Boiler
1 Scafolding di Furnace 10%
2 Disassembly Boiler Steam Drum 25%
3 Melepas Isolasi Steam Drum Man Hole 100%
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG MEKANIK
Pekerjaan Yang Telah Dilaksanakan Progress
No Tag No. Keterangan No Tag No.
(Work Has Been Done)
Tanggal : 21 September 2016
4 Drain Bunker Boiler 10%
Keterangan
Turbin
Disassembly Front Standard
Disassembly Turning Gear
Disassembly Kopling Turbin
Disassembly Cover Bearing 1, 2, 3, 4
Aux. Turbin
Bongkar Pompa
Inspeksi MOT
Drain ESP
Drain Pasir di Furnace
Cleaning Steam Drum
PAF System
SAF System
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
2 Aux. Turbin
Inspeksi MOT Progress 25%
SE0116064 Inspection HE pada Vacuum Pump Progress 20%
Bongkar HE No. 1 & 2 100%
3 Aux Boiler
PAF System Progress 10%
Pelepasan Kopling PA Fan dan Data Alignment 50%
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG MEKANIK
Pekerjaan Yang Telah Dilaksanakan (Work Has Progress
No Tag No. Keterangan No Tag No.
Been Done)
Tanggal : 22 September 2016
SAF System Progress 1%
4 Boiler
Inspection Steam Drum Progress 2%
Cleaning Steam Drum 10%
SE0116124 Inspeksi Air Heater Progress 30%
Test Air Heater (Tidak ada kebocoran) 50%
Keterangan
Turbine Casing
Melepas baut dan pin casing turbin
Turbine Bolt and Nut
Aux. Turbin
Inspeksi MOT
Inspection HE pada Vacuum Pump
Cleaning HE No. 1
Buka Penekan Gland Packing No. 1 dan No. 2
Inspection Saparator Tank
Aux Boiler
PAF System
Pelepasan Kopling PA Fan dan Data Alignment
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
SAF System
Boiler
Inspection Steam Drum
Cleaning Steam Drum
Inspeksi Air Heater
Test Air Heater (Hasil Baik)
Pembuatan Akses Manhole Air Heater
Drain Pasir di Furnace
Pelepasan Lance Cube & Inner Cube di
Sootblower No. 5 dan No. 7
Aux. Turbin
Inspeksi MOT Progress 30%
Inspection HE pada Vacuum Pump Progress 50%
Cleaning HE No. 1 Finished 100%
Boiler
Inspection Steam Drum Progress 2%
Cleaning Steam Drum Progress 10%
Inspeksi Air Heater Progress 40%
Finished 100%
Drain Pasir di Furnace
Pelepasan Lance Cube & Inner Cube di Sootblower Progress 70%
No. 5 dan No. 7
Pekerjaan Pemasangan Scafolding di furnace Progress 20%
Progress 50%
Lepas Chevron dan Sparator di Steam Drum
Melepas Coupling ID fan dan Pengambilan data Progress 50%
before aligment
Keterangan
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG MEKANIK
Pekerjaan Yang Telah Dilaksanakan (Work Has Progress
No Tag No. Keterangan No Tag No.
Been Done)
Tanggal : 23 September 2016
Koordinator Bidang Willy Pratama
Semua Bidang PPC Derry Ferdiansyah PT PJB SERVICES
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
Turbin
Turbine Casing
Pengangkatan Casing Turbin
Aux. Turbin
Inspeksi MOT
Inspection HE pada Vacuum Pump
Buka Penekan Gland Packing No. 1 dan No. 2
Pelepasan Bearing Vacuum Pump
No.1
Aux Boiler
PAF System
SAF System
Cleaning Gas Duct
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
Boiler
Inspection Steam Drum
Cleaning Steam Drum
Inspeksi Air Heater
Test Air Heater (Hasil Baik)
Pembuatan Akses Manhole Air Heater
Aux. Turbin
SE0116027 Inspeksi MOT Progress 30%
SE0116059 Inspection HE pada Vacuum Pump Progress 60%
Progress 80%
Buka Penekan Gland Packing No. 1 dan No. 2
Pelepasan Bearing Vacuum Pump No.1 Finished 100%
Aux Boiler
SE0116112 PAF System Progress 20%
SE0116118 SAF System Progress 1%
Cleaning Gas Duct (Back Pass) Progress 50%
Boiler
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG MEKANIK
Pekerjaan Yang Telah Dilaksanakan (Work Has Progress
No Tag No. Keterangan No Tag No.
Been Done)
Tanggal : 24 September 2016
SE0116078 Inspection Steam Drum Progress 10%
Disassembly Steam Drum Progress 60%
Lepas Chevron dan Separator di Steam Drum Progress 75%
SE0116100 Pelepasan Lance Cube & Inner Cube di Sootblower Progress 70%
No. 5 dan No. 7
Pekerjaan Pemasangan Scafolding di furnace Progress 50%
Keterangan
Tes Aligment HE
Tes Kebocoran HE Lanjutan
Aux. Turbin
SE0116027 Progress 30%
Inspeksi MOT
SE0116059 Inspection HE pada Vacuum Pump Progress 60%
Buka Penekan Gland Packing No. 1 dan No. 2 Progress 80%
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG MEKANIK
Pekerjaan Yang Telah Dilaksanakan (Work Has Progress
No Tag No. Keterangan No Tag No.
Been Done)
Tanggal : 25 September 2016
Tes Kebocoran HE No. 1 (no leak) Finished 100%
Boiler
SE0116078 Inspection Steam Drum Progress 10%
Disassembly Steam Drum Progress 60%
Lepas Chevron dan Separator di Steam Drum Progress 75%
SE0116100 Pelepasan Lance Cube & Inner Cube di Sootblower Finished 100%
No. 5 dan No. 7
Pekerjaan Pemasangan Scafolding di furnace Progress 80%
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG MEKANIK
Pekerjaan Yang Telah Dilaksanakan (Work Has Progress
No Tag No. Keterangan No Tag No.
Been Done)
Tanggal : 25 September 2016
Aux Boiler
SE0116112 Pembukaan Manhole PA Fan Finished 100%
Keterangan
Turbin
Pengukuran Clearance Before
Diapgrahm Gland P1-P17
Lifting Turbin
Aux. Turbin
Inspeksi MOT (menunggu pengangkatan
rotor)
Inspection HE pada Vacuum Pump
Buka Penekan Gland Packing No. 1 & 2
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
Boiler
Inspection Steam Drum
Disassembly Steam Drum
Lepas Chevron dan Separator di Steam Drum
Pekerjaan Pemasangan Scafolding di furnace
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
Aux Boiler
Cleaning Gas Duct (Back Pass)
2 Aux. Turbin 2
SE0116027 Inspeksi MOT Progress 40%
SE0116059 Inspection HE pada Vacuum Pump
Buka Penekan Gland Packing No. 1 & 2 Progress 80%
Disassembly shaft fan gland steam no.1 Finished 100%
Disassembly shaft fan gland steam no.2 Finished 100%
Cleaning tube shaft gland steam Progress 80%
Repair Lubang Baut fan no.1 dan no. 2 Progress 40%
4 Aux Boiler 4
SE0116112 Cleaning Gas Duct (Back Pass) Progress 50%
Keterangan
Turbin
Aux. turbin
Inspeksi MOT
Buka Penekan Gland Packing No. 1 & 2
Cleaning tube shaft gland steam
Repair Lubang Baut fan no.1 dan no. 2
Disassembly Condensate Pump
Inspeksi Expantion Tank
Boiler
Cleaning dinding boiler
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
Aux Boiler
2 Aux. turbin 2
SE0116027 Inspeksi MOT Progress 40%
SE0116059 Inspeksi Condensate Pump no. 1
Disassembly Condensate Pump no. 1 Finished 100%
Identifikasi & pembahasan temuan Progress 50%
ketidaksesuaian
Cleaning rumah impeller dan Discharge Cover Finished 100%
SE0116027 Disassembly Jacking Oil Pump no. 2 Progress 50%
Disassembly SAC No. 3 Progress 10%
Membuka manhole dan Storage Deaerator Progress 40%
Cleaning shaft impeller dan casing CCWP Progress 50%
4 Aux Boiler 4
Keterangan
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG MEKANIK
Pekerjaan Yang Telah Dilaksanakan (Work Has Progress
No Tag No. Keterangan No Tag No.
Been Done)
Tanggal : 01 Oktober 2016 (hari ke-13)
Keterangan
Turbin
NDT PT Rotor
Aux. turbin
Inspeksi MOT
Disassembly Condensate Pump
Disassembly Jacking Oil Pump no. 2
Disassembly IAC
Membuka manhole dan Storage Deaerator
Cleaning CCWP
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
Boiler
Inspection & Cleaning Steam Drum
Pengelasan Crack dinding
Cleaning Coal Bunker
Pasang Bearing ID Fan
Melepas Cover bawah sisi DE PA Fan
Aux Boiler
2 Aux. Turbin 2
SE0116027 Inspeksi MOT Progress 40%
SE0116059 Inspeksi Condensate Pump no. 1 Progress 50%
Inspeksi CCWP
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG MEKANIK
Pekerjaan Yang Telah Dilaksanakan (Work Has Progress
No Tag No. Keterangan No Tag No.
Been Done)
Tanggal : 02 Oktober 2016 (hari ke-14)
Cleaning Shaft Impeller dan Casing CCWP Finished 100%
Identifikasi & pembahasan temuan Progress 70%
ketidaksesuaian
Pengukuran Dimensi Shaft dan Impeller Progress 50%
Inspeksi Turning Gear Progress 30%
Disassmbly turning Gear Finished 100%
3 Boiler 3
SE0116078 Inspection & Cleaning Steam Drum Progress 80% SE0116078
Pengelasan Crack dinding Progress 60%
SE0116124 Cleaning Coal Bunker Progress 75% SE0116124
4 Aux Boiler 4
SE0116112 Cleaning Gas Duct (Back Pass) Progress 0% SE0116112
SE0116124 Inspection Air Heater Progress 75% SE0116124
Inspeksi ID Fan Progress 30%
Keterangan
Turbin
NDT PT Rotor
Memasang Diapraghm Lower
Aux. turbin
Inspeksi MOT
Inspeksi Condensate Pump no. 1
Identifikasi & pembahasan temuan
ketidaksesuaian
Inspeksi Jacking Oil Pump
Inspeksi SAC
Cleaning Inspeksi No. 4
Inspeksi Deaerator
Cleaning Deaerator
Inspeksi CCWP
Identifikasi & pembahasan temuan
ketidaksesuaian
Pengukuran Dimensi Shaft dan Impeller
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
Boiler
Inspection & Cleaning Steam Drum
Pengelasan Crack dinding
Cleaning Coal Bunker
Aux Boiler
Cleaning Gas Duct (Back Pass)
Inspection Air Heater
Inspeksi ID Fan
Pasang Bearing ID Fan
Inspeksi PA Fan
Melepas Bearing sisi DE
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
2 Aux. Turbin 2
SE0116027 Inspeksi MOT Progress 80%
Disassembly Filter MOT Finished 100%
SE0116059 Inspeksi Condensate Pump no. 1 Progress 50%
SE0116027 Inspeksi Jacking Oil Pump Progress 70%
Inspeksi Deaerator Progress 50%
Inspeksi CCWP Progress 30%
Inspeksi Turning Gear Progress 30%
Inspeksi CWP Progress 30%
Pengambilan data Bushing Finished 100%
Pembuatan Spesial Tools (run Out) Finished 100%
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
BIDANG MEKANIK
Pekerjaan Yang Telah Dilaksanakan (Work Has Progress
No Tag No. Keterangan No Tag No.
Been Done)
Tanggal : 06 Oktober 2016 (hari ke-18)
Inspeksi Shaft Gland Cooler Progress 50%
Tes Kebocoran Finished 100%
3 Boiler 3
SE0116078 Cleaning Coal Bunker Progress 80%
SE0116124 Mobilisasi Tools dan Meterial Penggantian (Sparator, Progress 50%
Chevron)
Memasang Gland Manhole Progress 40%
Pelepasan Supporting di steam drum Progress 50%
Retubbing Boiler Progress 35%
Remove tube (20 ea) Progress 60%
Bevel Tube Progress 40%
Install Tube no 3, 13, 16, 18 Finished 100%
4 Aux Boiler 4
SE0116112 Cleaning Gas Duct (Back Pass) Progress 0%
Keterangan
Turbin
Aux. Turbin
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN
Boiler
Aux Boiler
SERIOUS INSPECTION
PLTU AMURANG UNIT 2
2016
LAPORAN HARIAN