PROPOSED QUARTERS FOR CECB AT ANURADHAPURA

BILL OF QUANTITIES
ITEM DESCRIPTION UNIT QTY RATE

EXCAVATION & EARTHWORK

m2

Clearing site including grubbing up roots, removing trees,shrubs and bushes and remova

2 Setting Out Item

3 Excavation in trenches for column


footings in depth not exceeding 1.5m,
m3
backfilled into excavation and remove
surplus material from site

4 Filling in making up levels with imported


material well watered and compacted in m3
layers

5 Filling in making up levels with imported


materials well watered and cpmpacted in
m3
layers for the internal roadway
construction

6 Hardcore filling in under floors, well ram


& compacted in layers, thickness not m3
exceeding 150mm

TOTAL FOR EXCAVATION &


EARTHWORK CARRIED TO SUMMARY
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES

ITEM DESCRIPTION UNIT QTY RATE

CONCRETE WORK

Concrete

Work upto DPC

8 G25 reinforced cement concrete in


column footing and column shaft upto m3
DPC level

9 75mm thick G25 reinforced cement


m3
concrete in ground floor slab

10 m3
G25 reinforced cement concrete in tie beams

11 m3
G25 reinforced cement concrete in Plinth beams

Work upto Roof Level

12 m3
G25 reinforced cement concrete column shaft

Reinforcement

Tor steel (bars) and Mild steel

reinforcement (stirrups) in the following

13 Column footing Kg

14 Column shaft Kg

15 One layer of A142 welded mesh under


ground floor slab area including m2
necessary laps

16 Tie beam Kg

17 Plinth beam Kg
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES

Formwork

ply wood formwork to the following

18 Column footing m2

19 Column shaft m2

20 Ground floor slab m2

21 Tie beam m2

22 Plinth beam m2

Miscellanneous Concrete Work

150×150mm high reinforced concrete


23 lintels including 2nos 3/8" dia rods at
m
bottom and necessary form work

24 250×250×250mm size column Footings


including GI pipes for verandah coumns Nos

TOTAL FOR CONCRETE WORK


CARRIED TO SUMMARY
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES

MASONRY WORK

Work upto DPC

Random rubble masonryin wall

foundation in cement and sand 1:5 using


25 150mm to 225mm size broken stone m3

Work upto Rooflevel

150mm thick hollow block wall in cement


26 and sand 1:5 m2

TOTAL FOR MASONRY WORK


CARRIED TO INSTALLATION
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES

ASPHALT WORK

1000 gauge polythene damp proof


memberane laying under concrete floor
27 with minimum 150mm end & side laps m2

Waterproofing in bathroom floors & walls


upto 1.5m height with approved type
28 waterproofing compound m2

TOTAL FOR ASPHALT WORK


CARRIED TO SUMMARY
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES

DOORS & WINDOWS

Single sash, side hung, Plywood door


including door frame, type D1, size
29 750mm×2100mm Nos

Single sash side hung, PVC door


including door frame, type D2, size
30 700mm×2100mm Nos

Double sash, side hung, timber louvered


window including timber frame size
31 1200mm×1200mm Nos

32 Fanlight size 600mm×600mm,including frame


Nos
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES

ROOF & ROOF PLUMBING

Roof covering with corrugated asbestos


33 sheets & ceilling m2

Timber framework including ridging, wall


plates, ridge plate, rafters, battens,
34 valence and barge boards m2

PVC eaves gutter 41/2" square type fixed


35 to valence board with PVC brackets m

PVC downpipes 31/2" dia. Fixed to wall


36 with PVC clips m

TOTAL FOR ROOF & ROOF


PLUMBING CARRIED TO SUMMARY
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES

FINISHES

1/2" thick rendering in cement and sand


37 1:3 in floors m2

38 Skirting 4"×1/2" thick in cement and sandm1:3

39 5/8" thick plastering to block walls m2

TOTAL FOR FINISHES CARRIED TO SUMMARY


PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES

PAINTING

external weather shield paint of two


coats and a primer undercoat including
preparation of surfaces to receive paint
40 to external plastered walls m2
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
internal paint emulsion finish with two
coats paint and suitable under coat
including preparation of surfaces of
41 internal plastered walls m2

TOTAL FOR PAINTING WORK


CARRIED TO SUMMARY

PLUMBING, DRAINAGE & DISPOSAL


SYSTEM

Water supply system


PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
Water storage tank 1000litres including
all necessary fixing accessaries and
placed in position and complete with
42 float switch and all connections Nos

Supply and installation of

43 12mm pipe m

44 20mm pipe m

45 32mm pipe m

46 Gate valves 20mm Nos

47 Gate valves 12mm Nos

Sanitary fittings and toilet accessories

supply and fixing(including all connections) of

48 Wash basin Nos

49 water closet with hand shower Nos

50 head shower Nos

51 piller tap Nos

52 Towel rack Nos

53 soap holder Nos

Water disposal system

Floor traps with stainless steel grating on


top including water seal fix complete
54 with all connections Nos

55 90mm Pipe m

56 110mm pipe m

57 Gullies Nos

58 Manholes Nos
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
Construction of Brick septic tank
59 including all connections Nos

TOTAL FOR PLUMBING, DRAINAGE


AND DISPOSAL SYSTEM CARRIED TO
SUMMARY
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES

ELECTRICAL WORK

Supply and installation of DB consisting


all connection and all cables complete to
60 working order Nos

Point wiring including for an cables,


wiring, conducting, clips, earth cables,
draw wires, brackers,ceiling roses, wiring
wooden blocks, junction boxes, switch
boxes, 3 core flexible cord, bulb holders,
accessories, switches, socket outlet
bases, hardware fixing and insulating
materials, cuyying holes and chases and
making good to walls for the following

61 Wall bracket lamp points Nos

62 Fan points Nos

63 5A socket outlet points Nos

Supply and Installation of

64 Fans Nos

65 Lamps Nos

TOTAL FOR ELECTRICAL WORK


CARRIED TO SUMMARY
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
AMOUNT
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES

AMOUNT
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES
PROPOSED QUARTERS FOR CECB AT ANURADHAPURA
BILL OF QUANTITIES