Motor 380 V 1
1 Dissasembly Motor CEP 10% 2
2 Cleaning Motor CEP 50% 3
3 Insulated Resistance Tester (Megger) 50%
1
Keterangan
Generator
Pelepasan Brush
Pengukuran Gap
Megger dan Pelepasan NGR
Motor 380 V
Dissasembly Motor CEP
Cleaning Motor CEP
Insulated Resistance Tester (Megger)
Motor 6 kV
Motor PA Fan
1 SE0116007 Transformator 5% 1
2 Pasang Scafolding Progress 40% 2
3 Pelepasan Fan Progress 30% 3
Keterangan
Motor 6 kV
Motor PA Fan Lanjutan
Motor 380 V
Cleaning dan IR Test Lanjutan
Transformator Lanjutan
Pasang Scafolding Lanjutan
Pelepasan Fan
Motor 380 V
Cleaning dan IR Test Progress 10%
Keterangan
Motor 6 kV
Motor PA Fan
Melepaskan Coupling
Melepaskan Branket dan Bearing DE
Motor 380 V
Cleaning dan IR Test
Main Transformator
Diassembly Motor Fan Transformator
Keterangan
Cleaning Branket
Keterangan
Motor 6 kV
SE0116113 Pasang Bearing sisi DE motor PA Fan
Pasang Braket motor PA Fan
Keterangan
Cleaning Breaker 6 kV
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
2 Motor 6 kV
SE0116113 Pasang Bearing sisi NDE motor PA Fan Finished 100% 2 SE0116113
Pasang Braket motor PA Fan Progress 60%
3 Motor 380 V 3
SE0116122 Revarnish Stator PA Booster Fan Finished 100% SE0116030
Assembly branket DE NDE dan acsesoris Finished 100%
Pengencangan baut pondasi PA booster Fan Finished 100%
SE0116030 Disassembly Gland Steam No. 2 Finished 100%
Keterangan
Main Transformator
Disassembly Bearing Fan Transformator Lanjutan
Cleaning Motor Fan Trafo Lanjutan
Motor 6 kV
Pasang Braket motor PA Fan Lanjutan
Motor 380 V
Pasang Bearing Gland Steam Lanjutan
2 Motor 6 kV
SE0116113 Pasang Braket motor PA Fan Progress 70% 2 SE0116113
3 Motor 380 V 3
SE0116030 Pasang Bearing Gland Steam Finished 100%
5 ESP
Insulated Resistance Testing (Megger ) Finished 100%
Transformator
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG Listrik
Pekerjaan Yang Telah Dilaksanakan Progress
No Tag No. Keterangan No Tag No.
(Work Has Been Done)
Tanggal : 29 September 2016
Insulated Resistance Testing (Megger) Trafo Finished 100%
sisi Beban
Insulated Megger motor dan isolator Finished 100%
6 Generator
Pengecekan & pengukuran Clearance bearing Finished 100%
generator No. 4
Keterangan
Main Transformator
Pemasangan Fan Transformator
Cleaning Motor Fan Trafo Lanjutan
Motor 6 kV
Pasang Braket motor PA Fan Lanjutan
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
Motor 6 kV
SE0116113 Pasang Braket motor PA Fan Finished 100%
2 Melepas Cooler ID Fan Finished 100%
Merubah posisi motor untuk pelepasan Progress 10%
kopling ID Fan
3 Motor 380 V
SE0116030 Disassembly Bearing Vacum Pump Finished 100%
4 MCC
Inspeksi dan Cleaning MCC Progress 40%
5 ESP
Insulated Resistance Testing (Megger )
Transformator (sisi beban 2 Trafo tidak bisa di Finished 100%
megger)
Disassembly motor emiting Finished 10%
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG Listrik
Pekerjaan Yang Telah Dilaksanakan Progress
No Tag No. Keterangan No Tag No.
(Work Has Been Done)
Tanggal : 29 September 2016
Cleaning Isolator Trafo Incoming 4,5,6 Finished 10%
6 Generator
Membuka Cover Fan Blade Finished 100%
Pembuatan Spesial Tools Jacking Generator Progress 10%
Keterangan
Motor 6 kV
Merubah posisi motor untuk pelepasan
kopling ID Fan
MCC
Inspeksi dan Cleaning MCC
ESP
Generator
Pembuatan Spesial Tools Jacking Generator
2 Motor 380 V
SE0116045 Inspeksi Motor AOP Progress 40% SE0116045
Disassembly motor AOP Finished 100%
SE0116028 Inspeksi Motor Jacking Oil Pump Progress 5% SE0116028
Disassembly Jacking il Pump Progress 10%
Motor 6 KV
Inspeksi PA Fan Lanjutan
Inpeksi PA Booster Fan Lanjutan
Inspeksi ID Fan Lanjutan
Memasang Bearing NDE ID Fan Lanjutan
Melepaskan Coupling ID Fan Lanjutan
Motor 380 V
Inspeksi Motor AOP Lanjutan
Inspeksi Motor Jacking Oil Pump Lanjutan
Disassembly Jacking il Pump Lanjutan
Transformator
Pemasangan Fan Trafo Lanjutan
ESP
Inspeksi Heater Hopper Lanjutan
Cleaning Busbar Isolator Lanjutan
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
Generator
Assembly Support Jacking rotor dengan
balok
Disassembly Pedestal bearing #4
2 Motor 380 V
SE0116045 Inspeksi Motor AOP Progress 40% SE0116045
SE0116028 Inspeksi Motor Jacking Oil Pump Progress 5%
Disassembly Jacking Oil Pump Progress 25% SE0116028
Melepas Koneksi CWP no. 3 Finished 100%
Motor 6 KV
Inspeksi PA Fan Lanjutan
Inpeksi PA Booster Fan Lanjutan
Inspeksi ID Fan Lanjutan
Motor 380 V
Inspeksi Motor AOP Lanjutan
Inspeksi Motor Jacking Oil Pump Lanjutan
Disassembly Jacking il Pump Lanjutan
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
ESP
Inspeksi Heater Hopper Lanjutan
Cleaning Busbar Isolator Lanjutan
Inspeksi Heater Hopper Lanjutan
Generator
Inspeksi Stopper Bearing
2 Motor 380 V
SE0116045 Inspeksi Motor AOP Progress 40%
SE0116028 Inspeksi Motor Jacking Oil Pump Progress 5%
Disassembly Jacking Oil Pump (pembuatan Progress 25%
Spesial Tools)
5 SE0116003 Generator
Inspeksi Stopper Bearing Progress 40%
Pengaturan Simplate di Stopper Bearing Progress 90%
Lower
Cleaning End Winding Progress 70%
Keterangan
Koordinator Bidang Herry Santoso
Semua Bidang PPC Derry Ferdiansyah PT PJB SERVICES
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
2 Motor 380 V
SE0116045 Inspeksi Motor AOP Progress 40%
SE0116028 Inspeksi Motor Jacking Oil Pump Progress 40%
Inspeksi Turning Gear Progress 40%
Inspeksi Motor Vibrator Progress 40%
Disassembly Motor Vibrator Finished 100%
Disassembly Motor DC Oil Pump Finished 100%
5 SE0116003 Generator
Inspeksi Stopper Bearing Progress 80%
Pengaturan kontak Stopper Bearing Terhadap Progress 90%
Pedestal
Cleaning End Winding Progress 100%
Keterangan
Koordinator Bidang Herry Santoso
Semua Bidang PPC Derry Ferdiansyah PT PJB SERVICES
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN