Sei sulla pagina 1di 7

BAPI_NAME Seq_Number notif_type equipment  funct_loc  Assembly

FIELD_NAME Char3 qmart equnr tplnr bautl


SAP FIELD_LENGTH
FIELD_LABEL
1
1
1
1 M1 P-1000-N001 K1-B01-1 100-100
2
2
2
2 M1 P-1000-N001 K1-B01-1 100-100
short_text priority  desstdate  pm_wkctr WORK_CENTER planplant
priok priok strmn/CHAR10 lgwid GEWRK iwerk

AC is leaking in apartment 1 4 12.05.2019 10000082 MECHANIK 1000

AC is leaking in apartment 2 1 12.05.2019 10000082 MECHANIK 1000


plangroup  breakdown  strmlfndate reportedby code_group  coding   d_codegrp 
ingrp msaus ausvn/CHAR10 qmnam qmgrp qmcod fegrp

PM01
PM01
PM01
100 X 12.05.2019 ZSSCGD2 HIO PM01
PM01
PM01
PM01
100 12.05.2019 UT-POLE 005 PM01
d_code descript  dl_codegrp dl_codegrp cause_codegrp
fecod fetxt otgrp oteil urgrp

1000 Hard or Brittle PM01 1001 MONITOR


1001 MobolutionsText PM01 1003 MONITOR
1000 Crushed, Pinched, Folded, Crimped PM01 1002 MONITOR
1002 MobolutionsText PM01 1000 MONITOR
1000 Pump assemblies PM01 1001 MONITOR
1001 Shafting Assembly PM01 1003 MONITOR
1000 Support PM01 1002 MONITOR
1002 Insufficient Clearance, Rubs PM01 1000 MONITOR
cause_code causetext  LongText
urgrp urstx CHAR132

1 Cable Defect Data uploading testing - By JASI PRAKASH


2 Wrong Voltage for Power Supply
3 Defective Power Supply
4 Wrong Adjustment
1 Cable Defect Data uploading testing - By JASI PRAKASH
2 Wrong Voltage for Power Supply
3 Defective Power Supply
4 Wrong Adjustment
ORDER_TYPE  BUS_AREA PMACTTYPE Text CONTROL_KEY work_center Plant
AUFART GSBER ILA STEUS ARBPL

PM01 MECHANIK 1000


PM01 MECHANIK 1000
PM01 MECHANIK 1000
PM01 9900 103 Pump Damage PM01 MECHANIK 1000
PM01 MECHANIK 1000
PM01 MECHANIK 1000
PM01 MECHANIK 1000
PM01 9900 103 Pump Damage PM01 MECHANIK 1000
DESCRIPTION
LTXA1

PUMP IS LEAKING
PUMP IS LEAKING
PUMP IS LEAKING
PUMP IS LEAKING
PUMP IS LEAKING
PUMP IS LEAKING
PUMP IS LEAKING
PUMP IS LEAKING

Potrebbero piacerti anche