1 \C\onstruction of Bio Gas plant ftyut
1 2.6.1
Earth work in excavation by mechanical means (Hydraulic ex`cavator)/manual means over areas
(exceeding 30 cm in depth,1.5 in in width as weH as 10 sqm on plan) including disposal of excavatedearth,leadupto50inandliftupto1.5in,disposedearth\toPelevelledandneatlyd+essed.Allkindsof
soil
Bottom portion(2/3x3.14xl.325xl.325xO.59)
•2/3 1.750 0.590 2.162
3.140
2 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering andshuttering-Allworkuptoplinthlevel:1:4:8(1cement:4coarsesand:8gradedstoneaggregate40nominalsize)
3 4.1.3 ` `,f^Providingandlayingi,nposition cement concrete of specified grade excluding the cost of centering and
shuttering -All work up to plinth level;1 :2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size)
®io!440 cum
¥:i y;::+QtalQu#;n##
Total Deduct6yd Quantity¥ ;pea.otdifecum
4 5.21
Extra for providing and fixing expanded metal mesh of size 20x60 mm and strands 3.25 mm wide 1.6 mm
thick weighing 3.64 kg per sqm for encasing or rolled steel sections in beams, columns and grillages
excluding cost of hangers.
I
5 16.15.2
Supplying at site:Welded steel wire fabric of required width having rectangular mesh painted with two or
more coats of enamel paint of approved shade over a coat of primer (Priming & painting to be paid for
separately)
i`1`.7oo 3.060
0.900
•`:5, 1 .8oo
j. 2- 1.050 3.781
Topofout,e:t¥fi`k\.Mixingtank
•+146 0.600 2.355
2 ;2:r;'
-1' g i r~```aefifetr ={ ~ `
0,625 .
Deducti6hs
o.Boo i,
-0.600
Dome opening 2 i.Ooo , y
` Total Quantity 38.792 kg
6 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending,placing in position and
b.ln9PAsperitem
din com lete upto plinth le velThermo - Mechanically Treated bars of grade Fe-500D or more
all No.414926sqin
50 50.000
7 13.16.1
0.570 1.368
0.600
1.050 3.781
Top of Outlet tankM.xintank 2 1.800
0.500 -0.600
Dome openlng 2 1.000 0.600
page 3
printed on 16-05-201910:24:29
PRICE EST NO:2019-2020/0
8 13.18
LR,*:, •y -o.86o
Dome opening 2 0.600 0.500
#"^i'
9 13.37.1
White washing with lime to give an even shade:New work (three or more coats)