Document: 10000191342-PDC-000
Structures, Global Procedure
Is the drawing title block updated with data from SAP on all sheets? ( Title, Modified By,
6 Originator, Plant, Material No., Material specification, Release date, Reason for issue,
Doc. No., Doc. Ver., ECO no. )
Does the drawing include (Standard / Project Specific) 'General note and specifications'
7 document number on Sheet 1 top right corner?
Is the cutlist table in accordance with WP03 example drawing & Best practices doc.?
8
Are all the values from cutlist populated from Solidworks model? (No manual
9 editing/overwriting)
Is the cutlist positioned on first sheet, at bottom-right corner, above the title block and
10 attached to anchor point?
Are the description of plates show correct value of thickness (e.g. PLATE 10) and is it
11 linked to solidworks model?
12 Are the material specs. in cutlist as per project material selection philosophy?
DRAWING VIEWS
Is the drawing hierarchy following same break down structure found in DIR
13 10000370363 "Drawing Hierarchy"?
14 Is the orientation of Isometric view same as per top level assembly?
Is the sheet area fully utilized using standard / recommended view scales as per WP03
15 Best practices doc.?
16 Are all views labelled with scale below drawing view?
Are all section / Detail view labels incrementally sequenced starting with 'A' and
17 arranged alphabetically in ascending order starting from top left?
Are the tangent lines visibility turned OFF in all views other than isometric viewfrom first
18 sheet?
Are all revision triangle value same as that of the drawing revision mentioned in title
25 block? (revision number updated from values linked to SAP)
Are all the text annotations, geometry lines and dimensions clearly visible in the printout
26 / pdf?
27 Are there any baloons with manual text input?
28 Are the text indicating 'FORE' / 'AFT' orientation added as per the field layout?
29 Is the text alignment for leader notes correct? (Aligned in the direction of leader)
Checking Routine for Drawings
Document: 10000191342-PDC-000
Structures, Global Procedure
33 Are the field welds identified by appropriate weld symbol along with related note?
45 Are pressure equalization holes marked with dimensions for any closed sections?
The drawing shall be complete and consistent up to Originators best knowledge. The checklist is part of quality assurance process and shall be attached to SWD DIR and completed by the originator prior to initiate of IDC, CR, IFC or re-IFC
workflows. Draft Checker and Eng. Checker complete their checkpoints during the workflow process.