Sei sulla pagina 1di 28
SM2A-03-BLOCK I-(1) APOLLO OPERATIONS HANDBOOK ‘APPENDIX A ABBREVIATIONS AND SYMBOLS AB Aft bulkhead BAT Battery aC Alternating current cb Binary-coded decimal AC Audio center BCN Beacon ac A and C quads (RCS) 8/0 B and D quads (RCS) ACCEL Accelerometer BECO Booster engine cutoff ACCUM ‘Accumulator BIOINST Bioinstrunentation ACE Acceptance checkout BIOHED Biomedical equipment BLUR Blower ACK Acknowledge BMAG Body-mounted attitude gyro AS Attitude control subsysten 8.0. Breakout switches acTY Activity BPC Boost protective cover A/D Analog to digital bps Bits per second ADA Angular differentiating BRT Brignt accelerometer Btu British thermal unit ADAP. Adapter Bu Backup AD Adjust BUR Backup rate ESB Aft equipment stowage bay BURR Backup rate rol] AF Audio frequency/atnospheric BURP jackup rate pitch Flight BuRY Backup rate yaw AGC Automatic gain control AH ‘Anpere-hours cag Cabin a ‘Amplitude modulation CA(OH)2 Calcium hydroxide NPL Anplifier CANR Camera AMPS Anperes ce Cireuit breaker ANS Apollo mission simulator ce Cubic centineter ANAL Analyzer cw Counterclockwise ANUS Analog cap Controls and displays ANT ‘Antenna oF Confined detonating fuse ‘OA Angle of Attack CoH Constant delta altitude OK pollo Operations Handbook COU Coupling data unit ARS Attitude reference subsysten CF Coasting flight ASA Abort sensor assembly cre Contractor-furnished ASCP ‘Attitude set control panel equipment as Apolo standard detonator cep Concentric flight plan AS/GPL Attitude set/aimbal position cfm Cubic feet per minute indicator 6 Center of gravity ATT SET Attitude set CHAN Channe AIT Attenuator/attitude cHGR Charger AUTO. Automatic CLR Clear AUK Auxiliary oO Command module ave Automatic volume control otc Comrand module computer OD Command BARO Baronetric CoAS Grevman optical alsgnment stoht ABBREVIATIONS AND SYMBOLS Mission, Basic Date 15 April 1969 Change Date. Page Ark SM2A-03-BLOCK 11-(1) APOLLO OPERATIONS HANDBOOK con Contingency orbit insertion € Elevation angle cov ConmunicatYons ECA Electronic contro} comp Compressor, computing assembly conn Condenser/conditioner Eee Error counter and logic cont Control ete Electrocardiograph gore Control ECO Engine combustion/ co Carbon dioxide engine cutoff orc Cold plate clan ECs Environmental contro! cps. Cycles per second system chvo cryogente ecu Environmental control unit ese Coseeant computing amplifier EDA Electronic display assenbly csi Coelliptic sequence initiation EDS Emergency detection. systen ese Connand and service module Eig VoTtage-tnner. gfnbal css Computer subsystem EL. Electroluminescent cre Central timing equipment elec Electronics crs Conputer test set ls Earth landing subsystem cH Clockwise/continuous wave ELSC Earth landing sequence ce hot elockrise oie enrol cy Caution and warning Wa Constant wear garment ng Yoltage-nidéle ginbal caus Caution and warning system eM Extravenicular mobility unit om” Detector assenbly re Engine D/A Digital-to-analog ENTR Enver ac Digital to analog converter — & Geos ects arate Oa Digital auto pitet fog Voltage-outer ginbal 7 Digital gency oxygen sys DB Deadband EPS. Electrical power subsystem Fa peadbane rant fauie Equionent pac. Displays and controls Ess Eecential oct Docked configuration transfer Essent ate ae pact Docking and crew transfer ET Extravehicular transfer OOF Data distribution panel EVA Extravehicular activities OER Display electronic assenbly — Eyap Feats ore pecrease EVCT Extravehicular crew transfer bee becrease E Visor Extraventeular visor D0 Denodulate exci Crchanger Der Digital event timer/detector Fy Exhaust isc Discharae ext Extenston but Docking Tock handle a pees OPsT Double-pole single-throw oRé Digital ranging generator FL cre) uel cet Os Docking subsystem FcD Fecal containment system OSE. Data storage equipment Fes. Flight Crew Support osiF Deep. Space Instrarentation Hane cnet se acility amb u bility osky Display and keyboard Fest carton scion stability Ft Direct ulTage ‘OUP Duplex ABBREVIATIONS AND SYMBOLS Mission, Basic Date 15 April 1969_Change Date Page, Az SM2A-03-BLOCK IL-(1) APOLLO OPERATIONS HANDBOOK FOAL Flight director attitude Hz Hertz (cps) indicator Fe Fecal enests 1eou Inertial coupling data unit, usc Flexible linear-shaped charge ICS Interconmunieat ton system Fw Frequency nodulation Teco Inboard engine cut-off Fo Field of view IF Intermediate frequency FPS Fest per second/frame per IGA Imer gimbal angle Second Icy Ignition FOR Flight qualification iT Tnpulse recorder Im Inertial measurenent unit FQTR: Flight qualification tape INCR (INC) Increase recorder, IND Indieator Fs Fail sense INST (INSTR) — Instrument FST Free space transfer IW Inverter FUNCT Functional re THluminated pushbutton Fa Forward ips Inches per. second Tic Inertial rate integrating GA Gyro assembly gyro GEC Guidance and control ISOL Isolation Qg Gravity Iss. Inertial subsystem giv Gravity vs velocity lu Instrument units aoc Gyro display coupler GET Ground elapse time JETT Jettison GFP Government-furnished property GLY Glycol ‘KBS (KBPS) Kilo bits per second GMBL Gimbal ke Kilocycle GMT Greenwich Mean Time KHz, Kilo Hertz (kilocycles) G/N (GaN) Guidance and navigation Ame Kilomegacycle Gh Gaseous nitrogen Kinki Kilomega Hertz GPI/FPL Gimbal position indicator and KOH Potassium hydroxide fuel pressure indicator opt Ginbal' position indicetor LAT Latitude ase Ground Support. equipment Tb/br Pounds per hour GSOP Guidance system operations Tb min Pounds per minute plan BR Lon-bit rate GTA Ground test access uce Launch contra) center auto Guidance uc Liquid cooled garment Dec Lunar decking events ha Apogee altitude controller HBR High-bit rate Log Landing He HeTiun LEA Launch escape assenbly HEX Hexagonal Lee Lover equipment. bay HE High frequency Lan Launch escape motor HSA High gain antenne Les Launch escape system at High Let Launch escape tower hp Perigee altitude Ley Launch escape vehicle aR Hour uss, LUN guidance computer HT EXCH Heat. exchanger LHe Left-hand forward AIRS Heaters equipment. bay # Hycrogen U0 Liquie #0 water Los Landmark ine of sight i Lunar module ABBREVIATIONS AND SYMBOLS Mission Basic Date 15 April 1969 Change Date Page. As3 SM2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK uk Landmark nR North American Rockwel1 to Low Corporation toc Lunar orbit coast NRZ Non-return to zero Lor Lunar orbit insertion n2 Nitrogen LONG Longitude N2B Gaseous nitrogen Lor Lunar orbit rendezvous N2Ha Hydrazine (fuel) Los Line of sight 204 Nitrogen tetroxide LPH Legrest pin handle (oxidizer) tse. Least significant bit tse Linear shaped charge ocou Optical coupling data unit Lsse Lunar module separation o&ca Outboard engine cutoff a Light GA Quter gimbal angle Le Lighting on Orbit. insertion wv Launch vehicle OWN Omnidirectional oFR. Operator MAN Manual ORDEAL Orbit rate drive electronics ANF Manifold Apollo LM AK Maxcimun osc Oscillator me Negacycles oss Optics subsystem KC Midcourse correction ovo Overload McC Mission Control Center oxi Oxidizer wc Henory cycle tine 02 Oxygen MDA Motor drive amplifier Moc Vain display console Roll control axis HOF Mild detonating fuse PA Power amplifier MERU Willi earth rate unit PAM Pulse amplitude modulation MESC Master event sequence PB Pushbutton controller P/8 Playback MGA Middle gimbal angle PCH Pulse code modulation/pitch MGMT Management control motor Miz Mega Hertz pve, Pyro continuity verification MIN Minimum/minute box rat Mononethyl hydrazine PE Powered flight nm Hg Millimeters of mercury P5a Pressure garment assenbly MN A Main bus A Pancs Prinary guidance, MN 8 Main bus B navigation and control NSC Manned Spacecraft Center system MSD Monitor selection decoder pH Phase MSEC Marshall Space Flight Center pH Alkalinity to acidity MSEN Manned space flight network content (hydrogen ion ‘MSN Mission concentration) wT Mission timer PPA Pulsed integrating svc Manual thrust vector control pendulous accelerometer MULTI Multiplexer PKG: Package PL. Post landing Nay Navigation PLSS. Portable life support system NB Navigation base PLY. Postlanding ventilation Now. None PLvc Postlanding ventilation NORH Norma control POS Nuclear particle detection PM Phase modulation system PMP Prenodulation processor AND SYMBOLS ABBREVIATION: Mission, Basic Date 15 April 1969 Change Date. Page. Ant SM2A-03-BLOGK II-(1) APOLLO OPERATIONS HANDBOOK Por Potable REV Reverse pe Partial pressure RF Radio frequency PPK Pilot's preference kit RHC. Rotational hand control ps. Pulses-per-second RHE, Right-hand equipment bay PRD Personnel radiation dosimeter RHFES Right-hand forward PRESS Pressure - pressurize - equipment bay pressurization rap. Reaction jet driver PRE Pulse repetition frequency ROE Reaction jet engine ON-OFF PRIM (PRI) Primary contrat PRN Pseudo-random noise RIL. Richt/Left Prog. Program LSE Release Prop Propel lant aLyoT Rotary linear variable PRPLNT Propel lant differential transformer PRR Pulse repetition rate ALY Relay PSA Power servo assembly Row Reference and measurement psc. Pressure suit circuit RNOZ Rendezvous PSI Pounds per square inch RNG: Ranging PSIA Pounds per square inch ROT Rotation absolute R/R Renove/replace PsID Pounds per square inch RRT Rendezvous radar differential ‘transponder psig Pounds per square inch gauge RSET Reset. a) Pad safety officer RSI Roll stability indicator PIT Push to talk RSH Radiation survey meter Pu Propellant utilization SO Range safety officer Puss Propellant utilization and R/T Real time gauging systen RTC Real-time commands Pua. Power RUPT Interrupt PYRO Pyrotechnic. RZ Return to zero q. Pitch control axis SA Signal analyzer assembly ay Quantity SBAST Single bridgewire Apollo standard initiator r Yaw control axis sc Spacecraft RAD Radiator SCE Signal conditioning RAL Roll attitude indicator equi pent RC Rotation control scl Scientific RCDR Recorder scIN Scinitar-notch RCS. Reaction control systen Sct Scanning telescope Rese Reaction control systen sco Sub-carrier oscillator controller scs Stabilization and contro} RCY (RCVR) Receive/Receiver system REACQ Reacquire sec Secondary REACS Reactants SECO SIVB engine cutoff REC. Receive SECS Sequential events control RECT Rectifier system RECY Recovery SEL. Select REFSHMAT —-Ref-to-stable member matrix SENS Sensitivity REG Regulator ‘SEP Separation REL Release SEQ Sequencer/sequential RESUR Reservoir sig Signal ABBREVIATIONS AND SYMBOLS Mission, Basic Date 1° April 196? change Date___ Page SM2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK sm Simplex TPL Terminal phase initiation SLA Spacecraft lunar module TR Transmit/receive adapter TReT Target sLos Star Tine of sight TRNFR Transfer st Service module TIE Time-to-event sac Service module jettison TInt Time to intercept controller w Television tiRD Spin motor rotation detector VC Thrust vector controT SUSR Sensor TSA Thrust vector position Sov Shutoff valve servo amplifier SPEC Specification TWR Tower SPLI Seat pin Tock handle TT Traveling wave tube SPS: Service propulsion system/ ‘sample per second vuco Urine collection device sg Square UDL Up-data Tink SSA Space suit assenbly pr Unsymmetrical dimethyl 558 Single side-band hydrazine (fuel) S/S Samples per second UNF Uitra-high frequency STA Station ULL Uiage STAB Stabilization UNBAL. Unbalance sTBY Standby UPTL. Up-link telemetry sto Standard USBE Unified S-band equipment su Separation ullage Uses Unified S-band system sup. Supply ‘Sh Switch v Velocity SxT Sextant ABD Van Allen belt. dosimeter sync ‘Synchronize aC Yacuum/volts alternating Sys System current Ye Circular velocity 1B Talkback wco Voltage control oscillator 780 To be determined voc Volts direct current 1c Translation control YEE Very-high frequency TELCOM Teleconmunications vy Valve (r/c) VN Velocity measured TEC Transearth coast Yo Initial velocity Tel Transearth injection vox. Voice-operated relay/ TEMP. Temperature voice-operated transmission TFF Time of freefall TFL Time-fron-launch ws Water-lycol THC Translation hand control wits Waste management. system IG Time of ignition TUM Tower jettison motor xeve Transceiver TK Tank xpuceR Transducer me Translunar coast. XFUR, Transformer 1 Translunar injection XLATION Translation TL Telemetry or telenetered XLUNAR Translunar Tig Thermal meteoroid garment XeTR Transmitter TPAC Telescope Precision Angle XPNDR Transponder Counter (XPONDER) PF Transfer phase final ABBREVIATIONS AND SYMBOLS Mission, Basic Date 15 April 1969 Change Date Page, Anb SM2A-03-BLOCK I1-(1) APOLLO OPERATIONS HANDBOOK wW Zine oP Differential pressure Differential velocity Roll axis designation/phase Pitch axis designation Yaw axis designation Entry piten attitude Angle between local horizontal and velocity vector ~ocoee ABBREVIATIONS AND SYMBOLS Mission, Basic Date 13 April 1969_Change Date Page__A=7/A-8 SM2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK ALPHABETICAL INDEX ‘The following index consists of all paragraphs. order and location paragraph numbers are given, sections 1 through 3 only. AC and DC Data . Accelerometer. . a Accelerometer (G-Meter). . They are arranged in alphabetical This index includes material from External Tlumination Aids . Title Para No. Title Para No. A Ablative Combustion Chamber. . 2.4.2.5 Loose Equipment Abort Request Light . 5... 2.9,45.3) Stowage . 2 RS Aborts oe. 229.414 Protection Panels |. 1,3.2.3.2 Mode 1A. + 29.3.2, Crew Couches 2 RS 2.9.4.14,.3 CM Impact Attenuation Mode 13. 2.9.4.14.7 System 2... 1. Medes 1B and 1G 2.9.3.3 Foldable Couch Mode lC. . 2.9.4.14.8 Structure 2 Modes 2, 3, and 4, 2.9.3.4 Grew Stations |... Abort Start. 2.9.4, 14.1 Crew Life Support 1 1 3 4 9 2, Internal Sighting Accessories... 22,12, Aids. LATS Activate EISC. 29.4.1 Medical Active Docking Target, Equipment © L327 IM. eee ee 2124.14 Mission Operational Alt Compartment : 1.3.22 Aids... 1.3.2.7.5 ‘Aids, Mission Operational |) | | 2.12.5 Postlanding Recovery Angle of Attack Monitor. 2.9.4.8.1 Aids... 2 Le Antenna Equipment 28.24 Radiation Monitoring Antenna Equipment Group 2.8.3.5 Equipment... 1.3.2.7.8 Apex Cover Jettison 2 2.94 1312 Restraints 1.3.2.7.2 Apollo Spacecrait Configuration. . . 1.3 Spacesuits. . 13271 Command Module . rend Stowage and Internal ‘Aft Compartment . 2 L822 Configuration 1.3.2.7.10 CM Mechanical Controls, | 1.3.2.6 Launch Escape Assembly. 1.3.2 Side Access Hatch». 1.3.2.6.1 Service Module . pee 1S Forward Access Spacecraft LM Adapter | 1). 1.3.4 Hatch . 1,3,.2.6.2 Apollo Standard Initiator . |) | 2.9.5.1 Windows and Arm ELSC . 9.4.13.8 Shades... .. . . 1.3,2.6.3 Arming Pyro Buses 2201 Crew Compartment... . 1.3.2.3 Arming Sequential Systems Grew Compartment Logic Circuits . . 229A LE and Equipment Attitude Bays... es 18231 Configurations... 2... 2.344 Mission, Basic Date 15 April 1969 Change Date Page. I SM2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK Title Para No. Title Para No. Control 21.3 Major Component/Subsystem Control Subsystem (AGS)... 2.3.4 Description... 2.10.3 Error Display Mode... 5. 2.2.4.7 Electrical Power Reference... - De Distribution, . 221030 Reference Subsystem, 1 233 Operational Limitations and Set Control Panel (ASCP). . 2,3.2.2.3 Restrictions 2.10.4 Audio Center Equipment 2.8.3.1.4 C&WS General Data 2.100401 Auto Abort Logic . 2.9.4. 7.2 System Status Light ‘Automatic oil Commands. 2.3.4.302 Dates ee 210.42 Automatic Control . 213,4.4.2 CkWS General Data 1210.41 Central Timing Equipment B (CTE ee BBR Check Valve Assemblies Dad Bag, Accessory 2.12.5. 4.8 2.5.2.1.4 Bags, Temporary Stowage | | 2.12.5.4.1 Gireuit Concept 2.9.2.12 Baro Switch Lock Up, Clamps, UCD . 212213 24,000 Fe - 2.9.4.13.10 CM Docking Ring... 2. +. 2.15.3-1 Batteries . : 2.6.3.2 CM Impact Attenuation Battery Charger. te 2638 System se ee ZT Bioinstrumentation Harness. . 2.12. 2.1.1 CM RCS. Bioinstrumentation Harness Electrical Power Assembly . 21271 Distribution. . 2... 2.8.7.3 Biomed Belt 212.211 Fonetional Description. . 5. . 2.3.5 Biomedical Signal Conditioner Interface... 269.4. 13.6 Assembly 212712 Major Cormponents/ Bipropellant Valve Assembly Subsystems Deseription. 2.5.6 Check Valves... ee 1 24.2,3,10 Operation Limitations and Boosters Restrictions 2.5.8 First Stages... L211 Performance and Design Second Stage... . L212 Data. . 2.5.7 Third Stage o 1.2.1.3 CM-SM Separation and SM Barning of the CM RCS Tettison . 2.9.2.6 Propellants wee 2.9.4.13.15 GM-SM Separation Gontrol | | 2.9.4.13.1 CM-SM Separation System | | 2.9.5. 12.4 © Combustion Chamber. 2 2S Command Module 432 Cable, Grounding... 2,12,5,4,10 Command Module Computer. - 2.2.3. 2.1 Cameras te 2.12.5.3 Command Module Exterior 16mm a 2.12.5.3.1 Lighting 2 267 70 mm 21. 12,125.32 Gommand Module Uprighting Canard Actuators - 22. 2 System : 221s Canard Deploy and ELSC Communications Cable (Electrical Arm. . wees ee 294.144 Umbilical Assembly) 2.8.3.1, Caution and Warning System, 2,10 Communications Cable With Introduction. . 2.10.1 Control Head -2.12.2,1.8 Functional Deseription. 2.10.2 Compliance With Design Requirements 2.9.5.2 15 April 1969 16 July 1969 1-2 Mission, Basic Date Change Date Page. SM2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK Title Para No. Title Para No. Component Description, Guidance and Navigation Crew Personal Equipment . 2.13.3 Station Restraint . . 2. Component Description, Hand Straps... 1 12. Power Plants. 2.6.3.3.1 Restraint Straps. 1.2. Component Selection and Sleep Restraint Installation. 2.9.5.3 Tiedown Ropes... 2.12.3.2.2 Computer Mode Operation | | 2.2. 4,10.5 Sleep Station Configuration Tunnel Hatch Stow Apollo Spacecraft . fe LS Bag... on RARBG Lauach Vehicle and Booster... 1.2 Velcro and Snaps Constant Wear Garment 2.12.2.1.4 Retainer BI Containers 2.12.5.4. 14 Locations . 2,12.3.2.8 Contingency Feeding System. . 2.12.6.2.3 ng! Load Restraints 2123.1 Hcontrols and Displays, Crewman Restraint Description 13.24 Harness... 2 62.12.31 Goatrols and Displays, Hand Bar 2 2123.103 Introduction - . Bl Handholds 22123162 Gontrols and Displays, SCS | 2.3.2.2 Heel Restraints 212.3, L4 Controls, Sensors, and Displays. . 2.3.2 Equipment Stowage . 2.12.10 Coolant Flow...) 2 ee) 2761 Introduetion 2.12.1 Corridor Verification Medical Supplies and Indicators . 2.37.13 Equipment... 2.12.7 Coach Floodlight | Bioinstrumentation Harness Glareshieta 21.7 Assembly...) 2,12,7,1 Coupling Data Unit. 13 Bioinstrumentation, ry 2 3.2 Accessories oF ‘Crew Compartment... . 22.3 Spares, 2127.13 Grew Couches tae 22.5; Biomedical Signal Grew Life Support... ze Conditioner Crewman Toolset coe 5.2 Assembly . 212212 Crew Personal Equipment... . 2.12 Personal Biomedical Crew Life Support... 2.12.6 Sensors Instrument Crew Water 2... 2. 21261 Assembly 2127 Drinking Water Medical Accessories Subsystem...» 2.12,6.1.1 Kit. a 2.12.72 Food Preparation Mission Operational Aids. 22.125 Water... 2... 2.12.6,1.2 Accessories and Food : Fo B12 BD Miscellaneous Stowage. 2... 2 2.12.6.2.2 Equipment 2 2125.4 Use ee ee ee 2126.21 Accessory Bag, 2 2.12,5.4.8 Crewman Restraints - +. 212.3 Containers 2.12.5. 4.14 Zero-g Restraint . 2.12. 3.2 Flag Kit 2.12.5.4.13 MDC Glareshade Fire Extinguisher. . 2.12.5.4.3 Straps... 2. 212.327 Grounding Cable. | 2.12.5. 4.10 1 Headrest Pad 2.12.5.4.9 Mission, Basic Date 15 April 1969 Change Date_1é Iuly 1969 Page. 13 SM2A-03-BLOCK 11-(1) APOLLO OPERATIONS HANDBOOK Title Para No. Title Para No. Inflight Exerciser . .2,12.5.4.5 Wet Cleansing Oxygen Masks . 2112.5.4.4 Cloth. we B16 A Pilot's Preference Radiation Monitoring and Kits. 2.12.5.4.2 Measuring Equipment, 2.12.8 Tape Roll. . 2.12.5.4.6 Nuclear Particle ‘Telecommunications Detection System 2.12,8.5. Switchguide 2.12.5.4.12 Passive Dosimeters, . . . 2.12.8,1 ‘Temporary Stowage Radiation Survey Meter |, 2.12.8.3 Bags . RAR S AT Van Allen Belt TworSpeed Timer | 2.12,5.4.7 Dosimeter 2.12.84 Cameras... . . 1 | 2.12.53 Sighting and Tlumination Aids, . 2.12.4 16 mm Data External Sighting and Acquisition Mlumination Aids 2 BZA 2 Camera... . . 212,5.3.1 Docking Spotlight. . 2.12.4.2.1 70 mm Hasectblad EVA Handles With Electric Camera and RL Disks 2.3 Accessories... . 2.12.5.3.2 EVA Floodlight... 22d Spotmeter, Rendezvous Beacon, | 2.12.4.2.5 Automatic... . . 2.12.5.3.3 Running Lights. 22.124. 2. 2 Crewman Toolset. |... 2.12.52 Internal Sighting and Description and Mlumination Aids 2.12.4.1 Uses ee ee 125.22 Couch Floodlight General Dll lalazisiaa Glareshield 2.12.4.1.7 Flight Data File 281 Crewman Optical Data File Clip... . 2.12.5.1.2 Alignment Sight... 2.12,4.1.3 LM Pilot's Flight Data Eyepateh . 2.12.4.1.9 Files... 2 RAR SLT Internal Viewing Scioutitie tneteumeniation Microre araiel Outlets. se 2125.6 LM Active Docking” Voice Recorder, Target... 2.12.4.1.4 Cassettes, and Battery MDG Glareshades | | 2.12.4.1.8 Packs 2.12.5.4,11 Meter Covers . 2.124.111 y Utility Outlets 2.12.55 Monocular. 2.12.4.1.6 Waste Management ‘Telescope Sun System and Supplies . . , 2,12. 6.3 Filters : 2.12.4.1.10 Contingency Feeding Window Markings |. 2,12.4.1.5 ‘System = 2.12, 6.2.3 Window Shades. 224d Dry Cleansing Spacesuits . . : 2.12.2 Cloth 2212, 6.4.2 Extravebicular Mobility Fecal Subsystem | 6.3.3 Unit. 212z.24 General Extravehicular Description»... 2.12.6.3.1 Spacesuit : 2.12.23 Oral Hygiene Set... 2.12.6.4.1 Liquid Cooled Personal Hygiene . |. 2,12.6.4 Garment. 2 2.12.2.3.1 Urine Subsystem. |. 2,12.6.3.2 Spacesuit Assembly Utility Towels... . 2.12.6.4.4 (intravehicular) . 2212201 Vacuum QD 212. 6.3.5 Bioinstrumentation Waste Stowage Vent Harness and Biomed System... . - 2.12.6.3.4 Belt. 2.12.21 ion Baste Date_!5 APF! 1969 Change Date_16 July 1969 Page Int SM2A-03-BLOCK I1-(1) APOLLO OPERATIONS HANDBOOK Title Para No. ‘Title Para No. Communications Cable D With Control Head... . . .2,12,2.1.8 Data Acquisition Camera, Communication Soft 16mm. 2212.5. 3.1 Hat... 2... 2.12,2.1.6 Data Equipment 2.8.2.2 Constant Wear 2.8.33 Garment... . . .2.12.2,1.4 Data Equipment Interfaces 2.8.3.3.3 Constant Wear Garment Data File Clip. . F212 S12 NT" Adapter . . . .2.12.2.1.7 Data Storage Equipment | | | 2,8,3.3.8 Eartube. . .. . . . 212,216 Deadfacing the CM-SM Fecal Containment ‘Umbilical : 2.9.4.13.3 System... . . .2.12,2,1,2 Delta Velocity Functions 2.3.7.2 Flight Coveralls | | | 2/12121115 Delta Velocity Indicator. 2.3.7.2.2 Lightweight Delta V/Range-To-Go Headset . 2.12.2.1.6 Indicator. se. TL Pressure Garment AV/EMS SET Switch . 2.3.7.3.3 Assembly... . .2,12,2.1,9 AV/RANGE Display UCD Clamps. |). 2.12.21,3 Cireuits. Urine Collection Deployment of Drogue and Transfer Parachute... . 2.9.4.13.13 Assembly... . .2,12,2.1.3 Deployment of Main Spacesuit Related Parachute and Release of Equipment... 2.12.12,.2 Drogues. oe ee ee 2.941304 EMU Maintenance Deseription, General, Kit... = 2.12,2.2.4 Sequential Systems... 2... 2.9.2 Oxygen Hose Design Criteria... 02) 1 2.9,.2,11 Assembly . 2.12.2.2.1 Design Data Oxygen Hose CMRGS.. 2... © 25.701 Coupling. . . . . .2.12.2.2,.2 Grew Personal Equipment | | 2.13.4.1 Oxygen Hose Sereen SMRCS . 2.5.31 Caps... 212223 SPS... lll aaa Postlanding Recovery Aids... 2,12,9 Detonators |. 2 29.5.12 Dye Marker . 1 2.12.912 Diaphragm Burst Isolation Postlanding Ventilation Valve... tae 2,5, 6.2.3 Ducts... + 2.12.9.1 Digital Ranging Generator Recovery Beacon 2 2.12.9.3 (VHF Ranging)... 2.8,3.4.2 Sea Water Pump 1 2.12.9.5 Direct Coil Commands | | 2.8.4.3.3 Snagging Line... . . .2,12,9.4 Disable CM RCS/SCS. 2.9.4.13.11 Survival Kit... . . 4, 212.96 Display and Keyboard 2.2.3.2.2 6) Rucksack I 2.12,9.6.1 Display Switching Interfaces, | 2.3.2. 3.1 Rucksack It. 2.12.9.6.2 Distribution Plumbing Swimmer Umbilical 2.12.92 Pressurization Subsystem Crew Stations 2... | 13.2.7 CMROS 2... 2,5.6.1.6 Cryogenic Storage. 2.6.3.1 Pressurization Subsystem, Cryogenic Storage SMROS. se 2.5.2.1.6 Subsystem 2.6.5.2 Mission, Basic Date15 April 1969 Change Date_16 July 1969 Page. 15 SM2A-03-BLOCK 11-(1) APOLLO OPERATIONS HANDBOOK Title Para No, Propellant Subsystem CMRCS ee ee ee 25625 Propellant Subsystem SMROS.. 2... 2) 25.22 Docking Latehes 2. ee 2.13.32 213411 Operation Sequence... . . 2.13.1.1 System Electrical Mechanical Schematic, . 0. eee eo 2133.9) Docking and Transfer, |) 1) ls. 2.13 Component Description... . , 2.13.3 CM Docking Ring. 5... 2.13.3.1 Docking Latches... .2.13.3.2 Docking Probe Assembly, 6... 5 + 5 2,13,3.3 Pitch Arms and Tension Linkages. + 2,13, 33,2 Probe Body - Extension Lateh Assembly. . 2.13.3.3.4 Probe Head - Capture Tatehes 22... 2 2.133.385 Probe Umbilicale |) 2)13.3.3.8 Ratchet Assembly . .2.13.3.3.6 Retraction System . .2.13.3.3.7 Shock Attenuators 5. 2.13.3,3,3 Support Structure |. 2.13.3. 3.1 Docking System Electrical Mechanical Schematic ee 218389 Drogue Assembly. |. 12.13.34 Forward Tunnel Hatch |. 2,13.3.6 LM Tunnel Hatch... 5 5 213.367 ‘Tunnel and LM Pressurization . . . . . 2.13.38 LM Pressure Barop valve. oe LM/Tannel Vent Valve. ee ee 2215382 Pressure Equalization Vale. 2 ee 2 213381 Vehicle Umbilicals | 13.3.5 Functional Description... . 2.13.2 Introduetion . be RB Docking Operational Sequence . 2.1B.ded Title Operational Limitations and Restrictions... Performance and Design Data wade Design Data | | | | Docking Latches Docking Probe. Probe Pressure System : Performance Data. Docking Probe... 2... Assembly. ss. 2. ee Retraction Drogue Assembly. Dry Cleansing Cloth Dye Marker... se ee 5 Fartube. . ECS Performance and Design Date se ee ee ECS Radiator Control |. EDS Automatic Abort ‘Activation and Deactivation . EDS Automatic Abort Deactivate . oe EDS Bus Changeover... Electrical Power Distribution Electrical Power System . Command Module Exterior Lighting . Floodlight System | | Integral Lighting System. . oe Nameries Cighting System... oe Tunnel Lighting |) | Functional Description, . Energy Storage... Power Gonversion . Para No. 2 21S 2 BB 213401 2.134.161 2ABAL2 2.134.163 2.13.42 2.13.4,1,2 3 7.8 6.3 NbuaRe Mission, Basic Date_15 April 1969 change Date. Page. 16 SM2A-03-BLOGK II-(1) APOLLO OPERATIONS HANDBOOK Title Para No. Power Distribution... . 2.6.2.4 Power Generation, . 0. 2 2.6.2.2 Introduction . 2 RE Major Component/Subsystem Description. 2... 2 2. 263 Batteries 2... ee es 266.32 Battery Charger 2... 5 2.6.3.5 Cryogenic Storage... . 2.6.3.1 Fuel Cell Power Plants. . 2.6.3.3 Component Description © 26331 Fuel Gell Loading». 2.6,3.3.2 Inverters. : 2.6.3.4 Power Distribution | 2.6.3.6 Operational Limitations and Restrictions. 2... es 2.65 Additional Data. 2... 2.6.5.3 Cryogenic Storage Subsystem . 2 265.2 Fuel Cell Power Planta |) 2.6.5.1 Performance and Design Data. be BO AC and DC Data) 12. 2.6.4.1 Systems Test Meter. . 2.6.6 Electrical Circuit Interrupters 6... 2. 2 2.9,5,131 Electronics Control Assembly (ECA)... 2.) 2.34. 2.5 ELSG Operation... 2... 2.9.4.14.5 ELS Equipment 2... 1 2 1s 269228 ELS Parachutes . 2.9.2.9 Emergency Detection System 2.9.4.5 EMS Functional Data Plow... 2.3.7.5 EMS Switches . ce BRT EMU Maintenance Kis 11. 1 2.12,20204 Enable Automated Control of the SMCS. . nergy Storage... Engine Ignition, Thrust On-Off Title Thrusting Logic. ©... 1 2.5.28 ‘Thrust ON-OFF Control . . Thrust ON-OFF Logic 2.5, Engine Assemblies... 2... 2 Engine Assembly... 2. 2 Entry Functions... . 2. . 2, Entry Monitor System . 2... Entry Scroll... 22. Environmental Control System (ecs). +2 ECS Performance and Design | Data : Electrical Power Distribution. Functional Description. . . . Spacecraft Atmosphere Control. . Thermal Control . Water Management Introduction... Oxygen Subsystem Pressure Suit Cireuit ‘Water-Glyeol Coolant Subsystem. . 2. 2. ees 2 Coolant Flow. . 2 27, ECS Radiator Control» 27 Gaycol Temperature Control. . Water Subsystem | Le Equipment Bays... 2. ee Equipment Data, ‘Telecommunications System oe ee Equipment, System ee ee Equipment, Radio Frequency. 2... Exerciser, Inflight. External Illumination Aids Forward Compartment SC Controls and Displays. Intercommunications Logics ss. se ee + 2,386 Extingaish LIFT OFF and NO Injector Se 2.4 AUTO ABORT Lights . 8.3 Propellant Lines, Extravehicular Mobility Unit 24 Solenoid Injector Extravehicular Spacesuit .. |. 2.12,2.3 ‘Temperature-Control Eyepatch .. D219 System oe ee 25.6365 Mission, Basic Date 15 April 1969 Change Date Page, it SM2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK Title Para No, Title Para No. e G FDAL Display Sources 2.3.3.3 GDC Configurations ©. 2... 2.3.3.2 Fecal Containment System | _2.12.2.1.2 Gimbal Actuator. . 2.4.2.8. 1 Fecal Subsystem . 2.12.6.3.3 Gimbal Position and Fuel Fire Extinguisher... |. 1 2,12.8.4.3 Pressure Indicator Firing Circuit Protection. ||, 2.9.5.4 (GP/FP1) 2.3.2.24 Brig Gt...) . . 2,12,5,413 Glareshade Straps, MDC 2.12. 3.2.7 Flight Coveralls | 2.12.2.1.5 Glycol Temperature Control |. 2.7.6.2 Flight Data File |. +. 42.12.51 GNy Ball Valve Actuators. . | 2.4.2.3.8 Flight Director Attitude GN Filters (CSM 108 and Indicator (FDAD 2.3.2.2.5 Subs) 2.4.2,3,3 Floodlight, BVA 1. :2124.2.4 GNp Orifices Fe 2286 Floodlight System... .. . . 2.6.7.1 GNz Pressure Regulators. | | 2.4,2.3.4 Foldable Couch Structure. . . 1.3.2.5.2 GN Pressure Vessels . 2.4.2.3.1 Food... + 2.12,6.2 GN} Relief Valves . 2.4.2.3.5 Stowage | 2.12,6.2.2 GNz Solenoid Control Uses. sl 22621 Valves. 2 BRT Forward Compartment . 1.5.2.1 GPISignal Flow 2). 1.215153 Forward Heat Shield (Apex GIA Swites 2 aaa Cover) 2. ee ee es 29:2,7 Guidance and Controt. 22). 2d Forward Tunnel Hatch |) 1 | 12,13,3,6 Attitude Control. |.) 1 1. 2.103 Fuel Gell Loading... 11. 2,6.3.3.2 Attitude Reference |) 11) 201.2 Fuel Gell Power Plants. 2.6.3.3 Guidance and Gontro! Systems 2.6.5.1 Interface . . fe Bhd Fuel Tank. 2... 2... 2,86.2,2 Thrust and Thrust Vector’ Functional Description | 1). 211.41 Control... . 2d Caution and Warning Guidance and Control Systems System . +. 2:10,2 Interface : 21d Command Module Uprighting Guidance and Navigation Station System . 2.11.41 Restraints. wee 2123.23 Grow Personal Equipment 2.13.2 Guidance and Navigation System... 2.2 Electrical Power System. 2.6.2 Functional Deseription. . . | | 2.2.2 Environmental Control Introduction... 2 22 System . ++ 27,2 Major Component Subsystem Guidance and Navigation Description... . 2 223 System... 2.2.2 Computer Subsystem 2.2.3.2 Sequential Systems | | | 2.9.3 Command Module Service Propulsion System 2a Computer . 2.2.3.2 SM RCS Electrical Power Display and Distribution... . 6. . 2.5.3.3 Keyboard... 2.2.3.2.2 Telecommunication System. |. 2.8.2 Inertial Subsystem |. 1. 2.2.3.1 FUNCTION Switch... . . 2.3.7.3.2 Coupling Data Unit. 2,2. 3,1.2 Functional Switching Coneept |. 2.3.2.3 Navigation Base «| | 2.2,3,1,1 18 Mission, Basic Date_15 April 1969 Change Date_l6 July 1969 Page SM2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK Title Para No. Title Para No. Power and Servo Heat Exchangers 6.2... 2.4.2.1.6 Assembly... . . 2.2.3.1.4 Heel Restraints... L223 Optical Subsystem . |. 2.2.3.3 Helium Check Valve Coupling Data Unit. . 2,2.3.3.2 Assembly . . . 2.5.6.164 Optics»... + ss 2:2.3.3:1 Helium Isolation (Squib- ‘Operated Operational Modes. 2.2.4 Valve). 2 2861.2 Attitude Error Display Helium Isolation Valve | | 2.5.2.1.2 Mode... es wee 2.2.4.7 Helium Pressure Regulator IMU Gage Mode 2.24.4 Assembly... ee ee + 28613 IMU Goarse Align 2.2.4.5 Helium Pressure Relief IMU Fine Align : 2.24.6 Valves ee ee AQIS IMU Turn-On Mode, | | | 2.2.4.3 Helium Pressurizing Valves.» 2.4.2.1.2 Inertial Reference Mode, | 2.2.4.8 Helium Relief Valve...» 2.5.6.1.5 Manual Mode Operation . . 2.2.4,10 Helium Supply Tank Pil ag.2n1 Computer Mode 242d Operation | .2.2.4,10,5 Helium Tanks . . 24 2Ld Manual Direct Operation = 2.2,4.10.1 1 Manual Resolved Operation... . .2.2,4,10,3 IMU Gage Mode 2.244 Optics - Computer IMU Goarse Align 2.24.5 Mark Logic... 2.2.4,10.4 IMU Fine Align Do. 2246 Slave Telescope IMU Turn-On Mode so...) 2.243 Modes. . . .2.2.4,10.2 Induced Current Protection... 2.9.5.5 S-IVB Takeover. 1. 2.2.4.1 Inertial Measurement Unit . . 2.2.3.1.2 Thrust Vector Control. | 2.2.4.2 Inertial Reference Mode 1 2248 Zero Optics Mode...» » 2.2.4.9 Inertial Subsystem . Pll. zak Hower Distribution. 20 22212721258 Injector. 2 BLE Gyro Assembly - 1 (GA-I) 2.3.4.2.1 25.6.3.2 Gyro Assembly - 2 (GA-2) . . 2.3.4.2.2 Injector Prevalves . ee Gyro Display Coupler (GDC). . . 2.3.31 Instrumentation Equipment Group... 2.8.3.3.1 B Integral Lighting System 2.6.7.2 Intercommunication System Hand Bar... 1 2.12.3.1.3 “Interfaces » : . 2.8.32 Handholds| |). | | | | 12.12.3152 qnrercommunications Hand Straps... Pizas2. Ylipmest. ss. 2.8.2.1 Hardware Function (AGS)... . 2.3.4.2 Det Hasselblad Electric + 2.12,5.32 Internal Sighting Aids... 6. 1.3.2.7.3 Hatches Inverters... ee ee 2634 Forward Access...) 13262 Side Access. 13.261 7 Headrest Pad 2 2.12.5.4.9 Headset, Lightweight. + 2,12,2.1.6 Settisoning the SM... 6 6 62.9.4 13.2 Mission, Basic Date_15 April 1969 Change Date_13 Oct 1969 Page 1:9 SM2A-03-BLOCK IL-(1) APOLLO OPERATIONS HANDBOOK Title Para No. Title Para No. K Major Component /Subaystem Description Kits, Pilot's Preference... 2.12.5.4,2 L Launch Escape Assembly... . Manual Control Launch Escape Motor. ne he Manual Direct Operation Launch Escape Tower ‘Manual Mode Operation . Assembly... .. .. .. . 2.9.2.1 Mamual Resolved Operation | Tower Jettison . . . .. . 2.9.4.7.4 Manual Thrust Vector Control. Physically Attached . . . . 2.9.4.7.1 MDC Glareshades Launch Vehicle and Booster Mechanical Controls, CM. Configuration, . . oe . 1.2 Medical Saturn V Launch Vehicles |). 1.211 Accessories Kit. First Stage $-IC Booster. . 1.2.1.1 Equipment... a Second Stage S-II Supplies and Equipineat | Booster... . 2... 1.2.1.2 MESG Auto Abort Voting ‘Third Stage $-1VB Logie Le BOAT Booster»... .... 1.2.1.3 MESC, ELSC, LDEC, and Launch Vehicle Status 94.5.2, PCVB Locations. . 2 B12 Launch Vehicle Tank Pressure Meter Covers... 2.12.4.1.11 Monitor... 4s. + 4s + 2:9:4.5.4 Miscellaneous Equipment 212,54 LES Abort Mode Miscellaneous Systems Data 21 Switchover. . ss... .2%4146 Accelerometer (G-Meter) |) | 2.11.3 LES Abort Start. 5... . .2.9.4.14.2 Command Module Uprighting LES Igniter Fe 2 2.925.210 System. . +R LET Frangible Nuts. 2.9.5. 12.1 Functional Description | | 2,11.4.1 Life Support, Crew . ++ L327.6 Introduction. . 221d Lift-off. L 2944 Timers, 212 Tine, Snagging. ss. + + + 2129.4 Mirrors Internal Viewing. | | 2,12,4.1.2 ff Liquid Cooled Garment. . . . 2,12,2.3.1 Mission Operational Aide - 1.3.2.7.5 LM MODE Switch 2... 2.) 2.3,7031 Docking Ring Separation . 12 Monocular. . | | 2 BIBL Pilot's Flight Data File La Pressure Damp Valve . 2383 N Tunnel Hatch ce RRB Tannel Vent Valve... . . 2,13.3.8.2 Navigation Base... 2... 2.2311 Locator Index. . sees 22 Normal Ascent. | |! 5 2948 Logic Power... Fee 4.1 Normal Mission Functions 2.9.3.1 Loose Equipment Stowage. 2.3.3 Nozzle Extension SSC Location, ©... 1. 1 2915 CMROS. ee 25.654 M Main Bus Tie... 2.9.4 13.7 Main Parachute Release = 2.9.42,3 Mission, Basic Date_15 April 1969 Change Date_!6 July 1969 page 10. ‘$M2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK ‘ritle Para No. witte sM Ros voce 25.2:3:4 Passive Dosimeters ys SPS L111 ata Performance and Desigh Data Nuclear Particle Detector Crew Personal Equipment. Sytem ss sv es s21285 Electrical Power System Numerics Lighting System hens ° Sequential Systems 2. 2 ss 26905 Service Propulsion System» |. 24.3 Operational and Flight Perlormence Data Gwalification cues. 2.5.7.2 Instrumentation... 2+. 2833.2 CPE. esas operational Deserigtion | | gold SMeRes Lilt asa Operational Limitations and spss Shit gale Restrictions Personal Biomedical Sensors Eps. Le 2.6.5 "Instrumentation Assembly +. 2,12.7.11 ‘Additional Data! | ||| | 2.6.5.3 Personal Communications CPR 11 2185 “Apoembly (Comm Carcies). . 2.83.11 Caws 1111 LLL LLL Latold personal Hygiene sss ss. 2 126d Pitch Arme and Tension SPS ee BAA Tinkagess nen ee ee e218 332 TS. LLL LILI 1 284 pice Comrot Motor |) 11 17 '2belsis Operational Medes | 1! ela PMP. Dll alsiae Optical Subsystem |! 2.2.5.3 Postlanding Recovery aids |. 13,2079 Optics: . 2.2.3.3.1 2.12.9 Optics - Computer Mark Postlanding Ventilation Duets. 2.12.91 Logic» Ls: 2.2,4,10.4 Power Conversion ss. ss) 226.203 Oral Hygiene Set. 12:12,6.4.1 Power Distribation | lls. 2.2.5 Origin Of Signals agté we Outlets aed Scientific. Li 1 212.5.6 pee Utility. 2 ee + 4 +2.12.5.5 Power Generation ~ 2.6.2.2 Oxidizer Tank 2.5,6.2.1 Power and Servo Assembly | | 2.2.3.1.4 Onvten Hose Assembly: |. | 2.12:2.2.1 Pressure Cartridge Omygen Hove Coupling» |) 1 2:12.2.2.2 Aesemblies £2.9.5.13 Omygen Masks. ss |) | /2/12,504.4 Presaure Equalization Onyyon Hore Screen Capes | 12122023 Vvawes ey 62.13.3681 Onyien Subsystem ss ss 2.7.3 Presvure Garment Assembly eee ee eee BIB 19 P Pressure Regulator Assemblies aes Parachute Disconnect 25.213 Parachute Mortares s 0 Pressure Retief Valves 25.2115 Parachute Subsystems Pressure Suit Circuit, Sita Pressure Versus Temperature Measuring System 25.24 Mission Basie Date_!5 APTI 1969 Change Date_!S Ort 1969 fen Page SM2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK Title Para No Title Para No, Pressurization Subsystem 24.21 R 25.2.1 2.5.6.1 Radiation Monitoring and Primary and Secondary Fuel Measuring Equipment. . . 212.8 Tanks... |. s+ 2.5.2,2.2 Radiation Monitoring Primary and Secondary Equipment. 22. - + + 1.3.2.7.8 Oxidizer Tanks... 5. 2.5.2.2.1 Radiation Survey Meter 2.12.8. 3 Probe Body - Extension Latch Radio Frequency Equipment. . . 2.8.2.3 Assembly . = 2.13.3.3.4 Ratchet Assembly... . + 2,15.5,3.6 Probe Head - Capture RC SC Location . Pe BOLE Latches... - +2.13.3.3,5 RCS Electrical Heaters. | |) 2,5.2.3.5 Probe Passive Tension Tie | |. 2.9.2.2 Reaction Control Subsystem Probe Pressure System, . . .2.13,4,1.3 Interface 2... 2.3.4.3 Probe Umbilicals. , . |. | 2,13,3,3,8 Reaction Gontrol System (RCS) 2.5 Propellant, In-Line Filters | | 2.5.2.2.5 CM RGS Functional Propellant Isolation Shutoff Deseription . . « 2 25S valve... ~~ 2,5.2.2.3 CM RCS Major Components/ 2.5.6.2.4 Subsystems Description... 2.5. Propellant Jettison. . 2 25.64 Engine Assembly... 2. 2.5.6.3 Propellant Solenoid Injector | Engine Solenoid Injector Control Valves (Fuel and ‘Temperature-Control Oxidizer) . 6. ee 2,5.2.3.1 System . 2.5.6.3.5 2.5.6.3.1 Engine Thrust ON-OFF Propellant Subsystem. 2.4.2.2 Logic. oe ee 2.5.2.2 Injector... ee 2.5.6.2 Nozzle Extension « Propellant Tanks... 2.) 2422.1 Propellant Jettison - Propellant Utilization and Propellant Solenoid Gauging Subsystem (PUGS). 2.4.2.9 Injector Control Valves Propellant Utilization Valve. . 2.4.2.9.3 (Fuel and Protection Panels . 1.3.2,3.2 Oxidizer) 6. 2 2 + 2656.31 Premodulation Processor ‘Thrust Chamber Equipment : 2.8.3.4.5 Assembly... 6. 2,5,6.3.3 Pulse-Code Modulation Pressurization Telemetry (PCM TLM) Subsystem . 2... 2. 2.5.61 Equipment... ee ee es 28336 Distribution Pump, Sea Water 2022... 2.12.95 Plumbing 225.616 Pyro Arm Switch Lock... 2.9.5.6 Helium Check Valve Pyro Cutout. 2. 2 294 LSS Assembly . Pyro Powers 2. es 2942 Helium Isolation (Squib-Operated) Q Valve. es 25.612 Heliun Pressure Quantity Computing and Regulator Indicating System Test 24.2.9.2 Assembly . Quantity Sensing, Computing, Helium Relief ‘and Indicating System. 2A QOL Vale. 2 eee 25.6165 Mission, Basic Date_15 April 1969 Ee Change Date Page SM2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK Title Para No, Title Para No, Helium Supply Helium Isolation Tank eee ee 25.601 Vawe. ee SB Propellant Subsystem... 2.5.6.2 Helium Supply Diaphragm Burst Tank... 25.2101 Isolation Valve... 2,5.6.2,3 Pressure Regulator Distribution Assemblies . 2.5.2.1.3 Plumbing . 6 5. 2:5.6.2.5 Pressure Relief Fuel Tank... 2. . 2.5,6.2.2 Valves . 2.5.2.1.5 Oxidizer Tank. 2.5.6.2.1 Secondary Propellant | Propellant Isolation Fuel Pressure Shutoff Valves... 2.5.6.2.4 Isolation Valve... 2.5,2.1.7 CM RCS Operation Limitations Propellant Subsystem... 2.5.2.2 and Restrictions . . os 25.8 Distribution OM RCS Performance and Plumbing . 2.52.24 Design Data... 2 257 Primary and Secondary CM RCS Electrical Power Fuel Tanks... 2. 2.5.2.2.2 Distribution... 2. 25.7.3 Primary and Secondary Design Data... 2. 2.5.7.1 Oxidizer Tanks . 21 Performance Data 1... 2.5.7.2 Propellant, In-Line SM RGS Functional Filters 25 Description... . 2 251 Propellant Isolation SM RCS Major Component/ Shutoff Valve... 2.5.2.2.3 Subsystem Description. . . . 2.5.2 SM RCS Operational Engine Assemblies... . 2.5.2.3 Limitations and Combustion Restrictions. . fe 254 Chamber... .. 2.5.2.3 SMCS Performance and Injector fee BBB Design Data...) 25 Nozzle Extension... 2.5.2.3.4 Design Data pee 2581 Propellant Solenoid Performance Data... 2. 2.5.3, Injector Control Valves SM RGS Electrical Power (Buel and Distribution . 2... . 2.5.3.3 Oxidizer) . . . . . 2,5,2,3,1 Reaction Jet Engine Control RCS Electrical (RIJEC). 1s 2326 Heaters . 2.5.2.3,5 Recovery Beacon pee 212.923 Engine Thrusting Logic |. 2.5.2.5 Reefing Line Cuttera. | | | | 1 2.9.5.14 Pressure Versus Reefing System...) . 1 2.9,2.10 Temperature Measuring Release of Main System... 2.4... 25,24 Parachutes... . 02. 2.941316 Pressurization Rendezvous Beacon... . 2 2,12,4.2.3 Subsystem . 2.5.2.1 Check Valve Restraints Assemblies... . 2.5.2,1.4 CrewStatio. ... 5... 13272 Distribution Plumbing... 5. 25.2166 Mission, Basic Date_15 April 1969 Change Date_15 Oct 1969 Page. SM2A-03-BLOGK II-(1) APOLLO OPERATIONS HANDBOOK Title Para No. vg Lead... 2 ee 22.1231 Zero... 2s 22.12.32 Retraction System . . 2133.37 RF Electronies Equipment Group. 2. ce 288d Roll Attitude Indicator ||) 2.3, Roll Attitude Indicator Drives... ee ee 2375.6 Rotation Control . 2.32.21 Rotational Controllers (RC- and RO-2). 2. 3 RucksackI se eee 1 Rucksack IT... eee 2 Running Lights... 2. 2 s S-Band High-Gain Antenna 2.8.3.5.2 S-Band Ommiantennas. . 2). 2.8.3.5.3 S-Band Power Amplifier Equipment, tee 2.83.44 SCS Hardware 2.3.2.1 SCS Auto TVG . ts 2B Sd Scroll Assembly... 2.3.7.1.5 Scroll Assembly G Axis Drive | Circuits... 2.3.7.5.3 Scroll Assembly Velocity Axis | Drive Circuits . 2.3.7.5.4 Secondary Propeliant Fuel Pressure Isolation Valve 2.5.2.1.7 Separation of LM From S-IVB. . 2.9.4. 11 Separation of the CM From the SM... 2.9.4. 15.4 Separation of the CSM From the LV. . Se 2925 Separation of the Spacecrait From the Launch Vehicle Separation System . Title Para No, Design Criteria, 2.9.2 Docking Probe Retraction... . 2.9.2.3 ELS Equipment... . . . 2.9.2.8 ELS Parachutes . 2.9.2.9 Forward Heat Shield (Apex Cover)... 2.9.2.7 Launch Escape Tower ‘Assembly 2.9.2.1 Probe Passive Tension Tie ce 29.2.2 Reofing System... . + .2.9.2.10 Separation of the CSM” Fromthe LV... . 2.9.2.5 S-IVB/LM Separation . 2.9.2.4 Functional Description 2.9.3 Mode 1A Abort . 2.9.3.2 Modes 1B and 1G Aborts. | 2.9.3.3 Modes 2, 3, and 4 Aborts. fee 2934 Normal Mission Functions... 2... 2.9.3.1 Introduction. : 2.901 LSSC Location... 2.9.1.5 MESC, ELSC, LDEG, and PCVB Locations 2.9.1.2 Origin of Signals... 2.91.6 RC SC Location... 2.94 Sequential Events Control Subsystem SMIG Location . Performance and Design Data. Apollo Standard Initiator. Compliance With Design Requirements . Component Selection and Installation Detonators : GM-SM Separation Sequential Events Control System 2 B95 1A Subsystem... “a LET Frangible Sequential Systems . 9 Nats. fo 2.95.12 Description, General 2 LM Separation Circuit Concept. . « 2 System. 0... 2.9.5.12.3 CM-SM Separation and SLA Separation SM Iettison. 2. 2... 2.9-2.6 Ordnance System ©. 2.9.5.12.2 Mission, Basic Date 15 4PFil 1969 change Date 16 July 1969 Page, 1:14 SM2A-03-BLOCK I1-(1) APOLLO OPERATIONS HANDBOOK Title Para No. Title Para No. Firing Circuit 2. 2... 2.9.5.4 Canard Deploy and Induced Current ELSC Arm 2.9.4.14.4 Protection... . 2.9.5.5 ELSC Operation... 2.9.4. 14.5 Launch Escape Motor | 2.9.5.8 LES Abort Made ‘Thrust of LEM. + 2.9.5.861 ‘Switchover 2.9.4.14.6 ‘Thrust Rise Time of LES Abort Start... 2.9.4.14.2 LEM. . 2.9.5.8.3 Mode IA Abort. . 5. 2.9,4.14.3 ‘Thrust Vector Alignment Mode 1B Aborts . . .2.9.4.14.7 of LEM 2.9.5.8.4 Mode 1G Abort. 2.9-4,14.8 Total Impulse of SPS Abort 2.9.4,14.9 LEM 2.9.5.8.2 Docking Probe Useful Life of LEM. | 2.9.5.8.5 Retraction 2.9.4.10 LES Igniter. + 2.9.5.10 EDS Bus Changeover 2.9.4.3 Parachute Subsystem 2.9.5.15 Emergency Detection Pitch Control Motor. 2.9.5.9 System. « 2.9.4.5 Total Impulse of ‘Abort Request PCM 2.9.5.9.2 Light 2.9:4.5.3 ‘Thrust Rise Time of EDS Automatic Abort PCM 2.9.5.9.3 ‘Activation and ‘Thrust Vector Alignment Deactivation 2.9.4.5.1 of POM... 2.9,5.9.4 Launch Vehicle Thrust of PCM. 2.9.5.9.1 Status - 2.9.4.5.2 Useful Life of PCM. . 2.9.5.9.5 Launch Vehicle Tank Pressure Cartridge Pressure Monitor. . 2.9.4.5.4 Assemblies. + 2.9.5.13 Lift-of . 2.9.44 Canard Actuators. .2.9.5.13.2 MESC Auto Abort Voting Electrical Cireuit Logic « Interrupters 2.9.5.13.1 Auto Abort Logic Parachute Launch Escape Tower Disconnect. . 2.9.5.13.4 Physically Parachute Mortars. .2.9.8.13.3 Attached. 2.94.71 Pyro Arm Switch Lock 2.9.5.6 Normal Ascent . 2.9.4.8 Reefing Line Cutters 2.9.5.14 Angle of Attack Squib Valves - 2.9.5.11 Monitor 2.9.4.8.1 Tower Jettison Motor 2.9.8.7 EDS Automatic Abort Thrust of TIM 2.98.71 Deactivate 2.9.4.8.2 Thrust Rise Time of Extinguish LIFT OFF TIM 2... 2.9,5.7.3 and NO AUTO ABORT ‘Thrust Vector Alignment Lights « 2.94.83 of TIM. . 29 Launch Escape Tower Total Impulse of Jettison . 2.9.4.8.4 TIM Pyro Power : = 2.9.4.2 Useful Life of TTM Arming Pyro Buses.» 2.9.4.2.1 Operational Description Main Parachute Aborts . 5. Release . . Fo BRS Abort Start SIVB/LM Separation... . . 2.9.4.2.2 115 Mission, Basic Date_13 April 1969 Change Date. Page SM2A-03-BLOCK I1-(1) APOLLO OPERATIONS HANDBOOK Title Para No. Title Para No. Logic Power. 2... 2.9.4.1 Bipropellant Valve Separation of the Spacecraft Assembly, 6 oe 2 ee 6 264.203 From the Launch Bipropellant Ball Vehicle... fe 24D Valves. oe ee BABI Enable Automated Control Bipropellant Valve ofthe MRCS... 2.9.4.9,1 Assembly Check Separation of LM From Valves. 2... . 24.2.5,10 S-IVB oe 2A Engine Propellant Activate ELSC. | 1. 2.9.4,13.9 Lines... eS 4. 2517 ‘Apex Gover Gaseous Nitrogen (GN2) Jettison. «6 5 + 2:9.4.13,12 Pressure Vessels,» 2.4.2,3.1 ArmELSC ... . 6 2,94,13.8 GNz Ball Valve Baro Switch Lock Actuators... 2. 2.4.2.3.8 Up, 24, 000 ft 2.9.4.13.10 GN2 Filters (CSM 108 Burning of the CM RCS and Subs)... 2. 2.4.2.3.3 Propellants , . . 2.9.4.13.15 GN? Orifices . 5. 2.4.2.3.6 CM RCS Interface . . 2.9.4.13.6 GN? Pressure CM/SM Separation Regulators... . . 2.4,2.3.4 Gontrol. 2. 5 + 2.94131 GNz Relief Valves.) 2.4.2.3. Deadfacing the CM-SM GNz Solenoid Control Umbilical . 2294133 valves... 2 1 + 264,2.3.7 Deployment of Drogue Injector Prevalves . 2.4.2.3.2 Parachute . 2.9.4,13.13 Engine Injector... . . 1 2.4.2.4 Deployment of Main Engine Thrust ON-OFF Parachute and Release Control 2... ee 242.10 of Drogues . . 2.9.4,13.14 Nozzle Extension... . 2.4.2.6 Disable CM Pressurization RCS/SCS 2... 2.9-4.13.11 Subsystem... 2 2. 24.21 Jettisoning of the Check Valve SM... 22.94 13.2 Assemblies... . 2.4.2.1.4 LM Docking Ring Heat Exchangers... 2.4.2.1.6 Separation... + 29.4.13.12 Helium Pressure Main Bus Tie... . 29.4137 Relief Valves... . 2.4,2.1,5 Pyro Cutout. 6 22. 2.9.4.13.5 Helium Pressurizing Release of Main Valves. 22. 2 1) 24212 Parachutes. 2.9.4,13.16 Helium Tanks 5... 2.4.2.1,1 Separation of the CM Pressure Regulator From the SM... .2,9.4.13.4 Assemblies... . 2.4.2.1.3 Service Module... eee eee 13S Propellant Subsystem... 2.4.2.2 Service Propulsion System (SPS). 2a Propellant Tanks, 2.42.21 Funetional Description... . . 24.1 ‘Tank Propellant Feed Major Component/Subs ystem Lines... 242.202 Description . . : - 24.2 Propellant Utilization and Ablative Combustion Gauging Subsystem Chamber... ee GBS (PUGS). ee ee BADD Mission, Basic Date 15 April 1969 Change Date, Page 16 SM2A-03-BLOCK II-(1) APOLLO OPERATIONS HANDBOOK Title Para No. Quantity Computing and Indicating System Test... 2 ee 242.902 Quantity Sensing, Computing, and Indicating System. . 2,4.2.91 Propellant Utilization Valve... + 24.2.9.3 SPS Electrical Heaters |. 2.4.2.7 SPS Electrical Power Distribution... . . 2.4.3.3 Thrust Mount Assemblies...) 2. 2.4.28 Gimbal Actuator... 2,4.2.8.1 Operational Limitations and Restrictions . oe Re Performance and Design Data, | 2.4.3 Design Data... 2. 24.31 Performance Data. 432 Shades, Window . fe QIRALT Shock Attenuators . 5... 52.13.3335 Sighting and Illumination Aids |. . 2.12.4 Internal D212 ad External to 2.1242 Hs-1VB Takeover) 20. RAL S-IVB/LM Separation. + 2.9.24 2.94.22 Signal Conditioning Equipment (SCE)... ee eee 2.83.35 SLA Separation Ordnance System woe 29.8 12.2 [Slave Telescope Modes. |» 2,2,4,10.2 Sleep Station Restraints farid. 324 Sleep Restraints Tiedown Ropes. se ee ee 2,12. 3,2,10 SMIC Location |)! 2.9.1.3 SM RCS. Electrical Power Distribution. 6... 3.3 Functional Deseription. 2 RSL Major Component/Subsystem Description... . 2.5.2 Operational Limitations and Restrictions . 2.5.4 Performance and Design Data, | 2.5.3 Title Para No. Spacecraft Atmosphere Control... eee BB Spacecraft Control Switching Interfaces... 2 ee ee) 232,32 Spacecraft LM Adapter) | 1) 2. 13.4 Spacesuit . . . fee LRT Spacesuit Assembly (intravehicular). . . oe RAZZ Spacesuit Related Equipment . - eee BRA Spacesuits. . bee BAB Spetmeter, Automatic 212.533 Spotlight, Docking . 2124.21 SPS Abort. 2.9. 4.14.9 SPS Blectrical Heaters... 2.4.2.7 SPS Electrical Power Distribution... 6... . 2.4,3,3 SPS Thrust-On Indicator | 2.37.21 SPS Thrust-Off Command |. 2.3.7.2/3 Soft Hat, Communications . . 2.12. 2.1.6 Squib Valves. . . 2 2.9.5.11 Stabilization and Control System (SCS). ee BS Attitude Control Subsystem, (ACS). es 2 23 Attitude Configurations | | 2.3/4.4 Manual Control... 2.3.4.4.3 Hardware Function (AGS) 2 RAD Electronics Control Assembly (ECA) . . Gyro Assembly = | (GAD. ee 2A Gyro Assembly - 2° (GA-2). 0 2. 2.3.4.2.2 Rotational Controllers (AC-L and RC-2), . -2.3.4.2,3 Reaction Jet Engine Control (RJ/EC) . . 2.3.4.2.6 Translation Controller. 2... 2.3.4.2.4 Introduction... . 2.3.4.1 Reaction Control Subsystem Interface... ee es 2343 Mission, Basic Date 15 April 1969 Change Date_l6 July 1969_ Page. iu SM2A-03-BLOCK I1-(1) APOLLO OPERATIONS HANDBOOK Title Para No, Title Para No. Automatic Coil Corridor Verification Commands. 2... 2.3.4.3.2 Indicators... 2. 2.3.7.103 Direct Coil Delta V/Range-To-Go Commands. . 2. 2,3.4.3.3 Indicator... 2. 23.7104 General. oe 2.34.31 Roll Attitude Translation Control, 2 23.45 Indicator... . . . 2,3.7.1.2 Attitude Reference Subsystem. . 2.3.3 Scroll Assembly) |) 2.3,7.1.5 FDAI Display Sources. . 2.3.3.3 Threshold Indicator Total Attitude and Error (.05c). 2.37101 Display Sourees 2.33.31 Entry Scroll 237.4 GDC Configurations... . 2.3.3.2 EMS Functional Data Gyro Display Coupler Flow. eee ee BETS (GDC). ee ee 288 Accelerometer...) 2.3,7.5.1 Controls, Sensors, and AV /RANGE Display Displays see ee ee 232 Cireuits. .. . . 2.3.7.5.5 Controls and Displays... 2.3.2.2 Roll Attitude Attitude Set Control Indicator, , +s 23.7.5.6 Panel (ASCP)... . 2,3.2.2.3 Scroll Assembly G Axis Flight Director Attitude Drive Circuits... 2.3.7.5.3 Indicator (FDAI) . .2.3.2.2.5 Scroll Assembly Gimbal Position and Velocity Axis Drive Fuel Pressure Circuits... . . 2.3.7.5.4 Indicator ‘Threshold and Corridar (GPyFPD 2.3.2.204 Verification Rotation Control... 2.3.2.2.1 Cireuits. 2... 2.5.7.5,.2 ‘Translation Thrast-OfF Control. 2... 2.3.2.2. Function... 2 2. 2.3.7.5.7 Functional Switching PMS Switches 2... 2. 2.3.7.3 Concept ee ee es 23203 AV/EMS SET Display Switching Switeh . 2,3.7.3.3 Interfaces... 2.3.2.3.1 FUNCTION Spacecraft Control Switeh . okt 2,3.7.3.2 Switching GTA Switch | 22) 23734 Interfaces. 2... 2.32.32 MODE Switch... 2.3.7.3.1 SCS Hardware). 2. 232.1 Introduction, 2... ee 23.1 Entry Monitor System... 4. 2.3.7 Power Distribution . . 2.3.6 Delta Velocity Functions. . 2.3.7.2 Thrust Vector Control (TVC) | | 2.3.5 Delta Velocity Engine Ignition, Thrust Indicator. 2... 2.3.7,2,2 On-Off Logie 2.3.5.6 SPS Thrust-off GPI Signal Flow 2. 235.3 Command . 6... 2.3.7.2.3 Introduction...) 2.) 2.35.1 SPS Thrust-On| Manual Thrust Vector” Indicator... . . 2.3. 7.2.1 Controh 2. ee 23.55 Entry Functions 2222. 2.3701 SCS AutoTVE 2.2... 2554 Mission, Basic Date_15 April 1969 Change Date. Page. 1-18 SM2A-03-BLOCK I1-(1) APOLLO OPERATIONS HANDBOOK Configurations 6. 2.3.5.2 Distribution eo ss 2.8, Stowage ant itoeral Intereommuriestion Configuration sy. 4 -1:3:2.7.20 Boupmont see ves 2891 SuwnalKine ss lll login Communications Cable Sommer Uisbiscal and (Biectrical Umbittet Dye Marker se ss. 212.92 ‘hssempiy)« 2.8818 sitiamers Umiiect Cable | | aaa Person Commaustations Syoiem Sins Light Data s |. 210.402 ‘Nesembiy (comme Sytem Tet eee nD) Beeb Carrier) cs 248.341 Swimmers Unbiies) t Gite ees 28.215 Tekisoiee Cabie! |) 218 L2 Felecommanieatons Emupment (CTE). . 2.8.3.3.4 [isctinace ns. . az sate Dat Bauipment Telecontounestion Siem | Oe ab intortacee sv 5 248,3:363 Thntenme Byeipmont © 2 1) Reed snsttumentation Duo Bqipmonts so), eed Tipment Group». 2:8.3.341 Baupmenee 1) Renee opetetiona! sud Fig Generates DD Bee Suuttiation tncerconmuniccicns Thetrumentation, «2 2:6,3.3.2 Dqipment ns 28.20 Pulse: Cote Nedutaitn Equpment 011) aeeie Telemetry (PEM=TEN) Radio Prequesey Squpinonte 2.8.2.3 sigial Conioning Equipment agers pment SCE). . 2.8.3.3.5 Generate 1) baat retevievon (PV) Najor Camponest/Subsyateia Beuipmente 2 2.8.3.3.7 SBtnd HighGain Group neds hetoue ns. B8s.52 Digital Ranging Generator scBant (te Ranging) 0 28.3.4.2 Ormiantennas . . . 2.8.3:543 Premodulation Processor Equpmente ss. 28.3541 Rendesvous Hadar Mission, Basic Date_15 April 1969 Change Date 16 July 1969 Page 119 SM2A-03-BLOCK I1-(1) APOLLO OPERATIONS HANDBOOK Tiste Para No. Title Para No. S-Band Power ‘Thrust Vector Control (TVG)... 2.3.5 ‘Amplifier Timer, Two-Speed, « . . . 12.12.5047 Equipment... . 2.8.3.4.4 Timers. - > Lil) annie Unified S-Band Total Attitade and Error Display Equipment Sourees. Dee 23.331 (USBE) . 2.8.3.4.3 Total Impulse of LEM 1 1) | 219.5.8.2 VHF/AM Transmitters Total Impulse of POM |. 2.95692 Transmitter-Receiver Total Impulse of TIM 219.5.7.2 Equipment « 2.8.3.4,1 Tower Jettison Motor | 1). . 2.9.5.7 VHF Recovery Beacon Translation Control. 1 1.) 2.32.22 Equipment ss. + 28.3.4.6 2345 Operational Limitations and Translation Controller»... 2.34.2.4 Restrictions... .. +. + 28.4 Tunneland IM DSE. sll te ts 2843 Pressurization. ©... 2.213.368 Tunnel Hatch Stow Bag | 2.12. 3.219 PMR. . 2.8.4.2 Tunnel Lighting...) 1). 26 Ted l tvc ‘Panel Configurations. pec es 23, 5.2 USBE. 28d u VHF-AM. 22121212 deal Telescope Sun Filters |. 2,124,110 Unified S-Band Equipment Television (TV) Equipment». 2.8.33.7 (USBE) oe ee ns eee 28343 Thermal Control. ss. 2.7.2.3 Up-Data Link (UDL) Threshold and Corridor Bnipment. ov. eee 28339 Verification Cirenite . . . . 2.3.7.5.2 Urine Subsystem. |) 1). 12,126.32 ‘Threshold indicator (.05G). | 2.3.7,111 Urine Collection and ‘Transfer Thrust and Thrust Vector Assombly oe wt a Control. se ee ee ee QL USBEL bit 4 Thrust Chamber Assembly | | 2.5.6.3.3 Useful Lite of LEM. |) 1! 5 Thrust Mount Assemblies - 214.218 Useful Life of PCM. | 5 Thrast-Off Function 2.3.715.7 Useful Life of TIM. | | os Thrast of LEM) 2.) 11). 2.9:5,81 Usility Towels... we Tarast of Pom. | 111 1) 2 2igisi9lt Thrust of TIM. 11.2) 2igsita v Thrust Rise Time of LEM 219,5.8.3 Thrust Rise Time of PCM | | 2.915.913 VacuumaD . fe 2126.35 Thrast Rise Time of TIM. | | 2.9.5.7.3 Van Allen Belt Dosimeter- 2.12.84 Thrust Vector Alignment of Vehicle Umbiticals . 21335 LEM... + 2.9.5,8.4 Velcro and Snaps Retainer Thrust Vector Alignment of | Locations ve sss es = 2123.28 POM ove ee eee 2:95.94 VEPAAM 1] Dl aleaa Thrast Vector Alignment of VHP-AM Tranemitter-Receiver TM cece ee eee Equipment... 2.8.3.4 Thrust Vector Control | | 1 |," 2121412 Voice Recorder, Cassettes, and Battery Packs 2.12.5.4.11 Mission, Basic Date 15 April 1969 Change Date_!5 Oct 1969 _ Page, 1-20 SM2A-03-BLOCK IL-(1) APOLLO OPERATIONS HANDBOOK Title Para No. Title Para No. VHF Omniantenna Equipment... ss 2.8.3.5.1 VHF Recovery Antenna Equipment... . 2.8.3.5.4 VHF Recovery Beacon Equipment . 5 2834.6 w Waste Management System and Supplies... ss = 2.12, 6.3 Waste Stowage Vent System. . 2.12.6.3.4 Water Grew. 2... 22.12, 6.1 Drinking... 2 212.6.101 Food Preparation... . . 2,12,6.1.2 Water-Glycol Coolant Subsystems see ee 2.7.6 Water Management. 2.7.2.2 Water Subsystem. 2.7.5 Wet Cleansing Cloth»... . 2.12.6.4.2 Windows and Shades»... . 1.3.2.6.3 Window Markings 6... 6. 2.124.185 z Zero Optics Mode ee 2B Mission, Basic Date 15 April 1969 Change Date 16 July 1969 Page L:21/1-22

Potrebbero piacerti anche