E4 Stockholm Bypass

FSE215
Concrete tunnels Skärholmen

Object Specific Technical Description Measure

BUILDING POLICY

2016-02-01
2Z140002-FSE215

Examiner Approved by place Date


Marten Coral Andreas Nilsson Stockholm 2016-02-01
object Name E4 Stockholm Bypass
construction number FSE215
construction Name Concrete tunnels Skärholmen
Description 1 Object Specific Technical Description Measure
Description 2
Description 3
Description 4
Information examined
Reference number
Construction number Object
number 8448590
planning Stage BUILDING POLICY
Status Name Company
Grontmij-Golder
Author / Engineer Joel Bergkvist
external number 10004389

Content
GENERAL MANDATE AND ............................................. contract ........ 4
1 BRIEF measuring technical description ............................................... ........................ 4
1.1 Contractor's supply of instruments, equipment and surfaces during the planning and construction stage as well
as the warranty period. ............................................. 4
2 Basic technical requirements ............................................... ........................................... 4
2.1 Reference ................................................. .................................................. 5
2.1.1 Coordinate and height system .............................................. .................................. 5
2.1.2 Reference system for satellite measurement ............................................... .................... 5
2.2 Transformations, fitting and over behalf ............................................. ... 5
2.3 Control / testing instruments and associated equipment .......................... 5
2.4 Checking the supplied core network .............................................. .................... 5
3 Ask the client ............................................... ............................................ 6
3.1 Delivery of materials supplied .............................................. .................... 6
3.2 Core network in plan and elevation ............................................. ......................................... 6
3.2.1 Core network in the plan ............................................... .................................................. .... 6
3.2.2 Core network in height ............................................... .................................................. .... 6
3.2.3 GNSS - Satellite Measuring ............................................... ....................................... 6
3.2.4 Local permanent reference station GNSS ............................................. ......... 7
3.2.5 Local temporary reference station GNSS ............................................. ............... 7
3.2.6 Network RTK service ............................................... .................................................. ....... 7
3.3 Digital models ................................................ ................................................. 7
3.3.1 Mark Model ................................................. .................................................. ...... 7
3.4 Map material ................................................. .................................................. ..... 7
3.5 Photogrammetric material ................................................ 7 ................................
3.5.1 Orthoimagery ................................................. .................................................. ............ 7
3.5.2 Aerial ................................................. .................................................. .......... 7
3.6 Laser scanning ................................................. .................................................. 7 ..
4 Agreements and contracts ............................................... ............................................ 7
PLANNING ................................................. .................................................. ................... 8
5 Core network ................................................. .................................................. .......................... 8
5.1 Connection network plan ............................................... ........................................... 8
5.2 A switching network in height. .................................................. ....................................... 8
5.3 Bruksnät plan ............................................... .................................................. ... 8
5.4 Bruksnät in height ............................................... .................................................. ... 8
5.5 Other networks ................................................ .................................................. .......... 8
6 Data Collection and Models ............................................... ............................................. 9
6.1 Aerial photography ................................................. ................................................ 9
6.2 Laser scanning ................................................. .................................................. 9 ..
6.2.1 Airborne laser scanning ................................................ .................................... 9
6.2.2 Car-borne laser scanning ................................................ ....................................... 9

2 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

6.2.3 Terrestrial laser scanning ................................................ ................................ 9


6.3 Measurement work ................................................. ................................................ 9
6.3.1 Survey ................................................. .................................................. ......... 9
6.3.2 Measurement of movement and settlement ............................................. ..................... 10
6.4 Mark Model with underlying models .............................................. ........ 10
6.4.1 Berg Model ................................................. .................................................. ...... 11
6.5 Plant Model ................................................. .......................................... 12
7 Withdrawal ................................................. .................................................. .................... 12
8 Map-making and orthophotos ............................................... ..................................... 12
8.1 Maps ................................................. .................................................. .............. 12
8.2 Orthoimagery ................................................. .................................................. .......... 12
9 Documentation and delivery ............................................... .......................................... 12
CONSTRUCTION PHASE AND GUARANTEE ............................................... .......................................... 15
10 Core network ................................................. .................................................. ......................... 15
10.1 Core network in the plan ............................................... .................................................. ... 15
10.1.1 Bruksnät in the plane of concrete tunnel and trough ........................................... ................ 15
10.2 Core network in height ............................................... .................................................. ... 17
10.2.1 Bruksnät in height in the concrete tunnel trough and ........................................... ................ 17
10.2.2 Brofixpunkter ................................................. .................................................. . 18
10.2.3 Brodubbar ................................................. .................................................. ....... 18
11 Measurement and documentation ............................................... .......................................... 18
11.1 General requirements for measurement .............................................. ................................. 18
11.2 Control measurement of installations and structures ................................... 18
11.3 Survey railway rail ............................................... ................................... 18
11.4 Enforcement of property boundaries ............................................... .................. 18
11.5 Delivery of the road geometry to NVDB - National road database .......................... 18
11.6 Delivery of events to NVDB - National road database ............................. 19
12 Touchdown and movement measurements .............................................. ..................................... 19
13 Measurements during the warranty period ............................................... ........................................ 19
13.1 Control measurements of core network ............................................... .......................... 19
13.2 Control measurement of bridge ............................................... ..................................... 19
13.3 Other measurements under warranty .............................................. ................ 19
13.3.1 Control measurement of concrete tunnel ............................................... ..................... 19
13.3.2 Control measurement of trough ............................................... 19 ....................................
14 Measurement Technical account for construction phase and warranty ........................................ 20
14.1 Reporting from the construction stage ............................................... 20 ..............................
14.2 Accounting during and after the warranty period ............................................. .......... 20
14.2.1 Reports during the warranty period ............................................... .................... 20
14.2.2 Reporting after the warranty period .............................................. .................. 20
15 Document References and concepts ............................................... ............................. 20
15.1 Document Reference ................................................. 20 ......................................
15.2 Concepts ................................................. .................................................. ........... 20

3 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

GENERAL MANDATE AND Contract


This object-specific technical description of the measurement is divided into sections "General assignment and the contract", "project"
and "construction phase and warranty period". Regardless of this division are the requirements described and the advice of the
contractor applicable at all stages. The stages have no practical significance, but is to make the document more clearly.

1 BRIEF measuring technical description


Meetings and consultations with the client's manager surveyor should be carried out continuously throughout the contract period. The client
must be kept informed of the progress of the measurement, difficulties and any deviation from the schedule. Consultation with other
stakeholders, government agencies, businesses and private individuals, should go through the client unless otherwise agreed. The contractor
shall convene the initial meeting current measurement technology.

Implementation Descriptions shall be prepared for all measuring jobs. Implementation descriptions must be submitted to the customer for
approval before starting work. Implementation description should include the following:

1 Enter the planned start and end date for implementation, and, where applicable dates for major papers in the
mission.

2 Enter selected method / technique and describe the performance of the various operating steps of the respective product / service
(process description).

3 Specify how it verified that the chosen methodology / technology meets the requirements.

4 Enter the commission continuously documented.

5 Enter the selected equipment and related software implementation. Specify the instruments and equipment are
tested and calibrated, and when this is done in connection with the commission.

6 Enter item lists and code tables used.

7 Specify how and what checks carried out.

8 Enter the risk assessment and the elements in the mission to which it relates and how the consideration or
controlled in implementation. Risk evaluation can for example relate to a planned work performance can not occur
without complications, or to a quality characteristic on the requested product is not fully obtainable, etc.

9 Define what is included in the delivery and the form of products delivered.

1.1 Contractor's supply of instruments, equipment and surfaces during the planning and
construction stage as well as the warranty period.
The contractor shall object all stages and guarantee to provide the customer base as up to date maintained models, measurement and control
data from different measurement tasks etc. Delivery format should be as IT supervision or consultation with the client. The Purchaser shall, on
request, be given access to the contractor's measurement equipment for temporary controls.

2 Basic technical requirements


The contractor's name sincerely measurement controller must meet the following basic requirements:

• Have the transport department issued "certificate of qualification for the measurement of technical work in the transport department" with specified
minimum level credential I.

4 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

• Have a proven track record as a responsible Chief Measurer of large and complex construction contracts
of similar type.

Eligibility Certificate must be reported to the client.

2.1 reference

2.1.1 Coordinate and height systems

For contract valid reference in plan and elevation seen in IT Tutorial "E4FS 2012: 0106 Overall", section 2.9.

The height system is a project specific system designed especially for the Stockholm bypass (FS). Height system described in
Annex 5 to the measurement technical basis 2Z140003.

Handling of geometric corrections should be made in consultation with the client.

2.1.2 Reference system for satellite measurement

For the contract, the following geoid model, specially adapted to FS RH 00:

• SWEN08_RH00FS

The contractor provided the geoid model in DAT, GRD, and txt after the contract signing.

2.2 Transformations, and alignment of bill


Transformation, fitting or on behalf of geographic information may only be carried out after consultation with the client. Transformation, fitting
or on behalf of geographic information must be carried out according to SIS-TS 21143: 2009, Chapter 5.4, 5.5, 5.5.2, 5.5.3 and 5.5.4.
Attempted transformations of bills and fittings shall be presented as table in Chapter 9, the title "Transformation and fitting."

Coordinate Transformation of plant geometries, structures, etc. should not be performed with the method that changes them. In such
calculations, the unitary transformation used. Performed transformations contractor must supply original coordinates and the transformed
coordinates to the customer upon request. Coordinate Transformation of points in the core network may only be carried out with the consent
of the client.

2.3 The control / testing instruments and associated equipment


For testing, inspection and documentation for SIS-TS 21143: 2009 Section 4.1.2 and according to the instrument manufacturer's
recommendations. Control programs for each instrument should be communicated to the customer before the equipment is put into
operation.

2.4 Checking the supplied core network


The contractor assumes responsibility to protect and preserve the control points in the work area.

As some points of the supplied core network within the contractor's work is a risk that they will be destroyed due to the construction of the new
facility. It is therefore important that the entrepreneur at an early stage, a suggestion immediately after clearing, condenses supplied network in
such a way that the points that will later disappear are replaced with new, representative points.

Upon clearing of trees and shrubs, or at the unveiling of the surface of the work area, it is important that the contractor takes into account the
points in the provided core networks and carry out clearing work in such a way that the points in the network is not damaged.

5 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

The contractor shall immediately inform the client of the risk that the control points can be lost or destroyed.

The provided control points in the plan that the contractor intends to use for the measurement must be checked according to SIS-TS 21143:
2009 6.3, with non-compliance of the contractor's inspection and verification of the calculation documents of the existing network. The visual
inspection under SISTS 21143: 2009 6.3 refers not hard to reach points marked on buildings or structures. It remains with the contractor to
check the existing networks in such a way that it is possible to verify that they hold sufficient accuracy to complete your mission. Inspection of
inaccessible points be performed by station setup with resection against at least three points on the evaluation of residuals. The contractor
shall establish an audit program that describes the control of the points to be used.

In the control test by measuring from the prior paragraph, deviations from nearby known points lie within the error limits of SIS OR 21143:
2009 Table 22.

All provided points in height must be checked according to SIS-TS 21143: 2009 6.3, with non-compliance of the contractor's inspection
and verification of the calculation documents of the existing network.

Control Balance to be carried out by double leveling the instrument according to SIS-TS 21143: 2009 Table 3, the lowest "Class A2" or
better. Control Balance to be connected to at least two known (mountain marked) starting points.

If the contractor checks show discrepancies should the client's measurement manager promptly informed.

Reporting from the control of the control points must include description, status, measurements and calculations according to SIS-TS 21143:
2009 6.3.

3 Provided by the client

3.1 Delivery of materials supplied


Coordinates, point sketches and photos on points regarding network construction and for bruksnät in height, are provided in the Chaos
component database at the contract signing. The documentation provided by the client are described in the measurement technical
basis, 2Z140003.

3.2 Core network in plan and elevation

3.2.1 Core network plan

Described in section 2.1 of the measurement technical basis 2Z140003.

3.2.2 Core network in height

Described in section 2.2 of the measurement technical basis 2Z140003.

3.2.3 GNSS - Satellite Measurement

For all measurements with GNSS in the contract concerns a specific geoid model adapted to FS RH 00. The geoid is called
SWEN08_RH00FS and described in section 1.3 of the measurement technical basis 2Z140003.

At RTK survey should daily check of the accuracy of measurement carried out according to the exporter established control. The control
program must be approved by the customer before the RTK measurements begin.

6 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

The client should be given the opportunity to use the contractor's system during the time that the system is established and cultivated.

3.2.4 Local permanent reference station GNSS

If the contractor intends to establish a permanent local reference station that will be performing as SISTS 21143: 2009 7.3.2, 7.3.2.1,
7.3.2.2, 7.3.2.4. Control of RTK accuracy of the measurement should be performed according to SIS-TS 21143: 2009 7.2.

Implementation description shall be established and approved by the client before proceeding.

3.2.5 Local temporary reference station GNSS

Local temporary reference station is controlled according to SIS TS 21143: 2009 7.3.2.3 before use in the contract.

Definition of temporary reference station is that it is intended to be used for short periods, eg the disruption of Network RTK services.

3.2.6 Network RTK services

Network RTK service is controlled according to SIS TS 21143: 2009 7.3.2.3 before use in the contract.

3.3 digital models

3.3.1 Mark Model


Existing ground example described in chapter 1.2.1 and chapter 3 of the measurement information package 2Z140003.

3.4 map Materials


Map material for the project can be found in Chapter 1.2.2 of measurement technical basis 2Z140003.

Note that maps the design does not keep adequate accuracy for detailed design but can be used only for orientation and visualization.

The client does not respond to provided map data is updated completely. Necessary additions to be performed by the contractor.

3.5 Photogrammetric materials

3.5.1 Orthoimagery

Orthoimagery found in Section 1.2.3 of the measurement technical basis, 2Z140003.

3.5.2 aerial

Provided no.

3.6 laser scanning


Provided no.

4 Agreements and contracts


The client holds agreements with other government agencies and agreements with external organizations for access to products and
services in order to provide the basis for the production or the exercise of authority in accordance with the client commitments.

7 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

Where necessary, the base is contained in an agreement or agreements (LMV SGU Municipality) that will capture made by call-offs.
Blanket and supply of material should be done by the client's participation.

Documents which copyright is claimed should always be named by the author / owner together with the registration number of
the agreement governing the usufruct.

Name of the author / photographer / editor and responsible organization and execution of the derived result the products are always specified
in the product, including the date of completion.

The client holds agreements with certain property owners regarding the selection of points of network plan for construction works. Contact
with these property owners regarding access points is done by the client.

PROJECTION
The term planning refers to the planning carried out by the contractor procured before and during construction.

5 Core network
Provided stomnätspunkter listed under 3.2, which of these should be checked listed under Chapter 2.4

It is the responsibility of the contractor to self-establish temporary work locations within the work area adequately in order to continue the
necessary work if provided points blocked or destroyed. The purchaser shall, upon request, access to the coordinates of these points.

For the establishment of new networks and new items may only be provided by control points used as starting points.

5.1 Connection network plan


Not included in the contract.

5.2 A switching network in height.

Not included in the contract.

5.3 Bruksnät plan


See section 10.1 for information on bruksnät plan. Note that bruksnät the plan be drawn up before the start of construction.

5.4 Bruksnät in height


See section 10.2 for information on bruksnät in height.

5.5 Other networks

Generally, the contractor if needed to complement existing networks to the extent necessary to carry out the necessary work.

The construction works have networks in plan drawn up by the client. It is the responsibility of the contractor to immediately notify the customer
if problems arise with the provided online. When certain points at certain times may be directed against neighboring contracts can have full
access to the network can not be guaranteed during the entire construction period. It is the responsibility of the contractor to supplement the
grid with points for their own needs survey and stake.

8 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

When certain points in the network of the plan for construction works within the contractor's work is a risk that they will be destroyed due to the
construction of the new facility. It is therefore important that the entrepreneur at an early stage, a suggestion immediately after clearing,
condenses the supplied network in such a way that the points that will later disappear are replaced with new, representative points.

Upon clearing of trees and shrubs, or at the unveiling of the surface of the work area, it is important that the contractor takes into account the points in the
network of the plan for construction works and performs the clearing work in such a way that the points in the network is not damaged.

Grids plan for operating and setting measurement shall be drawn up according to SIS-TS 21143: 2009 chapter 6.1.4. Measurement
Program will be prepared and presented at the review meeting with the client's measurement controller before selection and
measurement.

Nets at the height of the movement and settlement measurement shall be drawn up according to SIS-TS 21143: 2009 chapter 6.2.3.3.
Measurement Program will be prepared and presented at the review meeting with the client's measurement controller before selection and
measurement.

6 Data Collection and Models

6.1 aIR-PHOTOGRAPHY

Not included in the contract.

6.2 laser scanning

6.2.1 Airborne laser scanning

Not included in the contract.

6.2.2 Car-borne laser scanning

If the scan is performed, the results provided to the client. The contractor must verify that the performed scanning fulfills the tolerance
requirements for the application it is used for.

6.2.3 Terrestrial laser scanning

If the scan is performed, the results provided to the client. The contractor must verify that the performed scanning fulfills the tolerance
requirements for the application it is used for.

6.3 Measurement work

6.3.1 Survey
The aforementioned references below refer to HMK Building & construction BA3, Annex C and D inputs should be performed according to tolerance
indications in column construction document in Annex D to HMK Building & construction BA3.

The object's connections to existing roads, maps completions and completion of photogrammetric processing should be measured in
the extent of establishing construction document requires. The measurements will be carried out as follows:

• Paved road should the plan be measured in accordance with 4.1 - 4:10.

• Connecting gravel roads to object to the level measured in accordance with 4.1, 4.3, 4.4, 4.6 - 4:10.
• Tolerances in the height of the measurement should be under 4:11 to 4:13
• Connecting roads to objects located in the straight line or curve to be measured into the plane, so that raklinjens direction
respectively. curve radius can be ensured / calculated.
• Boundary points within respectively. in vägområdets proximity should be inventoried and measured up. Surveying the plan should be carried out with
the tolerance of 20 mm, as defined in Annex C.

9 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

• Measured boundary points are the special documentation listed regarding designation, marking, verification and coordinate
tasks. Surveyed boundary markers will be verified against the actual property map.

• Existing building to be moved to be measured in accordance with 1.1 -1.7 and 2.1 - 2.21, 2.3 and 3.1 - 3.3. Entries must be
documented and reported in accordance with special instructions.
• Existing leads and lead measured in details under 8.1 -8.10.
• Fences and walls within or adjacent to the road area is measured in accordance with 5.1 - 5.8. Tolerance for measurement should be
under 4.6.
• Trees with special natural value, in or near the road area, measured and indicated as 6.1 - 6.2.
• Ground facilities within or near the road area is measured in accordance with 13.1.
• Measure the object crossing the track facility shall be carried out according to specific instructions from the track property and
under specific restrictions.
• Ägoslagsgränser and areas of special natural values ​should be defined and measured in accordance with
14.1 - 14.2.
• Trenches crossing items and trenches to be used for the removal of water should be loaded in tolerance plane 50 mm and height
30 mm of 4.10. The measurements must be performed to determine the dikens bottom slope can be.

• Surfaces which require supplementing measured, for example in dense forest etc.

Survey of geotechnical investigations


The measurements shall be performed according HMK Building & Construction BA 2 Chapter 5.1.

Measurement of concrete tunnel / concrete trough


Measurement of concrete tunnel and concrete trough will be so characteristic surfaces and lines is described. Careful sake requirements shall
follow HMK Building & construction BA3, Annex D, surveying the bridge. Entries must be performed in accordance with tolerance indications for
construction documents.

Survey of sewage plants


The contractor should call off measurement to be performed by cable owners, see Administrative regulations AFD.17.

The contractor will perform the surveying of all VA facilities in addition to the owner's own management input, to the extent that
related documents can be established.

The piping and associated connections and devices to be measured in accordance Property Specific Technical Description, H. sewage network

Survey of groundwater pipes


Measurement of water due to be performed with a tolerance of ± 0.01 m high and 0.10 ml ± plane. Height must be reported for the tube top and
the ground surface level, the coordinates will be communicated to the client.

6.3.2 Measurement of movement and settlement

Reporting of measurement programs for the execution of the motion and composition measurements must be performed according to SIS-TS 21143:
2009 chapter 7.4.4.

6.4 Mark Model with underlying models


Land Model to be completed to sufficient accuracy and that the construction document can be established. Mark model must in its entirety be
ytbildad and classified according to SIS TS 21144: 2007 Table 3. The underlying models referred to models drawn up by the contractor in
addition to land the model, such as soils and other existing soil conditions.

Mark Model with underlying models should be described as IT tutorial "E4FS 2012: 0107Cad and drawings", chapter 3.7.1. Deviations
from the complete model to be specified and approved by the client.

10 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

Mark Model shall also be drawn up of complete plant. The same requirements apply as for the land model drawn up for the construction
documents and as described above.

Accounting for known deficiencies and missing information


Known defects and omissions in the ground model should be documented. Documentation should include the type of failure / missing
information and for which areas or distances this regard, see also the SIS-TS 21144: 2007 Annex A.

Requirements for accuracy


Mark Model must meet the accuracy classification according to SIS-TS 21144: 2007 Table 7 and 8 according to the designated purposes, so
that construction documents can be established. Underlying models produced by the interpretation and accuracy requirements agreed with the
client.

Model of construction documents to be created by the characteristic break lines separating height differences and lines as SIS TS
21144: 2007 Table 10 object Roads.

Mark Model will be built as an edited triangle model as SIS TS 21144: 2007 chapter 9.3.

Testing of soil model


Land Model to be checked as SIS TS 21145: 2007 with the scope of inspection in accordance with Table 7 and execution in consultation
with the client.

Requirements for building


Mark Model will be built as a 3D triangle models. All surfaces must be ytklassade. Input data to triangle model will consist of coded points
with N, E, H and coded lines.

Coding of soil model


Mark Model should be coded as IT tutorial "E4FS 2012: 0107-Cad and drawings."

quality labels
Mark Model should be labeled with quality content as SIS TS 21144: 2007 Section 9.6.

Delivery format and naming of files


Mark Model name will be supplied in accordance with IT tutorial "E4FS 2012: 0107-Cad and drawings."

6.4.1 Berg Model


Bergöveryta be measured in a sufficient extent and accuracy of construction documents can be established. Assessment of the extent
made by the contractor.

The contractor must, by measuring, verifying if uncovered rock surface is outside the uncertainty model. The customer will be offered the
opportunity attend this rock scaling.

Break lines / border lines


The digital model will indicate the rock surface referred to. Limit Line should be the natural outcrop, framschaktad / uncovered rock
surface, rock surface interpret, etc.

triangulation
Berg Model will be built as an edited triangle model as SIS TS 21144: 2007, 9.3

Departures from complete model


Deviations from the complete model to be specified by the contractor and approved by the client.

Delivery

11 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

Berg Model name will be supplied in accordance with IT tutorial "E4FS 2012: 0107-Cad and drawings."

6.5 plant Model


Plant Model established pursuant to Item Specific technical description XB PROJECT DESCRIPTION / DESIGN BASIS / LAND AND
BUILDING MODELS.

7 Withdrawal
The following applies to release both at the design stage as well as in the construction phase: Withdrawal should be performed according to SIS-TS 21143:
2009 7.5. Measuring method of withdrawal will be selected and the work to be carried out so that the tolerances according to SIS-TS 21143: 2009 7.1.2
achieved. Quality assurance of the releases to be performed according to SIS-TS 21143: 2009 8.2.

Exposure to road, planes, etc.


Exposure to road construction including side areas shall be based on the proposed tolerances for dimensional measurement and position statements in
plan and elevation according HMK Building & Construction, BA4, 7.2, Figures 9 and 10 or tolerances reported in the construction documents.

Withdrawal of tunnel construction road


Withdrawal of tunneling takes place according to SIS TS 21143: 2009 7.5.2. The contractor must put out distance measurement every 10 meters in
the uniform section of the trough and concrete tunnel on both sides and maintain these markings throughout the construction period. Type of
selection is determined in consultation with the client.

Reporting Performed release and marking should be included in the measurement technical report entitled Technical PM
Measurement Work Chapter 1:11.

8 Map-making and orthophotos

8.1 Maps
Delivered planning maps must be kept up to date by the contractor. Project Map will be made as follows:

• Content, code, and mannerisms management should be carried out according to IT tutorial "E4FS 2012: 0107-Cad and drawings." Map should
be designed in 2D.
• Items will be reported as closed polygons where possible.
• The map mannerisms be adapted for plotting a scale of 1: 1000.
• Kartas content with complete stock content should be quality marked the sourcing, timeliness and accuracy.

8.2 Orthoimagery
Not included in the contract.

9 Documentation and delivery


Accounting for the contract's execution will be compiled into a document called a technical measurement reporting. Reporting from the design
stage to the construction stage will be delivered to the customer later this subsection performed / completed. The format of this report should
be planned for the execution of the start.

The presentation will take place digitally, unless otherwise specified in the contract documents. The following information shall, to the extent that it affects
the contract, included in the measurement technical account. All headlines below should be included regardless of whether the work was performed or
not. If the work is not done, this is marked by "have not been conducted" under each heading.

12 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

Heading / Section Content / Subheading Performed (X) Remark

Completed construction The contract scope Regulatory and X The section should provide a general
references Surface Materials description of the work.

Technical basic facts


This can usefully be referred to the
established technical memo input torque.
- reference
- Timing of

Staff
- Responsible person including competence requirements

Implementation
- Core network

- aIR-PHOTOGRAPHY

- laser scanning
- Maps
- Orthoimagery

- Sättning- and motion measurement

- Mark Model with underlying models


- plant Model
- entries
- Withdrawal

Equipment Software Delivery


Delivery Format Arisen deviations
on request

Technical PM Organization, planning and X


implementation, practice and
experience.

document Reference Deviations from the regulations must be X


reported and justified.

Technical PM Core Full report for the core network in plan X 5 Core network

network and elevation. Overview Maps


Coordinate List incl Marker Item
Descriptions controls in existing core
network. Planning and reconnaissance
Nymätning of damaged or lost points
Ethernet cards, 1: 2000, alternatively 1:
1000

Net adjustment and other calculations,


measurements and reports equipment
and controls Technical Specifications
Measuring the instrument and signal
heights Plan Maps backbone

Technical PM Laser Technical memo describes the planning, X 6.2 Laser scanning
scanning execution, including systems / equipment,
software, control, performance and delivery is
established.

Technical PM Technical PM describing the measurement X 6.3 Measuring 7


surveying and release performed established, incl Discontinuation

13 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

scope, methodology, input, testing and


delivery. This memo shall include,
executed control input measurements of
individual structures, building components,
structures and components and
background documentation, data, scale
and measurement data handling.

Technically PM Scope Surface Materials Technical X 6.3.2 Measurement of movement and


settlement
composition and motion basic facts Measurement Programs
measurement Equipment Software Personal
Delivery Measurements shall be
compiled objektsvis and contain all
results. In each item should be
included statement, principles,
methodology, accuracy and compiled
the results.

Technical PM Technical memo describes version including X 8.1 Maps


maps system / equipment, documentation,
software, control, performance and delivery is
established.

Mark Model and underlying Regulatory and design assumptions X 6.4 Model Mark with underlying
models Descriptions Software Data models
collection method Surface Quality
labels Variations (known) Personal
Delivery Reviews

Updated land model for the construction


phase
Updated rock model for the construction
phase

Transformations and fitting - The files that have been X


transformed

- What transformation refers to its


purpose

- Control points and the resulting


residual error in the fit

- The transformation parameters and


the transformation method

- Controls in the fitting, respectively.


transformation,

- If the so-called restfelsinterpolation be performed


respectively. residual error, and

14 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

interpolationens embodiment
described

- For transformation parameters


which region comes na

Monitoring and Verification The basis of the X


instruments of
self-regulation of
products

Road geometry and Road geometry and the phenomena under. X 11.5 Delivery of road geometry to NVDB -
phenomena to NVDB National road database
11.6. Delivery of events to NVDB -
National road database

CONSTRUCTION PHASE and guarantee 10

Core network

10.1 Core network plan

Bruksnät the plan will be established before the start of construction and be built fitted adjacent to the road area. Use the Net to be resistant
to be used for measurement during the warranty period. Use network will cover the entire work area.

Establishment, Selection, återfinning and item description should be performed according to SIS-TS 21143: 2009 given in Chapter 6. Paragraph
numbering should be according to the customer's instructions.

Bruksnät in plan shall be established as SIS OR 21143: 2009 Section 6.1 relating requirements indicated under Weight Composition and
Error limits, Measurement of Table 10, measurement, accounting from establishment of bruksnät of Chapter 6.1.2.

Reporting of planned bruksnät the plan should be carried out at the review meeting with customer's metering manager as SIS TS 21143:
2009 chapter 6.1.2, specified under Accounting. A review should be carried out before the selection and measurement.

10.1.1 Bruksnät in the plane of concrete tunnel and trough

With bruksnät referred to in this chapter is finally marked and measured core network in the plane of concrete tunnel and in the pan, which
will be handed over to the client. For all the main tunnel contracts in the Stockholm Bypass Project sets the client common requirements
for establishing bruksnät.

Bruksnät in trays and tunnel should be performed according to SIS-TS 21143: 2009 6.1 and food class G1 according to Table 9, with the following deviations:

• Introductory text SIS TS 21143: 2009 Chapter 6 under the heading "Selection, återfinning, item numbers and item
description" starts

• Table 1 and 2 of SIS OR 21143: 2009 4.1.1 is replaced with the following instrument conditions: In the measurement of core
network in plan tunneling shall total station with the accuracy of the following specification or better used:

- Accuracy in the horizontal and vertical angles: 0.15 mgon


- Accuracy in gauge length: 1 mm + 1 ppm to prism

15 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

• The following text in the SIS TS 21143: 2009 6.1 Table 9 deleted: Number helsatser ≥3 and replaced with: Number of approved helsatser ≥4

Measurement Program established pursuant to the SIS TS 21143: 2009 6.1.3.1 and approved by the client before stomnätsarbete begins.

The contractor will be in the implementation description to describe the connection between building the network and use the network. The same measurements and
discrepancies between building the network and use the network to be reported.

Use network in the tunnel will be carried out as follows nätgeometri:

• Use points shall be marked in pairs, ie a point in each tunnel wall.

• The distance between point pairs should be a maximum of 100 meters, however, at least two pairs of points marked.

• Homogeneous nätgeometri, ie small distance deviations between point pairs should be sought.

Selection of the operating points of the tunnel and troughs should be performed with Unikonsol 400 mm. Unikonsolen be installed at a height of 1.30 m
above the finished road. ID badge must be mounted at each stompunkt in consultation with the client. Paragraph numbering should be carried out
according to the customer's instructions.

Use network in the tunnel will connect to the core network for tunneling in the following order of priority:

1st Provided bruksnät plan

2nd Adjacent Entreprenad bruksnät in tunnel

3rd Adjacent Entreprenad byggnät for tunneling

Reporting should be carried out according to SIS-TS 21143: 2009 6.1.2. If possible, the deviation from the adjacent Entreprenad's core
network for tunneling reported.

Data from stomnätsmätningarna be delivered to the client in a format that allows independent calculation as follows:

• Measuring instrument exchange format containing all measurements.

• Disclosure containing any renumbering, underlined measurements, identified serious errors and other inaccuracies.

• Excel file containing correct item numbers and reduced data rate, corrected for temperature, pressure and the earth curvature.
A model for Excelfilens design will be submitted by the client.

• Station Protocol containing: station number, operator, the serial number, the date, the instrument height, pressure,
temperature, paragraph numbers backward items, prism constant and signal heights.

16 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

10.2 Core network in height

The contractor shall establish networks in height. These shall be established as follows:

• Nets in height for the touchdown measurement according to SIS TS 21143: 2009, Section 6.2.3.3.

• Nets at the height of the tunnel under the SIS TS 21143: 2009, Section 6.2.3.1.

10.2.1 Bruksnät in height in the concrete tunnel trough and

With bruksnät referred to in this section is final and measured the backbone network at the height of the concrete tunnel and trough, which will
be handed over to the client. For all the main tunnel contracts on the Stockholm Bypass Project sets the client common requirements for
establishing bruksnät in the tunnel.

Measurement Program for establishing bruksnät the height of the tunnel to be established according to SIS-TS 21143: 2009
6.2.3.1. Measuring program must be approved by the client before proceeding.

The initial text of the SIS TS 21143: 2009 6.2 applies with the exception of Section Simulation. In Table 16, the food class J2.

Use the Net to be performed according to SIS-TS 21143: 2009 6.2.3.1.2 and the same measurement as 6.2.3.1.2.2.

The contractor will be in the implementation description to describe the connection between byggnät and bruksnät. The same measurements
and discrepancies between byggnät and bruksnät be reported.

Use network in the tunnel should be measured adjacent to the core network at the height of the tunnel construction in the following order of priority:

1st Provided connection network in height of the tunnel

2nd Adjacent Entreprenad bruksnät in height in the tunnel

3rd The contract byggnät in height for tunneling

4th Adjacent Entreprenad byggnät in height for tunneling

Marker selected in consultation with the client. ID badge must be mounted at each stompunkt in consultation with the client. Paragraph numbering
should be carried out according to the customer's instructions.

Data from stomnätsmätningarna will is delivered to the client in a format that allows independent calculation as follows:

• Measuring instrument exchange format containing all measurements

• Disclosure containing any renumbering, underlined measurements, identified serious errors and other inaccuracies

• Excel file containing correct item numbers and data. A model for Excelfilens design will be submitted by the client

• Station Protocol containing: station number, the operator, the instrument's serial number, date and item number for back
and forward items.

17 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

10.2.2 Brofixpunkter
Not included in the contract.

10.2.3 Brodubbar

Not included in the contract.

11 Measurement and documentation

11.1 General requirements of the measurement

All data from entries and releases must be documented.

All measurement data, calculations and reports will be stored for at least ten years of the construction phase is completed.

Requirements for the management and calculation of tolerances (release tolerances) as SIS OR 21143: 2009 Chapter 7 and annexes C
and D.

Measuring instruments and associated equipment and measurement methods should be adapted to the objects of accuracy required.

11.2 Control measurement of installations and structures


Requirements for kontrollmätningars accuracy as SIS TS 21143: 2009, Section 7.1.1.1.

The contractor shall perform said check measurements of all of the reported structures, individual building components, structures or
components.

Said check measurements should be documented and the accuracy of the measurement will be reported as standard error unless otherwise specified.

Way
All roads control measured according Object Specific Technical Description, C3. TEMPORARY CONSTRUCTION AND DEVICE
FOR TRAFFIC / road structure and subgrade, DB1. Roadbed and subgrade, DB1. Roadbed and subgrade // GROUP 1, DB2.
Roadbed and subgrade // Groups 2.

concrete tunnel
Concrete Tunnel entrance ramp to E4 (249) and the exit ramp from the E4 (24B).

Other structures or constructions


Exhaust station at exit ramp from E4 (271), other structures at the exit ramp from E4 (24A) and other structures at the access ramp to E4
(24C).

11.3 Survey railway rail


Not included in the contract.

11.4 Enforcement of property boundaries


The contractor must take stock of the existing border points in the road area at risk of collapsing. After the inventory, the client shall be
informed. The client pays nymarkering of border points and the selection made by the responsible municipality or authority.

11.5 Delivery of the road geometry to NVDB - National road database


Road geometry of the object's depth vägdelar be delivered to the client. Delivery will take place according to the object-specific technical
description x Documentation.

18 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

11.6 Delivery of events to NVDB - National road database


Phenomena (such as signs, posts, wells, drums) will be delivered to the client. Delivery will take place according to the object-specific
technical description x Documentation.

12 Touchdown and movement measurements


When the touchdown and movement measurements needed to verify that the assets and the contractor promised product and function
requirements are fulfilled, such measurements appear from control with the associated control plans established during the design of Object
Specific technical description XC WORKING DOCUMENT / PRODUCTION.

For typesetting controls in the contract, the touchdown and movement measurements performed. Verification is carried out from the network described in
paragraph 5.5, and should follow the SIS TS 21143: 2009 in the following chapters:

• 6.1.4 Grids plane of movement and planting measurement


• 6.2.3.3 web in height for movement and compression set measurement

• 7.1.1.2 Accuracy movement and planting measurement


• 7.4.4 Measurement Program for operating and setting measurement
• 7.4.6 said check Measurements of deformations of structures

Monitoring should include the location of the measurement points, schedule, accuracy requirements, and reporting list prepared for
typesetting and motion measurement and deformation. Results for each measurement point must be reported in tables and graphically in
the chart. Measurements shall be presented in digital form.

13 Measurements under warranty


Measurements shall be made to meet different measurement requirements needed in the context of inspections, audits and verifications performed
during the object's warranty. The contractor shall establish a measurement program that describes measurements during the warranty period. The
measurement program must be approved by the client before the guarantee period begins.

13.1 Control measurements of core network


The following core network should be checked during the warranty period:

• Bruksnät in plan and elevation.

Control measurements should primarily be carried out when the ground is not tjälad. Documentation from the control measurement
should be reported to the client Measurement manager.

13.2 Control measurement of bridge


Not included in the contract.

13.3 Other measurements under warranty

13.3.1 Control measurement of concrete tunnel

Measurement works should be coordinated with the control measurement of backbone in the plane and height specified in 13.1.

13.3.2 Control measurement of trough

Measurement works should be coordinated with the control measurement of backbone in the plane and height specified in 13.1.

19 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

14 Measurement Technical account for construction phase and warranty

14.1 Accounting from the construction stage


The content of the measurement technical report from the construction stage, see Chapter 9.

14.2 Recognition during and after the warranty period

14.2.1 Reports during the warranty period

The contractor must disclose to the client all the checks and measurements performed during the warranty period.

14.2.2 Reporting after the warranty period


The contractor must disclose to the client all the checks and measurements performed during the warranty period.

15 Document References and concepts

15.1 Document Reference


In this description is direct or indirect reference to the following documents:

SIS TS 21143: 2009 Geodetic measurement, calculation and reporting at the elongated object SIS TS 21144: 2007
Specification for the production of digital terrain models SIS TS 21145: 2007 Statistical testing terrain model HMK Building &
Construction, Designing
HMK BA3
HMK Building & Construction, Planning HMK-BA2
HMK Building & Construction, Construction HMK BA4
Measurement Technical file Matu
IT Tutorial

The HMK recognized award criteria will be for the construction construed as skakrav.

15.2 Concepts

Concepts which occur in the SIS TS document recognized as follows: SIS TS 21143: 2009
Appendix A
SIS TS 21144: 2007 Chapter 3
SIS TS 21145: 2007 Chapter 3

Concept Explanation

geoid The geoid is used to define the shape of the earth. A certain geoid model corrects for the
uplift and the heights above the ellipsoid and altitudes for a certain specified height
system. The correction is done by restfelsinterpolering. Examples of the geoid is
SWEN05_RH2000 (SWEN 05LR)

Mark Model Model (digital) in 3D that describes the height of the top surface of the ground including
"outcrop" and the bottom surface of lakes and rivers. Model can be prepared for example
from terrestrial field measurement, laser scanning, photogrammetric measurement or other
substrate materials of SIS OR 21144: 2007 Table 6.

20 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)
E4 Stockholm Bypass
FSE215 concrete tunnels Skärholmen Object Specific
Technical Description Measure

Orthoimagery With orthophoto referred photographic image converted from the central projection to
the orthogonal scale real projection. Orthophotos can refer rectified single image or
multiple images together into a so-called mosaic.

Underlying models to Underlying models described as model associated ground model. These models
land model describe the height of the top surface of the respective surface layer. Examples of
underlying models can be fixed soil, rock and groundwater. The models are developed
through the interpretation of geotechnical surveys or other substrate materials.

Ytbildad land model Mark Model where the model can also account for soil type and its limitations.

21 (21)
FSE215 / \\ TRV8126 \ PWDCSforPDF \ 19641 \ 5062_63 \ 2Z140002-FSE215.docx / / 2016-02-01 / / (Printed 2016-01-08 08:39)