VALORIZACION 06 AMPLIACION
ITEM DESCRIPCION UND CANT COSTO UNIT COSTO TOTAL ANTERIOR ACTUAL ACUMULADO SALDO
% MONTO % METRADO MONTO % MONTO % MONTO
AMPLIACION
01 REQUISITOS GENERALES 33,341.99
01.01 OFICINA RESIDENTE Y SUPERVISION m2 12.00 172.07 2,064.84 100.00% 2,064.84 0.00% - S/ - 100.00% 2,064.84 0.00% -
01.02 ALMACEN DE OBRA m2 9.00 229.74 2,067.66 0.00% - 50.00% 4.50 S/ 1,033.83 50.00% 1,033.83 50.00% 1,033.83
01.03 COMEDOR Y VESTIDOR m2 12.00 97.35 1,168.20 0.00% - 50.00% 6.00 S/ 584.10 50.00% 584.10 50.00% 584.10
01.04 CERCO PROVISIONAL m 19.50 166.22 3,241.29 100.00% 3,241.29 0.00% - S/ - 100.00% 3,241.29 0.00% -
01.05 GUARDIANIA DURANTE LA OBRA mes 3.00 2,000.00 6,000.00 100.00% 6,000.00 0.00% - S/ - 100.00% 6,000.00 0.00% -
01.06 TRANSPORTE DE MATERIALES unid 1.00 10,000.00 10,000.00 100.00% 10,000.00 0.00% - S/ - 100.00% 10,000.00 0.00% -
01.07 TRANSPORTE DE EQUIPO Y HERRAMIENTAS glb 1.00 8,000.00 8,000.00 100.00% 8,000.00 0.00% - S/ - 100.00% 8,000.00 0.00% -
01.08 LIMPIEZA FINAL DE OBRA unid 1.00 800.00 800.00 0.00% - 20.00% 0.20 S/ 160.00 20.00% 160.00 80.00% 640.00
SUBTOTAL DE REQUISITOS GENERALES 33,341.99 87.90% 29,306.13 5.33% S/ 1,777.93 93.23% 31,084.06 6.77% 2,257.93
02 NIVELACION Y REPLANTEO 6,345.84
02.01 TRAZO Y REPLANTEO m2 206.79 2.90 599.69 100.00% 599.69 - S/ - 100.00% 599.69 0.00% 0.00
02.02 TRAZO Y REPLANTEO DURANTE LA OBRA mes 1.00 850.00 850.00 100.00% 850.00 - S/ - 100.00% 850.00 0.00% -
02.03 EXCAVACION A MANO EN TERRENO NORMAL m3 48.69 41.53 2,021.93 60.00% 1,213.16 40.00% 19.47 S/ 808.77 100.00% 2,021.93 0.00% -
02.04 RELLENO CON EQUIPO MATERIAL DE PRESTAMO m3 5.69 66.59 378.90 80.00% 303.12 20.00% 1.14 S/ 75.78 100.00% 378.90 0.00% -
02.05 RELLENO MANUAL MATERIAL PROPIO m3 28.17 23.20 653.45 0.00% - 100.00% 28.17 S/ 653.45 100.00% 653.45 0.00% -
02.06 ACARREO MATERIAL DE EXCAVACIONES m3 30.78 12.45 383.21 80.00% 306.57 20.00% 6.16 S/ 76.64 100.00% 383.21 0.00% -
02.07 ELIMINACION DE MATERIAL DE EXCEDENTE m3 30.78 47.39 1,458.66 80.00% 1,166.93 20.00% 6.16 S/ 291.73 100.00% 1,458.66 0.00% -
SUBTOTAL DE NIVELACIÓN Y REPLANTEO 6,345.84 69.96% 4,439.47 30.04% S/ 1,906.37 100.00% 6,345.84 0.00% 0.00
03 HORMIGON 28,546.50
03.01 ZAPATAS 4,739.08
03.01.01 SOLADO, CONCRETO h=2" M2 14.64 23.78 348.14 100.00% 348.14 - S/ - 100.00% 348.14 0.00% -0.00
03.01.02 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 5.86 395.00 2,314.70 100.00% 2,314.70 - S/ - 100.00% 2,314.70 0.00% -
03.01.03 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 21.12 38.68 816.92 100.00% 816.92 - S/ - 100.00% 816.92 0.00% 0.00
03.01.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 297.01 4.24 1,259.32 100.00% 1,259.32 - S/ - 100.00% 1,259.32 0.00% 0.00
03.02 VIGA DE CIMENTACION 5,678.68 - S/ -
03.02.01 CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 4.13 395.00 1,631.35 100.00% 1,631.35 - S/ - 100.00% 1,631.35 0.00% -
03.02.02 ENCOFRADO VIGA CIMENTACION m2 32.52 38.68 1,257.87 100.00% 1,257.87 - S/ - 100.00% 1,257.87 0.00% 0.00
03.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 657.89 4.24 2,789.45 100.00% 2,789.45 - S/ - 100.00% 2,789.45 0.00% 0.00
03.03 LOSA DE CIMENTACION 18,128.74 - S/ -
03.03.01 CONCRETO EN LOSA CIMENTACION f'c=210 kg/cm2 m3 33.40 395.00 13,193.79 100.00% 13,193.79 - S/ - 100.00% 13,193.79 0.00% -
03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS M2 13.96 39.47 551.00 100.00% 551.00 - S/ - 100.00% 551.00 0.00% 0.00
03.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 1,033.95 4.24 4,383.95 100.00% 4,383.95 - S/ - 100.00% 4,383.95 0.00% -0.00
- S/ -
SUBTOTAL DE OBRAS DE CONCRETO 28,546.50 100.00% 28,546.49 0.00% S/ - 100.00% 28,546.49 0.00% 0.01
04 MUROS Y TABIQUES 32,321.61
04.01 TABIQUES DE DRYWALL 32,321.61
04.01.01 TABIQUES DE SUPERBOARD 8mm m2 182.83 92.24 16,864.24 100.00% 16,864.24 0.00% - S/ - 100.00% 16,864.24 0.00% -
04.01.02 TABIQUERIA DRYWALL CON PARANTES e=0.90 mm m2 127.61 76.69 9,786.41 100.00% 9,786.41 0.00% - S/ - 100.00% 9,786.41 0.00% -
04.01.03 COLUMNAS DE DRYWALL SOBRE TUBO METALICO und 12.00 160.00 1,920.00 100.00% 1,920.00 0.00% - S/ - 100.00% 1,920.00 0.00% -
04.01.04 REFUERZOS DE MADERA EN VENTANAS Y PUERTAS glb 1.00 1,200.00 1,200.00 100.00% 1,200.00 0.00% - S/ - 100.00% 1,200.00 0.00% -
04.01.05 SELLADO DE JUNTAS DE DILATACION ml 141.72 18.00 2,550.96 100.00% 2,550.96 0.00% - S/ - 100.00% 2,550.96 0.00% -
SUBTOTAL DE MUROS Y TABIQUES 32,321.61 100.00% 32,321.61 0.00% S/ - 100.00% 32,321.61 0.00% 0.00
1/14
C VERA S.R.L.
RUC. 20511630879
LOS PINOS Mz. A1, Lote 9
SAN JUAN DEMIRAFLORES - LIMA
VALORIZACION 06 AMPLIACION
ITEM DESCRIPCION UND CANT COSTO UNIT COSTO TOTAL ANTERIOR ACTUAL ACUMULADO SALDO
% MONTO % METRADO MONTO % MONTO % MONTO
05 ESTRUCTURA METALICA 60,830.77
05.01 ESTRUCTURA METALICA 60,830.77
05.01.01 COLUMNAS 5,999.45
05.01.01.01 COLUMNA METALICA P-1 (TUBO CUADRADO 100X100X4mm) ml 24.60 115.43 2,839.58 100.00% 2,839.58 - S/ - 100.00% 2,839.58 0.00% -0.00
05.01.01.02 COLUMNA METALICA P-2 (TUBO RECTANGULAR 100X150X4.5mm) ml 24.60 128.45 3,159.87 100.00% 3,159.87 - S/ - 100.00% 3,159.87 0.00% -
05.01.02 VIGAS 54,831.32
05.01.02.01 VIGA DE AMARRE PERIMETRAL (TUBO CUADRADO DE 100X100X2mml 50.00 70.56 3,528.00 100.00% 3,528.00 - S/ - 100.00% 3,528.00 0.00% -
05.01.02.02 VIGUETAS VC1 (TUBO RECTANGULAR 50X100X2mm) ml 265.00 63.80 16,907.00 100.00% 16,907.00 - S/ - 100.00% 16,907.00 0.00% -
05.01.02.03 VIGA METALICA (TUBO RECTANGULAR DE 150X100X3mm) ml 80.00 113.43 9,074.40 100.00% 9,074.40 - S/ - 100.00% 9,074.40 0.00% -
05.01.02.04 APOYO PARA P1 und 6.00 285.00 1,710.00 100.00% 1,710.00 - S/ - 100.00% 1,710.00 0.00% -
05.01.02.05 APOYO PARA P2 und 6.00 385.00 2,310.00 100.00% 2,310.00 - S/ - 100.00% 2,310.00 0.00% -
05.01.02.06 ARENADO DE ESTRUCTURAS METALICAS m2 255.92 16.00 4,094.72 100.00% 4,094.72 - S/ - 100.00% 4,094.72 0.00% -
05.01.02.07 SOPORTE VENTILADORES und 7.00 150.00 1,050.00 100.00% 1,050.00 - S/ - 100.00% 1,050.00 0.00% -
05.01.02.08 MONTAJE ESTRUCTURA glb 1.00 3,000.00 3,000.00 100.00% 3,000.00 - S/ - 100.00% 3,000.00 0.00% -
05.01.02.09 PINTURA EPOXICA EN ESTRUCTURA METALICA m2 255.92 35.00 8,957.20 100.00% 8,957.20 - S/ - 100.00% 8,957.20 0.00% -
05.01.02.10 REJA METALICA CON BARRAS LISAS (VENTANAS) und 12.00 350.00 4,200.00 100.00% 4,200.00 - S/ - 100.00% 4,200.00 0.00% -
SUBTOTAL DE ESTRUCTURAS METÁLICAS 60,830.77 100.00% 60,830.77 0.00% S/ - 100.00% 60,830.77 0.00% 0.00
06 TECHOS Y AISLAMIENTOS 40,415.58
06.01 COBERTURA TEJA ANDINA m2 260.00 48.06 12,495.60 100.00% 12,495.60 - S/ - 100.00% 12,495.60 0.00% -
06.02 CUMBRERA TEJA ANDINA ml 30.83 21.90 675.18 100.00% 675.18 - S/ - 100.00% 675.18 0.00% -
06.03 PLANCHA OSB DE 18mm m2 260.00 46.23 12,019.80 100.00% 12,019.80 0.00% - S/ - 100.00% 12,019.80 0.00% -
06.04 CANALETAS PARA AGUAS DE LLUVIA PVC 4" ml 80.00 48.30 3,864.00 0.00% - - S/ - 0.00% - 100.00% 3,864.00
06.05 CERCO PRONTO ( TUBO CUADRADO DE 60X60mm, MALLA CERCO) ml 30.70 220.00 6,754.00 0.00% - - S/ - 0.00% - 100.00% 6,754.00
06.06 PUERTA SIMPLE EN CERCO PRONTO und 1.00 1,800.00 1,800.00 0.00% - - S/ - 0.00% - 100.00% 1,800.00
06.07 GUARDASILLA DE MADERA ml 112.28 25.00 2,807.00 0.00% - - S/ - 0.00% - 100.00% 2,807.00
SUBTOTAL DE TECHOS Y AISLAMIENTOS 40,415.58 62.33% 25,190.58 0.00% S/ - 62.33% 25,190.58 37.67% 15,225.00
07 PUERTAS Y VENTANAS 20,865.00
07.01 MAMPARAS 4,400.00
07.01.01 MAMPARA 01 und 1.00 4,400.00 4,400.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 4,400.00
07.02 VENTANAS 7,200.00
07.02.01 VENTANA V-01 und 12.00 600.00 7,200.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 7,200.00
07.03 PUERTAS 9,265.00
07.03.01 PUERTA P-01 und 5.00 1,200.00 6,000.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 6,000.00
07.03.02 PUERTA P-02 und 2.00 1,500.00 3,000.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 3,000.00
07.03.03 PICAPORTE DE 8" und 2.00 80.00 160.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 160.00
07.03.04 TOPES EN PISO PARA PUERTA und 7.00 15.00 105.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 105.00
SUBTOTAL DE PUERTAS Y VENTANAS 20,865.00 0.00% 0.00 0.00% S/ - 0.00% 0.00 100.00% 20,865.00
08 ACABADOS 40,293.34
08.01 PISOS 19,387.29
08.01.01 CONTRAPISO m2 218.50 27.90 6,096.21 100.00% 6,096.21 - S/ - 100.00% 6,096.21 0.00% -
08.01.02 PISO CERAMICO m2 133.68 65.00 8,689.20 100.00% 8,689.20 0.00% - S/ - 100.00% 8,689.20 0.00% -
08.01.03 PISO ENCHAPE VEREDA m2 73.54 62.58 4,601.88 0.00% - 0.00% - S/ - 0.00% - 100.00% 4,601.88
08.02 ZOCALOS 3,929.80
08.02.01 ZOCALO CERAMICA SOBRE DRYWALL H= 15 cm mL 112.28 35.00 3,929.80 0.00% - 0.00% - S/ - 0.00% - 100.00% 3,929.80
2/14
C VERA S.R.L.
RUC. 20511630879
LOS PINOS Mz. A1, Lote 9
SAN JUAN DEMIRAFLORES - LIMA
VALORIZACION 06 AMPLIACION
ITEM DESCRIPCION UND CANT COSTO UNIT COSTO TOTAL ANTERIOR ACTUAL ACUMULADO SALDO
% MONTO % METRADO MONTO % MONTO % MONTO
08.03 PINTURAS 9,220.21
08.03.01 PINTURA MUROS INTERIORES DRYWALL m2 562.10 12.50 7,026.25 0.00% - 0.00% - S/ - 0.00% - 100.00% 7,026.25
08.03.02 PINTURA MUROS EXTERIORES DRYWALL m2 182.83 12.00 2,193.96 0.00% - 0.00% - S/ - 0.00% - 100.00% 2,193.96
08.04 FALSO CIELO 6,991.28
08.04.01 FALSO CIELO ACUSTICO m2 133.68 52.30 6,991.28 0.00% - 0.00% - S/ - 0.00% - 100.00% 6,991.28
08.05 ITEMS ESPECIALES 764.77
08.05.01 ROTULO INTERIORES und 7.00 68.15 477.05 0.00% - 0.00% - S/ - 0.00% - 100.00% 477.05
08.05.02 LLAVEROS Y OTROS und 1.00 123.29 123.29 0.00% - 0.00% - S/ - 0.00% - 100.00% 123.29
08.05.03 INSTALACION DE PIZARRAS und 7.00 23.49 164.43 0.00% - 0.00% - S/ - 0.00% - 100.00% 164.43
SUBTOTAL DE ACABADOS 40,293.34 36.69% 14,785.41 0.00% S/ - 36.69% 14,785.41 63.31% 25,507.94
09 INSTALACIONES ELECTRICAS 17,734.13
09.01 ACOMETIDAS ELECTRICAS 9,419.21
09.01.01 ALIM. 3-1x6mm2 NH+1x6mm2 NH - 25mm PVC-P m 35.00 13.32 466.20 0.00% - 80.00% 28.00 S/ 372.96 80.00% 372.96 20.00% 93.24
09.01.02 ALIM. 2-1x2.5mm2 NH-80 - 20mm PVC-P m 95.00 6.16 585.20 0.00% - 80.00% 76.00 S/ 468.16 80.00% 468.16 20.00% 117.04
09.01.03 ALIM. 2-1x4mm2 NH-80 + 1X2.5mm2NH-80 - 20mm PVC-P m 55.00 8.29 455.95 0.00% - 80.00% 44.00 S/ 364.76 80.00% 364.76 20.00% 91.19
09.01.04 TUBERIA DE PVC C-10 1" m 30.00 8.30 249.00 0.00% - 80.00% 24.00 S/ 199.20 80.00% 199.20 20.00% 49.80
09.01.05 TABLERO TD und 1.00 3,312.86 3,312.86 0.00% - 80.00% 0.80 S/ 2,650.29 80.00% 2,650.29 20.00% 662.57
09.01.06 TABLERO TE und 1.00 1,850.00 1,850.00 0.00% - 80.00% 0.80 S/ 1,480.00 80.00% 1,480.00 20.00% 370.00
09.01.07 ESTABILIZADOR 5 KVA und 1.00 2,500.00 2,500.00 0.00% - 80.00% 0.80 S/ 2,000.00 80.00% 2,000.00 20.00% 500.00
09.02 SALIDAS ELECTRICAS 5,135.76
09.02.01 SALIDA PARA CENTRO DE LUZ pto 21.00 77.06 1,618.26 0.00% - 80.00% 16.80 S/ 1,294.61 80.00% 1,294.61 20.00% 323.65
09.02.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE UNIVERSAL + L.T. pto 16.00 105.98 1,695.68 0.00% - 80.00% 12.80 S/ 1,356.54 80.00% 1,356.54 20.00% 339.14
09.02.03 SALIDA PARA TOMACORRIENTE ESTABILIZADA pto 3.00 105.98 317.94 0.00% - 80.00% 2.40 S/ 254.35 80.00% 254.35 20.00% 63.59
09.02.04 SALIDA PARA VENTILADORES pto 7.00 67.96 475.72 0.00% - 80.00% 5.60 S/ 380.58 80.00% 380.58 20.00% 95.14
09.02.05 SALIDA VOZ Y DATA pto 3.00 85.68 257.04 0.00% - 80.00% 2.40 S/ 205.63 80.00% 205.63 20.00% 51.41
09.02.06 SALIDA PARA INTERRUPTOR pto 9.00 85.68 771.12 0.00% - 80.00% 7.20 S/ 616.90 80.00% 616.90 20.00% 154.22
09.03 CAJAS DE PASE 183.60
09.03.01 CAJA DE PASE 100x100x50mm und 4.00 33.41 133.64 0.00% - 80.00% 3.20 S/ 106.91 80.00% 106.91 20.00% 26.73
09.03.02 CAJA DE PASE 200x200x100mm und 1.00 49.96 49.96 0.00% - 80.00% 0.80 S/ 39.97 80.00% 39.97 20.00% 9.99
09.04 COMUNICACIÓN AUDIO Y VIDEO 1,012.28
09.04.01 SALIDA PARA TV und 5.00 127.18 635.90 0.00% - 80.00% 4.00 S/ 508.72 80.00% 508.72 20.00% 127.18
09.04.02 CAJA DE PASE DE 100X100X50mm und 3.00 33.41 100.23 0.00% - 80.00% 2.40 S/ 80.18 80.00% 80.18 20.00% 20.05
09.04.03 ALIM CABLE RG-6 und 35.00 7.89 276.15 0.00% - 80.00% 28.00 S/ 220.92 80.00% 220.92 20.00% 55.23
09.05 ILUMINACION 754.53
09.05.01 COLOCACION ARTEFACTOS DE ILUMINACION INTERIOR und 21.00 35.93 754.53 0.00% - 80.00% 16.80 S/ 603.62 80.00% 603.62 20.00% 150.91
09.06 SISTEMA CONTRA INCENDIO 1,228.75
09.06.01 SALIDA DETECTOR DE HUMO pto 8.00 41.48 331.84 0.00% - 80.00% 6.40 S/ 265.47 80.00% 265.47 20.00% 66.37
09.06.02 OTRAS SALIDAS pto 8.00 47.71 381.68 0.00% - 80.00% 6.40 S/ 305.34 80.00% 305.34 20.00% 76.34
09.06.03 CAJA DE PASE 100x100x50mm und 3.00 33.41 100.23 0.00% - 80.00% 2.40 S/ 80.18 80.00% 80.18 20.00% 20.05
09.06.04 TUBERIA PVC-SAP ELECTRICA DE 25 mm m 50.00 8.30 415.00 0.00% - 80.00% 40.00 S/ 332.00 80.00% 332.00 20.00% 83.00
SUBTOTAL DE INSTALACIONES ELECTRICAS 17,734.13 0.00% 0.00 80.00% S/ 14,187.30 80.00% 14,187.30 20.00% 3,546.83
3/14
C VERA S.R.L.
RUC. 20511630879
LOS PINOS Mz. A1, Lote 9
SAN JUAN DEMIRAFLORES - LIMA
VALORIZACION 06 AMPLIACION
ITEM DESCRIPCION UND CANT COSTO UNIT COSTO TOTAL ANTERIOR ACTUAL ACUMULADO SALDO
% MONTO % METRADO MONTO % MONTO % MONTO
10.01.02 EXTINTOR und 1.00 193.58 193.58 0.00% - 0.00% - S/ - 0.00% - 100.00% 193.58
10.01.03 MARCO PARA LIENZOS und 12.00 127.98 1,535.76 0.00% - 0.00% - S/ - 0.00% - 100.00% 1,535.76
10.01.04 BEBEDERO und 1.00 2,550.00 2,550.00 0.00% - 60.00% 0.60 S/ 1,530.00 60.00% 1,530.00 40.00% 1,020.00
SUBTOTAL DE MOBILIARIO Y EQUIPAMIENTO 7,881.50 0.00% 0.00 19.41% 1,530.00 19.41% 1,530.00 80.59% 6,351.50
COSTO DIRECTO 288,576.26 67.72% 195,420.45 6.72% 19,401.60 74.44% 214,822.06 25.56% 73,754.21
GASTOS GENERALES 11.00% 31,743.39 21,496.25 2,134.18 23,630.43 8,112.96
UTILIDAD 4.00% 11,543.05 7,816.82 776.06 8,592.88 2,950.17
SUBTOTAL 331,862.70 224,733.52 S/ 22,311.84 247,045.37 84,817.34
IMPUESTO IGV 18.00% 59,735.29 40,452.03 S/ 4,016.13 44,468.17 15,267.12
TOTAL PRESUPUESTO 391,597.99 67.72% 265,185.55 6.72% S/ 26,327.98 74.44% 291,513.53 25.56% 100,084.46
4/14
C VERA S.R.L.
RUC. 20511630879
LOS PINOS Mz. A1, Lote 9
SAN JUAN DEMIRAFLORES - LIMA
VALORIZACION 06 AMPLIACION
ITEM DESCRIPCION UND CANT COSTO UNIT COSTO TOTAL ANTERIOR ACTUAL ACUMULADO SALDO
% MONTO % METRADO MONTO % MONTO % MONTO
11 MANTENIMIENTO 15,108.14
11.01 REPARACION DE CERCO PERIMETRICO- SOLO EN ZONAS AFECTADAS
11.01.01 ESTUCADO DE MUROS DEL CERCO CON MEZCLA DE BARRO + AGR m2 60.00 19.60 1,176.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 1,176.00
11.01.02 RECTANGULARES A MODO DE VIGA- CERRAR O TAPIAR ABERTURA m2 40.00 120.00 4,800.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 4,800.00
11.01.03 CERRADO DE ABERTURAS EN VENTANAS MODULO 3 - EXISTENTE glb 1.00 600.00 600.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 600.00
11.01.04 LOGOTIPO + INSTALACION ( EN PIEDRA GRANITO COLOR ESTANDARglb 1.00 1,800.00 1,800.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 1,800.00
11.01.05 PINTADO DE MUROS INTERIORES MODULO 3 m2 220.00 12.00 2,640.00 0.00% - 0.00% - S/ - 0.00% - 100.00% 2,640.00
11.01.06 MADERA ROLLIZO + VIGA SOBRESALIENTE EN ALERO, PUERTA, MO m2 100.00 38.00 3,800.00 40.00% 1,520.00 60.00% 60.00 S/ 2,280.00 100.00% 3,800.00 0.00% -
11.01.07 INMOBILIZAR PUERTA A LOS COSTADOS DE CADA MAMPARA glb 1.00 292.14 292.14 0.00% - 1.00% 0.01 S/ 2.92 1.00% 2.92 99.00% 289.22
5/14
C VERA S.R.L.
RUC. 20511630879
LOS PINOS Mz. A1, Lote 9
SAN JUAN DEMIRAFLORES - LIMA
RESUMEN DE VALORIZACION N° 02
Propietario ASPERSUD
Proyecto CAPILLA CALCA - CUSCO
CONTRATISTA : C&VERA S.R.L.
Fecha 15/032/2019
PRESUPUESTO CONTRACTUAL
A. ANTERIOR A. ACTUAL A. ACUMULADO SALDO
CODIGO DESCRIPCION Presupuesto Base
% MONTO % MONTO % MONTO % MONTO
01.00 AMPLIACION 288,576.26 67.72% 195,420.45 6.72% S/ 19,401.60 74.44% 214,822.06 25.56% 73,754.21
02.00 MANTENIMIENTO 15,108.14 10.06% S/ 1,520.00 15.11% S/ 2,282.92 25.17% S/ 3,802.92 74.83% 11,305.22
TOTAL 349,237.06 62.03% 216,634.49 7.14% 24,937.21 71.99% 251,418.73 28.01% 97,818.34
COSTO DIRECTO
GsGs (11.00%)
UTILIDAD (4.00%)
TOTAL 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00
COSTO DIRECTO 303,684.40 64.85% 196,940.45 7.14% 21,684.53 71.99% 218,624.98 28.01% 85,059.42
GsGs (11.00%) 33,405.28 9,847.02 2,385.30 24,048.75 9,356.54
UTILIDAD (4.00%) 12,147.38 9,847.02 867.38 8,745.00 3,402.38
TOTAL 349,237.06 62.03% 216,634.49 7.14% 24,937.21 71.99% 251,418.73 28.01% 97,818.34
6 de 14
C VERA S.R.L.
RUC. 20511630879
LOS PINOS Mz. A1, Lote 9
SAN JUAN DEMIRAFLORES - LIMA
RESUMEN DE VALORIZACION N
PROYECTO: CAPILLA CALCA - CUSCO
CODIGO: 593-8570
MONTO + GG y UTILIDAD
6520101 REQUISITOS GENERALES
Requisitos generales 1,777.93
1,777.93 +
6520110 MANTENIMIENTO
MANTENIMIENTO 2,282.92
2,282.92 +
7 de 14
C VERA S.R.L.
RUC. 20511630879
LOS PINOS Mz. A1, Lote 9
SAN JUAN DEMIRAFLORES - LIMA
8 de 14
C VERA S.R.L.
RUC. 20511630879
LOS PINOS Mz. A1, Lote 9
SAN JUAN DEMIRAFLORES - LIMA
DE VALORIZACION N° 02
CAPILLA CALCA - CUSCO AL 15/032/2019
266.69
266.69 = 2,044.62
285.96
0.00
0.00
285.96 = 2,192.33
0.00
0.00
0.00 = 0.00
0.00
0.00 = 0.00
0.00
0.00
0.00
0.00 = 0.00
0.00
0.00
0.00
0.00
0.00
0.00 = 0.00
2,128.10
229.50
2,357.60 = 18,074.90
342.44
342.44 = 2,625.36
9 de 14
C VERA S.R.L.
RUC. 20511630879
LOS PINOS Mz. A1, Lote 9
SAN JUAN DEMIRAFLORES - LIMA
10 de 14
C VERA S.R.L.
RUC. 20511630879 LA IGLESIA DE INFORME DE AVA
LOS PINOS Mz. A1, Lote 9
JESUCRISTO
SAN JUAN DEMIRAFLORES - LIMA
DE LOS SANTOS DEPARTAMENTO DE ADMINIST
DE LOS ULTIMOS DIAS AREA SUDAMERIC
DESCRIPCION FECHA A
INICIO 5 10 15 20 25 30 35 40 45
AMPLIACION
1 REQUISITOS GENERALES R 1/3/2019
P 12/28/2019
2 NIVELACION Y REPLANTEO R 1/3/2019
P 1/3/2019
3 HORMIGON R 1/9/2019
P 1/10/2019
4 MUROS Y TABIQUES R 1/18/2019
P 2/11/2019
5 ESTRUCTURAS METALICAS R 1/13/2019
P 1/20/2019
6 TECHOS Y AISLAMIENTOS R 1/16/2019
P 2/6/2019
7 PUERTAS Y VENTANAS R
P 2/4/2019
8 ACABADOS R
P 2/2/2019
11 INSTALACIONES ELECTRICAS R
P 2/6/2019
12 MOBILIARIO Y EQUIPAMIENTO R
P 2/21/2019
15 MANTENIMIENTO R
P 2/4/2019
ORDEN DE CAMBIO N° 01 R
P
ORDEN DE CAMBIO N° 02 R
P
Dias de atraso 0
Dias reconocidos 0
Dias sujetos a multa 0
Fecha de conclusión reprogramada 3/3/2019
Fecha de recepción provisional 3/3/2019
COMENTARIOS
93.23% 2/21/2019
80.20% 2/21/2019
100.00% 2/7/2019
100.00% 8/8/2018
100.00% 2/2/2019
100.00% 2/2/2019
15.20% 2/28/2019
45.00% 2/28/2019
100.00% 2/8/2019
100.00% 2/8/2019
12.00% 2/14/2019
100.00% 2/14/2019
0.00% 2/28/2019
100.00% 2/28/2019
36.69% 3/3/2019
70.00% 3/3/2019
80.00% 2/15/2019
100.00% 2/15/2019
19.41% 3/1/2019
100.00% 3/1/2019
0.00% 2/19/2019
100.00% 2/19/2019
42.20% 3/3/2019
82.73% 3/3/2019
ADMINISTRACION DE PROYECTOS
15/032/2019