Sei sulla pagina 1di 3

RESUME

Venkat Krishna.R
Cell No: 9885475652 SAP M.M. CONSULTANT
Email: venkat_sr2004@yahoo.com

SUMMARY:
 SAP professional with1+ year’s expertise in functional module of materials management .
 Having 8+ years of experience in functional area in Materials management and having
exposure to maintenance area.
 A good team player with strong leadership, communication and interpersonal skills.
 Proficient in ASAP methodology.
 Exposed to AS-IS, TO-BE and business blue print phases of implementation of SAP.
 Proficient in configuration of purchasing, inventory management, valuation and account
determination sub modules.
 Having exposure in warehouse management configuration.

QUALIFICATION:

B.TECH from MYSORE UNIVERSITY with first class - 1993

SKILL SETS:

 ERP package : SAP R/3 M.M. module on Ver 4.6c


 Operating environment : Windows 98/2000, Windows NT, DOS
 GUI tools : SAP GUI.

CARRIER PROFILE:

Presently working for M/s Reliance global services Pvt. Ltd from 2003 Feb till date.

SAP EXPERIENCE:

PROJECT # 1
DURATION: : Mar2003 to Jan2004

ENVIRONMENT: : SAP R/3 Version 4.6C

TEAM SIZE : 14

ROLE : ASSOCIATE CONSULTANT

Client Description : Subros Limited

Subros Limited is India's largest auto air conditioning manufacturing company. The company
has partnered with Denso & Suzuki and today Subros Limited has the capacity to manufacture
up to 500000 A/C systems per annum. Subros has set up state of the art manufacturing
facilities including multi flow condensers & squeeze die casting components. The company
today manufactures all the key components of an A/C system including compressors,
condensers, evaporators and connecting elements.
Role:

* Detailed project scooping, mapping the processes, configuration, integration testing.

*Reasonably participated in Analysis Design, and Testing of Reports, BDC.

Responsibilities:

 Involved in configuring organization structure.

 Configured Attributes of material types, number ranges

 Involved in configuring material master, vender master data.

 Customizing release procedure for purchase order with classification.

 Defined schema groups, schema determination, pricing procedure for purchase order.

 Stock transfer with in plant, between plants, posting goods receipts, issues.

 Account determination with out wizard- by valuation class, material type, and account
Category reference.

PROJECT # 2

ENVIRONMENT: : SAP R/3 Version 4.6C

ROLE : ASSOCIATE CONSULTANT

DURATION : from Feb2004 to till date

Client Description : Hasbro, Inc.

Hasbro is a worldwide leader in children's and family leisure time entertainment products and
services, including the design, manufacture and marketing of games and toys ranging from
traditional to high-tech. Both internationally and in the U.S.,
Tickets resolved:

 Problems relating to purchase order release.

 Down payment request display in purchase orders.

 Physical inventory stock postings.

 Problems relating to split valuation.

 Stock transfers and transfer postings within, between plants

FUNCTIONAL EXPERIENCE:

Organization : M/s. Surya Latha Spinning Mills Ltd. Hyderabad


Position : Asst. Manager (Materials)
Period : 1998 June to 2003 Jan
Responsibility:

 Receiving Inquiries/Work order requisitions from various departments


 Inviting quotations from various parties.
 Compiling quotations for negotiations and preparation of Comparative statements.
 Preparing/issuing letter of indents/rate contracts, Preparing/Issuing the work orders for Annual
Maintenance Contracts, Renewing Contracts, and Extending Contracts for several jobs.
 Execution over the vender performance.

Organization : M/s. Kothari Spinning Mills Ltd. – Adoni


Position : Engineer (Materials)
Period : 1995 July to 1998 May
Responsibility:

 Receiving material indents from user Departments.


 Analyzing possible sources for procurement of materials. .
 Requesting quotations from vendors.
 Receiving quotations and compiling for negotiations basing on comparative statements
 Approval of purchase orders and finalization of delivery schedules.

Organization : M/s. Priyadarshini Spinning Mills Ltd. - Hyderabad


Position : Engineer (maintance dept)
Period : 1993 Dec to 1995 June
Responsibility:
 Planning maintenance schedule with out effecting production.
 Planning for materials required for maintance schedules.
 Rising purchase requisitions to materials management dept;
 Planning for reduction of machine breakdown time.

Personal details:

Pass Port Validity : March 2014


Languages known : English, Hindi, Telugu, Kannada
Relocation : No constraints

Potrebbero piacerti anche