Cooling Condition: Indoor Dry-bulb 27.0 °C
Cooling Condition: Indoor Wet-bulb 19.0 °C
Cooling Condition: Outdoor Dry-bulb 34.1 °C
Cooling condition: Outdoor wet bulb 26.6 °C
Heating Condition: Indoor Dry-bulb 20.0 °C
Heating Condition: Outdoor Dry-bulb 7.0 °C
Heating Condition: Outdoor Wet-bulb 6.0 °C

B.Material List

Model Quantity Description


MV5-X335W/V2DN1 1 All DC Inverter V5 X
(220V-60Hz)
MDV-D160T1/VN1-B 2 High Static Pressure Duct
(7.1~16kW)
FQZHN-02D 1 Branch Joint
Ø1 30.0 m Copper Pipe
Ø5/8 10.0 m Copper Pipe
Ø1/2 30.0 m Copper Pipe
Ø3/8 10.0 m Copper Pipe
KJR-29B 2 Wired Controller
Project Name New Project
Peru ,lima
Date 2019 / 11 / 4

System1

1.1 Material List

Model Quantity Description


MV5-X335W/V2DN1 1 All DC Inverter V5 X
(220V-60Hz)
MDV-D160T1/VN1-B 2 High Static Pressure Duct
(7.1~16kW)
FQZHN-02D 1 Branch Joint
KJR-29B 2 Wired Controller
Ø1 30.0 m Copper Pipe
Ø5/8 10.0 m Copper Pipe
Ø1/2 30.0 m Copper Pipe
Ø3/8 10.0 m Copper Pipe
Project Name New Project
Peru ,lima
Date 2019 / 11 / 4

1.2 Indoor Unit Specifications

IDU Name Model Sound (dB(A)) Weight(kg) Dimension(inch) Power Supply Rated Power(W) MCA(A) MFA(A)
WxHxD
IDU2 MDV-D160T1/VN1-B 54(High) 69.50 51-3/16*16-35/64*27-11/64 208-230,60,1 532 2.31 15
IDU2 MDV-D160T1/VN1-B 54(High) 69.50 51-3/16*16-35/64*27-11/64 208-230,60,1 532 2.31 15

IDU Name Model Cooling AT Req.TC TC Req.SC SC Heating AT Req.HC HC Air flow ESP
(°C) (Btu/h) (Btu/h) (Btu/h) (Btu/h) (°C) (Btu/h) (Btu/h) (m^3/h) (Pa)
IDU2 MDV-D160T1/VN1-B 27.0/19.0 0 49,916 0 37,599 20.0 0 56,296 2969(High) 50(50-196)
IDU2 MDV-D160T1/VN1-B 27.0/19.0 0 49,916 0 37,599 20.0 0 56,296 2969(High) 50(50-196)
Project Name New Project
Peru ,lima
Date 2019 / 11 / 4

1.3 Outdoor Unit Specifications

Name Model Module Dimension(inch) Weight(kg) Base refr(kg) Add refr(kg) Power Supply MCA(A) MFA(A)
ODU1 MV5-X335W/V2DN MV5-X335W/V2DN1 38-63/64*64-3/8*31-7/64 237.00 11.00 3.92 220V-3ph-60Hz 49.5 55
1

Name Model CR% Temp(°C) CC(Btu/h) Req CC(Btu/h) Temp(H/RH)(°C) HC(Btu/h) Req HC(Btu/h)
ODU1 MV5-X335W/V2DN1 89.55 34.1 111,364 0 7.0/87% 126,616 0

Name Model EER COP Cooling Power(kW) Heating Power(kW)


ODU1 MV5-X335W/V2DN1 4.67 5.00 6.43 6.72
Req.TC: Required Total Cooling Capacity
Req.SC: Required Sensible Cooling Capacity
Req.HC: Required Total Heating Capacity
TC: Available Total Cooling Capacity
SC: Available Sensible Cooling Capacity
HC: Available Total Heating Capacity
AT: Ambient Temperature
ESP: External Static Pressure
Req.CC: Required Cooling Capacity
CC: Available Cooling Capacity
Project Name New Project
Peru ,lima
Date 2019 / 11 / 4

1.4 Piping and Mode Selection Devices

IDU Quantity 2/20


Combination Ratio 89.55%
Additional refrigerant charge 3.92 kg
= 10.00(3/8) * 0.057 + 30.50(1/2) * 0.110
Factory refrigerant charge 11.00 kg
Total refrigerant charge 14.93 kg
Total Pipe Length 40.5 m / 1000 m
Furthest Actual 35 m / 175 m
Furthest Equivalent 35.5 m / 200 m
Furthest Equivalent from First Branch to IDU 5 m / 40(90) m
Drop Height between IDU and IDU 0 m / 30 m
Drop height between IDU and ODU(Below 3 m / 90 m
ODU)
Available Capacity Cooling 99,900 Btu/h
Available Capacity Heating 113,548 Btu/h
Note:
1.The equivalent length of each branch joint is 0.5m.

Pipe
No. Length Gas Pipe Liquid Pipe
(1) 30.0 m Ø1 Ø1/2
(2) 5.0 m Ø5/8 Ø3/8
(3) 5.0 m Ø5/8 Ø3/8

Branch Joint
No. Load Btu/h Model
(1) 102,357 FQZHN-02D
Project Name New Project
Peru ,lima
Date 2019 / 11 / 4

1.5 Piping Diagram

VRF 60Hz R410A


ODU:111,364/126,616 Btu/h IDU Total:99,832/75,198/112,593 Btu/h

MV5-X335W/V2DN1

IDU2
(1)
Ø1,Ø1/2 Ø5/8,Ø3/8 MDV-D160T1/VN1-B
TC:49,916 Btu/h
FQZHN-02D SC:37,599 Btu/h
HC:56,296 Btu/h
IDU2
Ø5/8,Ø3/8 MDV-D160T1/VN1-B
TC:49,916 Btu/h
SC:37,599 Btu/h
HC:56,296 Btu/h

The piping size may be different with the actual situation because of the software's illustration
limitation, please confirm the piping size according to the installation manual before installation.
Project Name New Project
Peru ,lima
Date 2019 / 11 / 4

1.6 Wiring Diagram

ODU1 L1,L2,L3 220V-3ph-60Hz

3-core Cables PQE

IDU2 KJR-29B

PQE

IDU2 KJR-29B

The wiring diagram may be different with the actual situation because of software's illustration
limitation, please confirm the wiring diagram according to the installation manual before installation.

Potrebbero piacerti anche