Month Target

1 Orientation of other departments

2 HSEQ SOPs study


Interview
3 HSEQ SOPs study

4 HSEQ SOPs study

Interview

5 Safety rule book study

6 P&ID study

Interview Legends
7 P&ID study

8 Store SOPs

Interview
Note: Participate in daily Activities
9 Equipment Engine O&M manual study

10 Equipment Steam Turbine, HRSG O&M manual study


Interview

11 SAP awareness

Prepared By
12 Revision of all Employee
Name
Interview Mechanical Maintenance,KTG
an
s, to study and go through all mandatory technical literature in

Legends

Interview to Manager and GM

e: Participate in daily Activities


Ammar Akhter uz Zaman (Deputy Manager)

Baran Shafqat (Trainee Engr.)

Mechanical Maintenance,KTGTPS
S.No Document
A SAFETY RULE BOOK
B KTGTPS HSEQ
1 HSEQ Manual
2 QMS Manual
3 HSEQ STEERING COMMITTEE
4 HAZARD ASPECT IDENTIFICATION & RISK ASSESSMENT
5 ENVIRONMENTAL ASPECTS & THEIR IMPACTS
6 LAWS & REGULATIONS
7 HSE RESPONSIBILITIES & ACCOUNTABILITIES
8 CONTROL OF DOCUMENTS & RECORDS
9 PERSONAL PROTECTIVE EQUIPMENTS
10 PERMIT TO WORK PROCEDURE
11 LOCK OUT TAG OUT PROCEDURE
12 CONTRACTOR SAFETY INDUCTION
13 HAZARDOUS SUBSTANCE MANAGEMENT
14 COMPRESSED GAS CYLINDERS STORAGE AND HANDLING
15 WORK AT HEIGHT AND SCAFFOLDING
16 MANUAL HANDLING
17 ACCIDENT PREVENTION PLAN
18 OXYACETYLENE WELDING PROCEDURE
19 WASTE MANAGEMENT
20 HOT WORK SAFETY
21 TOOL BOX TALK
22 CONFINED SPACE SAFETY
23 VIOLATION CARD PROCEDUE
24 EMERGENCY RESPONSE PLAN
25 EVALUATION OF COMPLIANCE
26 INCIDENT REPORTING
C STORE SOPs
27 Store Operation
28 Capex Material Return Procedure
29 Project Material handover
30 Warranty Claim against PO
31 Store Opening and Closing
32 Scrap Disposal Form
33 Store Physical Inventory through Audit
34 PR Creation
35 Gate Pass Management
36 Tool Management
D Manuals
38 Engine
39 Steam Turbine
40 HRSG
E P&ID
Engine
41 Engine Technical Diagram
Steam Turbine + HRSG
42 Legends
43 Deaerator System
44 Boiler Feed Water Distribution System
45 Water & Steam System
46 Steam Collection Header
47 Sampling System
48 Instrument Air Distribution
49 Chemical Dosing System
50 Steam Turbine & Air Condensing System
51 Cooling Water Supply System
52 Cooling Water Return System
53 Blow Down System
54 Compressed air system
55 Raw Water System
56 RO Water System
57 RO Water Distribution System
58 Fire Fighting System
F SAP Awareness

59 PM Module

60 MM Module
Document no.

KTGTPS-HSEQ-001
KTGTPS -QMS-001
HSEQ-SOP-001
HSEQ-SOP-002
HSEQ-SOP-003
HSEQ-SOP-005
HSEQ-SOP-006
HSEQ-SOP-008
HSEQ-SOP-09-001
HSEQ-SOP-09-003
HSEQ-SOP-09-004
HSEQ-SOP-09-005
HSEQ-SOP-09-006
HSEQ-SOP-09-007
HSEQ-SOP-09-008
HSEQ-SOP-09-009
HSEQ-SOP-09-010
HSEQ-SOP-09-011
HSEQ-SOP-09-014
HSEQ-SOP-09-015
HSEQ-SOP-09-016
HSEQ-SOP-09-017
HSEQ-SOP-09-020
HSEQ-SOP-011
HSEQ-SOP-014
HSEQ-SOP-018

KTGTPS-STORE-SOP-001
KTGTPS-STORE-SOP-002
KTGTPS-STORE-SOP-003
KTGTPS-STORE-SOP-004
KTGTPS-STORE-SOP-005
KTGTPS-STORE-SOP-006
KTGTPS-STORE-SOP-007
KTGTPS-STORE-SOP-008
KTGTPS-STORE-SOP-009
KTGTPS-STORE-SOP-010

GE Jenbacher
NG Allen
Technical Proposal Descon

J F885 00 03
HRSG
KGTPS-DM.13208-000-B01-000
KGTPS-DM.13208-000-B01-001
KGTPS-DM.13208-000-B01-002
KGTPS-DM.13208-000-B01-003
KGTPS-DM.13208-000-B01-004
KGTPS-DM.13208-000-B01-005
KGTPS-DM.13208-000-B01-006
KGTPS-DM.13208-000-B01-007
KGTPS-DM.13208-000-B01-008
KGTPS-DM.13208-000-B01-009
KGTPS-DM.13208-000-B01-010
KGTPS-DM.13208-000-B01-011
KGTPS-DM.13208-000-B01-012
KGTPS-DM.13208-000-B01-013
KGTPS-DM.13208-000-B01-014
KGTPS-DM.13208-000-B01-015
KGTPS-DM.13208-000-B01-016

IW21, IW22, IW23, IW28, IW29,


IW31, IW32, IW33, IW38, IW41,
IW44, IW45, IW48, IW42,
IW47,MB21, MB22, MB23, MB25,
IW81, IW36, ZPM_WCM, IP03,
IP15

ME23N, ME2L, ME2M, ME5A,


ME53N, ZMM_RES, MB51, MB5B,
MM60, MMBE, ZMML

Potrebbero piacerti anche