SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements (Radiographic examination procedure)

RT procedure is applicable to specific requirement of the project


Schedule Q,
(Identified, traceable to Project Quality Plan & updated doc. list)
Section 3 &
A1 and was approved by both Subcontractor & Prime Contractor.
Att. VI
ASNT certified Level III Inspector(s)
Tables
reviewed & approved.
OID/NDTU Document Review Sheet is attached to procedure &
lists Revision Specific approval Status & NDTU Comments.
Note 1: Document Review Sheet with
OID/NDTU comments shall be attached to NDT Procedures Schedule Q,
(Controlled Field Copies). Section 3 &
A2
Note 2:Technicians shall be trained and are aware of their Att. VI
responsibilities regarding use of controlled field copies. Tables
Note 3:Technicians understand
OID/NDTU comments and can explain details regarding technique
& other OID/NDTU comment
Radiographic examination shall be performed in accordance with a
written procedure. Each procedure shall include following
information but not limited to
a) Material type and thickness
range Para T-221,
b) Isotope or Maximum X ray voltage used Artcile 2,
A3 c) Source to Object
distance d) ASME Section
Distance from source side of object to film V
e) Source size
f) Film brands and designation
g) Screens used

RT techniques deviating from SAEP-1143 shall be recorded on the


Para. 5
RT technique sheet and submitted to Insp Dept. OID/NDT RT
A4 SAEP-1143,
Level III for approval prior to implimentation.

Surafce Preparation: The weld surface should be free from ripples


Para. 5.4
and irregularities which can mask indications on radiographic
A5 SAEP-1143,
image. The weld reinforcement should not exceed permissible
value of the reference code

Back scattered radiation: The Lead letter B (size- 13mm


Para. 5.5
Height/1.5mm thk) shall be attached on the back side of each film
A6 SAEP-1143,
holder during exposure to determine if back scattered radiation is
exposing the film

Film Identification: Each radiograph shall be permanently identified


using Lead numbers and letters. The film identification information Para. 8.4
A7 shall include JO/BI number, Component/vessel/piping identification, SAEP-1143,
Weld joint and welder identification, repair identification, Date of
radiography and Manufacturer symbol.

Saudi Aramco: Company General Use


Para. 6.5.4
A8 Film density monitoring: Calibrated Densitometer shall be used. SAEP-1143,

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

B Equipment & Materials

Film: Radiography shall be conducted with industrial radiography Para. 6.2.1


B1 film. Film shall be either Type I or Type II. Type 1 film shall be used SAEP-1143,
for RT of pipe diameters 8"NPS or less.

Para. 6.2.2
Radiographic film can be processed either manually or automatically
B2 SAEP-1143,

Intensifying screens: Only Lead intensifying screens shall be used.


The front lead screen thickness shall be 0.13mm for Ir-192 , Se-75
Para. 6.3
and 0.25mm for Co-60 or the linear accelerator.
B3 SAEP-1143,
(For other
screen material written approval from designated SA NDT Level III is
required before its use).

Image Quality Indicators (IQI): IQIs shall be wire type. Following IQIs
shall be used:
1) EN wire type as desribed in BS EN 462.1
2) ASME wire type as desribed in ASTM SE- Para. 6.4
B4 747 3) DIN wire type SAEP-1143,
as desribed in DIN 54 109
4) ISO wire type as desribed in ISO 1027
(See
Attachment 1)

IQIs shall be selected from either the same alloy material group or Para. 6.4.3
B5 grade or from an alloy material group or grade with less radiation SAEP-1143,
absorption than the material being radiographed.

Viewing facilities: Viewing facilities shall provide subdued background


lighting of an intensity that will not cause reflections, shadows or Para. 6.5
B6 glare on the radiograph. Radiographic viewers shall meet minimum SAEP-1143,
requirements setforth in ISO 5580 and shall provide variable light
source.

Acceptable radiation sources:


1) X ray generators (upto 6Mev)
2) Iridium 192 (Ir-192)
Para. 6
(Upto 200Ci) 3) Cobalt
SAEP-1143,
60 (Co-60) (Upto 100Ci)
B7 Para. 9.3 & 10.2
4) Selenium 75 (Se-75) (Upto 50 Ci)
SAEP-
5) Cs-137 sources are acceptable as control sources for X ray
1141
pipeline crawlers Note:
In Offshore only Ir-192 (Maximum 30Ci) shall be used . For Se-75
specific approval from ID-RPO is needed.

Densitomer: Densitometer shall be calibrated atleast every 90days


using national standard step tablet or a step wedge calibration film
traceable to national standard step tablet. The densitometer is
acceptable if the density readings do not vary by more than +/-0.05 T-260
B8
density units from the actual density stated on national standard step ASME Sec V
tablet or a step wedge calibration film. Periodic calibration verification
checks shall be performed at the begining of each shift , after 8hrs of
continuous use or after changes of apertures whichever comes first.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Stepwedge comparison film: Step wedge comparison films shall be


verified annually and the measured density readings by calibrated T-260
B9
densitometer donot vary by more than +/-0.1 density units from the ASME Sec V
density stated on the step wedge comparison film.

C Examination

Radiographic technique: A single wall exposure technique shall be


used for radiography whenever practical. When it is not practical, a
Para. 7.1
double wall technique shall be used. The direction of the central
C1 SAEP-1143,
beam of radiation should be centered on the area of interest
whenever practical. (See
attachment 1)

Para. 8.1.2
Use of Co-60 is only permitted when the thickness of the material
C2 SAEP-1143,
exceeds the practical limits of Ir-192 or Se-75.
Geometric unsharpness(Ug): The minimum source to object distance
shall be great enough to ensure that Ug of the radiograph does not
exceed the values noted below:

Para. 8.2
C3 SAEP-1143,

Location markers: The location markers shall be placed on the part,


not on the exposure holder or casette. Location markers shall not
intrude into the area of interest. The starting point and the direction of
numbering shall be identified adjacent to the weld. Number belt
spacing around the circumference of the piping (size 3.5" NPS and
more) shall not exceed table 6, SAEP-1143
Para. 8.3
C4 SAEP-1143,

IQI selection: IQI shall be selected as per Table 7 & 8 SAEP-1143.


Para. 8.6
IQIs shall be placed on source side at all times. When film side IQIs
C5 SAEP-1143,
are used, a lead letter 'F' shall be placed adjacent to or on the IQIs
and shall not interfere with the IQI or be on matter of interest.

IQI selection for welds joining dissimilar materials or welds with


dissimilar filler metal shall be based on weld metal. When the density
T-276.3
C6 limits canot be met with one IQI, and the exceptional density areas is
ASME Sec V
at the interface of the weld metal and base metal, the material
selection for the additional IQI shall be based on the base material

Number of IQIs: One IQI at center and one IQI with in 1" from one
Para. 8.7
end of the film shall be placed for Rt techniques requiring multiple
C7 SAEP-1143,
exposures and the film to be interpreted is greater than 5". Minimum
4 IQIs are required for panoramic exposure.

D Evaluation

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

All radiographic films shall be free from :


a) Fogging
b) Processing defects such as streaks, watermarks, or chemical
Para. 9.1
stains
D1 SAEP-1143,
c) Scratches, finger marks, crimps, dirtiness, static marks, smudges
or tears
d) False indications due to
defective screens

Radiographic density limitations: The density range for Gamma Para. 9.3
D2 radiography shall be 2 to 4 and for X rays 1.8 to 4. A tolerance of 0.05 SAEP-1143,
in density is allowed for variations between densitomer readings.

Density variation: Radiographic density anywhere through the area of


interest shall not vary more than -15% and +30% from the measured Para. 9.4
D3 density next to the designation wire of the IQI. If the density variation SAEP-1143,
exceeds the permissible variation, additional IQI shall be used for
each exceptional area and the area of interest reradiographed.

IQI sensitivity: Radiography shall be performed with a technique of Para. 9.5


D4 sufficient sensitivity to display the essential wire of a wire IQI.The SAEP-1143,
radiograph shall also display the IQI identifying numbers and letters.

Excessive backscatter: If a light image of the lead letter "B" appears


ona darker background of the radiograph, protection from back Para. 9.6
D5 scatter is insufficient and the radiograph shall be considered SAEP-1143,
unacceptable. A dark image of the letter "B" on a lighter background
is not cause for rejection.

Film viewing: Radiographs shall be interpreted only in those areas in


which the IQIs have established that a suitable radiographic Para. 10
D6 technique has been used. Composite viewing of double film SAEP-1143,
exposure is not permitted unless in writing approval from designated
SA NDT Level III.

Film Interpretation: The radiographs shall be examined and


Para. 11
interpreted for film quality and for discontinuities by personnel
D7 SAEP-1143,
certified to perform RTFI by Saudi Aramco. The acceptance criteria
for discontinuities shall be as per applicable construction code.

E Documentation

Radiographic reports shall be issued using Saudi Aramco form 4719-


Para. 12
A-ENG "Radiographic request & report sheet" (See Attachment 2).
E1 SAEP-1143,
Alternative forms are acceptable but should contain all the details as
listed in para. 12 SAEP-1143

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The manufacturer shall prepare and document the technique details.
As a minimum following information shall be provided:

T-291
E2 ASME
Sec V

Para. 12.3
Radiographs shall be turned over to proponent upon completion of
E3 SAEP-1143,
the work

F NDE Control Procedure for RT Technique Procedure Direction & Use on IK Projects ... (SEE SAIC-RT-2010)

RT procedure usage is strictly controlled as follows:


An approved NDE Control Procedure
shall details the NDT responsibiliy, reporting, documentation, Schedule Q,
supervision, interface between Prime Contractor, Subcontractor, NDT Section 3 &
F1
Service Provider. Refer to SAIC-RT-2010*. Att. VI
* A single NDT Control Procedure on Tables
Projects shall detail the above for all applicable NDE Methods on
the project.

REMARKS:
Attachments: 1. Image Quality Indicators, Technique & exposure requirements.
2. Radiographic request / report form - Form 4719-A-ENG (09/98), Form 4719-A1-ENG (09/98)
3. Document review sheet
4. Document approval letter

REFERENCE DOCUMENTS: 1.
1. SAEP-1143, Radiographic Examination 2 Oct, 2014
2. Schedule Q, Quality Requirements
3. Approved Project Document Control Procedure (to be identified)
4. ASME Section V, Non Destructive Examination (2013 Edition)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Attachment 1: Image Quality Indicators, Technique and Exposure requirements

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Attachment 1: Image Quality Indicators, Technique and Exposure requirements

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Attachment 1: Image Quality Indicators, Technique and Exposure requirements

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Attachment 2: Radiographic request / report form - Form 4719-A-ENG (09/98), Form 4719-A1-ENG (09/98)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Attachment 2: Radiographic request / report form - Form 4719-A-ENG (09/98), Form 4719-A1-ENG (09/98)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018)

Saudi Aramco: Company General Use


Rev. 2018.03.00

###

Saudi Aramco: Company General Use


###

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
N/A
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date: N/A

Saudi Aramco: Company General Use


*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018)

Saudi Aramco: Company General Use


Rev. 2018.03.00

###

Saudi Aramco: Company General Use


###

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 14-May-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018)

Saudi Aramco: Company General Use


Rev. 2018.03.00

###

Saudi Aramco: Company General Use


###