Sei sulla pagina 1di 2

Technical Checklist for Seamless Pipes

CLIENT LOGO
CS/LTCS
(PEC-EN-FRM-L-09232 Rev 2)
INQUIRY No.
JOB NO.: XXX XXX

PROJECT: XXX ITEM PIPES CS/LTCS SEAMLESS

Supplier's Confirmation (Complied / Not-Complied)


SL. NO DESCRIPTION
(Justification required in case of Non-compliance)

1.0 Quotation Summary


1.1 Supplier to furnish Quotation Reference and Quotation Date. Quotation No._________________Date__________
1.2 Supplier to indicate Manufacturer's Name and Country of Origin.

2.0 Scope of Supply


Supplier to confirm that they have quoted for all items (Size & Thickness) as per Material
2.1
Requisition Scope of Supply (Annexure-1).

3.0 Technical Requirements


3.1 Design Requirements
3.1.1 Supplier to confirm that dimensions of pipe shall be as per ASME B 36.10M
Supplier to confirm that all the sizes covered as per Material Requisition scope of supply
3.1.2
are offered by the Supplier.
Supplier to confirm that pipes up to x" size shall be supplied in single random length and
3.1.3 sizes y" and above shall be supplied in double random length. All galvanized pipes shall
be single random length.
Supplier to confirm that the end preparation of pipe shall be PE (plain end), BE as per
3.1.4
ASME B 16.25 (fig. 2a/3a)
Supplier to confirm that Galvanized pipes shall be threaded in accordance with ASME
3.1.5 B1.20.1 (NPTM). Each pipe shall be supplied with a Galvanized threaded full coupling
3000# rated, screwed hand tight at one end
Supplier to confirm that all the items specified for Sour service shall meet the
3.1.6
requirements of NACE MR-0175 / ISO 15156 /MR0103.
Supplier to confirm chemical analysis of pipes in accordance with the applicable product
3.1.7
standard with Carbon content shall be 0.23 maximum wt.%.
Supplier to confirm that the Carbon equivalent shall not exceed 0.43 maximum wt. %,
3.1.8 where CE=C+Mn/6+(Cr+Mo+V)/5+(Cu+Ni)/15
Supplier to confirm that Galvanizing shall be carried out in accordance with ASTM A153.
3.1.9
Threaded portion of pipes shall be free of galvanizing.
Supplier to the all maximum hardess of pipes in NACE service shall not exceed -------
3.1.10
(specify as per project specification)
Supplier to confirm that all CS/LTCS pipes shall be fully killed, fine grained and shall be
3.1.11
supplied in normalized or normalized and tempered condition.
Supplier to confirm that pipe ends shall be protected with heavy duty plastic end caps.
3.1.12
For beveled ends, the caps shall cover the full area of the bevel.

3.2 Material of Construction


Supplier to confirm that all the CS seamless pipes are supplied in accordance with ASTM
3.2.1
A106 Gr.B
Supplier to confirm that all the LTCS seamless pipes are supplied in accordance with
3.2.2
ASTM A333 Gr.6

4.0 Compliance to Specification


Supplier to confirm compliance to "Techncial Supply Requirements for Pipes"
4.1
(Attachment - xx).
Supplier to confirm compliance to SDRL "Supplier Document Requirement List"
4.2
(Attachment - xx).
Supplier to confirm compliance to "Specification for Marking & Color Coding"
4.3
(Attachment - xx).
Supplier to confirm compliance to "Packing, marking, preservation & shipping Documents
4.4
specification" (Attachment-xx).

Controlling Document: PEC-EN-WIN-L-12500 Page 1 of 2


Technical Checklist for Seamless Pipes
CLIENT LOGO
CS/LTCS
(PEC-EN-FRM-L-09232 Rev 2)
INQUIRY No.
JOB NO.: XXX XXX

PROJECT: XXX ITEM PIPES CS/LTCS SEAMLESS

Supplier's Confirmation (Complied / Not-Complied)


SL. NO DESCRIPTION
(Justification required in case of Non-compliance)

5.0 Inspection & Testing Requirements


Supplier to confirm full compliance to SQRF "Supplier Quality Requirement Form"
5.1
(Attachment -xx).
Supplier to confirm that material certificate shall be in accordance with Type 3.1 EN
5.2
10204
Supplier to confirm that the hydro test/NDE test shall be carried out in accordance with
5.3
respective ASTM/API standard
Supplier to confirm that for LTCS pipes, the impact test temperature shall be (-46 0C).
5.4 Test results shall be at least 27 joules as an average of three tests (for standard
specimen 10 x 10 mm), one result may be lower, but not lower than 21 joules.

6.0 Supplier Quality Requirement


Supplier to confirm that certificates for ISO accreditation for self and sub suppliers are
6.1
attached with offer.

7.0 Delivery Period


7.1 Supplier to furnish the delivery period of materials quoted in the offer.

8.0 Additional Notes


Supplier to confirm that all items to be supplied in accordance with the wall thickness or
8.1 schedule as stated in inquiry / purchase requisition. Wall thickness heavier or thinner
than specified tolerance shall not be accepted.
Add additional notes as per project requirement

Notes
1) Supplier shall fill in this Technical Check list and attach with the offer without which the offer shall not be considered for detailed evaluation.
2) Supplier can attach the supplementary sheet to provide detailed justification, if required.

Note for User: User shall review all points and update as per project requirements

Supplier's Name

Supplier's Sign

Supplier's Company Seal/Stamp

Controlling Document: PEC-EN-WIN-L-12500 Page 2 of 2

Potrebbero piacerti anche