Italian technecian Recomandations on our issues.

Body Department.
ISSUE Recomandation
1.Under fire & Over fire Walstonite introduction in glaze composition(Minimizes).
2.Micro pin holes & improve Glaze texture. Walstonite introduction glaze composition.
3.For improve casting rate increasing residue %.

Casting Department.
ISSUE Recomandation
Purging air pipe position Final of the BCL slip pipe
New filling system
Filling of big tank with disk system
Pin holes & Blibs 1st 10 minutes slow filling and then normal filling
shortage of slip during casting Reorganisation of shifts
Big air bubble on top part(Marcela wc) Study on mould filling pipes in BCL slip line
Increasing line angle and slip pipe little high that the rest
All water closets bowl cracks, Covering(Filling) of fall pieces gaps with clay.
All water closets foot cracks To clean immediattely after the lateral mold onces open up
Water closets front side rim bad finish Covering(filling) of top side body parts gap with clay
All Asian Pans catching cracks To modify mold to diminish thickness of wall of the piece
Vivana water closet foot cracks. Reduce gap between foot core & body part.
Isabella WC corner cracks Reducing back core drying and Talc powder application
Flat Urinal corner cracks Application of Talc powder at core part corners.
Water Tank pin holes & blibs Introducing purging air pipe at final of line slip pipe.
proper cleaning of moulds after and before casting
Water tank body cracks. Avoiding slip leakages in the mould and casting process.
Verso water closet sump cracks Good water fingering and merging of plate with sump.
Verso wash basin big tap hole side crack Maintain sufficient thickness.
Marcela water closet water leakages Application of Talc powder for Plaster pin & slow releasing
Proper setting of plaster pin in the mould
Cooling cracks (Silvana ped) Maintain sufficient thickness.

Inspection & Spraying Department.


ISSUE Recomandation
After Inspection every piece cleaning by blowing air with air
Pin holes & Blibs gun and clearing appeared pin holes & blibs.

Increasing of air blowing time(To allow clay particles to go out)


Proper checking and clearing of clay particles from the piece
Clay droppers(CDR) after inspection.
All inspection related issues Increasing lighting, even side of booth.
Kiln Department.
ISSUE Recomandation
Introducing perforated slabs for top deck.
Allow more heat to go out(In that case top pieces will get
Under fire in Kiln-2 sufficient heat).

Moulding Department.
ISSUE Recomandation
Improve the supervision.Introducing finishing of moulds after
releasing from the case in single cavity moulds. Try to
introduce cement in case making to get good case surface.
Poor finishing of mouls Case production with resin.

Improve the supervision.Proper case maintenance.proper


finishing. Proper calmping of moulds during production.case
Poor fitting of Moulds production with resin
More weight of moulds. To maintain 60 mm wall thickness of moulds.

Mould dis placement Modification of mould carriers with mould size.


Body Department.
Check list
N/A
N/A
N/A

Casting Department.

Need to provide air purging pipe at final area for all lines.
Trained all super visors & workmen. Required every day all lines checking during mould filling time

Required every day all lines checking for big air bubbles and to change the pipes.
N/A
Required every day all lines checking during mould filling time
Results not favourable.
Required every day all WC lines checking during mould preparation time
Required every day all WC lines checking during piece releasing operation time.
Required every day all WC lines checking after body parts fitting.
Modified moulds(8 pieces) in line number-47.samples under progress
Reduced gap in the moulds and the results found good.
Followed the instruction 30% improvement only found.
Started Application and results found good, same continueing. Casting part found good.
Privided air purging pipe in line no- 33, Trails under progress.
Required every day all WT lines checking during mould preparation time
Required every day all WT lines checking during casting time
Results found good.Required every day verso WC lines checking after merging & fingering.
following casting slip holding time and green piece weights
Required every day Marcela lines checking during mould preparation & pin releasing time
checked the setting, found gap between pin & mould.5 moulds casting with proper setting.
Following green piece weights with standards on daily basis.

Inspection & Spraying Department.


Check list
Need to check process implimentation and need to train up people regarding checking and clearing of
surface defects(pin holes, blibs & Bcr)

Need to check, the way people air blowing and need to train up people regardin air blowing time

Monitoring the inspectors during air blowing and cross checking the inspection finished pieces.
work under progress.
Kiln Department.
Check list
Need to check one car on trail basis with perforated slabs.

need to check one firing by adjusting the chimny heights

Moulding Department.
Check list

Need to check Case mould maintenance and production mould quality and production supervisor must
ensure the quality of moulds produced in his shift.

Need to check Case mould maintenance and production mould fitting and production supervisor must
ensure the fitting of moulds produced in his shift.
work under progress.

Need to start carrier modification at more displacement observed areas. Already Orchid pan trails under
progress.