1.The Title :

“The Design Of Mountain Road Drainage System at Jalur Lingkar Barat


(Jalinbar) Batu.”

2.The Abstract :

Raharjo, B.A 2015. The Design Of Mountain Road Drainage System at Jalur
Lingkar Barat (Jalinbar) Batu. Thesis. Construction Engineering Management
Study Program, Civil Engineering Department, State Polytechnic of
Malang.Advisors: (1) Moch.Suaib Reiza,Drs.,MT.(2) Ratih Indri Hapsari,
ST.,MT.,PH.D.

The unavailability of road drainage channels in Jalinbar, resulted in run


off water mixed with soil, causing damage to the road and reducing the comfort of
road users.The purpose of this design is to determine the position of the drainage
channels, Slope drainage on the hills and supporting strcutures, as well as to
determine the dimensions of all the channels and the time and cost required in the
constructions process.
The design started with collecting the required data like contour
maps,detail of road jalinbar, road geometric detail, work unit price of Batu,
Rainfall data of the last 10 years from the nearby rainfall stations of Kr.
Ploso,Pujon,and Blimbing.Then they were processed throught hydrologic analysis
to predict the rainfall and the flood discharge and to determine the dimensions of
the channel.The last is analysing the technical specifications,unit price,budgeting
and scheduling.
The results of the design ar as follows: 103,893 mm/hour rainfall, 0,00039
– 0,13327 m3/sec flood discharge,drainage channel varies between 0,30 m x 0,60
m to 0,60 m x 1,20 m with 260 inlets at IDR 4.357.77.836 on 150 work days to
complete.

Key words: road drainage,flood discharge,budget planning


3.The Content :
1) Chapter 1 – introduction, consist of :
• The background or reason of the author why he took that object (The
Design Of Drainage System ) for this thesis
• The problem to be discussed in this thesis
• Limits on the problem to be discussed in this thesis
• The purpose of the thesis to be discussed by the author
• The benefit of the thesis to the reader about the planning of drainage

2) Chapter II - Literature Review


In this chapter, the author will discuss books that include previous studies,
expert opinions, and formula calculations by experts. There are several
topics that will be discussed, including:
• Definition of Drainage
• Hydrological Analysis
• Analysis of plan discharge
• hydraulic analysis
• channel complementary buildings
• Definition of a Cost Budget Plan for Drainage Channels
• Meteri about the Scheduling Plan

3) Chapter III - Discussion Methods


• Object Area Description
In this section, we will discuss specific locations, object coverage areas, and
several types of houses about the selected object area, which includes
photos of the object area.
• Planning Data
• Planning preparation stage
• General steps of planning
 Planning Flow Chart
4) Chapter IV - Analysis and Discussion
In this chapter, the author will discuss data from the methods used by the
author to complete the thesis. There are several topics that will be discussed,
including:
Hydrological Analysis which includes:
Step 1
-Maximum Annual Rainfall Calculation
- Calculation of Rainfall Data Consistency Test
-Looking for Regional Average Rainfall
Step 2
Calculation of design rainfall, namely:
-Frequency distribution of the normal method
- Test the suitability of the chi-squared distribution
- test the suitability of the Kolmograv smirnov distribution
Step 3
-Distribution of drainage plan plans
-Looking for channel dimensions
-Planning Cross Drain building grill
Complementary building planning namely Inlet looking for discharge and
dimensions
-Technical specifications
Analyze unit price for this plan
-calculating the budget plan
-Scheduling for this job.

5) Chapter V - Closing
In this chapter, the author will conclude a discussion of the data obtained from
the calculations in chapter IV. Planning Results of the design ar as follows:
103,893 mm/hour rainfall, 0,00039 – 0,13327 m3/sec flood discharge,drainage
channel varies between 0,30 m x 0,60 m to 0,60 m x 1,20 m with 260 inlets at IDR
4.357.77.836 on 150 work days to complete.