JADWAL KERJA
TRIAL MIX REPORT
PROJECT UPPER STRUCTURE SUDIRMAN SUITE "SS-31"
GRADE Fc'30 + FLY ASH 10%
DATE OF JOB MIX DESIGN JANUARY 07' 2020
QUARRY MATERIALS Ex. JENE'BERANG RIVERS BILI BILI KAB. GOWA
CONTRACTOR PT. TOTAL INDO
LOCATION MAKASSAR CITY SULSEL
SLUMP 120 ± 20
WATER CEMENT RATIO 0.395

JMD MC ABS ACT MIX LAB J M F


NO DESCRIPTION
(KG) (%) (%) (KG) (KG)

1 FINE AGGREGATE 828 828


2 CHIPPING ( COARSE AGG) 551 1379
3 SPLITE ( COARSE AGG) 498 1877
4 WATER 160 160
5 ADDITIVE SIKA (RTD) 1.20 1.20
6 PORTLAND CEMENT 401 401
7 FLY ASH 41 441

TOTAL WEIGHT 2480

TRIAL RECORD
No. Content Time Record Unit Remarks :
1 LOADING m3
2 ADDITIVE RTD ltr
3 SLUMP ACTUAL mm
4 SAMPLING pc

Makassar,

Owners Consultant / MK Main Contraktor Suplayer Ready Mix


(………………………………) (………………………………) (………………………………) (………………………………
ACTUAL MIX
(KG)

Suplayer Ready Mix


(………………………………)
PT. BUMI SARANA BETON
Office : WISMA KALLA Jl. DR. SAM Ratulangi No. 08 Makassar
Phone (0411) - 850 358 ; 858 594 Fax (0411) - 858 594
Plant : Jl. Manunggal 22. Tanjung Bunga Makassar Sulsel
Jl. KIMA 17 Kawasan Industri Makassar
Bandara Slutan Hasanuddin Makassar

CONCRETE MIX DESIGN

PROJECT : UPPER STRUCTURE SUDIRMAN SUITE "SS-31"


GRADE : Fc'30 + FLY ASH 10%
DATE : JANUARY 07' 2020
QUARRY MATERIALS : Ex. JENE'BERANG RIVERS BILI BILI KAB. GOWA
CONTRACTOR : PT. TOTAL INDO
LOCATION : MAKASSAR CITY SULSEL
SLUMP : 120 ± 20 mm
WATER CEMENT RATIO 0.395
TYPE CEMENT : OPC

DISCRIPTION OF MATERIALS
SPEC. GRAFITY UNIT WEIGHT
CEMENT OPC 3.150 1.260
WATER 1.000 1.000
FINE AGGRERATE 2.586 1.412
COARSE AGGREGATE 1 - 2 2.582 1.398
COARSE AGGREGATE 2 - 3 2.595 1.341

STRUCTURE : ALL CATEGORY


AGGREGATE SIZE MAX : 35 MM
WATER CEMENT RATIO (W/C) : 0.395
SLUMP 120 ± 20 Mm

VOLUME CEMENT : 405 : 3150 = 0.1286 M3


VOLUME WATER : 160 : 1000 = 0.1600 M3
VOLUME FASTA : 0.1286 0 0.1600 = 0.2886 M3
VOLUME OF AGGREGATE : 1 - 0.2886 = 0.7114 M3

PROPORTION OF CONCRETE PER METER CUBIC


BY WEIGHT
PORTLAND CEMENT : 0.1286 x 3.150 x 0.9 = 401
FINE AGGREGATE : 0.4500 x 0.7114 x 2.586 = 828
COARSE AGG. CHIPPING (1-2) : 0.3000 x 0.7114 x 2.582 = 551
COARSE AGG. SPLITE (2 -3) : 0.2700 x 0.7114 x 2.595 = 498
WATER : 0.1600 x 1.000 x 1.000 = 160
ADDITIVE RETARDER SIKA : 0.0035 x 405 : 1.180 = 1.20
FLY ASH 15 % : 405 x 0.1 = 41
TOTAL WEIGHT FRESH CONCRETE = 2440

PT. BUMI SARANA BETON


BUDI HARSANA IDHAM ALI
Manager QA Kabag. QA. RM.
BSB/FR/RM/02-01 Agustus 2013-00
KG
KG
KG
KG
LTR
LTR
KG
M/02-01 Agustus 2013-00
PT. BUMI SARANA BETON
Office : WISMA KALLA Jl. DR. SAM Ratulangi No. 08 Makassar
Phone (0411) - 850 358 ; 858 594 Fax (0411) - 858 594
Plant : Jl. Manunggal 22. Tanjung Bunga Makassar Sulsel
Jl. KIMA 17 Kawasan Industri Makassar
Bandara Slutan Hasanuddin Makassar

JADWAL KERJA
TRIAL MIX REPORT
PROJECT UPPER STRUCTURE SUDIRMAN SUITE "SS-31"
GRADE Fc'35 + FLY ASH 10%
DATE OF JOB MIX DESIGN JANUARY 07' 2020
QUARRY MATERIALS Ex. JENE'BERANG RIVERS BILI BILI KAB. GOWA
CONTRACTOR PT. TOTAL INDO
LOCATION MAKASSAR CITY SULSEL
SLUMP 120 ± 20
WATER CEMENT RATIO 0.360

JMD MC ABS ACT MIX LAB J M F


NO DESCRIPTION
(KG) (%) (%) (KG) (KG)

1 FINE AGGREGATE 795 795


2 CHIPPING ( COARSE AGG) 559 1354
3 SPLITE ( COARSE AGG) 508 1862
4 WATER 160 160
5 ADDITIVE SIKA (RTD) 1.32 1.32
6 PORTLAND CEMENT 441 441
7 FLY ASH 45 485

TOTAL WEIGHT 2508

TRIAL RECORD
No. Content Time Record Unit Remarks :
1 LOADING m3
2 ADDITIVE RTD ltr
3 SLUMP ACTUAL mm
4 SAMPLING pc

Makassar,

Owners Consultant / MK Main Contraktor Suplayer Ready Mix


(………………………………) (………………………………) (………………………………) (………………………………
ACTUAL MIX
(KG)

Suplayer Ready Mix


(………………………………)
PT. BUMI SARANA BETON
Office : WISMA KALLA Jl. DR. SAM Ratulangi No. 08 Makassar
Phone (0411) - 850 358 ; 858 594 Fax (0411) - 858 594
Plant : Jl. Manunggal 22. Tanjung Bunga Makassar Sulsel
Jl. KIMA 17 Kawasan Industri Makassar
Bandara Slutan Hasanuddin Makassar

CONCRETE MIX DESIGN

PROJECT : UPPER STRUCTURE SUDIRMAN SUITE "SS-31"


GRADE : Fc'35 + FLY ASH 10%
DATE : JANUARY 07' 2020
QUARRY MATERIALS : Ex. JENE'BERANG RIVERS BILI BILI KAB. GOWA
CONTRACTOR : PT. TOTAL INDO
LOCATION : MAKASSAR CITY SULSEL
SLUMP : 120 ± 20 mm
WATER CEMENT RATIO 0.360
TYPE CEMENT : OPC

DISCRIPTION OF MATERIALS
SPEC. GRAFITY UNIT WEIGHT
CEMENT OPC 3.150 1.260
WATER 1.000 1.000
FINE AGGRERATE 2.586 1.412
COARSE AGGREGATE 1 - 2 2.582 1.398
COARSE AGGREGATE 2 - 3 2.595 1.341

STRUCTURE : ALL CATEGORY


AGGREGATE SIZE MAX : 35 MM
WATER CEMENT RATIO (W/C) : 0.360
SLUMP 120 ± 20 Mm

VOLUME CEMENT : 445 : 3150 = 0.1413 M3


VOLUME WATER : 160 : 1000 = 0.1600 M3
VOLUME FASTA : 0.1413 0 0.1600 = 0.3013 M3
VOLUME OF AGGREGATE : 1 - 0.3013 = 0.6987 M3

PROPORTION OF CONCRETE PER METER CUBIC


BY WEIGHT
PORTLAND CEMENT : 0.1413 x 3.150 x 0.9 = 441
FINE AGGREGATE : 0.4400 x 0.6987 x 2.586 = 795
COARSE AGG. CHIPPING (1-2) : 0.3100 x 0.6987 x 2.582 = 559
COARSE AGG. SPLITE (2 -3) : 0.2800 x 0.6987 x 2.595 = 508
WATER : 0.1600 x 1.000 x 1.000 = 160
ADDITIVE RETARDER SIKA : 0.0035 x 445 : 1.180 = 1.32
FLY ASH 15 % : 445 x 0.1 = 45
TOTAL WEIGHT FRESH CONCRETE = 2464

PT. BUMI SARANA BETON


BUDI HARSANA IDHAM ALI
Manager QA Kabag. QA. RM.
BSB/FR/RM/02-01 Agustus 2013-00
KG
KG
KG
KG
LTR
LTR
KG
M/02-01 Agustus 2013-00
PT. BUMI SARANA BETON
Office : WISMA KALLA Jl. DR. SAM Ratulangi No. 08 Makassar
Phone (0411) - 850 358 ; 858 594 Fax (0411) - 858 594
Plant : Jl. Manunggal 22. Tanjung Bunga Makassar Sulsel
Jl. KIMA 17 Kawasan Industri Makassar
Bandara Slutan Hasanuddin Makassar

CONCRETE MIX DESIGN

PROJECT : UPPER STRUKCTURE SUDIRMAN SUITE "SS-31"


GRADE : B-0 NON FLY ASH
DATE : JANUARY 07' 2020
QUARRY MATERIALS : Ex. JENE'BERANG RIVERS BILI BILI KAB. GOWA
CONTRACTOR : PT. TOTAL INDO
LOCATION : MAKASSAR CITY SULSEL
SLUMP : 120 ± 20 mm
WATER CEMENT RATIO 0.974
TYPE CEMENT : OPC

DISCRIPTION OF MATERIALS
SPEC. GRAFITY UNIT WEIGHT
CEMENT OPC 3.150 1.260
WATER 1.000 1.000
FINE AGGRERATE 2.586 1.412
COARSE AGGREGATE 1 - 2 2.582 1.398
COARSE AGGREGATE 2 - 3 2.595 1.341

STRUCTURE : ALL CATEGORY


AGGREGATE SIZE MAX : 35 MM
WATER CEMENT RATIO (W/C) : 0.974
SLUMP 120 ± 20 Mm

VOLUME CEMENT : 190 : 3150 = 0.0603 M3


VOLUME WATER : 185 : 1000 = 0.1850 M3
VOLUME FASTA : 0.0603 + 0.1850 = 0.2453 M3
VOLUME OF AGGREGATE : 1 - 0.2453 = 0.7547 M3

PROPORTION OF CONCRETE PER METER CUBIC


BY WEIGHT
PORTLAND CEMENT : 0.0603 x 3.150 = 190
FINE AGGREGATE : 0.5100 x 0.7547 x 2.586 = 995
COARSE AGG. CHIPPING (1-2) : 0.2500 x 0.7547 x 2.582 = 487
COARSE AGG. SPLITE (2 -3) : 0.2100 x 0.7547 x 2.595 = 411
WATER : 0.1850 x 1.000 x 1.000 = 185
ADDITIVE RETARDER SIKA : 0.0035 x 190 : 1.180 = 0.56
TOTAL WEIGHT FRESH CONCRETE = 2269

PT. BUMI SARANA BETON

BUDI HARSANA IDHAM ALI


Manager QA Kabag. QA. RM.
BSB/FR/RM/02-01 Agustus 2013-00
KG
KG
KG
KG
LTR
LTR
M/02-01 Agustus 2013-00
PT. BUMI SARANA BETON
Office : WISMA KALLA Jl. DR. SAM Ratulangi No. 08 Makassar
Phone (0411) - 850 358 ; 858 594 Fax (0411) - 858 594
Plant : Jl. Manunggal 22. Tanjung Bunga Makassar Sulsel
Jl. KIMA 17 Kawasan Industri Makassar
Bandara Slutan Hasanuddin Makassar

JADWAL KERJA
TRIAL MIX REPORT
PROJECT UPPER STRUCTURE SUDIRMAN SUITE "SS-31"
GRADE Fc'30 + FLY ASH 15%
DATE OF JOB MIX DESIGN JANUARY 07' 2020
QUARRY MATERIALS Ex. JENE'BERANG RIVERS BILI BILI KAB. GOWA
CONTRACTOR PT. TOTAL INDO
LOCATION MAKASSAR CITY SULSEL
SLUMP 120 ± 20
WATER CEMENT RATIO 0.376

JMD MC ABS ACT MIX LAB J M F


NO DESCRIPTION
(KG) (%) (%) (KG) (KG)

1 FINE AGGREGATE 821 821


2 CHIPPING ( COARSE AGG) 546 1367
3 SPLITE ( COARSE AGG) 494 1861
4 WATER 160 160
5 ADDITIVE SIKA (RTD) 1.26 1.26
6 PORTLAND CEMENT 397 397
7 FLY ASH 64 461

TOTAL WEIGHT 2483

TRIAL RECORD
No. Content Time Record Unit Remarks :
1 LOADING m3
2 ADDITIVE RTD ltr
3 SLUMP ACTUAL mm
4 SAMPLING pc

Makassar,

Owners Consultant / MK Main Contraktor Suplayer Ready Mix


(………………………………) (………………………………) (………………………………) (………………………………
ACTUAL MIX
(KG)

Suplayer Ready Mix


(………………………………)
PT. BUMI SARANA BETON
Office : WISMA KALLA Jl. DR. SAM Ratulangi No. 08 Makassar
Phone (0411) - 850 358 ; 858 594 Fax (0411) - 858 594
Plant : Jl. Manunggal 22. Tanjung Bunga Makassar Sulsel
Jl. KIMA 17 Kawasan Industri Makassar
Bandara Slutan Hasanuddin Makassar

CONCRETE MIX DESIGN

PROJECT : UPPER STRUCTURE SUDIRMAN SUITE "SS-31"


GRADE : Fc'30 + FLY ASH 15%
DATE : JANUARY 07' 2020
QUARRY MATERIALS : Ex. JENE'BERANG RIVERS BILI BILI KAB. GOWA
CONTRACTOR : PT. TOTAL INDO
LOCATION : MAKASSAR CITY SULSEL
SLUMP : 120 ± 20 mm
WATER CEMENT RATIO 0.376
TYPE CEMENT : OPC

DISCRIPTION OF MATERIALS
SPEC. GRAFITY UNIT WEIGHT
CEMENT OPC 3.150 1.260
WATER 1.000 1.000
FINE AGGRERATE 2.586 1.412
COARSE AGGREGATE 1 - 2 2.582 1.398
COARSE AGGREGATE 2 - 3 2.595 1.341

STRUCTURE : ALL CATEGORY


AGGREGATE SIZE MAX : 35 MM
WATER CEMENT RATIO (W/C) : 0.376
SLUMP 120 ± 20 Mm

VOLUME CEMENT : 425 : 3150 = 0.1349 M3


VOLUME WATER : 160 : 1000 = 0.1600 M3
VOLUME FASTA : 0.1349 0 0.1600 = 0.2949 M3
VOLUME OF AGGREGATE : 1 - 0.2949 = 0.7051 M3

PROPORTION OF CONCRETE PER METER CUBIC


BY WEIGHT
PORTLAND CEMENT : 0.1349 x 3.150 x 0.85 = 397
FINE AGGREGATE : 0.4500 x 0.7051 x 2.586 = 821
COARSE AGG. CHIPPING (1-2) : 0.3000 x 0.7051 x 2.582 = 546
COARSE AGG. SPLITE (2 -3) : 0.2700 x 0.7051 x 2.595 = 494
WATER : 0.1600 x 1.000 x 1.000 = 160
ADDITIVE RETARDER SIKA : 0.0035 x 425 : 1.180 = 1.26
FLY ASH 15 % : 425 x 0.15 = 64
TOTAL WEIGHT FRESH CONCRETE = 2419

PT. BUMI SARANA BETON


BUDI HARSANA IDHAM ALI
Manager QA Kabag. QA. RM.
BSB/FR/RM/02-01 Agustus 2013-00
KG
KG
KG
KG
LTR
LTR
KG
M/02-01 Agustus 2013-00
PT. BUMI SARANA BETON
Office : WISMA KALLA Jl. DR. SAM Ratulangi No. 08 Makassar
Phone (0411) - 850 358 ; 858 594 Fax (0411) - 858 594
Plant : Jl. Manunggal 22. Tanjung Bunga Makassar Sulsel
Jl. KIMA 17 Kawasan Industri Makassar
Bandara Slutan Hasanuddin Makassar

JADWAL KERJA
TRIAL MIX REPORT
PROJECT UPPER STRUCTURE SUDIRMAN SUITE "SS-31"
GRADE Fc'35 + FLY ASH 15%
DATE OF JOB MIX DESIGN JANUARY 07' 2020
QUARRY MATERIALS Ex. JENE'BERANG RIVERS BILI BILI KAB. GOWA
CONTRACTOR PT. TOTAL INDO
LOCATION MAKASSAR CITY SULSEL
SLUMP 120 ± 20
WATER CEMENT RATIO 0.344

JMD MC ABS ACT MIX LAB J M F


NO DESCRIPTION
(KG) (%) (%) (KG) (KG)

1 FINE AGGREGATE 788 788


2 CHIPPING ( COARSE AGG) 554 1342
3 SPLITE ( COARSE AGG) 503 1845
4 WATER 160 160
5 ADDITIVE SIKA (RTD) 1.38 1.38
6 PORTLAND CEMENT 435 435
7 FLY ASH 70 505

TOTAL WEIGHT 2511

TRIAL RECORD
No. Content Time Record Unit Remarks :
1 LOADING m3
2 ADDITIVE RTD ltr
3 SLUMP ACTUAL mm
4 SAMPLING pc

Makassar,

Owners Consultant / MK Main Contraktor Suplayer Ready Mix


(………………………………) (………………………………) (………………………………) (………………………………
ACTUAL MIX
(KG)

Suplayer Ready Mix


(………………………………)
PT. BUMI SARANA BETON
Office : WISMA KALLA Jl. DR. SAM Ratulangi No. 08 Makassar
Phone (0411) - 850 358 ; 858 594 Fax (0411) - 858 594
Plant : Jl. Manunggal 22. Tanjung Bunga Makassar Sulsel
Jl. KIMA 17 Kawasan Industri Makassar
Bandara Slutan Hasanuddin Makassar

CONCRETE MIX DESIGN

PROJECT : UPPER STRUCTURE SUDIRMAN SUITE "SS-31"


GRADE : Fc'35 + FLY ASH 15%
DATE : JANUARY 07' 2020
QUARRY MATERIALS : Ex. JENE'BERANG RIVERS BILI BILI KAB. GOWA
CONTRACTOR : PT. TOTAL INDO
LOCATION : MAKASSAR CITY SULSEL
SLUMP : 120 ± 20 mm
WATER CEMENT RATIO 0.344
TYPE CEMENT : OPC

DISCRIPTION OF MATERIALS
SPEC. GRAFITY UNIT WEIGHT
CEMENT OPC 3.150 1.260
WATER 1.000 1.000
FINE AGGRERATE 2.586 1.412
COARSE AGGREGATE 1 - 2 2.582 1.398
COARSE AGGREGATE 2 - 3 2.595 1.341

STRUCTURE : ALL CATEGORY


AGGREGATE SIZE MAX : 35 MM
WATER CEMENT RATIO (W/C) : 0.344
SLUMP 120 ± 20 Mm

VOLUME CEMENT : 465 : 3150 = 0.1476 M3


VOLUME WATER : 160 : 1000 = 0.1600 M3
VOLUME FASTA : 0.1476 0 0.1600 = 0.3076 M3
VOLUME OF AGGREGATE : 1 - 0.3076 = 0.6924 M3

PROPORTION OF CONCRETE PER METER CUBIC


BY WEIGHT
PORTLAND CEMENT : 0.1476 x 3.150 x 0.85 = 435
FINE AGGREGATE : 0.4400 x 0.6924 x 2.586 = 788
COARSE AGG. CHIPPING (1-2) : 0.3100 x 0.6924 x 2.582 = 554
COARSE AGG. SPLITE (2 -3) : 0.2800 x 0.6924 x 2.595 = 503
WATER : 0.1600 x 1.000 x 1.000 = 160
ADDITIVE RETARDER SIKA : 0.0035 x 465 : 1.180 = 1.38
FLY ASH 15 % : 465 x 0.15 = 70
TOTAL WEIGHT FRESH CONCRETE = 2441

PT. BUMI SARANA BETON


BUDI HARSANA IDHAM ALI
Manager QA Kabag. QA. RM.
BSB/FR/RM/02-01 Agustus 2013-00
KG
KG
KG
KG
LTR
LTR
KG
M/02-01 Agustus 2013-00