Management Summary Energy Audit

ANGLOGOLD

S T R AT E G Y

ENERGY
EFFICIENCY
EARNINGS

3E STRATEGY

TSI
MI

Y
RG
N

RA
E
E

Netherlands Ministery of Economic Affairs LS EN Technical Services International


AND
EUROPEAN COMMISSION
INTRODUCTION testing, the team proceeded to monitor and
analyse key areas in detail. The initial findings
The objective of the project, financed by are outlined below.
European Commission and co-financed by the
Department of Minerals and Energy (DME), the
Dutch Government and TSI, was to gather and KEY AREAS OF
INVESTIGATION AND
package information on energy efficiency in
INITIAL FINDINGS
South Africa using three case studies in different
industries. AngloGold, the largest gold mining
Ÿ REFRIGERATION: AngloGold has a
company in Africa, agreed to participate in the
scheduled maintenance plan requiring
project and nominated Elandsrand mine for the
refrigeration machines to be inspected
case study. Access and information relating to
and heat balanced at regular intervals. A
energy management measures currently
typical finding is an insufficient heat
underway at Elandsrand were made available.
transfer across some of the condensers
An energy audit, and its recommendations, form
and therefore efficiency losses. It is
a vital part of a mine's '3E Strategy' (Energy
possible to cost the effects of scale build-
Efficiency Earnings). AngloGold currently has a
up by a heat-balance and hence
very commendable energy efficiencydrive.
determine the optimal time to clean this
equipment to minimise costs. AngloGold
The audit at Elandsrand was a collaborative have already established a pilot plant
Effort involving NOVEM (Representing the testing the feasibility of automatic on line
European Union), the Energy Research Institute efficiency monitoring and in-line tube
(ERI) at the University of Cape Town and Energy cleaning at their Great Noligwa mine. A
Consulting Services (ECS), a division of further potential saving is to insulate
Technical Services International. these vessels.
Ÿ COMPRESSORS: At AngloGold's
The energy sur vey at Elandsrand was Kopanang and Tshepong mines, hot water
approached as follows: from compressor coolers is successfully
1. A typical one-day 'walk through' to being used for supplying hostel change
survey the plant, gather information and identify houses with hot water requirements. The
areas for further analysis. same could be investigated for Elandrand.
2. A comprehensive review of energy This is an effective use for waste heat.
consumption and production records over a Additionally the cost of losses caused by
twelve-month period to determine total energy the pressure drop across compressor
costs, overall consumption of various fuels, inlet air filters can be calculated. This will
energy intensities and seasonal variations. give an indication of the best time to
3. Monitoring current key energy flows change the filters.
directly from the plant including an electrical Ÿ COMPRESSOR COOLING TOWERS: There
energy audit. appeared to be room for some efficiency
improvement here. The cooling towers
Throughout the project the prime concern was were returning water above design
to improve energy performance without temperature to the compressor station.
compromising operations. Following initial This issue was taken up with mine staff.
investigations, which included approximately a Ÿ ENERGY RECOVERY: Elandsrand mine
month of electrical monitoring and a week of recovers energy from water supplied to
Ÿ the lower levels via pelton wheel turbine the team proceeded to evaluate and
driven generators. Anglo-Gold is categorise their benefit.
similar ly investigating alter native
energy saving methods of pumping
EVALUATION CRITERIA
water, namely a three pipe chamber
feed system, operational at Tshepong, The following table identifies some of the key
and a water transformer being areas where energy saving could be achieved.
installed a t Moab Khotsong. These include: a cost estimate, the projected
Ÿ ENERGY MANAGEMENT: While energy is benefit to the company (in monetary terms),
currently accounted to macro pro- duration of the proposed project, the
cesses, as far as the metering allows, estimated return on investment, as well as the
the next level of accounting would be to category of expenditure.
individual end users, for charging direct
utility costs. This is in line with current Type of expenditure was categorised as
AngloGold policy to distribute energy follows:
costs as close as practicable to the end
user. Elandsrand appears to be on the Ÿ IMPROVED HOUSEKEEPING (1)
most cost effective tariff, currently using Covered by maintenance budget
the Eskom Real Time Pricing option on Ÿ LOW-COST MODIFICATION (2)
top of their previous Nightsave KVA tariff. Covered by maintenance budget.
Ÿ MEDIUM COST MODIFICATION (3)
Having highlighted the potential cost areas, A one-off investment, which is expen-

1
COSTS RETURN PAYBACK CATEGORY

Rigorous R192 000 pa R 384 000 pa 6 months (1)


Compressed air
saving program

Rigorous inter-stage R 500 000 pa R 1 200 000 pa 5 months (2/3)


cooling maintenance/
retrofit for surface
air compressors

Rigorous after-stage R 500 000 See knock on effects 13 months (2/3)


cooling maintenance/
retrofit for surface
air compressors

Knock on effect on R 308 000 pa


refrigeration from (Value of additional
improving after-cooler heat input to mine)
performance

1
All costs indicated above are ‘high cost’ estimates. In most cases actual costs will be lower. (Similar low savings estimates were chosen.)
sive in relation to the value of existing Reduced environmental emissions from coal-
equipment fired power stations providing less power
Ÿ HIGH COST MODIFICATION (4)
Substantial capital outlay on new OTHER AREAS OF ACTIVITY
equipment

ETA AWARDS:
SELECTED RESULTS
Ÿ The Eta awards, sponsored by Eskom
and SABS, are awards to the year's most
After having completed the more detailed
outstanding energy efficiency initiatives.
analysis, new energy saving opportunities, as
The Energy monitoring and accounting
well as those listed in the walk through, were
system used on AngloGold won this
identified. The table below highlights some of
award in 1997 by the developers - IST
the main recommendations from this study,
Otokon.
and includes projects identified by AngloGold
Ÿ This year AngloGold is one of the finalists
and the team.
for this year's award. Their entry involves
the implementation of a comprehensive
INVESTMENT VS ANTICIPATED PERIOD OF
real time moni-toring and control
PAYBACK
scheme to re-spond to real time pricing
ALL MEASURES: signals received daily from Eskom. The
Ÿ The total investment required for the investment was 0.33 million Rand and
execution of all the above listed projects the payback an impressive 7.2 million
was R1.293 m. rand per annum.
Ÿ The total annual energy earning for the
MONITORING AND TARGETING:
above is: R1.99 m per annum
Ÿ The overall payback is approximately
Ÿ AngloGold monitors and benchmarks the
eight months
energy performance of each operation.
Elandsrand has formed an energy
MAINTENANCE & LOW COST MEASURES:
management team lead by the "utility"
Ÿ The total investment required for the
engineer.
execution of all the above listed
maintenance and low-cost (category (1) RETHINKING REFRIGERATION PRACTICES:
& (2)) projects was R692 000
Ÿ The total annual energy earning for Ÿ The current utilities' engineer at
this is: R1 584 000 pa Elandsrand initiated the pre-cooling of
Ÿ The payback for these measures (class 1 underground hot water dams directly.
& 2) is approximately five months This gives a better cooling thermal-
efficiency than conventional cooling from
ENVIRONMENTAL CONSIDERATIONS: the hot to the cold dam.
Ÿ GLOBAL ENVIRONMENT: Ÿ Another initiative included decreasing
Reduction in CO2 emissions: condenser water solids by changing the
9 700 000 tons pa existing con-figuration of the existing
Ÿ NATIONAL ENVIRONMENT: plant, improving heat transfer and
Reduction in SO2 emissions: therefore achieving higher efficiencies
70 000 tons pa and savings.
GENERAL CONCLUSION saving of about R 32000 per month can be
AND
RECOMMENDATIONS achieved by implementing an effective
campaign against leaks.
PAYBACK OPPORTUNITY
By addressing the issues identified, the LIGHTING
exercise indicated that savings of R 2 million AngloGold is investigating the potential for
per year, at a capital payback of less than a upgrading lighting, and have produced a set of
year, are achievable. performance criteria for lighting replacements.
Upgrading T12 fluorescent lighting systems to
COMPRESSED AIR GENERATION T8 (including electronic ballasts) and
The Elandsrand team has implemented several replacing incandescent lights with compact
excellent energy efficient initiatives. They are fluorescent lighting (CFLs) should be
currently improving surface compressor considered at Elandsrand. Group replace-
control. Moore Controllers will optimise ment of lights based on 70% of the lamp's
compressor sequencing thus ensuring the rated life should also be considered.
most efficient combination of operating the
five surface compressors. ENERGY MANAGEMENT TEAM
The commitment of the engineering staff to the
COMPRESSOR INTER-STAGE COOLING efficient use of energy on the mine was
Ensuring that inter-stage and after-cooling for evident. The possible savings in any plant are
the compressors run as close to design directly proportional to the commitment of
conditions as practicably can make further those who apply these principles. Elandsrand
savings possible. A saving of about R100 000 mine is to be commended in this regard.
a month could be derived from the decreases in
the input work to the compressor due to CHARGING USERS FOR CONSUMPTION.
correct isothermal operation. By ensuring AngloGold believes end-users should be held
that compressed air is cooled before leaving accountable for energy efficiency. This should
the compressor s would contribute to assist in curtailing wastage.
minimising the heat input to the mine. This
would have further spin off in improving REWARDING INITIATIVES AND PROVIDING
environmental conditions underground. In INCENTIVES FOR STAFF.
some cases savings in capital equipment could Energy efficiency often requires extra effort
be achieved. from engineers , as it is not yet a high priority
issue in South Africa. Rewarding initiatives will
COMPRESSED AIR DISTRIBUTION go some way in motivating staff to encourage
For compressed air distribution, it was efficiency.
recommended that a rigorous leak detection
and repair program should be implemented Special thanks must be made to the following persons
from AngloGold for their kind assistance:
and that the responsible staff should have
CONRAD FREESE
more authority to enforce repair when this is
Peter O'Tool
feasible. This finding has confirmed previous Keith Arnold
work by AngloGold in this area. Some of the air
system may be rationalised by removing or Thanks must also be made to Sulzer Inc, who provided
valuable compressor information.
isolating dead legs and minimising pressure

3E
drops, as well as isolating certain legs during
non-productive hours to prevent leakage. A STRATEGY
3E STRATEGY

The 3E Strategy was

S
T
R
A
T
developed to target

E
G
ENERGY

Y
areas of high-level

management where
EFFICIENCY
the focus is on

increasing profits
ST
R
AT
EG
Y

EARNINGS
whilst still providing

the same standard

of ser vice.

ETSU TSI Technical Services International


ovem

ENERGY RESEARCH INSTITUTE


UNIVERSITY OF CAPE TOWN
PRIVATE BAG RONDEBOSCH 7701 SOUTH AFRICA
TELEPHONE +27 (0)21 650 3892
FAX +27 (0)21 686 4838
EMAIL 3E@eng.uct.ac.za
WEBSITE www.3e.uct.ac.za

Potrebbero piacerti anche