To, QUOTATION GST No .

29 BBDPB 6339N1ZB
M /S VYDEHI HOSPITAL Date : 20/05/2019
Kind Attn : Mr SANJAI. Floor : U G SUMP
Sub : Towards quotation for supply and insttallation of the U G sump motor connection work at
VYDEHI Project . Bangalore.
Si No Description Unit Rate Qty Amount
PART - A
1 Supply of 65 mm B F V ( Adco make) Nos 3711 4 14844
2 Supply of 80 mm B F V ( Adco make) Nos 4700 2 9400
3 Supply of 65 mm N R V (Inter valve make) Nos 4077 4 16308
4 Supply of 80mm N R V (Inter valve make) Nos 5220 2 10440
5 Supply of 65 mm G I Pipe ( C class) Length 4890 4 19560
6 Supply of 80 mm G I Pipe ( C class) Length 5580 5 27900
7 Supply of 65 mm Long elbow Nos 415 4 1660
8 Supply of 80 mm long elbow Nos 620 6 3720
9 Supply of 65 mm Flanches Nos 326 28 9128
10 Supply of 80 mm Flanches Nos 460 14 6440
11 Supply of 65 mm dia mouth Flanches Nos 416 4 1664
12 Supply of 65 mm dia mouth Flanches Nos 550 2 1100
13 Supply of 3 mm Rubber gascut Nos 38 36 1368
14 Supply of Nut boalt Kg 30 92 2760
15 Supply of Structural frame support Nos 382 15 5730
16 Supply of Sky blue enamel paint Ltr 469 3 1407
17 Supply of Zyncromatic yellow primer Ltr 432 3 1296
18 Supply of thinner Ltr 230 2 460
19 Supply of 15 mm high class coller Nos 78 6 468
20 Transpotation 2500 1 2500
TOTAL FOR PART - A. 138153
SGST@9% 12433.77
C G S T @ 9% 12433.77
GRAND TOTAL FOR PART - A 163020.54
PART - B .
1 Charges for exiting pump lifting and re erection Nos 3000 6 18000
2 Installation charges LS 8500 6 51000
3 Labour charges for painting 3 coat LS 3500 1 3500
TOTAL FOR PART - B 72500
SGST@9% 6525
C G S T @ 9% 6525
GRAND TOTAL FOR PART - B 85550
Grand Total FOR PART - A + B ( INCLUDING G S T ) 248570.54
Total Amount in I N R Two Lakh forty eight thousand five hundred and sevanty one only.
Notes,
1A Supply bill amount 100 % released separatly along with P O. ( PART - A )
B adv 50% of the Installation amount along with P O.
2 Delivery with in 03 days received after P O.
2 All rates are without shifting and civil work.
3 Goods once sold cannot taken back or exchanged. Thanking you
4 Delivery with in 03 days . For
5 , Discount 5 % of the total amount. MBR CONSTRUCTION SOLUTIONS.

AWATING FOR YOUR VALUED ORDERS.

Authorized signatory.