93%(14)Il 93% ha trovato utile questo documento (14 voti)
7K visualizzazioni3 pagine
This report documents the inspection of a transformer. It lists 33 items that were checked, including the correctness of ratings, installation, oil level, leakage, tank condition, bushing condition, cable connections, surge arresters, and testing of turns ratio, resistance, insulation, and dielectric strength. Each item is marked as good, no, or N/A. The report also documents the tag number, manufacturer, serial number, specifications, and inspection results which were either accepted, rejected/reinspected, or noted. Inspectors, reviewers, and those acknowledging the report are listed with signatures.
This report documents the inspection of a transformer. It lists 33 items that were checked, including the correctness of ratings, installation, oil level, leakage, tank condition, bushing condition, cable connections, surge arresters, and testing of turns ratio, resistance, insulation, and dielectric strength. Each item is marked as good, no, or N/A. The report also documents the tag number, manufacturer, serial number, specifications, and inspection results which were either accepted, rejected/reinspected, or noted. Inspectors, reviewers, and those acknowledging the report are listed with signatures.
This report documents the inspection of a transformer. It lists 33 items that were checked, including the correctness of ratings, installation, oil level, leakage, tank condition, bushing condition, cable connections, surge arresters, and testing of turns ratio, resistance, insulation, and dielectric strength. Each item is marked as good, no, or N/A. The report also documents the tag number, manufacturer, serial number, specifications, and inspection results which were either accepted, rejected/reinspected, or noted. Inspectors, reviewers, and those acknowledging the report are listed with signatures.
Pekerjaan Engineering, Procurement, & Construction (EPC)
Tag Number : Date of Check :
Manufacture : Report ID : Serial Number : Report No. : Capacity / Phase : Type of Cooling : Rated Voltage / Freq. : Auxilary Equipment : Weight : Weather : Year of Manufature : Temperature :
No. Item to checked Condition Remarks
1 Corectness of rating on the nameplate [ ] Yes [ ] No [ ] N/A 2 Corectness of the installation on the area classification [ ] Yes [ ] No [ ] N/A 3 Transformer Base Skid [ ] Good [ ] No [ ] N/A 4 HV Bushing [ ] Good [ ] No [ ] N/A 5 LV Bushing [ ] Good [ ] No [ ] N/A 6 Bushing Sealed [ ] Good [ ] No [ ] N/A 7 Oil Level [ ] Good [ ] No [ ] N/A 8 Oil Leakage [ ] Good [ ] No [ ] N/A 9 Tank Cover [ ] Good [ ] No [ ] N/A 10 Painting / Overall [ ] Good [ ] No [ ] N/A 11 Oil Thermometer [ ] Good [ ] No [ ] N/A 12 Panel Radiator and Radiator Valve [ ] Good [ ] No [ ] N/A 13 Oil Drain Vlave [ ] Good [ ] No [ ] N/A 14 N2 Filling Valve [ ] Good [ ] No [ ] N/A 15 Correctness of the installation pipes & valves [ ] Yes [ ] No [ ] N/A 16 Corectness of the installation of Neutral CT [ ] Yes [ ] No [ ] N/A 17 Cable Connection secure and thight [ ] Yes [ ] No [ ] N/A 18 Plate of cable gland for magnetisation [ ] Yes [ ] No [ ] N/A 19 Terminal Control Box Sealed ( HV & LV Cable Box ) [ ] Yes [ ] No [ ] N/A 20 Bolt and Gasket [ ] Yes [ ] No [ ] N/A 21 Surge Arrester correctness of installation and operated properly [ ] Yes [ ] No [ ] N/A 22 Alarm and trip contact operated properly [ ] Yes [ ] No [ ] N/A 23 Pressure relief device tested and set properly [ ] Yes [ ] No [ ] N/A 24 Tap seting continuity check or test [ ] Good [ ] No [ ] N/A 25 Neutral connection bolted and clamped [ ] Good [ ] No [ ] N/A 26 Grounding continuity to the network check [ ] Good [ ] No [ ] N/A 27 Polarity check & Phase sequence [ ] Good [ ] No [ ] N/A 28 Insulation resistance meet the requirement [ ] Good [ ] No [ ] N/A 29 Transformer Turn Ratio test meet the requirement [ ] Good [ ] No [ ] N/A 30 High Voltage Test meet the requirement [ ] Good [ ] No [ ] N/A 31 Winding Resistance Test Primary side meet the requirement [ ] Good [ ] No [ ] N/A 32 Winding Resistance Test Secondary side meet the requirement [ ] Good [ ] No [ ] N/A 33 Dielectric strenght of the oil insulation [ ] Good [ ] No [ ] N/A
Test Report : □ Accepted □ Rejected / Reinspected □ With Note
Comments TRANSFORMER INSPECTION REPORT
Pekerjaan Engineering, Procurement, & Construction (EPC)
Tag Number : Date of Check :
Manufacture : Report ID : Serial Number : Report No. : Capacity / Phase : Type of Cooling : Rated Voltage / Freq. : Auxilary Equipment : Weight : Weather : Year of Manufature : Temperature :
Checked / Inspected by Reviewed / Approved by Acknowledge / Approved by
( ) ( ) ( )
Photo : TRANSFORMER INSPECTION REPORT
Pekerjaan Engineering, Procurement, & Construction (EPC)
Tag Number : Date of Check :
Manufacture : Report ID : Serial Number : Report No. : Capacity / Phase : Type of Cooling : Rated Voltage / Freq. : Auxilary Equipment : Weight : Weather : Year of Manufature : Temperature :