Sei sulla pagina 1di 4

Maharashtra State Power Generation Co Ltd

Paras Thermal Power Station, Paras


Dist: Akola(MS) Pin:444109
Phone:07257-234848,234465/66 Fax.No:07257-234846
E mail:rpparas10@gmail.com

NOTICE INVITING TENDER

1. Tender No:50102

2. Description of Tender: Bi-Annual Maintenance work contract of Electrostatic Precipitator as &

when required in Ash Handling Plant U#3 & 4, Paras TPS.

3. Contact Operating Authority: Section Head E.E. (AHP 250 MW).


a. Tel. No.07257-234848/ 07257-234465/66
b. Fax. No. 07257-234846
c. e mail:rpparas10@gmail.com

4. Any amendment to this notice and or notification of amendment in bidding document shall
be notified on website http://sets.mahagenco.in only. Potential bidders are requested to make a
note of the same.

5. MSPGCL reserves the right to reject any or all the tenders without assigning any reason
whatsoever.

SR
SAP Item Code Description Qty Unit
1 W0040201100311 Internal Inspection of ESP field 192 NOS
outage
Work includes:-
1) Obtain mechanical permit for this work.
2) Confirm mechanical & Electrical isolating
along, with proper earthing of
corresponding field.
3) After confirmation of isolation open manhole
door. With the help of earthing rod
earthing is to be done to earthing plate.
4) Inspection of field is to be done as per
directive of site in charge, checking of
snapped emitting electrode & damaged
electrodes are to be removed and new to
be fitted it available.
5) Checking of collecting plate gap and for bend
or shock bar misplacing/ damage plain
bearing, condition, rapping mechanism
hammer damage.
6) Checking of shaft insulators.
Reporting of all the problems observed to EE
AHP.
2 W004020100010009 COLLECTING/EMITTING ELECTRODE 100 NOS
RAPPING Plain bearing replacement
Work includes:-
All bearing of CRM & ERM shaft shall be
checked for wear& replaced as per
directives of site in charge
3 W004020110160001 EMITTING RAPPING SYSTEM ALIGNMENT 32 NOS

4 W004020110020020 ESP hopper manhole rope replacement 64 NOS


/ ESP hopper Leakage attend
Work includes:-
Any ESP hopper, door found leakage attend,
sealing rope is to be replaced properly
during shutdown
5 W004020110030017 ESP Field Alignment & 16 NOS
damaged/broken EERM and CERM shaft
replacement or repairing.
Work includes:-
Field Alignment shall be done properly &
checked by maintenance engineer. The
shaft of collecting and emitting rapping
mechanism shall be checked for wear. If the
wear is excessive complete shaft shall be
replaced. The fitting of coupling etc. on
shaft is covered on the scope of work
6 W004020100020005 Straightening of collecting 200 NOS
electrode.
Work includes:-
Collecting electrodes of ESP shall be straighten
or re-positioned as per the directives of
engineer in charge.
7 W004020100030005 Removal or Replacement of 200 NOS
snapped/missing electrode
Work includes:-
The damaged or missing emitting electrode shall
be replaced as per the instruction of site in
charge.
8 W004020100010013 Repair/replacement of shock bar 64 NOS
Work includes:-
The bend shock bars shall be repaired as per the
directives of engineer in charge.
9 W004020100010017 Repair of shock bar guide & field 64 NOS
alignment Work includes:-
The damaged guide bars shall be repaired with
the new guide bars
10 W004020110060001 Repair of gas distribution screen 2 NOS
plate
11 W004020120020004 ESP inlet/outlet gate opening 44 NOS
manually
13 W004020110020014 Preventive maintenance of 128 NOS
CRM/ERM/GDRM gear boxes.
P.M. includes :-
1) Oil level checking
2) Nut/bolt tightening.
3) Input pinion & its mating gear checking.
4) Damaged input pinion & its mating gear
replacement.
5) Bearings greasing.
6) Oil seal replacement if required.
Servicing includes :-
Check all the defective gear box as per the list
by the site in charge if the gearbox is found
defective dismantle the gearbox for
servicing after draining oil inside the
gearbox. Check the gearbox for damages
and replace the parts damaged or worn out
as per the directives of site in charge. After
repair/ servicing of gear box, box up the
same and give successful trial. After
successful trial couple with CRM/ ERM shaft
and give coupled trial.
14 W004020110090001 Replacement/repairing of damaged 100 NOS
Collecting rapping hammer assembly
and inner/outer arm.
Work includes:-
Checking of all CRM inner and outer arm for excessive
wear on hammer pin. Worn out arms shall be replaced
as per the instruction of site in charge. The dislocated
hammer assemblies shall be positioned by providing
proper bolts with tack welding.
15 W004020110150001 Replacement/repairing of damaged 108 NOS
Emitting hammer assembly and
inner/outer arm.
Work includes:-
Checking of all ERM inner and outer arm for excessive
wear on hammer pin. Worn out arms shall be replaced
as per the instruction of site in charge. The dislocated
hammer assemblies shall be positioned by providing
proper bolts with tack welding.
16 W00402011040031 Replacement/repairing of damaged 102 NOS
Gas distribution plate rapping
hammer assembly and inner/outer
arm.
Checking of all GDRM inner and outer arm for excessive
wear on hammer pin. Worn out arms shall be replaced
as per the instruction of site in charge. The dislocated
hammer assemblies shall be positioned by providing
proper bolts with tack welding.
17 W004020110030015 CLEANING ESP ROOF TOP PASS 64 NOS
WISE and ESP inlet /outlet
duct by removing
accumulated dust, ash,
scrap material.
Work includes:-
Cleaning of ESP roof area near
rectiformer pass by pass by
removing accumulated ash &
dust & scrap material. Also
removing of accumulated
ash. Lift & dispose ash by
filling ash in bags.
18 W004020110340002 Removal and refitting of broken shaft 2 NOS
insulator of emitting shaft.
Work includes:-
Removal of broken insulator of ERM shaft insulator shall
be replaced with new one either by decoupling the shaft
or by cutting it and refitting the new shaft as per the
instruction.
19 W004020100030019 Replacement/ repair of pin 2 NOS
wheel of EERM shaft
20 W004030010270001 Replacement of 200NB clinker 600 NOS
grinder, ESP, Bottom ash discharge
line.
Work includes:-
Replacement of 200NB clinker grinder, ESP, Bottom ash
discharge line as per the instruction.
New pipeline will be in the scope of MSPGCL. Other
consumables like cutting set, welding set etc. will be
supplied by agency.
21 W004030010270002 180 degree Rotation of 200NB 600 NOS
clinker grinder, ESP, Bottom ash
discharge pipeline.
Work includes:-
Rotation of 200NB clinker grinder, ESP, Bottom ash
discharge pipeline by 180 degree as per the instruction.

Chief Engineer
TPS Paras