Sei sulla pagina 1di 25

26.5 25 27.

5
tamaño mm retenido(x) masa retenida % Masa % Acumulativo % Acum Pasante X/Y
25 12.5 102 10.2 10.2 89.8 1
12.5 6.3 124 12.4 22.6 77.4 0.504
6.3 3.3 216 21.6 44.2 55.8 0.264
3.3 1.4 280 28 72.2 27.8 0.112
1.4 1 180 18 90.2 9.8 0.08
1 0 98 9.8 100 0 0
1000
26.5 25.74
25

% Acum Pasante
100
90
80
70
60
50
40
30
20
10
0
0 5 10 15 20 25 30
27.5 1
26.5 25 25.7390754 0.93596638
25 12.5 17.6776695 0.64282435
12.5 6.3 8.87411967 0.32269526
3.3 1.4 2.14941853 0.07816067
1.4 1 1.18321596 0.04302603
1

t10 47
A 50 T10 es un decimo del tamañ original
b 2.2
EG 1.27882032 *Energia de fracturamient 46.999982

se conocen estos valores ta 4.7


Y X
tamaño(x) Passing t/10 t(10) index x
25.7 99.2 100 10 4 4.6
17.6 84.6 68.4824903 5 1.1
8.9 55.1 34.6303502
4.6 28 17.8988327
1.1 16 4.28015564 micrones index x
2.57 4 4.6
5 1.1

t(25) index x
% Passing % Passing EG 25 3 8.9
t(10) 21.04 21.0400105 0.45957636 4 4.6
t(25) 39.5017442 30.5009436 1.02574019
t(50) 68.4936782 34.9999961 8
t(75) 87.6191358 34.9999999 10 micrones index x
6.425 3 8.9
A 35 4 4.6
b 2

t(50) index x
50 2 17.6
3 8.9

micrones index x
12.85 2 17.6
3 8.9

t(75) index x
75 1 25.7
2 17.6

micrones index x
19.275 1 25.7
2 17.6
y X Passing
17.8988327 2.57 punto1
100
4.28015564 punto2
90

80
y Y(passing)
70
28 21.04 punto1 EG
60
16 punto2 12
50
10 40
y X
8 30
34.6303502 6.425 punto1
20
17.8988327 punto2
6
10

4 0
0 5 10 15 20 25 30
y Y(passing)
55.1 39.5017442 punto1 2
28 punto2
0
X  40x1 50x 2 60x1

10 20 30 70 80 90 100

y X Y  y1 y 2  y1
68.4824903 12.85 punto1
34.6303502 punto2

y Y(passing)
84.6 68.4936782 punto1
55.1 punto2

y X
100 19.275 punto1
68.4824903 punto2

y Y(passing)
99.2 87.6191358 punto1
84.6 punto2
g

20 25 30

80 90 100
size Wt wt% Acumulado % Acum Pas y/n
1 22.4 14.87 1.91064798 1.91064798 98.09 1
2 16 49.06 6.30372493 8.2143729 91.79 0.71428571
3 11.2 229.24 29.4550734 37.6694463 62.33 0.5
4 8 136.24 17.505493 55.1749393 44.83 0.35714286
5 5.6 93.81 12.0536575 67.2285968 32.77 0.25
6 4 52.47 6.74187621 73.970473 26.03 0.17857143
7 2.8 44.3 5.69211199 79.662585 20.34 0.125
8 2 29.28 3.7621905 83.4247755 16.58 0.08928571
-2 129 16.5752245 100 0
778.27

t(10) index t/n(x) size(y) X


0.1 7 0.125 2.8 2.24 punto1
8 0.08928571 2 punto2

micrones index x(size) y Y(passing)


2.24 7 2.8 20.34 17.708 punto1
8 2 16.58 punto2

t(10) index t/n(x) size(y) X


0.5 3 0.5 11.2 11.2 punto1
4 0.35714286 8 punto2

micrones index x(size) y Y(passing)


0.75 8 2 16.58 Err:502 punto1
9 Err:502 Err:502 punto2
% Acum Pas
120

100

80

test -63+53 -45+37.5 -31.5+26.5 22.4+19 16+13.2


60
1 0.1 0.1 0.25 0.25 0.25
40 2 0.25 0.25 1 1 1
3 0.5 1 2.5 2.5 2.5
20

0 malla 5 Test 1 10 test 2 15 test 3


0 20 25
-63+53 0.1 0.25 0.5
-45+37.5 0.1 0.25 1
-31.5+26.5 0.25 1 2.5
22.4+19 0.25 1 2.5
16+13.2 0.25 1 2.5
Test
1
2
3

57.78 41.08 28.89


63 45 31.5
53 37.5 26.5

14.5 mm Ecs(KWh/t) 20.6 mm Ecs(KWh/t) 28.9 mm


0.25 7 0.25 7 0.25
1 23 1 28 1
2.5 40 2.5 43 2.5

-16+13.2mm Ecs(KWh/t) Ecs(KWh/t) Ecs(KWh/t)


0.25 7 7 7
1 23 28 27
2.5 40 43 48

14.5 mm Ecs(KWh/t) Ecs(KWh/t) Ecs(KWh/t) Ecs(KWh/t)


0.1 4
0.25 7 7 7 10
0.5
1 23 28 27 22
2.5 40 43 48

50

45
Ecs(KWh/t) t10 t10C Error 40
0.1 0.1 3.7736603559 13.4957804102
35
0.25 7.43 8.8491784341 2.0140674277
0.5 15 15.958180002 0.918108917 30
1 26 26.257170916 0.0661368801 25
2.5 43.67 39.961873225 13.7502041789
20
30.2442978139
15
A 45
b 0.8758512594 10
Axb 39.413306671 5

0
0 0.5 1
15

10

0
0 0.5 1
20.63 14.53
22.4 16
19 13.2

-45+37.5 mm -63+53 mm

Ecs(KWh/t) 41.1 mm Ecs(KWh/t) 57.8 mm Ecs(KWh/t)


7 0.1 4 0.1 4
27 0.25 10 0.25 8
48 1 22 0.5 15 Chart Tit
60

50

40

30
t10

20

Ecs(KWh/t) 10
4
0
8 0 0.5 1 1.5
15 ECS(Kwh/t)

50

45

40

35

30

25

20

15

10

0
0 0.5 1 1.5 2 2.5 3
15

10

0
0 0.5 1 1.5 2 2.5 3
Chart Title
60

50

40

30

20

10

0
0 0.5 1 1.5 2 2.5 3
Col umn C Col umn D Col umn E Col umn F
Col umn G

Chart Title

14.5 mm
20.6 mm
28.9 mm
41.1 mm
57.8 mm

0.5 1 1.5 2 2.5 3


ECS(Kwh/t)
.5 3
intervalo 1 2 3 4 5 6
Tamaño 2400 1200 600 300 150 75 -75
Feed(% Re) 72.5 16.5 8.5 1.5 0.3 0.9

tamaño di B(di)
2400 1697 1
1200 1200 0.80197181
424.26 424.26 0.47112709
75.0264738 75.0264738012 0.25641758
6.63254519 6.632545185 0.13384765
0.29223358 0.2922335805 0.0681895
-75

1200 849
600
di B(di) B(i,j)
1697 1 0.19802819
Tamaño 1200 0.80197181 0.33084472
2400 1697.0562748477 600 0.47112709 0.21470951
1200 848.5281374239 300 0.25641758 0.12256992
600 424.2640687119 150 0.13384765 0.06565816
300 212.132034356 75 0.0681895 0.0681895
150 106.066017178
75 75
75 0.19802819 0 0 0 0
0.33084472 0.19802819 0 0 0
0.21470951 0.33084472 0.19802819 0 0
0.12256992 0.21470951 0.33084472 0.19802819 0
0.06565816 0.12256992 0.21470951 0.33084472 0.19802819

corregido

intervalo Tamaño Feed(% Re) intervalo mid Size(d) B(di) B(i,j)


0 2400 1 2400 1 -0.3678794
1 1200 72.5 2 1697.05627 1.36787944 0
2 600 16.5 3 848.528137 1.36787944 0
3 300 8.5 4 424.264069 1.36787944 0
4 150 1.5 5 212.132034 1.36787944 1.36787944
5 75 0.3 106.066017
6 -75 0.9
Durante el funcionamiento de los molinos SAG, a menudo se encuentra que el consumo de energía calculado por Lo
no concuerdan con el consumo de energía encontrado en la práctica. Esta diferencia tiene ha sido atribuido a la va
dureza del mineral recibida de una mina. Starkey y dobby [28,29] desarrolló la prueba del índice de potencia SAG (S
determinar la información que permitiría El cálculo del consumo de energía de un molino industrial SAG. La prueba
en Conjuntamente con Minnovex Technologies y posteriormente adquirida por SGS. La prueba SPI se lleva a cabo e
laboratorio, de 30,5 cm de diámetro y 10,2 cm de largo con seis Barras elevadoras. Se carga con un 15% (5 kg) de bo
con un diámetro de 25 mm [28] o 31,8 mm de diámetro [30,31]. Una muestra de 2 kg de mineral a cargar se tritura
pasando 19 mm y 80% pasando 12.7 mm. La prueba se ejecuta al 70% de la velocidad crítica. con varias iteraciones
que la muestra completa alcance un tamaño de paso del 80% 1.7 mm. El tiempo para alcanzar este tamaño de moli
como el índice de potencia SAG. Starkey y Dobby [28] correlacionaron el valor SPI con cinco operaciones industriale
relación de la energía requerida para ejecutar un molino SAG como

Se afirma que esta ecuación es aplicable a cualquier tamaño de producto SAG e incluye molienda fina Más allá de
tamaño del producto. La correlación fue buena para cuatro de los cinco molinos SAG estudiados. Se atribuyó el re
posibles diferencias operativas incluyendo; la descarga del molino no fue clasificada, la La relación diámetro / lon
mineral fue extremadamente duro.
mo de energía calculado por Los métodos
tiene ha sido atribuido a la variación de la
a del índice de potencia SAG (SPI) para
olino industrial SAG. La prueba fue desarrollada
La prueba SPI se lleva a cabo en un molino de
e carga con un 15% (5 kg) de bolas de acero
g de mineral a cargar se tritura a un determinado 100%
d crítica. con varias iteraciones de cribado / cribado hasta
a alcanzar este tamaño de molienda, en minutos, se toma
n cinco operaciones industriales de SAG y determinó la

luye molienda fina Más allá de 10 mallas (1,7 mm)


G estudiados. Se atribuyó el resultado atípico. a las
a, la La relación diámetro / longitud fue menor y el

Potrebbero piacerti anche