Title
th
01 26 Dec 2016 1 of 5 HSEQ
Document no. Revision Date of Page Issuing Department
Issuance
Authorization:
Name Designation Signature
Distribution list:
1. Director KPC
2. GM Operations
3. Advisor Mechanical
4. GM Performance
5. DGM HSEQ
6. DGM Electrical
7. DGM Operations
8. DGM Material
9. DGM Mechanical
10. Manager I&C
11. Manager E&P
12. Manager SAP
13. Shift Manager
TABLE OF CONTENTS:
1.0) PURPOSE 3
2.0) SCOPE 3
3.0) DEFINITION 3
4.0) RESPONSIBILITIES 4
5.0) PROCEDURE 4
6.0) RELATED DOCUMENTS 5
CONTRACTOR SAFETY INDUCTION
Title
th
01 26 Dec 2016 3 of 5 HSEQ
Document no. Revision Date of Page Issuing Department
Issuance
(1.0) PURPOSE:
The purpose of the contractor safety program is to establish, implement, and execute
a practical and effective method for preventing accidents, illnesses, and injuries and
protecting the environment.
(2.0) SCOPE:
(3.0) DEFINITIONS:
Liaison Officer: The KESC, KPC contract Liaison Officer will be the person
who has initiated the work and through whom all communications between
the KESC, KPC and company will be channeled.
(4.0) RESPONSIBILITY:
(4.1) Concerned Dept. Head shall send prior information to Manager HSEQ
regarding arrival of contractor, sub-contractor and visitor.
(5.0) PROCEDURE:
(5.1) Contractors, sub contractors shall follow all established procedures, as well as
all applicable safety standards and regulations while on site.
(5.2) All Contractors, sub contractor work must be carried out in accordance with a
safe system of work. KESC KPC achieves this by the application of its safety
rules. Work on all plant and apparatus at KPC must follow the safety rules. The
safety document must then be issued to a competent person by a SAP Senior
Authorized Person).
(5.4) Contractors, sub contractors shall provide all the required tools, equipment,
supplies, personal protective equipment, and personnel to comply with the
terms of the contract or service agreement.
(5.5) Work areas shall be cleaned and all debris disposed of daily. Overall
housekeeping shall be kept neat and orderly.
CONTRACTOR SAFETY INDUCTION
Title
th
01 26 Dec 2016 5 of 5 HSEQ
Document no. Revision Date of Page Issuing Department
Issuance
(5.6) Any hazard, oil/chemical spillage and incident including (accident, near miss)
involving contractors must immediately be reported to the competent person
or Control Room. Further it shall be reported to HSEQ Manager for detail
investigation.
(5.7) Contractors shall, at the completion of work, remove their property, supplies,
equipment, tools, and any waste materials with the approval of Liaison Officer.
(5.8) KPC reserves the right to remove any contractor from the property in the event
of unsafe work practices.
(5.9) All contractors, sub contractors and visitors shall participate in Evacuation drill
when it performed.
(5.10) All moving vehicles (cranes, fork lifters etc), radiographic substance, tools &
equipments, compliance certificates, driving license shall be checked by
competent person and HSEQ Manager before start of work at KPC premises.
Compliance certificates and driving license copy shall be kept as record in
HSEQ Dept.