HISTORY
01 - HISTORY

Founded in 1984

Mexican Company

Energy sector
• Electricity ( Power Generation)
• Oil & Gas

3
01 - HISTORY

PROUD OF OUR HISTORY

1984 1994 2005 2014 2015 2016


Certifications Inauguration of ASME Certifications
First CFE Contract Certifications Start of Operations of
ASME and NBIC Manufacturing Plant inn OHSAS 18001
ISO 9001 and LAPEM CGV Energy and
Apodaca N.L.
RIMMSA USA

4
02

CORPORATE
STRUCTURE
02- corporate structure

● Engineering
● Procurement
● Maintenance, Rehabilitation and
Modernization
● Manufacture ASME
● Construction and Assemblies

● Commercialization of Technologies
● Integration of Power Generation
Projects

● Business Development
LLC ● Procurement International

6
03

LOCATIONS
03 - LOCARIONS

CORPORATE OFFICES
San Pedro Garza García, NL
OFFICE OF
PROCUREMENT AND
BUSINESS DEVELOPMENT
Houston,
MANUFACTURING PLANT TX
ASME
Apodaca, NL

OFFICE OF ENGINEERING
AND COMMERCIAL
Polanco, CDMX

8
03 - LOCATIONS

MANUFACTURING PLANT
ASME

LOCATED IN THE SANTA ROSA INDUSTRIAL PARK, IN APODACA NUEVO LEON ,SITUATED STRATEGICALLY TO IDENTIFY SUPPLY
AD EXPORT PRODUCTS TO USA

HUMAN RESOURCES FULL EQUIPED


• Supervision with extensive • Pipe bending machines
experience • Hydraulic press for swage and
• Inspectors of Quality bending processes
Assurance certified in NDT • Semi-automatic welding Machine
• Safety, & Health Inspectors FCAW and GMAW
• Qualified workforce • GTAW orbital welding equipment
including pipe benders and • Welding positioners
code welders • Portal Cranes
• Titan 30 tons
• 5 Tons forklift
• Heat Equipment for treatment
• Among others.
9
04

SERVICES BY
MARKET SEGMENT
04- SERVICES BY MARKET SEGMENT

SERVICES

ASME
MAINTENANCE,REHABILITATIONS CONSTRUCTIONS
ENGINEERING PROCUREMENT
AND MODERNIZATIONS MANUFACTURING (NEW PLANYTS)

One of our specialties are pressure vessels and pressures equipment including: Boilers,
HRSG’s, Furnace, Reformer, Reactors, Tanks, Heat Exchangers among others
Servicios de
11
05

CERTIFICATIONS
05 - CERTIFICATIONS RIMMSA manufactures pressure vessel pack and
pressurized parts in strict compliance with A.S.M.E.
(American Society of Mechanical Engineers)
On-site repairs are carried out in accordance with the
NBIC (National Board Inspection Code)

FABRICATIONS
01 Under the Code ASME (American Society of
Mechanical Engineers) Section I we have the
pictures “S”, “U” , “H” and PP”

REPAIRS
02 Under the code NBIC (National Board Inspection Code),
we have the pictures “R” y “NB”.

Power Pipes Heaters Pressure Boilers


Vessel

Reparaciones Organizar, registrar y


en sitio control de fabricaciones

13
05 - CERTIFICATIONS

03 The RIMMSA Quality Management System is


certified with international regulations: ISO
9001:2015.

04 RIMMSA is a reliable supplier of de CFE and is


certified by LAPEM

05 The RIMMSA Health and Safety at work (SST)


management system certified with the OHSA
18001: 2007 International Standard

14
06

MANUFACTURING
SCOPE
MANUFACTURING SCOPE

DESIGN ENGINEERING AND SUPPLY

16
07

PRESSURE
VESSELS
MANUFACTURING SCOPE

PRESSURE VESSELS

STEAM HEADER FILTERS BLOWDOWN TANKS

18
MANUFACTURING SCOPE

ON SITE DELIVERY

19
MANUFACTURING SCOPE
PRESSURE VESSELS

MEDIUM PRESSURE
DECOMPOSER

ONCE THROUGH
COOLER

STEAM CONDENSATE
SEPARATOR

LOW PRESSURE
20
ABSORBER
08

PRESSURE PARTS
MANUFACTURING SCOPE
SPOOLS

22
MANUFACTURING SCOPE
SPOOLS

23
MANUFACTURING SCOPE
SPOOLS INSTALLATION

24
MANUFACTURING SCOPE
VALVES AND FLANGE WORKS

25
MANUFACTURING SCOPE
HEADERS

26
MANUFACTURING SCOPE
WATER WALLS

27
MANUFACTURING SCOPE
ECONOMIZERS

28
MANUFACTURING SCOPE
PREHEATERS

29
MANUFACTURING SCOPE
SUPERHEATERS

30
MANUFACTURING SCOPE
HRSG HARPS

31
09

MANUFACTURING
PROCESS
MANUFACTURING PROCESS
BENDING

33
MANUFACTURING PROCESS
TIG WELDING

34
MANUFACTURING PROCESS
MIG WELDING

35
MANUFACTURING PROCESS
ASSEMBLYS

36
MANUFACTURING PROCESS
HYDRO TESTING

37
MANUFACTURING PROCESS
THERMAL TREATMENT

38
MANUFACTURING PROCESS
QUALITY INSPECTIONS

39
MANUFACTURING PROCESS
CLEANING AND PAINTING

40
10

MAIN VENDORS
Suppliers

09 – PRINCIPALES PROVEEDORES NACIONALES Y EN EL


EXTRANJERO

42 34
11

NEW EQUIPMENT
H R SG S BO IL ER S W H R BS BU R N ER S

• Steam Flow: 2-90


• Steam Flow: Up 250
W AT ER T U BE

ton/hr (120 MW)


BO IL ER ton/hr
• State-of-the-art burners
• Steam flow: all capacites • Pressure DESIGN: that ensure complete
• 1, 2 or 3 Pressure • Design pressures: 17-138 bares 7 100 bares and efficient combustion.
Leves
• Temp. Steam Up: 565°C • Hot Water, Steam • Emissions of Nox
• Modular Design • Design Types: Design “O” and “D” • Saturated, Steam <30 ppm
• Steam temperatures: F IR E T U BE • Overheated • Rates of turndown 10:1
up 565°C BO IL ER S

• Steam Flow: 3-45 ton/hr


• Steam Temperatures:
Up 565°C
• Pressure Design: 10-40
bares
• Saturated Steam 44
12

EXPERIENCE
06 - EXPERIENCE

Francisco I. Madero Refinery


(Waste Heat Boiler BI-DRUM Marca Babcock & Wilcox de México)
PEMEX REFINERY https://www.youtube.com/watch?v=Z973JwChkas

> PROJECT > SCOPE

Energy efficiency project including the RIMMSA developed all detail drawings
rehabilitation of the Waste Heat Boiler through reverse engineering, boiler
U-100, modification of the inlet and tube supply, ASME fabrication of all
outlet ducts, and modernization of pressure parts (230 Tons), hydrostatic
guillotine valves in the Catalytic Plant test, pneumatic test, radiography test,
(FCC-2). heat treatment, paint, chemical
cleaning, instrumentation, expansion
joints, duct work, chimney painting and
other parts. The installation works were
executed according to the National
Board Inspection Code. (To stamp-R).

46
06 - EXPERIENCE

CFE CT CARBÓN II
CFE (4 x 350 MW)

> PROJECT > SCOPE

Complete of modernization
of generating units 3 and 4 Manufacturing Key Points: RIMMSA Engineering, Supply
(2) 350 MW, Radiant Boiler Brand
and Manufacture of Lower Economizer, reheater fourth and
Foster Wheeler.
fifth step and final superheater, with a total weight of more
than 1600 tons, consisting of 72 trucks of parts and
components under pressure ASME
Installing Key Points : RIMMSA will install all the pressure
parts during the year 2019.

More than 29,000 press-fit welds will be made throughout


the contract (Manufacturing and Assembly).

47
06 - EXPERIENCE

Pro-Agroindustria, Plant Cosoleacaque &


PEMEX FERTILIZERS Pajaritos Plant VI Cosoleacaque

> PROJECT > ALCANCE

Complete of rehabilitation of 53 pressure equipment and containers.

> SCOPE

Complete of rehabilitation of 53 pressure equipment and vessels,


including: inspections and engineering, materials supply, chemical
cleaning, replacement of pressure parts, coatings and all non-
destructive tests applicable in accordance with ASME code

48
06 - EXPERIENCE

PEMEX GAS Gas Processor Complex Cactus


(Waste Heat Recovery Boiler CH-31 Brand Deltak)
AND BASIC PETROCHEMISTRY
> PROJECT

Complete manufacture of the CH-31 Heat Waste Recovery CH-31 including: reverse engineering, ASME calculations, details drawings, supply of all
materials and all non-destructive tests, according to code

• Upper Drum
(11.4 Tons)

• Furnace
(100.1 Tons)

49
06 - EXPERIENCE

Tractebel Monterrey Energy


ICA FLUOR (1 x 284 MW)

> PROJECT

Complete reconstruction of the cooled air condenser (ACC).

50
ENGIE
TRACTEBEL ENERGIA MONTERREY
Monterrey Nuevo León.
https://www.youtube.com/watch?v=vgPgGhjZyGI&t=9s

> PROJECT

PROJECT:
Turn Key project: Supply, Installation,
commissioning and startup of a 77,000 Lb/h
Victory Energy Superheated steam Boiler.

SCOPE:
Design and Engineering, manufacturing, supply, Installation, and
commissioning of 35 ton / h Victory Energy Boiler, including
Engineering, Civil Works, Structures, Auxiliary Equipment,
commissioning and commissioning, record execution time less than 10
weeks.

51
06 - EXPERIENCE

Pro-Agroindustria, area VI Cosoleacaque Plant


PEMEX FERTILIZERS

> PROJECT

Turnkey project. Supply of two (2) package boiler.

> SCOPE

Design, supply, manufacturing, testing, transportation, disassembly,


installation and start-up of two (2) boilers, 220,000 lb / h package
including civil works, electromechanical work, instrumentation and
control.

52
13

customers

CUSTOMERS
Some of our customers

FINAL USER

EPC’S

OEM´S

INDUSTRIAL

54