1.0 SCOPE
Work covered by this contract shall conform to latest CPCB norms effective from July 1,
2004 and include design, manufacture, supply, transportation, delivery, installation, testing
and commissioning of automatic start direct coupled Diesel Generator Sets suitable for
continuous round the clock operation at upto rated output with permissible overload along
with associated works. Items included (but not limited to) in the contract are abstracted as
below.
Diesel engines directly coupled with alternators mounted on a rigid fabricated steel
base frame with resilient antivibration mountings.
Electric starting equipment including batteries and battery chargers.
AMF cum Auto Synchronising panel.
Exhaust piping with Silencer to provide 25 dBA insertion loss
DG cooling system.
Acoustic Enclosure
Statutory approvals including permission from Electric Supply Authority for
operation of DG sets, approval, clearance from Electrical Inspector, approval from
Pollution Control Board and necessary approvals from Department of Explosive for
bulk oil storage.
2.3 The DG set shall comply to latest guidelines, regulations and Central Pollution Control
board norms.
3.0 ENGINE
3.1 The diesel engine shall be Outdoor-type, four stroke, multi-cylinder, 1500RPM with 3%
speed variation for operation between 10% and 100% load, Turbo charged inner cooled,
compression ignition with Electronic Fuel Injection system complete with its self contained
lubricating system.
3.2 Engine mounted radiator designed to dissipate the generated heat effectively shall be
used.
3.3 High-speed diesel oil shall be used as fuel for the engine.
3.4 The engine shall be de-rated in accordance with the tables given in BS649 to suit site
conditions.
3.5 The engine shall be directly coupled to the generator.
3.6 The noise level limitations shall be as per CPCB norms.
3.7 The engine shall be capable of taking 10% overload for one hour in every 12 hours.
3.8 The engine shall be capable of producing the desired nominal output at site referred to the
generator terminals and with machine operating under ambient conditions as specified in
the specific requirements.
3.9 The lube oil system shall be provided with engine driven lube oil pump and lube oil-priming
facility for use when the engine is not in operation
3.10 The Engine to be fitted with silencer to provide min 25 dBA insertion loss.
3.11 Fuel Consumption
The engine shall be suitable for satisfactory operation on H.S.D. as locally available. The
tenderers shall declare the guaranteed fuel consumption in liters per litres/hr, in
accordance with relevant I.S. or B.S. at 50%, 75% and 100% of rated load at 0.8 pf. Fuel
consumption shall be low so as to deliver minimum 3-4 units per liter at 75% load.
Such guaranteed fuel consumption is also to be expressed in liters per unit (after
supplying the requirements of auxiliaries) at 50%, 75% and 100% of rated load at 0.8 pf.
If guaranteed fuel consumption is exceeded, the Contractor shall make such modifications
or alterations as are necessary to bring the consumption to within the guaranteed figures.
The crankcase breather outlet of the engine shall be fitted with a filter cap capable of
preventing entry of dust.
Over Speed
Speed control shall be so arranged that a 12-1/2% increase over normal rated speed shall
cut off fuel supply, thus stopping the engine. Potential free contacts for conveying the
signal to BMS shall be provided
Overload Protection
The engine shall be adequately protected against operating under overload conditions.
The requirements shall be met by the provision of a fixed overload limit stop on the fuel
pump rack control rod to prevent the set being subject to a load exceeding the site rating
plus 10%. Potential free contacts for conveying the signal to BMS shall be provided
Flexible Bellows
Exhaust Silencer
Interconnection wiring, cabling and piping as required
Set of standard tools
Anti-vibration mounting pads.
4.0 AUXILLARIES
Type - Brushless, rotating field design alternator rated for 660 volt / 50 Hz
complying to IS 4722-1992, BS 5000 Part-III and IEC 34.
Excitation system - Permanent magnet generator (PMG) powered excitation system
Speed - 1500 RPM
Net Site Output - Rated continuous at ambient conditions and as per schedule of
quantities.
Voltage Regulation - Within 0.5% of the rated voltage
Overload - More than 10% of the nominal for 1 hour every 12 hours without
exceeding permissible temperature rise.
Harmonics - Maximum 1% between phase and neutral and total maximum 3%
The Alternator shall be capable of delivering the rated output at rated power factor as spelt
out in specific requirement sheet
The Alternator shall be capable of withstanding without damage a three-phase short circuit
at its terminals when operating at rated KVA and PF and at 5% over voltage with fixed
excitation for 3 seconds.
The Alternator shall be capable of withstanding without damage
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
Construction
The alternator shall be of air ventilated screen protected drip proof design with IP 55
protection having adequate air intake / outlet areas to enable designed air quantity to flow
within permissible pressure drop. The dynamic balancing of the rotor assembly shall be
carried out as per IS 12075 : 1987 and BS 6861 Part-I Grade-II to ensure vibration limit to
be within as per IS 12075 or BS 4999. Double bearing alternator shall be provided with
substantial bedplate with engine / generator mounting pads to ensure a good base for
accurate alignment. A flexible coupling, designed to suit the specific engine – generator
combination shall be provided to minimize torsional effects. The alternator shaft and
coupling shall be designed to withstand torsional vibrations even at certain critical speed.
The terminal arrangement of the alternator of 750 kVA DG sets shall be suitable for
receiving a bus duct with flexible interconnection with rubber bellows. The termination
details shall be finalized in coordination with the electrical contractor and got approved
from Client before execution. All alternators neutral shall be solidly earthed and each
neutral shall be connected to 2 nos copper plate earth stations by means of 50 mm x 6
mm copper strip. The body earthing shall be with GI strips and GI plate earth stations.
The Combined Engine Alternator unit shall be mounted on a common rigid fabricated base
frame. The alternator shall have its windings star connected with the neutral connection
brought out to a separate terminal. The alternator shall fully comply with the latest
Standard BS 2613 and BS 269 in respect of winding insulation and fast response to
maintain steady voltage.
Temperature Rise
The maximum temperature rises of the various components of the alternator shall not
exceed those permitted under I.S. with full output and under the ambient temperature
conditions specified in Special conditions of contract.
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
Rating
The alternator shall be continuously rated to deliver the rated output at 0.8 pf lagging, on a
3 phase 4 wire 415 volts 50 cycle system with neutral solidly earthed. The earthing system
conforming to Indian TNS.
Alternator Insulation
The Alternator winding shall have class of insulation as H class with temperature rise
limited to Class B.
6.0 EXCITATION :
6.1 The excitation system shall be a brushless system with all accessories, and shall be
capable of supplying the excitation current of the generator under all conditions of output
from no load to full load and capable of maintaining voltage of the generator constant.
6.2 The exciter shall have class F insulation with temperature rise limited to class B.
6.3 The exciter shall be capable of forcing the field for 3 seconds (or duration as specified in
the data sheet) in the event of short circuit fault at generator terminal.
6.4 The exciter should be capable of building up voltage from residual magnetism, protection
against low speed operation and high motor starting capability.
6.5 The rectifier shall have in built protection for over voltage and rate of rise of voltage.
6.6 Automatic Voltage Regulators
The AVR shall regulate the output voltage from generator current/voltage signals. The
automatic voltage regulator (AVR) shall be high-speed dead band type with automatic and
manual control and mounted on control panel or on alternator as specified in the data
sheet. If mounted on panel it shall be flush with door, accessible on front door. The manual
control shall change in excitation system while AVR is in service so that when there is a
failure of AVR the generators excitation control is transferred immediately to manual
control without any change in excitation current. Necessary motorised potentiometer for
manual control raise / lower PBs shall be provided.
6.7 Necessary equipment for field suppression and surge protection shall be provided. The
response time of the exciter and the generator shall be matched to avoid hunting.
6.8 All routine tests shall be carried out as per the various Indian standards for engine,
alternator and the coupled DG system. The vendor shall give 2 weeks notice for the
inspection.
6.9 Suitable measures shall be taken for field failure protection. The manufacture should
specify the method adopted for the same with proper equipment specification and
schemes. Alternate method for achieving field failure protection can also be included as an
optional item with all required diagrams and component specification.
7.0 GOVERNING
The governor shall be of electronic type with governing class A direct. The governor shall
be capable of regulating the speed of the engine within the limits approx. 10% of the rated
speed within 4 sec due to the sudden application or removal of full load.
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
8.0 STARTING :
8.1 The DG set shall be automatically started, once the Grid Supply has failed and there
should be provision given for manual starting in case the AMF system has failed.
8.2 The starting of the DG set shall be through a starting switch for manual start.
8.3 Batteries of suitable AH capacity with a suitable Battery Charger shall be provided for
starting the DG sets. The battery shall be Maintenance free, lead acid type, heavy-duty
motive power/traction battery sufficient for three consecutive starts without recharging.
Battery charger shall have boost and trickles charging features. Battery shall be confirming
to IS: 1651.
a) Battery stand
Set of connectors with ends take off suitable for connections.
b) Cell insulator and stand insulators
c) Spring type hydrometer
Thermometer with specific gravity correction scale
d) Cell testing voltmeter
Set of tools consisting of spanners, rubber syringe, acid resisting funnel and acid
resisting tube of 2 litres capacity – one set
All the components for battery charger shall be adequately rated and housed in a well
ventilated sheet steel cubicle with input and output terminals. Proper cable glands shall be
provided for incoming and outgoing cables.
The panel manufacturer must have a CPRI or ERDA certification for a panel of equivalent
rating or more.
The panels shall be fabricated from 2mm thick CRCA sheet and load bearing members
with 2.5 mm thick. This shall be of compartmentalized and sectionalized design. The main
supporting framework shall be of angle iron or of heavier gauge sheet metal. The panel
shall be self-supporting design, dust and vermin proof, dead front and fully inter locked
with isolating switches. The panel should meet IP54 or better requirements.
The panel shall be designed so as to facilitate inspection, cleaning and repairs. The
clearance between phase to phase and phase to earth or metal parts shall be as per
relevant IS standards. The metering instruments like voltmeter, ammeter etc. shall be (as
per B.O.Q) flush mounted and shall be of 0.5 class accuracy and of standard design. All
indication lamps shall be of LED lamp type.
The panel shall be treated for rust protection comprising of de-greasing and de-scaling in
Sulphuric acid, baked and powder coated for smooth finish. The colour of paint shall be
Siemens grey. The Panel shall be tested at site before commissioning. The Panel
drawings shall be first got approved from consultants before taking up for fabrication.
The panel shall have separate cable alley and a bus bar chamber. The bus bars shall be
rigid hard drawn Aluminium and insulated with colour coded heat shrinkable sleeves. The
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
neutral bus shall be rated for capacity of half the size of phase bus unless otherwise
stated in schedule of quantities / drawings. The bus bars sizes shall be as per mentioned
in the drawing only.
All bus bars, cables, wires, lugs etc. adequately rated and temperature de-rated.
All control cabling / wiring inside the panel shall be done with FRLS copper conductor
wires/cables rated for 1100 V and of adequate current carrying capacity but in any case
the current drawn by the conductor shall not exceed 80% of the total current carrying
capacity of the cable / wire. The cables / wires shall be a minimum of 2.5 sq. mm cross-
section.
All the control / power cabling and bus bars must be colour coded as follows only:
Red for red phase
Yellow for yellow phase
Blue for blue phase
Black for neutral
Green for earthing.
The insulation of the cable / wires shall be PVC FRLS. The minimum size of cable / wires
shall be: < 25 Amps - 6.0 sq. mm, >25 Amps < 32 Amps - 10 Sq.MM, > 32 Amps < 45
Amps - 16 sq. mm, >45 Amps < 55 Amps - 25 sq. mm, > 55 Amps < 72 Amps - 35 Sq.MM,
> 72 Amps < 95 Amps - 50 sq. mm, > 95 Amps < 125 Amps - 70 sq. mm, > 125 < 160
Amps - 95 sq. mm, > 160 Amps < 180 Amps - 120 sq. mm. For higher current ratings bus
bars shall be preferably used. The specifications stated under Cabling and termination of
this specification shall apply.
The insulators for supporting the Bus-Bars shall be SMC / DMC type. All the power
components/ frames installed in the panel shall be earthed from the main bus with
adequate size of bus bar. The doors shall be fitted with concealed hinges and shall be
earthed with flexible braided copper earth, to be connected to the earth bus. An earth bus
of copper 100 mm x 5 mm shall be fixed along the length of the panel at the lower section.
Adequate ventilation for the panel shall be provided. Logic diagram of operation of
switches shall be with LED mimic. The nameplates for each feeder shall be of engraved
design and screwed to the respective switchgear. The letters shall not be less than 10 mm
size for individual feeders and not less than 15 mm for the main feeders. All switchgear to
be mounted in the panel shall be as per schedule of quantities.
The minimum depth of the panel shall be 1 meter. All connections shall be accessible from
the back. For ease of cable terminations the outgoing links of all feeders shall be
extended by 0.5 meter at the back duly supported on insulators.
The panel may be connected to a Building management system and the contractor shall
take into account the requirements and shall provide potential free contacts brought out to
the gateway terminal blocks rated minimum 10 A at 230 V. All CT secondary connections
shall be routed through linked terminal block.
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
A separate dedicated cubicle / compartment shall be provided with terminal blocks for
connections to and from the BMS to the feeders for remote monitoring.
Type: Cubical, front operated with detachable cable gland plates 2mm thick for top/ bottom
cable entry.
Enclosure: 2MM CRCA suitably rust inhibited and baked enamel painted and provided
with square section neoprene gaskets. Load bearing members shall have a thickness of
2.5 mm with IP55 protection.
For all equipment’s (components) installed in the panel, certificates issued by the
manufacturer shall be provided.
While the GRID supply is healthy, the Diesel Generating set is at rest and load is
supplied directly by the grid through grid circuit breaker.
The 415V 3Ph, 4wire supply, tapped from line the side of incomer, will be fed as input
to the AMF panel. The status of the supply has to be monitored by the U/V relay
provided in the AMF panel.
When the Grid voltage fails or drops below a certain pre-set value, the automatic
control system gives a starting signal to the diesel generator set after ensuring the grid
CB at 415v MAIN PANEL (PMCC) is off.
As soon as the alternator set reaches its operating speed & rated voltage, then a
signal shall be generated by the D.G control panel to close the DG incomer CB at
415V MAIN PANEL (PCC).
A maximum of three attempts of starting facility for the DG set shall be provided and in
case the diesel engine fails to start & reach its operating speed with in stipulated time,
as per DG set characteristic, the feature should automatically lock out the operation of
DG set and further operation of DG set should be prevented in both auto & manual
condition. This lockout signal shall be given to a hooter, indication lamp with rest
button and two potential free contacts.
When the main supply restored to normal value for atleast one minutes then a suitable
signal shall be generated and close the Main supply ACB automatically and open the
DG supply ACB.
The set has thus reverted to its standby condition and will only start when the mains
fail again.
After restoring back to its normal operation ( i.e the grid feeding the loads while DG is
off ), if the grid supply fails once again with in ONE hour of restoration, then the grid
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
breaker ( 415v ) shall be tripped off and the AMF circuit shall be triggered by the DG
control panel. Then the system should remain in D.G operation and the feature of
automatic switching over from DG to GRID shall be locked-out. This feature shall be
put in to function only after operating personnel’s intervention. This shall be suitably
annunciated in the control panel.
Selector switch shall be provided to select the following feature.
“Auto / Manual
While it is “Auto” mode, the function described under clause 10.1 to 10..7 shall be
done automatically. But while in manual mode the same will be done manually by
operating personnel.
12.1 The following drawings shall be submitted for approval for DG set:
a) Foundation drawing with loading data : --- DO ---
b) Schematic drawings : --- DO ---
c) All control & Indication circuit drawings : --- DO ---
d) Schematic P&I drawing for Lube oil : --- DO ---
e) Component list with ratings & ranges: --- DO ---
of all items.
f) Design/Engineering of DG exhaust : --- DO ---
system including BOQ
g) Design/Engineering of DG cooling system
Radiator type cooling with BOQ : --- DO ---
12.2 The final drawings with erection/operation & maintenance manual and literature, write ups
and description of DG set excitation system, voltage regulator governor and other
auxiliaries shall be submitted.
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
13.0 TOOLS
Tenderer shall submit a list of the tools to be used for installation and operation.
All standards checks including the ones elaborated in the specifications to ensure that the
installation of the DG sets and associated systems has been carried out satisfactorily shall
be done on completion of installation. These shall include.
DG sets
– Checking of piping interconnections
– Checking electrical interconnections
– Checking of insulation resistance
– Checking of earthing
– Checking of instruments and controls.
– Checking of alignment
– Checking of vibration transmission to building a structure.
– Checking of expansion joints.
Fuel system
– Checking of automatic operation of fuel transfer pumps.
Exhaust system
– Checking of Surface Temperature of Exhaust Piping.
– Checking of Silencer operation.
All instruments, materials, consumables (fuel oil, lube oil etc.) load and labour required for
carrying out of the test shall be provided by the Contractor.
Copies of all documents of routine and type test certificates of the equipments shall be
furnished to the department along with the supply of equipments and these are as below.
The performance figures quoted in the technical particular sheets shall be guaranteed
within the tolerance permitted by relevant; standards. In case of failure of equipment to
meet the guaranteed figures, the purchaser reserves the right to reject the equipment.
The rejected equipment may be used by the purchaser till the new equipment meeting the
guaranteed requirements is supplied by the vendor.
19.0 TESTING
General
Protection system:
THERMISTORS : As per spec. for winding
CT-Neutral Side : 1no.(one on each lead)
Protection Core Ratio
Burden : 10VA
Class of accuracy : 5P10
Relays : a) THERMISTOR Relay
: b) On neutral side 51N element, range setting
10% to 40%, relay shall be provided
c) Synchronising reverse power relay
Indication lamps : a) Red, Yellow, Blue indication lamps for
Voltage indication.
: b) "Load on" indication Lamp.
: c) "Engine ON" indication lamp.
: d) “Grid supply healthy” indication lamp.
Switches / PB’s : a) Starting Switch with key
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
1 SCOPE
The exhaust piping shall be fitted with residential type silencer in order to limit the sound
level. Expansion joints shall take care of thermal deformations. The pressure drop in
exhaust piping including silencer, bends, expansion joints etc., shall be compatible with
exhaust gas leaving the engine. The exhaust piping shall be duty covered through out the
length from engine outlet up to the outlet point inside the room with mineral wool insulation
and Aluminium cladding. The exhaust piping shall be independent from each engine and
shall be with minimum bends. The bending radius of the bends shall be not less then 3
internal diameter of chosen piping. A drain plug shall be fitted at the lowest point of piping
for condensate extraction.
The exhaust piping shall be insulated with min. 50mm thick mineral wool with 24SWG
Aluminium foil cladding.
The exhaust piping shall be taken above the building along the building face with suitable
supporting system. The exhaust pipe shall be raised at least 6 meter (or as per stringent
regulation) above the highest point of the roof and shall meet the regulations of pollution
board. Suitable support shall be provided for proper insulation of exhaust pipes.
2 INSTALLATION
The Vendor shall carryout the installation with their men and machinery. Water and
Electricity shall be provided by the purchaser.
Vendor shall adhere to the project schedule and ensure timely completion of the
project.
3 TESTING
Vendor shall carry out the tests as per IS and demonstrate the achieved noise level to the
Purchaser / Client. In case achieved noise level is more than the specified maximum noise
level even at one point inside the room, the vendor shall do the necessary modification at
free of cost.
4 HANDING OVER
The Vendor shall obtain a written statement from the Client during handing over duly
signed by representatives of Purchaser and Client.
The warranty period if any shall start from date of system handing over to the client.
5 MISCELLANEOUS
Accessories required for complete operation of the system shall be supplied and installed
by the vendor, if specifically mentioned or not.
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
1 SCOPE
The scope of this section comprises the design, supply, erection, testing and
commissioning of D.G cooling system in accordance with the prevailing Indian standards.
The vendor should submit all the drawing to us for approval. This is a general
specification; all allied and implied items necessary for proper cooling of the DG sets shall
be considered.
2 RADIATOR
2.2 Headers
Headers are made of carbon steel with 3/4” NPT vent and drain sockets fitted with ball
valves and Connection flanges of ANSI 16.5 RF #150.
2.3 Casing
Casing is made out of heavy gauge galvanized iron steel sheet. The casing is powder
coated for protection against moisture / rust.
2.5 Motors
The motors shall be totally enclosed (TEFC) for protection against dust / moisture and
class F insulated with IP-55 protection. The motors shall be foot mounted and shall be
designed for 415 ± 10% Volts, 3 Phase and 50 Hz. All the motors terminals shall be
terminated in a weather proof junction box mounted on the cooler with MCCB for isolation.
2.7 Painting
The complete radiator structure including base frame and headers are quality painted
giving excellent finish and aesthetics to the equipment.
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
The DG Sets shall be installed in an integral acoustic enclosure, suitable for emitting a
maximum noise level of 65dBA at one meter from the external wall of enclosure, on all the
four sides, roof and exhaust silencers (if mounted outside of enclosure).
The enclosure shall be totally weather proof, ingress proof detachable modular type
acoustic enclosure suitable for outdoor application and designed to meet IP55 standards.
The enclosure should be constructed on the skid base of DG set and should have suitable
openings / doors for easy access to engine accessories like Radiator filling cap, oil filling
cap, Engine V belts, Charging alternator, Oil drain plug and Engine breather.
The canopies / enclosures shall be base frame mounted and made from sheet steel and
lined with fire proof sound absorbing materials retained by perforated zinc sheet. The
canopy shall be designed with a pitched roof, guttering and a panel- viewing window. Side-
opening access doors shall be provided either side with lockable recessed handles. Cable
and fuel line gland plates shall be provided to avoid the necessity to cut into the canopy.
The enclosure shall be constructed out of 10/12 SWG CRCA sheet steel as per IS 513
and ISMC for vertical and horizontal framework and base frame. The roof shall be formed
out of modular panels built at an inclined angle on a horizontal framework fastened to the
vertical members. There shall be no chance water accumulation on the roof. The sides,
roof and the doors should be of bolted assembly for easy dismantling during overhauls /
major repairs.
The complete enclosure metal work shall be treated with 7 tank process and the enclosure
surface shall be protected with zinc chromate primer and two coats of Chlorinated Rubber
or Epoxy paint to approved colour to withstand the weather conditions prevent rusting and
finished with paint to approved shade. The canopy is to be finished in synthetic enamel
paint or epoxy two pack paint. The silencer shall be aluminium sprayed.
The enclosure shall be provided with suitable air intake openings lined with noise
attenuators and louvers designed to maintain steady air flow in to the enclosure and
prevent ingress of rainwater and any other external foreign matter.
Attenuators shall be placed on the hot air outlet and cooling air inlet. Exhaust silencers of
residential / hospital type as required shall, be mounted either on top of, or inside the
enclosure, exhausting to atmosphere and the enclosure to be equipped with all internal
pipe work including flexible bellows. The inlet and outlet baffles / attenuators shall be with
corresponding weather louvers and bird mesh to allow sufficient airflow for the set to
operate even under the harshest ambient conditions whilst maintaining specified noise
levels. The louvers and attenuators should be so designed that maximum temperature
difference between the ambient and inside of the enclosure is maintained at 10 deg. C
Upgradation of Medicare Facilities at Jipmer, Puducherry DG Technical Specification
The enclosure walls should be lined with Polyurethane Fire retardant convoluted acoustic
foam, of adequate thickness or Fibre Glass wool/ Rock wool acoustic insulation boards
bonded with suitable thermosetting resins. The density shall be > 64 KG /cub. M.
The enclosure shall be provided with high performance noise reduction, fire resistant and
airtight doors with EPDM gaskets, Robust hinges, door locks with keys and handles.
A battery rack should be provided inside the enclosure to hold the batteries in place
The above specifications are indicative and the vendor shall guarantee that the enclosure
is so designed and constructed to achieve a sound attenuation of not more than 65db at
1.0 M distance from the enclosure to be measured as per BS 5615. Also the air circulation
/ distribution shall be driven by the radiator fan of the DG set only, no other fan shall be