Valley View
Local School District

VALLEY
VIEW FAQs
CONTACT INFORMATION:
Ben Richards, Superintendent
(937) 855-6581
ben.richards@valleyview.k12.oh.us

BOARD MEMBERS:
Elliot Boyd
Mark Cline
Ben DeGroat
Spencer Izor
Angie Valenti
1) What is the issue on the ballot? 4) How will we be funding our portion?
A new K-5/9-12 school building and With a 5.5 mill bond levy, along with a .5% income
improvements to the current high school and tax increase.
athletic facilities. The building includes core
space for future middle school students and will
be designed for future expansion into a full K-12 5) Why a combined issue?
school facility. We have very serious facility AND operating
concerns. We have had to use money from our
2) Why do we need this project? general fund to supplement repairs. That, in
conjunction with the unconstitutional way that
a. Our Primary, Intermediate, and Junior High Ohio schools are funded, necessitates doing both at
buildings do not provide adequate environments the same time.
in which to teach our children. Lack of climate
control, security, ADA accessibility and
technology are all placing severe limitations on 6) Why is the bond issue a property tax and the
our students and staff. operating levy an income tax?
b. Those 3 buildings are in the most need, with We listened to our community and the struggle of
all 3 labeled as “Poor” by the OFCC (Ohio Facilities how property tax affects certain groups (namely
Construction Commission). They will not pay for farmers and retirees) more than others. Social
any renovations to those buildings. Security benefits are not subjected to an income
c. Numerous community meetings showed that tax, making this proposal less of a burden on our
there was strong community support for keeping senior citizens.
our current high school, which will become a 6-8
middle school.
7) Where will the K-5/9-12 building be located?
d. Community surveys showed the most
The district is in the process of swapping land with
support for either a new K-12 building or two new
the Weaver family to acquire land to the west of
buildings (one K-5, the other 9-12). We are simply
the current high school (past the ball fields) and to
combining the two most popular plans in a way
the south of the HS in exchange for our land across
that is the most cost effective.
Manning and across the Pike that was donated to
e. This project will provide our students with the district by the Swartzel family. This eliminates
programming and facilities to prepare them to the concern regarding the pipeline. The facility will
be competitive with other area schools. be located on this new campus. The exact location is
still being examined.
3) How will this project be funded?
The state (OFCC) will fund 60% of the base 8) Will the kindergartners be mixed in with high
project, leaving us with only 40% to raise school students?
ourselves. This is the best ratio Valley View has
No. The buildings will have separate entrances and
ever received and early indications are that we
really function as separate buildings. However,
will not see a better percentage in the future.
it will give high school students the opportunity
We have elected to add a few extra things to the to help at the elementary with presentations
projects which are 100% funded by us. and demonstrations during the day, allowing for
1) Some fixed seating for an auditorium at the additional learning opportunities for all of our
new building while also using flexible seating to students.
use as cafeteria seating
2) A new bus garage on this new complex in
Locally Funded
order to centralize transportation and to increase
parking by Barker Field
Initiatives

3) Basic renovations to the existing high school


and athletic facility improvements.

State Portion
Local Portion
State Portion $ 29,683,940
Local Portion $ 19,789,294
Locally Funded Initiatives $ 8,563,479