PLATE CONNECTION
1 CITISCAPE
Contents:
1. Scope
2. Reference documents
3. Materials properties
5. Design loads
6. References
0401-CI-MAR-L-0015-04
Specification, Section 329000
7. Analysis
HILTI PROFIS ANCHOR 2.4.6
2 CITISCAPE
1. SCOPE
The purpose of this report is to design the base connection between the
preserved palm and the 200 mm concrete slab below it .
2. REFERENCE DOCUMENTS
2.2 Drawings:
The following inputs have been used in finalizing of this report
• 401-CI-L-04-20-5.00-PD-SD-011.
• 401-CI-L-04-20-5.00-PD-SD-012.
3. Materials properties
3.1 Concrete:
Density of concrete = 2.5 t/m3
Concrete Type : Cracked concrete
Fcu = 30 Mpa
Steel rebars: Fy = 460 Mpa
Structural steel Fy = 275 Mpa
3.2 Bolts:
HIT-ZM16
3.3 Adhesive:
HIT-HY200-A
5. Design loads:
Wind (WL):
• 0.25 KN/m2 “AC wind pressure” .
3 CITISCAPE
-Neglect own weight.
- Solidity Factor For Palm crown 40 %.
-Average trunk diameter = 50 cm
-Wind load at tree trunk = 0.25 x 0.5 perimeter x Hight = 0.25 x (3.14 x 0.25) x 8 = 1.568 KN
- Wind load at tree crown = 0.25 x 0.4 x Total crown area = 0.25 x 0.4 x 12.56 = 1.256 KN
- Total ultimate bending moment at base connection = 1.6 ( 1.568 x 4 + 1.256 x 10 )
= 30.12KN
- Total ultimate shear force at base connection = 1.6 ( 1.568 + 1.256 ) = 4.518 KN