S.NO DESCRIPTION ITEMS TOTAL QTY WORKING QTY SERVICE QTY REMARKS
Intake water level is 5.0m Raw water flow 1830m3/hr
5 FILTER BED 15 13 7
Cl2 water pump 1&2 Gland leak was more. Pump 1 & 2
removed for service, pump suction pipe modified to direct Cl2
injection system, now dosing system are running normally
GAS CHLORINATION PLANT –
6 PUMPS 2 0 -
7 BACKWASH SYSTEM 2 2 1
Pump #2 O/L MOV disc was damaged condition
BACWASH WATER TRANSFER
8 PUMP 2 1 1
10 CHEMICALS DOSING 2 2 -
11 BLOWER 2 2 -
13 THICKENER 2 2 -
14 SLUDGE PUMP 2 2 -
15 CENTRIFUGE 2 2 -
Intake well and Clear water out let Flow meter instrument
earthing to be provided. Clear water out let Flow meter still in
issue.
16 FLOW METERS 3 1 1
PARAMETERS UNIT LIMIT INLET TO WTP OUT LET - CLEAR WATER OUTLET
CLARIFIER
1 20 -