CONTENTS
Foreword............................................................................. 4
Mission & Vision.................................................................. 5
Profile................................................................................... 6
Key Activities....................................................................... 7
Certificates . ................................................................ 8

KCT Orgenization Chart & Personnel.............................. 13

KCT Projects. ................................................................ 20

Ready Mixed Concrete Dept. ..................................... 77


Machinery & Reinforcement Dept. ............................. 81

KCT Owned Machinery And Equipment List.................. 85


Global Trade & Supplying Dept. ...................................... 88
A L
N
QA / QC / HSE..................................................................... 90
I
F
Why KCT ?........................................................................... 92
Contacts Information....................................................... 93
4

Chairman Word
Mission & Vision
OUR MISSION

A L
To rise the real estate and projects local market up to an international levels to
commensurate the exceptional building renaissance that takes place in Syrian Arab

I N
Republic during last few years, through applying the highest professionalits , creativity

F
and commitment criterias in whole business fields matching the top of perfection
levels.

OUR VISION
To move AL KHAYYAT COTRACTING TRADING from a local establishment in
Syrian Arab Republic to a leader regional and international one capable to execute
all kind of projects even in the hardest circumstances, armed with confidence,
knowledge, and long experience in our field.
6

Profile
KCT is a Syrian establishment was formed by Mr. Mouhamad Resslan Al Khayyat. Ever since
it started operating in 1983, KCT has grown to assume a leading role in the field of construction
for the quality and timely completion of its projects.
KCT turnover rate was 42000,000 USD in 2007 , 45500,00 USD in 2008 , 65350000 USD
in 2009 while our estimated turnover rate for 2010 is 100,000,000 USD.

KCT is classified by the Ministry of Housing & Construction in Syrian Arab Republic as an “A”
class contractor in the field of construction of all types of projects and all related components
such as roads, bridges, buildings, water & sewage and electromechanical works.

Other activities of the company are engineering services, ready mixed Concrete ,
concrete products, foundation, reinforcement, and real estate investments.

KCT offers turn key engineering and construction projects in Syria. A large measure of its
success has come from its use of qualified technical & engineering staff, owned building
machinery, equipment and management systems to tackle the most difficult jobs.

KCT has earned a reputation in the Syrian market through executing huge number of projects

A L
(Bridges & Tunnels, Reinforcement Works, Hospitals, Factories, Hotels & Residentel Cities,
Universities & Instituts and Palaces ....etc) in ideal time with best quelity criterion Such as
(ready mixed concrete, cement products, piles, anchors, shot-crete and precast bridges).

I N
F
KCT est. is a full service construction firm offering a broad menu of specialized services to our
national and local clients.

Our professional leadership and many years of experience allow us to focus on special
customer needs. .

We believe that there are “five critical” factors that determine the project’s success:
• Responsiveness
• Timeliness
• Quality & Safety
• Flexibility
• Cost Awareness

We are dedicated to spending an extra time understanding each project as not only sticks and
bricks but as a business catering to our clients’ goals.
The management team understands that the highest level of “trust and confidence” awarded
by a client is the responsibility of building the next project.
We take great pride in this confidence and trust.
Key Activities
KCT through its Projects Department involved in the General Constructions & Turne Key
Projects; commercial and educational buildings, Residential complexes, bridges, industrial
buildings, which include site development, infrastructure and utilities all types of construction,
structural works, plant infrastructural civil works, and surveying services. i.e; KCT executes all
civil, mechanical, electrical, sanitary, telecommunication, renovation, beautification works.

CIVIL WORKS: Site Development, Road Works, Bridges Works, Earth Works, and Water
Treatment Works.

MECHANICAL WORKS: Water Treatment Plants, Plumbing, Drainage Installations, Vacuum

Systems, Fire Protection Systems, Air Conditioning & Heating Systems, Ventilation Piping
Networks,…etc.

ELECTRICAL WORKS: Supply and Install all those of Light Points & Lightening Devices,
Cabels, Panel Boards, Power Generators, Audiovisual Systems, Alarm System, Operator &
Phone Devices, Controling Systems,…etc.

services.
A L
KCT also carried out study, design and build projects, besides to engineering and consulting

KCT established other departments in addition to the Projects Department specialized in


differnet fields mentioned below:
I N
Real Estate Projects Dept.
F
Ownership of lands, Intergrated Cities, Buildings, and Apartments completed with all services
and furnishings.

Ready Mixed Concrete Dept.


Specialized in producing concrete and other Cemented Products with best modern machineries
through four owned automated concrete plants and concrete patching machines up to 64 m
height provided by 43 trans-mixers with different capacities .

Machinery and Foundations Dept.


Specialized in the design and installation of foundation Systems for construction projects,
Piling, and reinforcing works using a professional machineries up to 28 ones for various types
of excavations.

Global Trade & Supplying Dept.


Specialized in Supplying all kind of raw material and decorations issue Our mission is to
make quality products available to clients at reasonable price on time. Our aim is to cater the
needs of the client with adequate support of premier technical and management services in a
highly responsible manner.
For that all, KCT offeres a wider range of services in the most economic way.
8

A L
CERTIFICATES
I N
SINCE 1983
F
40

Orgenization Chart & Personnel

SINCE 1983
A L
I N
F
ORGANIZATION CHART
46

KCT PROJECTS

SINCE 1983

A L
I N
F
Hotels and Palaces Projects
Contract Value
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATE GLIMPSE ABOUT THE PROJECT
(USD)

1 Yaafour Resort Damascus 27000 sqm 52000 sqm 100% 12,238,000.00 4 stars hotel, playgrounds, sport halls

residential palace of 3 floors - floor area 3000 sqm


including all civil, archtectural, electrical, mechanical
2 Al Bayt Al Shami Damascus 20500 sqm 90000 sqm 80% 83,200,000.00
and agricultural works , decoration
and gardens design - mosaics - site works of 5000 sqm
3 Intradus Resort and Hotel Tartous 37000 sqm 35000 sqm 75% 30,000,000.00 _
4 Prime Minister of Qatar Palace - Sabboura Damascus 15500 sqm 52000 sqm 45% 51,500,000.00 landscape 32000 m2

civil, archtectural, electrical, mechanical , decoration


5 Qatari Prince Palace at Palmyra Palmyra 105000 sqm 18000 sqm 90% 40,200,000.00
and gardens design
6 Manors/ Palmyra Palmyra 28000 sqm 60000 sqm 100% 2,000,000.00 _
two main divisions Bldg (presidential - platform and
7 Presidential Platform for Camels Track Race Palmyra 7000 sqm _ 100% 3,700,000.00 auditorium) as well as employees offices - turn key
project
8 Fishermen Appartments Lattakia 7280 sqm 17000 sqm 10% 5,300,000.00 104 appartments, 70 sqm each - turnkey project
9 Al Salemlik Bldg / Yaafour Damascus 2600 sqm 600 sqm under execution 3,200,000.00 _

10 Al Jaryan Mosque / Yaafour Damascus 2800 sqm 400 sqm under execution 1,800,000.00 _

11 Al Shamia Villas Project Damascus 6600 sqm 22000 sqm under execution 15,000,000.00 _

5 floors Bldg - 104 residences - each residence 70 sqm -


12 Al Diyar Al Qataria - Ibn Hani Damascus 8000 sqm 17000 sqm 100% 12,576,000.00
turn key
restauarants , cars trach race, children
13 Zaman Al Khair Touristic Compound Damascus 25000 sqm 17500 sqm 100% 5,582,000.00
entertainment

residential villa of 3 floors, all civil, archtectural,


Shaikh Bin Hamad Bin Khalifa
14 Damascus 6000 sqm 8000 sqm 100% 2,500,000.00 electrical, mechanical , decoration
Al Atiyya Palace
and gardens design - damascene mosaics
A L
I N
F

Ya'four Resort Expansion


Project and Location • Ya'four Resort Expansion - Damascus
Client • Jupiter
Work Description • Turn key project - Luxury star hotel
chalet and resorts.
built up area capacity 27000sq.m
Execution Period • 180 Day
Performance Percentage • 100%
A L
I N
F

Al Bayt al shami
Project and Location • Al Bayt Al Shami - Yafour
Client • Qatari Prince
Work Description • residential
palace, 4 floors. Civil, Architectural, Mechanical, Electrical and Agricultural

Execution Period • 18 Months

Performance Percentage: 80%


A L
I N
F
A L
I N
F

Antradous Tartous
Project and Location
. Antradous Hotel and Resorts
Client • Al Amer Group & Wahoud Group

Scope of Work: Turn key


Job Description: built up area 37000 sqm, civil, mechanical, MEP works

Execution Period: 8 months


Performance Percentage: 75 %
A L
I N
F

Al Saboura Palace
Project and Locatio . A l Saboura Palace - Saboura
Client • Prime Minister of Qatar
Work Description • Turn
Key Project
Execution Period:
18 months
Performance Percentage: 45 %
A L
I N
F

Palmyra Palace
Project and Location • Palmyra Palace - Palmyra
Client . Qatari Prince

Scope of Work: Turn Key


Work Description: Built up area 10500 sqm, Palace, chalet, landscape, Majles

Execution Period: 12 months


Performance Percentage: 90 %
Qatari Prince Manors
Project and Location: Palmyra
Client: Qatari prince
Work Description: Turnkey project
Execution Period: 4 months
Performance Percentage: 100 %
Presidential Platform for Camels Track Race
Project and Location: Palmyra
Client: Qatari prince
Work Description: Turnkey project
Execution Period: 3 months
Performance Percentage: 100 %
A L
I N
F

Fishermen Appartments
Project and Location • Fishermen Appartments - Lattakia
Client • Qatari Diar Real Estate Investment Company
Work Description • Constructing building of 5 floors,
104 apartments, 70 sqm each
Turn Key Project
Execution Period • 310 Day
Performance Percentage • 100%
64

A L
I N
F

Sihnaya Villa
Project and Location • Sihnaya Villa - Damascus
Client • Private
Work Description • Structuring residential Villa - Turn Key / 7150 m2 - The Project

mechanical, decoration works. In addition to garden design works.


Execution Period • 360 Day
Industrial and Infrastructure Projects
Contract Value
REF PROJECT NAME Location (sqm) BLDG AREA LAND AREA COMPLETION RATE GLIMPSE ABOUT THE PROJECT
(USD)

the project consists of different blocks:


1- A.S.P
2- W.T.P (Water Treatment Plant)
3- R.W.T.P (Rural Water Treatment Plant)
4- LPG
5- Workshop
6- Substation
Damascus 7- F.T.P
1 Steel Melt Factory / Adra Industrial Area 175000 sqm 165000 sqm 80% 94,330,000
Countryside 8- Ferroalloy
9- Scrap Yard
10- E.A.F
11- C.C.M (Continous Cast Machine)
12- Slag Area
13- Roads and Infrastructure
14- Piping Works
in addition to all the mechanical and electrical works

the project consists of different blocks:


1- Admin Bldg: 4 floors
2- Workshops Bldg: 4 floors
Damascus 3- Workshops warehouse Bldg: 5000 sqm
2 Steel Scrap Warehouses 68000 sqm 120000 sqm 90% 15,540,000 4- Steel Scrap yards: 8000 sqm
Countryside
5- Oil Station
6- Various Service Bldgs
7- Special break room on the admin Bldg

Damascus
3 SHAM PRINT 6244 sqm 9573 sqm 50% 35,000,000 MEP,Architectural, structural works - Turn key project
Countryside

Structural, Architectural, Electrical, Mechanical,


4 Mowaslat Sq Parking Damascus 13500 sqm _ 100% 6,120,000 and Controling Works / 4 floors under ground
parking 13500m2 / 500 cars

Installing and operating the technical Supply, install, and commissioning electro-mech.
5 inspection equipment of gas, lights, All Syrian Provinces 39000 sqm _ 100% 3,588,936 equipments for testing big and small cars.
replacement and cars brakes 13 hangars with 2 test lanes each.

Constructing the last bridge to link the Syrian Railways


to the Iraqi Railways
6 Wadi Ali Bridge Dei Al Zour 150 ML _ 100% 713,200
150 Ml / 6 spans, prestressed girders.
11000m3 concrete based on 4000 Ml pile
depth 35 Ml
Structural and&Architectural
100000m3 excavations.
Works
7 Al Na'na' Parking Damascus 10000 sqm _ 100% 3,200,000 10000m2 / 5 floors, 1 under ground and
4 above ground parking / 350 cars .
excavation and backfilling from chosen soils in
8 Air Planes Parking Aprons Damascus 300000 sqm _ 100% 7,460,000 addition to levelling ,compacting, anti-herbal
treatment and concrete pavement works
A L
I N
F

Steel Melting Factory


Project and Location • Steel Melting Factory - Adra Industrial Area
Client • SMI Group

Execution Period • 360 Day


Performance Percentage • 90%
A L
I N
F

PROJECT BLOCKS

1- A.S.P
2- W.T.P (Water Treatment Plant)
4- LPG
5- Workshop
6- Substation
7- F.T.P
8- Ferroalloy
9- Scrap Yard
10- E.A.F
11- C.C.M (Continous Cast Machine)
12- Slag Area
A L
I N
F

Steel Scrap Warehouses


Project and Location Steel Scrap Warehouses Project - Adra Industrial Area
Client • SMI Group
Work Description Administration building + warehouses set on a total
space of 68000sq.m
Execution Period • 360 Day
Performance Percentage • 100%
A L
I N
F
SHAM PRINT
Project and Location Sham Print - Adra Industrial Area
Client Hamsho International Group
Work Description MEP, Architectural, structural works - Turn key project

Execution Period three months and half

Performance Percentage
50 %
A L
I N
F

Mowaslat Sq Parking
Project and Location •
Mowaslat Sq. Parking - Al Hamra' - Damascus
Client •
Damascus Governorate
Work Description •
Structural, Architectural, Electrical, Mechanical,
and Controling Works / 4 floors under ground
parking 13500m2 / 500 cars
Execution Period • 1290 Day
Performance Percentage • 100%
A L
I N
F

Cars Test lanes


Project and Location • Cars Test lanes - All Syrian Provinces
Client • Ministry of Transportation
Work Description • Supply, install, and commissioning electro-mech.
equipments for testing big and small cars.
13 hangers with 2 test lanes each.
Execution Period • 210 Day
A L
I N
F

Wadi Ali Bridge


Project and Location • Wadi Ali Bridge - Al Bou Kamal City - Iraqi Boarders
Client • Syria Rail Way Est.
Work Description • 150 l.m/ 6 spans, prestress girders.
11000m3 concrete based on 4000 l.m piles
depth 35 l.m & 100000m3 excavations.
Execution Period • 360 Day
A L
I N
F

Al Na'na' Parking
Project and Location • Al Na'na' Parking - Baramekah - Damascus
Client • Damascus Governorate
Work Description • Structural and Architectural Works
10000m2 / 5 floors, 1 under ground and
4 above ground parking / 350 cars .
Execution Period • 1080 Day
A L
I N
F

Airplanes Parking Aprons


Project and Location • Airplanes Parking Aprons - Damascus Airport
Client • General Association for Civil Aviation
Work Description • Excavation and backfilling from choosen soils in
addition to leveling, compacting, anti-herbal
treatment and concrete pavement works.
Execution Period • 550 Day
Performance Percentage • 100%
Malls Projects
Contract Value
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATE GLIMPSE ABOUT THE PROJECT
(USD)

International Construction & Building Co.


Al Doha City
1 Damascus 118900 sqm 400000 sqm 50% 30,000,000.00 Civil, Architectural, Electrical, and Mechanical
Doha Mall - Hotel - Villas - Resorts
Works / Villas, Apartments, and Commercial Mall

Study and design and installation of new public


2 Al Salam Mall Damascus 30200 sqm 65000 sqm 80% 14,670,000.00 lighting, cabling, earthing, and controlling
of high-tech designe.
A L
I N
F

Dawha City
Project and Location •
Dawha City - Damascus
Client •
International Construction & Building Co.
Work Description •
Civil, Architectural, Electrical, and Mechanical
Works / Villas, Apartments, and Commercial Mall
Turn Key
Execution Period • 900 Day
Performance Percentage • 50%
Rehabilitation & Development Projects
Contract Value
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATE GLIMPSE ABOUT THE PROJECT
(USD)
Execution of beautifying, renovating,
Civill,Mechanical, Electrical, and
Tanks for deposition, Balancing / filtering.
1 Rehabilitation & Development of Omayyad Sq. Damascus N/A N/A 100% 6,300,000
maintenance, Inspecting, and services
Agricultural Works with best europian lighting devices
/ Under ground
Rooms for pumps,
Reconstruction, computers,
Renovating Thecontrol panels
Periphery of the
Palace in
Rehabilitation & Development of Conference addition to supplying mechanical and electrical
2 Damascus N/A N/A 100% 5,775,000 equipments.
Palace
Water Fountain / Squares / Lightening / Pavements
by using luxury materials.
Study and design and installation of new public
3 Al Jalaa Park Damascus N/A N/A 100% 140,000 lighting, cabling, earthing, and controlling
of high-tech designe.
Study and design and installation of new public
4 Al Manshiya Park Damascus N/A N/A 100% 180,000 lighting, cabling, earthing, and controlling
of high-tech designs.

Study and design and installation of new public


5 Al Samaka Park Damascus N/A N/A 100% 159,000 lighting, cabling, earthing, and controlling
of high-tech designs.
A L
I N
F

Rehabilitation & Development of Omayyad Square


Project and Location • Beautifying Omayad Sq. - Damascus
Client • Damascus Governorate
Work Description • Execution of beautifying, renovating, Civill,Mechanical, Electrical, and
Agricultural Works best europian lighting devices / Under ground
Tanks for deposition, Balancing / filtering.
Rooms for pumps, computers, control panals
maintenance, Inspecting, and services
Execution Period • 90 Day
58

A L
I N
F

Rehabilitation & Development of Conferences Palace


Project and Location • Reconstruction for Conventions Palace Periphery - Airport Road
Client • Damascus Governorate
Work Description • Reconstruction, Renovating The Periphery of the Palace in
addition to supplying mechanical and electrical equipments.
Water Fountain / Squares / Lightening / Pavements
by using luxury materials.
Execution Period • 150 Day
60

A L
I N
F

Al Jalaa Park
Project and Location • Al Jalaa Park - Damascus
Client • Damascus Governorate
Work Description • Study and design and installation of new public
lighting, cabling, earthing, and controlling
of high-tech designe.
Execution Period • 60 Day
62

A L
I N
F

Al Manshiya Park
Project and Location • Al Manshiya Park - Damascus
Client • Damascus Governorate
Work Description • Study and design and installation of new public
lighting, cabling, earthing, and controlling
of high-tech designe.
Execution Period • 60 Day
A L
I N
F

Al Samaka Park
Project and Location • Al Samaka Park - Damascus
Client • Damascus Governorate
Work Description • Study and design and installation of new public
lighting, cabling, earthing, and controlling
of high-tech designe.
Execution Period • 60 Day
Educational Bldgs Projects
COMPLETION Contract Value
REF PROJECT NAME Location BLDG AREA LAND AREA GLIMPSE ABOUT THE PROJECT
RATE (USD)
construction and architectural works,
turn key, auditoriumaccomodates 300
1 Dental Institute Hama 15000 sqm 25000 sqm 45% 4,656,754
persons - 5 halls, Labs,service library and a
dome
turn key,
2 Social Care Institute Damascus 23200 sqm 40000 sqm 60 % 6,980,000
construction and architectural works

6 floors +a basement, construction and


3 Computer Science Institute Damascus 14000 sqm 27000 sqm 50% 5,297,120 architectural works,
accomodates for 4000 students

Skeleton works execution for the Engineering


Damascus
4 Bldg 15800 sqm _ 50% 1,300,000 Skeleton works only - 4 floors
Countryside
at Al Kalamoun University

5 floors +a basement, construction and


5 Administrative Works Institute Homs 21000 sqm 35000 sqm 50% 9,500,000 architectural works,
turn key

6 floors , construction and architectural


Constructing and finishing the commercial
6 Damascus 10500 sqm 31000 sqm 50% 4,000,000 works,
and the secretariat institute
along with 40000 sqm site works
A L
I N
F

Dental Institute
Project and Location •
Dental Institute - Hama
Client •
Ministry of High Education
Work Description •
Structural and Architectural Works / Turn key /
15000 sq.m / stadium for 300 Per. / 5 halls / Labs /
Library / and basement for services.
Execution Period • 730 Day
Performance Percentage • 45%
66

A L
I N
F

Social Care Institute


Project and Location • Social Care Institute - Damascus
Client • Ministry of work & Social Affairs
Work Description • Structural and Architectural Works
Turn Key Project / 23200 m2
Execution Period • 720 Day
Performance Percentage • 60 %
A L
I N
F

Computer Science Institute


Project and Location • Computer Science Institute - Damascus
Client • Ministry of High Education
Work Description • Structural and Architectural Works
Turn Key / 14000 m2 / 1 Basement
6 Floors / Capacity for 4000 Student
Execution Period • 720 Day
Performance Percentage • 95 %
52

A L
I N
F

Civil Engineering Building


Project and Location • Civil Engineering Building - Damascus Rural
Client • Qalamon University
Work Description • Construction Works only
15800 m2 / 4 Floors
Execution Period • 100 Day
A L
I N
F

Commercial & Secretary Institute


Project and Location • Commercial & Secretary Institute - Damascus
Client • Ministry of High Education
Work Description • Structural and Architectural Works
Turn Key / 12500 m2 / 5 Floors
10500 m2 / 6 Floors
Execution Period • 1000 Day
Governmental Bldgs Projects
Contract Value
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATE GLIMPSE ABOUT THE PROJECT
(USD)

civil, electrical, mechanical, architectural and


1 Civil Affairs Governorate Homs 8000 sqm 12000 sqm 80% 2,210,000.00
construction works - turn key
6 furnished floors +a basement, construction
2 Civil Affairs Governorate Dar'a 5000 sqm 9500 sqm 45% 1,557,608.00 and architectural works,
turn key
Operations Bldg at Al Basel Hospital - Dummar -
3 Operations Bldg at Al Basel Hospital Damascus 11000 sqm _ 65% 11,900,000.00
Damascus along with medical equipment
4 floors +2 underground floors, construction
4 Patriot Block Building Damascus 2400 sqm 3000 sqm 100% 5,200.00 and architectural works,
Garage and other services

5 floors, floor area 12500 sqm, turn key,


constructing and finishing
5 Aleppo 12500 sqm 40200 sqm 100% 3,460,000.00 construction and architectural works as well as
Aleppo Transport Governorate Bldg
40000 sqm of site works

6 floors, construction and architectural works,


7 Al Qunaytra Finance Governorate Qunaytra 6850 sqm 13880 sqm 100% 2,340,000.00 turn key
74

A L
I N
F

Civil Affairs Administration


Project and Location • Civil Affairs Administration - Homs
Client • Ministry Of Interior
Work Description • Structural and Architectural Works
Turn Key / 5000 sq.m
One basement and 4 furnished floors.
Execution Period • 420 Day
Performance Percentage • 80%
A L
I N
F

Civil Affairs Administration


Project and Location •
Civil Affairs Administration - Daraa
Client •
Ministry Of Interiol
Work Description •
Civil, Architectural, Electrical, and Mechanical
Works / Turn Key
Execution Period • 540 Day
Performance Percentage • 45%
68

A L
I N
F

Al Basel Hospital Operations Building


Project and Location • AlBaselHospitalOperationsBuilding-Domar-Damascus
Client • Ministry of Health
Work Description • Structural and Architectural Works
Turn Key Project
With Supplying Medical Instrument.
Execution Period • 1080 Day
Performance Percentage • 65%
54

A L
I N
F

Patriot Bloc. Building


Project and Location • Patriot Bloc. Building - Al Rawdha - Damascus
Client • Presidency Attain Ministry
Work Description • Structural and Architectural Works
Turn Key / 7150 m2
2 Basements/ 4 Floor
Execution Period • 540 Day
A L
I N
F

Transportation Administration
Project and Location • Transportation Administration - Aleppo City
Client • Ministry of Transportation
Work Description • Structural and Architectural Works
Turn Key / 12500 m2 / 5 Floors
4000 sq.m site works.
Execution Period • 1100 Day
48

A L
I N
F

Financial Administration Building


Project and Location • Financial Administration Building - Qunaitrah City
Client • Ministry of Finance
Work Description • Structural and Architectural Works
Turn Key / 6850 m2 / 6 floors.
Execution Period • 1020 Day
Residential Bldgs Projects
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATE Contract Value GLIMPSE ABOUT THE PROJECT
turn key project
Resdential Bldgs at Al Yarmouk + commercial construction and architectural works - 360
3 Damascus 51000 sqm 75500 sqm Completed 5,800,000
markets residential units - 2 commercial markets 2000
sqm
2 towers/ 12 floors (for each tower)
5 University Residences Homs 13000 sqm 3500 sqm Completed 2,210,000
construction and architectural works, turn key
2 towers/ 12 floors / 144 apartments (for each
tower) construction and architectural works,
4 Resdential Bldgs at Al Barzeh Damascus 20800 sqm _ Completed 4,700,000
turn key project

New Residences - Jadidah Artouz - Turn Key project including all the architectural
1 Damascus 188000 sqm 125000 sqm Completed 83,533,000
phase 1 - 1253 residential unit and construction works

New Residences - Jadidah Artouz - phase 2 Turn Key project including all the architectural
2 (advanced) - 2200 residential unit Damascus 330000 sqm 175000 sqm Completed 146,670,000
and construction works
A L
I N
F

Residences Buildings
Project and Location • Residences Buildings - Alyarmouk - Damascus
Client • Damascus Governorate
Work Description • Structural and Architectural Works
Turn Key / 24 Buildings / 4 Floor each
51000 m2 / 360 Apartment.
Execution Period • 720 Day
Real Estate Dept.
The begining was since 1983…

• All our real estates are void from checks and claims on the cadastre and are sectioned into
partitions and then authorized in order to erect buildings on them.
• Buildings are constructed together with their complete overall facilities up to a high quality
standard, exactness and aestheticism.
• We perform public services
- Non portable water lines, potable water, electricity and telephone networks as well as
pavements, asphalts and street lighting.
- Finishing unification and standardization through overlaying the four frontages of each
building with granite or natural stone, fitting and assembling stairs and walls marble, as
well as a wooden front door and balcony banisters and ceiling lights, all form unified to all
built partitions.
• We carry out the registry of all built partitions at the Real Estate Directorates then, buildings are
finally allotted to buyers.

And we still carry on …

A L
I N
F
A L
I N
F
A L
I N
F

University Residences
Project and Location • University Residences - Homs City
Client • Ministry of High Education
Work Description • Structural and Architectural Works
Turn Key / 13000 sq.m
2 Towers / 12 Floors each.
Execution Period • 945 Day
Performance Percentage • 95 %
A L
I N
F

Barzeh Towers
Project and Location • Barzeh Towers - Damascus
Client • Damascus Governorate
Work Description • Structural and Architectural Works /
Turn Key / 20800 m2 /
Towers 12 Floors each / 144 Apartment.
Execution Period • 820 Day
Reinforcement and renovation Projects
Contract Value
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATE GLIMPSE ABOUT THE PROJECT
(USD)

1 Reinforcement works for Marabaa Hangar Damascus _ N/A 100% 400,000 soil shoring works by using nails and shotcrete system

Soil Shoring Works by using nails and


2 Reinforcement works for Ghardenia Hotel Homs 8000sqm N/A 100% 2,800,000
Shotcrete system at depth of 18 metres

Constructing a retaining wall of 17 metres height with


shoring and constructing retaining walls
3 Damascus _ N/A 100% 350,000 concrete piles no 52, dim 90 cm through using nails
at Dummar, Island 4
and shotcrete system
82

A L
I N
F

Reinforcement Works for Marabaa Hangar


Project and Location • Reinforcement Works for Marabaa Hanger
Client • International Hamsho Group
Work Description • Soil Shoring Works by using nails and
Shotcrete system

Execution Period • 90 Day
A L
I N
F

Reinforcement Works for Gardenia Hotel


Project and Location • Reinforcement Works for Gardenia Hotel - Homs
Client • Al Gadrinia Real Estate Investment Company
Work Description • Soil Shoring Works by using nails and
Shotcrete system
8000 sqm, Depth 18m
Execution Period • 120 Day
A L
I N
F

Retaining Wall In Domar


Project and Location • Retaining Wall - Domar - Damascus
Client • Damascus Governorate
Work Description • Retaining wall / hight 17 m by using
nails and shotcrete system.
Execution Period • 45 Day
A L
N
Ready Mixed Concrete Dept.
I
F
SINCE 1983
84

A L
I N
F
Ready Mixed Concrete
It is a division for producing all types of mixed concrete with its all forms (normal, resistant,
cast….etc) and cement products (edges, tiles, bricks and interlock) which we produce
automatically.
Khayyat Contracting & Trading has established several mixing plants throughout Damascus
and Damascus countryside besides the movable ones in order to provide the demands of its
projects and to provide a part of the local market demands. Moreover, these weighted mixing
plants are equipped with the latest technologies and automated systems by computer which
meet the highest international quality standards and with total production capacity exceeded
3800 m3/day. This division is also equipped with wide range of modern and developed
machines which ensure the proper work flow without any hindrance, delay or without any
delay towards the customers under all circumstances and at all sites. It also includes the
capability to meet the demands in quantities without delay.

Since the evolution of this division and in order to satisfy customers and maintain their great
confidence in the Establishment, Khayyat Contracting & Trading has established a laboratory
to control and monitor quality. This laboratory was equipped with the latest international test
equipments of high reliability. These tests include:

• Test the granules grades of supplies through screens ASTM C136.



L
Test measurement and chemical analysis for very fine substances and which pass through
screens (200) micron 75- C117 ASTMN.
A


I N
Test the qualitative weight and pebbles and sand absorption ASTM C127/C128.
Chemical tests to define impurities in sand ASTM C40.

F
Los Angles Test to define pebbles resistance (anti-collision).

The laboratory controls quality also by designing concrete mixtures through the most modern
programs in this regard and it compares it to the reality. The laboratory monitors mixtures
produced daily through some field tests and other internal laboratorial ones regularly and
continuously.
The most important advantages to deal with "Mixed Concrete and Cement Product" Division
in Khayyat Contracting & Trading are:

1- Accurate appointments schedule strictly applied as the company ensure an administrative


system and excellent organizational structure in addition to several vehicles and three mixing
machines distributed around Damascus to allow it to regulate long and accurate appointments
schedules without any problems or delay in delivery date and casting.
2- Excellent quality for the mixed concrete for several reasons; most importantly:

-All permitted materials are of all types of sand, granules and cement types, which is excellent
raw materials as the company adopts high standards to buy these materials, even if it is from
remote sources and with additional cost for transport and loading because the aim is to have
best quality types and brands to realize the best quality of mixed concrete in addition to a set
of additives to the mixtures to give it high and excellent resistance as per the minimum limit of
the Syrian Arab code.
86

-Professional technical team with high competence and experience in this field, starting from
the technicians in charge to mix the materials to the laboratory staff who test these materials
and to trained drivers and supervising engineers.

3- Very competitive price compared to the quality of the concrete.

4- Extreme care for customers in terms of the after sale service.

5- Possibility to install movable mixing plants at casting sites within 24 hours only.
Mixing plants sites of Khayyat Contracting & Trading

Mixing plant
Mixing plant address Capacity
description
Damascus countryside, Weight mixing plant automated
100 m3 / h
industrial area – Adraa by computer 2006
Weight mixing plant automated
Sahnaya – Daraa highway 150 m3 / h
by computer 2008
Movable mixing plants to be
installed at projects wherever

A L
Installation within 24 hours ----

I N
F
90

A L
Machinery & Reinforcement Dept.

I N
SINCE 1983 F
A L
I N
F
92

A L
I N
F
Machinery & Reinforcement Dept.
Specialized in performing all works of reinforcement, excavation and transportation relative to
the establishment projects or the common and/or private sector projects through offering the
following services:
• Execution of concrete wedge works up to various depths and dimensions by the use of
international class most modern wedge borer machines and all related technical accessories.
• Carrying out soil lateral reinforcement by using horizontal stud technology with injected
concrete or by concrete wedges with horizontal tensors.
• Implementing boring works of all types and dimensions.
• Effectuating transport works.
• welcoming various engineering works.

A L
I N
F
Machinery & Equipment List
Project Dept
Six Wheel Tipping Lorry, capacity 20 m3, made by Mercedes
1 5
Benz - Germany

2 Truck Towing Head, Six wheel Tipper, capacity 20m3, made by Kamaz 5

3 Wheel Loader 950 Caterpillar 7

4 Wheel Loader 4500, Volvo 4

5 Wheel Loader L 90, Volvo 4

6 Wheel Loader 980, Caterpillar 1

Jack Hammer with Air Compressor, Atlas Capco, 10 cylinders, pressure 23


7 4
bar, with two impellers

8 Electric Generating Set, 60KVA 20

9 Telescopic Crane, 50 tons capacity, made by Kobelco of Japan 1

Tower Crane, length 44m, full automatic control, with lifting capacity 3.5
10 5
tons, jib 75m, made by Liebher - Germany

11 Welding Machines, MOSA Italy, with Electric Generating ,10 KVA 10

12 Welding Machines, 999 ,Chaina, 375 Am. 35

13 Electronic Total satation 30

14 Auto Level 60

15 concrete vibrators 150


Machinery & Equipment List
Ready Mix Concret Dept
Concrete Batching Plant, capacity 100m3, made by MEKA - Turkey,
1 1
located in Addra.
Concrete Batching Plant,(Mobil system) capacity 100m3, made
2 1
by MEKA - Turkey, located inYaafor
Concrete Batching Plant, capacity 120m3, made by B Makena - Turkey,
3 1
located in Sahnaya.
Concrete Batching Plant, capacity 200m3, made by B Makena - Turkey,
4 1
located inTartos city

5 Truck Mounted - Mercedes - concrete pump - Schwing. 1

6 Truck Mounted - Daewoo - concrete pump - Putzmeister. 1

7 Concrete Pump,whetzinger mounted on mercedes truk length 37m 2

8 Concrete Pump,,shwing mounted on mercedes truk length 28m 1

9 Concrete Pump, ,pustmister mounted on mercedes truk length 32m 1

10 Concrete Pump, hanwoo mounted on daewoo length 48m 1

11 Concrete Pump, hanwoo mounted onDaewoo length 58m 1

12 Truck Mixer, capacity 8.5m3, made by Kamaz. 17


13 Truck Mixer, capacity 9.5m3, made by Kamaz. 12

14 Truck Mixer, capacity 10m3, made by Akor - Mercedes 14

15 Truck Mixer, capacity 12m3, made byActros - Mercedes 3

16 Laboratory Equipment for Batching Plant 1

17 Laboratory Equipment for Batching Plant z

18 Laboratory Equipment for Batching Plant 1

19 Laboratory Equipment for Batching Plant 1

20 Cement Silo, capacity 100 tons each. 4

21 Towing Heads, made by Kamaz. 5

22 Towing Heads, made by Scania. 4

23 Electric Generating Set, Noiseless, 300KVA, Assembled by CTM - Italy 12

24 Air compressor, Atlas Capco, 4 cylinders 11

25 Welding Machines For all type of steel,999 China, ACDC ,260 AM. 5
Machinery & Equipment List
Foundation and Pilling Dept
Drilling Rig, Rotary, drilling depth up to 43m and diameter of 1.5m, with
1 5
metallic sleeves, and all necessary equipment, made by Gasagrandi - Italy
Hydraulic Vibrators for lowering sleeves of 110cm diameter, made by
2 2
Gasagrandi - Italy
Hydraulic Vibrators for lowering sleeves of 200cm diameter, made by
3 1
Gasagrandi - Italy

4 All equipments for testing of wedges (piles) through Tensile Force. 1

Hydraulic Pump for aerating the vibrator, pressure 400 bar with Deutz diesel
5 1
engine of 6 cylinders.

6 Injection Machine, pressure of 200 bar, Hani 151 - Switzerland 1

7 Concrete Shooting Machine, Aliva (Sika) 146 - Switzerland 4

8 Horizontal drilling Tensiles Machine, made by Gasagrandgi - Italy 2

Drilling Rig, Rotary, drilling depth up to 43m and diameter of 1.5m, with
9 1
metallic sleeves, and all necessary equipment, made by Sany - China

10 Dewatering pump 50
Machinery & Equipment List
Roads and Infra Dept

1 Bulldozer D9, Caterpillar 3

2 Crawler Loader 977, Caterpillar 2

3 Water Tank Wagon 2

4 Rollers, 8 tons, Dynapac 4

5 Grader, Caterpillar 1

6 Agricultural Tractor 11

7 Loader, capacity 70 tons, made by Mercedes 8

8 Excavator - Poclain C170 - France 2


Machinery & Equipment List
Service Cars
1 AUDI S08 1
2 H.VERNA 1
3 LADA 1
4 SHANA 1
5 KIA RIO 2
6 AVANTI 1
7 KIA PICANTO 3
8 SUZUKY 1
9 PEUGOT 206 1
10 RENAULT KANGO 2
11 KIA MORNING 5
12 KIA 1
13 H.VAN 4
14 HYUNDAI 1
A L
Global Trade & Supplying Dept.

I N
SINCE 1983
F
96

Global Trade & Supplying Dept.


This dept is specialized in global trading and supplying around the world, we import all
equipment and technology from manufacturers to employer.

L
Our mission is to make quality products available to client at reasonable price and on time,
our aim is to cater the needs of the client with adequate support of premier technical and
management services in a highly responsible manner. A
I N
F
We are welcoming in any company and manufacturer to be our partner in our successful
business.
A L
N
Quality & Safety Philosophy
I
SINCE 1983
F
Quality & Safety Philosophy

A L
Through built-in monitoring and implementation procedures, KCT is commitied to
delivering a quality construction projects and final product. The procedures begin
during the pre-construction phase with budgeting, value engineering services, and
subcontractor selection.
I N
F
The Quality Control proceduers togather through a concentrated effort of teamwork
involving KCT Estimators, Project Manager, Safety Director, and field staff to deliver the
Client a successful project.
At KCT, safety is a prime concern. Our full-time Safety Director visits each individual
project site, performs regular staff training and networks with other to insure safe working
conditions are being maintained.
Weekly safety meetings are held on each project site to stress the importance of jobsite
safety and to keep safety in the minds of each individual working on the site.

At KCT, we are always improving...


Why KCT ?
KCT executes diverse construction projects and has a reputation of being one of the
best construction companies, who successfully complete all projects in the shortest
time possible.

Our qualified & committed project management team, adequate manpower and

L
sophisticated machinery contribute to our success and continued grwoth.

A
proficiency is a necessity. I N
Our specialization enables us to deliver beyond expectations in markets where technical

F
We constantly upgrade our processes and adopt new technologies to retain our
competitive edge and maintain our position as market leader in the construction field.
Contacts Info.

Damascus Rural - Syria


P.O.BOX : 206
Tel : +963 11 622 49 96
+963 11 621 61 79
+963 11 621 70 21
Mobile : +963 955 88 88 80
A L
Fax : +963 11 621 55 79
e-mail: info@khayyat-sy.com I N
Damascus Rural - Syria
F
P.O.BOX : 13404
Fax: +963 11 214 48 45
Tel : +963 11 214 55 77
+963 11 214 6002
+963 11 214 6003
Mob.+963 949 99 99 96
+963 949 99 99 97
info-rmc@khayyat-sy.com

www.khayyat-sy.com