PRESUPUESTO DE MATERIALES

PROYECTO: PROYECTO SISTEMA DE INGENIERIA


Moneda: BOLIVIANOS

PRECIO COSTO
CÓDIGO DESCRIPCIÓN UND. CANTIDAD UNITARIO TOTAL
001 NACIONAL
ALAM008 ALAMBRE DE AMARRE KG 108.01 11.97 1,292.99
AREN006 ARENA FINA M3 115.70 136.49 15,791.32
ARE005 ARENILLA M3 56.73 120.69 6,847.12
CEME001 CEMENTO KG 57,630.95 0.90 52,144.48
CIEL01 CIELO FALSO DE YESO SUSPENDIDO+COLOCADO M2 216.11 44.96 9,716.47
CLAV001 CLAVOS KG 96.57 12.53 1,209.86
CONT001 CONTENEDOR DE 4MX2.50M PZA 1.00 835.20 835.20
ESTU001 ESTUCO KG 40.39 0.97 39.36
ESTU005 ESTUCO KG 2,725.78 0.90 2,466.29
GRAV001 GRAVA M3 84.96 120.69 10,253.73
LAD101 LADRILLO CERAMICO DE 6 HUECOS 24*15*11 PZA 22,191.12 1.20 26,565.43
LIMP01 LIMPIEZA DE CAPA VEGETAL CON PòDADORA GLB 1.00 149.99 149.99
MADE003 MADERA DE CONSTRUCCION P2 2,671.67 8.00 21,384.03
PIED001 PIEDRA BOLON M3 42.34 114.98 4,868.68
VIGU01 VIGUETA Y COMPLEMENTO Nº12 M2 356.80 69.95 24,957.45
SUBTOTAL NACIONAL 178,522.40
002 BRASIL
FIER001 FIERRO CORRUGADO KG 5,858.20 6.47 37,918.96
SUBTOTAL BRASIL 37,918.96
TOTAL 216,441.35