ELECTRICITY
SYSTEM
OPERATOR
K.Palanka BULGARIA
Tearce
Kumanovo 1
Electric and power system of the
Skopje 1 220
M.Kamenica Republic of Macedonia
Tetovo 2
Skopje 1 110
Planned situation with connection of
Jugohrom Kumanovo 2
Kratovo Probishtip future HPPs
Tetovo 1
Substations
Skopje 2
Rafinery Delchevo
HPP Kochani
Polog Sv.Petka Skopje 3 Vinica
Skopje 4 400
O.Pole
Skopje 4 110 Petrovec [tip 1 400
smelter
Vrutok 110 [tip 2
Veles 2 Berovo
Samokov
HPP Vrutok Centralna
Radovish
SS 400/110 kV/kV
Buchim
Zgropolci
Prilep 3
Power lines
HEC Globocica HPP Tikvesh Feni
400 kV
Negotino
Prilep 1 Valandovo
Struga
220 kV
Ohrid 1 Bitola 1 Mariovo400 Gevgelija
110 kV
Elbasan
Resen
Bitola2 400
Mariovo 110
Planned
Ohrid 2
TPP Bitola 110 kV PL
Bitola 2 110
Bitola 4
Bitola 3
Brod-Gneotino
Power plants
Suvodol
Thesaloniki
Hydro PP
GREECE Thermal PP
Florina
ALBANIA June 2008
Generation and transmission price
y Average electricity generation price
Power plant €/MWh
Lignite TPP 40
Heavy fuel oil TPP 60
Natural gas CHP (234 MW) 45
Natural gas CHP (30 MW) 48
HPP 50
Import 60
3 2 4 5 8 9 12 3 0
ST
100 MW
58 Export
SK KU ТЕ and GV GE and SR BT OH 59
500 MW 200 MW 200 MW FENI 200 MW 200 MW 200 MW 1
20 MW
51 52 53 55 56 57
54
Radovish
71
20 MW
Mathematical model of the electric
power system of Macedonia
Mathematical model of the electric
power system of Macedonia
y Adding new consumer - Radovish
58’ x 4,58 + x6,58 + x8,58 + x10 ,58 + x14 ,58 + x18,58 + x 20 ,58 + x 22 ,58 − x58, 71 = 80
71 x58, 71 = 20
y Adding small hydropower plant – Ohrid
80 x80 ,81 ≤ 9
81 x81,57 − x80 ,81 = 0
57’ x 4,57 + x 6,57 + x8,57 + x10 ,57 + x14,57 + x18,57 + x 20,57 + x 22 ,57 + x12,57 + x81,57 = 200
y The model solution
22 125
5 30
10 73
20 11
8
19 67
104
259
73
9
160
100
125 93
212 146
ST
58 Export
80 MW
SK KU TE and GE and BT OH
520 MW 180 MW GV FENI SR 220 MW 160 MW 20 59
260 MW 20 MW 190 MW
51 52 53 55 56 57
54 Radovish
71
20 MW
Consumption in a winter day 2
Electricity production in a winter day 2
Consumption in a winter night
Electricity production in a winter night
Consumption in a summer day
Electricity production in a summer day
Consumption in a summer night
Electricity production in a summer night
Link flow in a summer night
TPP BT HPP
2 CHP WPP S HPP S HPP TPP NG
225 MW 586 MW 5 9 13
1
30 MW 30 MW 10 MW 9 MW 210 MW
22
60 5 30
40
70 55 117
45 25
18
65
ST
20 MW
58 Export
SK KU TE and GV GE and BT OH
130 MW 45 MW 65 MW FENI SR 55 MW 40 MW 5 59
5 MW 48 MW
51 52 53 55 56 57
54 Radovish 71
5 MW
Conclusion
y An original model for solving a multidisciplinary
problem of Macedonian electric power system is
developed that can optimize and analyze every (real)
state of the system.
y Future works include
y More detail analysis of the power system of Macedonia
y Extending the model to larger regions and/or EU power
grid
y Extending the model to E3 class of models (energy,
ecology, economy)