Activity Engineering Purchasing / Supplier Quality Supplier Plant Quality Manufacturing Customer Care Site Management

^ VAL-N910248 and VAL-N910243 were replaced by VACDE- ^ Supplier qualification rating prior to sourcing. ^ Supplier 1724 Power Industries manufactured ^ One incoming detail inspected and recorded ^ Assembly was more difficult to ^ Became aware of difficulties experienced by
00000C2329-S (rel "A" 27JAN19) and VACDE-00000C2330-S ^ Issued PO 10133942 on 7/23/2019 for (78) details VACDE-00000C2329-S and VACDE- nominal dimensions on 8/30/2019. assemble than what had been historically Manufacturing during assembly.
(rel "A" 27JAN19) in response to failures in customer plants VACDE-00000C2329-S and (78) VACDE- 00000C2330-S to PO 10133942. ^ "?" recorded where supplier documentation experienced due to tighter fit of revised ^ Authorized the shipment of details with
(Ford, FCA, and GM). 00000C2330-S for multiple (2) projects and ^ Delivered details on dates: requirement was supposed to be verified. design (shaft bore change) knowledge of reason for revisions.
^ Caster Concepts Wheel design was revised to tighten bore multiple (6) delivery dates. xx/xx/xx ^ Became aware of difficulties experienced by ^ Verified dimensions to print upon
diameter tolerance and keyway width as part of the response ^ PO Text requiring make to print detail xx/xx/xx Manufacturing during assembly. difficulty.
to the same failures. identification with detail number, revision level, xx/xx/xx ^ Shaft diameter was measured with calipers and ^ Shaft diameter was measured and
^ Shaft analysis (2016) corrective actions considered in new serial number, supplier code, last three digits of ^ Delivered details that did not meet PO Text determined to be larger than drawing tolerance. determined to be larger than drawing
What was done
design. PO. requirements ^ "Green tagged" assemblies for shipment on tolerance.
^ Shaft diameter and tolerance remained unchanged for new ^ Delivered details that did not meet 1/22/2020. ^ Contacted Quality to address issue.
design. dimensional requirements. ^ Manufacturing determined the course
^ Included Product Quality in new design meetings. of action was to modify the shaft
^ Coordinated testing of new design. diameter.
^ Analyized and prepared Report showing results of new ^ Initiated NC 61282 due to modification
design testing. of shaft details.

^ Coordinate with Purchasing, Manufacturing, and Site ^ Source to supplier that follows PO ^ Contact Comau Supplier Quality for inspection ^ Incoming inspection should record measured ^ Assemble the details to design intent. ^ Kick Off meeting with Manufacturing for kits to
Management (regarding kit installations) prior to release to requirements. criteria. dimensions to validate acceptability within ^ Measurement of shaft and wheel bore introduce the new design intent.
communicate the design changes and probable impacts to ^ Make to print details identification according tolerance. to determine source of non-conformity. ^ Contact Engineering when Manufacturing
their activities. to PO requirements. ^ Multiple incoming inspection reports based ^ Contact Engineering when difficulty was difficulty was experieinced to determine course of
^ Coordinate with Customer Care prior to release regarding ^ Make details to print dimensions upon multiple (6) delivery dates. experieinced to determine course of action.
probable impacts to maintenance and replacement due to ^ Provide report showing measured data for ^ Validation of supplier reporting documentation action.
new design. 100% of dimenisions identified as KPC on ^ Vaidation of 100% KPCs within tolerance.
drawing. reported on supplier documentation.
^ Completed "GCL-MFG-105 Fabrication, ^ Validation of make to print detail identification
Machining, and Paint" checklist. requirements (detail number, revision level, serial
^ 100% first part inspection and avery 20th part number, supplier code, last three digits of PO).
per run. ^ Validation of completed "GCL-MFG-105
Fabrication, Machining, and Paint" checklist.
What should have been (but was not) ^ Validation of 100% first part inspection and
done avery 20th part per run.
^ Reject incoming nonconforming items from
any requirements listed above.
^ Initiate NC to P6 regarding nonconforming
details.
^ Measure shaft diameters and wheel bores with
equipment capable of the accuracy required
(micrometer vs. caliper, electronic 3-point bore
gages, Faro Arm, CMM).
^ Contact Engineering when Manufacturing
difficulty was experienced to determine course of
action.

^ More detailed testing / reporting including various suppliers ^ Collect other NCs regarding supplier 1724 and ^ Inform Purchasing / Supplier Quality of ^ Contact Customer Care to ensure they were ^ Details out-sourced for assembly if ^ Contact Engineering to determine course of ^ Initiate NC to P4 regarding
and Manufacturing methods, greater control of variables. their manufacturing quality (NC 61338). intention to not comply with PO reuirements. aware of modification to details prior to "Green Comau Manufacturing does not have the action. difficulty in field installation of
^ Initiate NC to P7 regarding Manufacturing not assembling ^ Re-rate supplier 1724 Quality score based upon Tag". capability to assemble according to design ^ Initiate NC to P7 regarding Manufacturing not new shaft design due to addition
details to design intent. non-conformities. ^ Initiate NC to P7 regarding Manufacturing not intent. assembling details to design intent. of shoulder in new design (not
^ Investigate alternative design solutions (i.e. shaft materials, ^ Suppliers of revised details contacted and the assembling details to design intent. ^ Prepare dedicated station for fitting and ^ Initiate NC regarding to P4 difficulty in field associated with NC 61282).
key materials, fits, coatings {tungsten disulfide, etc.}, heat changes reviewed during quoting process. ^ Update Inspection SOP with proper equipment assembly operation. installation of new shaft design.
treatments, Loctite bearing locker). ^ Emphasize inspection requirements to supplier. and methods required for measuring new fitting ^ Request design of fixture for fitting
What could have been (or could be)
^ Additional requirements to wheel design (allowable surface ^ Separate POs for Comau Standard Product process. operation from Engineering.
done
roughness, cylindricity, taper, etc.). details (from non Standard Product details) to ^ Training on key fit and shaft fit, including
delineate special requirements. training records and only allowing trained
personnel to perform fits.
^ Update Assembly SOP for new fitting
process.