Sei sulla pagina 1di 1

or existing utiliWa during construction.

Call
construction. whel bodsflow preumlion ddAdd, rryubed by XTCo will need U- Lao at 811 Contractor is responsible fair the repa9
on
to be his list Of cpp' oeed deWcea by USUCCCHR
or 155E. I. and replacanent or any utilities, are k gutter, powmmt.
etc. that may be be damogid during conatnmtion.
romps. ewv least
oamoged items anall be repalred to at

the calmly or
ip
a .-.
round m the original than.
Wota 4 a
not be aeuwem on maNa
10.
until the Engneas Catifwllon and era- huilla recas.
and ' End APpo.- iawM by the Public Water Hydrants Mal ee red in saw. Fire
Supply Section of NCOENR. and ' VNd Engineering
Certification' issued by Whom of Water Oualny
deeded
Section of NCOENR. Water lines need to be Notes: 1.
and dedlcaled Mereoa ., an board appreval meters Hydrants should be 18 inches from the cantarline of the
will be flat If other reauMemmta mention are
streamer connection to finish grade. this Mdudw landscaping.
meL 1)
3.
Street New of hydrants should not be o61tructM New
ft.
by landscaping or other Wilia. fair a 3 radius
rand the hydrant. 3.
al landaping mound the hydrant Mould not obstruct
access to hydrant. 5

protection

POO

er
w. HasEl ` J

w/IuuN
OIOX AT
6,
c- soo RgautyW fl M

900
C- PVC W SS

C-
900 PW My
8'

WA,

220- Im-

SSW Na5-
CONNECTION I SIgt2
Nw3 NIX Na3-- Po4 i
RIN
1 w9. JRCH
WV 8.
58
mIH
Ho. 4
IXV
5. 33
11.
7.
145
IN 6.
BORE
5
35'
PT N 1
p110'
1

554H
1)
SSNH
Bi

INV
9

s]1
RIN [
WV &
W INV OUT 4. I
k^
0

b'

TO' S1R1

TI:
tf x0. 25' CA9aIC-] o
6• " 60 60;
pP SS

6Se
sTO BORE
lF 18'U CASI
C NO 9./
Na.
BORE
2. BGE
11'- 1
PIT
15x10Y,
T PIT

a'
TIEWATIDil - INTO
B' SlEEV£
EXIST. ST. 3
. 1)
e• e'
s TAPPING AND TAPPING V&
W LEGEND
VALVE 1 L

PROPO
NflGM
EOSEWERe —
s —
b' PROPOSED WATER

Of during
49')

Potrebbero piacerti anche