MasterEmaco® S 466
Shrinkage compensated, free flowing precision
concrete
Index
1. Company Profile
2. Commercial Licenses
3. ISO Certificate
4. Technical Datasheet
5. Method Statement
7. Job References
8. Approvals
9. Test Reports
Company Profile
About BASF
We have summed up this contribution in our corporate purpose: We create chemistry for a sustainable future. BASF had
sales of over €74 billion in 2014 and around 113,000 employees as of the end of the year. BASF shares are traded on the
stock exchanges in Frankfurt (BAS), London (BFA) and Zurich (AN). Further information on BASF is available on the Internet
at www.basf.com
As a reliable partner for our customers we deliver innovative, customized and easy-to-use solutions for sustainable
construction. The division operates production sites and sales centers in more than 50 countries and achieved sales of
about €2.1 billion in 2014.
Master Builders Solutions
Master Builders Solutions is BASF’s brand of advanced
chemical solutions for construction. The Master Builders
Solutions brand is built on the experience gained from more
than 100 years in the construction industry. The
comprehensive portfolio under the Master Builders Solutions
brand encompasses lasting solutions for new construction,
maintenance, repair and renovation of structures: Concrete
admixtures, cement additives, chemical solutions for
underground construction, waterproofing solutions, sealants,
repair & protection solutions, performance grouts, tiling
solutions and performance flooring solutions.
The Master Builders Solutions brand is backed by a global community of BASF construction experts. To solve our
customers’ specific construction challenges from conception through to completion a project, we combine our
know-how across areas of expertise and regions and draw on the experience gained in countless construction projects
worldwide. We leverage global BASF technologies, as well as our in-depth knowledge of local building needs, to
develop innovations that help make our customers more successful and drive sustainable construction. For more
information please visit www.master-builders-solutions.basf.ae
International Accreditation
BASF Construction Chemicals UAE is a registered GCC manufacturer certified to the ISO
9001 Quality Management System, Environmental Standard ISO 14001 and the Occupational
Health & Safety Standard OHSAS 18001.
® = Registered trademark of the BASF-Group in many countries
Company
Registration
><Bar Code
**102054
102054 ﺭﻗﻢ ﺍﻟﺘﺴﺠﻴﻞ ﺍﻟﻀﺮﻳﺒﻲ: 102054 ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ:
ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ: ﻣﺼﻨﻊ ﺍﻟﺨﻠﻴﺞ ﻟﻠﻤﻮﺍﺩ ﺍﻻﺿﺎﻓﻴﺔ ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ:
06/08/2019 ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺴﺠﻞ: 06/08/2017 ﺗﺎﺭﻳﺦ ﺍﻧﺸﺎﺀ ﺍﻟﺴﺠﻞ:
ﺭﺍﺱ ﺍﻟﻤﺎﻝ: ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺌﻮﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻰ:
ﻗﻄﺮ ﺟﻨﺴﻴﺔ ﺍﻟﻤﻨﺸﺄﺓ: ﻧﺸﻂ ﺣﺎﻟﺔ ﺍﻟﺴﺠﻞ:
0 ﻋﺪﺩ ﺍﻟﻔﺮﻭﻉ:
ﻣﻌﻠﻮﻣﺎﺕ ﺍﻻﺗﺼﺎﻝ
ﺃﺭﻗﺎﻡ ﺍﻻﺗﺼﺎﻝ: ﺻﻨﺪﻭﻕ ﺍﻟﺒﺮﻳﺪ:
ﺍﻟﺸﺮﻛﺎﺀ
Page 1 of 2
ﺭﻗﻢ ﺍﻟﺴﺠﻞ 102054 :
ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ
Qatar Chamber certifies that the above mentioned establishment has been registered
><Bar Code
ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ
Page 2 of 2
ﺭﻗﻢ ﺍﻟﺴﺠﻞ 102054 :
ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ
Qatar Chamber certifies that the above mentioned establishment has been registered
ISO Certificates
Technical Datasheet
MasterEmaco® S 466
Shrinkage compensated, free flowing precision concrete
DESCRIPTION COMPOSITION
MasterEmaco S 466 is a high strength precision MasterEmaco S 466 is a pre-packaged blend of
concrete, requiring only the on-site addition of Portland cement, carefully graded natural
water to provide a free flowing concrete ideally aggregate, specially selected sands, fillers,
suited for placing in nominal thicknesses of 40mm shrinkage control agents and fluidifiers. When
and above. mixed with the stated amount of water it produces
a free flowing, cohesive, precision concrete that
When mixed, applied and cured in accordance hardens to produce a dense, durable surface.
with the manufacturers instructions,
MasterEmaco S 466 produces a free flowing ADVANTAGES
precision concrete free from segregation and Guaranteed performance - material is precision
bleeding. blended in the factory to ensure consistent
results.
PRIMARY USES Durable - utilisation of low water cement ratio
Whenever a material is required to reconstruct ensures minimum permeability and high
heavily congested areas and areas with difficult durability.
access. Free flowing - eliminates honeycombing in
areas of congested reinforcement.
MasterEmaco S 466 is the ideal material for Self compacting - ensures complete filling of
vertical or horizontal structural repairs wherever spalled/damaged areas.
the use of formwork is preferable to hand or Shrinkage compensated - unique formulation
machine applied repair systems. provides dual expansion system in plastic and
Its high early and ultimate strength enables hardened states.
formwork to be stripped at an early age thus Easy to use - simple on site addition of water.
minimising delays.
Due to its rheoplastic nature MasterEmaco S 466
TYPICAL PROPERTIES
can be utilised as a grout and poured under a
head of pressure. MasterEmaco S 466 should
not be used where the depth of voids to be filled is Wet density approx. 2285 kg/m³
less than 20mm. Compressive >25 N/mm² at 1 day
Used as the capping medium in conjunction with strength at 25°C >35 N/mm² at 3 days
MasterSeal 910 in the BASF pile head BS 1881 Part 116 >45 N/mm² at 7 days
waterproofing system. For further details of this >65 N/mm² at 28 days
system, please contact your BASF representative. Tensile strength >3N/mm² at 28 days
BS 1881 Part 117
TYPICAL APPLICATIONS Resistivity 5000-10000cm
General repair and renovation of decayed, Flexural strength >10N/mm²
defective or damaged concrete such as: BS 4551 Part 1 1998
/ BS EN 12390-3
Columns
Rapid Chloride <1000 coulombs
Walls
Permeability ASTM
Beams
C1202: 2009
Honeycombed concrete Water permeability <10mm
Floors BS EN 12390 Part 8
PACKAGING
MasterEmaco S 466 is supplied in 25kg bags.
MasterEmaco® S 466
METHOD OF USE
MasterEmaco S 466 is a versatile repair and Areas to be repaired should be soaked with water
renovation mortar. Surface preparation, method of for several hours prior to application of
use etc. are dependent on the job in hand. MasterEmaco S 466 to minimise local absorption
Detailed below are general guidelines for the use and to assist in the free flow of the concrete.
of MasterEmaco S 466. For full specification Before placing ensure concrete surfaces are damp
details and advice on specific repairs contact your but free of standing water and seal drainage
local representative. outlets. Ensure formwork is secure to prevent
movement during placing and curing.
Providing the substrate has been thoroughly
APPLICATION PROCEDURE soaked priming is not normally necessary.
PLACING STORAGE
MasterEmaco S 466 should be placed in a single Store out of direct sunlight, clear of the ground on
continuous operation. Poured material should be pallets protected from rainfall. Avoid excessive
introduced slowly to prevent entrapment of air. It compaction. Shelf life is 1 year when stored as
is essential to place the mixed material within 30 above.
minutes of batching.
SAFETY PRECAUTIONS
CURING As with other products containing Portland
As with all cementitious material curing is of vital cement, the cementitious material in
importance to ensure that optimum properties are MasterEmaco S 466 may cause irritation. In case
obtained. of contact with eyes, immediately flush with plenty
of water for at least 15 minutes. Call a physician.
SUBSEQUENT SURFACE FINISHES In case of contact with skin, wash skin thoroughly.
It is recommended that products from the
MasterProtect range of protective finishes be NOTE
applied. Field service, where provided, does not constitute
supervisory responsibility. For additional
Note: In addition to shrinkage compensation, this information contact your local BASF
product has been designed to develop tensile strength
representative.
sufficient to withstand the internal stress generated by
volume change to reduce the incidence of drying BASF reserves the right to have the true cause of
shrinkage cracking. any difficulty determined by accepted test
methods.
CLEANING
Treat as concrete. Clean all tools with water
* Properties listed are based on laboratory controlled tests.
immediately after use. Hardened material can be
removed using mechanical means. ® = Registered trademark of the BASF-Group in many countries.
COVERAGE
Yield approximately 12.5 litres per 25kg.
BASF_CC-Oman/Em_S466_05_96/v2/11_15
The technical information and application advice given in this BASF publication are based on the present state of
STATEMENT OF our best scientific and practical knowledge. As the information herein is of a general nature, no assumption can be
RESPONSIBILITY made as to a product's suitability for a particular use or application and no warranty as to its accuracy, reliability or
completeness either expressed or implied is given other than those required by law. The user is responsible for
checking the suitability of products for their intended use.
Field service where provided does not constitute supervisory responsibility. Suggestions made by BASF either
NOTE orally or in writing may be followed, modified or rejected by the owner, engineer or contractor since they, and not
BASF, are responsible for carrying out procedures appropriate to a specific application.
%$6)&RQVWUXFWLRQ&KHPLFDOV//&
32%R[6HHE3RVWDO&RGH2PDQ
7HO)D[
ZZZPDVWHUEXLOGHUVVROXWLRQVEDVIFRP
Method Statement
MS – AD-MasterEmaco S 466/CHL-10/2015
1. GENERAL:
1.1. The area to be repaired should be marked on the drawings and on the structure, and
subject to revision based on conditions found as breaking out proceeds.
1.2. All further repairs will be at the discretion of the Engineer and subject to remeasurement.
1.3. All deviations from the original Bill of Quantities or scope of works must be agreed in
writing by the Engineer before reinstatement starts.
2. PREPARATION:
2.1. The edges of all repairs shall be cut by angle grinder or similar to produce a regular profile
with a minimum depth of 20mm. No feather edges will be accepted in any repair work.
2.2. All contaminated, decayed and spalled concrete shall be broken out using high pressure
water jetting or pointed mechanical chisels. The use of blunt scabbling hammers which can
fracture aggregate, but leave it in place, are not permitted.
2.3. Where the removal of damaged concrete exposes the steel, further breaking out to expose
the full circumference of the steel is essential. A minimum of 20mm behind the steel is
required.
2.4. Breaking out shall continue beyond the periphery of the damaged area until uncorroded
steel is exposed.
2.5. Exposed steel should be cleaned by high pressure water jetting, mechanical wire brush or
grit blasting, to remove all corrosion products and be washed down with potable water to
remove any residual contamination.
2.6. If reinforcement has deteriorated, it shall be removed and be replaced as directed by the
Engineer.
2.7. The prepared surface shall be sound, dense, free of all oil, grease, loose and and fractured
aggregate or other contaminants that could impair adhesion.
3. COATING OF STEEL:
3.1. Where directed by the Engineer, the cleaned steel shall be given a continuous coating of
MasterEmaco 8100 AP, a single component, active, zinc rich, epoxy primer, and allowed
to dry for at least 2 hours. If left exposed the MasterEmaco 8100 AP coated steel must be
washed down with potable water to remove any deposited contamination prior to
encapsulation.
4. PRIMING / FORMWORK:
Page - 1
MS – AD-MasterEmaco S 466/CHL-10/2015
4.1. MasterBrace ADH 1414, a two component, solvent free, epoxy bonding agent, shall be
applied to surfaces where the migration of chlorides present in the parent concrete is
anticipated.
4.2. Pour the total contents of the MasterBrace ADH 1414 (Part B) into the larger base tin
(Part A) and stir with a clean dry rod until a uniform and streak free consistency is
achieved.
4.3. Pour contents into a flat paint tray.
4.4. Using a short haired brush MasterBrace ADH 1414 shall be applied to the prepared
surface ensuring total coverage of the substrate and paying special attention to the saw cut
edges of the parent concrete.
4.5. Formwork shall be erected ensuring it is firmly in place, sealed to be “grout tight” and to
provide at least 20mm cover to the steel.
4.6. A 45° birds mouth shall be constructed at the top of the formwork to ensure ease of
placement of the MasterEmaco S 466.
4.7. MasterEmaco S 466, shall be applied to the primed substrate whilst the primer is still
tacky.
5. TEMPERATURE CONDITIONS:
5.1. MasterEmaco S 466 shall be used when the ambient temperature is between +5°C and
50°C. Chilled water shall be used to prevent mixed material temperatures exceeding 32°C.
5.2. Substrate temperatures should not be less than 5°C. In hot weather, areas to be repaired
shall be shaded from direct sunlight.
6. MIXING:
6.1. The mixer shall be capable of imparting sufficient shear throughout the mix to ensure a
homogenous, lump free consistency. Mixers such as slow speed drill and mortar mixing
paddle or modified free fall mixers are suitable.
6.2. Ensure the mixing container is clean and dampened down prior to mixing.
6.3. A proportion of the specified amount of water (approx. 90%) to achieve the requried flow
shall be poured into the mixer. Slowly add the powder whilst the mixing drum is rotating.
6.4. Mixing shall be for a minimum of 3 minutes during which time the remaining mix water may
be added, if required, until a uniform free flowing consistency is achieved.
Page - 2
MS – AD-MasterEmaco S 466/CHL-10/2015
7. APPLICATION:
7.1. The mixed MasterEmaco S 466 shall be poured steadily and continuously, through the
birds mouth opening at the top of the formwork. A slow steady pouring rate reduces the
chances of air entrapment.
7.2. Alternatively, the MasterEmaco S 466 shall be placed by pouring into a funnel attached to
a flexible pipe of 30-50mm diameter, the pipe is initially placed near the bottom of the
formwork. The pipe is then raised as the pour continues.
7.3. For large scale repairs of extended length, the MasterEmaco S 466 shall be placed in
layers, i.e. place from left to right in one layer and then repeated with the successive layers
applying the MasterEmaco S 466 wet on wet.
7.4. MasterEmaco S 466 shall be placed continuously, minimising the amount of time between
successive batches.
7.5. MasterEmaco S 466 is self compacting and does not require external vibration. However,
tapping the formwork lightly with a hammer during placement will contribute towards
effective consolidation of the material.
8. CURING:
8.1. Using the appropriate MasterKure curing compound, spray surfaces immediately upon
removal of formwork and spray at least 10cm onto the adjacent concrete around the
periphery of the repair.
8.2. Protect from wind, rain and direct sunlight for 24 hours.
Page - 3
MS – AD- MasterEmaco S 466 - NC- 10/2015
1. GENERAL:
1.1. The area to be repaired should be marked on the drawings and on the structure, and
subject to revision based on conditions found as breaking out proceeds.
1.2. All further repairs will be at the discretion of the Engineer and subject to remeasurement.
1.3 All deviations from the original Bill of Quantities or scope of works must be agreed in
writing by the Engineer before reinstatement starts.
2. PREPARATION:
2.1. The edges of all repairs shall be cut by angle grinder or similar to produce a regular profile
with a minimum depth of 20mm. No feather edges will be accepted in any repair work.
2.2. The predetermined areas shall be broken out to remove all substandard concrete.
2.3. Breaking out should be undertaken using high pressure water jetting or pointed mechanical
chisels. The use of blunt scabbling hammers which can fracture aggregate, but leave it in
place, are not permitted.
2.4. Breaking out shall continue until sound, dense concrete is encountered.
2.5. Exposed steel should be cleaned by high pressure water jetting, mechanical wire brush or
grit blasting, and be washed down with potable water to remove any residual dust.
2.6. The prepared surface must be sound, dense, free of all oil, grease, loose and fractured
aggregate or other contaminants that could impair adhesion.
3. COATING OF STEEL:
3.1. Where directed by the Engineer, the cleaned steel shall be given a continuous coating of
MasterEmaco 8100 AP, a single component, active, zinc rich, epoxy primer and allowed to
dry for at least 2 hours. If left exposed the MasterEmaco 8100 AP coated steel must be
washed with potable water to remove any deposited contamination prior to encapsulation.
Page - 1
MS – AD- MasterEmaco S 466 - NC- 10/2015
4. PRIMING / FORMWORK:
4.1. Formwork shall be erected, ensuring it is firmly in place, sealed to be “grout tight”, and to
provide at least 20mm cover to steel.
4.2. Provision must be made for drainage outlets at the lowest points of the sealed formwork.
4.3. A 45° birds mouth shall be constructed at the top of the formwork to ensure ease of
placement of the MasterEmaco S 466.
4.4. The shuttered repair shall be saturated for 3-4 hours with potable water prior to placement
of MasterEmaco S 466.
5. TEMPERATURE CONDITIONS:
5.1. MasterEmaco S 466 shall be used when the ambient temperature is between +5°C and
50°C. Chilled water shall be used to prevent mixed material temperatures exceeding 32°C.
5.2. Substrate temperatures should not be less than 5°C. In hot weather, areas to be repaired
shall be shaded from direct sunlight.
6. MIXING:
6.1. The mixer shall be capable of imparting sufficient shear throughout the mix to ensure a
homogenous, lump free consistency. Mixers such as slow speed drill and mortar mixing
paddle or modified free fall mixers are suitable.
6.2. Ensure the mixing container is clean and dampened down prior to mixing.
6.3. Add sufficient water to achieve the required flow, then whilst the mixer is rotating slowly
add the powder.
6.4. Mixing shall be for a minimum of 3 minutes during which time the remaining mix water may
be added, if required, until a uniform free flowing consistency is achieved.
6.5. The maximum water addition is 3.5 litres always use the minimum amount of water to
achieve the required flow.
7. APPLICATION:
7.1. Ensure all free water is drained from the formwork and the drain holes are plugged before
mixing the MasterEmaco S 466.
7.2. The mixed MasterEmaco S 466 shall be poured steadily and continuously, through the
birds mouth opening at the top of the formwork. A slow steady pouring rate reduces the
chances of air entrapment.
Page - 2
MS – AD- MasterEmaco S 466 - NC- 10/2015
7.3. Alternatively, the MasterEmaco S 466 (Formerly Known As EMACO S66 T) shall be
placed by pouring into a funnel attached to a flexible pipe of 30-50mm diameter, the pipe is
initially placed near the bottom of the formwork. The pipe is then raised as the pour
continues.
7.4. For large scale repairs of extended length, the MasterEmaco S 466 (Formerly Known As
EMACO S66 T) shall be placed in layers, i.e. place from left to right in one layer and then
repeated with the successive layers applying the MasterEmaco S 466 (Formerly Known
As EMACO S66 T) wet on wet.
7.5. MasterEmaco S 466 (Formerly Known As EMACO S66 T) shall be placed continuously,
minimising the amount of time between successive batches.
7.6. MasterEmaco S 466 (Formerly Known As EMACO S66 T) is self compacting and does
not require external vibration. Tapping the formwork lightly with a hammer during
placement will contribute towards effective consolidation of the material.
8. CURING:
8.1. Using the appropriate MasterKure curing compound, surfaces shall be sprayed
immediately upon removal of formwork, extending at least 10cm onto the adjacent
concrete around the periphery of the repair.
8.1. Protect from wind, rain and direct sunlight for 24 hours.
Page - 3
Material Safety
Data Sheet
Safety data sheet
Page: 1/13
BASF Safety data sheet according to Regulation (EC) No. 1907/2006 as amended from time to time.
Date / Revised: 21.01.2016 Version: 2.2
Product: MasterEmaco S 466 also EMACO S66 T
(ID no. 30586452/SDS_GEN_EU/EN)
Date of print 22.01.2016
Company:
BASF SE
67056 Ludwigshafen
GERMANY
Operating Division Construction Chemicals
Skin Corr./Irrit. 2
Eye Dam./Irrit. 1
STOT SE 3 (irritating to respiratory system)
Page: 2/13
BASF Safety data sheet according to Regulation (EC) No. 1907/2006 as amended from time to time.
Date / Revised: 21.01.2016 Version: 2.2
Product: MasterEmaco S 466 also EMACO S66 T
(ID no. 30586452/SDS_GEN_EU/EN)
Date of print 22.01.2016
For the classifications not written out in full in this section the full text can be found in section 16.
Pictogram:
Signal Word:
Danger
Hazard Statement:
H318 Causes serious eye damage.
H315 Causes skin irritation.
H335 May cause respiratory irritation.
Precautionary Statement:
P102 Keep out of reach of children.
Not applicable
3.2. Mixtures
Chemical nature
Calcium dihydroxide
Content (W/W): < 3 % Skin Corr./Irrit. 2
CAS Number: 1305-62-0 Eye Dam./Irrit. 1
EC-Number: 215-137-3 H318, H315
REACH registration number: 01-
2119446671-38
For the classifications not written out in full in this section, including the hazard classes and the
hazard statements, the full text is listed in section 16.
If inhaled:
After inhalation of dust. Keep patient calm, remove to fresh air. If difficulties occur: Obtain medical
attention.
On skin contact:
Page: 4/13
BASF Safety data sheet according to Regulation (EC) No. 1907/2006 as amended from time to time.
Date / Revised: 21.01.2016 Version: 2.2
Product: MasterEmaco S 466 also EMACO S66 T
(ID no. 30586452/SDS_GEN_EU/EN)
Date of print 22.01.2016
After contact with skin, wash immediately with plenty of water and soap. Under no circumstances
should organic solvent be used. If irritation develops, seek medical attention.
On ingestion:
Rinse mouth immediately and then drink plenty of water, seek medical attention. Do not induce
vomiting unless told to by a poison control center or doctor.
4.2. Most important symptoms and effects, both acute and delayed
Symptoms: The most important known symptoms and effects are described in the labelling (see
section 2) and/or in section 11.
4.3. Indication of any immediate medical attention and special treatment needed
Treatment: Treat according to symptoms (decontamination, vital functions), no known specific
antidote.
The substances without values are not listed in the occupational exposure regulations for the validity
area of this safety data sheet.
Hand protection:
Page: 6/13
BASF Safety data sheet according to Regulation (EC) No. 1907/2006 as amended from time to time.
Date / Revised: 21.01.2016 Version: 2.2
Product: MasterEmaco S 466 also EMACO S66 T
(ID no. 30586452/SDS_GEN_EU/EN)
Date of print 22.01.2016
nitrile coated cotton gloves (e.g. EN 388, 374)
Eye protection:
Tightly fitting safety goggles (splash goggles) (e.g. EN 166)
Body protection:
Body protection must be chosen based on level of activity and exposure., light protective clothing
Form: powder
Colour: dark grey
Odour: odourless
Odour threshold:
Not determined due to potential
health hazard by inhalation.
pH value:
(70 %(m))
alkaline
Melting point:
not applicable
Flash point:
not applicable
Flammability: not flammable
Density:
not applicable
Self ignition: not self-igniting
Substances to avoid:
strong bases, strong acids
Acute toxicity
Respiratory/Skin sensitization
Assessment of sensitization:
There is no evidence of a skin-sensitizing potential. The product has not been tested. The statement
has been derived from the properties of the individual components.
Chromate in this product has been reduced. Sensitization due to chromate within stated shelf-live is
unlikely.
Assessment of mutagenicity:
The chemical structure does not suggest a specific alert for such an effect. Based on available Data,
the classification criteria are not met.
Carcinogenicity
Assessment of carcinogenicity:
The chemical structure does not suggest a specific alert for such an effect. Based on available Data,
the classification criteria are not met.
Reproductive toxicity
Developmental toxicity
Assessment of teratogenicity:
The chemical structure does not suggest a specific alert for such an effect. Based on available Data,
the classification criteria are not met.
Remarks: The product has not been tested. The statement has been derived from the properties of
the individual components.
Repeated dose toxicity and Specific target organ toxicity (repeated exposure)
Aspiration hazard
No data available.
Based on our experience and the information available, no adverse health effects are expected if
handled as recommended with suitable precautions for designated uses. The product has not been
tested. The statements on toxicology have been derived from the properties of the individual
components.
Elimination information:
not applicable
The product does not contain a substance fulfilling the PBT (persistent/bioaccumulative/toxic) criteria
or the vPvB (very persistent/very bioaccumulative) criteria.
The product does not contain substances that are listed in Regulation (EC) 1005/2009 on
substances that deplete the ozone layer.
Contaminated packaging:
Completely emptied packagings can be given for recycling.
Land transport
ADR
Not classified as a dangerous good under transport regulations
UN number: Not applicable
UN proper shipping name: Not applicable
Transport hazard class(es): Not applicable
Packing group: Not applicable
Environmental hazards: Not applicable
Special precautions for None known
Page: 11/13
BASF Safety data sheet according to Regulation (EC) No. 1907/2006 as amended from time to time.
Date / Revised: 21.01.2016 Version: 2.2
Product: MasterEmaco S 466 also EMACO S66 T
(ID no. 30586452/SDS_GEN_EU/EN)
Date of print 22.01.2016
user
RID
Not classified as a dangerous good under transport regulations
UN number: Not applicable
UN proper shipping name: Not applicable
Transport hazard class(es): Not applicable
Packing group: Not applicable
Environmental hazards: Not applicable
Special precautions for None known
user
Sea transport
IMDG
Not classified as a dangerous good under transport regulations
UN number: Not applicable
UN proper shipping name: Not applicable
Transport hazard class(es): Not applicable
Packing group: Not applicable
Environmental hazards: Not applicable
Special precautions for None known
user
Air transport
IATA/ICAO
Not classified as a dangerous good under transport regulations
UN number: Not applicable
Page: 12/13
BASF Safety data sheet according to Regulation (EC) No. 1907/2006 as amended from time to time.
Date / Revised: 21.01.2016 Version: 2.2
Product: MasterEmaco S 466 also EMACO S66 T
(ID no. 30586452/SDS_GEN_EU/EN)
Date of print 22.01.2016
UN proper shipping name: Not applicable
Transport hazard class(es): Not applicable
Packing group: Not applicable
Environmental hazards: Not applicable
Special precautions for None known
user
14.1. UN number
See corresponding entries for “UN number” for the respective regulations in the tables above.
14.7. Transport in bulk according to Annex II of MARPOL and the IBC Code
Regulation: Not evaluated
Shipment approved: Not evaluated
Pollution name: Not evaluated
Pollution category: Not evaluated
Ship Type: Not evaluated
If other regulatory information applies that is not already provided elsewhere in this safety data
sheet, then it is described in this subsection.
Full text of the classifications, including the hazard classes and the hazard statements, if mentioned
in section 2 or 3:
Skin Corr./Irrit. Skin corrosion/irritation
Eye Dam./Irrit. Serious eye damage/eye irritation
STOT SE Specific target organ toxicity — single exposure
H318 Causes serious eye damage.
H315 Causes skin irritation.
H335 May cause respiratory irritation.
The data contained in this safety data sheet are based on our current knowledge and experience and
describe the product only with regard to safety requirements. The data do not describe the product's
properties (product specification). Neither should any agreed property nor the suitability of the product for
any specific purpose be deduced from the data contained in the safety data sheet. It is the responsibility
of the recipient of the product to ensure any proprietary rights and existing laws and legislation are
observed.
Vertical lines in the left hand margin indicate an amendment from the previous version.
Job References
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
UAE
JEBEL ALI REFINERY EXPANSION, JEBEL ALI FREE ZONE, TECHNIP ITALY (EPC) / ARABIAN CONSTRUCTION
2017/07 KELLOGG BROWN & ROOT (KBR)
DUBAI, UAE COMPANY
UAE
DUBAI HILLS ESTATE - RESIDENTIAL DEVELOPMENT - PLOT
2017/06 SEIDCO GENERAL CONTRACTING CO. NATIONAL ENGINEERING BUREAU
NO.5AB AT MOHAMMED BIN RASHID CITY DUBAI, UAE
A2Z ARCHITECTURAL
2017/02 MIRDIFF HILLS IN MIRDIFF, DUBAI, UAE ENGINEERING CONTRACTING CO. LLC
ENGINEERING CONSULTANT
CONSTRUCTION OF MY CITY CENTRE SUR COMMUNITY MALL SPML / OMAN SHAPOORJI CONSTRUCTION CO
2017/01 COWI & PARTNERS OMAN
OMAN LLC (OSCO) JV
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
FEWA CONTRACT NO. 71E/2015 - 132/33/11KV SUBSTATION FEDERAL ELECTRICITY & WATER
2016/12 AL NABOODAH CONSTRUCTION GROUP LLC UAE
WORKS IN NORTHERN EMIRATES - AJMAN, UAE AUTHORITY
THE ROYAL ATLANTIS RESORT AND RESIDENCES, THE PALM DYNAMIC ENGINEERING
2016/11 SSANYONG / BESIX JOINT VENTURE UAE
ISLAND DUBAI, UAE CONSULTANT (DEC)
OMAN MUSEUM ACROSS AGES (OMAA) AT WILAYAT OF MANAH, SPML / OMAN SHAPOORJI CONSTRUCTION CO
2016/10 COX GROUP-ABU DHABI OMAN
AL DAKHILIYAH OMAN LLC (OSCO) JV
ME 3000 MAIN WORKS BADR PHASE 1 ON PLOT NO. 2615314 AT LACASA ARCHITECTS &
2016/07 ENGINEERING CONTRACTING CO. LLC UAE
MUHAISNAH FIRST, DUBAI, UAE ENGINEERING CONSULTANT
GENERAL MAINTENANCE OF KUWAIT AIRLINES BUILDING AND MEDCO GENERAL TRADING AND CONTRACTING
2016/06 KUWAIT AIRWAYS KUWAIT
SERVICE ROOM, KUWAIT INTERNATIONAL AIRPORTS, KUWAIT CO.
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
NEW ROYAL OMAN POLICE GENERAL HOSPITAL AT AIRPORT
SPML / OMAN SHAPOORJI CONSTRUCTION CO
2016/06 HEIGHTS, MUSCAT PACKAGE 2 (ACCOMMODATIONS), MUSCAT, ROYAL OMAN POLICE OMAN
LLC (OSCO) JV
OMAN
OMAN CONVENTION & EXHIBITION CENTRE - PHASE 1 OMAN SHAPOORJI CONSTRUCTION
2016/06 OMAN SHAPOORJI CONSTRUCTION CO LLC OMAN
PACKAGE 3, MUSCAT, OMAN CO LLC
2016/05 CONSTRUCTION OF ADAM AIR BASE, PACKAGE 4 & 5, OMAN AL BADI TRADING & CONT EST HILL INTERNATIONAL OMAN
ENGINEERING CONSULTANTS
2016/05 THREE STAR HOTEL AT AL BARSHA FIRST- DUBAI, UAE ARABTEC CONSTRUCTION LLC UAE
GROUP (ECG)
2016/03 TIARA UNITED TOWERS AT BUSINESS BAY, DUBAI, UAE ARABTEC CONSTRUCTION LLC ADPI UAE
RAFT FOUNDATION WORKS FOR MARYAH PLAZA ON PLOT NO. KEO INTERNATIONAL
2016/03 AL FARAA GENERAL CONT. CO. UAE
EW-11-M18-C1 AT MARYAH ISLAND, ABU DHABI, UAE CONSULTANTS
AL BAYT STADIUM AT AL KHOR PACKAGE 4 (ENERGY CENTRE GALFAR AL MISNAD / SALINI IMPREGILO / CIMOLAI KEO INTERNATIONAL
2016/03 QATAR
BUILDING), DOHA, QATAR JV CONSULTANTS - QATAR
NEW ROYAL OMAN POLICE GENERAL HOSPITAL AT AIRPORT SPML / OMAN SHAPOORJI CONSTRUCTION CO
2016/03 ROYAL OMAN POLICE OMAN
HEIGHTS, MUSCAT PACKAGE 2 (ACCOMMODATIONS), OMAN LLC (OSCO) JV
2014/05 SHEIKH JABER AL AHMAD CULTURAL CENTRE - KUWAIT AL HANI CONSTRUCTION & TRADING CO KUWAIT
R881/2D COMPREHENSIVE IMPROVEMENT OF PARALLEL ROAD
2014/04 DUTCO BALFOUR BEATTY PARSONS OVERSEAS LTD UAE
PHASE 2D
CONTRACT R842/6 - IMPROVEMENTS OF AL KHAIL ROAD PHASE
2014/03 EMIRATES ROADS CONTRACTING AECOM MIDDLE EAST LIMITED UAE
6 (AL YALAYIS ROAD), DUBAI
2014/03 DCC RESIDENCES REFURB LAING O' ROURKE WSP UAE
CONTRACT NO. AUH.06.10.0416 - UTILITY PLANT DISTRIBUTION KBR / ADAC - ABU DHABI AIRPORTS
2014/02 AND EAST MIDFIELD AND PERIMETER ROADS CONSTRUCTION - LEIGHTON CONTRACTING (ABU DHABI) L.L.C. COMPANY (CONTRACT DESIGN & UAE
ABU DHABI, UAE BUILD)
2014/02 P080 / PRIVATE VILLA AT PALM JUMEIRAH AL ROSTAMANI PEGEL LLC UAE
2012/05 P573FZ DEVELOPMENT OF GATE 4 IN JAFZA - JEBEL ALI, DUBAI KHANSAHEB CIVIL ENGINEERING LLC AECOM MIDDLE EAST LIMITED UAE
DESIGN & BUILD OF CHANGING ROOMS WORKS @ MULTI- IMPERIAL TRADING AND CONTRACTING
2012/04 QATAR OLYMPIC COMMITTEE QATAR
PURPOSE HALL IN AL-GHARAFA SPORTS CLUB COMPANY W.L.L.
RUWAIS HOUSING COMPLEX EXPANSION PHASE III MARRIED
2012/03 SYSTEM CONSTRUCT LLC X UAE
FLATS - PACKAGE 11
QATAR FOUNDATION - EDUCATION CITY PROJECT
2012/02 BROOKFIELD MULTIPLEX ASTAD PROJECT MANAGEMENT QATAR
CONSTRUCTION OF CENTRAL LIBRARY
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
R829/4 ACCESS ARRANGEMENT TO RASHIDIYA PARK AND RIDE PARSONS DE LEUW CATHER
2008/11 EMIRATES ROADS CONTRACTING UAE
STATION OVERSEAS LTD
KEO INTERNATIONAL
2008/11 23 MARINA ON PLOT NO. A23D MARSA DUBAI, 4B+G+90 DUBAI CIVIL ENGINEERING UAE
CONSULTANTS
R881/2C COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL SALINI COSTRUTTORI SPA PARSONS DE LEUW CATHER
2008/11 UAE
ROADS PHASE II CONTRACT - 2C OVERSEAS LTD
R881/3B - COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL PARSONS DE LEUW CATHER
2008/09 AL NABOODAH CONTRACTING LLC UAE
ROADS OVERSEAS LTD
R881/3A - COMPREHENSIVE IMPROVEMENT OF THE PARALLEL PARSONS DE LEUW CATHER
2008/08 TODINI CONSTRUZIONI GENERALI SPA UAE
ROADS (CONTRACT 3A) OVERSEAS LTD
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
2007 HOUSE OF MUSICAL ARTS, AL KHUWAIR, OMAN CARILLION ALAWI COWI & PARTNERS OMAN
2007/05 EMIRATES CEMENT FACTORY IN FUJAIRAH, UAE SIX CONSTRUCT - ORASCOM JV - UAE
R800/6 IMPROVEMENTS OF INTERCHANGE NO.1 ON SHK ZAYED PARSONS DE LEUW, CATHER
2007/04 SALINI COSTRUTTORI SPA UAE
ROAD, DUBAI, UAE OVERSEAS LIMITED
2007/02 SHARJAH SEWAGE TREATMENT PLANT PHASE 7 SIX CONSTRUCT LTD. HALCROW UAE
MOTORCITY – SITE WIDE INFRASTRUCTURE & LANSCAPE, BURT HILL / EDARA PROJ.
2006/08 AL FUTTAIM CARILLION UAE
DUBAI, U.A.E. MANAGEMENT
NAPHTHA HYDROTREATER REFORMER - MAIN CIVIL WORKS, FOSTER WHEELER - MANAGEMENT
2006 AL FUTTAIM CARILLION UAE
DUBAI U.A.E OPERATIONS
2006/09 AL FATTANTOWER, DUBAI, UAE PEREMBA CONSTRUCTION SDN BHD LC CONSULTING UAE
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
MOUCHELPARKMAN / TURNER
DUBAI MARITIME CITY PACKAGE CP402 SHIP TRANSFER AND
2006/09 BELHASA SIX CONSTRUCT INTERNATIONAL / CLIENT: UAE
DRY BERTHS CIVIL WORKS, DUBAI, UAE
NAKHEEL
DUBAI METRO - DUBAI LIGHT RAIL TRANSIT PROJECT, DUBAI, SYSTRA / CLIENT: ROADS &
2006/08 OBAYASHI / YAPI MERKEZI CONSORTIUM UAE
UAE TRANSPORT AUTHORITIES (RTA)
PALM JUMEIRAH TRUNK CROWN DISTRICT COOLING PLANTS HYDER CONSULTING MIDDLE EAST
2006/08 SHINRYO CORPORATION MIDDLE EAST UAE
T3 & T4, DUBAI, UAE / CLIENT: NAKHEEL
PARSONS DE LEUW, CATHER
RAS AL KHOR CREEK CROSSING - CONTRACT R800/3B, DUBAI,
2006/07 NATIONAL WHEEL J&P LLC OVERSEAS LIMITED / CLIENT: UAE
UAE
ROADS & TRANSPORT AUTHORITY
NATIONAL ENGINEERING BUREAU
JUMEIRAH LAKE TOWERS - CLUSTER X TOWERS X1, X2, X3 -
2006/05 BELHASA ENGINEERING & CONTRACTING CO. LLC (NEB) / MORGANTI GROUP UAE
DUBAI, UAE
(PROJECT MANAGER) / CLIENT:
MOTORCITY - SITE WIDE INFRASTRUCTURE & LANDSCAPE, BURT HILL / EDARA PROJECT
2006/05 AL FUTTAIM CARILLION UAE
DUBAI, UAE MANAGEMENT
HALCROW INTERNATIONAL
LA VILLE CONTEMPORAINE - THE LAGOONS CONTRACT NO.
2006/04 DUTCO BALFOUR BEATTY LLC PARTNERSHIP / CLIENT: DUBAI UAE
DIP-0410-B.41, DUBAI, UAE
INTERNATIONAL PROPERTIES
DSA ARCHITECTS INTERNATIONAL
2006/04 SOUQ RESIDENCES FZCO GOLDEN MILE, DUBAI, UAE AL SHAFAR GENERAL CONTRACTING / CLIENT: ISTITHMAR/IFA JOINT UAE
VENTURE
AL KHAILI TOWER (3B+G+5P+30+HC) COMMERCIAL / OFFICES
2006/02 TRANSEMIRATES CONTRACTING NATIONAL ENGINEERING BUREAU UAE
TOWER ON PLOT NO. A-002-037 AT TECOM, DUBAI, UAE
HALCROW INTERNATIONAL
AL JADAF DEVELOPMENT MARINE EDGE TREATMENT PHASE 1,
2006/01 BELHASA SIX CONSTRUCT PARTNERSHIP/ CLIENT: DUBAI UAE
DUBAI, UAE
PROPERTIES
COMMERCIAL / RESIDENTIAL FURNISHED APARTMENTS FOR THE FRASER NAG PARTNERSHIP /
2005/12 AL GHURAIR INVESTMENTS ON PLOT NO. 123-1090 ASCON CLIENT: AL GHURAIR UAE
SALAHUDDIN ROAD, AL MUTHEENA, DEIRA – DUBAI, UAE INVESTMENTS
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
2005/11 HAMRIYAH POWER STATION PHASE I, DUBAI, UAE ACTCO GENERAL CONTRACTING SEWA UAE
2B+G+10 RESIDENTIAL BUILDING ON PLOT NO. C003-005&006 ARENCO ARCHITECTURAL &
2005/11 AL SAHEL CONTRACTING CO. LLC UAE
TECOM, DUBAI, UAE ENGINEERING
PARSONS DE LEUW, CATHER
2005/10 R659/12 - WIDENING OF SHEIKH ZAYED ROAD, DUBAI, UAE DUTCO CONSTRUCTION COMPANY LLC OVERSEAS LIMITED / CLIENT: UAE
DUBAI MUNICIPALITY
RAS AL KHOR CREEK CROSSING - CONTRACT R800/1, DUBAI, PARSONS DE LEUW, CATHER
2005/10 BELHASA SIX CONSTRUCT UAE
UAE OVERSEAS LIMITED
RAS AL KHOR CREEK CROSSING - CONTRACT R800/2, DUBAI, PARSONS DE LEUW, CATHER
2005/10 DUTCO CONSTRUCTION COMPANY LLC UAE
UAE OVERSEAS LIMITED
AA-7029- BUSINESS BAY DEVELOPMENT - CREEK EXTENSION HALCROW INTERNATIONAL
2005/09 DUTCO BALFOUR BEATTY LLC UAE
CONTACT -1, DUBAI, UAE PARTNERSHIP
3B+G+34 STOREY COMMERCIAL/RESIDENTIAL BUILDING ON DESIGN & ARCHITECTURE BUREAU
2005/07 ASCON UAE
PLOT NO. U1-JLT, DUBAI, UAE (DAR)
2005/07 DUBAI FESTIVAL CITY - Z10P020, DUBAI, UAE AL NABOODAH CONTRACTING (DESIGN) - ACD KHATIB & ALAMI UAE
DUBAI INTERNATIONAL AIRPORT EXPANSION PHASE II,
2005/07 CONTRACT AX247, COMPLETION WORKS FOR TERMINAL 1 AL HABTOOR MURRAY AND ROBERTS JV DAR AL-HANDASAH CONSULTANTS UAE
EXPANSION, DUBAI, UAE
ADDITION OF G+9 STOREYED LUXURY BEACH RESORT AT MINA ARCHON ENGINEERING
2005/06 ARABIAN CONSTRUCTION CO. LLC UAE
AL SEYAHI / AG-010, DUBAI, UAE CONSULTANTS
3B + G + 34 STOREY BUILDING ON PLOT C-3 AT JUMEIRAH LAKE
2005/05 ASCON DAR CONSULTANTS UAE
TOWERS, DUBAI, UAE
2005/04 BURJ DUBAI BUSINESS PARK PHASE 1, DUBAI, UAE BU HALEEBA CONTRACTING DAR CONSULTANTS UAE
2005/04 BURJ DUBAI DEVELOPMENT - THE BURJ TOWER, DUBAI, UAE SAMSUNG CORPORATION HYDER CONSULTING MIDDLE EAST UAE
6B - CONSTRUCTION OF HOUSING DEVELOPMENT (HOUSING
KEO INTERNATIONAL
2005/03 LOT 2) FOR QATAR FOUNDATION - EDUCATION CITY, DOHA, MIDMAC-CONTRACO JV QATAR
CONSULTANTS
QATAR
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
2005 MARINASCAPE, DUBAI MARINA, DUBAI. UAE LARSEN & TOUBRO/TRIDENT HOLDINGS ARCHON UAE
REFURBISHMENT OF FUJAIRAH INTERNATIONAL AIRPORT, FUJAIRAH NATIONAL CONSTRUCTION &
2005 KHATIB & ALAMI UAE
FUJAIRAH, UAE TRANSPORT
2005 TEXTILE CITY, WARSAN, DUBAI, UAE UNITED ENGINEERING CONSTRUCTION ARIF & BINTOAK UAE
2004-
QASEER ALAM, OMAN OSCO AL TURKI COWI DIGPM OMAN
2005
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
2004/06 JUMEIRAH BEACH RESIDENCE JBR-SECTOR 2, DUBAI, UAE SALEH CONSTRUCTIONS HYDER CONSULTING MIDDLE EAST UAE
PILE HEAD REPAIRING FOR KHALID AL ATTAR TOWER, DUBAI,
2004/06 TRANSEMIRATES CONTRACTING ADNAN SAFFARINI UAE
UAE
MALL OF THE EMIRATES- WP 3100 EAST CAR PARK, DUBAI,
2004/06 AL NABOODAH LAING O'ROURKE MOTT MACDONALD UAE
UAE
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
2004/03 MARINA MALL EXTENSION PHASE 2, ABU DHABI, UAE EMIRATES BELBADI ACG UAE
THE PALM - JUMEIRA, JAP006/C102 CONSTRUCTION OF THE
2004/03 BELHASA SIX CONSTRUCT LAP & PARSONS DE LEUW CATHER UAE
GATEWAY BRIDGE, DUBAI, UAE
DUBAI INTERNATIONAL AIRPORT EXPANSION PHASE II-
2004/02 TERMINAL III CONCOURSE II & CAR PARK CONTRACT AX058, AL NABOODAH LAING O'ROURKE DAR AL-HANDASAH CONSULTANTS UAE
DUBAI, UAE
20004/0 EMIRATES NEW ENGINEERING CEBTRE - LANDSIDE BUILDINGS
ASCON THE FRASER NAG PARTNERSHIP UAE
1 DUBAI, UAE
KNOWLEDGE VILLAGE II FOR TECOM, B+G+3 - 6BUILDINGS,
2004/01 AL BASTI & MUKTHA LLC DAR CONSULTANTS UAE
DUBAI, UAE
MALL OF THE EMIRATES - SNOW CENTRE & WCP MAIN
2004/01 AL NABOODA LAING O' ROURKE HYDER CONSULTING MIDDE EAST UAE
CONTRACT DUBAI, UAE
BASEMENT CONSTRUCTION JOINTS AND INJECTION WORKS,
2004 TRANSEMIRATES CONTRACTING NATIONAL ENGINEERING BUREAU UAE
B+G+13 STOREY BUILDING, RASHIDIYA, DUBAI, UAE
2004 DUBAI MARINA HEIGHTS, DUBAI, UAE DUTCO BALFOUR BEATTY CONSTRUCTION CO. RMJM UAE
2004 MARINA DEVELOPMENT – DISTRICT 2 UNITED ENGINEERING CONSTRUCTION KHATIB & ALAMI UAE
PILE HEAD TREATMENT, KHALIDIYAH 6 TOWER DEVELOPMENT,
2004 CIVILCO BAINOONA CONSULTANTS UAE
BAINOONA STREET, ABU DHABI, UAE
2003/11 PILE CAP WATER PROOFING`, BEL RASHID TOWER, DUBAI, UAE EASTERN CONTRACTING ADNAN SAFFARINI UAE
2003/10 DUBAI FESTIVAL CITY, DUBAI, UAE AL NABOODAH CONTRACTING - BUILDING (ACB) BREWER SMITH & BREWER GULF UAE
2003/10 JEBEL ALI FREEZONE QUAY WALL 5 DUBAI, UAE SIX CONTRUCTOR LTD. / AL NAKHEEL UAE
DAR AL – HANDASAH
2003/08 DUBAI INTERNATIONAL AIRPORT EXPANSION DUBAI, UAE M/S AL NABOODAH LAING O'ROURKE UAE
CONSULTANTS
CONTRACT R267 - AL SAHARA MALL INTERCHANGE, DUBAI, HALCROW INTERNATIONAL
2003/08 ATHENA S.A. / N.C.T.C JV UAE
UAE PARTNERSHIP
2003/07 DAM REPAIR, MANGLA DAM, PAKISTAN WAPDA PAKISTAN
FLOWER CENTRE PROJECT FOR DUBAI CIVIL AVIATION, DUBAI,
2003 AL NABOODAH LAING O'ROURKE W.S ATKIN’S UAE
UAE
2003 DOHA INTERNATIONAL AIRPORT, QATAR DARWISH ENGINEERING QATAR
2003 FAHAHEEL CINEMA COMPLEX, FAHAHEEL, KUWAIT AHMADIAN CONTRACTING & TRADING CO. OHA CONSULTANT KUWAIT
FAHAHEEL WATER FRONT DEVELOPMENT PROJECT,
2003 AHMADIAH CONTRACTING & TRADING CO. GULF CONSULT KUWAIT
FAHAHEEL, KUWAIT
2003 K. O. A. C. COMMERCIAL COMPLEX, SHUWAIKH, KUWAIT COMBINED GROUP CO. BONYAN DESIGN KUWAIT
2003 SHEIKH KHALIFA BRIDGE, MANAMA, BAHRAIN SIX CONSTRUCT HYDER BAHRAIN
2002/11 SHEIKH AHMED BIN RASHID AL MAKTOUM HOTEL – DUBAI
NASA MULTIPLEX ARCHON UAE
-12 MARINA, UAE
B+G+36 RESIDENTIAL TOWER ON PLOT NO. 335-0333, SHEIKH
2002/10 AL NEKREH CONTRACTING CO. LLC DAR CONSULTANTS UAE
ZAYED ROAD, DUBAI, UAE
PILE HEAD PROTECTION, WASIT POWER STATION PHASE IV,
2002/10 AL KAUTHER CONTRACTING SEWA UAE
SHARJAH, UAE
2002/09 DUBAI WORLD TRADE CENTRE BRIDGE, DUBAI, UAE DUTCO CONSTRUCTION LLC MAUNSELL CONSULTANCY UAE
2002/08
4 RESIDENTIAL BUILDINGS, DUBAI MEDIA CITY, DUBAI, UAE ASCON DUBARCH CONSULTANTS UAE
-09
CONSTRUCTION OF RESERVOIR COMPLEX PHASE II AND
2002/07 UNEC ACE INTERNATIONAL UAE
PHASE III IN MUSHRIF, DUBAI, UAE
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
2002/07 THE KNOWLEDGE VILLAGE, PLOT NO. P-028, DUBAI, UAE AL BASTI & MUKTHA LLC DAR CONSULTANTS UAE
2002/07 KNOWLEDGE VILLAGE PROJECT NO. J - 028 TECOM DUBAI, UAE AL BASTI & MUKTHA LLC DAR UAE
2002/06 GREEN COMMUNITY PHASE 1A, DUBAI INVESTMENT PARK,
BELHASA ENGG. & CONTG. CO. KHATIB & ALAMI LLC UAE
-07 DUBAI, UAE
2002/05 AL HAMIDIYA INTERCHANGE, UAE EMIRATES ROAD CONTG. AL TURATH ENG CONSULTANTS UAE
ARCHON ENGINEERING
2002/05 EMAAR THE LAKES DEVELOPMENT – ZULAL (M2), DUBAI, UAE ARABTEC UAE
CONSULTANTS
SCHUSTER PECHTOLD &
2002 DUBAI MEDIA CITY PHASE III, DUBAI, UAE BELHASA ENGG. & CONTG. CO. LLC UAE
PARTNERS
SCHUSTER PECHTOLD &
2002 DUBAI MEDIA CITY PHASE II (4 BUILDINGS), DUBAI, UAE BELHASA ENGINEERING & CONTRACTING UAE
PARTNERS
2001/12 THE GREEN COMMUNITY, PHASE I A, DUBAI, UAE NASA MULTIPLEX LLC UNION PROPERTIES UAE
2001 AL JIMI SHOPPING CENTRE, AL AIN, UAE PIVOT ENGINEERING / AL AIN MUNICIPALITY C.R.S.S. UAE
REPAIRS TO OVERHEAD TRANSMISSION TOWER
2001 TOWER & POWER / ADWEA LAHMEYER INTERNATIONAL UAE
FOUNDATIONS, ABU DHABI TO AL AIN, UAE
2000/08 AL JIMI SHOPPING CENTRE, AL AIN, UAE PIVOT CRSS UAE
KILN SUPPORT COLUMN REPAIRS, AL AIL CEMENT FACTORY,
2000/08 DICOTECH IHI - DUBAI UAE
UAE
2000/08 RESIDENTIAL DEVELOPMENT SSANGYONG ARKITEKNIK
2000/07 3 SCHOOLS FOR MINISTRY OF PUBLIC WORKS, DUBAI, UAE AL BADUYAH CONTRACTING CO. MINISTRY OF PUBLIC WORKS UAE
DUBAI MUNICIPALITY, ARCHON
2000/07 2 SCHOOLS FOR DEZ, DUBAI MUNICIPALITY, DUBAI, UAE AL HALLAWI CONTRACTING CO. UAE
CONSULTANTS
HALCROW INTERNATIONAL,
2000/07 WEST SIDE MARINA, DUBAI, UAE AL FUTTAIM TARMAC UAE
EMAAR
LAYYAH POWER STATION, SHARJAH SUBSTATION, SHARJAH,
2000/06 GDS SEWA UAE
UAE
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
1998/12 B+G+M+4 STOREY BUILDING NEAR FALCON R/A, DUBAI AL BASTI & MUKTHA ARKITEKNIK UAE
1998/11 EMIRATES TOWER PROJECT HOTEL & PODIUM SIX CONSTRUCT HYDER CONSULTANTS
1998/09 SHARJAH UNDERPASS REPAIRS, SHARJAH, UAE GDS SHARJAH MUNICIPALITY UAE
1998/09 DUBAI PLAZA HOTEL, DUBAI, UAE FIRST MAINTENANCE SHEIKH MOHD AL MUBARAK UAE
1998/07 JEBEL ALI DESALINATION, SEAWATER INTAKES, DUBAI, UAE DICOTECH DEWA UAE
1998/06 ITTIHAD MONUMENT SHARJAH, UAE RIVIERA POOLS SHARJAH MUNICIPALITY UAE
1998/05 132 KV SUBSTATION SHARJAH-NEAR HAMRIYA FREE ZONE TEAM ENGINEERING SEWA UAE
1998/04 BUILDING FOR MUJEERIN MOHAMMED - SATWA DUBAI AL BASTI & MUKTHA W.S. ATKINS UAE
1998/04 B+G+M+7 STOREY BLDG ZARABAT DOIE, DUBAI AL BASTI & MUKTHA ARIF & BINTOAK UAE
1998/04 2B+G+M+4 STOREY BUILDING NEAR DUBAI INT’L AIRPORT ARENCO AL TAMIR CONSULTANT UAE
1998/04 AL AROUBA ROAD BRIDGES, SHARJAH, UAE GDS SHARJAH MUNICIPALITY UAE
1998/03 B+G+M+7 STOREY FOR ARIF & BINTOAK AL BASTI & MUKTHA ARIF & BINTOAK UAE
1998/03 AL HASAWI CENTRE DUBAI SUN ENGINEERING KHATIB & ALAMI UAE
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
1998/02 AL TAYER COMMERCIAL BUILDING DUBAI AL BASTI & MUKTHA ARKITEKNIK UAE
1998/02 GHUSAIS HOUSING REPAIRS, DUBAI, UAE PYRAMID BUILDING MAINT. UAE
1997/11 STATE SECURITY DEPT. H.Q., UAE GULF CONT. CO. DAR AL AMARA
1997/10 INTERCON STAFF ACCOMMODATION, DUBAI, UAE ABRAR MAINT. DUBAI INTERCON
1997/08 AJMAN CHAMBER OF COMMERCE BUILDING TEAM ENGINEERING MOHD SHEIKH AL MUBARAK
1997/07 DUBAI ISLAMIC BANK BUILDING SHARJAH BRANCH S.S. LOOTAH PORT SAEED ENG CONSULTANT
1997/04 PHEONICIA HOTEL, JORDAN ABADI & ANANI ABADI & ANANI
1997/04 COLD STORES FOR JAFZA, DUBAI, UAE DICOTECH TEBBODIN / JAFZA
1997/02 WEIGH LEAF BRIDGE REPAIRS, JEBEL ALI, UAE DICOTECH/KHANSAHEB TEBBODIN / JAFZA
1997/01 AL FALAH MILITARY CAMP (WATER TANK), SHARJAH, UAE AL HAMED DEV G.H.Q.
1996/12 DUBAI INT. AIRPORT T.D. 46 CONCOURSE FOUNDATION, UAE AL NABOODAH CONT. ROAD DIVISION BECHTEL INTERNATIONAL
1996/12 AL MALAZ STADIUM REPAIR WORK, SAUDI ARABIA SMBTC MINISTRY OF YOUTH FAIR
1996/12 RAK MILITARY CAMP, RAS AL KHAIMAH, UAE AL SAFA CONTRACTING G.H.Q.
1996/03 AL NAHDA INTERCHANGE DUBAI/SHARJAH, UAE AL NABOODAH CONTG ROADS DIV. HALCROW
93-94 SEEB RAFO AIRPORT REPAIRS, UAE STRABAG (OMAN) LLC MODES
1992/06 JEBEL ALI PORT REFURBISHMENT QUAY, UAE DUTCO BALFOUR BEATTY
1992/03 NAWAISEEB CUSTOMS POST KUWAIT SA'AD TRADING KUWAIT AMERICAN CORP. OF ENG.
1991/00 CONCRETE REPAIRS-DOHA EFFLUENT SCH. LOTUS CONTG. QATAR PENCOL JOHN TAYLOR
1991/00 CABLE TRENCH REPAIRS, UAE DUBAL / DUTCO PAULING E.W. PREECE
1991/00 DS51 SEWAGE TREATMENT WKS-DXB MUNICIPALITY, UAE. KEANG NAM GERMAN WATER ENGG.
1991/00 SHARJAH FLYOVER REPAIRS - SHARJAH MUNICIPALITY, UAE IDEAL INDUSTRIES SHARJAH MUNICIPALITY
1991/00 QUAY WALL REPAIRS - SHARJAH PORT AUTHORITY, UAE OVERSEAS AST. HALCROW
1990-91 RECON. OF CONC. COL & SEA WATER STNS. , UAE GULF HOUSING QATAR TREVOR CROCKERS
1989/10 CONCRETE REPAIRING DUBAL UPGRADING, UAE DUTCO PAULING DUBAI E.W. PREECE
International Job References - MasterEmaco S 466
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
1989/05 DUBAL REPAIR WORKS, UAE OVERSEAS ASST. DUBAI E.W. PREECE
Approvals
AECOM Middle East Limited +974 44079000 let
A:COM f~I ~~I~
PO Box 6650, Doha
+97444376782 fax
Qatar
www.aecom.com
Project name Design & Construction Orbital Highway Truck Route P023 - Contract 4
Project number 60312728
Client ASHGHAL
Request for material approval for Concrete repair works in Highway &
Subject Utility Structu re Ma nufactu rer: MIS BAS F Constructor Chemicals-UAE
Comment Consent classification "A"
Issued by Wael Amer 11 February 2015
Distribution Details
Organisation Address Received Attention of Copies
~~-------------------------------
Document Detai ls
Document number Rev Document Title
RECE I V E D
C:\Users\HakkimAlAppDalaILocaIIMicrOsofl\
12 FEB 2015 WindowslTemporary Internet
FileslContent. OutiooklUW 16A52\TN
Concrete repair.docx
... I
'Oate: nUoh ,_,n" Doc No: REV: CB
..
Project New Orbltat I '. T, ·0, , Project (P0231 - Contract 4
t No. nn14l14
IKBR
IAECOM
I Source of I., Chemicals/Plot No. 598·387, Ouballnvestment Park, Jebel All, DubaJ, UAE
with Full Add ress
Manufacture in the Approved list Yes 0 No 0
I".ro /'nm'oo of t usa,e 'Ulllily i fPlnholes, Small & large Sca" R.pa'r'ng or LO",,'"
Project Specification of
Corlloo 5, Part 16
IOrawlng N/A
IBOQ N/A
~ . , ... .r "
Ilocal Supplier of Materials iBASF Construction Chemicals/PO Box 55426, Doha, Qatar
Enclosu res
1(0 Comment Response Sheet
o Test Results! Certificate
Wfl C! rtify Iblthfllhove luOmltt!d It!/IU hive been Ie~Jevnd In dlll~ Ind Irl correclilld confOl"m.n"wlth Jpeclfic. tIoM.nd .!so lilt mll!ri.l sovrcu Indk.,d.txw.
h..... bun rMewM ill del,lI . nd _will JUpply tlwl,ubmit1ed items in fun conformity .
Rejected:
Engineer:
Client- Ashgal:
A::COM
Co nse nt Classification: A Number of comments open · o
Number of comments dosed - 8
Number of comments carried to next stage-
EXPRESSWAY PROGRAMME
Comment/Response Sheet
Project: P023 - New Orbital Highway and Truck Route - Contract 4 Due Date: 20-Jan-IS
Review Document: Request for material approval for Concrete repair works in Highway & Utility Structure Manufacturer : MIS 8ASF Constructor Chemicals-UAE
Comments by: AECOM :-Venugopal/Saurabh Sinha/Mubashir Hussain 5yed/Govinda Rae Date: 28-Jan-IS
Comment Sheet Reference: EXW-P023-0004-CM-AEC-CR-OlS30 CA
Response by: Daewoo E&C Date: 03-feb-IS
Review Reference : EXW-POB-0004-MQ-OEC- TN-00697
Comments by: AECOM :-Venugopal/Saurabh Sinha/Mubashir Hussain 5yed/ Govinda Rao Dat e: ll-Feb-15
The Flexural Strength and Anchorage bond test report for Master Saurabh
3 General Rev.CA C1 Rev.CA Refer to attached sheet. Radel Closed
Emaco S 466 (Large Scale Concrete Repair) is required. Sinha
QCS 2010 Section 5 Part Contractor shall submit a detailed method statement identifying
Saurabh Noted. MS to submit incorporating the approved material for
4 16 Clause 16.6.1 Bulletin Rev.CA the specific materials to be used and the sequence of activities for C1 Rev.CA Radel Closed
Sinha repairs before to proceed remedial works.
2 the repair.
1 of 2 EXW-POZ3-0004-CM-AEC-CR-D1S30
A:COM
Consent Classificat ion : A: Consented to, authorized to proceed B: Consented to, subject to comments W: Rejected, not consented to, reasons noted I: Information only
categor:v~ •
C t 4 : major comme n ,
Cat 3 ' techn 'cal c;ommen t ,
cat 2- non techn 'cal commen Cat 1 : Impat
ran tfor fut ur e su b miSSionS
•
(tOOb se r va t'/N
Ion 0"
No Reference Comment bV Co,. Response bV Status
Technical Submission
Section C_1I Part 2 Project
Contractor to comply with Technical Submission Section C_1I Part 2
Specification Section Saurabh
6 Rev.CA Project Specification Section 32/00 Clause 3.10, QCS 2010 Section (1 Rev.CA Noted and to comply. Rodel Closed
32/00 Clause 3.10, QCS Sinha
5 Part 16 Clause 16.6 in fo r Concrete Repair works
2010 Section S Part 16
Clause 16.6
Technical Submission
All repairs approved by the Engineer shall be performed by a
Section C-1I Part 2 Project Govinda
7 Rev.CA subcontractor specialized in the repa ir of concret e in the Middle ( 1 Re v.CA Noted Rod el Closed
Specification Section Rao
East and prepared to guarantee the work.
32/00 Clause 3.10.C
2 of 2 EXW-P023-{)()()4-CM -AEC-CR-01530
~I SEG atar 9'~K o
SITE TRANSMITTAL of TRANSMITIAL NO: 543-SEG-C-TRM-OB14
Shop Drawings, Materials, etc.
RECEIVED BY KEO
Submittal Item
Brookfield Multiplex
Medgulf JV WLL
Doha, P.O Box 54 Submittal Item No.
Phone: +974-449- BP-1C-01-0024
3251
Fax: +974-449-3251
General Information
Dates
Sample Attached No
Activity Code
Micro Schedule Activity ID
BLDG
AREA
LEVEL
Submitted Date 15/10/2012
Discipline
Sub Contractor
Compliance: Specification Division 3, Section 033000, Clause 3.04 (D)
Requirement
Compliance: Contractor Specified
Proposal
Compliance: Remarks
Acknowledged (E2)