Sei sulla pagina 1di 23

HENRICH

Henrich Airconditioning Service


60 Nuestra Sra St., 6th Avenue, Kalookan City,
Metro Manila www.henrichsales.wix.com/htc
0920-362-1222 /0995-240-1886 /366-7416 /
782-6286
henrich_tc@yahoo.com henrichaire@gmail.com
Mayor’s Permit for 2020 is subject for processing.
VISION

We will be recognized as the most professional team of HVAC products and


services while providing reliable service and installation. We will also lead
the way toward more efficient and effective methods and procedures.

MISSION
Our mission is to provide quality design, installation and service for Heating,
Ventilation, and Air Conditioning (HVAC) equipment in both residential and
light commercial markets. We extend our services in helping the industry in
discharging safe treated water from their STP.

OBJECTIVES
Maintain the highest level of design and engineering possible.
Establish and cultivate a training program to ensure quality installation and
service.
Hire, develop, and retain employees who are committed to our growth and
customer satisfaction.
COMPANY INFORMATION
Business Name: HENRICH Airconditioning Service
Nature of Business: Air Conditioning & Refrigeration Services
Proprietor/Manager Henry D. San Pedro - Reg.Mechanical Engineer
Office #60 Nuestra Del Rosario St., 6th Avenue, Kalookan City
AddressTelephone: 0995-2407886 or 782-6286
Mayor’s Permit No.: 05-013030 / Jan 15,2019
Date Issued: SSS 03-9515884-5-000
No: TIN : 127- 586-192
Bank Acct Union Bank, 9th Avenue, Kalookan City

ABOUT US
Henrich Airconditioning Service is a registered Sole Proprietorship entity with primary business
in Air Conditioning & Refrigeration Services, a PCAB license for Specialty Trade Contractor in
Aircon and Refrigeration Works. With experience in various Air Conditioner Units Installation
and Service. Henrich completed some projects in Air Ducting , Kitchen and All Fresh Air
Ducting, Fire Protection System Modification, Air Compressor System Installation, BMS System
Installation , Dehumidifier and Humidifier Installation, Air-conditioning for Sound Proof
Recording Room, Chilled Water System Installation.

Henrich is also engaged in Design and Build of STP System with or with-out Re-use water. We
design in compliance with the required effluent parameters set by DENR. We offer up to date
system and technology.

We are also into selling of industrial equipments such as Generator Set, Screw Air
Compressor, Air Drier, BMS, Dehumidifiers, Medical Gas Plant, Chiller and AHU, BTU Meters.
COMPLETED PROJECT
Oil Less Free 30hp Atlas Copco Screw Air Compressor Installation
Philippine Bobbin Corp, EPZA Rosario Cavite ,Jan 2020-On going

Piping System for Chilled Water For MRI System –East Avenue Medical Center, April 2019

Tong Lung Metal Ind


Subic Gateway Business Park, Subic Zambales
Design Supply & Installation of 140 Tonner Direct Expansion Air-con Carrier (10TR & 20TR)
March 2018 to July 2018

Tong Lung Metal Ind


Installation of Centralized Dust Collector as Designer, Estimator & Project Supervision, Oct 2017

Tubigon Municipal Hall, Bohol


Installation of Carrier Aircon ,26 Units Split Inverter Aircon March 2017 to April 2017

Philippine Bobbin Corporation, Epza Rosario Cavite, Installation of 280 Tonner Direct Expansion
Aircon with Humidification System
Design and Installation of BMS SCADA System Oct 28,2015 to 2018

DENR EMB, Visayas Ave. Quezon City


Installation of 30Hp and 36HP VRF Everest + 22 FCU June 2015

Vernida 2 Condominium, Salcedo Village Makati


Installation of Midea Mini VRF 7U x 6HP Air Con and Exhaust Ducting

Intramuros Plaza San Luis Installation of 36HP Midea VRV Engr Taganas

Unilogix/ Concessionaire of Starbucks Merville Compound, Pasay


Maneze Construction Installation of 24HP VRV Daikin

Radio Mindanao Network Office Makati


Installation of Mini VRF Aircon Midea Brand 2015

RJ Landoy 3 Storey Building, Makati City Installation of Everest Inverter Split Type Air con

Loui Vuitton, Makati City , Supply of Ceiling Ducted Inverter Type 6u x 10HP
Mitsubishi Air Con
COMPLETED PROJECT
Manila Peninsula, Makati City
Supply of Inverter Type – Mitsubishi Air Con Home for the Elder, Lancaster, Pasay City

Home for the Elder of Little Jesus, Pasay City


lnstallation of Mitsubishi 6u x 10HP VRV Air Con
Jun to Dec 2005, Arch. Eugene Ferraris, Tel 882-1287

Home for the Elder, Bolinao, Pangasinan


Installation of Mitsubishi 8u x 10HP VRV Air Con and Exhaust Ducting,
Apl’07 to Dec’07, Arch. Eugene Ferraris, Tel 882-1287

Home for the Elder, Bolinao, Pangasinan Solar Piping & Cladding Works, Oct to Dec’07
Arch. Eugene Ferraris, Tel 882-1287

Caloocan Christian Baptist Church, C3, 5th Avenue, Caloocan City


Installation of 3 5tr Carrier Packaged Air Con, Sept’07,

Gov. Vilma Santos Residence, Ayala Alabang


Installation of Mitsubishi 15sets Air Con, April 28,’06 to Feb’07 , Arc. Santos

Biblical Seminary of the Philippines


Valenzuela, Feb07, Relocation & Repair of Mitsubishi (Mr Slim) Air Con , Engr. Robert
Sugcang PM. Constech: Tel 0922-806-7805

Daughter of St Paul, Harrison St., Pasay City


Studio Room –Accoustic Ducting & Air Conditioning, Oct to Nov’06

Arch. Eugene Ferraris, Tel 882-1287St Paul Store, Gateway, Cubao


10HP Ducting Works & Chilled Water FCU Installation, April ’06
Mr. George Fuentecilla, Tel-0919-217-4511

Mr. Orlando Vea Residence, Ayala Heights, Tandang Sora, QC,

Installation of Mitsubishi Air Con, Nov’05 to December 05


Club Ultima Office, J King Place, Pasay Road, Makati, April 05
Sub Con with Engr. Ruel Pancho – Air Pro. Tel: 0919-385-2247

Crossworld Maritime, Sage House, Legaspi Village, Makati City,


April ’05 Rehabilitation of 40TR unitary Type Air Con.
Sub Con with Eunicon Devt Corp
COMPLETED PROJECT
DSP-Alberione , Project, Harrison Pasay City
Installation of 32sets Mitsubishi Electric AC
May 2008 up to Dec.2008
Arch. Eugene Ferraris, Tel 882-1287

St. Paul Store, Ali mall, Cubao


Installation of Ducting & Chilled Water Fan Coil (10TRU)
November to Dec 2008, Mr. George Fuentecilla, Tel 882-1287

Ms. Erlinda Villanueva, Dasmarinas Village, Makati


Re-Installation of Floor Mounted Air Con, Nov 2008 –Dec 2008
Proj Archt. Eugene Ferraris, Tel 882-1287

Thunderbird Casino, Poro Point, San Fernando, La Union


Installation of Carrier Air Conditioning and Ducting System
Kitchen Exhaust System, Sept 2005 to April 2006
Consultant ; Engr. Ramon Aguilos: ,Tel: 374-1329

Thunderbird Casino , Binangonan, Rizal,


All Fresh Air and Exhaust Ducting System, March to April 2006
Consultant ;
Engr. Ramon Aguilos, Tel: 374-1329

Wan Chai Restaurant,Re-installation of Mitsubishi Air Con,Dec 2008 ,


Sub-Con with ; Mr. Rene Garcia

Vilman Computer Store, Gateway, Cubao, Quezon City, 2TR Supply and
install of Hitachi FCU Ducting System

Antonio P. Tuviera’s Entertainment , J Cruz St, E. Rodriguez Ave., Pasig;


Supply & Installation of Mitsubishi Mr. Slim Air Con,
Feb –March 2009 , PM: Engr. Julius Landoy , Tel 882-1287

Pan Pacific Manila , Adriatico Square Inc., Malate Manila, Supply and
Installation of Exhaust Ducting System for SUB_STATION
March 23,2009 up May, 2009
Technical Director: Engr. Ding Pascual, Tel: 536-0351
COMPLETED PROJECTS
Installation of Fire Sprinkler System
Reyes Barbeque, Tutuban Mall, Divisoria, Manila City August 2009, PM Tan
Construction , Engr. Dennis Sandoval

CIBI Building , Zapote St., Near Pasong Tamo St., Makati City Relocation of Fire
Department Connection Piping
September 2009, PM Tan Construction. Engr. Dennis Sandoval

Installation of Mezzanine Racking System, Techpoint Electronics Bambang, Sta Cruz


Manila, LPI Thailand
January 2010 to February 2010
Sewage/ Wastewater Treatment Systems
MBBR -Moving Bed Biofilm Reactor
Membrane Bioreactor (MBR)
SBR- Sequencing Batch Reactor
PROJECT COMPLETED : PHILIPPINE BOBBIN CORPORATION ,
EPZA ROSARIO , CAVITE
SUPPLY AND INSTALL OF 20TONS X 14 SPLIT PACKAGED AC
PROJECT COMPLETED : VRF AIRCONDITIONER – DENR HEAD OFFICE

PROJECT COMPLETED : TONGLUNG METAL IND , SUBIC GATEWAY


BUSINESS PARK
SUPPLY AND INSTALL OF 140TONS PACKAGED AC
PHILIPPINE BOBBIN CORPORATION , EPZA ROSARIO , CAVITE
SUPPLY AND INSTALL OF 20TONS X 14 SPLIT PACKAGED AC
PHILIPPINE BOBBIN CORPORATION , EPZA ROSARIO , CAVITE
SUPPLY AND INSTALL OF BUILDING MANAGEMENT SYSTEM /SCADA
PHILIPPINE BOBBIN CORP, EPZA ROSARIO CAVITE
INSTALLATION OF 14UNITS 20TONS DUCTED TYPE PACKAGE AC
TEL: 366-7416 782-6286

ENVIRONMENT MANAGEMENT BUREAU –DENR HEAD OFFICE


INSTALLATION OF VRF –MUNTI INDOOR AIRCONDITIONER

Potrebbero piacerti anche