES-Q-006
A3 Prime coat shall be tested prior to applications and every 10,000 m2. .
Sec. 5.4.1.A
Prior to application of the prime coat the surface shall be cleaned of all loose
SAES-Q-006
A4 dirt and other objectionable materials by means of approved mechanical .
Sec. 5.4.1.B
sweepers, blower and/or hand brooms.
Prime coat is to be applied only when the surface to be treated is dry and the SAES-Q-006
A5 .
atmospheric temperature is 160C or above. Sec. 5.4.1.C
Prime coat shall never be applied when the weather is foggy or rainy or in a SAES-Q-006
A6 .
sand storm. Sec. 5.4.1.C
The prime coat shall be applied uniformly to the surface of the base using a
pressure distributor at a rate between 0.65 and 1.75 litres/m 2 and at a SAES-Q-006
A7 .
temperature between 500C and 800C for MC-70 and between 650C and 1050C Sec. 5.4.1.C
for MC-250.

The distributor truck shall be equipped with a device to accurately measure the SAES-Q-006
A8 .
rate of application of the prime coat asphalt. Sec. 5.4.1.C
The prime coat materials shall be applied to a width of 300mm greater on each SAES-Q-006
A9 .
side of the road than the specified width of the finished surface. Sec. 5.4.1.C
SAES-Q-006
A10 Priming material shall be prevented from spraying on adjacent pavements. .
Sec. 5.4.1.C
Prime coat shall be maintained intact until it is covered by Asphalt Base SAES-Q-006
A11 .
Course. Sec. 5.4.1.C
Any area where prime coat is disturbed shall be repaired to the satisfaction of SAES-Q-006
A12 .
Saudi Aramco representative. Sec. 5.4.1.C

The prime coat shall be permitted to cure until the penetration into underlying
surface has been approved by Saudi Aramco Representative, but at no time SAES-Q-006
A13 .
shall the curing period be less than 24 hours. The prime coat shall be fully set Sec. 5.4.1.D
and cured before placing an asphalt mixture on the base.

B Tack Coat

The tack coat shall be of RC-70 conforming to the requirements in MOT Table
4.01-3A:
I) Cutback Asphalt (Rapid-Curing Type) - RC-70
Test Guarantee Method
to 437(225) 50 Min
Distillation:°F (°C) Distillate, %
by volume of Total Distillate to to 500(260) 70 Min
680 (360)
to 600(315) 85 Min AASHTO T-78

Residue from Distillation to


680°F (360°C), % Volume by Min 55
Difference

Flash point (Tag Open Cup),


NIL AASHTO T-79
°F (°C) SAES-Q-006
B1 .
Sec. 5.4.2.B
Kinematic Viscosity, @ 140°F, Min 325 (70)
AASHTO T-201
SUS (60°C, cSt) Max 650 (140)

Tests on Residue from Distillation:

Absolute Viscosity, @ 140°F, Min 2780 (600)


AASHTO T-202
SUS (60°C, cSt) Max 11150 (2400)

Penetration @ 77°F, (25°C)


60-70
100G, 5 Sec AASHTO T49
SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Asphalt Pavement Prime Coat & Tack Coating Inspection SAIC-Q-1041 15-Nov-17 MAH-SA-C5441
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

HAWIYAH AND HARADH DEVELOPMENT SATELLITE GAS COMPRESSIO10 - 01996 / 0007 MOFARREH AL-HARBI & PARTNERS
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME SAES-Q-006 QUANTITY INSP. MH's SPENT TRAVEL TIME
B1 .
Sec. 5.4.2.B SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-Q-006-02 3.5
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
W H
ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

Ductility @ 77°F, (25°C), cm Min 100 AASHTO T-51

Solubility in trichloroethylene, % Min 99.0 AASHTO T-44

Water, Vol. % Max 0.2


AASHTO T-55

Temperature of the tack coat shall be heated to 50-80°C and uniform SAES-Q-006
B2 .
throughout the distributor tank. (MOT GS, Par. 4.02.5.2) Sec. 3.2

SAES-Q-006
B3 Tack coat shall be tested prior to applications and every 10,000 m2. .
Sec. 5.4.3.B

Prior to tack coat application, the surface shall be swept and cleaned until it is SAES-Q-006
B4 .
free from all loose dirt and other objectionable materials. Sec. 5.4.3.C

The tack coat shall be applied by means of bitumen distributor at a maximum


SAES-Q-006
B5 rate of 0.25 liters per square meter or as directed by Saudi Aramco .
Sec. 5.4.3.C
Representative.

In places where the distributor bars cannot reach, tack coat shall be applied SAES-Q-006
B6 .
with a hand spray attached to the distributor by a hose. Sec. 5.4.3.C

The tack coat shall be uniformly applied over the entire surface of the area to SAES-Q-006
B7 .
be covered. Sec. 5.4.3.C

Tack coat shall not be placed during rainy weather, nor when the moisture on
the surface to be paved would prevent proper bond, nor when the atmospheric SAES-Q-006
B8 .
temperature is less than 16°C, nor when the temperature of the surface on Sec. 5.4.3.C
which the material is to be placed is less than 16°C.

All necessary precautions shall be taken to protect the tack coat from damage SAES-Q-006
B9 .
and all traffic shall be kept off the tack coat until it has been covered. Sec. 5.4.3.C

If application of the surface course is delayed by more than 3 days, or if dirt,


SAES-Q-006
B10 sand, or other impurities have contaminated the tack coat, then a new tack .
Sec. 5.4.3.C
coat shall be applied after the original one has been swept clean.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-Q-006 -- Asphalt and Sulfur Extended Asphalt Concrete Paving, 22 May 2016
2- General Specifications for Road and Bridge Construction, Ministry of Transport (MOT) -- November 1998
3- MOT Table 4.01-2A -- Specifications for Medium Curing (MC) Liquid Asphalts
4- MOT Table 4.01-3A -- Specifications for Rapid Curing (RC) Liquid Asphalts

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Asphalt Pavement Prime Coat & Tack Coating Inspection SAIC-Q-1041 15-Nov-17 MAH-SA-C5441
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

HAWIYAH AND HARADH DEVELOPMENT SATELLITE GAS COMPRESSIO10 - 01996 / 0007 MOFARREH AL-HARBI & PARTNERS
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-Q-006-02 3.5
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
W H
ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE
Work is Complete and Ready for Inspection: Work
T&I Witnessed QC Record Reviewed
Verified
Name, Initials and Date: Name, Initials and Date:
Mr. Tahir Muhammad
QC Inspector PID Representative
Work
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed
Verified
Name, Initials and Date: Name, Initials and Date:
Mr Hedayat Ullah khan Mr Renold Casidsid
QC Supervisor Proponent and Others
Quality Record Approved: Work
T&I Witnessed QC Record Reviewed
Name, Organization, Verified
Name, Sign and Date:
Mr. Muhammed Zubair Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Asphalt Pavement Prime Coat & Tack Coating Inspection SAIC-Q-1041 15-Nov-17 CIVIL -
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Flash point (Tag Open Cup),


Min 150 (66) AASHTO T-79
°F (°C)

Kinematic Viscosity, @ Min 1161 (250)


AASHTO T-201
140°F, SUS (60°C, cSt) Max 2322 (500)

Tests on Residue from Distillation:

A1 Penetration @ 77°F, (25°C) SAES-Q-006


cont'd 100G, 5 Sec 120-250 Sec. 5.4.1.A
AASHTO T-49

Ductility @ 77°F, (25°C), cm Min 100 AASHTO T-51

Solubility in
Min 99.0 AASHTO T-44
trichloroethylene, %

Water, Vol. % Max 0.2


AASHTO T-55

A prime coat shall consist of the initial application of liquid asphalt into SAES-Q-006
A2
the surface of non-asphalt base course. Sec. 5.4.1.A

SAES-Q-006
A3 Prime coat shall be tested prior to applications and every 10,000 m2.
Sec. 5.4.1.A

Prior to application of the prime coat the surface shall be cleaned of


SAES-Q-006
A4 all loose dirt and other objectionable materials by means of approved
Sec. 5.4.1.B
mechanical sweepers, blower and/or hand brooms.

Prime coat is to be applied only when the surface to be treated is dry SAES-Q-006
A5
and the atmospheric temperature is 16 0C or above. Sec. 5.4.1.C

Prime coat shall never be applied when the weather is foggy or rainy SAES-Q-006
A6
or in a sand storm. Sec. 5.4.1.C

The prime coat shall be applied uniformly to the surface of the base
using a pressure distributor at a rate between 0.65 and 1.75 litres/m 2 SAES-Q-006
A7
and at a temperature between 500C and 800C for MC-70 and Sec. 5.4.1.C
between 650C and 1050C for MC-250.

The distributor truck shall be equipped with a device to accurately SAES-Q-006


A8
measure the rate of application of the prime coat asphalt. Sec. 5.4.1.C

The prime coat materials shall be applied to a width of 300mm


SAES-Q-006
A9 greater on each side of the road than the specified width of the
Sec. 5.4.1.C
finished surface.

Priming material shall be prevented from spraying on adjacent SAES-Q-006


A10
pavements. Sec. 5.4.1.C

Prime coat shall be maintained intact until it is covered by Asphalt SAES-Q-006


A11
Base Course. Sec. 5.4.1.C

Any area where prime coat is disturbed shall be repaired to the SAES-Q-006
A12
satisfaction of Saudi Aramco representative. Sec. 5.4.1.C

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Asphalt Pavement Prime Coat & Tack Coating Inspection SAIC-Q-1041 15-Nov-17 CIVIL -
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

The prime coat shall be permitted to cure until the penetration into
underlying surface has been approved by Saudi Aramco
SAES-Q-006
A13 Representative, but at no time shall the curing period be less than 24
Sec. 5.4.1.D
hours. The prime coat shall be fully set and cured before placing an
asphalt mixture on the base.

B Tack Coat

The tack coat shall be of RC-70 conforming to the requirements in


MOT Table 4.01-3A:

I) Cutback Asphalt (Rapid-Curing Type) - RC-70


Test Guarantee Method
to 437(225) 50 Min
Distillation:°F (°C) Distillate,
% by volume of Total to 500(260) 70 Min
Distillate to 680 (360)
to 600(315) 85 Min AASHTO T-78

Residue from Distillation to


680°F (360°C), % Volume Min 55
by Difference

Flash point (Tag Open Cup),


NIL AASHTO T-79 SAES-Q-006
B1 °F (°C)
Sec. 5.4.2.B
Kinematic Viscosity, @ Min 325 (70)
AASHTO T-201
140°F, SUS (60°C, cSt) Max 650 (140)

Tests on Residue from Distillation:

Absolute Viscosity, @ Min 2780 (600)


AASHTO T-202
140°F, SUS (60°C, cSt) Max 11150 (2400)

Penetration @ 77°F, (25°C)


60-70
100G, 5 Sec AASHTO T49

Ductility @ 77°F, (25°C), cm Min 100 AASHTO T-51

Solubility in
Min 99.0 AASHTO T-44
trichloroethylene, %

Water, Vol. % Max 0.2


AASHTO T-55

Temperature of the tack coat shall be heated to 50-80°C and uniform SAES-Q-006
B2
throughout the distributor tank. (MOT GS, Par. 4.02.5.2) Sec. 3.2

SAES-Q-006
B3 Tack coat shall be tested prior to applications and every 10,000 m2.
Sec. 5.4.3.B

Prior to tack coat application, the surface shall be swept and cleaned SAES-Q-006
B4
until it is free from all loose dirt and other objectionable materials. Sec. 5.4.3.C

The tack coat shall be applied by means of bitumen distributor at a


SAES-Q-006
B5 maximum rate of 0.25 liters per square meter or as directed by Saudi
Sec. 5.4.3.C
Aramco Representative.

In places where the distributor bars cannot reach, tack coat shall be SAES-Q-006
B6
applied with a hand spray attached to the distributor by a hose. Sec. 5.4.3.C

The tack coat shall be uniformly applied over the entire surface of the SAES-Q-006
B7
area to be covered. Sec. 5.4.3.C

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Asphalt Pavement Prime Coat & Tack Coating Inspection SAIC-Q-1041 15-Nov-17 CIVIL -
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Tack coat shall not be placed during rainy weather, nor when the
moisture on the surface to be paved would prevent proper bond, nor
SAES-Q-006
B8 when the atmospheric temperature is less than 16°C, nor when the
Sec. 5.4.3.C
temperature of the surface on which the material is to be placed is
less than 16°C.

All necessary precautions shall be taken to protect the tack coat from
SAES-Q-006
B9 damage and all traffic shall be kept off the tack coat until it has been
Sec. 5.4.3.C
covered.

If application of the surface course is delayed by more than 3 days, or


if dirt, sand, or other impurities have contaminated the tack coat, then SAES-Q-006
B10
a new tack coat shall be applied after the original one has been Sec. 5.4.3.C
swept clean.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-Q-006 -- Asphalt and Sulfur Extended Asphalt Concrete Paving, 22 May 2016
2- General Specifications for Road and Bridge Construction, Ministry of Transport (MOT) -- November 1998
3- MOT Table 4.01-2A -- Specifications for Medium Curing (MC) Liquid Asphalts
4- MOT Table 4.01-3A -- Specifications for Rapid Curing (RC) Liquid Asphalts

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED