Mystique Builders Ltd

Self-Build Costings

Borrower

Property

Cost Estimate

Item Description Cost £

Stage 1 (Foundations)

1 Site ground preparation / foundations

2 Sub-structure brickwork up to DPC

3 Underground drainage & Utility groundwork's

4 Ground floor slab - Floor

Sub total 0.00

Contingency 0.00

TOTAL 0.00

Stage 2 (Wall plate/timber frame)

1 Internal and external wall construction up to wall plate

2 Structural works, lintels etc

3 First floor structure (inc weather deck if required)

4 Internal load bearing walls

Sub total 0.00

Contingency 0.00

TOTAL 0.00

Stage 3 (wind & water tight)

1 Roof structure, felt and tiling complete

2 Windows and doors, glazed & watertight

sub total 0.00

Contingency 0.00

TOTAL 0.00

Stage 4 (first fix & plastering)

1
1 First fix mechanical and electrical

2 First fix joinery (internal walls)

3 External rendering (if required)

sub total 0.00

Contingency 0.00

TOTAL 0.00

Stage 5 (second fix/certified completion)

1 Internal finishes, plastered finishes

2 External works, soft and hard landscaping

3 Decoration

4 Second fix joinery

5 Second fix mechanical & electrical

6 Kitchen (inc fittings and fixtures)

7 Utility connections (inc drainage)


Gas
Electric
Water
Underground drainage
Telephony

sub total 0.00

Contingency 0.00

TOTAL 0.00

Summary

Total of all stages (excl contingency) 0.00

Total contingency 0.00

TOTAL BUILD COSTS ( including contingency) 0.00

The following fees cannot be included in the costings above. They should be funded from the applicants own funds.
Professional fees
Architect / Designer
Civil Engineer
Structural Engineer
Planning Consultant
Environmental Consultant
Arboriculturist Consultant
Acoustic Consultant
Energy SAP assessor & EPC
Party Wall Surveyor
CDM Principle Designer

Building Control Fees


Planning Fees
Building Warranty Fees

2
Preliminaries
0.00

TOTAL PROJECT COSTS 0.00

Excludes
Finance costs

3
Renovation Costings

Borrower

Property

Cost Estimate

Item Description Cost

Stage 1

1 Structural works 0.00

2 Retrospective damp proof course 0.00

3 Stripping Out / demolition works 0.00

4 Roofing works 0.00

Sub total 0.00

contingency 0.00

TOTAL 0.00

Stage 2

1 First fix joinery 0.00

2 First fix mechanical and electrical 0.00

Sub total 0.00

contingency 0.00

TOTAL 0.00

Stage 3

1 Internal walls , plastered 0.00

2 Second fix joinery 0.00

Sub total 0.00

contingency 0.00

4
TOTAL 0.00

Stage 4

1 Internal finishes 0.00

2 Kitchen, (inc fixtures & Fittings) 0.00

3 Second fix mechanical and electrical 0.00

4 Decorations 0.00

5 Utility connections (inc drainage) 0.00


Gas 0.00
Electric 0.00
Water 0.00
Underground drainage 0.00
Telephony 0.00

Sub total 0.00

contingency 0.00

TOTAL 0.00

Summary

Total of all stages (excl contingency) 0.00

Total contingency 0.00

TOTAL BUILD COSTS (incl contingency) 0.00

Professional fees
Architect / Designer 0.00
Civil Engineer 0.00
Structural Engineer 0.00
Planning Consultant 0.00
Environmental Consultant 0.00
Arboriculturist Consultant 0.00
Acoustic Consultant 0.00
Energy SAP assessor & EPC 0.00
Party Wall Surveyor 0.00
CDM Principle Designer 0.00

Building Control Fees 0.00


Planning Fees 0.00
Building Warranty Fees 0.00
Preliminaries 0.00
0.00

TOTAL PROJECT COSTS 0.00

5
Excludes
Finance costs