I BIAYA LANGSUNG PERSONIL
1 Project Manager 1 15 Man-Mont 15 29,032,200
2 Site Manager 1 1 15 Man-Mont 15 25,806,400
3 Site Manager 2 1 15 Man-Mont 15 25,806,400
4 Project & Cost Control 1 18 Man-Mont 18 22,580,600
5 Civil/ Structural Engineer 1 15 Man-Mont 15 22,580,600
6 Mechanical/ Piping Engineer 1 9 Man-Mont 9 22,580,600
7 Electrical Engineer 1 9 Man-Mont 9 22,580,600
8 Instrument Engineer 1 9 Man-Mont 9 22,580,600
9 Geotech Engineer 1 7 Man-Mont 7 24,193,500
10 Civil/ Structural Supervisor 1 15 Man-Mont 15 14,516,100
11 Civil/ Structural Supervisor 1 15 Man-Mont 15 14,516,100
12 Civil/ Structural Supervisor 1 15 Man-Mont 15 14,516,100
13 Mechanical/ Piping Supervisor 1 1 9 Man-Mont 9 14,516,100
14 Mechanical/ Piping Supervisor 2 1 9 Man-Mont 9 14,516,100
15 Mechanical/ Piping Supervisor 3 1 9 Man-Mont 9 14,516,100
16 Electrical Supervisor 1 1 9 Man-Mont 9 14,516,100
17 Electrical Supervisor 2 1 9 Man-Mont 9 14,516,100
18 Electrical Supervisor 3 1 9 Man-Mont 9 14,516,100
19 Instrument Supervisor 1 1 9 Man-Mont 9 14,516,100
20 Instrument Supervisor 2 1 9 Man-Mont 9 14,516,100
21 Instrument Supervisor 3 1 9 Man-Mont 9 14,516,100
22 Architect Supervisor 1 1 17 Man-Mont 17 14,516,100
23 Architect Supervisor 2 1 17 Man-Mont 17 14,516,100
24 Architect Supervisor 3 1 17 Man-Mont 17 14,516,100
25 HSE Supervisor 1 1 15 Man-Mont 15 22,580,600
26 HSE Supervisor 2 1 15 Man-Mont 15 22,580,600
27 HSE Supervisor 3 1 15 Man-Mont 15 22,580,600
28 Admin + Finance Project 1 1 15 Man-Mont 15 6,451,600
29 Admin + Finance Project 2 1 15 Man-Mont 15 6,451,600
30 Typist & Operator Computer 1 1 15 Man-Mont 15 6,451,600
31 Typist & Operator Computer 2 1 15 Man-Mont 15 6,451,600
TOTAL BIAYA LANGSUNG PERSONIL (I)
II. BIAYA LANGSUNG NON-PERSONIL
1 Mobilisasi/ Demobilisasi Personi 1 1 Ls 1 65,151,000
2 Sewa kendaraan Operasional t 2 15 unit-month 30 24,130,000
3 Alat Pengaman Diri 31 2 unit-orang 62 1,290,320
4 Laporan Pelaksanaan terdiri atas 1 1 Ls 1 5,080,000
- Harian
- Mingguan
- Bulanan
- Mutu & Metode Pekerjaan
- Pekerjaan Tambah & Kurang
- Akhir Pelaksanaan MK-EPC
- Akhir Pelaksanaan MK-Masa Pemeliharaan
5 Peralatan Pendukung di Kantor
- Sewa Kantor 216 15 m²/bln 3240 119,984
- Notebook 9 15 Unit-bln 135 508,000
- Computer Desk Top 10 15 Unit-bln 150 508,000
- Printer A3 (1 unit) 1 15 Unit-bln 15 508,000
- Printer A4 (1 unit) 1 15 Unit-bln 15 317,500
- Scanner A-3 (1 unit) 1 15 Unit-bln 15 952,500
- Scanner A-4 (1 unit) 1 15 Unit-bln 15 381,000
- Mesin Fax (1 unit) 1 15 Unit-bln 15 127,000
- Biaya Komputer & Printer Con 1 15 bln 15 3,175,000
- Biaya Komunikasi 1 15 bln 15 2,540,000
- Office Consumables 1 15 bln 15 2,540,000
- Biaya Operasional Kantor (Listrik 1 15 bln 15 3,810,000
TOTAL BIAYA NON LANGSUNG PERSONIL (II)
TOTAL (I+II)
Disetujui Oleh :
PT. Pertamina (Persero)
.....................................
LAPORAN KEMAJUAN PEKERJAAN BULANAN
Bulan Ke : 2 (Dua)
Periode Bulan : April 2019
Untung
Project Manager
EMAJUAN PEKERJAAN APRIL
S/D BULAN INI Remaining
Biaya Total Volume Biaya Total
(Rp) (Rp)
nstruksi (MK)
PENAWARAN KOMERSIAL
REKAPITULASI
MANAJEMEN KONSTRUKSI WORKSHOP WAREHOU
RDMP RU V-Balikpapan
No. Description
I. Biaya Langsung
II Biaya Tidak Langsung
SUB TOTAL
TOTAL
DIBULATKAN
Terbilang :
#NAME?
Belum termasuk PPn 10%
AN KOMERSIAL
APITULASI
KSI WORKSHOP WAREHOUSE
U V-Balikpapan
(Rp)
68,924,593
265,958,211
334,882,804
334,882,804
334,882,800
#NAME?
KONSULTAN MANAJEMEN KONSTRUKS
.....................................
PERINCIAN
NAJEMEN KONSTRUKSI (MK) UNTUK PEKERJAAN WORKSHOP RE-ROUTE
PROGRESS REALISASI KEMAJUAN PEKE
Harga Satuan Total
Satuan S/D BULAN LALU BULAN INI
(Rupiah) (Rupiah) Volume Biaya Total (Rp) Volume Biaya Total (Rp)
### 0 0 4 62,903,100
4 62,903,100 99 2,048,383,000
1 30,314,900 0 -
1 24,130,000 10 506,730,000
1 1,290,320 1 29,677,360
1 6,350,000 0 -
1 135,871 10 152,311,754
1 635,000 10 76,200,000
1 1,016,000 6 34,544,000
1 635,000 10 6,350,000
1 381,000 10 3,810,000
1 1,143,000 10 11,430,000
1 381,000 10 3,810,000
1 127,000 10 1,270,000
1 3,175,000 10 31,750,000
1 2,540,000 10 25,400,000
1 2,540,000 10 25,400,000
1 3,810,000 10 38,100,000
16 78,604,091 946,783,114
27 285,055,291 2,851,618,014
0 285,000,000 2,851,000,000
Balikpapan, 22 Mei 2019
Dilaporkan Oleh :
Konsultan Manajemen Konstruksi (MK)
PT. Prosys Bangun Persada
Ir. Zamrinoveri
Project Manager
PENAWARAN KOMERSIAL
REKAPITULASI
MANAJEMEN KONSTRUKSI RE-ROUTE JALAN YOS SUDARSO
RDMP RU-V Balikpapan
No. Description
I. Biaya Langsung
II Biaya Tidak Langsung
SUB TOTAL
TOTAL
DIBULATKAN
Terbilang :
#NAME?
Belum termasuk PPn 10%
AN KOMERSIAL
APITULASI
UTE JALAN YOS SUDARSO/ JL. MINYAK
U-V Balikpapan
(Rp)
62,903,100
95,424,048
158,327,148
158,327,148
158,327,000
#NAME?
PENAWARAN KOMERSIAL
REKAPITULASI
MANAJEMEN KONSTRUKSI WORKSHOP WAREHOUSE DAN RE-ROUTE JALAN
RDMP RU-V Balikpapan
No. Description
SUB TOTAL
TOTAL
DIBULATKAN
Terbilang :
Lima Ratus Delapan Puluh Satu Juta Lima Ratus Empat Pu
Belum termasuk PPn 10%
AN KOMERSIAL
APITULASI
USE DAN RE-ROUTE JALAN YOS SUDARSO/ JL. MINYAK
U-V Balikpapan
(Rp)
68,924,593
265,958,211
334,882,804
RSO/ JL. MINYAK
62,903,100
95,424,048
158,327,148
493,209,952
493,209,952
493,209,000
atu Juta Lima Ratus Empat Puluh Ribu Rupiah