Sei sulla pagina 1di 6

SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.

Rev. 2018.03.00 31-Mar-18


SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Low Voltage Building Wire, Termination Torque Testing SATR-P-3206 14-May-18 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

A. TEST PROCEDURE AND CHECKLIST

Inspection shall be performed by the project approved Quality Schedule Q


A1 Control Inspector (QCI) and witness point shall be coordinated with
the Contractor and Company. Att. IV Sec. 3
Testing is to be carried out ONLY on de-energized cables. Cables
shall be tested for their de-energized state before starting test on SAES-P-104
A2
them. Sec. 3.2
NFPA 70, NEC 110.3 & NETA ATS 2009, 5.1
The low voltage power and control cable connections shall be torque
test with certified and calibrated torque-type screw driver or beam- SAES-P-104
A3
type torque wrench or ratchet-type torque wrench. Sec. 3.2
NETA ATS 2009, 7.3.2.1.3

The torque levels shall be in accordance with the bolt manufacturer's


SAES-P-104
A4 recommended values.
Sec. 3.2
NETA ATS 2009, 7.3.2.1.3.2

Check proper terminals and crimping die are used on cable and that
SAES-P-104
A5 crimping procedure is proper.
Sec. 3.2
NETA ATS 2009, 7.3.2.1.4

Check that the installed connector size match with the size of wire. SAES-P-104
A6
NFPA 70, NEC 110-14 & 250-110 Sec. 3.2
Check that the required information is marked on the compression
SAES-P-104
A7 lugs.
Sec. 3.2
NFPA 70, NEC 110-14 & 250-110
Check the bolt & hole size of termination lugs installed for SAES-P-104
A8
correctness. NFPA 70, NEC 110-14 Sec. 3.2

Check torque tester sit at proper range of each size of bolt/screw. SAES-P-104
A9
NFPA 70, NEC 110-14 & 250-110 Sec. 3.2

Check the type of bolt/screw diameter, thread and adjust the torque
setting into the required FT / LBS. as per SA Pre-Commissioning SAES-P-104
A10
Form # SA-P-000 or equipment manufacturer's recommendation. Sec. 3.2
NETA ATS 2009, Table 100.12

Torque the bolted connection and check that torque bolts/screw are
SAES-P-104
A11 marked.
Sec. 3.2
NFPA 70, NEC 110-14 & 250-110

Site Test Records and Receipt documents are to be carefully SAES-P-104


A12
presented in original. Sec. 3.2

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Low Voltage Building Wire, Termination Torque Testing SATR-P-3206 14-May-18 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

B. TEST EQUIPMENT AND MATERIALS CRITERIA

1. Torque-type Screw driver or Beam-type Torque Wrench or Ratchet-type Torque Wrench shall have valid calibration date.

2. The test equipment calibration cycle shall not exceed twelve months.
Schedule Q, Att. IV, Sec. 7

Test Equipment Manufacturer: Serial Number:

Scale Range and accuracy: Calibration date:

Calibration Company and Technician: Calibration Expiration Date:

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

C. TEST RESULTS

D. CONCLUSIONS

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

The bolts/screw torque check shall meet the requirements of


Manufacturer's recommendations, testing guide lines of SA Pre- SAES-P-104
D1
Commissioning Form # SA-P-000, NETA Table 100.12 Sec. 4.1
NFPA 70, NEC Sec. 110.3

Test results are acceptable and in accordance with Saudi Aramco Schedule Q
D2
Engineering Standards and contractual requirements. Att. II

REMARKS:

ATTACHMENT(S):
1. Attachment - 1 Table 100.12, NETA ATS (2009) and Pre-Com Form SA-P-000

REFERENCE DOCUMENTS:
1. Schedule G - Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 2006
2. Schedule Q - Quality Requirements (Pro Forma Contract), February 2008
3. Acceptance Testing Specifications- NETA (2009)
4. Pre-Commissioning Form (SA-P-000) Testing Guidelines

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Low Voltage Building Wire, Termination Torque Testing SATR-P-3206 14-May-18 ELECT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

5. NFPA 70 National Electrical Code (NEC), 2014 Edition


6. SAES-P-104 Wiring Methods and Materials, 01 January 2018
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization concerned
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the manufacturer
indicates compliance with appropriate standards or performance in a specified manner.

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Name, Title, Department, Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Name, Initials and Date:
Date:
QC Inspector PID Representative
Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Low Voltage Building Wire, Termination Torque Testing SATR-P-3206 14-May-18 ELECT-

Attachment - 1
NETA ATS 2009, Table 100.12 Bolt-Torque Values for Electrical Connections

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Low Voltage Building Wire, Termination Torque Testing SATR-P-3206 14-May-18 ELECT-

SA Pre-Commissioning Form # SA-P-000 (Testing Guidelines)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Low Voltage Building Wire, Termination Torque Testing SATR-P-3206 14-May-18 ELECT-

Saudi Aramco: Company General Use

Potrebbero piacerti anche