OWNER:
LOCATION:
SUBJECT:
PREPARED BY:
CHECKED BY:
DATE:
UNIT COST
ITEM NO. ITEM / DESCRIPTION QTY UNIT TOTAL AMOUNT
SUBTOTAL SUBTOTAL LABOR
MATERIAL COST LABOR
MATERIAL COST COST
2.0 EARTHWORKS
2.1 Excavation 55.27 cbm 0.00
F1-C1: 1000x1000 10.80 cbm
F1-C2: 1000x1000 7.20 cbm
F3-C3: 1200x1200 10.37 cbm
F2-C4: 800x800 3.46 cbm
F2-C5: 800x800 2.30 cbm
Wall footing 21.14 cbm
2.2 Backfill 39.90 cbm 0.00
TOTAL OF COLUMNS & COLUMN FOOTING (CONCRETE) 19.09 cbm
F1-C1: 1000x1000 2.52 cbm
F1-C2: 1000x1000 1.68 cbm
F3-C3: 1200x1200 2.21 cbm
F2-C4: 800x800 0.85 cbm
F2-C5: 800x800 0.56 cbm
Wall footing 11.27 cbm
2.3 Gravel bedding 10.97 cbm 0.00
F1-C1: 1000x1000 0.30 cbm
F1-C2: 1000x1000 0.20 cbm
F3-C3: 1200x1200 0.29 cbm
F2-C4: 800x800 0.10 cbm
F2-C5: 800x800 0.06 cbm
Wall footing 1.76 cbm
Slab 8.26 cbm
Subtotal, Earthworks 0.00
3.0 FORMWORKS
3.1 Surface area 401.67 sqm 0.00
Wall footing 35.23 sqm
Column Footing 22.56 sqm
Column: below NGL 33.90 sqm
Column: above NGL 141.50 sqm
A1 7.08 sqm
B1 7.08 sqm
C1 7.08 sqm
D1 7.08 sqm
E1 7.08 sqm
A2 7.44 sqm
B2 7.44 sqm
C2 7.44 sqm
D2 7.44 sqm
E2 7.44 sqm
A3 6.50 sqm
A'3 9.10 sqm
B3 6.50 sqm
B'3 9.10 sqm
C3 6.50 sqm
C'3 9.10 sqm
D3 6.50 sqm
D'3 9.10 sqm
E3 6.50 sqm
RC Beams 168.48 sqm
B-1: 200x350 69.26 sqm
LB-1: 200x400 39.20 sqm
RB-1: 180x300 60.02 sqm
MATERIAL BREAKDOWN LIST:
Page 1 of 4
Grade 40 (10mm bars -both vert & hor bars) 336.82 kgs 0.00
4.6 Wall Footing
Grade 40 (10mm bars) 14.383 kgs 0.00
Grade 40 (8mm bars) 30.918 kgs 0.00
4.7 Stairs
Grade 40 (10mm bars) 29.568 kgs 0.00
4.8 Kitchen and Service counter
Grade 40 (10mm bars) 38.214 kgs 0.00
4.9 GI. tie wire Ga.16 1.00 lot 0.00
Subtotal, Rebars 0.00
5.0 CONCRETING
5.1 Concreting works 76.15 cbm 0.00
RC Column Footing 5.69 cbm
F1-C1: 1000x1000 1.80 cbm
F1-C2: 1000x1000 1.20 cbm
F3-C3: 1200x1200 1.73 cbm
F2-C4: 800x800 0.58 cbm
F2-C5: 800x800 0.38 cbm
RC Wall Footing 11.27 cbm
RC Beams 12.68 cbm
B-1: 200x350 5.39 cbm
LB-1: 200x400 3.14 cbm
RB-1: 180x300 4.16 cbm
RC Lintel beam 0.08 cbm
D-1: 0.9m x 2.1m Baige Steel Door on 50mm x 100mm thk. Steel Door 0.078 cbm
Jamb (Main and Back Door)
RC Columns 9.72 cbm
A1 0.47 cbm
B1 0.47 cbm
C1 0.47 cbm
D1 0.47 cbm
E1 0.47 cbm
A2 0.50 cbm
B2 0.50 cbm
C2 0.50 cbm
D2 0.50 cbm
E2 0.50 cbm
A3 0.39 cbm
A'3 0.73 cbm
B3 0.39 cbm
B'3 0.73 cbm
C3 0.39 cbm
C'3 0.73 cbm
D3 0.39 cbm
D'3 0.73 cbm
E3 0.39 cbm
Slab (Ground thk: 100mm; 2nd thk: 75mm) 21.74 cbm
Ground Floor 16.05 cbm
Second Floor 5.69 cbm
Kitchen and Service counter 0.49 cbm
Concrete Topping 14.49 cbm
T&B 10.00 cbm
Stairs 0.70 cbm
2nd Floor 3.79 cbm
MATERIAL BREAKDOWN LIST:
8.0 CARPENTRY
8.1 Installation of 200mm fibercement board accent wall siding in 30.52 sqm 0.00
20mm distances in between
8.2 Installation of 100mm thk fibercement drywall in metal framing 93.8232 sqm 0.00
Page 2 of 4
8.5 Installation of 6" baseboard 93 lnm 0.00
9.0 MASONRY
9.1 150mm thk. CHB Wall w/ mortar cement 521.30 sqm 0.00
Partiwall 265.37 sqm
Front (GF-2F) 107.25 sqm
Rear (GF-2F) 117.50 sqm
GF Interior walls 31.18 sqm
13.2 CF-01: General Painting Works (approved white color flat paint 215.60 sqm 0.00
finish)
D-3: 0.7m x 2.1m 40mm thk. Single Leaf Single-Action PVC Swing 4.00 set/s 0.00
Door with PVC Louvers on PVC Jamb (Toilet Door)
Subtotal, Doors 0.00
17.0 ROOFING WORKS
17.1 Rib Type Long Span (6mm thk) 562.00 pcs 0.00
17.2 2" x 6" x 1.5mm C-Purlins Rafter 5.00 pcs 0.00
17.3 2" x 4" x 1.5mm C-Purlins Rafter 5.00 pcs 0.00
17.4 10mm dia. Plain Round Sagrod 9.00 pcs 0.00
17.5 Roof Eaves 166.32 lnm 0.00
0.00
Page 4 of 4