RESUMEN DEL PRESUPUESTO CONTRATADO

OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION
PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA
DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C. PLAZO DE EJECUCION CONTRACTUAL : 420 Días Calendarios
FECHA PTO : Mayo 2019 PRESUPUESTO CONTRATADO C /IGV 32,680,979.63 CON IGV
AREA GEOGRAFICA N° 06 PRESUPUESTO CONTRATADO S /IGV 27,695,745.45 SIN IGV

SISTEMA DE CONTRATACIÓN: SUMA ALZADA


PRECIOS VIGENTES A MAYO DEL 2019

RESUMEN DEL CALENDARIO VALORIZADO

G.G. Fijo G.G. Variable Utilidades IGV


Item Descripción Costo Directo Sub Total TOTAL
3.4000000% 6.0000000% 4.0000000% 18.0000000%
1.00 ESTRUCTURAS 11,181,237.97 380,162.09 670,874.28 447,249.52 12,679,523.87 2,282,314.30 14,961,838.17
2.00 ARQUITECTURA 9,241,795.58 314,221.05 554,507.73 369,671.82 10,480,196.18 1,886,435.30 12,366,631.48
3.00 INSTALCIONES SANITARIAS 2,375,468.92 80,765.94 142,528.14 95,018.76 2,693,781.76 484,880.72 3,178,662.48
4.00 INSTALCIONES ELECTRICAS 1,624,553.49 55,234.82 97,473.21 64,982.14 1,842,243.65 331,603.87 2,173,847.52

COSTO DIRECTO 24,423,055.96


GASTOS GENERALES FIJOS 3.4000% 830,383.90
GASTOS GENERALES VARIABLES 6.0000% 1,465,383.35
UTILIDAD 4.0000% 976,922.24
SUBTOTAL 27,695,745.45
IGV (18%) 18.0000% 4,985,234.18
COSTO TOTAL 32,680,979.63 830,383.90 1,465,383.36 976,922.24 27,695,745.46 4,985,234.19 32,680,979.65
SUSTENTACION DEL ADELANTO ESPECIFICO PARA MATERIAL
FORMULAS POLINOMICAS Y REAJUSTES
OBRA
: SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUEST
MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA
INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DIS
UNICO N° 2131616

CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C. PLAZO DE EJECUCION CONTRACTUAL : 420


FECHA PTO : Mayo 2019 PRESUPUESTO CONTRATADO C /IGV 32,680,979.63
AREA GEOGRAFICA N° 06 PRESUPUESTO CONTRATADO S /IGV 27,695,745.45

FORMULA 1 ESTRUCTURAS
K = 0.349*(Jr / Jo) + 0.101*(Cr / Co) + 0.143*(MAHr / MAHo) + 0.180*(ADPr / ADPo) + 0.060*(Mr / Mo) + 0.16
SIMBOLO CONCEPTO IU INCIDENCIA % PARTICIP. Io(May-2019)

J MANO DE OBRA (INCL. LEY SOCIAL) 47 0.349 100.000% 600.40


C CEMENTO PORRTLAND TIPO I 21 0.101 100.000% 418.76
MAH AGREGADO GRUESO 05 0.143 18.881% 629.64
MAQUINARIA Y EQUIPO NACIONAL 48 0.143 68.532% 371.16
HORMIGON 38 0.143 12.587% 644.15
ADP PERFIL DE ACERO LIVIANO 51 0.180 15.556% 298.89
ACERO DE CONSTRUCCION CORRUGADO 03 0.180 65.000% 553.40
DÓLAR MAS INFLACION USA 30 0.180 19.444% 496.36
M MADERA NACIONAL ENCOFRADO Y CARPINTERIA 43 0.060 100.000% 902.26
GGU INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.167 100.000% 457.75
1.000 537.28

FORMULA 2 ARQUITECTURA
K = 0.298*(Jr / Jo) + 0.138*(DPAr / DPAo) + 0.059*(BMAr / BMAo) + 0.078*(BPr / BPo) + 0.185*(CCr / CCo) + 0.075*(MBr
SIMBOLO CONCEPTO IU INCIDENCIA % PARTICIP. Io(May-2019)

J MANO DE OBRA (INCL. LEY SOCIAL) 47 0.298 100.000% 600.40


DPA PLANCHA DE ACERO LAF 57 0.138 9.420% 385.78
ACERO DE CONSTRUCCION CORRUGADO 03 0.138 4.350% 553.40
DÓLAR MAS INFLACION USA 30 0.138 86.230% 496.36
BMA AGREGADO GRUESO 05 0.059 13.560% 629.64
BLOQUE Y LADRILLO 17 0.059 57.630% 878.92
MAQUINARIA Y EQUIPO NACIONAL 48 0.059 28.810% 371.16
BP PERFIL DE ALUMINIO 52 0.078 6.410% 318.74
BALDOSA VINILICA 16 0.078 93.160% 354.83
CC CEMENTO PORTLAND TIPO I 21 0.185 82.160% 418.76
CERAMICO ESMALT. Y SIN ESMALT 24 0.185 17.840% 236.72
MB BALDOSA ACUSTICA 14 0.075 41.330% 262.90
MADERA NACIONAL ENCOFRADO Y CARPINTERIA 43 0.075 58.670% 902.26
GGU INDICE GENERAL DE ´RECIOS AL CONSUMIDOR 39 0.167 100.000% 457.75
SUSTENTACION DEL ADELANTO ESPECIFICO PARA MATERIAL
FORMULAS POLINOMICAS Y REAJUSTES
OBRA
: SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUEST
MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA
INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DIS
UNICO N° 2131616

CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C. PLAZO DE EJECUCION CONTRACTUAL : 420


FECHA PTO : Mayo 2019 PRESUPUESTO CONTRATADO C /IGV 32,680,979.63
AREA GEOGRAFICA N° 06 PRESUPUESTO CONTRATADO S /IGV 27,695,745.45
1.000 490.54
SUSTENTACION DEL ADELANTO ESPECIFICO PARA MATERIAL
FORMULAS POLINOMICAS Y REAJUSTES
OBRA
: SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUEST
MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA
INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DIS
UNICO N° 2131616

CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C. PLAZO DE EJECUCION CONTRACTUAL : 420


FECHA PTO : Mayo 2019 PRESUPUESTO CONTRATADO C /IGV 32,680,979.63
AREA GEOGRAFICA N° 06 PRESUPUESTO CONTRATADO S /IGV 27,695,745.45
FORMULA 3 INSTALACIONES SANITARIAS
K = 0.271*(Jr / Jo) + 0.276*(DPAr / DPAo) + 0.061*(Ar / Ao) + 0.092*(TMAr / TMAo) + 0.133*(PCBr / PCBo) + 0
SIMBOLO CONCEPTO IU INCIDENCIA % PARTICIP. Io(May-2019)

J MANO DE OBRA (INC. LEYES SOC) 47 0.271 100.000% 600.40


DPA DÓLAR MAS INFLACION USA 30 0.276 85.507% 496.36
ACERO DE CONSTRUC. CORRUGADO 3 0.276 4.348% 553.40
PLANCHA DE ACERO LAF 57 0.276 10.145% 385.78
A APARATO SANITARIO CON GRIFERIA 10 0.061 100.000% 423.13
TMA AGREGADO GRUESO 5 0.092 9.783% 629.64
MAQUINARIA Y EQUIPO NACIONAL 48 0.092 39.130% 371.16
TUBERIA DE PVC AGUA-DESAG-ELEC 72 0.092 51.087% 433.94
PCB PERFIL DE ACERO LIVIANO 51 0.133 74.436% 298.89
BLOQUE Y LADRILLO 17 0.133 1.504% 878.92
CEMENTO PORTALD TIPO I 21 0.133 24.060% 418.76
GGU IND. GRAL. PRECIOS AL CONSUM. 39 0.167 100.000% 457.75
1.000

FORMULA 4 INSTALACIONES ELECTRICAS


K = 0.194*(Jr / Jo) + 0.264*(DMAr / DMAo) + 0.247*(APr / APo) + 0.053*(PCAr / PCAo) + 0.075*(ATr / ATo) + 0.
SIMBOLO CONCEPTO IU INCIDENCIA % PARTICIP. Io(May-2019)

J MANO DE OBRA (INC. LEYES SOC.) 47 0.194 100.000% 600.40


DMA MAQUINARIA Y EQUIPO NACIONAL 48 0.264 5.682% 371.16
ACERO DE CONSTRUC. CORRUGADO 03 0.264 0.379% 553.40
DÓLAR MAS INFLACION USA 30 0.264 93.939% 496.36
AP ARTEFACTO AUMBRADO INTERIOR 12 0.247 95.142% 323.47
PLANCHA GALVANIZADA 61 0.247 4.858% 230.60
PCA POSTE DE CONCRETO 62 0.053 60.377% 468.94
CEMENTO PORTLAND TIPO I 21 0.053 28.302% 418.76
ALAMBRE Y CABLE DE COBRE DESNUDO 06 0.053 11.321% 953.85
AT ALAMBRE Y CABLE TIPO TW Y THW 7 0.075 81.333% 686.78
TUBERIA DE PVC AGUA-DESAG-ELEC 72 0.075 18.667% 433.94
GGU IND. GRAL. PRECIOS AL CONSUM 39 0.167 100.000% 457.75
SUSTENTACION DEL ADELANTO ESPECIFICO PARA MATERIAL
FORMULAS POLINOMICAS Y REAJUSTES
OBRA
: SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUEST
MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA
INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DIS
UNICO N° 2131616

CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C. PLAZO DE EJECUCION CONTRACTUAL : 420


FECHA PTO : Mayo 2019 PRESUPUESTO CONTRATADO C /IGV 32,680,979.63
AREA GEOGRAFICA N° 06 PRESUPUESTO CONTRATADO S /IGV 27,695,745.45
1.000
NTO ESPECIFICO PARA MATERIALES
LINOMICAS Y REAJUSTES
TO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI –
HABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA
BICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO

Días Calendarios
CON IGV
SIN IGV

ESTRUCTURAS
Ho) + 0.180*(ADPr / ADPo) + 0.060*(Mr / Mo) + 0.167*(GGUr / GGUo)
Ia (Dic-2019) Ia/Io k

619.76 1.0322 0.3602


412.86 0.9859 0.0996
629.70 1.0001 0.0270
374.00 1.0077 0.0988
638.80 0.9917 0.0179
301.46 1.0086 0.0282
540.81 0.9772 0.1143
505.85 1.0191 0.0357
917.51 1.0169 0.0610
459.60 1.0040 0.1677
540.04 1.0104

ARQUITECTURA
078*(BPr / BPo) + 0.185*(CCr / CCo) + 0.075*(MBr / MBo) + 0.167*(GGUr / GGUo)
Ia (Dic-2019) Ia/Io k

619.76 1.0322 0.3076


390.41 1.0120 0.0132
540.81 0.9772 0.0059
505.85 1.0191 0.1213
629.70 1.0001 0.0080
886.98 1.0092 0.0343
374.00 1.0077 0.0171
319.26 1.0016 0.0050
354.83 1.0000 0.0727
412.86 0.9859 0.1499
237.75 1.0044 0.0331
262.90 1.0000 0.0310
917.51 1.0169 0.0447
459.60 1.0040 0.1677
NTO ESPECIFICO PARA MATERIALES
LINOMICAS Y REAJUSTES
TO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI –
HABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA
BICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO

Días Calendarios
CON IGV
SIN IGV
493.73 1.0115
NTO ESPECIFICO PARA MATERIALES
LINOMICAS Y REAJUSTES
TO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI –
HABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA
BICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO

Días Calendarios
CON IGV
SIN IGV
NSTALACIONES SANITARIAS
+ 0.092*(TMAr / TMAo) + 0.133*(PCBr / PCBo) + 0.167*(GGUr / GGUo)
Ia (Dic-2019) Ic/Io k

619.76 1.0322 0.2797


505.85 1.0191 0.2405
540.81 0.9772 0.0117
390.41 1.0120 0.0283
431.91 1.0208 0.0623
629.70 1.0001 0.0090
374.00 1.0077 0.0363
442.39 1.0195 0.0479
301.46 1.0086 0.0999
886.98 1.0092 0.0020
412.86 0.9859 0.0315
459.60 1.0040 0.1677
1.0168

NSTALACIONES ELECTRICAS
APo) + 0.053*(PCAr / PCAo) + 0.075*(ATr / ATo) + 0.167*(GGUr / GGUo)
Ia (Dic-2019) Ic/Io k

619.76 1.0322 0.2002


374.00 1.0077 0.0151
540.81 0.9772 0.0010
505.85 1.0191 0.2527
319.67 0.9883 0.2323
233.37 1.0120 0.0121
472.26 1.0071 0.0322
412.86 0.9859 0.0148
914.59 0.9588 0.0058
686.10 0.9990 0.0609
442.39 1.0195 0.0143
459.60 1.0040 0.1677
NTO ESPECIFICO PARA MATERIALES
LINOMICAS Y REAJUSTES
TO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI –
HABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA
BICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO

Días Calendarios
CON IGV
SIN IGV
1.0091
MONTOS MAXIMOS POR INSUMOS Y SUSTENTACION DEL MONTO M
FORMULAS DE REAJUSTES Y MONTOS M
OBRA : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E N
INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE
REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C. PLAZO DE EJECUCION CONTRACTUAL


FECHA PTO MAYO 2019 PRESUPUESTO CONTRATADO C /IGV
AREA GEOGRAFICA N° 06 PRESUPUESTO CONTRATADO S /IGV

FORMULA 1 ESTRUCTURAS
PRESUPUESTO CONTRATADO C/IGV 14,961,838.17
PRESUPUESTO CONTRATADO S/IGV 12,679,523.87

SIMBOLO CONCEPTO IU INCIDENCIA % PARTICIP.

J MANO DE OBRA (INCL. LEY SOCIAL) 47 0.349 100.000%


C CEMENTO PORTLAND TIPO I 21 0.101 100.000%
MAH AGREGADO GRUESO 05 0.143 18.881%
MAQUINARIA Y EQUIPO NACIONAL 48 0.143 68.532%
HORMIGON 38 0.143 12.587%
ADP PERFIL DE ACERO LIVIANO 51 0.180 15.556%
ACERO DE CONSTRUCCION CORRUGADO 03 0.180 65.000%
DÓLAR MAS INFLACION USA 30 0.180 19.444%
M MADERA NACIONAL ENCOFRADO Y CARPINTERIA 43 0.060 100.000%
GGU INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.167 100.000%
1.000

FORMULA 2 ARQUITECTURA
PRESUPUESTO CONTRATADO C/IGV 12,366,631.48
PRESUPUESTO CONTRATADO S/IGV 10,480,196.18

SIMBOLO CONCEPTO IU INCIDENCIA % PARTICIP.

J MANO DE OBRA (INCL. LEY SOCIAL) 47 0.298 100.000%


DPA PLANCHA DE ACERO LAF 57 0.138 9.420%
ACERO DE CONSTRUCCION CORRUGADO 03 0.138 4.350%
DÓLAR MAS INFLACION USA 30 0.138 86.230%
BMA AGREGADO GRUESO 05 0.059 13.560%
BLOQUE Y LADRILLO 17 0.059 57.630%
MONTOS MAXIMOS POR INSUMOS Y SUSTENTACION DEL MONTO M
FORMULAS DE REAJUSTES Y MONTOS M
OBRA : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E N
INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE
REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C. PLAZO DE EJECUCION CONTRACTUAL


FECHA PTO MAYO 2019 PRESUPUESTO CONTRATADO C /IGV
AREA GEOGRAFICA N° 06 PRESUPUESTO CONTRATADO S /IGV

MAQUINARIA Y EQUIPO NACIONAL 48 0.059 28.810%


BP PERFIL DE ALUMINIO 52 0.078 6.410%
BALDOSA VINILICA 16 0.078 93.160%
CC CEMENTO PORTLAND TIPO I 21 0.185 82.160%
CERAMICO ESMALT. Y SIN ESMALT 24 0.185 17.840%
MB BALDOSA ACUSTICA 14 0.075 41.330%
MADERA NACIONAL ENCOFRADO Y CARPINTERIA 43 0.075 58.670%
GGU INDICE GENERAL DE ´RECIOS AL CONSUMIDOR 39 0.167 100.000%
1.000
MONTOS MAXIMOS POR INSUMOS Y SUSTENTACION DEL MONTO M
FORMULAS DE REAJUSTES Y MONTOS M
OBRA : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E N
INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE
REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C. PLAZO DE EJECUCION CONTRACTUAL


FECHA PTO MAYO 2019 PRESUPUESTO CONTRATADO C /IGV
AREA GEOGRAFICA N° 06 PRESUPUESTO CONTRATADO S /IGV

FORMULA 3 INSTALACIONES SANITARIA


PRESUPUESTO CONTRATADO C/IGV 3,178,662.48
PRESUPUESTO CONTRATADO S/IGV 2,693,781.76

SIMBOLO CONCEPTO IU INCIDENCIA % PARTICIP.

J MANO DE OBRA (INC. LEYES SOC) 47 0.271 100.000%


DPA DÓLAR MAS INFLACION USA 30 0.276 85.507%
ACERO DE CONSTRUC. CORRUGADO 3 0.276 4.348%
PLANCHA DE ACERO LAF 57 0.276 10.145%
A APARATO SANITARIO CON GRIFERIA 10 0.061 100.000%
TMA AGREGADO GRUESO 5 0.092 9.783%
MAQUINARIA Y EQUIPO NACIONAL 48 0.092 39.130%
TUBERIA DE PVC AGUA-DESAG-ELEC 72 0.092 51.087%
PCB PERFIL DE ACERO LIVIANO 51 0.133 74.436%
BLOQUE Y LADRILLO 17 0.133 1.504%
CEMENTO PORTALD TIPO I 21 0.133 24.060%
GGU IND. GRAL. PRECIOS AL CONSUM. 39 0.167 100.000%
1.000

FORMULA 4 INSTALACIONES ELECTRIC


PRESUPUESTO CONTRATADO C/IGV 2,173,847.52
PRESUPUESTO CONTRATADO S/IGV 1,842,243.65

SIMBOLO CONCEPTO IU INCIDENCIA % PARTICIP.

J MANO DE OBRA (INC. LEYES SOC.) 47 0.194 100.000%


DMA MAQUINARIA Y EQUIPO NACIONAL 48 0.264 5.682%
ACERO DE CONSTRUC. CORRUGADO 3 0.264 0.379%
MONTOS MAXIMOS POR INSUMOS Y SUSTENTACION DEL MONTO M
FORMULAS DE REAJUSTES Y MONTOS M
OBRA : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E N
INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE
REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C. PLAZO DE EJECUCION CONTRACTUAL


FECHA PTO MAYO 2019 PRESUPUESTO CONTRATADO C /IGV
AREA GEOGRAFICA N° 06 PRESUPUESTO CONTRATADO S /IGV

DÓLAR MAS INFLACION USA 30 0.264 93.939%


AP ARTEFACTO AUMBRADO INTERIOR 12 0.247 95.142%
PLANCHA GALVANIZADA 61 0.247 4.858%
PCA POSTE DE CONCRETO 62 0.053 60.377%
CEMENTO PORTLAND TIPO I 21 0.053 28.302%
ALAMBRE Y CABLE DE COBRE DESNUDO 06 0.053 11.321%
AT ALAMBRE Y CABLE TIPO TW Y THW 7 0.075 81.333%
TUBERIA DE PVC AGUA-DESAG-ELEC 72 0.075 18.667%
GGU IND. GRAL. PRECIOS AL CONSUM 39 0.167 100.000%
1.000

MONTOS MAXIMO SOLO MAT

MONTOS MAXIMO SOLICITAD

20% DEL MONTO DEL CONTR

MONTO MAXIMO SOLO MATERIALES > 40% DEL MONTO DEL

MONTOS MAXIMO SOLICITAD


ION DEL MONTO MAXIMO PARA ADELANTO MATERIALES
JUSTES Y MONTOS MAXIMOS
NFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE
DUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA
2131616

: 420 Días Calendarios


32,680,979.63 CON IGV
27,695,745.45 SIN IGV

ESTRUCTURAS

K= 1.0104
PRESUPUESTO PRESUPUESTO MONTO MAXIMO MONTOS MONTOS
CONTRATADO ACTUALIZADO POR INSUMOS MATERIALES MATERIALES
C/IGV (1) (1)*K ACTUALIZADO SEGÚN EXPED. SOLICITADOS

14,961,838.17 15,117,441.29 5,275,987.01 0.00 0.00


14,961,838.17 15,117,441.29 1,526,861.57 1,526,861.57 1,391,962.90
14,961,838.17 15,117,441.29 408,168.34 408,168.34 335,581.54
14,961,838.17 15,117,441.29 1,481,520.74 1,481,520.74 0.00
14,961,838.17 15,117,441.29 272,105.02 272,105.02 130,434.86
14,961,838.17 15,117,441.29 423,300.45 423,300.45
14,961,838.17 15,117,441.29 1,768,740.63 1,768,740.63 1,140,242.44
14,961,838.17 15,117,441.29 529,098.35 529,098.35
14,961,838.17 15,117,441.29 907,046.48 907,046.48 780,541.11
14,961,838.17 15,117,441.29 2,524,612.70 2,524,612.70 0.00
15,117,441.29 9,841,454.28 3,778,762.85

ARQUITECTURA

K= 1.0115

PRESUPUESTO PRESUPUESTO MONTO MAXIMO MONTOS MONTOS


CONTRATADO ACTUALIZADO POR INSUMOS MATERIALES MATERIALES
C/IGV (1)*K ACTUALIZADO SEGÚN EXPED. SOLICITADOS

12,366,631.48 12,508,847.75 3,727,636.63 0.00 0.00


12,366,631.48 12,508,847.75 162,610.02 162,610.02 0.00
12,366,631.48 12,508,847.75 75,090.61 75,090.61 61,121.75
12,366,631.48 12,508,847.75 1,488,520.36 1,488,520.36 0.00
12,366,631.48 12,508,847.75 100,075.79 100,075.79 85,136.47
12,366,631.48 12,508,847.75 425,322.09 425,322.09 376,287.93
ION DEL MONTO MAXIMO PARA ADELANTO MATERIALES
JUSTES Y MONTOS MAXIMOS
NFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE
DUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA
2131616

: 420 Días Calendarios


32,680,979.63 CON IGV
27,695,745.45 SIN IGV

12,366,631.48 12,508,847.75 212,624.14 212,624.14 0.00


12,366,631.48 12,508,847.75 62,541.74 62,541.74 0.00
12,366,631.48 12,508,847.75 908,952.92 908,952.92 625,244.25
12,366,631.48 12,508,847.75 1,901,294.82 1,901,294.82 621,575.85
12,366,631.48 12,508,847.75 412,842.01 412,842.01 353,353.27
12,366,631.48 12,508,847.75 387,743.01 387,743.01 0.00
12,366,631.48 12,508,847.75 550,420.57 550,420.57 457,200.16
12,366,631.48 12,508,847.75 2,088,977.57 2,088,977.57 0.00
12,504,652.28 8,777,015.65 2,579,919.68
ION DEL MONTO MAXIMO PARA ADELANTO MATERIALES
JUSTES Y MONTOS MAXIMOS
NFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE
DUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA
2131616

: 420 Días Calendarios


32,680,979.63 CON IGV
27,695,745.45 SIN IGV

STALACIONES SANITARIAS

K= 1.0168

PRESUPUESTO PRESUPUESTO MONTO MAXIMO MONTOS MONTOS


CONTRATADO ACTUALIZADO POR INSUMOS MATERIALES MATERIALES
C/IGV (1)*K ACTUALIZADO SEGÚN EXPED. SOLICITADOS

3,178,662.48 3,232,064.01 875,889.35 0.00 0.00


3,178,662.48 3,232,064.01 762,764.91 762,764.91 0.00
3,178,662.48 3,232,064.01 38,786.32 38,786.32 0.00
3,178,662.48 3,232,064.01 90,498.44 90,498.44 0.00
3,178,662.48 3,232,064.01 197,155.90 197,155.90 0.00
3,178,662.48 3,232,064.01 29,089.74 29,089.74 0.00
3,178,662.48 3,232,064.01 116,353.01 116,353.01 0.00
3,178,662.48 3,232,064.01 151,907.14 151,907.14 153,307.50
3,178,662.48 3,232,064.01 319,973.95 319,973.95 0.00
3,178,662.48 3,232,064.01 6,465.16 6,465.16 0.00
3,178,662.48 3,232,064.01 103,425.40 103,425.40 0.00
3,178,662.48 3,232,064.01 539,754.69 539,754.69 0.00
3,232,064.00 2,356,174.66 153,307.50

STALACIONES ELECTRICAS

K= 1.0091

PRESUPUESTO PRESUPUESTO MONTO MAXIMO MONTOS MONTOS


CONTRATADO ACTUALIZADO POR INSUMOS MATERIALES MATERIALES
C/IGV (1)*K ACTUALIZADO SEGÚN EXPED. SOLICITADOS

2,173,847.52 2,193,629.53 425,564.13 0.00 0.00


2,173,847.52 2,193,629.53 32,905.50 32,905.50 0.00
2,173,847.52 2,193,629.53 2,194.86 2,194.86 0.00
ION DEL MONTO MAXIMO PARA ADELANTO MATERIALES
JUSTES Y MONTOS MAXIMOS
NFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE
DUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA
2131616

: 420 Días Calendarios


32,680,979.63 CON IGV
27,695,745.45 SIN IGV

2,173,847.52 2,193,629.53 544,017.84 544,017.84 0.00


2,173,847.52 2,193,629.53 515,504.56 515,504.56 0.00
2,173,847.52 2,193,629.53 26,321.93 26,321.93 0.00
2,173,847.52 2,193,629.53 70,195.73 70,195.73 0.00
2,173,847.52 2,193,629.53 32,904.57 32,904.57 0.00
2,173,847.52 2,193,629.53 13,162.06 13,162.06 0.00
2,173,847.52 2,193,629.53 133,810.85 133,810.85 0.00
2,173,847.52 2,193,629.53 30,711.36 30,711.36 24,185.05
2,173,847.52 2,193,629.53 366,336.13 366,336.13 0.00
2,193,629.52 1,768,065.39 24,185.05

NTOS MAXIMO SOLO MATERIALES S/ 22,742,709.98

NTOS MAXIMO SOLICITADOS MATERIALES S/ 6,536,175.08 19.9999%

% DEL MONTO DEL CONTRATO DE OBRA S/ 6,536,195.93 20.0000%

> 40% DEL MONTO DEL CONTRATO DE OBRA

NTOS MAXIMO SOLICITADOS MATERIALES S/ 6,536,175.08


CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020

ESTRUCTURAS
DEMOLICIÓN
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 S/ 2.09 S/ 1.79 S/ - S/ -
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70 S/ - S/ 1,158.43 S/ 1,158.43 S/ 1,158.43
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66 S/ - S/ - S/ - S/ -
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24 S/ - S/ - S/ - S/ -
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07 S/ - S/ - S/ - S/ -
2300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69 S/ - S/ 57.10 S/ 57.10 S/ 57.10
0009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 S/ 0.26 S/ 0.31 S/ 0.31 S/ -
02350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98 S/ - S/ - S/ - S/ 895.35
50081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56 S/ 44.42 S/ 53.32 S/ 99.98 S/ 99.98
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31 S/ - S/ - S/ - S/ -
02350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88 S/ - S/ - S/ 152.72 S/ 152.72
PERNO 5/8" und S/ 57.89 S/ 2.41 S/ 2.89 S/ 2.89 S/ 2.89
0202350085 PERNO 1 1/4' x 12" und S/ 598.40 S/ - S/ 89.76 S/ 89.76 S/ 89.76
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 S/ 13.74 S/ 16.50 S/ 16.50 S/ -
087 PERNO 1/2' A36 x 4" und S/ 25.06 S/ - S/ - S/ - S/ 3.76
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14 S/ 0.74 S/ 0.89 S/ 1.67 S/ 1.67
02350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05 S/ - S/ - S/ - S/ -

CAM18
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13 S/ - S/ - S/ 280.28 S/ 280.28
350091 TUERCA DE 3/8" und S/ 62.78 S/ 2.61 S/ 3.14 S/ 3.14 S/ 3.14
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 S/ 41.27 S/ 41.28 S/ - S/ -
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40 S/ - S/ 183.60 S/ 183.60 S/ 183.60
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60 S/ - S/ - S/ - S/ -
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82 S/ - S/ - S/ - S/ -
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55 S/ - S/ - S/ - S/ -
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08 S/ - S/ 994.21 S/ 994.21 S/ 994.21
0203010020 ACERO LISO DE 1" m S/ 161.83 S/ 33.70 S/ 40.46 S/ 40.46 S/ -
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35 S/ - S/ - S/ - S/ 270.35
0203010022 ACERO LISO DE 3/8' m S/ 644.91 S/ 42.98 S/ 51.59 S/ 96.74 S/ 96.74
0203010023 ACERO LISO DE 3/4" m S/ 633.70 S/ - S/ - S/ - S/ -
0204050001 ARENA GRUESA m3 S/ 14,604.83 S/ - S/ - S/ 3,651.21 S/ 3,651.21
0204050002 ARENA FINA m3 S/ 0.10 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94 S/ - S/ 7,896.29 S/ 7,896.29 S/ 7,896.29
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 S/ 1,257.54 S/ 1,509.65 S/ 1,509.65 S/ -
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21 S/ - S/ - S/ - S/ 19.23
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 S/ 1,186.72 S/ 1,187.20 S/ - S/ -
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76 S/ - S/ 1,033.19 S/ 1,033.19 S/ 1,033.19

CAM19
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0205350001 AGUA m3 S/ 1,368.63 S/ - S/ - S/ - S/ -
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00 S/ - S/ - S/ - S/ -
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88 S/ - S/ - S/ - S/ -
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18 S/ - S/ 2,352.33 S/ 2,352.33 S/ 2,352.33
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 S/ 1,783.95 S/ 2,141.60 S/ 2,141.60 S/ -
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33 S/ - S/ - S/ - S/ 36,305.75
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61

CAM20
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44

CAM21
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 S/ 1,984.48 S/ 2,382.33 S/ 2,382.33 S/ -
0238100001 AFIRMADO m3 S/ 39,205.70 S/ 8,164.59 S/ 11,761.71 S/ - S/ -
0243010001 MADERA TORNILLO p2 S/ 133,765.32 S/ - S/ 33,441.33 S/ 33,441.33 S/ 33,441.33
0243010002 MADERA TORNILLO - A glb S/ 2,940.00 S/ - S/ - S/ - S/ -
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00 S/ - S/ - S/ - S/ -
0243010004 MADERA TORNILLO - C glb S/ 1,540.00 S/ - S/ - S/ - S/ -
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71 S/ - S/ 553.31 S/ 553.31 S/ 553.31
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 S/ 3,863.60 S/ 4,638.17 S/ 4,638.17 S/ -
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11

CAM22
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68

CAM23
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52
SUSTITUCIÓN
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 S/ 1.49 S/ 1.79 S/ - S/ -
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70 S/ - S/ 1,158.43 S/ 1,158.43 S/ 1,158.43
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66 S/ - S/ - S/ - S/ -
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24 S/ - S/ - S/ - S/ -
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07 S/ - S/ - S/ - S/ -
2300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69 S/ - S/ 57.10 S/ 57.10 S/ 57.10
0009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 S/ 0.26 S/ 0.31 S/ 0.31 S/ -

CAM24
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


02350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98 S/ - S/ - S/ - S/ 895.35
50081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56 S/ 44.42 S/ 53.32 S/ 99.98 S/ 99.98
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31 S/ - S/ - S/ - S/ -
02350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88 S/ - S/ - S/ 152.72 S/ 152.72
PERNO 5/8" und S/ 57.89 S/ 2.41 S/ 2.89 S/ 2.89 S/ 2.89
0202350085 PERNO 1 1/4' x 12" und S/ 598.40 S/ - S/ 89.76 S/ 89.76 S/ 89.76
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 S/ 13.74 S/ 16.50 S/ 16.50 S/ -
087 PERNO 1/2' A36 x 4" und S/ 25.06 S/ - S/ - S/ - S/ 3.76
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14 S/ 0.74 S/ 0.89 S/ 1.67 S/ 1.67
02350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05 S/ - S/ - S/ - S/ -
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13 S/ - S/ - S/ 280.28 S/ 280.28
350091 TUERCA DE 3/8" und S/ 62.78 S/ 2.61 S/ 3.14 S/ 3.14 S/ 3.14
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 S/ 41.27 S/ 41.28 S/ - S/ -
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40 S/ - S/ 183.60 S/ 183.60 S/ 183.60
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60 S/ - S/ - S/ - S/ -
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82 S/ - S/ - S/ - S/ -
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55 S/ - S/ - S/ - S/ -
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08 S/ - S/ 994.21 S/ 994.21 S/ 994.21
0203010020 ACERO LISO DE 1" m S/ 161.83 S/ 33.70 S/ 40.46 S/ 40.46 S/ -

CAM25
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0203010021 ACERO LISO DE 5/8" m S/ 1,802.35 S/ - S/ - S/ - S/ 270.35
0203010022 ACERO LISO DE 3/8' m S/ 644.91 S/ 42.98 S/ 51.59 S/ 96.74 S/ 96.74
0203010023 ACERO LISO DE 3/4" m S/ 633.70 S/ - S/ - S/ - S/ -
0204050001 ARENA GRUESA m3 S/ 14,604.83 S/ - S/ - S/ 3,651.21 S/ 3,651.21
0204050002 ARENA FINA m3 S/ 0.10 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94 S/ - S/ 7,896.29 S/ 7,896.29 S/ 7,896.29
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 S/ 1,257.54 S/ 1,509.65 S/ 1,509.65 S/ -
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21 S/ - S/ - S/ - S/ 19.23
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 S/ 1,186.72 S/ 1,187.20 S/ - S/ -
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76 S/ - S/ 1,033.19 S/ 1,033.19 S/ 1,033.19
0205350001 AGUA m3 S/ 1,368.63 S/ - S/ - S/ - S/ -
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00 S/ - S/ - S/ - S/ -
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88 S/ - S/ - S/ - S/ -
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18 S/ - S/ 2,352.33 S/ 2,352.33 S/ 2,352.33
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 S/ 1,783.95 S/ 2,141.60 S/ 2,141.60 S/ -
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33 S/ - S/ - S/ - S/ 36,305.75
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68

CAM26
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230010032 CORDEL m S/ 922.03
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80

CAM27
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230990049 CILINDRO CON ARENA und S/ 64.41
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 S/ 1,984.48 S/ 2,382.33 S/ 2,382.33 S/ -

CAM28
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0238100001 AFIRMADO m3 S/ 39,205.70 S/ 8,164.59 S/ 9,801.42 S/ - S/ -
0243010001 MADERA TORNILLO p2 S/ 133,765.32 S/ - S/ 33,441.33 S/ 33,441.33 S/ 33,441.33
0243010002 MADERA TORNILLO - A glb S/ 2,940.00 S/ - S/ - S/ - S/ -
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00 S/ - S/ - S/ - S/ -
0243010004 MADERA TORNILLO - C glb S/ 1,540.00 S/ - S/ - S/ - S/ -
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71 S/ - S/ 553.31 S/ 553.31 S/ 553.31
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 S/ 3,863.60 S/ 4,638.17 S/ 4,638.17 S/ -
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13

CAM29
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53

CAM30
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52
SALDO
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 S/ - S/ -
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70 S/ - S/ 1,158.43 S/ 1,158.43 S/ 1,158.43
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66 S/ - S/ - S/ - S/ -
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24 S/ - S/ - S/ - S/ -
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07 S/ - S/ - S/ - S/ -
2300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69 S/ - S/ 57.10 S/ 57.10 S/ 57.10
0009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 S/ 0.26 S/ 0.31 S/ 0.31 S/ -
02350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98 S/ - S/ - S/ - S/ 895.35
50081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56 S/ 44.42 S/ 53.32 S/ 99.98 S/ 99.98
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31 S/ - S/ - S/ - S/ -
02350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88 S/ - S/ - S/ 152.72 S/ 152.72
PERNO 5/8" und S/ 57.89 S/ 2.41 S/ 2.89 S/ 2.89 S/ 2.89
0202350085 PERNO 1 1/4' x 12" und S/ 598.40 S/ - S/ 89.76 S/ 89.76 S/ 89.76
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 S/ 13.74 S/ 16.50 S/ 16.50 S/ -
087 PERNO 1/2' A36 x 4" und S/ 25.06 S/ - S/ - S/ - S/ 3.76
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14 S/ 0.74 S/ 0.89 S/ 1.67 S/ 1.67

CAM31
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


02350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05 S/ - S/ - S/ - S/ -
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13 S/ - S/ - S/ 280.28 S/ 280.28
350091 TUERCA DE 3/8" und S/ 62.78 S/ 2.61 S/ 3.14 S/ 3.14 S/ 3.14
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 S/ 41.27 S/ 41.28 S/ - S/ -
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40 S/ - S/ 183.60 S/ 183.60 S/ 183.60
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60 S/ - S/ - S/ - S/ -
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82 S/ - S/ - S/ - S/ -
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55 S/ - S/ - S/ - S/ -
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08 S/ - S/ 994.21 S/ 994.21 S/ 994.21
0203010020 ACERO LISO DE 1" m S/ 161.83 S/ 33.70 S/ 40.46 S/ 40.46 S/ -
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35 S/ - S/ - S/ - S/ 270.35
0203010022 ACERO LISO DE 3/8' m S/ 644.91 S/ 42.98 S/ 51.59 S/ 96.74 S/ 96.74
0203010023 ACERO LISO DE 3/4" m S/ 633.70 S/ - S/ - S/ - S/ -
0204050001 ARENA GRUESA m3 S/ 14,604.83 S/ - S/ - S/ 3,651.21 S/ 3,651.21
0204050002 ARENA FINA m3 S/ 0.10 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94 S/ - S/ 7,896.29 S/ 7,896.29 S/ 7,896.29
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 S/ 1,257.54 S/ 1,509.65 S/ 1,509.65 S/ -
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21 S/ - S/ - S/ - S/ 19.23
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 S/ 1,186.72 S/ 1,187.20 S/ - S/ -

CAM32
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76 S/ - S/ 1,033.19 S/ 1,033.19 S/ 1,033.19
0205350001 AGUA m3 S/ 1,368.63 S/ - S/ - S/ - S/ -
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00 S/ - S/ - S/ - S/ -
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88 S/ - S/ - S/ - S/ -
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18 S/ - S/ 2,352.33 S/ 2,352.33 S/ 2,352.33
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 S/ 1,783.95 S/ 2,141.60 S/ 2,141.60 S/ -
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33 S/ - S/ - S/ - S/ 36,305.75
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22

CAM33
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64

CAM34
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 S/ 1,984.48 S/ 2,382.33 S/ 2,382.33 S/ -
0238100001 AFIRMADO m3 S/ 39,205.70 S/ 9,797.50 S/ 9,801.42 S/ - S/ -
0243010001 MADERA TORNILLO p2 S/ 133,765.32 S/ - S/ 33,441.33 S/ 33,441.33 S/ 33,441.33
0243010002 MADERA TORNILLO - A glb S/ 2,940.00 S/ - S/ - S/ - S/ -
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00 S/ - S/ - S/ - S/ -
0243010004 MADERA TORNILLO - C glb S/ 1,540.00 S/ - S/ - S/ - S/ -
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71 S/ - S/ 553.31 S/ 553.31 S/ 553.31
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 S/ 3,863.60 S/ 4,638.17 S/ 4,638.17 S/ -
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67

CAM35
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25

CAM36
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52
MEJORA
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 S/ 1.79 S/ 1.79 S/ - S/ -
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70 S/ - S/ 1,158.43 S/ 1,158.43 S/ 1,158.43
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66 S/ - S/ - S/ - S/ -
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24 S/ - S/ - S/ - S/ -
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07 S/ - S/ - S/ - S/ -
2300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69 S/ - S/ 57.10 S/ 57.10 S/ 57.10

CAM37
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 S/ 0.26 S/ 0.31 S/ 0.31 S/ -
02350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98 S/ - S/ - S/ - S/ 895.35
50081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56 S/ 44.42 S/ 53.32 S/ 99.98 S/ 99.98
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31 S/ - S/ - S/ - S/ -
02350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88 S/ - S/ - S/ 152.72 S/ 152.72
PERNO 5/8" und S/ 57.89 S/ 2.41 S/ 2.89 S/ 2.89 S/ 2.89
0202350085 PERNO 1 1/4' x 12" und S/ 598.40 S/ - S/ 89.76 S/ 89.76 S/ 89.76
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 S/ 13.74 S/ 16.50 S/ 16.50 S/ -
087 PERNO 1/2' A36 x 4" und S/ 25.06 S/ - S/ - S/ - S/ 3.76
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14 S/ 0.74 S/ 0.89 S/ 1.67 S/ 1.67
02350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05 S/ - S/ - S/ - S/ -
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13 S/ - S/ - S/ 280.28 S/ 280.28
350091 TUERCA DE 3/8" und S/ 62.78 S/ 2.61 S/ 3.14 S/ 3.14 S/ 3.14
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 S/ 41.27 S/ 41.28 S/ - S/ -
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40 S/ - S/ 183.60 S/ 183.60 S/ 183.60
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60 S/ - S/ - S/ - S/ -
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82 S/ - S/ - S/ - S/ -
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55 S/ - S/ - S/ - S/ -
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08 S/ - S/ 994.21 S/ 994.21 S/ 994.21

CAM38
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0203010020 ACERO LISO DE 1" m S/ 161.83 S/ 33.70 S/ 40.46 S/ 40.46 S/ -
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35 S/ - S/ - S/ - S/ 270.35
0203010022 ACERO LISO DE 3/8' m S/ 644.91 S/ 42.98 S/ 51.59 S/ 96.74 S/ 96.74
0203010023 ACERO LISO DE 3/4" m S/ 633.70 S/ - S/ - S/ - S/ -
0204050001 ARENA GRUESA m3 S/ 14,604.83 S/ - S/ - S/ 3,651.21 S/ 3,651.21
0204050002 ARENA FINA m3 S/ 0.10 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94 S/ - S/ 7,896.29 S/ 7,896.29 S/ 7,896.29
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 S/ 1,257.54 S/ 1,509.65 S/ 1,509.65 S/ -
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21 S/ - S/ - S/ - S/ 19.23
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 S/ 1,186.72 S/ 1,187.20 S/ - S/ -
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76 S/ - S/ 1,033.19 S/ 1,033.19 S/ 1,033.19
0205350001 AGUA m3 S/ 1,368.63 S/ - S/ - S/ - S/ -
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00 S/ - S/ - S/ - S/ -
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88 S/ - S/ - S/ - S/ -
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18 S/ - S/ 2,352.33 S/ 2,352.33 S/ 2,352.33
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 S/ 1,783.95 S/ 2,141.60 S/ 2,141.60 S/ -
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33 S/ - S/ - S/ - S/ 36,305.75
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37

CAM39
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98

CAM40
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42

CAM41
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0238010001 HORMIGON m3 S/ 9,529.34 S/ 1,984.48 S/ 2,382.33 S/ 2,382.33 S/ -
0238100001 AFIRMADO m3 S/ 39,205.70 S/ 9,797.50 S/ 9,801.42 S/ - S/ -
0243010001 MADERA TORNILLO p2 S/ 133,765.32 S/ - S/ 33,441.33 S/ 33,441.33 S/ 33,441.33
0243010002 MADERA TORNILLO - A glb S/ 2,940.00 S/ - S/ - S/ - S/ -
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00 S/ - S/ - S/ - S/ -
0243010004 MADERA TORNILLO - C glb S/ 1,540.00 S/ - S/ - S/ - S/ -
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71 S/ - S/ 553.31 S/ 553.31 S/ 553.31
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 S/ 3,863.60 S/ 4,638.17 S/ 4,638.17 S/ -
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92

CAM42
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72

CAM43
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52
DEFICIENCIA
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 S/ 1.79 S/ 1.79 S/ - S/ -
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70 S/ - S/ 1,158.43 S/ 1,158.43 S/ 1,158.43
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66 S/ - S/ - S/ - S/ -
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24 S/ - S/ - S/ - S/ -
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07 S/ - S/ - S/ - S/ -
2300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69 S/ - S/ 57.10 S/ 57.10 S/ 57.10
0009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 S/ 0.26 S/ 0.31 S/ 0.31 S/ -
02350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98 S/ - S/ - S/ - S/ 895.35
50081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56 S/ 44.42 S/ 53.32 S/ 99.98 S/ 99.98
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31 S/ - S/ - S/ - S/ -
02350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88 S/ - S/ - S/ 152.72 S/ 152.72
PERNO 5/8" und S/ 57.89 S/ 2.41 S/ 2.89 S/ 2.89 S/ 2.89
0202350085 PERNO 1 1/4' x 12" und S/ 598.40 S/ - S/ 89.76 S/ 89.76 S/ 89.76
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 S/ 13.74 S/ 16.50 S/ 16.50 S/ -
087 PERNO 1/2' A36 x 4" und S/ 25.06 S/ - S/ - S/ - S/ 3.76

CAM44
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14 S/ 0.74 S/ 0.89 S/ 1.67 S/ 1.67
02350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05 S/ - S/ - S/ - S/ -
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13 S/ - S/ - S/ 280.28 S/ 280.28
350091 TUERCA DE 3/8" und S/ 62.78 S/ 2.61 S/ 3.14 S/ 3.14 S/ 3.14
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 S/ 41.27 S/ 41.28 S/ - S/ -
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40 S/ - S/ 183.60 S/ 183.60 S/ 183.60
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60 S/ - S/ - S/ - S/ -
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82 S/ - S/ - S/ - S/ -
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55 S/ - S/ - S/ - S/ -
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08 S/ - S/ 994.21 S/ 994.21 S/ 994.21
0203010020 ACERO LISO DE 1" m S/ 161.83 S/ 33.70 S/ 40.46 S/ 40.46 S/ -
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35 S/ - S/ - S/ - S/ 270.35
0203010022 ACERO LISO DE 3/8' m S/ 644.91 S/ 42.98 S/ 51.59 S/ 96.74 S/ 96.74
0203010023 ACERO LISO DE 3/4" m S/ 633.70 S/ - S/ - S/ - S/ -
0204050001 ARENA GRUESA m3 S/ 14,604.83 S/ - S/ - S/ 3,651.21 S/ 3,651.21
0204050002 ARENA FINA m3 S/ 0.10 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94 S/ - S/ 7,896.29 S/ 7,896.29 S/ 7,896.29
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 S/ 1,257.54 S/ 1,509.65 S/ 1,509.65 S/ -
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21 S/ - S/ - S/ - S/ 19.23

CAM45
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 S/ 1,186.72 S/ 1,187.20 S/ - S/ -
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76 S/ - S/ 1,033.19 S/ 1,033.19 S/ 1,033.19
0205350001 AGUA m3 S/ 1,368.63 S/ - S/ - S/ - S/ -
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00 S/ - S/ - S/ - S/ -
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88 S/ - S/ - S/ - S/ -
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18 S/ - S/ 2,352.33 S/ 2,352.33 S/ 2,352.33
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 S/ 1,783.95 S/ 2,141.60 S/ 2,141.60 S/ -
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33 S/ - S/ - S/ - S/ 36,305.75
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64

CAM46
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64

CAM47
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 S/ 1,984.48 S/ 2,382.33 S/ 2,382.33 S/ -
0238100001 AFIRMADO m3 S/ 39,205.70 S/ 9,797.50 S/ 9,801.42 S/ - S/ -
0243010001 MADERA TORNILLO p2 S/ 133,765.32 S/ - S/ 33,441.33 S/ 33,441.33 S/ 33,441.33
0243010002 MADERA TORNILLO - A glb S/ 2,940.00 S/ - S/ - S/ - S/ -
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00 S/ - S/ - S/ - S/ -
0243010004 MADERA TORNILLO - C glb S/ 1,540.00 S/ - S/ - S/ - S/ -
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71 S/ - S/ 553.31 S/ 553.31 S/ 553.31
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 S/ 3,863.60 S/ 4,638.17 S/ 4,638.17 S/ -
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48

CAM48
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24

CAM49
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52

TOTAL S/5,189,520.62 S/ 97,021.06 S/350,119.08 S/313,886.05 S/447,713.11


ARQUITECTURA
SUSTITUCIÓN
0202050031 FIERRO LISO 1/2" m S/ 35.93 S/ - S/ 8.98 S/ 8.98 S/ 8.98
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26 S/ - S/ - S/ - S/ -

CAM50
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80 S/ - S/ - S/ - S/ -
0202100004 ALAMBRE GALV.#16 kg S/ 108.67 S/ - S/ - S/ 27.17 S/ 21.73
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84 S/ 290.27 S/ 348.46 S/ - S/ -
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46 S/ - S/ 4.12 S/ 4.12 S/ 4.12
0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75 S/ - S/ - S/ - S/ -
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30 S/ - S/ - S/ - S/ -
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84 S/ - S/ - S/ - S/ -
0202350050 ARANDELA 1/2" und S/ 0.12 S/ - S/ 0.02 S/ 0.02 S/ 0.02
0202350083 TORNILLO 3/8" und S/ 50.16 S/ 10.45 S/ 12.54 S/ 12.54 S/ -
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80 S/ - S/ - S/ - S/ 16.47
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32 S/ 3.89 S/ 4.67 S/ 8.75 S/ 8.75
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60 S/ - S/ - S/ - S/ -
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90 S/ - S/ - S/ 2.72 S/ 2.72
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60 S/ 2.36 S/ 2.83 S/ 2.83 S/ 2.83
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86 S/ 1.43 S/ 1.71 S/ 1.71 S/ -
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65 S/ 2.59 S/ 4.66 S/ 6.21 S/ 7.77
0202400062 TARUGO 1" X 1/2" und S/ 369.09 S/ - S/ - S/ - S/ -
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70 S/ - S/ - S/ - S/ -
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16 S/ - S/ - S/ - S/ -
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83 S/ - S/ 2.67 S/ 2.67 S/ 2.67
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGO DE PLASTICO und S/ 2.60 S/ 0.54 S/ 0.65 S/ 0.65 S/ -
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68 S/ - S/ - S/ - S/ 0.70
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23 S/ 8.61 S/ 10.34 S/ 19.38 S/ 19.38

CAM51
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51 S/ - S/ - S/ - S/ -
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70 S/ 1.15 S/ 1.39 S/ 1.39 S/ 1.39
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75 S/ 1.22 S/ 1.47 S/ 2.21 S/ 2.21
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50 S/ - S/ - S/ 3.38 S/ 2.70
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00 S/ 20.83 S/ 25.00 S/ - S/ -
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71 S/ - S/ 0.18 S/ 0.18 S/ 0.18
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31 S/ - S/ - S/ - S/ -
0204050001 ARENA GRUESA m3 S/ 6,093.86 S/ - S/ - S/ - S/ -
0204050002 ARENA FINA S/ 11,373.27 S/ - S/ - S/ - S/ -
0204100001 TIERRA DE CHACRA S/ 8,564.35 S/ - S/ 1,284.65 S/ 1,284.65 S/ 1,284.65
0204100026 GRASS AMERICANO m2 S/ 9,050.46 S/ 1,884.76 S/ 2,262.61 S/ 2,262.61 S/ -
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24 S/ - S/ - S/ - S/ 2,978.59
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41 S/ 0.96 S/ 1.15 S/ 2.16 S/ 2.16
0205350001 AGUA m3 S/ 1,652.76 S/ 344.19 S/ 413.19 S/ 413.19 S/ -
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35 S/ -
0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59 S/ -
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45 S/ -
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50 S/ -
0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUARZOSA Y PINTADO DE LINEAS m2 S/ 208,162.94 S/ -
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO C/AC m2 S/ 11,780.45 S/ -
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+SUP m2 S/ 15,110.46 S/ -
0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+SUP m2 S/ 47,740.29 S/ -
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. PR m2 S/ 19,577.12 S/ -

CAM52
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. PIVOTANT m2 S/ 4,734.76 S/ -
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+COR m2 S/ 2,415.98 S/ -
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mm C/PERFILES ALUM m2 S/ 3,703.01 S/ -
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.0 mm, DE 6 HOJAS, INC. TODOS LOS ACC m2 S/ 1,873.43 S/ -
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 y 6 mm, DE 2 HOJAS, INC. TODOS LOS A m2 S/ 1,959.24 S/ -
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON CRISTAL TEMPLADO DE 8mm COLOR GRAFI m2 S/ 1,730.54 S/ -
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_113 O SIMILAR CON CRISTAL TEMPLADO D m2 S/ 118.84 S/ -
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01 S/ -
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70 S/ -
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90 S/ -
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81 S/ -
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LOSA DE POLIDEPORTIVO m2 S/ 44,784.47 S/ - S/ - S/ - S/ -
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE LINEAS LADRILLO KK TIPO IV 24X13X m2 S/ 157,467.84 S/ 32,792.68 S/ 39,366.96 S/ 39,366.96 S/ -
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28 S/ - S/ - S/ - S/ 13,733.59
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10 S/ 26.80 S/ 32.17 S/ 60.32 S/ 60.32
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67 S/ - S/ - S/ - S/ -
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88 S/ - S/ - S/ 32,015.97 S/ 32,015.97
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32 S/ 0.35 S/ 0.42 S/ 0.42 S/ 0.42
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14 S/ 574.38 S/ 689.53 S/ 689.53 S/ -
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03 S/ 51.21 S/ 92.22 S/ 122.96 S/ 153.70
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25 S/ - S/ - S/ - S/ -
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91 S/ - S/ - S/ - S/ -
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03 S/ - S/ - S/ - S/ -

CAM53
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0224100017 CERAMICO m2 S/ 5.78 S/ - S/ 0.87 S/ 0.87 S/ 0.87
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81 S/ 32.03 S/ 38.45 S/ 38.45 S/ -
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64 S/ - S/ - S/ - S/ 106.90
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40 S/ 73.33 S/ 88.03 S/ 165.06 S/ 165.06
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL O SIMILAR pza S/ 134.09 S/ - S/ - S/ - S/ -
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16 S/ 0.80 S/ 0.96 S/ 0.96 S/ 0.96
0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIOR pza S/ 21.15 S/ 0.70 S/ 0.85 S/ 1.27 S/ 1.27
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25 S/ - S/ - S/ 67.06 S/ 53.65
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84 S/ 31.00 S/ 37.21 S/ - S/ -
0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34 S/ - S/ 158.59 S/ 158.59 S/ 158.59
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78 S/ - S/ - S/ - S/ -
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03 S/ 11.67 S/ 14.01 S/ 14.01 S/ -
0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPORTE Y PERNO DE FIJACION und S/ 349.15 S/ - S/ - S/ - S/ 52.37
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64 S/ 34.56 S/ 41.49 S/ 77.80 S/ 77.80
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58 S/ - S/ - S/ - S/ -
0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 m und S/ 317.80 S/ - S/ - S/ 79.45 S/ 79.45
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96 S/ 32.40 S/ 38.90 S/ 38.90 S/ 38.90
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98 S/ 81.01 S/ 97.25 S/ 97.25 S/ -
0226300033 CERROJO 2" pza S/ 84.26 S/ 2.81 S/ 5.06 S/ 6.74 S/ 8.43
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47 S/ - S/ - S/ - S/ -
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77 S/ - S/ - S/ - S/ -
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJAS pza S/ 63.34 S/ - S/ - S/ - S/ -
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34 S/ - S/ 3.80 S/ 3.80 S/ 3.80

CAM54
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46 S/ 7.38 S/ 8.87 S/ 8.87 S/ -
0226500005 MECANISMO DE IZAJE und S/ 4.37 S/ - S/ - S/ - S/ 0.65
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40 S/ -
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61 S/ -
0230010015 AGUARRAS gal S/ 454.15 S/ -
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44 S/ -
0230010025 LIJA PARA FIERRO und S/ 114.48 S/ -
0230010035 THINNER gal S/ 8.62 S/ -
0230010080 RODOPLAST 6mm m S/ 545.96 S/ -
0230010104 BASE ZINCROMATO gal S/ 280.68 S/ -
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36 S/ -
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75 S/ -
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58 S/ -
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55 S/ -
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21 S/ -
0230010150 FRAGUA X 1 KG und S/ 4,140.15 S/ -
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38 S/ -
0230010162 LIJA PARA MADERA und S/ 3,682.57 S/ -
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23 S/ -
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04 S/ -
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03 S/ -
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 15 cm m_x000D_ S/ 1,634.50 S/ -
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37 S/ -

CAM55
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59 S/ -
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADO 1.20 x 2.40 m C/BANDEJA DE ALUMINIO und_x000D_ S/ 13,029.50 S/ -
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97 S/ -
0230010192 SELLADOR PARA MADERA gal S/ 1,238.36 S/ -
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO C/BARRA ANTIPANICO, BATIENTE DE 2 H m2 S/ 2,951.74 S/ -
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑOS, ANCHO= 0.50 m, INC. ANCLAJES und S/ 832.39 S/ -
0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00 S/ -
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87 S/ -
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000D_ S/ 355.95 S/ -
0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kg/m' pln S/ 148.95 S/ -
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68 S/ -
0230100002 SOLDADURA kg S/ 0.39 S/ -
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19 S/ -
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03 S/ -
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12 S/ -
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24 S/ -
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53 S/ -
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38 S/ -
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPINTADO C/AZUL; INC. ELEM. DE SOPORTE m2 S/ 28,702.26 S/ -
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01 S/ -
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA CON PARED, INC. ELEM. DE FIJACIÓN m2 S/ 1,222.87 S/ -
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09 S/ -
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE INC. ACCESORIOS - PATIO m2_x000D_ S/ 5,897.43 S/ -

CAM56
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE INC. ACCESORIOS - TRIBUNAS m2 S/ 21,785.89 S/ -
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE - ESTRADO m2 S/ 859.09 S/ -
0230300002 CUERDA DE NYLON m S/ 1.17 S/ -
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85 S/ -
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58 S/ -
0230410094 ESPEJO BISELADO m2 S/ 1,788.39 S/ -
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68 S/ -
0230990175 WATER STOP DE 6"x25m rll S/ 177.24 S/ -
0238010001 HORMIGON m3 S/ 345.84 S/ - S/ - S/ - S/ -
0243010001 MADERA TORNILLO p2 S/ 89,826.90 S/ - S/ - S/ 22,456.72 S/ 22,456.72
0243100001 MADERA CEDRO p2 S/ 23,992.75 S/ 999.30 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
243100025 COLA SINTETICA gal S/ 174.35 S/ 36.31 S/ 43.59 S/ 43.59 S/ -
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20 S/ 152.91 S/ 275.35 S/ 367.14 S/ 458.92
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84 S/ - S/ - S/ - S/ -
244040017 PLANCHA MDF e=3MM m2 S/ 42.20 S/ - S/ - S/ - S/ -
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31 S/ -
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09 S/ -
0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37 S/ -
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42 S/ -
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94 S/ -
0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63 S/ -
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77 S/ -
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39 S/ -

CAM57
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34 S/ -
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31 S/ -
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65 S/ -
0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11 S/ -
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62 S/ -
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81 S/ -
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44 S/ -
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62 S/ -
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45 S/ -
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79 S/ -
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66 S/ -
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65 S/ -
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54 S/ -
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34 S/ -
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85 S/ -
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26 S/ -
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33 S/ -
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99 S/ -
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20 S/ -
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91 S/ -
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44 S/ -
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18 S/ -
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88 S/ -

CAM58
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06 S/ -
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55 S/ -
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31 S/ -
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66 S/ -
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39 S/ -
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62 S/ -
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10 S/ -
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70 S/ -
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63 S/ -
254010005 PINTURA LATEX gal S/ 8,516.06 S/ -
254010006 PRESERVANTE DE MADERA gal S/ 225.62 S/ -
254100005 BARNIZ MARINO gal S/ 18.51 S/ -
254150020 PINTURA ESMALTE gal S/ 152.14 S/ -
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50 S/ -
254150033 PINTURA OLEO MATE . gal S/ 11,500.04 S/ -
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18 S/ -
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07 S/ -
254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11 S/ -
254200001 PINTURA ANTICORROSIVA gal S/ 179.77 S/ -
254300001 PINTURA PARA TRAFICO gal S/ 413.05 S/ -
254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00 S/ -
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68 S/ -
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86 S/ -

CAM59
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58 S/ -
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34 S/ -
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30 S/ -
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86 S/ -
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87 S/ -
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04 S/ -
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63 S/ -
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36 S/ -
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61 S/ -
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27 S/ -
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71 S/ -
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11 S/ -
265010030 TUBERIA FºGº 11/2" m S/ 163.89 S/ -
265010046 TUBERIA FºGº 1" m S/ 1,218.74 S/ -
265010058 TUBERIA FºGº 2" m S/ 400.87 S/ -
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69 S/ -
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77 S/ -
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23 S/ -
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27 S/ -
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55 S/ -
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89 S/ -
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INSTALAC m S/ 13,481.12 S/ -
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38 S/ 11.22 S/ 13.47 S/ 25.26 S/ 25.26

CAM60
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17 S/ -
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29 S/ -
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03 S/ -
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50 S/ -
SALDO S/ -
0202050031 FIERRO LISO 1/2" m S/ 35.93 S/ - S/ 8.98 S/ 8.98 S/ 8.98
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26 S/ - S/ - S/ - S/ -
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80 S/ - S/ - S/ - S/ -
0202100004 ALAMBRE GALV.#16 kg S/ 108.67 S/ - S/ - S/ 27.17 S/ 21.73
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84 S/ 290.27 S/ 348.46 S/ - S/ -
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46 S/ - S/ 4.12 S/ 4.12 S/ 4.12
0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75 S/ - S/ - S/ - S/ -
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30 S/ - S/ - S/ - S/ -
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84 S/ - S/ - S/ - S/ -
0202350050 ARANDELA 1/2" und S/ 0.12 S/ - S/ 0.02 S/ 0.02 S/ 0.02
0202350083 TORNILLO 3/8" und S/ 50.16 S/ 10.45 S/ 12.54 S/ 12.54 S/ -
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80 S/ - S/ - S/ - S/ 16.47
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32 S/ 3.89 S/ 4.67 S/ 8.75 S/ 8.75
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60 S/ - S/ - S/ - S/ -
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90 S/ - S/ - S/ 2.72 S/ 2.72
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60 S/ 2.36 S/ 2.83 S/ 2.83 S/ 2.83
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86 S/ 1.43 S/ 1.71 S/ 1.71 S/ -
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65 S/ 2.59 S/ 4.66 S/ 6.21 S/ 7.77

CAM61
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0202400062 TARUGO 1" X 1/2" und S/ 369.09 S/ - S/ - S/ - S/ -
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70 S/ - S/ - S/ - S/ -
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16 S/ - S/ - S/ - S/ -
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83 S/ - S/ 2.67 S/ 2.67 S/ 2.67
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGO DE PLASTICO und S/ 2.60 S/ 0.54 S/ 0.65 S/ 0.65 S/ -
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68 S/ - S/ - S/ - S/ 0.70
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23 S/ 8.61 S/ 10.34 S/ 19.38 S/ 19.38
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51 S/ - S/ - S/ - S/ -
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70 S/ 1.15 S/ 1.39 S/ 1.39 S/ 1.39
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75 S/ 1.22 S/ 1.47 S/ 2.21 S/ 2.21
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50 S/ - S/ - S/ 3.38 S/ 2.70
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00 S/ 20.83 S/ 25.00 S/ - S/ -
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71 S/ - S/ 0.18 S/ 0.18 S/ 0.18
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31 S/ - S/ - S/ - S/ -
0204050001 ARENA GRUESA m3 S/ 6,093.86 S/ - S/ - S/ - S/ -
0204050002 ARENA FINA S/ 11,373.27 S/ - S/ - S/ - S/ -
0204100001 TIERRA DE CHACRA S/ 8,564.35 S/ - S/ 1,284.65 S/ 1,284.65 S/ 1,284.65
0204100026 GRASS AMERICANO m2 S/ 9,050.46 S/ 1,884.76 S/ 2,262.61 S/ 2,262.61 S/ -
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24 S/ - S/ - S/ - S/ 2,978.59
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41 S/ 0.96 S/ 1.15 S/ 2.16 S/ 2.16
0205350001 AGUA m3 S/ 1,652.76 S/ 344.19 S/ 413.19 S/ 413.19 S/ -
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35 S/ -
0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59 S/ -

CAM62
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45 S/ -
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50 S/ -
0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUARZOSA Y PINTADO DE LINEAS m2 S/ 208,162.94 S/ -
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO C/AC m2 S/ 11,780.45 S/ -
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+SUP m2 S/ 15,110.46 S/ -
0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+SUP m2 S/ 47,740.29 S/ -
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. PR m2 S/ 19,577.12 S/ -
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. PIVOTANT m2 S/ 4,734.76 S/ -
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+COR m2 S/ 2,415.98 S/ -
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mm C/PERFILES ALUM m2 S/ 3,703.01 S/ -
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.0 mm, DE 6 HOJAS, INC. TODOS LOS ACC m2 S/ 1,873.43 S/ -
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 y 6 mm, DE 2 HOJAS, INC. TODOS LOS A m2 S/ 1,959.24 S/ -
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON CRISTAL TEMPLADO DE 8mm COLOR GRAFI m2 S/ 1,730.54 S/ -
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_113 O SIMILAR CON CRISTAL TEMPLADO D m2 S/ 118.84 S/ -
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01 S/ -
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70 S/ -
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90 S/ -
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81 S/ -
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LOSA DE POLIDEPORTIVO m2 S/ 44,784.47 S/ - S/ - S/ - S/ -
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE LINEAS LADRILLO KK TIPO IV 24X13X m2 S/ 157,467.84 S/ 32,792.68 S/ 39,366.96 S/ 39,366.96 S/ -
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28 S/ - S/ - S/ - S/ 13,733.59
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10 S/ 26.80 S/ 32.17 S/ 60.32 S/ 60.32
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67 S/ - S/ - S/ - S/ -

CAM63
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88 S/ - S/ - S/ 32,015.97 S/ 32,015.97
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32 S/ 0.35 S/ 0.42 S/ 0.42 S/ 0.42
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14 S/ 574.38 S/ 689.53 S/ 689.53 S/ -
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03 S/ 51.21 S/ 92.22 S/ 122.96 S/ 153.70
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25 S/ - S/ - S/ - S/ -
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91 S/ - S/ - S/ - S/ -
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03 S/ - S/ - S/ - S/ -
0224100017 CERAMICO m2 S/ 5.78 S/ - S/ 0.87 S/ 0.87 S/ 0.87
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81 S/ 32.03 S/ 38.45 S/ 38.45 S/ -
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64 S/ - S/ - S/ - S/ 106.90
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40 S/ 73.33 S/ 88.03 S/ 165.06 S/ 165.06
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL O SIMILAR pza S/ 134.09 S/ - S/ - S/ - S/ -
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16 S/ 0.80 S/ 0.96 S/ 0.96 S/ 0.96
0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIOR pza S/ 21.15 S/ 0.70 S/ 0.85 S/ 1.27 S/ 1.27
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25 S/ - S/ - S/ 67.06 S/ 53.65
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84 S/ 31.00 S/ 37.21 S/ - S/ -
0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34 S/ - S/ 158.59 S/ 158.59 S/ 158.59
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78 S/ - S/ - S/ - S/ -
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03 S/ 11.67 S/ 14.01 S/ 14.01 S/ -
0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPORTE Y PERNO DE FIJACION und S/ 349.15 S/ - S/ - S/ - S/ 52.37
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64 S/ 34.56 S/ 41.49 S/ 77.80 S/ 77.80
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58 S/ - S/ - S/ - S/ -
0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 m und S/ 317.80 S/ - S/ - S/ 79.45 S/ 79.45

CAM64
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96 S/ 32.40 S/ 38.90 S/ 38.90 S/ 38.90
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98 S/ 81.01 S/ 97.25 S/ 97.25 S/ -
0226300033 CERROJO 2" pza S/ 84.26 S/ 2.81 S/ 5.06 S/ 6.74 S/ 8.43
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47 S/ - S/ - S/ - S/ -
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77 S/ - S/ - S/ - S/ -
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJAS pza S/ 63.34 S/ - S/ - S/ - S/ -
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34 S/ - S/ 3.80 S/ 3.80 S/ 3.80
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46 S/ 7.38 S/ 8.87 S/ 8.87 S/ -
0226500005 MECANISMO DE IZAJE und S/ 4.37 S/ - S/ - S/ - S/ 0.65
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40 S/ -
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61 S/ -
0230010015 AGUARRAS gal S/ 454.15 S/ -
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44 S/ -
0230010025 LIJA PARA FIERRO und S/ 114.48 S/ -
0230010035 THINNER gal S/ 8.62 S/ -
0230010080 RODOPLAST 6mm m S/ 545.96 S/ -
0230010104 BASE ZINCROMATO gal S/ 280.68 S/ -
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36 S/ -
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75 S/ -
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58 S/ -
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55 S/ -
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21 S/ -
0230010150 FRAGUA X 1 KG und S/ 4,140.15 S/ -

CAM65
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38 S/ -
0230010162 LIJA PARA MADERA und S/ 3,682.57 S/ -
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23 S/ -
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04 S/ -
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03 S/ -
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 15 cm m_x000D_ S/ 1,634.50 S/ -
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37 S/ -
0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59 S/ -
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADO 1.20 x 2.40 m C/BANDEJA DE ALUMINIO und_x000D_ S/ 13,029.50 S/ -
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97 S/ -
0230010192 SELLADOR PARA MADERA gal S/ 1,238.36 S/ -
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO C/BARRA ANTIPANICO, BATIENTE DE 2 H m2 S/ 2,951.74 S/ -
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑOS, ANCHO= 0.50 m, INC. ANCLAJES und S/ 832.39 S/ -
0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00 S/ -
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87 S/ -
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000D_ S/ 355.95 S/ -
0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kg/m' pln S/ 148.95 S/ -
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68 S/ -
0230100002 SOLDADURA kg S/ 0.39 S/ -
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19 S/ -
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03 S/ -
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12 S/ -
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24 S/ -

CAM66
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53 S/ -
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38 S/ -
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPINTADO C/AZUL; INC. ELEM. DE SOPORTE m2 S/ 28,702.26 S/ -
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01 S/ -
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA CON PARED, INC. ELEM. DE FIJACIÓN m2 S/ 1,222.87 S/ -
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09 S/ -
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE INC. ACCESORIOS - PATIO m2_x000D_ S/ 5,897.43 S/ -
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE INC. ACCESORIOS - TRIBUNAS m2 S/ 21,785.89 S/ -
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE - ESTRADO m2 S/ 859.09 S/ -
0230300002 CUERDA DE NYLON m S/ 1.17 S/ -
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85 S/ -
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58 S/ -
0230410094 ESPEJO BISELADO m2 S/ 1,788.39 S/ -
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68 S/ -
0230990175 WATER STOP DE 6"x25m rll S/ 177.24 S/ -
0238010001 HORMIGON m3 S/ 345.84 S/ - S/ - S/ - S/ -
0243010001 MADERA TORNILLO p2 S/ 89,826.90 S/ - S/ - S/ 22,456.72 S/ 22,456.72
0243100001 MADERA CEDRO p2 S/ 23,992.75 S/ 999.30 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
243100025 COLA SINTETICA gal S/ 174.35 S/ 36.31 S/ 43.59 S/ 43.59 S/ -
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20 S/ 152.91 S/ 275.35 S/ 367.14 S/ 458.92
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84 S/ - S/ - S/ - S/ -
244040017 PLANCHA MDF e=3MM m2 S/ 42.20 S/ - S/ - S/ - S/ -
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31 S/ -

CAM67
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09 S/ -
0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37 S/ -
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42 S/ -
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94 S/ -
0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63 S/ -
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77 S/ -
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39 S/ -
0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34 S/ -
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31 S/ -
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65 S/ -
0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11 S/ -
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62 S/ -
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81 S/ -
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44 S/ -
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62 S/ -
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45 S/ -
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79 S/ -
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66 S/ -
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65 S/ -
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54 S/ -
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34 S/ -
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85 S/ -
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26 S/ -

CAM68
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33 S/ -
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99 S/ -
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20 S/ -
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91 S/ -
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44 S/ -
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18 S/ -
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88 S/ -
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06 S/ -
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55 S/ -
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31 S/ -
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66 S/ -
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39 S/ -
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62 S/ -
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10 S/ -
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70 S/ -
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63 S/ -
254010005 PINTURA LATEX gal S/ 8,516.06 S/ -
254010006 PRESERVANTE DE MADERA gal S/ 225.62 S/ -
254100005 BARNIZ MARINO gal S/ 18.51 S/ -
254150020 PINTURA ESMALTE gal S/ 152.14 S/ -
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50 S/ -
254150033 PINTURA OLEO MATE . gal S/ 11,500.04 S/ -
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18 S/ -

CAM69
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07 S/ -
254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11 S/ -
254200001 PINTURA ANTICORROSIVA gal S/ 179.77 S/ -
254300001 PINTURA PARA TRAFICO gal S/ 413.05 S/ -
254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00 S/ -
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68 S/ -
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86 S/ -
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58 S/ -
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34 S/ -
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30 S/ -
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86 S/ -
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87 S/ -
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04 S/ -
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63 S/ -
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36 S/ -
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61 S/ -
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27 S/ -
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71 S/ -
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11 S/ -
265010030 TUBERIA FºGº 11/2" m S/ 163.89 S/ -
265010046 TUBERIA FºGº 1" m S/ 1,218.74 S/ -
265010058 TUBERIA FºGº 2" m S/ 400.87 S/ -
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69 S/ -

CAM70
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77 S/ -
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23 S/ -
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27 S/ -
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55 S/ -
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89 S/ -
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INSTALAC m S/ 13,481.12 S/ -
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38 S/ 11.22 S/ 13.47 S/ 25.26 S/ 25.26
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17 S/ -
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29 S/ -
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03 S/ -
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50 S/ -
MEJORA S/ -
0202050031 FIERRO LISO 1/2" m S/ 35.93 S/ - S/ 8.98 S/ 8.98 S/ 8.98
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26 S/ - S/ - S/ - S/ -
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80 S/ - S/ - S/ - S/ -
0202100004 ALAMBRE GALV.#16 kg S/ 108.67 S/ - S/ - S/ 27.17 S/ 21.73
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84 S/ 290.27 S/ 348.46 S/ - S/ -
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46 S/ - S/ 4.12 S/ 4.12 S/ 4.12
0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75 S/ - S/ - S/ - S/ -
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30 S/ - S/ - S/ - S/ -
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84 S/ - S/ - S/ - S/ -
0202350050 ARANDELA 1/2" und S/ 0.12 S/ - S/ 0.02 S/ 0.02 S/ 0.02
0202350083 TORNILLO 3/8" und S/ 50.16 S/ 10.45 S/ 12.54 S/ 12.54 S/ -

CAM71
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0202350116 TORNILLO DE FIJACION 1" und S/ 109.80 S/ - S/ - S/ - S/ 16.47
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32 S/ 3.89 S/ 4.67 S/ 8.75 S/ 8.75
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60 S/ - S/ - S/ - S/ -
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90 S/ - S/ - S/ 2.72 S/ 2.72
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60 S/ 2.36 S/ 2.83 S/ 2.83 S/ 2.83
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86 S/ 1.43 S/ 1.71 S/ 1.71 S/ -
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65 S/ 2.59 S/ 4.66 S/ 6.21 S/ 7.77
0202400062 TARUGO 1" X 1/2" und S/ 369.09 S/ - S/ - S/ - S/ -
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70 S/ - S/ - S/ - S/ -
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16 S/ - S/ - S/ - S/ -
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83 S/ - S/ 2.67 S/ 2.67 S/ 2.67
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGO DE PLASTICO und S/ 2.60 S/ 0.54 S/ 0.65 S/ 0.65 S/ -
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68 S/ - S/ - S/ - S/ 0.70
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23 S/ 8.61 S/ 10.34 S/ 19.38 S/ 19.38
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51 S/ - S/ - S/ - S/ -
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70 S/ 1.15 S/ 1.39 S/ 1.39 S/ 1.39
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75 S/ 1.22 S/ 1.47 S/ 2.21 S/ 2.21
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50 S/ - S/ - S/ 3.38 S/ 2.70
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00 S/ 20.83 S/ 25.00 S/ - S/ -
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71 S/ - S/ 0.18 S/ 0.18 S/ 0.18
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31 S/ - S/ - S/ - S/ -
0204050001 ARENA GRUESA m3 S/ 6,093.86 S/ - S/ - S/ - S/ -
0204050002 ARENA FINA S/ 11,373.27 S/ - S/ - S/ - S/ -

CAM72
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0204100001 TIERRA DE CHACRA S/ 8,564.35 S/ - S/ 1,284.65 S/ 1,284.65 S/ 1,284.65
0204100026 GRASS AMERICANO m2 S/ 9,050.46 S/ 1,884.76 S/ 2,262.61 S/ 2,262.61 S/ -
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24 S/ - S/ - S/ - S/ 2,978.59
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41 S/ 0.96 S/ 1.15 S/ 2.16 S/ 2.16
0205350001 AGUA m3 S/ 1,652.76 S/ 344.19 S/ 413.19 S/ 413.19 S/ -
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35 S/ -
0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59 S/ -
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45 S/ -
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50 S/ -
0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUARZOSA Y PINTADO DE LINEAS m2 S/ 208,162.94 S/ -
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO C/AC m2 S/ 11,780.45 S/ -
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+SUP m2 S/ 15,110.46 S/ -
0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+SUP m2 S/ 47,740.29 S/ -
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. PR m2 S/ 19,577.12 S/ -
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. PIVOTANT m2 S/ 4,734.76 S/ -
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+COR m2 S/ 2,415.98 S/ -
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mm C/PERFILES ALUM m2 S/ 3,703.01 S/ -
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.0 mm, DE 6 HOJAS, INC. TODOS LOS ACC m2 S/ 1,873.43 S/ -
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 y 6 mm, DE 2 HOJAS, INC. TODOS LOS A m2 S/ 1,959.24 S/ -
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON CRISTAL TEMPLADO DE 8mm COLOR GRAFI m2 S/ 1,730.54 S/ -
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_113 O SIMILAR CON CRISTAL TEMPLADO D m2 S/ 118.84 S/ -
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01 S/ -
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70 S/ -

CAM73
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90 S/ -
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81 S/ -
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LOSA DE POLIDEPORTIVO m2 S/ 44,784.47 S/ - S/ - S/ - S/ -
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE LINEAS LADRILLO KK TIPO IV 24X13X m2 S/ 157,467.84 S/ 32,792.68 S/ 39,366.96 S/ 39,366.96 S/ -
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28 S/ - S/ - S/ - S/ 13,733.59
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10 S/ 26.80 S/ 32.17 S/ 60.32 S/ 60.32
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67 S/ - S/ - S/ - S/ -
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88 S/ - S/ - S/ 32,015.97 S/ 32,015.97
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32 S/ 0.35 S/ 0.42 S/ 0.42 S/ 0.42
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14 S/ 574.38 S/ 689.53 S/ 689.53 S/ -
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03 S/ 51.21 S/ 92.22 S/ 122.96 S/ 153.70
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25 S/ - S/ - S/ - S/ -
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91 S/ - S/ - S/ - S/ -
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03 S/ - S/ - S/ - S/ -
0224100017 CERAMICO m2 S/ 5.78 S/ - S/ 0.87 S/ 0.87 S/ 0.87
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81 S/ 32.03 S/ 38.45 S/ 38.45 S/ -
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64 S/ - S/ - S/ - S/ 106.90
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40 S/ 73.33 S/ 88.03 S/ 165.06 S/ 165.06
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL O SIMILAR pza S/ 134.09 S/ - S/ - S/ - S/ -
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16 S/ 0.80 S/ 0.96 S/ 0.96 S/ 0.96
0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIOR pza S/ 21.15 S/ 0.70 S/ 0.85 S/ 1.27 S/ 1.27
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25 S/ - S/ - S/ 67.06 S/ 53.65
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84 S/ 31.00 S/ 37.21 S/ - S/ -

CAM74
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34 S/ - S/ 158.59 S/ 158.59 S/ 158.59
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78 S/ - S/ - S/ - S/ -
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03 S/ 11.67 S/ 14.01 S/ 14.01 S/ -
0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPORTE Y PERNO DE FIJACION und S/ 349.15 S/ - S/ - S/ - S/ 52.37
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64 S/ 34.56 S/ 41.49 S/ 77.80 S/ 77.80
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58 S/ - S/ - S/ - S/ -
0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 m und S/ 317.80 S/ - S/ - S/ 79.45 S/ 79.45
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96 S/ 32.40 S/ 38.90 S/ 38.90 S/ 38.90
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98 S/ 81.01 S/ 97.25 S/ 97.25 S/ -
0226300033 CERROJO 2" pza S/ 84.26 S/ 2.81 S/ 5.06 S/ 6.74 S/ 8.43
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47 S/ - S/ - S/ - S/ -
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77 S/ - S/ - S/ - S/ -
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJAS pza S/ 63.34 S/ - S/ - S/ - S/ -
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34 S/ - S/ 3.80 S/ 3.80 S/ 3.80
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46 S/ 7.38 S/ 8.87 S/ 8.87 S/ -
0226500005 MECANISMO DE IZAJE und S/ 4.37 S/ - S/ - S/ - S/ 0.65
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40 S/ -
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61 S/ -
0230010015 AGUARRAS gal S/ 454.15 S/ -
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44 S/ -
0230010025 LIJA PARA FIERRO und S/ 114.48 S/ -
0230010035 THINNER gal S/ 8.62 S/ -
0230010080 RODOPLAST 6mm m S/ 545.96 S/ -

CAM75
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230010104 BASE ZINCROMATO gal S/ 280.68 S/ -
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36 S/ -
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75 S/ -
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58 S/ -
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55 S/ -
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21 S/ -
0230010150 FRAGUA X 1 KG und S/ 4,140.15 S/ -
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38 S/ -
0230010162 LIJA PARA MADERA und S/ 3,682.57 S/ -
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23 S/ -
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04 S/ -
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03 S/ -
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 15 cm m_x000D_ S/ 1,634.50 S/ -
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37 S/ -
0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59 S/ -
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADO 1.20 x 2.40 m C/BANDEJA DE ALUMINIO und_x000D_ S/ 13,029.50 S/ -
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97 S/ -
0230010192 SELLADOR PARA MADERA gal S/ 1,238.36 S/ -
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO C/BARRA ANTIPANICO, BATIENTE DE 2 H m2 S/ 2,951.74 S/ -
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑOS, ANCHO= 0.50 m, INC. ANCLAJES und S/ 832.39 S/ -
0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00 S/ -
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87 S/ -
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000D_ S/ 355.95 S/ -

CAM76
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kg/m' pln S/ 148.95 S/ -
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68 S/ -
0230100002 SOLDADURA kg S/ 0.39 S/ -
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19 S/ -
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03 S/ -
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12 S/ -
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24 S/ -
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53 S/ -
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38 S/ -
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPINTADO C/AZUL; INC. ELEM. DE SOPORTE m2 S/ 28,702.26 S/ -
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01 S/ -
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA CON PARED, INC. ELEM. DE FIJACIÓN m2 S/ 1,222.87 S/ -
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09 S/ -
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE INC. ACCESORIOS - PATIO m2_x000D_ S/ 5,897.43 S/ -
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE INC. ACCESORIOS - TRIBUNAS m2 S/ 21,785.89 S/ -
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE - ESTRADO m2 S/ 859.09 S/ -
0230300002 CUERDA DE NYLON m S/ 1.17 S/ -
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85 S/ -
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58 S/ -
0230410094 ESPEJO BISELADO m2 S/ 1,788.39 S/ -
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68 S/ -
0230990175 WATER STOP DE 6"x25m rll S/ 177.24 S/ -
0238010001 HORMIGON m3 S/ 345.84 S/ - S/ - S/ - S/ -

CAM77
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0243010001 MADERA TORNILLO p2 S/ 89,826.90 S/ - S/ - S/ 22,456.72 S/ 22,456.72
0243100001 MADERA CEDRO p2 S/ 23,992.75 S/ 999.30 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
243100025 COLA SINTETICA gal S/ 174.35 S/ 36.31 S/ 43.59 S/ 43.59 S/ -
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20 S/ 152.91 S/ 275.35 S/ 367.14 S/ 458.92
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84 S/ - S/ - S/ - S/ -
244040017 PLANCHA MDF e=3MM m2 S/ 42.20 S/ - S/ - S/ - S/ -
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31 S/ -
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09 S/ -
0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37 S/ -
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42 S/ -
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94 S/ -
0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63 S/ -
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77 S/ -
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39 S/ -
0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34 S/ -
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31 S/ -
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65 S/ -
0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11 S/ -
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62 S/ -
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81 S/ -
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44 S/ -
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62 S/ -
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45 S/ -

CAM78
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79 S/ -
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66 S/ -
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65 S/ -
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54 S/ -
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34 S/ -
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85 S/ -
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26 S/ -
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33 S/ -
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99 S/ -
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20 S/ -
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91 S/ -
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44 S/ -
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18 S/ -
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88 S/ -
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06 S/ -
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55 S/ -
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31 S/ -
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66 S/ -
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39 S/ -
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62 S/ -
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10 S/ -
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70 S/ -
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63 S/ -

CAM79
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


254010005 PINTURA LATEX gal S/ 8,516.06 S/ -
254010006 PRESERVANTE DE MADERA gal S/ 225.62 S/ -
254100005 BARNIZ MARINO gal S/ 18.51 S/ -
254150020 PINTURA ESMALTE gal S/ 152.14 S/ -
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50 S/ -
254150033 PINTURA OLEO MATE . gal S/ 11,500.04 S/ -
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18 S/ -
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07 S/ -
254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11 S/ -
254200001 PINTURA ANTICORROSIVA gal S/ 179.77 S/ -
254300001 PINTURA PARA TRAFICO gal S/ 413.05 S/ -
254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00 S/ -
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68 S/ -
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86 S/ -
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58 S/ -
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34 S/ -
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30 S/ -
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86 S/ -
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87 S/ -
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04 S/ -
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63 S/ -
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36 S/ -
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61 S/ -

CAM80
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27 S/ -
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71 S/ -
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11 S/ -
265010030 TUBERIA FºGº 11/2" m S/ 163.89 S/ -
265010046 TUBERIA FºGº 1" m S/ 1,218.74 S/ -
265010058 TUBERIA FºGº 2" m S/ 400.87 S/ -
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69 S/ -
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77 S/ -
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23 S/ -
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27 S/ -
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55 S/ -
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89 S/ -
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INSTALAC m S/ 13,481.12 S/ -
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38 S/ 11.22 S/ 13.47 S/ 25.26 S/ 25.26
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17 S/ -
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29 S/ -
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03 S/ -
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50 S/ -
DEFICIENCIA
0202050031 FIERRO LISO 1/2" m S/ 35.93 S/ - S/ 8.98 S/ 8.98 S/ 8.98
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26 S/ - S/ - S/ - S/ -
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80 S/ - S/ - S/ - S/ -
0202100004 ALAMBRE GALV.#16 kg S/ 108.67 S/ - S/ - S/ 27.17 S/ 21.73

CAM81
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84 S/ 290.27 S/ 348.46 S/ - S/ -
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46 S/ - S/ 4.12 S/ 4.12 S/ 4.12
0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75 S/ - S/ - S/ - S/ -
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30 S/ - S/ - S/ - S/ -
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84 S/ - S/ - S/ - S/ -
0202350050 ARANDELA 1/2" und S/ 0.12 S/ - S/ 0.02 S/ 0.02 S/ 0.02
0202350083 TORNILLO 3/8" und S/ 50.16 S/ 10.45 S/ 12.54 S/ 12.54 S/ -
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80 S/ - S/ - S/ - S/ 16.47
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32 S/ 3.89 S/ 4.67 S/ 8.75 S/ 8.75
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60 S/ - S/ - S/ - S/ -
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90 S/ - S/ - S/ 2.72 S/ 2.72
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60 S/ 2.36 S/ 2.83 S/ 2.83 S/ 2.83
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86 S/ 1.43 S/ 1.71 S/ 1.71 S/ -
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65 S/ 2.59 S/ 4.66 S/ 6.21 S/ 7.77
0202400062 TARUGO 1" X 1/2" und S/ 369.09 S/ - S/ - S/ - S/ -
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70 S/ - S/ - S/ - S/ -
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16 S/ - S/ - S/ - S/ -
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83 S/ - S/ 2.67 S/ 2.67 S/ 2.67
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGO DE PLASTICO und S/ 2.60 S/ 0.54 S/ 0.65 S/ 0.65 S/ -
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68 S/ - S/ - S/ - S/ 0.70
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23 S/ 8.61 S/ 10.34 S/ 19.38 S/ 19.38
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51 S/ - S/ - S/ - S/ -
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70 S/ 1.15 S/ 1.39 S/ 1.39 S/ 1.39

CAM82
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75 S/ 1.22 S/ 1.47 S/ 2.21 S/ 2.21
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50 S/ - S/ - S/ 3.38 S/ 2.70
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00 S/ 20.83 S/ 25.00 S/ - S/ -
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71 S/ - S/ 0.18 S/ 0.18 S/ 0.18
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31 S/ - S/ - S/ - S/ -
0204050001 ARENA GRUESA m3 S/ 6,093.86 S/ - S/ - S/ - S/ -
0204050002 ARENA FINA S/ 11,373.27 S/ - S/ - S/ - S/ -
0204100001 TIERRA DE CHACRA S/ 8,564.35 S/ - S/ 1,284.65 S/ 1,284.65 S/ 1,284.65
0204100026 GRASS AMERICANO m2 S/ 9,050.46 S/ 1,884.76 S/ 2,262.61 S/ 2,262.61 S/ -
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24 S/ - S/ - S/ - S/ 2,978.59
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41 S/ 0.96 S/ 1.15 S/ 2.16 S/ 2.16
0205350001 AGUA m3 S/ 1,652.76 S/ 344.19 S/ 413.19 S/ 413.19 S/ -
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35 S/ -
0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59 S/ -
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45 S/ -
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50 S/ -
0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUARZOSA Y PINTADO DE LINEAS m2 S/ 208,162.94 S/ -
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO C/AC m2 S/ 11,780.45 S/ -
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+SUP m2 S/ 15,110.46 S/ -
0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+SUP m2 S/ 47,740.29 S/ -
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. PR m2 S/ 19,577.12 S/ -
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. PIVOTANT m2 S/ 4,734.76 S/ -
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRISTAL TEMPLADO DE 6mm SIST. FIJO+COR m2 S/ 2,415.98 S/ -

CAM83
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mm C/PERFILES ALUM m2 S/ 3,703.01 S/ -
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.0 mm, DE 6 HOJAS, INC. TODOS LOS ACC m2 S/ 1,873.43 S/ -
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 y 6 mm, DE 2 HOJAS, INC. TODOS LOS A m2 S/ 1,959.24 S/ -
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON CRISTAL TEMPLADO DE 8mm COLOR GRAFI m2 S/ 1,730.54 S/ -
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_113 O SIMILAR CON CRISTAL TEMPLADO D m2 S/ 118.84 S/ -
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01 S/ -
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70 S/ -
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90 S/ -
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81 S/ -
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LOSA DE POLIDEPORTIVO m2 S/ 44,784.47 S/ - S/ - S/ - S/ -
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE LINEAS LADRILLO KK TIPO IV 24X13X m2 S/ 157,467.84 S/ 32,792.68 S/ 39,366.96 S/ 39,366.96 S/ -
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28 S/ - S/ - S/ - S/ 13,733.59
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10 S/ 26.80 S/ 32.17 S/ 60.32 S/ 60.32
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67 S/ - S/ - S/ - S/ -
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88 S/ - S/ - S/ 32,015.97 S/ 32,015.97
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32 S/ 0.35 S/ 0.42 S/ 0.42 S/ 0.42
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14 S/ 574.38 S/ 689.53 S/ 689.53 S/ -
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03 S/ 51.21 S/ 92.22 S/ 122.96 S/ 153.70
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25 S/ - S/ - S/ - S/ -
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91 S/ - S/ - S/ - S/ -
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03 S/ - S/ - S/ - S/ -
0224100017 CERAMICO m2 S/ 5.78 S/ - S/ 0.87 S/ 0.87 S/ 0.87
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81 S/ 32.03 S/ 38.45 S/ 38.45 S/ -

CAM84
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64 S/ - S/ - S/ - S/ 106.90
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40 S/ 73.33 S/ 88.03 S/ 165.06 S/ 165.06
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL O SIMILAR pza S/ 134.09 S/ - S/ - S/ - S/ -
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16 S/ 0.80 S/ 0.96 S/ 0.96 S/ 0.96
0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIOR pza S/ 21.15 S/ 0.70 S/ 0.85 S/ 1.27 S/ 1.27
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25 S/ - S/ - S/ 67.06 S/ 53.65
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84 S/ 31.00 S/ 37.21 S/ - S/ -
0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34 S/ - S/ 158.59 S/ 158.59 S/ 158.59
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78 S/ - S/ - S/ - S/ -
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03 S/ 11.67 S/ 14.01 S/ 14.01 S/ -
0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPORTE Y PERNO DE FIJACION und S/ 349.15 S/ - S/ - S/ - S/ 52.37
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64 S/ 34.56 S/ 41.49 S/ 77.80 S/ 77.80
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58 S/ - S/ - S/ - S/ -
0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 m und S/ 317.80 S/ - S/ - S/ 79.45 S/ 79.45
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96 S/ 32.40 S/ 38.90 S/ 38.90 S/ 38.90
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98 S/ 81.01 S/ 97.25 S/ 97.25 S/ -
0226300033 CERROJO 2" pza S/ 84.26 S/ 2.81 S/ 5.06 S/ 6.74 S/ 8.43
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47 S/ - S/ - S/ - S/ -
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77 S/ - S/ - S/ - S/ -
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJAS pza S/ 63.34 S/ - S/ - S/ - S/ -
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34 S/ - S/ 3.80 S/ 3.80 S/ 3.80
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46 S/ 7.38 S/ 8.87 S/ 8.87 S/ -
0226500005 MECANISMO DE IZAJE und S/ 4.37 S/ - S/ - S/ - S/ 0.65

CAM85
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40 S/ -
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61 S/ -
0230010015 AGUARRAS gal S/ 454.15 S/ -
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44 S/ -
0230010025 LIJA PARA FIERRO und S/ 114.48 S/ -
0230010035 THINNER gal S/ 8.62 S/ -
0230010080 RODOPLAST 6mm m S/ 545.96 S/ -
0230010104 BASE ZINCROMATO gal S/ 280.68 S/ -
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36 S/ -
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75 S/ -
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58 S/ -
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55 S/ -
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21 S/ -
0230010150 FRAGUA X 1 KG und S/ 4,140.15 S/ -
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38 S/ -
0230010162 LIJA PARA MADERA und S/ 3,682.57 S/ -
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23 S/ -
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04 S/ -
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03 S/ -
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 15 cm m_x000D_ S/ 1,634.50 S/ -
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37 S/ -
0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59 S/ -
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADO 1.20 x 2.40 m C/BANDEJA DE ALUMINIO und_x000D_ S/ 13,029.50 S/ -

CAM86
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97 S/ -
0230010192 SELLADOR PARA MADERA gal S/ 1,238.36 S/ -
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO C/BARRA ANTIPANICO, BATIENTE DE 2 H m2 S/ 2,951.74 S/ -
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑOS, ANCHO= 0.50 m, INC. ANCLAJES und S/ 832.39 S/ -
0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00 S/ -
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87 S/ -
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000D_ S/ 355.95 S/ -
0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kg/m' pln S/ 148.95 S/ -
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68 S/ -
0230100002 SOLDADURA kg S/ 0.39 S/ -
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19 S/ -
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03 S/ -
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12 S/ -
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24 S/ -
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53 S/ -
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38 S/ -
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPINTADO C/AZUL; INC. ELEM. DE SOPORTE m2 S/ 28,702.26 S/ -
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01 S/ -
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA CON PARED, INC. ELEM. DE FIJACIÓN m2 S/ 1,222.87 S/ -
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09 S/ -
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE INC. ACCESORIOS - PATIO m2_x000D_ S/ 5,897.43 S/ -
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE INC. ACCESORIOS - TRIBUNAS m2 S/ 21,785.89 S/ -
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE - ESTRADO m2 S/ 859.09 S/ -

CAM87
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0230300002 CUERDA DE NYLON m S/ 1.17 S/ -
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85 S/ -
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58 S/ -
0230410094 ESPEJO BISELADO m2 S/ 1,788.39 S/ -
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68 S/ -
0230990175 WATER STOP DE 6"x25m rll S/ 177.24 S/ -
0238010001 HORMIGON m3 S/ 345.84 S/ - S/ - S/ - S/ -
0243010001 MADERA TORNILLO p2 S/ 89,826.90 S/ - S/ - S/ 22,456.72 S/ 22,456.72
0243100001 MADERA CEDRO p2 S/ 23,992.75 S/ 999.30 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
243100025 COLA SINTETICA gal S/ 174.35 S/ 36.31 S/ 43.59 S/ 43.59 S/ -
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20 S/ 152.91 S/ 275.35 S/ 367.14 S/ 458.92
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84 S/ - S/ - S/ - S/ -
244040017 PLANCHA MDF e=3MM m2 S/ 42.20 S/ - S/ - S/ - S/ -
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31 S/ -
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09 S/ -
0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37 S/ -
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42 S/ -
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94 S/ -
0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63 S/ -
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77 S/ -
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39 S/ -
0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34 S/ -
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31 S/ -

CAM88
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65 S/ -
0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11 S/ -
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62 S/ -
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81 S/ -
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44 S/ -
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62 S/ -
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45 S/ -
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79 S/ -
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66 S/ -
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65 S/ -
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54 S/ -
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34 S/ -
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85 S/ -
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26 S/ -
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33 S/ -
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99 S/ -
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20 S/ -
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91 S/ -
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44 S/ -
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18 S/ -
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88 S/ -
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06 S/ -
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55 S/ -

CAM89
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31 S/ -
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66 S/ -
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39 S/ -
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62 S/ -
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10 S/ -
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70 S/ -
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63 S/ -
254010005 PINTURA LATEX gal S/ 8,516.06 S/ -
254010006 PRESERVANTE DE MADERA gal S/ 225.62 S/ -
254100005 BARNIZ MARINO gal S/ 18.51 S/ -
254150020 PINTURA ESMALTE gal S/ 152.14 S/ -
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50 S/ -
254150033 PINTURA OLEO MATE . gal S/ 11,500.04 S/ -
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18 S/ -
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07 S/ -
254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11 S/ -
254200001 PINTURA ANTICORROSIVA gal S/ 179.77 S/ -
254300001 PINTURA PARA TRAFICO gal S/ 413.05 S/ -
254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00 S/ -
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68 S/ -
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86 S/ -
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58 S/ -
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34 S/ -

CAM90
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30 S/ -
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86 S/ -
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87 S/ -
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04 S/ -
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63 S/ -
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36 S/ -
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61 S/ -
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27 S/ -
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71 S/ -
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11 S/ -
265010030 TUBERIA FºGº 11/2" m S/ 163.89 S/ -
265010046 TUBERIA FºGº 1" m S/ 1,218.74 S/ -
265010058 TUBERIA FºGº 2" m S/ 400.87 S/ -
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69 S/ -
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77 S/ -
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23 S/ -
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27 S/ -
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55 S/ -
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89 S/ -
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INSTALAC m S/ 13,481.12 S/ -
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38 S/ 11.22 S/ 13.47 S/ 25.26 S/ 25.26
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17 S/ -
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29 S/ -

CAM91
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03 S/ -
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50

TOTAL S/5,801,396.27 S/150,104.32 S/186,555.80 S/404,700.32 S/300,884.94


LACIONES SANITARIAS
SALDO
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 1,198.76
202100002 ALAMBRE NEGRO Nro.16 kg S/ 1,341.30
202200001 CLAVOS CON CABEZA DE 21/2 , 3", 4" kg S/ 858.42
202200003 CLAVOS CON CABEZA DE 3" kg S/ 123.87
202350071 VARILLA ROSCADA DE 1/2" und S/ 133.64
202350072 BROCA 3/4" X 8" und S/ 1,505.02
202350073 COLGADOR METALICO S/ DISEÑO und S/ 3,196.16
202350074 TUERCA DE 1/2" und S/ 75.15
202350075 ACERO CORRUGADO GRADO 60 kg S/ 25,645.27
202350076 ARENA GRUESA m3 S/ 3,663.27
204050002 ARENA FINA m3 S/ 10,749.72 S/ - S/ - S/ - S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 13,044.92
205050036 GRAVA DE 1/2" m3 S/ 1,258.18
205050037 GRAVA DE 5/8" m3 S/ 6,880.11
205350001 AGUA m3 S/ 562.54
206200026 TRAMPA DE GRASA und S/ 5,271.30

CAM92
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


206200032 TRAMPA DE SOLIDOS und S/ 1,986.49
210050011 URINARIO CADET BLANCO. und S/ 14,278.50
210050041 LAVATORIO LOSA BLANCA DE TIPO OVALIN CLASSIC INC._x000D_ TUBO DE ABASTO Y TRAMPA P und S/ 19,115.35
210050042 LAVATORIO LOSA BLANCA DE TIPO FONTANA INC. TUBO DE ABASTO Y TRAMPA P und S/ 386.68
210050043 INODORO ADULTO NAC. LOSA VITRIFI BLANCO P/FLUXOMETRO INC. ASIENTO Y ACC. DE FIJACION und S/ 34,409.76
210050044 INODORO SIFÓN JET DE LOSA 1ra CALIDAD ADULTO TIPO_x000D_ SISTEMA DUAL und S/ 237.29
210050045 PORTA ROLLO METALICO INC. ACC. P/INSTALACION und S/ 10,722.60
210050046 DISPENSADOR DE JABON LIQUIDO INC. ACC. PilNSTALACION und S/ 2,375.00
210050047 DISPENSADOR DE PAPEL TOALLA INC. ACC. P/INSTALACION und S/ 995.52
210050048 GANCHO METALICO PORTA MULETAS INC. ACC._x000D_P/INSTALACION und S/ 2,491.58
210050049 GANCHO DOBLE DE LOSA INC. ACC P/INSTALACION und S/ 1,044.16
210050050 JABONERA DE LOSA DE SOBREPONER INC. ACC._x000D_ P/INSTALACION S/ 1,104.40
210150022 LAVAD. ACERO INOX. 1 POZA C/ESC 21"X38" und S/ 385.82
210150023 LAVAD. ACERO INOX. 02 POZAS C/ESC 21"X54" und S/ 1,256.06
210150024 LAVAD. ACERO INOX. 1 POZA S/ESC 21"X20" und S/ 2,882.18
210300047 GRIFERIA MEZCLADORA PARA DUCHA und S/ 5,162.73
210300049 GRIFERIA PARA DUCHA CROMADA 1 LLAVE INC ACC und S/ 648.00
210300050 FLUXOMETRO CROMADO DE MANIJA und S/ 26,052.75
210350020 LLAVE DE LAVADERO PICO GIRATORIO UECO CROMADA und S/ 1,112.02
210350088 LLAVE PARA LAVATORIO DE 1i2" CON TEMPORIZADOR und S/ 2,993.26
210350089 LLAVE DE MANIJA LARGA AL MUEBLE und S/ 7,070.28
210350090 LLAVE DE LAVADERO PICO GIRATORIO AF y AG UECO_x000D_CROMADA und S/ 348.80
210350091 GRIFERIA DE 1/2" und S/ 586.53

CAM93
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


210350094 SUM. E INST. DE ELECTROBOMBAS PRES. CTE Y VELOC. VAR (Q:3.25 1/s, HDT:35m. POT. APROX. 4.0 HP) und S/ 6,939.00
210350095 SUM. E INST. DE ELECTROBOMBAS PRES. CTE Y VELOC. VAR. (Q:3.00 lis, HDT:48m. POT. APROX. 4.0 HP) und S/ 6,737.28
210350096 SUM. E INST. DE ELECTROBOMBAS SUMERGIBLES (Q:3.00 lis, HDT:10m. POT. APROX. 1.0 HP) und S/ 2,913.06
210350097 SUM. E INST. DE ELECTROBOMBA CON TRAMPA DE PELOS RECIRCULACION (Q:9.76 lis, HDT:25m. POT. APROX. 7.5 und S/ 17,702.61
210350098 SUM. E INST. DE ELECTROBOMBA CON TRAMPA DE PELOS_x000D_ ASPIRACION (Q:5.0 lis, HDT:20m. POT. APROX. 3. und S/ 1,666.13
210350099 SUM. E INST. DE ELECTROBOMBA CON TRAMPA DE PELOS CALENTAMIENTO SOLAR (Q:3.60 lis, HDT:45m. POT. APRO und S/ 10,968.68
210350100 SUM. E INST. DE ELECTROBOMBA DOSIFICADORA DE CLORO_x000D_ (Q:1.00 l/s, HDT:35m. POT. APROX. 1.5 HP) und S/ 2,707.46
210350101 CLORINADOR DE PASTILLA TIPO PENTAR und S/ 1,138.52
210350102 SUM. E INST. DE ELECTROBOMBAS SUMERGIBLES (Q:3.00 l/s,_x000D_HDT:8.00m. POT. APROX. 1.0 HP) und S/ 2,913.06
210350103 CAÑON EMERGENTE AUTOMATIZADO (RADIO 40M, 4BAR) und S/ 37,810.14
210350104 SUM. E INST. DE ELECTROBOMBAS PRES. CTE Y VELOC. VAR._x000D_(Q:3.80 I/s, HDT:38m. POT. APROX. 4.0 HP) und S/ 13,474.56
210350105 SUM. E INST. EQ. BOMBEO; 02 ELECTROBOMBAS_x000D_ CENTRIFUGAS (Q=2.33Ips, HDT=20.15m,POT.=1.50HP) und S/ 2,186.44
212050162 CONTROLADOR DIGITAL TERMOSTATICO und S/ 815.28
212250183 CONTROL DE NIVEL AUTOMATICO DE ARRANQUE Y PARADA DE BOMBAS und S/ 355.95
212250184 VISOR D=6" und S/ 438.17
212250185 VISOR D=4" und S/ 611.44
212250186 MANIFOLD D=8" L=3.00 m. und S/ 1,752.40
212250187 MANIFOLD D=8" L=1.30 m. und S/ 876.20
213150009 FRAGUA (BOLSA DE 1KG) bl S/ 2.76
213150014 PEGAMENTO EXTRAFUERTE PARA CERAMICOS Y PORCELANATOS X 25KG bl S/ 13.79
217100020 LADRILLO KK TIPO IV 24X13X09 CM und S/ 4,782.30
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 57,892.13 S/ - S/ - S/ - S/ -
221030017 MARCO Y TAPA DE BUZON DE CONCRETO D=0.60M und S/ 288.75 S/ - S/ - S/ - S/ -

CAM94
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 373.44 S/ - S/ - S/ - S/ -
230010003 PEGAMENTO PARA TUBERIA PVC qal S/ 6,370.19
233570001 PEGAMENTO PARA TUBERIA CPVC qal S/ 509.11
237129999 CAL (BOLSA X 20 kg) bl S/ 955.08
230010030 CINTA TEFLON m S/ 151.16
230010032 CORDEL m S/ 168.21
230010143 SELLADOR BLANCO PARA MUROS qal S/ 34.77
230010163 GEOMEMBRANA IMPERMEABLE 1 mm m2 S/ 88,347.47
230010167 GEOTEXTIL NO TEJIDO CLASE 2 m2 S/ 3,476.68
230010176 FLUXOMETRO PARA INODORO und S/ 51,063.39
230010177 PORCELANA TO 60X60 m2 S/ 402.65
230010178 TUBO BASTON PARA VENTILACION DE CISTERNA ACERO_x000D_ SCH-40 4" m S/ 201.60
230010179 THINNER ACRILICO qal S/ 0.66
230010193 SUMINISTRO PARA LA INSTALACION DE TUBERIAS Y CAÑONES EMERGENTES glb S/ 73,740.00
230020051 CARTUCHO DE EXPANSION 1/2"X 1 5/8" und S/ 480.36
230060002 SUM. E INST. DE CALENTADOR DE AGUA 50 LITROS und S/ 1,744.02
230060003 SUM. E INST. DE CALENTADOR DE AGUA 80 LITROS und S/ 2,777.91
230060004 SUM. E INST. DE CALENTADOR DE AGUA 110 LITROS und S/ 11,117.82
230060008 SUM. E INST. DE CALENTADOR DE AGUA 150 LITROS und S/ 9,883.88
230060009 CALENTADOR A GAS (400 000 BTU) und S/ 47,200.00
230060010 SUM. E INSTALACION DE COLECTOR SOLAR DE 5.00x1.20M und S/ 74,880.00
230060013 EQUIPOS DE LIMPIEZA DE PISCINA und S/ 2,766.12
230060015 TANQUE DE PRESIÓN CON MEMBRANA EQUIPADO, DE 50_x000D_ GALONES und S/ 3,355.92

CAM95
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


230060017 KIT DE ACCESORIOS Y VALVULAS-COLECTORES SOLARES und S/ 4,028.00
230060019 ELECTRODO TIPO 6011-CELLOCORD kg S/ 20,114.74
230300013 FILTRO DE ARENA DE 40" und S/ 14,058.00
230990153 HIPOCLORITO DE CALCIO 70% kg S/ 2,546.86
230990172 MANOMETRO GLICERINA 0 -100PSI, INC. VALVULA Y_x000D_ACCESORIOS und S/ 610.20
230990178 CERCO DE MALLA HOPE m S/ 3,853.33
230990179 POSTE DE CONCRETO Y MADERA und S/ 33,977.94
231250023 MARCO Y TAPA DE BUZON DE CONCRETO Ø=1.20M und S/ 12,160.00 S/ -
238010001 HORMIGON m3 S/ 23.63
238100001 AFIRMADO m3 S/ 3,605.90
243010001 MADERA TORNILLO p2 S/ 20,606.45
243010006 TRANQUERA TIPO BARANDA DE 2,40 X 1,20 m und S/ 512.00
243100001 MADERA CEDRO p2 S/ 6.10
251050024 PERFIL TEE 2"X 2" X 1/8" m S/ 32,884.00
251200099 PLATINA DE FIERRO 2" X 1/4" m S/ 235,576.85
251300054 TUBERIA DE Ø 2" ACEDRO CELULA 40 m S/ 502.80
251300055 TUBERIA DE Ø 1" ACEDRO CELULA 40 m S/ 18.70
251300058 TUBERIA SCH-40 Ø 2" m S/ 181.64
251300059 TUBERIA SCH-40 Ø 2 1/2" m S/ 256.00
251300060 TUBERIA SCH-40 Ø 4" m S/ 975.24
251300061 TUBERIA SCH-40 Ø 6" m S/ 2,725.87
251300062 TUBERIA SCH-40 Ø 8" m S/ 122.18
251300064 CODO Ø 2" ACEDRO CELULA 40 uno S/ 59.67

CAM96
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


251300065 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE 02" uno S/ 56.10
251300066 TUBERIA DE Ø 3" ACEDRO CELULA 40 m S/ 2,150.30
251300067 CODO Ø 2 1/2" ACEDRO CELULA 40 uno S/ 57.78
251300068 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE Ø 2_x000D_ 1/2" uno S/ 56.31
251300069 TEE Ø 3" X 2" ACEDRO CELULA 40 uno S/ 228.60
251300070 TUBERIA DE Ø 2 1/2" ACEDRO CELULA 40 m S/ 270.90
251300071 TEE Ø 3" ACEDRO CELULA 40 uno S/ 45.72
251300072 REDUCCION CONCENTRICA 3" A 1" und S/ 9.00
251300073 UNION UNIVERSAL Ø 2" ACEDRO CELULA 40 und S/ 70.46
251300074 UNION UNIVERSAL Ø 1" ACEDRO CELULA 40 und S/ 39.66
251300075 UNION UNIVERSAL Ø 3" ACEDRO CELULA 40 und S/ 452.08
251300076 UNION UNIVERSAL Ø 11/2" ACEDRO CELULA 40 und S/ 54.70
251300077 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE 06" und S/ 168.64
251300078 MALLA PARA SOLDAR DE 6" und S/ 12.16
251300079 CODO Ø 3" ACEDRO CELULA 40 und S/ 161.67
251300080 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE 03" und S/ 283.08
251300081 TUBERIA DE Ø 2 1/2" ACEDRO CELULA 40 m S/ 81.27
251300082 TEE Ø 2 1/2" ACEDRO CELULA 40 und S/ 35.10
251300083 TUBERIA DE 0 11/2" ACEDRO CELULA 40 m S/ 208.08
251300084 CODO 011/2" ACEDRO CELULA 40 und S/ 24.30
251300085 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE Ø 1_x000D_ 1/2" und S/ 24.57
251300093 TUBERIA HDPE DN 110MM (4") m S/ 1,154.43
251300095 TUBERIA HOPE DN 90MM (3") m S/ 4,132.36

CAM97
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


251300097 CODO 01" ACEDRO CELULA40 und S/ 3.45
251300098 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE 08" und S/ 67.74
251300099 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE 01" und S/ 5.30
251300100 REDUCCION EXCENTRICA ACERO SCH-40 1.1/2" A 1" S/ 5.28
251300101 REDUCCION EXCENTRICA ACERO SCH-40 1.1/2" A 3/4" und S/ 2.45
251300102 TEE Ø 11/2" ACEDRO CELULA 40 und S/ 7.92
251300103 TEE Ø 2" ACEDRO CELULA 40 und S/ 7.01
251300104 CODO Ø 3" X 45º ACEDRO CELULA 40 und S/ 11.66
251300106 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE Ø4" und S/ 28.31
251350008 SOPORTE METALICO und S/ 7,000.00
251350009 CORREDERA PARA SOSTEN DE TUBERIA und S/ 25.92
253300001 BREA gal S/ 333.63
254150020 PINTURA ESMALTE gal S/ 74.95
254200001 PINTURA ANTICORROSIVA gal S/ 4.00
254200002 PINTURA BASE ZINCROMATO ANTICORROSIVA gal S/ 19.53
257010031 TAPA METALICA PARA VALVULAS und S/ 2,684.00
257010032 TAPA REJILLA P/ INGRESO ACAMARA (0.85m x 0.85m APROX .) und S/ 300.00
261020037 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS PRES. CTE Y VELOC. VAR. (Q:3.25 I/s, HDT:35m. POT. APRO und S/ 5,338.98
261020038 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS PRES. CTE Y VELOC. VAR . (Q:3.00 I/s, HDT:48m. POT. AP und S/ 6,271.18
261020039 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS SUMERGIBLES (Q:3.00I/s, HDT:10m. POT. APROX. 1.0 HP und S/ 338.98
261020040 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS EN PISCINA S/ 3,089.28
261020041 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS SUMERGIBLES (Q:3.00 I/s, HDT 8.00m. POT. APROX. 1.0 und S/ 338.98
261020046 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS PRES. CTE Y VELOC.VAR. (Q:3.80 1/s, HDT:38m. POT. APR und S/ 12,542.38

CAM98
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


261020051 TABLERO DE CONTROL EQUIPADO PARA EQ. BOMBEO; 02 ELECTROBOMBAS CENTRIFUGAS (Q=2.33Ips, HDT=20.15m und S/ 932.20
261020053 ABRAZADERA DE SUJECION DE 1.1/2" und S/ 5.10
261020054 ABRAZADERA DE SUJECION DE FºGº 2 und S/ 6.78
261020055 ABRAZADERAS DE FIJACION DE FºGº 3" und S/ 15.47
265010048 TUBERIA FºGº 4" "STANDARD m S/ 39.78
265010049 TUBERIA FºGº 6" "STANDARD m S/ 469.00
265010057 CANALETA SEMICIRCULAR06" FºGº, e=1/27" (DRENAJE PLUVIAL) m S/ 51,838.22
265010071 CANALETA METALICA RECTANGULAR 06" FºGº, e=1/27" (DRENAJE PLUVIAL) m S/ 9,225.72
265010073 TAPON MACHO DE 1.1/2" FºGº und S/ 4.68
265010074 TAPON HEMBRA DE 3/4" FºGº und S/ 1.10
265010075 APOYO METALICOEN SOPORTE TEE Y CODO und S/ 75.00
265010076 TAPON DE 4" und S/ 5.62
265040003 CODO FºGº 1/2" X 90º und S/ 1.84
265250003 REJILLA DE FIERRO EN CAJA GRIFO und S/ 1,425.92
265250006 REJILLA METALICA PARA CAJA DE CONCRETO 030X0.60 und S/ 45.00
265250007 REJILLA METALICA PARA CAJA DE CONCRETO 030X0.40 und S/ 30.00
265560027 NIPLE FºGº 2" X 21/2" und S/ 53.06
265560034 NIPLE FºGº 3" x 2" und S/ 401.04
265560039 NIPLE FºGº 2" und S/ 51.52
265560040 NIPLE FºGº 1" und S/ 41.40
265560041 NIPLE FºGº 3/4" und S/ 50.88
265560042 NIPLE FºGº 1/2" und S/ 334.40
265560043 NIPLE FºGº 1 1/4" und S/ 74.70

CAM99
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


265560044 NIPLE FºGº 1 1/2" und S/ 103.20
265570030 UNION UNIVERSAL FºGº 1/2" und S/ 1,388.40
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 794.64
265570032 UNION UNIVERSAL FºGº 1" und S/ 333.00
265570033 UNION UNIVERSAL FºGº 1 1/4" und S/ 666.00
265570034 UNION UNIVERSAL FºGº 1 1/2" und S/ 868.56
265570036 UNION UNIVERSAL FºGº 2 1/2" und S/ 394.56
265570038 UNION UNIVERSAL FºGº 2" und S/ 768.56
265570039 UNION UNIVERSAL FºGº 3" und S/ 2,071.76
265570047 UNION UNIVERSAL DE HIERRO DUCTIL DE 75 mm und S/ 209.50
265570048 UNION UNIVERSAL DE HIERRO DUCTIL DE 110 mm und S/ 270.60
265590038 CODO FºGº 4" x 90º m S/ 32.30
265590039 CODO FºGº 6" x 90º m S/ 411.92
265590040 CODO FºGº 3/4" x 90º m S/ 45.60
268110004 SUMIDERO DE FONDO 4" CON REJILLA 12" m S/ 1,191.72
272210042 TUBERIA PVC-CLASE 10 1/2" x 5m ROSCADA m S/ 970.28 S/ 64.66 S/ 77.62 S/ 145.54 S/ 145.54
272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 1,555.23 S/ - S/ - S/ - S/ -
272210044 TUBERIA PVC-CLASE 10 1" x 5m ROSCADA m S/ 1,684.90 S/ 70.18 S/ 84.24 S/ 84.24 S/ 84.24
272210046 TUBERIA PVC-CLASE 10 1,1/2" x 5m ROSCADA m S/ 1,619.03 S/ 53.95 S/ 64.76 S/ 97.14 S/ 97.14
272210047 TUBERIA PVC-CLASE 10 2" x 5m ROSCADA m S/ 4,605.48 S/ - S/ - S/ 1,151.37 S/ 921.10
272210048 TUBERIA PVC-CLASE 10 2,1/2" x 5m ROSCADA m S/ 5,200.30 S/ 1,082.96 S/ 1,300.07 S/ - S/ -
272210049 TUBERIA PVC-CLASE 10 3" x 5m ROSCADA m S/ 862.94 S/ - S/ 215.73 S/ 215.73 S/ 215.73
272210051 TUBERIA PVC-CLASE 10 1,1/4" x 5m ROSCADA m S/ 4,348.96 S/ - S/ - S/ - S/ -

CAM100
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


272210054 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 11O MM m S/ 9,397.72 S/ 391.41 S/ 469.89 S/ 469.89 S/ 469.89
272210055 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 315 MM m S/ 6,396.56 S/ 1,332.08 S/ 1,599.14 S/ 1,599.14 S/ -
272210056 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 355 MM m S/ 6,702.91 S/ 223.34 S/ 402.17 S/ 536.23 S/ 670.29
272210057 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 400 MM m S/ 6,383.21 S/ - S/ - S/ - S/ -
272210058 ACOPLE FLEXIBLE DE 2.1/2" und S/ 124.08 S/ - S/ - S/ - S/ -
272210059 ACOPLE FLEXIBLE DE 2" und S/ 58.32 S/ - S/ - S/ - S/ -
272210060 ACOPLE FLEXIBLE DE 3" und S/ 109.35 S/ - S/ 16.40 S/ 16.40 S/ 16.40
272210061 UNION UNIVERSAL PVC Ø 2" m S/ 59.56 S/ 12.40 S/ 14.89 S/ 14.89 S/ -
272210062 TUBERIA PVC ISO 1452, DN 75mm C-1O m S/ 10,549.23 S/ - S/ - S/ - S/ 1,582.38
272210063 TUBERIA PVC ISO 1452, DN 48mm C-10 m S/ 14.36 S/ 0.96 S/ 1.15 S/ 2.15 S/ 2.15
272220006 TUBO PVC-SAP - 2" (3M) m S/ 7,304.03 S/ - S/ - S/ - S/ -
272220023 TUBO PVC-SAP - 3" (3M) m S/ 1,761.78 S/ 73.38 S/ 88.09 S/ 88.09 S/ 88.09
272220032 TUBO PVC-SAP - 4" (3M) m S/ 26,929.13 S/ 897.28 S/ 1,077.17 S/ 1,615.75 S/ 1,615.75
272220033 TUBO PVC-SAP - 2 1/2" (3M) m S/ 17.74 S/ - S/ - S/ 4.43 S/ 3.55
272220034 TUBO PVC-SAP - 6" (5M) m S/ 4,052.06 S/ 843.84 S/ 1,013.01 S/ - S/ -
272220035 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 6" m S/ 9,589.96 S/ - S/ 2,397.49 S/ 2,397.49 S/ 2,397.49
272220036 UNION DE POLIPROPILENO (PPR-PN10) D= 6" und S/ 644.54 S/ - S/ - S/ - S/ -
272220037 UNION DE POLIPROPILENO (PPR-PN10) D= 4" und S/ 1,266.61 S/ 52.75 S/ 63.33 S/ 63.33 S/ 63.33
272220038 UNION DE POLIPROPILENO (PPR-PN10) D= 3" und S/ 284.96 S/ 59.34 S/ 71.24 S/ 71.24 S/ -
272220039 UNION DE POLIPROPILENO (PPR-PN10) D= 2" und S/ 19.89 S/ 0.66 S/ 1.19 S/ 1.59 S/ 1.99
272220040 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 4" m S/ 8,789.94 S/ - S/ - S/ - S/ -
272220041 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 3" m S/ 3,872.72 S/ - S/ - S/ - S/ -
272220042 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 2" m S/ 377.43 S/ - S/ - S/ - S/ -

CAM101
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


272220043 AISLAMIENTO TERMICO PARA TUBERIA POLIPROPILENO D= 4" m S/ 2,370.87 S/ - S/ 355.63 S/ 355.63 S/ 355.63
272220044 AISLAMIENTO TERMICO PARA TUBERIA POLIPROPILENO D= 3" m S/ 782.92 S/ 163.04 S/ 195.73 S/ 195.73 S/ -
272220045 AISLAMIENTO TERMICO PARA TUBERIA PÓLIPROPILENO D= 2" m S/ 85.93 S/ - S/ - S/ - S/ 12.89
272220046 AISLAMIENTO TERMICO PARA TUBERIA POLIPROPILENO D= 1 1/2" m S/ 1,438.76 S/ 95.88 S/ 115.10 S/ 215.81 S/ 215.81
272220047 UNION DE POLIPROPILENO (PPR-PN10) D= 1 und S/ 36.75 S/ - S/ - S/ - S/ -
272220048 TUBERIA DE POLIPROPILENO (PPR PN10) D= 1 1/ 2 m S/ 1,411.84 S/ 58.80 S/ 70.59 S/ 70.59 S/ 70.59
272220049 TUBERIA DE POLIPROPILENO (PPR-PN10) D= 1" m S/ 12.75 S/ 0.42 S/ 0.51 S/ 0.77 S/ 0.77
272220061 CODO PPR-PN10 DE 4" X 90º und S/ 376.88 S/ - S/ - S/ 94.22 S/ 75.38
272220062 CODO PPR-PN10 DE 3" X 90º und S/ 422.56 S/ 88.00 S/ 105.64 S/ - S/ -
272220063 TEE PPR-PN10 DE 4" und S/ 466.96 S/ - S/ 116.74 S/ 116.74 S/ 116.74
272220064 TEE PPR-PN10 DE 3" und S/ 227.28 S/ - S/ - S/ - S/ -
272220065 REDUCCION PPR-PN10 DE 4" A 3" und S/ 164.08 S/ 6.83 S/ 8.20 S/ 8.20 S/ 8.20
272220073 TUBERIA UF DE 200 mm S25 m S/ 1,394.17 S/ 290.34 S/ 348.54 S/ 348.54 S/ -
272220074 TUBERIA UF DE 400 mm S25 m S/ 9,301.31 S/ 309.92 S/ 558.08 S/ 744.10 S/ 930.13
272220075 TUBERIA PVC-UF NTP ISO 4435 SN2 DN 200 m S/ 8,239.64 S/ - S/ - S/ - S/ -
272220076 UNION PVC-UF NTP ISO 4435 SN2 DN 200 und S/ 851.06 S/ - S/ - S/ - S/ -
272220077 TUBERIA PVC-UF NTP ISO 4435 SN2 DN 160 m S/ 103.20 S/ - S/ - S/ - S/ -
272220078 UNION PVC-UF NTP ISO 4435 SN2 DN 160 und S/ 59.84 S/ - S/ 8.98 S/ 8.98 S/ 8.98
272500023 UNION SIMPLE PVC-P (ELEC.) 100mm und S/ 15.13 S/ 3.15 S/ 3.78 S/ 3.78 S/ -
272500034 UNION SIMPLE CPVC 1/2" und S/ 5.52 S/ - S/ - S/ - S/ 0.83
272500035 UNION SIMPLE CPVC 3/4" und S/ 5.99 S/ 0.40 S/ 0.48 S/ 0.90 S/ 0.90
272510011 TEE PVC-SAP-CLASE 10 SP - 1/2" und S/ 243.20 S/ - S/ - S/ - S/ -
272510012 TEE PVC-SAP-CLASE 10 SP - 3/4" und S/ 16.17 S/ 0.67 S/ 0.81 S/ 0.81 S/ 0.81

CAM102
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


272510027 UNION SIMPLE PVC-SAP-CLASE 10 SP -2 1/2" und S/ 316.64 S/ 10.55 S/ 12.67 S/ 19.00 S/ 19.00
272510079 TEE PVC-SAP-CLASE 1O SP - 1" und S/ 191.18 S/ - S/ - S/ 47.80 S/ 38.24
272510080 CODO PVC-CLASE 1O SP -1 1/4" x 90º und S/ 1,111.32 S/ 231.43 S/ 277.83 S/ - S/ -
272510081 TEE PVC-SAP-CLASE 10 SP -11/4" und S/ 1,230.39 S/ - S/ 307.60 S/ 307.60 S/ 307.60
272510087 CODO PVC-CLASE 10 SP -1" x 90º und S/ 320.74 S/ - S/ - S/ - S/ -
272510089 TEE PVC-SAP-CLASE 10 SP - 2 1/2" und S/ 24.99 S/ 1.04 S/ 1.25 S/ 1.25 S/ 1.25
272510091 CODO PVC-CLASE 10 SP - 2 1/2" x 90º und S/ 49.45 S/ 10.30 S/ 12.36 S/ 12.36 S/ -
272510092 TEE CPVC DE 1/2" und S/ 61.56 S/ 2.05 S/ 3.69 S/ 4.92 S/ 6.16
272510093 SOMBRERO PARA VENTILACION DE PVC DE 2" und S/ 181.79 S/ - S/ - S/ - S/ -
272510094 TEE CPVC DE 3/4" und S/ 4.68 S/ - S/ - S/ - S/ -
272510096 UNION SIMPLE PVC-SAP-CLASE 10 SP -3" und S/ 50.93 S/ - S/ - S/ - S/ -
272510103 SOMBRERO PARA VENTILACION DE PVC DE 4" und S/ 64.72 S/ - S/ 9.71 S/ 9.71 S/ 9.71
272510107 UNION SIMPLE PVC-SAP-CLASE 10 SP -4" und S/ 1,005.72 S/ 209.44 S/ 251.43 S/ 251.43 S/ -
272510124 BOQUILLA DE RETORNO DE 2" und S/ 1,577.34 S/ - S/ - S/ - S/ 236.60
272510125 BOQUILLA DE ASPIRACION DE 2" und S/ 2,136.84 S/ 142.40 S/ 170.95 S/ 320.53 S/ 320.53
272510127 CODO PVC-CLASE 10 SP -1/2" x 90º und S/ 358.40 S/ - S/ - S/ - S/ -
272510128 CODO PVC-CLASE 10 SP - 3/4" x 90º und S/ 32.34 S/ 1.35 S/ 1.62 S/ 1.62 S/ 1.62
272510129 UNION SIMPLE PVC-SAP CLASE 10 1/2" und S/ 16.17 S/ 0.54 S/ 0.65 S/ 0.97 S/ 0.97
272510130 ROSCADA UNION SIMPLE PVC-SAP CLASE 10 3/4" und S/ 74.83 S/ - S/ - S/ 18.71 S/ 14.97
272510131 ROSCADA UNION SIMPLE PVC-SAP CLASE 10 1" und S/ 23.52 S/ 4.90 S/ 5.88 S/ - S/ -
272510132 ROSCADA UNION SIMPLE PVC-SAP CLASE 10 1,1/4" und S/ 147.95 S/ - S/ 36.99 S/ 36.99 S/ 36.99
272510133 ROSCADA UNION SIMPLE PVC-SAP CLASE 10 1,1/2" und S/ 85.43 S/ - S/ - S/ - S/ -
272510134 ROSCADA UNION SIMPLE PVC-SAP CLASE 10 2" und S/ 370.52 S/ 15.43 S/ 18.53 S/ 18.53 S/ 18.53

CAM103
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


272510145 ROSCADA SOMBRERO PARA VENTILACION DE PVC DE 3" und S/ 52.92 S/ 11.02 S/ 13.23 S/ 13.23 S/ -
272510156 ANILLO PVC-U (NTP ISO 4435) SN4 DN 110 MM und S/ 460.62 S/ 15.35 S/ 27.64 S/ 36.85 S/ 46.06
272510167 ANILLO PVC-U (NTP ISO 4435) SN4 DN 315 MM und S/ 280.71 S/ - S/ - S/ - S/ -
272510151 ANILLO PVC-U (NTP ISO 4435) SN4 DN 355 MM und S/ 301.44 S/ - S/ - S/ - S/ -
272510152 ANILLO PVC-U (NTP ISO 4435) SN4 DN 400 MM und S/ 286.84 S/ - S/ - S/ - S/ -
272510153 CODO PVC-U (NTP ISO 4435) SN4 DN 11O MM und S/ 858.82 S/ - S/ 128.82 S/ 128.82 S/ 128.82
272510154 TAPON PVC-U (NTP ISO 4435) SN4 DN 11O MM und S/ 123.64 S/ 25.75 S/ 30.91 S/ 30.91 S/ -
272510155 SILLA TEE PVC-U (NTP ISO 4435) SN4 DN 315X11O MM und S/ 740.52 S/ - S/ - S/ - S/ 111.08
272510156 BOQUILLA DE INGRESO DE 2" und S/ 10.11 S/ 0.67 S/ 0.81 S/ 1.52 S/ 1.52
272510157 REDUCCION CONCENTRICA 2" A 1" und S/ 2.46 S/ - S/ - S/ - S/ -
272510159 UNION SIMPLEPVC ISO 1452, DN 75mm und S/ 2,176.19 S/ 90.64 S/ 108.81 S/ 108.81 S/ 108.81
272510160 UNION SIMPLE PVC ISO 1452, DN 48mm und S/ 42.42 S/ 1.41 S/ 1.70 S/ 2.55 S/ 2.55
272510161 CODO PVC ISO 1452, 75mm X 11.25º C-1O und S/ 112.81 S/ - S/ - S/ 28.20 S/ 22.56
272510162 CODO PVC ISO 1452, 75mm X 45º C-1O und S/ 338.43 S/ 70.48 S/ 84.61 S/ - S/ -
272510163 CODO PVC ISO 1452, 75mm X 90º C10 und S/ 249.64 S/ - S/ 62.41 S/ 62.41 S/ 62.41
272510164 TEE PVC ISO 1452, 75mm X 75mm C10 und S/ 138.36 S/ - S/ - S/ - S/ -
272510165 REDUCCION PVC ISO 1452, 110mm 75mm C-10 und S/ 211.10 S/ 8.79 S/ 10.56 S/ 10.56 S/ 10.56
272510166 TAPON PVC ISO 1452, 75mm C-10 und S/ 69.52 S/ 14.48 S/ 17.38 S/ 17.38 S/ -
272510167 ANILLO PVC-U (NTP ISO 4435) SN4 DN 200 MM und S/ 444.33 S/ 14.80 S/ 26.66 S/ 35.55 S/ 44.43
272510168 ANILLO PVC-U (NTP ISO 4435) SN4 DN 160 MM und S/ 20.12 S/ - S/ - S/ - S/ -
272520001 CODO PVC-SAP 2" x 90 und S/ 1,075.70 S/ 35.84 S/ 43.03 S/ 64.54 S/ 64.54
272520003 CODO PVC-SAP 4" x 90 und S/ 3,315.05 S/ - S/ - S/ 828.76 S/ 663.01
272520031 YEE PVC-SAP 2" x 2" und S/ 422.40 S/ 87.96 S/ 105.60 S/ - S/ -

CAM104
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


272520035 YEE PVC-SAP 4" x 4" und S/ 693.58 S/ - S/ 173.39 S/ 173.39 S/ 173.39
272520036 CODO PVC-SAP 2" x 45 und S/ 225.28 S/ - S/ - S/ - S/ -
272520037 CODO CPVC DE1/2" X 90º und S/ 78.66 S/ 3.28 S/ 3.93 S/ 3.93 S/ 3.93
272520038 CODO CPVC DE 3/4" X 90º und S/ 7.68 S/ 1.60 S/ 1.92 S/ 1.92 S/ -
272520064 CODO PVC-SAP 3" x 90 und S/ 593.46 S/ 19.77 S/ 35.61 S/ 47.48 S/ 59.35
272520068 YEE PVC-SAP 3" x 3" und S/ 208.66 S/ - S/ - S/ - S/ -
272610002 TUBO CPVC - 1/2" x 5 M m S/ 876.66 S/ - S/ - S/ - S/ -
272610003 TUBO CPVC - 3/4" x 5 M m S/ 574.83 S/ - S/ - S/ - S/ -
277010023 GRIFO DE RIEGO DE BRONCE 1/2" P/JARDIN und S/ 55.86 S/ -
277010024 GRIFO DE RIEGO DE BRONCE 3/4" P/JARDIN und S/ 1,131.30 S/ -
277010025 VALVULA MARIPOSA TIPO WAFER UNIÓN BRIDA D=6" und S/ 1,192.14 S/ -
277010026 VALVULA MARIPOSA TIPO WAFER UNIÓN BRIDA 0=4" und S/ 1,055.47 S/ -
277010027 VALVULA MARIPOSA TIPO WAFER UNIÓN BRIDA 0=3" und S/ 477.00 S/ -
277110007 VALVULA CHECK PESADA DE BRONCE 0=21/2" und S/ 1,309.35 S/ -
277110010 VALVULA COMPUERTADE BRONCE 0 =21/2" und S/ 2,514.82 S/ -
277110011 VALVULA CHECK PESADA DE BRONCE 0=2" und S/ 1,400.52 S/ -
277110013 VALVULA COMPUERTA DE BRONCE 0=11/2" und S/ 480.55 S/ -
277110014 VALVULA COMPUERTA DE BRONCE 0=2" und S/ 1,776.64 S/ -
277110015 VALVULA COMPUERTA DE BRONCE 0=3" und S/ 6,116.76 S/ -
277110019 VALVULA COMPUERTA DE BRONCE O= 3/4". und S/ 33.85 S/ -
277110020 VALVULA COMPUERTA DE BRONCE O= 1" und S/ 775.95 S/ -
277110022 VALVULA CHECK PESADA DE BRONCE 0=11 /2 1 und S/ 181.60 S/ -
277110023 VALVULA CHECK PESADA DE BRONCE 0=3" und S/ 1,760.28 S/ -

CAM105
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


277110024 VALVULA CHECK PESADA DE BRONCE 0=4" und S/ 3,897.30 S/ -
277110025 VALVULA CHECK PESADA DE BRONCE 0=6" und S/ 7,043.43 S/ -
277110028 VALVULA ESFÉRICA DE BRONCE PESADA 01/2" und S/ 3,824.48 S/ -
277110029 VALVULA ESFÉRICA DE BRONCE PESADA 0 3/4" und S/ 1,995.18 S/ -
277110030 VALVULA ESFÉRICA DE BRONCE PESADA 0 1.1/4" und S/ 2,924.55 S/ -
277110031 VALVULA ESFÉRICA DE BRONCE PESADA 0 11/2" und S/ 4,298.80 S/ -
277110032 VALVULA ESFÉRICA DE BRONCE PESADA 0 2" und S/ 2,273.74 S/ -
277110033 VALVULA CHECK PESADA DE BRONCE D=1" und S/ 102.18 S/ -
277110035 ELECTRO VÁLVULAS DE CUATRO VIAS (AUTOMATICA) D=4" und S/ 680.00 S/ -
277110036 ELECTRO VÁLVULAS DE TRES VIAS (AUTOMATICA) D=4" und S/ 300.00 S/ -
277110042 VALVULA COMPUERTA HIERRO DUCTIL CIERRE ELASTOMERICO DE 75 mm und S/ 331.69 S/ -
0277110043_x000D_ VALVULA COMPUERTA HIERRO DUCTIL CIERRE ELASTOMERICO DE 11O mm_x000D_ und S/ 515.00 S/ -
277110044 GRIFO CONTRA INCENDIO HIERRO DUCTIL 2 BOCAS TIPO POSTE INC. ACC. P/INSTALACION und S/ 1,396.61 S/ -
277210012 VÁLVULA FLOTADORA DE BRONCE DE 1,1/2" CON BOYA PVC und S/ 635.58 S/ -
277210017 VÁLVULA FLOTADORA DE BRONCE DE 2" CON BOYA PVC und S/ 552.08 S/ -
277210018 UNION TRANSICION ACERO A PVC DE Ø 2 und S/ 16.88 S/ -
277210019 UNION TRANSICION ACERO A PVC DE Ø 3 und S/ 24.60 S/ -
277210020 UNION TRANSICION ACERO A PVC DE Ø 11/2" und S/ 8.06 S/ -
277210021 VÁLVULA FLOTADORA DE BRONCE DE 1" CON BOYA PVC und S/ 66.95 S/ -
277320007 VALVULA DE PIE 3" C/CANASTILLA und S/ 3,817.08 S/ -
277320012 VALVULA DE PIE 2" C/CANASTILLA und S/ 301.78 S/ -
277320016 VALVULA DE PIE 2 1/2" C/CANASTILLA und S/ 1,355.82 S/ -
277510001 REGISTRO BRONCE DE 2" ROSCADO und S/ 263.52 S/ -

CAM106
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


277510003 REGISTRO BRONCE DE 4" ROSCADO und S/ 1,486.08 S/ -
277510013 REGISTRO BRONCE DE 3" ROSCADO und S/ 394.25 S/ -
277510017 SUMIDERO DE BRONCE 2" und S/ 775.92 S/ -
277510018 SUMIDERODE BRONCE 3" und S/ 1,876.63 S/ -
277510019 REGISTRO DE BRONCE TIPO DADO 4" und S/ 346.08
277510020 VENTILACION LATERAL DE 2" und S/ 124.10

TOTAL S/1,520,409.88 S/ 7,207.94 S/ 12,834.57 S/ 13,387.67 S/ 12,687.88


ALACIONES ELECTRICAS
SALDO
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 13.65 S/ -
202100002 ALAMBRE NEGRO Nro.16 kg S/ 4.93 S/ -
202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 14.25 S/ -
202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.00 S/ -
203010010 ACERO CORRUGADO GRADO 60 kg S/ 485.76 S/ -
204050001 ARENA GRUESA m3 S/ 569.50 S/ -
204050002 ARENA FINA m3 S/ 81.02 S/ -
204100010 TIERRA CERNIDA m3 S/ 482.98 S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 2,074.95 S/ -
205350001 AGUA und S/ 19.11 S/ -
206200005 CONECTOR DE BARRA DE 5/8" Y 3/4" und S/ 536.35
207050009 CONEXIONA CAJA PVC ELEC. SAP 25MM und S/ 12.37 S/ -

CAM107
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


207900013 CONECTOR PVC 25mm und S/ 6.01 S/ -
206200011 CONECTOR PVC 55mm und S/ 45.01
206200019 CONECTOR PVC 20mm und S/ 221.42
206200028 CONECTOR PVC 35mm und S/ 148.45
206200030 CONECTOR PVC 100mm und S/ 8.44
206200031 CONECTOR PVC 75mm und S/ 5.13
206300002 CABLE HELICOIDAL DE 9m Cu und S/ 843.76
206550023 VARILLA DE COBRE 3/4"x 2.40Ín C/PUNTA und S/ 1,728.27
206560001 CABLE 1x16mm2 COBRE DESNUDO m3 S/ 17.80
206560002 CABLE 1x50mm2 COBRE DESNUDO m S/ 925.75
207050015 CONDUCTOR N2XOH - 1 x 300mm m S/ 2,293.19 S/ -
207050016 CONDUCTOR N2XOH - 1 x 25mm2 m S/ 1,162.81 S/ -
207050017 CONDUCTOR N2XOH-1 x 10mm2 m S/ 11,248.14 S/ -
207050018 CONDUCTOR N2XOH - 1 x 6mm2 m S/ 3,531.68 S/ -
207050019 CONDUCTOR N2XOH - 1 x 16mm2 m S/ 2,900.81 S/ -
207050022 CONDUCTOR N2XOH -1 x 70mm2 m S/ 128.54 S/ -
207050023 CONDUCTOR N2XOH - 1 x 35mm2 m S/ 1,463.63 S/ -
207150013 CONDUCTOR NH-80, 4mm2 m S/ 4,475.89 S/ -
207150022 CONDUCTOR NH-80, 6mm2 m S/ 893.20 S/ -
207150023 CONDUCTOR NH-80, 2.5mm2 m S/ 10,650.04 S/ -
211250005 CORTACIRCUITO PARA POSTE DE CONCRETO und S/ 796.53 S/ -
211250010 SOPORTE P/TENSADO MOD.SA-9 DE FºGº C/AISLADOR und S/ 93.92 S/ -
211250012 SOPORTE P/TENSADO MOD.SA-7 DE FºGº C/AISLADOR und S/ 187.84 S/ -

CAM108
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


211250041 CAPTOR CON DISPOSITIVO DE CEBADO und S/ 5,388.49 S/ -
212050115 ARTEF. ILUMINACION DE EMERGENCIA C/2 LAMP. 20W, 2 HORAS DE AUTONOMIA und S/ 13,555.36 S/ -
212050123 ARTEFACTO SIMILAR RAS 3X36 und S/ 22,909.33 S/ -
212050124 ARTEFACTO SIMILAR RAS 2X36 und S/ 6,236.49 S/ -
212050125 ARTEFACTO SIMILAR TPC 132 und S/ 5,162.99 S/ -
212050126 ARTEFACTO SIMILAR TPR 2X18 und S/ 5,796.57 S/ -
212050127 ARTEFACTO SIMILAR RSP 2X18W und S/ 4,633.93 S/ -
212050128 ARTEFACTO SIMILAR ULTR AA2X18 und S/ 747.43 S/ -
212050129 REFLECTOR TIPO ARAN 1X70 und S/ 520.66 S/ -
212050130 REFLECTOR TIPO MERH - 250 und S/ 1,249.60 S/ -
212050131 ARTEFACTO SIMILAR A GEOTEC 1X35 und S/ 890.91 S/ -
212050132 ARTEFACTO PARA ADOSAR TIPO ALPHA SP.O A 1X20W und S/ 104.13 S/ -
212050133 WALL SOKETE, CON LAMPARA AHORRADORA DE 20W und S/ 27.77 S/ -
212050134 BRAQUETE DE 2 LAMPARAS DE 18W SIMILAR A RSP-2 JOSFEL und S/ 2,343.00 S/ -
212050135 ARTEFACTO PARA ADOSAR, 1 LAMPARA DE 32 W, SIMILAR AL TIPO TPC-1x32 DE JOSFEL. und S/ 1,703.25 S/ -
212050136 ARTEFACTO PARA ADOSAR Y/O COLGAR, CON LAMPARA FLUORECENTE DE 36W, SIMILAR AL TIPO AHR 2x36 und S/ 3,147.27 S/ -
212050137 ARTEFACTO ADOSADO, CON DOS LAMPARAS 18W, SIMILAR AL TIPO ELA-2 x 18 und S/ 87.93 S/ -
212050138 ARTEFACTO PARA SUSPENDER, CON 2 LAMPARAS FLUORECENTES DE 36 W, SIMILAR AL TIPO RAS 2X36W. und S/ 1,700.86 S/ -
212050139 ARTEFACTO PARA ADOSAR, CON 3 LAMPARAS DE 36W, SIMILAR AL TIPO RAS-A-3X36 und_x000D_ S/ 1,041.33 S/ -
212050140 ARTEFACTO PARA SUSPENDER, CON 3 FLUORECENTES DE 36_x000D_ und S/ 370.27 S/ -
212050141 W, SIMILAR AL
ARTEFACTO TIPOADOSAR,
PARA ISP 3x36W
CON LAMPARA FLUORECENTE DE 36W, CON KIT PARA EMERGENCIA SIMILAR AL TIPO A und S/ 592.43 S/ -
212050142 ARTEFACTOREFLECTOR CON LAMPARA DE 250 W, SIMILAR AL TIPO MERH-250. und S/ 6,768.67 S/ -
212050143 BRAQUETE REFLECTOR CON 2 LAMPARAS LED DE 18W SIMILAR AL TIPO ULTRA A und S/ 395.70 S/ -

CAM109
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


212050144 ARTEFACTO PARA ADOSAR, SIMILAR AL TIPO ALPHA SPOT A, CON DOS LAMPARAS DE 26W TC-DEL und S/ 138.84 S/ -
212050145 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROTECCION IP66 SIMILAR A JOSFEL AHR - 1x 36 und S/ 842.31 S/ -
212050146 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROTECCION IP66 SIMILAR A JOSFEL AHR - 1x 36 CO und S/ 2,166.00 S/ -
212050147 ARTEFACTO DE ILUMINACION CON LAMAPARA LED DE 36W, PROTECCION IP66 SIMILAR A AL TIPO AHR 1X36 und S/ 1,230.82 S/ -
212050148 ARTEFACTO DE ILUMINACION CON LAMPARA LED DE 36W, PROTECCION IP66 SIMILAR A AL TIPO AHR - 1x 36 CON und S/ 3,429.50 S/ -
212050149 REFLECTORES CON LAMPARAS DE 250 W , HALOGENURO METALICO und S/ 879.33 S/ -
212050150 ARTEFACTO TIPO ASTRO-70, CON LAMPARA DE 70W HALOGENURO METALICO und S/ 5,825.58 S/ -
212050151 PASTORAL SIMPLE TIPO SUCRE und S/ 1,050.00 S/ -
212050152 PASTORAL DOBLE TIPO SUCRE und S/ 100.00 S/ -
212050153 REFLECTOR SIMILAR A ARAN, CON LAMPARA DE 150W HALOGENURO METALICO und S/ 1,475.20 S/ -
212050154 ARTEFACTO SIMILARA AHR-1X36 + KIT DE EMERGENCIA und S/ 3,471.07 S/ -
212050155 ARTEFACTO SIMILAR AHR-1X36 und S/ 1,423.11 S/ -
212050156 CAMPANILLA DE TIMBRE DE 8" DE DIAMETRO und S/ 229.97 S/ -
212050157 CAMPANILLA DE TIMBRE DE 4" DE DIAMETRO und S/ 72.63 S/ -
212050159 SENSOR DE TEMPERATURA Y/O HUMO und S/ 248.79 S/ -
212150002 CAJA GALV. RECT. PESADA 4" x 2" x 21/4" und S/ 846.77 S/ -
212150011 CAJA GALV. OCTOGONAL PESADA 4" und S/ 862.61 S/ -
212150035 CAJA DE PASE GALVANIZADA 4" x 4" x 2" und S/ 366.50 S/ -
212150036 CAJA DE PASE GALVANIZADA OCTOGONAL (100X55mm) und S/ 40.48 S/ -
212150039 CAJA DE PASE GALVANIZADA (150X150X75mm) und S/ 185.13 S/ -
212150041 CAJA DE PASE GALVANIZADA (200X200X100mm) und S/ 145.86 S/ -
212150042 CAJA DE PASE GALVANIZADA (300X300X100mm) und S/ 224.00 S/ -
212150043 CAJA DE PASE GALVANIZADA (100X100X100mm) und S/ 93.51 S/ -

CAM110
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


212150044 CAJA DE PASE GALVANIZADA (100X100X50mm) und S/ 31.64 S/ -
212150045 TAPA CIEGA DE 300X300 und S/ 57.72 S/ -
212150046 TAPA CIEGA DE 200X200 und S/ 5.10 S/ -
212150047 TAPA CIEGA DE 150X150 und S/ 3.63 S/ -
212150048 CAJA DE PASE GALVANIZADA (100X50X55mm) und S/ 9.71 S/ -
212150049 TAPA CIEGA OCTOGONAL DE 100 und S/ 20.88 S/ -
212250004 INTERRUPTOR 2 GOLPE SIMILAR TIPO TICINO und S/ 545.39 S/ -
212250078 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und S/ 1,140.92 S/ -
212250080 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und S/ 1,106.35 S/ -
212250092 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und S/ 752.00 S/ -
212250093 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und S/ 465.18 S/ -
212250095 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und S/ 77.53 S/ -
212250103 INTERRUPTOR TERMOMAGNETICO - 3 x 20 A und S/ 158.60 S/ -
212250132 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und S/ 354.38 S/ -
212250134 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und S/ 470.00 S/ -
212250140 INTERRUPTOR DIFERENCIAL 2X25A-30MA und S/ 13,844.08 S/ -
212250143 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und S/ 25.84 S/ -
212250144 INTERRUPTOR TERMOMAGNETICO - 2 x 50 A und S/ 24.68 S/ -
212250145 INTERRUPTOR 1 GOLPE SIMILAR TIPO TICINO und S/ 255.64 S/ -
212250146 INTERRUPTOR DE CONMUTACION SIMILAR TIPO TICINO und S/ 1,025.89 S/ -
212250147 INTERRUPTOR 3 GOLPES SIMILAR TIPO TICINO und S/ 300.07 S/ -
212250148 PULSADOR DE TIMBRE und S/ 28.82 S/ -
212250150 INTERRUPTOR TERMOMAGNETICO - 2 x 40 A und S/ 34.91 S/ -

CAM111
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


212250152 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 16KA und S/ 62.56 S/ -
212250153 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 20KA und S/ 250.23 S/ -
212250154 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A 20KA und S/ 83.65 S/ -
212250155 INTERRUPTOR TERMOMAGNETICO- 3 x 70 A 16KA und S/ 62.56 S/ -
212250156 INTERRUPTOR DIFERENCIAL 2X40A-30MA und S/ 988.80 S/ -
212250164 INTERRUPTOR TERMOMAGNETICO- 3 x 60 A 10KA und S/ 16.29 S/ -
212250168 INTERRUPTOR TERMOMAGNETICO-3 x 125 A 25KA und S/ 167.30 S/ -
212250171 CONTACTOR ELECTRICO 2 X 20 A und S/ 319.32 S/ -
212250172 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A 20KA und S/ 125.11 S/ -
212250173 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 20KA und S/ 32.59 S/ -
212250174 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 16KA und S/ 32.59 S/ -
212250181 CONTROL DE NIVEL und S/ 281.19 S/ -
212250182 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA EN CISTERNA und S/ 86.52 S/ -
212250189 TG (TABLERO AUTOSOPORTADO, ITM: 11X40A 10KA, 4 2X20A 10KA, 3 2X40 10KA, 3 3X20 10KA, 2 3X30A 10KA, 2 3X40A und S/ 4,549.17 S/ -
212250190 TG - 6 (TABLERO AUTOSOPORTADO, ITM: 2 2X40A, 3 2X20A, 1 2X60 20KA, 4 3X80 25KA, 2 3X125A 25KA, 1 3X300A 50KA; I und S/ 3,536.33 S/ -
212300022 TOMA PARA RED DATA (DADO) und S/ 1,926.22 S/ -
212300025 TOMACORRIENTE DOBLE C/ LINEA DE TIERRA SIMILAR TIPO TICINO und S/ 4,612.63 S/ -
212300028 TOMACORRIENTE DOBLE A PRUEBA DE AGUA und S/ 654.50 S/ -
212350060 PLACA SALIDA PARA TV o TELEFONO und S/ 662.15 S/ -
212350062 PLACA DE ALUMINIO ANODIZADO 1 PERFORACION und S/ 1,058.20 S/ -
212350063 PLACA DE ALUMINIO ANODIZADO 2 PERFORACION und S/ 929.13 S/ -
219600001 CABLE DESNUDO 50MM2 (1/0 AWG) m S/ 564.27 S/ - S/ -
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 4,488.01 S/ -

CAM112
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


221030015 MARCO Y TAPA DE BUZON ELECTRICO und S/ 1,726.67 S/ -
221030016 MARCO Y TAPA DE BUZON COMUNICACIONES und S/ 2,461.01 S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 3.89 S/ -
230010030 CINTA TEFLON m S/ 0.11 S/ -
230010057 DOSIS QUIMICA THOR GEL DE 5 kg und S/ 1,362.78 S/ -
230010136 CINTA AISLANTE ml S/ 1,105.15 S/ -
230010143 SELLADOR BLANCO PARA MUROS gal S/ 0.28 S/ -
230010147 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal S/ 405.58 S/ -
230010151 ASCENSOR 03 PARADAS CON CUARTO DE MAQUINAS und S/ 29,880.67 S/ -
230010155 ASCENSOR 02 PARADAS CON CUARTO DE MAQUINAS und S/ 28,540.28 S/ -
230100010 EXTINTOR C02 DE 15 LIBRAS und S/ 736.71 S/ -
230990125 MANOMETRO DE GLICERINA DE 0-300psi und S/ 37.85 S/ -
230990126 MANOMETRO DE GLICERINA DE 0-100psi und S/ 36.45 S/ -
230990127 BALON DE GAS 100 LBS (INCLUYE GAS) und S/ 782.80 S/ -
230990128 REGULADOR FISHER C/NIPLES DE CONEX R962 und S/ 597.40 S/ -
230990168 SUM. E INSTALACION DE SUB ESTACION ZONA ACADEMICA glb S/ 44,373.52 S/ -
230990169 SUM. E INSTALACION DE SUB ESTACION ZONA DEPORTIVA glb S/ 47,022.71 S/ -
230990171 TANQUE DE GAS DE 1000 GALONES (INC. ACCESORIOS Y VALVULAS) und S/ 3,738.90 S/ -
230990176 MANOMETRO DE PRESION und S/ 48.00 S/ -
230990177 POOL DE CHICOTE COBRE ALTA PRESION TERMNAL TANQUE Y REG. DE PRESION und S/ 17.33 S/ -
231250001 CAJA DE CONCRETO C/TAPA und S/ 126.20 S/ -
231250025 CAJA DE CONCRETO C/TAPA 40 X 40 X 40 cm und S/ 107.12 S/ -
243010001 MADERA TORNILLO p2 S/ 542.04 S/ -

CAM113
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


243100001 MADERA CEDRO p2 S/ 0.06 S/ -
251050005 BALON DE GAS 100 LBS (INCLUYE GAS) m S/ 45.99 S/ -
251200002 PLATINA DE FIERRO 1/8" x 1" m S/ 1.76 S/ -
251200023 PLATINA DE FIERRO 114" X 1" m S/ 290.36 S/ -
251200096 PLATINA DE FIERRO 118" X 314" m S/ 1.36 S/ -
251300054 TUBERIA DE 0 2" ACEDRO CELULA 40 m S/ 36.86 S/ -
251300055 TUBERIA DE 0 1" ACEDRO CELULA 40 m S/ 17.85 S/ -
251300056 UNION DE 0 2 ACEDRO CELULA 40 und S/ 13.27 S/ -
251300057 UNION DE 01" ACEDRO CELULA 40 und S/ 6.43 S/ -
254150020 PINTURA ESMALTE qal S/ 4.94 S/ -
254200001 PINTURA ANTICORROSIVA qal S/ 14.65 S/ -
261020015 PCHA FºGº P/MASTIL 118" 15x20cm C/ABRAZ und S/ 63.17 S/ -
261020024 GABINETE METALICO CON BARRA DE COBRE 24 POLOS und S/ 4,482.22 S/ -
261020031 GABINETE METALICO CON BARRA DE COBRE 36 POLOS und S/ 1,184.50 S/ -
261020034 CAJA PARA INTERRUPTOR und S/ 45.00 S/ -
261020035 GABINETE PARA EXTINTOR und S/ 186.21 S/ -
262010017 POSTE DE CONCRETO CENTRIF. 8ML und S/ 4,729.50 S/ -
262010019 POSTE DE CONCRETO CENTRIF. 25MU1200/210/585 PARA PARARRAYOS und S/ 15,038.00 S/ -
262010021 TRANSPORTE TERRESTRE kg S/ 2,900.00 S/ -
262010022 POSTE DE CONCRETO ARMADO DE 11 MTS und S/ 1,086.67 S/ -
262120005 PASTORAL DE CONCRETO CENTRIFUGADO PARA LUMINARIA und S/ 147.63 S/ -
265010035 TUBO PROTECTOR DE FºGº 2"x4m C/02 ABRAZ . und S/ 151.95 S/ -
265010037 MASTIL DE FºGº 4" X9M C/ACOPLE S/DISEñO und S/ 673.33 S/ -

CAM114
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


265010046 TUBERIA FºGº 1" m S/ 47.76 S/ -
265010066 TUBERIA FºGº 314" m S/ 46.34 S/ -
265250008 CAJA METALICA PARA VALVULAS und S/ 35.31 S/ -
265560039 NIPLE FºGº 2" und S/ 2.45 S/ -
265560040 NIPLE FºGº 1" und S/ 1.84 S/ -
265560041 NIPLE FºGº 314" und S/ 1.28 S/ -
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 12.61 S/ -
265570032 UNION UNIVERSAL FºGº 1" und S/ 14.80 S/ -
265570038 UNION UNIVERSAL FºGº 2" und S/ 19.71 S/ -
265590040 CODO FºGº 314 x 90º S/ 5.70 S/ -
265590041 CODO FºGº 1" x 90º und S/ 8.00 S/ -
268010001 TUBERIA DE COBRE TIPO "L" 112" m S/ 299.44 S/ -
268010002 TUBERIA DE COBRE TIPO "K" 2" m S/ 320.46 S/ -
268010003 TUBERIA DE COBRE TIPO "K" 11/2" m S/ 160.23 S/ -
268120002 PITON DE BRONCE DE 1/2" PARA SALIDA DE GAS und S/ 22.32 S/ -
268120003 CODO DE COBRE 1/2" und S/ 25.98 S/ -
268120004 CODO DE COBRE 2" TIPO K und S/ 35.68 S/ -
268120005 CODO DE COBRE 1 1/2" TIPO K und S/ 14.08 S/ -
272200003 TUBO PVC-P (ELEC.) 20mm 3M m S/ 4,138.03 S/ - S/ - S/ - S/ -
272200004 TUBO PVC-P (ELEC.) 25mm 3M m S/ 308.98 S/ - S/ - S/ - S/ -
272200010 TUBO PVC-P (ELEC.) 100mm 3M m S/ 128.75 S/ - S/ 19.31 S/ 19.31 S/ 19.31
272200011 TUBO PVC-P (ELEC.) 35mm 3M m S/ 1,310.68 S/ 272.95 S/ 327.67 S/ 327.67 S/ -
272200012 TUBO PVC-P (ELEC.) 50mm 3M m S/ 1,492.58 S/ - S/ - S/ - S/ 223.89

CAM115
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


272200014 TUBO PVC-P (ELEC.) 75mm 3M m S/ 97.09 S/ 6.47 S/ 7.77 S/ 14.56 S/ 14.56
272220029 TUBERIA CONDUIT DE 20mm m S/ 122.62 S/ - S/ - S/ - S/ -
272220030 CONECTOR CONDUIT DE 20mm und S/ 47.10 S/ - S/ - S/ 11.78 S/ 11.78
272220031 CURVA EMT CONDUIT DE 20mm und S/ 39.84 S/ 1.66 S/ 1.99 S/ 1.99 S/ 1.99
272500003 CURVA PVC-P (ELEC.) 20mm und S/ 551.41 S/ 114.83 S/ 137.85 S/ 137.85 S/ -
272500004 CURVA PVC-P {ELEC.) 25mm und S/ 48.09 S/ 10.02 S/ 12.02 S/ - S/ -
272500013 UNION SIMPLE PVC-P (ELEC.) 20mm und S/ 16.00 S/ - S/ 4.00 S/ 4.00 S/ 4.00
272500025 CONECTOR PVC 025MM und S/ 8.36 S/ - S/ - S/ - S/ -
272500029 CURVA PVC-P (ELEC.) 100mm und S/ 41.91 S/ - S/ - S/ - S/ -
272500030 CURVA PVC-P (ELEC.) 35mm und S/ 310.33 S/ - S/ - S/ - S/ -
272500031 CURVA PVC-P (ELEC.) 50mm und S/ 200.35 S/ - S/ 30.05 S/ 30.05 S/ 30.05
272500032 CURVA PVC-P (ELEC.) 75mm und S/ 30.29 S/ 6.31 S/ 7.57 S/ 7.57 S/ -
272500033 UNION DE COBRE 1/2" und S/ 23.26 S/ - S/ - S/ - S/ 3.49
272510147 UNION DE COBRE 2" TIPO K und S/ 6.31 S/ 0.42 S/ 0.50 S/ 0.95 S/ 0.95
272510148 UNION DE COBRE 11/2" TIPO K und S/ 2.80 S/ - S/ - S/ - S/ -
272520069 TAPON HEMBRA DE COBRE 1/2" und S/ 12.27 S/ - S/ - S/ 3.07 S/ 3.07
272610005 TEE DE COBR E 1/2" und S/ 11.75 S/ 0.49 S/ 0.59 S/ 0.59 S/ 0.59
272610008 TEE DE COBRE 2" TIPO K m S/ 24.66 S/ 5.14 S/ 6.17 S/ 6.17 S/ -
272610009 TEE DE COBRE 11/2" TIPO K m S/ 10.33 S/ 0.34 S/ 0.62 S/ 0.83 S/ 1.03
277010015 VALVULA DE GLOBO DE 1/2" PARA GAS und S/ 401.70 S/ -
277010020 VALVULA DE SEGURIDAD DE 1/2" PARA GAS und S/ 10.83 S/ -
277010021 VALVULA DE GLOBO DE 1" und S/ 109.80 S/ -
277010022 VALVULA DE GLOBO DE 3/4" und S/ 290.87 S/ -

CAM116
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


277110011 VALVULA CHECK PESADA DE BRONCE D=2 " und S/ 42.44 S/ -
277110027 VALVULA T PESADA DE BRONCE D=2" und S/ 42.44 S/ -
277210014 VÁLVULA REGULADORA DE PRESION DE 1ER Y 2DAAETAPA INC. ACCSORIOS VARIOS und S/ 96.67 S/ -
277210022 VALVULA DE LLENADO S/ 32.62 S/ -
und
277210023 VALVULA DE RETORNO und S/ 30.56 S/ -
277210024 ACOPLES DE INYECCION und S/ 26.78 S/ -
277210025 ACOPLE DE RESTORNO und S/ 23.00 S/ -
277210026 VALVULA DE SEGURIDAD ESFERICA 11/2" und S/ 93.33 S/ -
277210027 VALVULA DE SEGURIDAD ESFERICA 3/4" und S/ 43.33 S/ -
277210028 VALVULA DE ALIVIO DE PRESION und S/ 90.00 S/ -
277510018 SUMIDERO DE BRONCE 3" und S/ 36.80 S/ -
MEJORA
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 13.65 S/ -
202100002 ALAMBRE NEGRO Nro.16 kg S/ 4.93 S/ -
202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 14.25 S/ -
202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.00 S/ -
203010010 ACERO CORRUGADO GRADO 60 kg S/ 485.76 S/ -
204050001 ARENA GRUESA m3 S/ 569.50 S/ -
204050002 ARENA FINA m3 S/ 81.02 S/ -
204100010 TIERRA CERNIDA m3 S/ 482.98 S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 2,074.95 S/ -
205350001 AGUA und S/ 19.11 S/ -
206200005 CONECTOR DE BARRA DE 5/8" Y 3/4" und S/ 536.35

CAM117
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


207050009 CONEXIONA CAJA PVC ELEC. SAP 25MM und S/ 12.37 S/ -
207900013 CONECTOR PVC 25mm und S/ 6.01 S/ -
206200011 CONECTOR PVC 55mm und S/ 45.01
206200019 CONECTOR PVC 20mm und S/ 221.42
206200028 CONECTOR PVC 35mm und S/ 148.45
206200030 CONECTOR PVC 100mm und S/ 8.44
206200031 CONECTOR PVC 75mm und S/ 5.13
206300002 CABLE HELICOIDAL DE 9m Cu und S/ 843.76
206550023 VARILLA DE COBRE 3/4"x 2.40Ín C/PUNTA und S/ 1,728.27
206560001 CABLE 1x16mm2 COBRE DESNUDO m3 S/ 17.80
206560002 CABLE 1x50mm2 COBRE DESNUDO m S/ 925.75
207050015 CONDUCTOR N2XOH - 1 x 300mm m S/ 2,293.19 S/ -
207050016 CONDUCTOR N2XOH - 1 x 25mm2 m S/ 1,162.81 S/ -
207050017 CONDUCTOR N2XOH-1 x 10mm2 m S/ 11,248.14 S/ -
207050018 CONDUCTOR N2XOH - 1 x 6mm2 m S/ 3,531.68 S/ -
207050019 CONDUCTOR N2XOH - 1 x 16mm2 m S/ 2,900.81 S/ -
207050022 CONDUCTOR N2XOH -1 x 70mm2 m S/ 128.54 S/ -
207050023 CONDUCTOR N2XOH - 1 x 35mm2 m S/ 1,463.63 S/ -
207150013 CONDUCTOR NH-80, 4mm2 m S/ 4,475.89 S/ -
207150022 CONDUCTOR NH-80, 6mm2 m S/ 893.20 S/ -
207150023 CONDUCTOR NH-80, 2.5mm2 m S/ 10,650.04 S/ -
211250005 CORTACIRCUITO PARA POSTE DE CONCRETO und S/ 796.53 S/ -
211250010 SOPORTE P/TENSADO MOD.SA-9 DE FºGº C/AISLADOR und S/ 93.92 S/ -

CAM118
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


211250012 SOPORTE P/TENSADO MOD.SA-7 DE FºGº C/AISLADOR und S/ 187.84 S/ -
211250041 CAPTOR CON DISPOSITIVO DE CEBADO und S/ 5,388.49 S/ -
212050115 ARTEF. ILUMINACION DE EMERGENCIA C/2 LAMP. 20W, 2 HORAS DE AUTONOMIA und S/ 13,555.36 S/ -
212050123 ARTEFACTO SIMILAR RAS 3X36 und S/ 22,909.33 S/ -
212050124 ARTEFACTO SIMILAR RAS 2X36 und S/ 6,236.49 S/ -
212050125 ARTEFACTO SIMILAR TPC 132 und S/ 5,162.99 S/ -
212050126 ARTEFACTO SIMILAR TPR 2X18 und S/ 5,796.57 S/ -
212050127 ARTEFACTO SIMILAR RSP 2X18W und S/ 4,633.93 S/ -
212050128 ARTEFACTO SIMILAR ULTR AA2X18 und S/ 747.43 S/ -
212050129 REFLECTOR TIPO ARAN 1X70 und S/ 520.66 S/ -
212050130 REFLECTOR TIPO MERH - 250 und S/ 1,249.60 S/ -
212050131 ARTEFACTO SIMILAR A GEOTEC 1X35 und S/ 890.91 S/ -
212050132 ARTEFACTO PARA ADOSAR TIPO ALPHA SP.O A 1X20W und S/ 104.13 S/ -
212050133 WALL SOKETE, CON LAMPARA AHORRADORA DE 20W und S/ 27.77 S/ -
212050134 BRAQUETE DE 2 LAMPARAS DE 18W SIMILAR A RSP-2 JOSFEL und S/ 2,343.00 S/ -
212050135 ARTEFACTO PARA ADOSAR, 1 LAMPARA DE 32 W, SIMILAR AL TIPO TPC-1x32 DE JOSFEL. und S/ 1,703.25 S/ -
212050136 ARTEFACTO PARA ADOSAR Y/O COLGAR, CON LAMPARA FLUORECENTE DE 36W, SIMILAR AL TIPO AHR 2x36 und S/ 3,147.27 S/ -
212050137 ARTEFACTO ADOSADO, CON DOS LAMPARAS 18W, SIMILAR AL TIPO ELA-2 x 18 und S/ 87.93 S/ -
212050138 ARTEFACTO PARA SUSPENDER, CON 2 LAMPARAS FLUORECENTES DE 36 W, SIMILAR AL TIPO RAS 2X36W. und S/ 1,700.86 S/ -
212050139 ARTEFACTO PARA ADOSAR, CON 3 LAMPARAS DE 36W, SIMILAR AL TIPO RAS-A-3X36 und_x000D_ S/ 1,041.33 S/ -
212050140 ARTEFACTO PARA SUSPENDER, CON 3 FLUORECENTES DE 36_x000D_ und S/ 370.27 S/ -
212050141 W, SIMILAR AL
ARTEFACTO TIPOADOSAR,
PARA ISP 3x36W
CON LAMPARA FLUORECENTE DE 36W, CON KIT PARA EMERGENCIA SIMILAR AL TIPO A und S/ 592.43 S/ -
212050142 ARTEFACTOREFLECTOR CON LAMPARA DE 250 W, SIMILAR AL TIPO MERH-250. und S/ 6,768.67 S/ -

CAM119
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


212050143 BRAQUETE REFLECTOR CON 2 LAMPARAS LED DE 18W SIMILAR AL TIPO ULTRA A und S/ 395.70 S/ -
212050144 ARTEFACTO PARA ADOSAR, SIMILAR AL TIPO ALPHA SPOT A, CON DOS LAMPARAS DE 26W TC-DEL und S/ 138.84 S/ -
212050145 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROTECCION IP66 SIMILAR A JOSFEL AHR - 1x 36 und S/ 842.31 S/ -
212050146 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROTECCION IP66 SIMILAR A JOSFEL AHR - 1x 36 CO und S/ 2,166.00 S/ -
212050147 ARTEFACTO DE ILUMINACION CON LAMAPARA LED DE 36W, PROTECCION IP66 SIMILAR A AL TIPO AHR 1X36 und S/ 1,230.82 S/ -
212050148 ARTEFACTO DE ILUMINACION CON LAMPARA LED DE 36W, PROTECCION IP66 SIMILAR A AL TIPO AHR - 1x 36 CON und S/ 3,429.50 S/ -
212050149 REFLECTORES CON LAMPARAS DE 250 W , HALOGENURO METALICO und S/ 879.33 S/ -
212050150 ARTEFACTO TIPO ASTRO-70, CON LAMPARA DE 70W HALOGENURO METALICO und S/ 5,825.58 S/ -
212050151 PASTORAL SIMPLE TIPO SUCRE und S/ 1,050.00 S/ -
212050152 PASTORAL DOBLE TIPO SUCRE und S/ 100.00 S/ -
212050153 REFLECTOR SIMILAR A ARAN, CON LAMPARA DE 150W HALOGENURO METALICO und S/ 1,475.20 S/ -
212050154 ARTEFACTO SIMILARA AHR-1X36 + KIT DE EMERGENCIA und S/ 3,471.07 S/ -
212050155 ARTEFACTO SIMILAR AHR-1X36 und S/ 1,423.11 S/ -
212050156 CAMPANILLA DE TIMBRE DE 8" DE DIAMETRO und S/ 229.97 S/ -
212050157 CAMPANILLA DE TIMBRE DE 4" DE DIAMETRO und S/ 72.63 S/ -
212050159 SENSOR DE TEMPERATURA Y/O HUMO und S/ 248.79 S/ -
212150002 CAJA GALV. RECT. PESADA 4" x 2" x 21/4" und S/ 846.77 S/ -
212150011 CAJA GALV. OCTOGONAL PESADA 4" und S/ 862.61 S/ -
212150035 CAJA DE PASE GALVANIZADA 4" x 4" x 2" und S/ 366.50 S/ -
212150036 CAJA DE PASE GALVANIZADA OCTOGONAL (100X55mm) und S/ 40.48 S/ -
212150039 CAJA DE PASE GALVANIZADA (150X150X75mm) und S/ 185.13 S/ -
212150041 CAJA DE PASE GALVANIZADA (200X200X100mm) und S/ 145.86 S/ -
212150042 CAJA DE PASE GALVANIZADA (300X300X100mm) und S/ 224.00 S/ -

CAM120
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


212150043 CAJA DE PASE GALVANIZADA (100X100X100mm) und S/ 93.51 S/ -
212150044 CAJA DE PASE GALVANIZADA (100X100X50mm) und S/ 31.64 S/ -
212150045 TAPA CIEGA DE 300X300 und S/ 57.72 S/ -
212150046 TAPA CIEGA DE 200X200 und S/ 5.10 S/ -
212150047 TAPA CIEGA DE 150X150 und S/ 3.63 S/ -
212150048 CAJA DE PASE GALVANIZADA (100X50X55mm) und S/ 9.71 S/ -
212150049 TAPA CIEGA OCTOGONAL DE 100 und S/ 20.88 S/ -
212250004 INTERRUPTOR 2 GOLPE SIMILAR TIPO TICINO und S/ 545.39 S/ -
212250078 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und S/ 1,140.92 S/ -
212250080 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und S/ 1,106.35 S/ -
212250092 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und S/ 752.00 S/ -
212250093 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und S/ 465.18 S/ -
212250095 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und S/ 77.53 S/ -
212250103 INTERRUPTOR TERMOMAGNETICO - 3 x 20 A und S/ 158.60 S/ -
212250132 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und S/ 354.38 S/ -
212250134 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und S/ 470.00 S/ -
212250140 INTERRUPTOR DIFERENCIAL 2X25A-30MA und S/ 13,844.08 S/ -
212250143 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und S/ 25.84 S/ -
212250144 INTERRUPTOR TERMOMAGNETICO - 2 x 50 A und S/ 24.68 S/ -
212250145 INTERRUPTOR 1 GOLPE SIMILAR TIPO TICINO und S/ 255.64 S/ -
212250146 INTERRUPTOR DE CONMUTACION SIMILAR TIPO TICINO und S/ 1,025.89 S/ -
212250147 INTERRUPTOR 3 GOLPES SIMILAR TIPO TICINO und S/ 300.07 S/ -
212250148 PULSADOR DE TIMBRE und S/ 28.82 S/ -

CAM121
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


212250150 INTERRUPTOR TERMOMAGNETICO - 2 x 40 A und S/ 34.91 S/ -
212250152 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 16KA und S/ 62.56 S/ -
212250153 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 20KA und S/ 250.23 S/ -
212250154 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A 20KA und S/ 83.65 S/ -
212250155 INTERRUPTOR TERMOMAGNETICO- 3 x 70 A 16KA und S/ 62.56 S/ -
212250156 INTERRUPTOR DIFERENCIAL 2X40A-30MA und S/ 988.80 S/ -
212250164 INTERRUPTOR TERMOMAGNETICO- 3 x 60 A 10KA und S/ 16.29 S/ -
212250168 INTERRUPTOR TERMOMAGNETICO-3 x 125 A 25KA und S/ 167.30 S/ -
212250171 CONTACTOR ELECTRICO 2 X 20 A und S/ 319.32 S/ -
212250172 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A 20KA und S/ 125.11 S/ -
212250173 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 20KA und S/ 32.59 S/ -
212250174 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 16KA und S/ 32.59 S/ -
212250181 CONTROL DE NIVEL und S/ 281.19 S/ -
212250182 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA EN CISTERNA und S/ 86.52 S/ -
212250189 TG (TABLERO AUTOSOPORTADO, ITM: 11X40A 10KA, 4 2X20A 10KA, 3 2X40 10KA, 3 3X20 10KA, 2 3X30A 10KA, 2 3X40A und S/ 4,549.17 S/ -
212250190 TG - 6 (TABLERO AUTOSOPORTADO, ITM: 2 2X40A, 3 2X20A, 1 2X60 20KA, 4 3X80 25KA, 2 3X125A 25KA, 1 3X300A 50KA; I und S/ 3,536.33 S/ -
212300022 TOMA PARA RED DATA (DADO) und S/ 1,926.22 S/ -
212300025 TOMACORRIENTE DOBLE C/ LINEA DE TIERRA SIMILAR TIPO TICINO und S/ 4,612.63 S/ -
212300028 TOMACORRIENTE DOBLE A PRUEBA DE AGUA und S/ 654.50 S/ -
212350060 PLACA SALIDA PARA TV o TELEFONO und S/ 662.15 S/ -
212350062 PLACA DE ALUMINIO ANODIZADO 1 PERFORACION und S/ 1,058.20 S/ -
212350063 PLACA DE ALUMINIO ANODIZADO 2 PERFORACION und S/ 929.13 S/ -
219600001 CABLE DESNUDO 50MM2 (1/0 AWG) m S/ 564.27 S/ -

CAM122
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 4,488.01 S/ -
221030015 MARCO Y TAPA DE BUZON ELECTRICO und S/ 1,726.67 S/ -
221030016 MARCO Y TAPA DE BUZON COMUNICACIONES und S/ 2,461.01 S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 3.89 S/ -
230010030 CINTA TEFLON m S/ 0.11 S/ -
230010057 DOSIS QUIMICA THOR GEL DE 5 kg und S/ 1,362.78 S/ -
230010136 CINTA AISLANTE ml S/ 1,105.15 S/ -
230010143 SELLADOR BLANCO PARA MUROS gal S/ 0.28 S/ -
230010147 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal S/ 405.58 S/ -
230010151 ASCENSOR 03 PARADAS CON CUARTO DE MAQUINAS und S/ 29,880.67 S/ -
230010155 ASCENSOR 02 PARADAS CON CUARTO DE MAQUINAS und S/ 28,540.28 S/ -
230100010 EXTINTOR C02 DE 15 LIBRAS und S/ 736.71 S/ -
230990125 MANOMETRO DE GLICERINA DE 0-300psi und S/ 37.85 S/ -
230990126 MANOMETRO DE GLICERINA DE 0-100psi und S/ 36.45 S/ -
230990127 BALON DE GAS 100 LBS (INCLUYE GAS) und S/ 782.80 S/ -
230990128 REGULADOR FISHER C/NIPLES DE CONEX R962 und S/ 597.40 S/ -
230990168 SUM. E INSTALACION DE SUB ESTACION ZONA ACADEMICA glb S/ 44,373.52 S/ -
230990169 SUM. E INSTALACION DE SUB ESTACION ZONA DEPORTIVA glb S/ 47,022.71 S/ -
230990171 TANQUE DE GAS DE 1000 GALONES (INC. ACCESORIOS Y VALVULAS) und S/ 3,738.90 S/ -
230990176 MANOMETRO DE PRESION und S/ 48.00 S/ -
230990177 POOL DE CHICOTE COBRE ALTA PRESION TERMNAL TANQUE Y REG. DE PRESION und S/ 17.33 S/ -
231250001 CAJA DE CONCRETO C/TAPA und S/ 126.20 S/ -
231250025 CAJA DE CONCRETO C/TAPA 40 X 40 X 40 cm und S/ 107.12 S/ -

CAM123
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


243010001 MADERA TORNILLO p2 S/ 542.04 S/ -
243100001 MADERA CEDRO p2 S/ 0.06 S/ -
251050005 BALON DE GAS 100 LBS (INCLUYE GAS) m S/ 45.99 S/ -
251200002 PLATINA DE FIERRO 1/8" x 1" m S/ 1.76 S/ -
251200023 PLATINA DE FIERRO 114" X 1" m S/ 290.36 S/ -
251200096 PLATINA DE FIERRO 118" X 314" m S/ 1.36 S/ -
251300054 TUBERIA DE 0 2" ACEDRO CELULA 40 m S/ 36.86 S/ -
251300055 TUBERIA DE 0 1" ACEDRO CELULA 40 m S/ 17.85 S/ -
251300056 UNION DE 0 2 ACEDRO CELULA 40 und S/ 13.27 S/ -
251300057 UNION DE 01" ACEDRO CELULA 40 und S/ 6.43 S/ -
254150020 PINTURA ESMALTE qal S/ 4.94 S/ -
254200001 PINTURA ANTICORROSIVA qal S/ 14.65 S/ -
261020015 PCHA FºGº P/MASTIL 118" 15x20cm C/ABRAZ und S/ 63.17 S/ -
261020024 GABINETE METALICO CON BARRA DE COBRE 24 POLOS und S/ 4,482.22 S/ -
261020031 GABINETE METALICO CON BARRA DE COBRE 36 POLOS und S/ 1,184.50 S/ -
261020034 CAJA PARA INTERRUPTOR und S/ 45.00 S/ -
261020035 GABINETE PARA EXTINTOR und S/ 186.21 S/ -
262010017 POSTE DE CONCRETO CENTRIF. 8ML und S/ 4,729.50 S/ -
262010019 POSTE DE CONCRETO CENTRIF. 25MU1200/210/585 PARA PARARRAYOS und S/ 15,038.00 S/ -
262010021 TRANSPORTE TERRESTRE kg S/ 2,900.00 S/ -
262010022 POSTE DE CONCRETO ARMADO DE 11 MTS und S/ 1,086.67 S/ -
262120005 PASTORAL DE CONCRETO CENTRIFUGADO PARA LUMINARIA und S/ 147.63 S/ -
265010035 TUBO PROTECTOR DE FºGº 2"x4m C/02 ABRAZ . und S/ 151.95 S/ -

CAM124
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


265010037 MASTIL DE FºGº 4" X9M C/ACOPLE S/DISEñO und S/ 673.33 S/ -
265010046 TUBERIA FºGº 1" m S/ 47.76 S/ -
265010066 TUBERIA FºGº 314" m S/ 46.34 S/ -
265250008 CAJA METALICA PARA VALVULAS und S/ 35.31 S/ -
265560039 NIPLE FºGº 2" und S/ 2.45 S/ -
265560040 NIPLE FºGº 1" und S/ 1.84 S/ -
265560041 NIPLE FºGº 314" und S/ 1.28 S/ -
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 12.61 S/ -
265570032 UNION UNIVERSAL FºGº 1" und S/ 14.80 S/ -
265570038 UNION UNIVERSAL FºGº 2" und S/ 19.71 S/ -
265590040 CODO FºGº 314 x 90º S/ 5.70 S/ -
265590041 CODO FºGº 1" x 90º und S/ 8.00 S/ -
268010001 TUBERIA DE COBRE TIPO "L" 112" m S/ 299.44 S/ -
268010002 TUBERIA DE COBRE TIPO "K" 2" m S/ 320.46 S/ -
268010003 TUBERIA DE COBRE TIPO "K" 11/2" m S/ 160.23 S/ -
268120002 PITON DE BRONCE DE 1/2" PARA SALIDA DE GAS und S/ 22.32 S/ -
268120003 CODO DE COBRE 1/2" und S/ 25.98 S/ -
268120004 CODO DE COBRE 2" TIPO K und S/ 35.68 S/ -
268120005 CODO DE COBRE 1 1/2" TIPO K und S/ 14.08 S/ -
272200003 TUBO PVC-P (ELEC.) 20mm 3M m S/ 4,138.03 S/ - S/ - S/ - S/ -
272200004 TUBO PVC-P (ELEC.) 25mm 3M m S/ 308.98 S/ - S/ - S/ - S/ -
272200010 TUBO PVC-P (ELEC.) 100mm 3M m S/ 128.75 S/ - S/ 19.31 S/ 19.31 S/ 19.31
272200011 TUBO PVC-P (ELEC.) 35mm 3M m S/ 1,310.68 S/ 272.95 S/ 327.67 S/ 327.67 S/ -

CAM125
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


272200012 TUBO PVC-P (ELEC.) 50mm 3M m S/ 1,492.58 S/ - S/ - S/ - S/ 223.89
272200014 TUBO PVC-P (ELEC.) 75mm 3M m S/ 97.09 S/ 6.47 S/ 7.77 S/ 14.56 S/ 14.56
272220029 TUBERIA CONDUIT DE 20mm m S/ 122.62 S/ - S/ - S/ - S/ -
272220030 CONECTOR CONDUIT DE 20mm und S/ 47.10 S/ - S/ - S/ 11.78 S/ 11.78
272220031 CURVA EMT CONDUIT DE 20mm und S/ 39.84 S/ 1.66 S/ 1.99 S/ 1.99 S/ 1.99
272500003 CURVA PVC-P (ELEC.) 20mm und S/ 551.41 S/ 114.83 S/ 137.85 S/ 137.85 S/ -
272500004 CURVA PVC-P {ELEC.) 25mm und S/ 48.09 S/ 10.02 S/ 12.02 S/ - S/ -
272500013 UNION SIMPLE PVC-P (ELEC.) 20mm und S/ 16.00 S/ - S/ 4.00 S/ 4.00 S/ 4.00
272500025 CONECTOR PVC 025MM und S/ 8.36 S/ - S/ - S/ - S/ -
272500029 CURVA PVC-P (ELEC.) 100mm und S/ 41.91 S/ - S/ - S/ - S/ -
272500030 CURVA PVC-P (ELEC.) 35mm und S/ 310.33 S/ - S/ - S/ - S/ -
272500031 CURVA PVC-P (ELEC.) 50mm und S/ 200.35 S/ - S/ 30.05 S/ 30.05 S/ 30.05
272500032 CURVA PVC-P (ELEC.) 75mm und S/ 30.29 S/ 6.31 S/ 7.57 S/ 7.57 S/ -
272500033 UNION DE COBRE 1/2" und S/ 23.26 S/ - S/ - S/ - S/ 3.49
272510147 UNION DE COBRE 2" TIPO K und S/ 6.31 S/ 0.42 S/ 0.50 S/ 0.95 S/ 0.95
272510148 UNION DE COBRE 11/2" TIPO K und S/ 2.80 S/ - S/ - S/ - S/ -
272520069 TAPON HEMBRA DE COBRE 1/2" und S/ 12.27 S/ - S/ - S/ 3.07 S/ 3.07
272610005 TEE DE COBR E 1/2" und S/ 11.75 S/ 0.49 S/ 0.59 S/ 0.59 S/ 0.59
272610008 TEE DE COBRE 2" TIPO K m S/ 24.66 S/ 5.14 S/ 6.17 S/ 6.17 S/ -
272610009 TEE DE COBRE 11/2" TIPO K m S/ 10.33 S/ 0.34 S/ 0.62 S/ 0.83 S/ 1.03
277010015 VALVULA DE GLOBO DE 1/2" PARA GAS und S/ 401.70 S/ -
277010020 VALVULA DE SEGURIDAD DE 1/2" PARA GAS und S/ 10.83 S/ -
277010021 VALVULA DE GLOBO DE 1" und S/ 109.80 S/ -

CAM126
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


277010022 VALVULA DE GLOBO DE 3/4" und S/ 290.87 S/ -
277110011 VALVULA CHECK PESADA DE BRONCE D=2 " und S/ 42.44 S/ -
277110027 VALVULA T PESADA DE BRONCE D=2" und S/ 42.44 S/ -
277210014 VÁLVULA REGULADORA DE PRESION DE 1ER Y 2DAAETAPA INC. ACCSORIOS VARIOS und S/ 96.67 S/ -
277210022 VALVULA DE LLENADO S/ 32.62 S/ -
und
277210023 VALVULA DE RETORNO und S/ 30.56 S/ -
277210024 ACOPLES DE INYECCION und S/ 26.78 S/ -
277210025 ACOPLE DE RESTORNO und S/ 23.00 S/ -
277210026 VALVULA DE SEGURIDAD ESFERICA 11/2" und S/ 93.33 S/ -
277210027 VALVULA DE SEGURIDAD ESFERICA 3/4" und S/ 43.33 S/ -
277210028 VALVULA DE ALIVIO DE PRESION und S/ 90.00 S/ -
277510018 SUMIDERO DE BRONCE 3" und S/ 36.80 S/ -
DEFICIENCIA
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 13.65 S/ -
202100002 ALAMBRE NEGRO Nro.16 kg S/ 4.93 S/ -
202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 14.25 S/ -
202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.00 S/ -
203010010 ACERO CORRUGADO GRADO 60 kg S/ 485.76 S/ -
204050001 ARENA GRUESA m3 S/ 569.50 S/ -
204050002 ARENA FINA m3 S/ 81.02 S/ -
204100010 TIERRA CERNIDA m3 S/ 482.98 S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 2,074.95 S/ -
205350001 AGUA und S/ 19.11 S/ -

CAM127
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


206200005 CONECTOR DE BARRA DE 5/8" Y 3/4" und S/ 536.35
207050009 CONEXIONA CAJA PVC ELEC. SAP 25MM und S/ 12.37 S/ -
207900013 CONECTOR PVC 25mm und S/ 6.01 S/ -
206200011 CONECTOR PVC 55mm und S/ 45.01
206200019 CONECTOR PVC 20mm und S/ 221.42
206200028 CONECTOR PVC 35mm und S/ 148.45
206200030 CONECTOR PVC 100mm und S/ 8.44
206200031 CONECTOR PVC 75mm und S/ 5.13
206300002 CABLE HELICOIDAL DE 9m Cu und S/ 843.76
206550023 VARILLA DE COBRE 3/4"x 2.40Ín C/PUNTA und S/ 1,728.27
206560001 CABLE 1x16mm2 COBRE DESNUDO m3 S/ 17.80
206560002 CABLE 1x50mm2 COBRE DESNUDO m S/ 925.75
207050015 CONDUCTOR N2XOH - 1 x 300mm m S/ 2,293.19 S/ -
207050016 CONDUCTOR N2XOH - 1 x 25mm2 m S/ 1,162.81 S/ -
207050017 CONDUCTOR N2XOH-1 x 10mm2 m S/ 11,248.14 S/ -
207050018 CONDUCTOR N2XOH - 1 x 6mm2 m S/ 3,531.68 S/ -
207050019 CONDUCTOR N2XOH - 1 x 16mm2 m S/ 2,900.81 S/ -
207050022 CONDUCTOR N2XOH -1 x 70mm2 m S/ 128.54 S/ -
207050023 CONDUCTOR N2XOH - 1 x 35mm2 m S/ 1,463.63 S/ -
207150013 CONDUCTOR NH-80, 4mm2 m S/ 4,475.89 S/ -
207150022 CONDUCTOR NH-80, 6mm2 m S/ 893.20 S/ -
207150023 CONDUCTOR NH-80, 2.5mm2 m S/ 10,650.04 S/ -
211250005 CORTACIRCUITO PARA POSTE DE CONCRETO und S/ 796.53 S/ -

CAM128
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


211250010 SOPORTE P/TENSADO MOD.SA-9 DE FºGº C/AISLADOR und S/ 93.92 S/ -
211250012 SOPORTE P/TENSADO MOD.SA-7 DE FºGº C/AISLADOR und S/ 187.84 S/ -
211250041 CAPTOR CON DISPOSITIVO DE CEBADO und S/ 5,388.49 S/ -
212050115 ARTEF. ILUMINACION DE EMERGENCIA C/2 LAMP. 20W, 2 HORAS DE AUTONOMIA und S/ 13,555.36 S/ -
212050123 ARTEFACTO SIMILAR RAS 3X36 und S/ 22,909.33 S/ -
212050124 ARTEFACTO SIMILAR RAS 2X36 und S/ 6,236.49 S/ -
212050125 ARTEFACTO SIMILAR TPC 132 und S/ 5,162.99 S/ -
212050126 ARTEFACTO SIMILAR TPR 2X18 und S/ 5,796.57 S/ -
212050127 ARTEFACTO SIMILAR RSP 2X18W und S/ 4,633.93 S/ -
212050128 ARTEFACTO SIMILAR ULTR AA2X18 und S/ 747.43 S/ -
212050129 REFLECTOR TIPO ARAN 1X70 und S/ 520.66 S/ -
212050130 REFLECTOR TIPO MERH - 250 und S/ 1,249.60 S/ -
212050131 ARTEFACTO SIMILAR A GEOTEC 1X35 und S/ 890.91 S/ -
212050132 ARTEFACTO PARA ADOSAR TIPO ALPHA SP.O A 1X20W und S/ 104.13 S/ -
212050133 WALL SOKETE, CON LAMPARA AHORRADORA DE 20W und S/ 27.77 S/ -
212050134 BRAQUETE DE 2 LAMPARAS DE 18W SIMILAR A RSP-2 JOSFEL und S/ 2,343.00 S/ -
212050135 ARTEFACTO PARA ADOSAR, 1 LAMPARA DE 32 W, SIMILAR AL TIPO TPC-1x32 DE JOSFEL. und S/ 1,703.25 S/ -
212050136 ARTEFACTO PARA ADOSAR Y/O COLGAR, CON LAMPARA FLUORECENTE DE 36W, SIMILAR AL TIPO AHR 2x36 und S/ 3,147.27 S/ -
212050137 ARTEFACTO ADOSADO, CON DOS LAMPARAS 18W, SIMILAR AL TIPO ELA-2 x 18 und S/ 87.93 S/ -
212050138 ARTEFACTO PARA SUSPENDER, CON 2 LAMPARAS FLUORECENTES DE 36 W, SIMILAR AL TIPO RAS 2X36W. und S/ 1,700.86 S/ -
212050139 ARTEFACTO PARA ADOSAR, CON 3 LAMPARAS DE 36W, SIMILAR AL TIPO RAS-A-3X36 und_x000D_ S/ 1,041.33 S/ -
212050140 ARTEFACTO PARA SUSPENDER, CON 3 FLUORECENTES DE 36_x000D_ und S/ 370.27 S/ -
212050141 W, SIMILAR AL
ARTEFACTO TIPOADOSAR,
PARA ISP 3x36W
CON LAMPARA FLUORECENTE DE 36W, CON KIT PARA EMERGENCIA SIMILAR AL TIPO A und S/ 592.43 S/ -

CAM129
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


212050142 ARTEFACTOREFLECTOR CON LAMPARA DE 250 W, SIMILAR AL TIPO MERH-250. und S/ 6,768.67 S/ -
212050143 BRAQUETE REFLECTOR CON 2 LAMPARAS LED DE 18W SIMILAR AL TIPO ULTRA A und S/ 395.70 S/ -
212050144 ARTEFACTO PARA ADOSAR, SIMILAR AL TIPO ALPHA SPOT A, CON DOS LAMPARAS DE 26W TC-DEL und S/ 138.84 S/ -
212050145 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROTECCION IP66 SIMILAR A JOSFEL AHR - 1x 36 und S/ 842.31 S/ -
212050146 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROTECCION IP66 SIMILAR A JOSFEL AHR - 1x 36 CO und S/ 2,166.00 S/ -
212050147 ARTEFACTO DE ILUMINACION CON LAMAPARA LED DE 36W, PROTECCION IP66 SIMILAR A AL TIPO AHR 1X36 und S/ 1,230.82 S/ -
212050148 ARTEFACTO DE ILUMINACION CON LAMPARA LED DE 36W, PROTECCION IP66 SIMILAR A AL TIPO AHR - 1x 36 CON und S/ 3,429.50 S/ -
212050149 REFLECTORES CON LAMPARAS DE 250 W , HALOGENURO METALICO und S/ 879.33 S/ -
212050150 ARTEFACTO TIPO ASTRO-70, CON LAMPARA DE 70W HALOGENURO METALICO und S/ 5,825.58 S/ -
212050151 PASTORAL SIMPLE TIPO SUCRE und S/ 1,050.00 S/ -
212050152 PASTORAL DOBLE TIPO SUCRE und S/ 100.00 S/ -
212050153 REFLECTOR SIMILAR A ARAN, CON LAMPARA DE 150W HALOGENURO METALICO und S/ 1,475.20 S/ -
212050154 ARTEFACTO SIMILARA AHR-1X36 + KIT DE EMERGENCIA und S/ 3,471.07 S/ -
212050155 ARTEFACTO SIMILAR AHR-1X36 und S/ 1,423.11 S/ -
212050156 CAMPANILLA DE TIMBRE DE 8" DE DIAMETRO und S/ 229.97 S/ -
212050157 CAMPANILLA DE TIMBRE DE 4" DE DIAMETRO und S/ 72.63 S/ -
212050159 SENSOR DE TEMPERATURA Y/O HUMO und S/ 248.79 S/ -
212150002 CAJA GALV. RECT. PESADA 4" x 2" x 21/4" und S/ 846.77 S/ -
212150011 CAJA GALV. OCTOGONAL PESADA 4" und S/ 862.61 S/ -
212150035 CAJA DE PASE GALVANIZADA 4" x 4" x 2" und S/ 366.50 S/ -
212150036 CAJA DE PASE GALVANIZADA OCTOGONAL (100X55mm) und S/ 40.48 S/ -
212150039 CAJA DE PASE GALVANIZADA (150X150X75mm) und S/ 185.13 S/ -
212150041 CAJA DE PASE GALVANIZADA (200X200X100mm) und S/ 145.86 S/ -

CAM130
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


212150042 CAJA DE PASE GALVANIZADA (300X300X100mm) und S/ 224.00 S/ -
212150043 CAJA DE PASE GALVANIZADA (100X100X100mm) und S/ 93.51 S/ -
212150044 CAJA DE PASE GALVANIZADA (100X100X50mm) und S/ 31.64 S/ -
212150045 TAPA CIEGA DE 300X300 und S/ 57.72 S/ -
212150046 TAPA CIEGA DE 200X200 und S/ 5.10 S/ -
212150047 TAPA CIEGA DE 150X150 und S/ 3.63 S/ -
212150048 CAJA DE PASE GALVANIZADA (100X50X55mm) und S/ 9.71 S/ -
212150049 TAPA CIEGA OCTOGONAL DE 100 und S/ 20.88 S/ -
212250004 INTERRUPTOR 2 GOLPE SIMILAR TIPO TICINO und S/ 545.39 S/ -
212250078 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und S/ 1,140.92 S/ -
212250080 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und S/ 1,106.35 S/ -
212250092 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und S/ 752.00 S/ -
212250093 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und S/ 465.18 S/ -
212250095 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und S/ 77.53 S/ -
212250103 INTERRUPTOR TERMOMAGNETICO - 3 x 20 A und S/ 158.60 S/ -
212250132 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und S/ 354.38 S/ -
212250134 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und S/ 470.00 S/ -
212250140 INTERRUPTOR DIFERENCIAL 2X25A-30MA und S/ 13,844.08 S/ -
212250143 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und S/ 25.84 S/ -
212250144 INTERRUPTOR TERMOMAGNETICO - 2 x 50 A und S/ 24.68 S/ -
212250145 INTERRUPTOR 1 GOLPE SIMILAR TIPO TICINO und S/ 255.64 S/ -
212250146 INTERRUPTOR DE CONMUTACION SIMILAR TIPO TICINO und S/ 1,025.89 S/ -
212250147 INTERRUPTOR 3 GOLPES SIMILAR TIPO TICINO und S/ 300.07 S/ -

CAM131
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


212250148 PULSADOR DE TIMBRE und S/ 28.82 S/ -
212250150 INTERRUPTOR TERMOMAGNETICO - 2 x 40 A und S/ 34.91 S/ -
212250152 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 16KA und S/ 62.56 S/ -
212250153 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 20KA und S/ 250.23 S/ -
212250154 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A 20KA und S/ 83.65 S/ -
212250155 INTERRUPTOR TERMOMAGNETICO- 3 x 70 A 16KA und S/ 62.56 S/ -
212250156 INTERRUPTOR DIFERENCIAL 2X40A-30MA und S/ 988.80 S/ -
212250164 INTERRUPTOR TERMOMAGNETICO- 3 x 60 A 10KA und S/ 16.29 S/ -
212250168 INTERRUPTOR TERMOMAGNETICO-3 x 125 A 25KA und S/ 167.30 S/ -
212250171 CONTACTOR ELECTRICO 2 X 20 A und S/ 319.32 S/ -
212250172 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A 20KA und S/ 125.11 S/ -
212250173 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 20KA und S/ 32.59 S/ -
212250174 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 16KA und S/ 32.59 S/ -
212250181 CONTROL DE NIVEL und S/ 281.19 S/ -
212250182 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA EN CISTERNA und S/ 86.52 S/ -
212250189 TG (TABLERO AUTOSOPORTADO, ITM: 11X40A 10KA, 4 2X20A 10KA, 3 2X40 10KA, 3 3X20 10KA, 2 3X30A 10KA, 2 3X40A und S/ 4,549.17 S/ -
212250190 TG - 6 (TABLERO AUTOSOPORTADO, ITM: 2 2X40A, 3 2X20A, 1 2X60 20KA, 4 3X80 25KA, 2 3X125A 25KA, 1 3X300A 50KA; I und S/ 3,536.33 S/ -
212300022 TOMA PARA RED DATA (DADO) und S/ 1,926.22 S/ -
212300025 TOMACORRIENTE DOBLE C/ LINEA DE TIERRA SIMILAR TIPO TICINO und S/ 4,612.63 S/ -
212300028 TOMACORRIENTE DOBLE A PRUEBA DE AGUA und S/ 654.50 S/ -
212350060 PLACA SALIDA PARA TV o TELEFONO und S/ 662.15 S/ -
212350062 PLACA DE ALUMINIO ANODIZADO 1 PERFORACION und S/ 1,058.20 S/ -
212350063 PLACA DE ALUMINIO ANODIZADO 2 PERFORACION und S/ 929.13 S/ -

CAM132
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


219600001 CABLE DESNUDO 50MM2 (1/0 AWG) m S/ 564.27 S/ -
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 4,488.01 S/ -
221030015 MARCO Y TAPA DE BUZON ELECTRICO und S/ 1,726.67 S/ -
221030016 MARCO Y TAPA DE BUZON COMUNICACIONES und S/ 2,461.01 S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 3.89 S/ -
230010030 CINTA TEFLON m S/ 0.11 S/ -
230010057 DOSIS QUIMICA THOR GEL DE 5 kg und S/ 1,362.78 S/ -
230010136 CINTA AISLANTE ml S/ 1,105.15 S/ -
230010143 SELLADOR BLANCO PARA MUROS gal S/ 0.28 S/ -
230010147 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal S/ 405.58 S/ -
230010151 ASCENSOR 03 PARADAS CON CUARTO DE MAQUINAS und S/ 29,880.67 S/ -
230010155 ASCENSOR 02 PARADAS CON CUARTO DE MAQUINAS und S/ 28,540.28 S/ -
230100010 EXTINTOR C02 DE 15 LIBRAS und S/ 736.71 S/ -
230990125 MANOMETRO DE GLICERINA DE 0-300psi und S/ 37.85 S/ -
230990126 MANOMETRO DE GLICERINA DE 0-100psi und S/ 36.45 S/ -
230990127 BALON DE GAS 100 LBS (INCLUYE GAS) und S/ 782.80 S/ -
230990128 REGULADOR FISHER C/NIPLES DE CONEX R962 und S/ 597.40 S/ -
230990168 SUM. E INSTALACION DE SUB ESTACION ZONA ACADEMICA glb S/ 44,373.52 S/ -
230990169 SUM. E INSTALACION DE SUB ESTACION ZONA DEPORTIVA glb S/ 47,022.71 S/ -
230990171 TANQUE DE GAS DE 1000 GALONES (INC. ACCESORIOS Y VALVULAS) und S/ 3,738.90 S/ -
230990176 MANOMETRO DE PRESION und S/ 48.00 S/ -
230990177 POOL DE CHICOTE COBRE ALTA PRESION TERMNAL TANQUE Y REG. DE PRESION und S/ 17.33 S/ -
231250001 CAJA DE CONCRETO C/TAPA und S/ 126.20 S/ -

CAM133
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


231250025 CAJA DE CONCRETO C/TAPA 40 X 40 X 40 cm und S/ 107.12 S/ -
243010001 MADERA TORNILLO p2 S/ 542.04 S/ -
243100001 MADERA CEDRO p2 S/ 0.06 S/ -
251050005 BALON DE GAS 100 LBS (INCLUYE GAS) m S/ 45.99 S/ -
251200002 PLATINA DE FIERRO 1/8" x 1" m S/ 1.76 S/ -
251200023 PLATINA DE FIERRO 114" X 1" m S/ 290.36 S/ -
251200096 PLATINA DE FIERRO 118" X 314" m S/ 1.36 S/ -
251300054 TUBERIA DE 0 2" ACEDRO CELULA 40 m S/ 36.86 S/ -
251300055 TUBERIA DE 0 1" ACEDRO CELULA 40 m S/ 17.85 S/ -
251300056 UNION DE 0 2 ACEDRO CELULA 40 und S/ 13.27 S/ -
251300057 UNION DE 01" ACEDRO CELULA 40 und S/ 6.43 S/ -
254150020 PINTURA ESMALTE qal S/ 4.94 S/ -
254200001 PINTURA ANTICORROSIVA qal S/ 14.65 S/ -
261020015 PCHA FºGº P/MASTIL 118" 15x20cm C/ABRAZ und S/ 63.17 S/ -
261020024 GABINETE METALICO CON BARRA DE COBRE 24 POLOS und S/ 4,482.22 S/ -
261020031 GABINETE METALICO CON BARRA DE COBRE 36 POLOS und S/ 1,184.50 S/ -
261020034 CAJA PARA INTERRUPTOR und S/ 45.00 S/ -
261020035 GABINETE PARA EXTINTOR und S/ 186.21 S/ -
262010017 POSTE DE CONCRETO CENTRIF. 8ML und S/ 4,729.50 S/ -
262010019 POSTE DE CONCRETO CENTRIF. 25MU1200/210/585 PARA PARARRAYOS und S/ 15,038.00 S/ -
262010021 TRANSPORTE TERRESTRE kg S/ 2,900.00 S/ -
262010022 POSTE DE CONCRETO ARMADO DE 11 MTS und S/ 1,086.67 S/ -
262120005 PASTORAL DE CONCRETO CENTRIFUGADO PARA LUMINARIA und S/ 147.63 S/ -

CAM134
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


265010035 TUBO PROTECTOR DE FºGº 2"x4m C/02 ABRAZ . und S/ 151.95 S/ -
265010037 MASTIL DE FºGº 4" X9M C/ACOPLE S/DISEñO und S/ 673.33 S/ -
265010046 TUBERIA FºGº 1" m S/ 47.76 S/ -
265010066 TUBERIA FºGº 314" m S/ 46.34 S/ -
265250008 CAJA METALICA PARA VALVULAS und S/ 35.31 S/ -
265560039 NIPLE FºGº 2" und S/ 2.45 S/ -
265560040 NIPLE FºGº 1" und S/ 1.84 S/ -
265560041 NIPLE FºGº 314" und S/ 1.28 S/ -
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 12.61 S/ -
265570032 UNION UNIVERSAL FºGº 1" und S/ 14.80 S/ -
265570038 UNION UNIVERSAL FºGº 2" und S/ 19.71 S/ -
265590040 CODO FºGº 314 x 90º S/ 5.70 S/ -
265590041 CODO FºGº 1" x 90º und S/ 8.00 S/ -
268010001 TUBERIA DE COBRE TIPO "L" 112" m S/ 299.44 S/ -
268010002 TUBERIA DE COBRE TIPO "K" 2" m S/ 320.46 S/ -
268010003 TUBERIA DE COBRE TIPO "K" 11/2" m S/ 160.23 S/ -
268120002 PITON DE BRONCE DE 1/2" PARA SALIDA DE GAS und S/ 22.32 S/ -
268120003 CODO DE COBRE 1/2" und S/ 25.98 S/ -
268120004 CODO DE COBRE 2" TIPO K und S/ 35.68 S/ -
268120005 CODO DE COBRE 1 1/2" TIPO K und S/ 14.08 S/ -
272200003 TUBO PVC-P (ELEC.) 20mm 3M m S/ 4,138.03 S/ - S/ - S/ - S/ -
272200004 TUBO PVC-P (ELEC.) 25mm 3M m S/ 308.98 S/ - S/ - S/ - S/ -
272200010 TUBO PVC-P (ELEC.) 100mm 3M m S/ 128.75 S/ - S/ 19.31 S/ 19.31 S/ 19.31

CAM135
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


272200011 TUBO PVC-P (ELEC.) 35mm 3M m S/ 1,310.68 S/ 272.95 S/ 327.67 S/ 327.67 S/ -
272200012 TUBO PVC-P (ELEC.) 50mm 3M m S/ 1,492.58 S/ - S/ - S/ - S/ 223.89
272200014 TUBO PVC-P (ELEC.) 75mm 3M m S/ 97.09 S/ 6.47 S/ 7.77 S/ 14.56 S/ 14.56
272220029 TUBERIA CONDUIT DE 20mm m S/ 122.62 S/ - S/ - S/ - S/ -
272220030 CONECTOR CONDUIT DE 20mm und S/ 47.10 S/ - S/ - S/ 11.78 S/ 11.78
272220031 CURVA EMT CONDUIT DE 20mm und S/ 39.84 S/ 1.66 S/ 1.99 S/ 1.99 S/ 1.99
272500003 CURVA PVC-P (ELEC.) 20mm und S/ 551.41 S/ 114.83 S/ 137.85 S/ 137.85 S/ -
272500004 CURVA PVC-P {ELEC.) 25mm und S/ 48.09 S/ 10.02 S/ 12.02 S/ - S/ -
272500013 UNION SIMPLE PVC-P (ELEC.) 20mm und S/ 16.00 S/ - S/ 4.00 S/ 4.00 S/ 4.00
272500025 CONECTOR PVC 025MM und S/ 8.36 S/ - S/ - S/ - S/ -
272500029 CURVA PVC-P (ELEC.) 100mm und S/ 41.91 S/ - S/ - S/ - S/ -
272500030 CURVA PVC-P (ELEC.) 35mm und S/ 310.33 S/ - S/ - S/ - S/ -
272500031 CURVA PVC-P (ELEC.) 50mm und S/ 200.35 S/ - S/ 30.05 S/ 30.05 S/ 30.05
272500032 CURVA PVC-P (ELEC.) 75mm und S/ 30.29 S/ 6.31 S/ 7.57 S/ 7.57 S/ -
272500033 UNION DE COBRE 1/2" und S/ 23.26 S/ - S/ - S/ - S/ 3.49
272510147 UNION DE COBRE 2" TIPO K und S/ 6.31 S/ 0.42 S/ 0.50 S/ 0.95 S/ 0.95
272510148 UNION DE COBRE 11/2" TIPO K und S/ 2.80 S/ - S/ - S/ - S/ -
272520069 TAPON HEMBRA DE COBRE 1/2" und S/ 12.27 S/ - S/ - S/ 3.07 S/ 3.07
272610005 TEE DE COBR E 1/2" und S/ 11.75 S/ 0.49 S/ 0.59 S/ 0.59 S/ 0.59
272610008 TEE DE COBRE 2" TIPO K m S/ 24.66 S/ 5.14 S/ 6.17 S/ 6.17 S/ -
272610009 TEE DE COBRE 11/2" TIPO K m S/ 10.33 S/ 0.34 S/ 0.62 S/ 0.83 S/ 1.03
277010015 VALVULA DE GLOBO DE 1/2" PARA GAS und S/ 401.70 S/ -
277010020 VALVULA DE SEGURIDAD DE 1/2" PARA GAS und S/ 10.83 S/ -

CAM136
CALENDARIO DE ADQUISICION DE MATERIAL
OBRA: : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLI
EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

CONTRATANTE : PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA - PRONIED


CONTRATISTA : GRUPO JOHESA CONSTRUCTORES S.A.C.
SUPERVISOR : CONSORCIO NORTE INGENIEROS

Mes 03 Mes 04 Mes 05 Mes 06


2/5/2020 3/1/2020 4/1/2020 5/1/2020

Código MATERIALES Unidad Parcial S/. 2/29/2020 3/31/2020 4/30/2020 5/31/2020


277010021 VALVULA DE GLOBO DE 1" und S/ 109.80 S/ -
277010022 VALVULA DE GLOBO DE 3/4" und S/ 290.87 S/ -
277110011 VALVULA CHECK PESADA DE BRONCE D=2 " und S/ 42.44 S/ -
277110027 VALVULA T PESADA DE BRONCE D=2" und S/ 42.44 S/ -
277210014 VÁLVULA REGULADORA DE PRESION DE 1ER Y 2DAAETAPA INC. ACCSORIOS VARIOS und S/ 96.67 S/ -
277210022 VALVULA DE LLENADO S/ 32.62
und
277210023 VALVULA DE RETORNO und S/ 30.56
277210024 ACOPLES DE INYECCION und S/ 26.78
277210025 ACOPLE DE RESTORNO und S/ 23.00
277210026 VALVULA DE SEGURIDAD ESFERICA 11/2" und S/ 93.33
277210027 VALVULA DE SEGURIDAD ESFERICA 3/4" und S/ 43.33
277210028 VALVULA DE ALIVIO DE PRESION und S/ 90.00
277510018 SUMIDERO DE BRONCE 3" und S/ 36.80

TOTAL S/ 1,233,680.60 S/ 1,255.86 S/ 1,668.35 S/ 1,699.15 S/ 944.12

CAM137
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ -
S/ - S/ 251.21 S/ - S/ 188.41 S/ - S/ - S/ 251.21 S/ 251.21
S/ 57.10 S/ 57.10 S/ 57.10 S/ 38.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 596.90 S/ 596.90 S/ 298.45 S/ -
S/ 79.99 S/ 79.99 S/ 99.98 S/ 99.98 S/ - S/ - S/ - S/ -
S/ 10.66 S/ 10.66 S/ 13.33 S/ 13.33 S/ 16.00 S/ 16.00 S/ 13.33 S/ 20.00
S/ 152.72 S/ 152.72 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.68 S/ 5.79 S/ 8.68 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
S/ 89.76 S/ 89.76 S/ 89.76 S/ 59.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 2.51 S/ 2.51 S/ 1.25 S/ -
S/ 1.34 S/ 1.34 S/ 1.67 S/ 1.67 S/ - S/ - S/ - S/ -
S/ 226.08 S/ 226.08 S/ 282.61 S/ 282.61 S/ 339.13 S/ 339.13 S/ 282.61 S/ 423.91

CAM138
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 280.28 S/ 280.28 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 9.42 S/ 9.42 S/ 6.28 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 29.15 S/ 29.15 S/ 29.15 S/ 29.15 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 137.95 S/ 137.95 S/ 137.95 S/ 137.95 S/ -
S/ - S/ 54,707.71 S/ - S/ 41,030.78 S/ - S/ - S/ 54,707.71 S/ 54,707.71
S/ 994.21 S/ 994.21 S/ 994.21 S/ 662.81 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 180.24 S/ 180.24 S/ 90.12 S/ -
S/ 77.39 S/ 77.39 S/ 96.74 S/ 96.74 S/ - S/ - S/ - S/ -
S/ 50.70 S/ 50.70 S/ 63.37 S/ 63.37 S/ 76.04 S/ 76.04 S/ 63.37 S/ 95.05
S/ 3,651.21 S/ 3,651.21 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 5,264.19 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 12.82 S/ 19.23 S/ 19.23 S/ 19.23 S/ 12.82 S/ 12.82 S/ 6.41 S/ 6.41
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM139
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 342.16 S/ 342.16 S/ 342.16 S/ 342.16 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 548.50 S/ 548.50 S/ 548.50 S/ 548.50 S/ -
S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 1,568.22 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 24,203.83 S/ 24,203.83 S/ 12,101.92 S/ -

CAM140
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM141
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 735.00 S/ 735.00 S/ 735.00 S/ 735.00 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 385.00 S/ 385.00 S/ 385.00 S/ 385.00 S/ -
S/ - S/ 308.00 S/ - S/ 231.00 S/ - S/ - S/ 308.00 S/ 308.00
S/ 553.31 S/ 553.31 S/ 553.31 S/ 368.87 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM142
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM143
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ -
S/ - S/ 251.21 S/ - S/ 188.41 S/ - S/ - S/ 251.21 S/ 128.12
S/ 57.10 S/ 57.10 S/ 57.10 S/ 38.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM144
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 596.90 S/ 596.90 S/ 298.45 S/ -
S/ 79.99 S/ 79.99 S/ 99.98 S/ 99.98 S/ - S/ - S/ - S/ -
S/ 10.66 S/ 10.66 S/ 13.33 S/ 13.33 S/ 16.00 S/ 16.00 S/ 13.33 S/ 10.20
S/ 152.72 S/ 152.72 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.68 S/ 5.79 S/ 8.68 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 1.48
S/ 89.76 S/ 89.76 S/ 89.76 S/ 59.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 2.51 S/ 2.51 S/ 1.25 S/ -
S/ 1.34 S/ 1.34 S/ 1.67 S/ 1.67 S/ - S/ - S/ - S/ -
S/ 226.08 S/ 226.08 S/ 282.61 S/ 282.61 S/ 339.13 S/ 339.13 S/ 282.61 S/ 216.19
S/ 280.28 S/ 280.28 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 9.42 S/ 6.28 S/ 9.42 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 1.60
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 29.15 S/ 29.15 S/ 29.15 S/ 29.15 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 137.95 S/ 137.95 S/ 137.95 S/ 137.95 S/ -
S/ - S/ 54,707.71 S/ - S/ 41,030.78 S/ - S/ - S/ 54,707.71 S/ 27,900.93
S/ 994.21 S/ 994.21 S/ 994.21 S/ 662.81 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM145
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 180.24 S/ 180.24 S/ 90.12 S/ -
S/ 77.39 S/ 77.39 S/ 96.74 S/ 96.74 S/ - S/ - S/ - S/ -
S/ 50.70 S/ 50.70 S/ 63.37 S/ 63.37 S/ 76.04 S/ 76.04 S/ 63.37 S/ 48.48
S/ 3,651.21 S/ 3,651.21 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 5,264.19 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 12.82 S/ 12.82 S/ 6.41 S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 342.16 S/ 342.16 S/ 342.16 S/ 342.16 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 548.50 S/ 548.50 S/ 548.50 S/ 548.50 S/ -
S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 1,568.22 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 24,203.83 S/ 24,203.83 S/ 12,101.92 S/ -

CAM146
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM147
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM148
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 735.00 S/ 735.00 S/ 735.00 S/ 735.00 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 385.00 S/ 385.00 S/ 385.00 S/ 385.00 S/ -
S/ - S/ 308.00 S/ - S/ 231.00 S/ - S/ - S/ 308.00 S/ 157.08
S/ 553.31 S/ 553.31 S/ 553.31 S/ 368.87 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM149
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM150
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ -
S/ - S/ 251.21 S/ - S/ 188.41 S/ - S/ - S/ 251.21 S/ 128.12
S/ 57.10 S/ 57.10 S/ 57.10 S/ 38.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 596.90 S/ 596.90 S/ 298.45 S/ -
S/ 79.99 S/ 79.99 S/ 99.98 S/ 99.98 S/ - S/ - S/ - S/ -
S/ 10.66 S/ 10.66 S/ 13.33 S/ 13.33 S/ 16.00 S/ 16.00 S/ 13.33 S/ 10.20
S/ 152.72 S/ 152.72 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.68 S/ 5.79 S/ 8.68 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 1.48
S/ 89.76 S/ 89.76 S/ 89.76 S/ 59.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 2.51 S/ 2.51 S/ 1.25 S/ -
S/ 1.34 S/ 1.34 S/ 1.67 S/ 1.67 S/ - S/ - S/ - S/ -

CAM151
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 226.08 S/ 226.08 S/ 282.61 S/ 282.61 S/ 339.13 S/ 339.13 S/ 282.61 S/ 216.19
S/ 280.28 S/ 280.28 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 9.42 S/ 6.28 S/ 9.42 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 1.60
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 29.15 S/ 29.15 S/ 29.15 S/ 29.15 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 137.95 S/ 137.95 S/ 137.95 S/ 137.95 S/ -
S/ - S/ 54,707.71 S/ - S/ 41,030.78 S/ - S/ - S/ 54,707.71 S/ 27,900.93
S/ 994.21 S/ 994.21 S/ 994.21 S/ 662.81 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 180.24 S/ 180.24 S/ 90.12 S/ -
S/ 77.39 S/ 77.39 S/ 96.74 S/ 96.74 S/ - S/ - S/ - S/ -
S/ 50.70 S/ 50.70 S/ 63.37 S/ 63.37 S/ 76.04 S/ 76.04 S/ 63.37 S/ 48.48
S/ 3,651.21 S/ 3,651.21 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 5,264.19 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 12.82 S/ 12.82 S/ 6.41 S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM152
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 1,033.19 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 342.16 S/ 342.16 S/ 342.16 S/ 342.16 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 548.50 S/ 548.50 S/ 548.50 S/ 548.50 S/ -
S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 1,568.22 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 24,203.83 S/ 24,203.83 S/ 12,101.92 S/ -

CAM153
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM154
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 735.00 S/ 735.00 S/ 735.00 S/ 735.00 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 385.00 S/ 385.00 S/ 385.00 S/ 385.00 S/ -
S/ - S/ 308.00 S/ - S/ 231.00 S/ - S/ - S/ 308.00 S/ 157.08
S/ 553.31 S/ 553.31 S/ 553.31 S/ 368.87 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM155
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM156
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ -
S/ - S/ 251.21 S/ - S/ 188.41 S/ - S/ - S/ 251.21 S/ 128.12
S/ 57.10 S/ 57.10 S/ 57.10 S/ 38.07 S/ - S/ - S/ - S/ -

CAM157
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 596.90 S/ 596.90 S/ 298.45 S/ -
S/ 79.99 S/ 79.99 S/ 99.98 S/ 99.98 S/ - S/ - S/ - S/ -
S/ 10.66 S/ 10.66 S/ 13.33 S/ 13.33 S/ 16.00 S/ 16.00 S/ 13.33 S/ 10.20
S/ 152.72 S/ 152.72 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.68 S/ 5.79 S/ 8.68 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 1.48
S/ 89.76 S/ 89.76 S/ 89.76 S/ 59.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 2.51 S/ 2.51 S/ 1.25 S/ -
S/ 1.34 S/ 1.34 S/ 1.67 S/ 1.67 S/ - S/ - S/ - S/ -
S/ 226.08 S/ 226.08 S/ 282.61 S/ 282.61 S/ 339.13 S/ 339.13 S/ 282.61 S/ 216.19
S/ 280.28 S/ 280.28 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 9.42 S/ 6.28 S/ 9.42 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 1.60
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 29.15 S/ 29.15 S/ 29.15 S/ 29.15 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 137.95 S/ 137.95 S/ 137.95 S/ 137.95 S/ -
S/ - S/ 54,707.71 S/ - S/ 41,030.78 S/ - S/ - S/ 54,707.71 S/ 25,480.93
S/ 994.21 S/ 994.21 S/ 994.21 S/ 662.81 S/ - S/ - S/ - S/ -

CAM158
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 180.24 S/ 180.24 S/ 90.12 S/ -
S/ 77.39 S/ 77.39 S/ 96.74 S/ 96.74 S/ - S/ - S/ - S/ -
S/ 50.70 S/ 50.70 S/ 63.37 S/ 63.37 S/ 76.04 S/ 76.04 S/ 63.37 S/ 48.48
S/ 3,651.21 S/ 3,651.21 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 5,264.19 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 12.82 S/ 12.82 S/ 6.41 S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 342.16 S/ 342.16 S/ 342.16 S/ 342.16 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 548.50 S/ 548.50 S/ 548.50 S/ 548.50 S/ -
S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 1,568.22 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 24,203.83 S/ 24,203.83 S/ 12,101.92 S/ -

CAM159
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM160
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM161
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 735.00 S/ 735.00 S/ 735.00 S/ 735.00 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 385.00 S/ 385.00 S/ 385.00 S/ 385.00 S/ -
S/ - S/ 308.00 S/ - S/ 231.00 S/ - S/ - S/ 308.00 S/ 157.08
S/ 553.31 S/ 553.31 S/ 553.31 S/ 368.87 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM162
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM163
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ -
S/ - S/ 251.21 S/ - S/ 188.41 S/ - S/ - S/ 251.21 S/ 128.12
S/ 57.10 S/ 57.10 S/ 57.10 S/ 38.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 596.90 S/ 596.90 S/ 298.45 S/ -
S/ 79.99 S/ 79.99 S/ 99.98 S/ 99.98 S/ - S/ - S/ - S/ -
S/ 10.66 S/ 10.66 S/ 13.33 S/ 13.33 S/ 16.00 S/ 16.00 S/ 13.33 S/ 10.20
S/ 152.72 S/ 152.72 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.68 S/ 5.79 S/ 8.68 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 1.48
S/ 89.76 S/ 89.76 S/ 89.76 S/ 59.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 2.51 S/ 2.51 S/ 1.25 S/ -

CAM164
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 1.34 S/ 1.34 S/ 1.67 S/ 1.67 S/ - S/ - S/ - S/ -
S/ 226.08 S/ 226.08 S/ 282.61 S/ 282.61 S/ 339.13 S/ 339.13 S/ 282.61 S/ 216.19
S/ 280.28 S/ 280.28 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 9.42 S/ 6.28 S/ 9.42 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 1.60
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 29.15 S/ 29.15 S/ 29.15 S/ 29.15 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 137.95 S/ 137.95 S/ 137.95 S/ 137.95 S/ -
S/ - S/ 54,707.71 S/ - S/ 41,030.78 S/ - S/ - S/ 54,707.71
S/ 994.21 S/ 994.21 S/ 994.21 S/ 662.81 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 180.24 S/ 180.24 S/ 90.12 S/ -
S/ 77.39 S/ 77.39 S/ 96.74 S/ 96.74 S/ - S/ - S/ - S/ -
S/ 50.70 S/ 50.70 S/ 63.37 S/ 63.37 S/ 76.04 S/ 76.04 S/ 63.37 S/ 48.48
S/ 3,651.21 S/ 3,651.21 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 5,264.19 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 12.82 S/ 12.82 S/ 6.41 S/ -

CAM165
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 342.16 S/ 342.16 S/ 342.16 S/ 342.16 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 548.50 S/ 548.50 S/ 548.50 S/ 548.50 S/ -
S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 1,568.22 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 24,203.83 S/ 24,203.83 S/ 12,101.92 S/ -

CAM166
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM167
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 735.00 S/ 735.00 S/ 735.00 S/ 735.00 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ 385.00 S/ 385.00 S/ 385.00 S/ 385.00 S/ -
S/ - S/ 308.00 S/ - S/ 231.00 S/ - S/ - S/ 308.00 S/ 157.08
S/ 553.31 S/ 553.31 S/ 553.31 S/ 368.87 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM168
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM169
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/476,630.77 S/573,862.03 S/277,687.97 S/475,608.02 S/137,798.82 S/137,798.82 S/351,283.40 S/139,353.73

S/ 8.98 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ 906.82 S/ 906.82 S/ - S/ - S/ -

CAM170
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ - S/ - S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20
S/ 32.60 S/ 21.73 S/ 5.43 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.12 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.44 S/ 0.44 S/ 0.44 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07
S/ - S/ 0.17 S/ - S/ 0.13 S/ - S/ - S/ 0.17
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49
S/ 7.00 S/ 7.00 S/ 8.75 S/ 8.75 S/ - S/ - S/ -
S/ 3.49 S/ 3.49 S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36
S/ 2.72 S/ 2.72 S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 5.66 S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.66 S/ 6.99 S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88
S/ 92.27 S/ 92.27 S/ 92.27 S/ 92.27 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43
S/ - S/ 0.23 S/ - S/ 0.17 S/ - S/ - S/ 0.23
S/ 2.67 S/ 2.67 S/ 2.67 S/ 1.78 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23
S/ 15.51 S/ 15.51 S/ 19.38 S/ 19.38 S/ - S/ - S/ -

CAM171
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 46.68 S/ 46.68 S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77
S/ 2.21 S/ 2.94 S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68
S/ 4.05 S/ 2.70 S/ 0.68 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.18 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ 863.58 S/ 863.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47
S/ - S/ 2,274.65 S/ - S/ 1,705.99 S/ - S/ - S/ 2,274.65
S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 856.43 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86
S/ 1.73 S/ 1.73 S/ 2.16 S/ 2.16 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM172
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 11,196.12 S/ 11,196.12 S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86
S/ 48.25 S/ 48.25 S/ 60.32 S/ 60.32 S/ - S/ - S/ -
S/ 242.05 S/ 242.05 S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57
S/ 32,015.97 S/ 32,015.97 S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.83 S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 92.22 S/ 138.33 S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85
S/ 84.31 S/ 84.31 S/ 84.31 S/ 84.31 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23
S/ - S/ 405.81 S/ - S/ 304.35 S/ - S/ - S/ 405.81

CAM173
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63
S/ 132.05 S/ 132.05 S/ 165.06 S/ 165.06 S/ - S/ - S/ -
S/ 10.73 S/ 10.73 S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92
S/ 1.27 S/ 1.69 S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11
S/ 80.48 S/ 53.65 S/ 13.41 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 158.59 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ 36.20 S/ 36.20 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 52.37 S/ 52.37 S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46
S/ 62.24 S/ 62.24 S/ 77.80 S/ 77.80 S/ - S/ - S/ -
S/ 13.97 S/ 13.97 S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46
S/ 79.45 S/ 79.45 S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 77.80 S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 5.06 S/ 7.58 S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21
S/ 14.37 S/ 14.37 S/ 14.37 S/ 14.37 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44
S/ - S/ 12.67 S/ - S/ 9.50 S/ - S/ - S/ 12.67
S/ 3.80 S/ 3.80 S/ 3.80 S/ 2.53 S/ - S/ - S/ -

CAM174
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22

CAM175
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM176
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 27.67 S/ 27.67 S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58


S/ 22,456.72 S/ 22,456.72 S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 2,399.27 S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 275.35 S/ 413.03 S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46
S/ 211.71 S/ 211.71 S/ 211.71 S/ 211.71 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55

CAM177
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM178
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM179
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 20.21 S/ 20.21 S/ 25.26 S/ 25.26 S/ - S/ - S/ -

CAM180
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 8.98 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ 906.82 S/ 906.82 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20
S/ 32.60 S/ 21.73 S/ 5.43 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.12 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.44 S/ 0.44 S/ 0.44 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07
S/ - S/ 0.17 S/ - S/ 0.13 S/ - S/ - S/ 0.17
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49
S/ 7.00 S/ 7.00 S/ 8.75 S/ 8.75 S/ - S/ - S/ -
S/ 3.49 S/ 3.49 S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36
S/ 2.72 S/ 2.72 S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 5.66 S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.66 S/ 6.99 S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88

CAM181
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 92.27 S/ 92.27 S/ 92.27 S/ 92.27 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43
S/ - S/ 0.23 S/ - S/ 0.17 S/ - S/ - S/ 0.23
S/ 2.67 S/ 2.67 S/ 2.67 S/ 1.78 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23
S/ 15.51 S/ 15.51 S/ 19.38 S/ 19.38 S/ - S/ - S/ -
S/ 46.68 S/ 46.68 S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77
S/ 2.21 S/ 2.94 S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68
S/ 4.05 S/ 2.70 S/ 0.68 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.18 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ 863.58 S/ 863.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47
S/ - S/ 2,274.65 S/ - S/ 1,705.99 S/ - S/ - S/ 2,274.65
S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 856.43 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86
S/ 1.73 S/ 1.73 S/ 2.16 S/ 2.16 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM182
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 11,196.12 S/ 11,196.12 S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ -


S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86
S/ 48.25 S/ 48.25 S/ 60.32 S/ 60.32 S/ - S/ - S/ -
S/ 242.05 S/ 242.05 S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57

CAM183
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 32,015.97 S/ 32,015.97 S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.83 S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 92.22 S/ 138.33 S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85
S/ 84.31 S/ 84.31 S/ 84.31 S/ 84.31 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23
S/ - S/ 405.81 S/ - S/ 304.35 S/ - S/ - S/ 405.81
S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63
S/ 132.05 S/ 132.05 S/ 165.06 S/ 165.06 S/ - S/ - S/ -
S/ 10.73 S/ 10.73 S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92
S/ 1.27 S/ 1.69 S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11
S/ 80.48 S/ 53.65 S/ 13.41 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 158.59 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ 36.20 S/ 36.20 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 52.37 S/ 52.37 S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46
S/ 62.24 S/ 62.24 S/ 77.80 S/ 77.80 S/ - S/ - S/ -
S/ 13.97 S/ 13.97 S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46
S/ 79.45 S/ 79.45 S/ - S/ - S/ - S/ - S/ -

CAM184
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 116.69 S/ 77.80 S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 5.06 S/ 7.58 S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21
S/ 14.37 S/ 14.37 S/ 14.37 S/ 14.37 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44
S/ - S/ 12.67 S/ - S/ 9.50 S/ - S/ - S/ 12.67
S/ 3.80 S/ 3.80 S/ 3.80 S/ 2.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22

CAM185
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM186
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 27.67 S/ 27.67 S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58


S/ 22,456.72 S/ 22,456.72 S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 2,399.27 S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 275.35 S/ 413.03 S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46
S/ 211.71 S/ 211.71 S/ 211.71 S/ 211.71 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55

CAM187
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM188
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM189
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM190
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 20.21 S/ 20.21 S/ 25.26 S/ 25.26 S/ - S/ - S/ -

S/ 8.98 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ 906.82 S/ 906.82 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20
S/ 32.60 S/ 21.73 S/ 5.43 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.12 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.44 S/ 0.44 S/ 0.44 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07
S/ - S/ 0.17 S/ - S/ 0.13 S/ - S/ - S/ 0.17
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM191
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 16.47 S/ 16.47 S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49
S/ 7.00 S/ 7.00 S/ 8.75 S/ 8.75 S/ - S/ - S/ -
S/ 3.49 S/ 3.49 S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36
S/ 2.72 S/ 2.72 S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 5.66 S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.66 S/ 6.99 S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88
S/ 92.27 S/ 92.27 S/ 92.27 S/ 92.27 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43
S/ - S/ 0.23 S/ - S/ 0.17 S/ - S/ - S/ 0.23
S/ 2.67 S/ 2.67 S/ 2.67 S/ 1.78 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23
S/ 15.51 S/ 15.51 S/ 19.38 S/ 19.38 S/ - S/ - S/ -
S/ 46.68 S/ 46.68 S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77
S/ 2.21 S/ 2.94 S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68
S/ 4.05 S/ 2.70 S/ 0.68 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.18 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ 863.58 S/ 863.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47
S/ - S/ 2,274.65 S/ - S/ 1,705.99 S/ - S/ - S/ 2,274.65

CAM192
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 856.43 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86
S/ 1.73 S/ 1.73 S/ 2.16 S/ 2.16 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM193
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 11,196.12 S/ 11,196.12 S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ -


S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86
S/ 48.25 S/ 48.25 S/ 60.32 S/ 60.32 S/ - S/ - S/ -
S/ 242.05 S/ 242.05 S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57
S/ 32,015.97 S/ 32,015.97 S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.83 S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 92.22 S/ 138.33 S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85
S/ 84.31 S/ 84.31 S/ 84.31 S/ 84.31 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23
S/ - S/ 405.81 S/ - S/ 304.35 S/ - S/ - S/ 405.81
S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63
S/ 132.05 S/ 132.05 S/ 165.06 S/ 165.06 S/ - S/ - S/ -
S/ 10.73 S/ 10.73 S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92
S/ 1.27 S/ 1.69 S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11
S/ 80.48 S/ 53.65 S/ 13.41 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM194
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 158.59 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ 36.20 S/ 36.20 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 52.37 S/ 52.37 S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46
S/ 62.24 S/ 62.24 S/ 77.80 S/ 77.80 S/ - S/ - S/ -
S/ 13.97 S/ 13.97 S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46
S/ 79.45 S/ 79.45 S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 77.80 S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 5.06 S/ 7.58 S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21
S/ 14.37 S/ 14.37 S/ 14.37 S/ 14.37 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44
S/ - S/ 12.67 S/ - S/ 9.50 S/ 12.67
S/ 3.80 S/ 3.80 S/ 3.80 S/ 2.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22

CAM195
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM196
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 27.67 S/ 27.67 S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58

CAM197
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 22,456.72 S/ 22,456.72 S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 2,399.27 S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 275.35 S/ 413.03 S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46
S/ 211.71 S/ 211.71 S/ 211.71 S/ 211.71 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55

CAM198
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM199
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM200
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 20.21 S/ 20.21 S/ 25.26 S/ 25.26 S/ - S/ - S/ -

S/ 8.98 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ 906.82 S/ 906.82 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20
S/ 32.60 S/ 21.73 S/ 5.43 S/ - S/ - S/ - S/ -

CAM201
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.12 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.44 S/ 0.44 S/ 0.44 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07
S/ - S/ 0.17 S/ - S/ 0.13 S/ - S/ - S/ 0.17
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49
S/ 7.00 S/ 7.00 S/ 8.75 S/ 8.75 S/ - S/ - S/ -
S/ 3.49 S/ 3.49 S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36
S/ 2.72 S/ 2.72 S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 5.66 S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.66 S/ 6.99 S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88
S/ 92.27 S/ 92.27 S/ 92.27 S/ 92.27 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43
S/ - S/ 0.23 S/ - S/ 0.17 S/ - S/ - S/ 0.23
S/ 2.67 S/ 2.67 S/ 2.67 S/ 1.78 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23
S/ 15.51 S/ 15.51 S/ 19.38 S/ 19.38 S/ - S/ - S/ -
S/ 46.68 S/ 46.68 S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77

CAM202
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 2.21 S/ 2.94 S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68
S/ 4.05 S/ 2.70 S/ 0.68 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.18 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ 863.58 S/ 863.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47
S/ - S/ 2,274.65 S/ - S/ 1,705.99 S/ - S/ - S/ 2,274.65
S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 856.43 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86
S/ 1.73 S/ 1.73 S/ 2.16 S/ 2.16 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM203
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 11,196.12 S/ 11,196.12 S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ -


S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86
S/ 48.25 S/ 48.25 S/ 60.32 S/ 60.32 S/ - S/ - S/ -
S/ 242.05 S/ 242.05 S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57
S/ 32,015.97 S/ 32,015.97 S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.83 S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 92.22 S/ 138.33 S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85
S/ 84.31 S/ 84.31 S/ 84.31 S/ 84.31 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23
S/ - S/ 405.81 S/ - S/ 304.35 S/ - S/ - S/ 405.81
S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM204
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 106.90 S/ 106.90 S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63
S/ 132.05 S/ 132.05 S/ 165.06 S/ 165.06 S/ - S/ - S/ -
S/ 10.73 S/ 10.73 S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92
S/ 1.27 S/ 1.69 S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11
S/ 80.48 S/ 53.65 S/ 13.41 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 158.59 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ 36.20 S/ 36.20 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 52.37 S/ 52.37 S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46
S/ 62.24 S/ 62.24 S/ 77.80 S/ 77.80 S/ - S/ - S/ -
S/ 13.97 S/ 13.97 S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46
S/ 79.45 S/ 79.45 S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 77.80 S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 5.06 S/ 7.58 S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21
S/ 14.37 S/ 14.37 S/ 14.37 S/ 14.37 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44
S/ - S/ 12.67 S/ - S/ 9.50 S/ - S/ - S/ 12.67
S/ 3.80 S/ 3.80 S/ 3.80 S/ 2.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22

CAM205
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM206
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM207
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 27.67 S/ 27.67 S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58


S/ 22,456.72 S/ 22,456.72 S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 2,399.27 S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 275.35 S/ 413.03 S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46
S/ 211.71 S/ 211.71 S/ 211.71 S/ 211.71 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55

CAM208
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM209
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM210
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 20.21 S/ 20.21 S/ 25.26 S/ 25.26 S/ - S/ - S/ -

CAM211
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/364,683.81 S/370,406.39 S/148,535.60 S/235,169.75 S/143,896.00 S/143,914.53 S/131,068.23

S/ - S/ - S/ -

CAM212
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM213
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ -
S/ - S/ - S/ -

CAM214
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ -

CAM215
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ -

CAM216
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM217
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM218
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM219
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 116.43 S/ 116.43 S/ 145.54 S/ 145.54 S/ - S/ - S/ -


S/ 124.42 S/ 124.42 S/ 155.52 S/ 155.52 S/ 186.63 S/ 186.63 S/ 155.52
S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 168.49
S/ 97.14 S/ 129.52 S/ 113.33 S/ 113.33 S/ 113.33 S/ 242.85 S/ 161.90
S/ 1,381.64 S/ 921.10 S/ 230.27 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 215.73 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,087.24 S/ 1,087.24 S/ 1,087.24 S/ 1,087.24 S/ - S/ - S/ -

CAM220
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 939.77 S/ 1,409.66 S/ 1,409.66 S/ 469.89 S/ 469.89 S/ 469.89 S/ 469.89
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 402.17 S/ 603.26 S/ 1,072.46 S/ 1,206.52 S/ 536.23 S/ 536.23 S/ 335.15
S/ 1,595.80 S/ 1,595.80 S/ 1,595.80 S/ 1,595.80 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 31.02 S/ 31.02 S/ 31.02 S/ 31.02
S/ - S/ 11.66 S/ - S/ 8.75 S/ - S/ - S/ 11.66
S/ 16.40 S/ 16.40 S/ 16.40 S/ 10.94 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,582.38 S/ 1,582.38 S/ 1,582.38 S/ 1,582.38 S/ 1,054.92 S/ 1,054.92 S/ 527.46
S/ 1.72 S/ 1.72 S/ 2.15 S/ 2.15 S/ - S/ - S/ -
S/ 584.32 S/ 584.32 S/ 730.40 S/ 730.40 S/ 876.48 S/ 876.48 S/ 730.40
S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 176.18
S/ 1,615.75 S/ 2,154.33 S/ 1,885.04 S/ 1,885.04 S/ 1,885.04 S/ 4,039.37 S/ 2,692.91
S/ 5.32 S/ 3.55 S/ 0.89 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,397.49 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 161.13 S/ 161.13 S/ 161.13 S/ 161.13 S/ - S/ - S/ -
S/ 126.66 S/ 189.99 S/ 189.99 S/ 63.33 S/ 63.33 S/ 63.33 S/ 63.33
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.19 S/ 1.79 S/ 3.18 S/ 3.58 S/ 1.59 S/ 1.59 S/ 0.99
S/ 2,197.48 S/ 2,197.48 S/ 2,197.48 S/ 2,197.48 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 968.18 S/ 968.18 S/ 968.18 S/ 968.18
S/ - S/ 75.49 S/ - S/ 56.61 S/ - S/ - S/ 75.49

CAM221
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 355.63 S/ 355.63 S/ 355.63 S/ 237.09 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 12.89 S/ 12.89 S/ 12.89 S/ 12.89 S/ 8.59 S/ 8.59 S/ 4.30
S/ 172.65 S/ 172.65 S/ 215.81 S/ 215.81 S/ - S/ - S/ -
S/ 2.94 S/ 2.94 S/ 3.68 S/ 3.68 S/ 4.41 S/ 4.41 S/ 3.68
S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 141.18
S/ 0.77 S/ 1.02 S/ 0.89 S/ 0.89 S/ 0.89 S/ 1.91 S/ 1.28
S/ 113.06 S/ 75.38 S/ 18.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 116.74 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 56.82 S/ 56.82 S/ 56.82 S/ 56.82 S/ - S/ - S/ -
S/ 16.41 S/ 24.61 S/ 24.61 S/ 8.20 S/ 8.20 S/ 8.20 S/ 8.20
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 558.08 S/ 837.12 S/ 1,488.21 S/ 1,674.24 S/ 744.10 S/ 744.10 S/ 465.07
S/ 2,059.91 S/ 2,059.91 S/ 2,059.91 S/ 2,059.91 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 212.77 S/ 212.77 S/ 212.77 S/ 212.77
S/ - S/ 20.64 S/ - S/ 15.48 S/ - S/ - S/ 20.64
S/ 8.98 S/ 8.98 S/ 8.98 S/ 5.98 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.83 S/ 0.83 S/ 0.83 S/ 0.83 S/ 0.55 S/ 0.55 S/ 0.28
S/ 0.72 S/ 0.72 S/ 0.90 S/ 0.90 S/ - S/ - S/ -
S/ 19.46 S/ 19.46 S/ 24.32 S/ 24.32 S/ 29.18 S/ 29.18 S/ 24.32
S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 1.62

CAM222
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 19.00 S/ 25.33 S/ 22.17 S/ 22.17 S/ 22.17 S/ 47.50 S/ 31.66
S/ 57.35 S/ 38.24 S/ 9.56 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 307.60 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 80.19 S/ 80.19 S/ 80.19 S/ 80.19 S/ - S/ - S/ -
S/ 2.50 S/ 3.75 S/ 3.75 S/ 1.25 S/ 1.25 S/ 1.25 S/ 1.25
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.69 S/ 5.54 S/ 9.85 S/ 11.08 S/ 4.92 S/ 4.92 S/ 3.08
S/ 45.45 S/ 45.45 S/ 45.45 S/ 45.45 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 1.17 S/ 1.17 S/ 1.17 S/ 1.17
S/ - S/ 10.19 S/ - S/ 7.64 S/ - S/ - S/ 10.19
S/ 9.71 S/ 9.71 S/ 9.71 S/ 6.47 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 236.60 S/ 236.60 S/ 236.60 S/ 236.60 S/ 157.73 S/ 157.73 S/ 78.87
S/ 256.42 S/ 256.42 S/ 320.53 S/ 320.53 S/ - S/ - S/ -
S/ 28.67 S/ 28.67 S/ 35.84 S/ 35.84 S/ 43.01 S/ 43.01 S/ 35.84
S/ 1.62 S/ 1.62 S/ 1.62 S/ 1.62 S/ 1.62 S/ 1.62 S/ 3.23
S/ 0.97 S/ 1.29 S/ 1.13 S/ 1.13 S/ 1.13 S/ 2.43 S/ 1.62
S/ 22.45 S/ 14.97 S/ 3.74 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36.99 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 21.36 S/ 21.36 S/ 21.36 S/ 21.36 S/ - S/ - S/ -
S/ 37.05 S/ 55.58 S/ 55.58 S/ 18.53 S/ 18.53 S/ 18.53 S/ 18.53

CAM223
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 27.64 S/ 41.46 S/ 73.70 S/ 82.91 S/ 36.85 S/ 36.85 S/ 23.03
S/ 70.18 S/ 70.18 S/ 70.18 S/ 70.18 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 75.36 S/ 75.36 S/ 75.36 S/ 75.36
S/ - S/ 57.37 S/ - S/ 43.03 S/ - S/ - S/ 57.37
S/ 128.82 S/ 128.82 S/ 128.82 S/ 85.88 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 111.08 S/ 111.08 S/ 111.08 S/ 111.08 S/ 74.05 S/ 74.05 S/ 37.03
S/ 1.21 S/ 1.21 S/ 1.52 S/ 1.52 S/ - S/ - S/ -
S/ 0.20 S/ 0.20 S/ 0.25 S/ 0.25 S/ 0.30 S/ 0.30 S/ 0.25
S/ 108.81 S/ 108.81 S/ 108.81 S/ 108.81 S/ 108.81 S/ 108.81 S/ 217.62
S/ 2.55 S/ 3.39 S/ 2.97 S/ 2.97 S/ 2.97 S/ 6.36 S/ 4.24
S/ 33.84 S/ 22.56 S/ 5.64 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 62.41 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 34.59 S/ 34.59 S/ 34.59 S/ 34.59 S/ - S/ - S/ -
S/ 21.11 S/ 31.67 S/ 31.67 S/ 10.56 S/ 10.56 S/ 10.56 S/ 10.56
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 26.66 S/ 39.99 S/ 71.09 S/ 79.98 S/ 35.55 S/ 35.55 S/ 22.22
S/ 5.03 S/ 5.03 S/ 5.03 S/ 5.03 S/ - S/ - S/ -
S/ 64.54 S/ 86.06 S/ 86.06 S/ 107.57 S/ 107.57 S/ 161.36 S/ 107.57
S/ 994.51 S/ 663.01 S/ 165.75 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM224
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 173.39 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 56.32 S/ 56.32 S/ 56.32 S/ 56.32 S/ - S/ - S/ -
S/ 7.87 S/ 11.80 S/ 11.80 S/ 3.93 S/ 3.93 S/ 3.93 S/ 3.93
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 35.61 S/ 53.41 S/ 94.95 S/ 106.82 S/ 47.48 S/ 47.48 S/ 29.67
S/ 52.16 S/ 52.16 S/ 52.16 S/ 52.16 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 219.16 S/ 219.16 S/ 219.16 S/ 219.16
S/ - S/ 114.97 S/ - S/ 86.22 S/ - S/ - S/ 114.97

CAM225
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM226
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 21,575.98 S/ 19,389.98 S/ 19,064.39 S/ 19,403.73 S/ 8,413.19 S/ 10,781.87 S/ 8,560.30

CAM227
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM228
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM229
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM230
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM231
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM232
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM233
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM234
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ 1,034.51


S/ - S/ 46.35 S/ - S/ 30.90 S/ - S/ - S/ 77.24
S/ 19.31 S/ 19.31 S/ 19.31 S/ 12.88 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 223.89 S/ 223.89 S/ 223.89 S/ 223.89 S/ 149.26 S/ 149.26 S/ 74.63

CAM235
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 11.65 S/ 11.65 S/ 14.56 S/ 14.56 S/ - S/ - S/ -
S/ 9.81 S/ 9.81 S/ 8.58 S/ 9.81 S/ 14.71 S/ 14.71 S/ 18.39
S/ 11.78 S/ 11.78 S/ - S/ - S/ - S/ - S/ -
S/ 3.98 S/ 5.98 S/ 5.98 S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.00 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.09 S/ 2.09 S/ 2.09 S/ 2.09 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 10.48 S/ 10.48 S/ 10.48 S/ 10.48
S/ - S/ 46.55 S/ - S/ 31.03 S/ - S/ - S/ 77.58
S/ 30.05 S/ 30.05 S/ 30.05 S/ 20.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.49 S/ 3.49 S/ 3.49 S/ 3.49 S/ 2.33 S/ 2.33 S/ 1.16
S/ 0.76 S/ 0.76 S/ 0.95 S/ 0.95 S/ - S/ - S/ -
S/ 0.22 S/ 0.22 S/ 0.20 S/ 0.22 S/ 0.34 S/ 0.34 S/ 0.42
S/ 3.07 S/ 3.07 S/ - S/ - S/ - S/ - S/ -
S/ 1.18 S/ 1.76 S/ 1.76 S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.62 S/ 0.93 S/ 1.65 S/ 1.86 S/ 0.83 S/ 0.83 S/ 0.52

CAM236
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM237
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM238
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM239
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM240
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM241
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM242
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM243
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM244
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ 1,034.51


S/ - S/ 61.80 S/ - S/ 61.80 S/ - S/ - S/ 46.35
S/ 19.31 S/ 19.31 S/ 19.31 S/ 12.88 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -

CAM245
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ 223.89 S/ 223.89 S/ 223.89 S/ 223.89 S/ 149.26 S/ 149.26 S/ 74.63
S/ 11.65 S/ 11.65 S/ 14.56 S/ 14.56 S/ - S/ - S/ -
S/ 9.81 S/ 9.81 S/ 18.39 S/ 12.26 S/ 14.71 S/ 14.71 S/ 12.26
S/ 11.78 S/ 11.78 S/ - S/ - S/ - S/ - S/ -
S/ 5.98 S/ 3.98 S/ 5.98 S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.00 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.09 S/ 2.09 S/ 2.09 S/ 2.09 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 10.48 S/ 10.48 S/ 10.48 S/ 10.48
S/ - S/ 62.07 S/ - S/ 62.07 S/ - S/ - S/ 46.55
S/ 30.05 S/ 30.05 S/ 30.05 S/ 20.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.49 S/ 3.49 S/ 3.49 S/ 3.49 S/ 2.33 S/ 2.33 S/ 1.16
S/ 0.76 S/ 0.76 S/ 0.95 S/ 0.95 S/ - S/ - S/ -
S/ 0.22 S/ 0.22 S/ 0.42 S/ 0.28 S/ 0.34 S/ 0.34 S/ 0.28
S/ 3.07 S/ 3.07 S/ - S/ - S/ - S/ - S/ -
S/ 1.76 S/ 1.76 S/ 1.76 S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.62 S/ 0.93 S/ 1.65 S/ 1.86 S/ 0.83 S/ 0.83 S/ 0.52

CAM246
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ -

CAM247
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM248
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM249
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM250
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM251
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM252
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM253
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

CAM254
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ - S/ - S/ - S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ 1,034.51


S/ - S/ 61.80 S/ - S/ 46.35 S/ - S/ - S/ 61.80
S/ 19.31 S/ 19.31 S/ 19.31 S/ 12.88 S/ - S/ - S/ -

CAM255
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 223.89 S/ 223.89 S/ 223.89 S/ 223.89 S/ 149.26 S/ 149.26 S/ 74.63
S/ 11.65 S/ 11.65 S/ 14.56 S/ 14.56 S/ - S/ - S/ -
S/ 9.81 S/ 9.81 S/ 12.26 S/ 12.26 S/ 14.71 S/ 14.71 S/ 12.26
S/ 11.78 S/ 11.78 S/ - S/ - S/ - S/ - S/ -
S/ 5.98 S/ 3.98 S/ 5.98 S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 4.00 S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.09 S/ 2.09 S/ 2.09 S/ 2.09 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 10.48 S/ 10.48 S/ 10.48 S/ 10.48
S/ - S/ 62.07 S/ - S/ 46.55 S/ - S/ - S/ 62.07
S/ 30.05 S/ 30.05 S/ 30.05 S/ 20.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.49 S/ 3.49 S/ 3.49 S/ 3.49 S/ 2.33 S/ 2.33 S/ 1.16
S/ 0.76 S/ 0.76 S/ 0.95 S/ 0.95 S/ - S/ - S/ -
S/ 0.22 S/ 0.22 S/ 0.28 S/ 0.28 S/ 0.34 S/ 0.34 S/ 0.28
S/ 3.07 S/ 3.07 S/ - S/ - S/ - S/ - S/ -
S/ 1.76 S/ 1.18 S/ 1.76 S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59
S/ - S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.62 S/ 0.93 S/ 1.65 S/ 1.86 S/ 0.83 S/ 0.83 S/ 0.52

CAM256
QUISICION DE MATERIALES
R - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION

Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


6/1/2020 7/1/2020 8/1/2020 9/1/2020 10/1/2020 11/1/2020 12/1/2020 1/1/2021 2/1/2021
6/30/2020 7/31/2020 8/31/2020 9/30/2020 10/31/2020 11/30/2020 12/31/2020 1/31/2021 2/12/2021

S/ 982.84 S/ 1,310.40 S/ 951.33 S/ 4,295.73 S/ 3,645.07 S/ 3,645.07 S/ 3,787.10

CAM257
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020

DEMOLICIÓN
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 S/ 2.09
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70 S/ -
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66 S/ -
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24 S/ -
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07 S/ -
0202300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69 S/ -
0202350009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 S/ 0.26
0202350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98 S/ -
0202350081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56 S/ 44.42
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31 S/ -
0202350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88 S/ -
0202350084 PERNO 5/8" und S/ 57.89 S/ 2.41
0202350085 PERNO 1 1/4' x 12" und S/ 598.40 S/ -
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 S/ 13.74
0202350087 PERNO 1/2' A36 x 4" und S/ 25.06 S/ -
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14 S/ 0.74
0202350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05 S/ -
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13 S/ -
0202350091 TUERCA DE 3/8" und S/ 62.78 S/ 2.61
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 S/ 41.27
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40 S/ -
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60 S/ -
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82 S/ -
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55 S/ -
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08 S/ -
0203010020 ACERO LISO DE 1" m S/ 161.83 S/ 33.70
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35 S/ -
0203010022 ACERO LISO DE 3/8' m S/ 644.91 S/ 42.98
0203010023 ACERO LISO DE 3/4" m S/ 633.70 S/ -
0204050001 ARENA GRUESA m3 S/ 14,604.83 S/ -
0204050002 ARENA FINA m3 S/ 0.10 S/ 0.00
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94 S/ -
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 S/ 1,257.54
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21 S/ -
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 S/ 1,186.72
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76 S/ -
0205350001 AGUA m3 S/ 1,368.63 S/ -
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00 S/ -

E258
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88 S/ -
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18 S/ -
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 S/ 1,783.95
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33 S/ -
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20

E259
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 S/ 1,984.48
0238100001 AFIRMADO m3 S/ 39,205.70 S/ 8,164.59
0243010001 MADERA TORNILLO p2 S/ 133,765.32 S/ -
0243010002 MADERA TORNILLO - A glb S/ 2,940.00 S/ -
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00 S/ -
0243010004 MADERA TORNILLO - C glb S/ 1,540.00 S/ -
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71 S/ -
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 S/ 3,863.60
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86

E260
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52
SUSTITUCIÓN
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 S/ 1.49
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70 S/ -
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66 S/ -
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24 S/ -
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07 S/ -
0202300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69 S/ -
0202350009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 S/ 0.26
0202350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98 S/ -
0202350081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56 S/ 44.42
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31 S/ -
0202350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88 S/ -
0202350084 PERNO 5/8" und S/ 57.89 S/ 2.41
0202350085 PERNO 1 1/4' x 12" und S/ 598.40 S/ -
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 S/ 13.74
0202350087 PERNO 1/2' A36 x 4" und S/ 25.06 S/ -
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14 S/ 0.74
0202350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05 S/ -
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13 S/ -
0202350091 TUERCA DE 3/8" und S/ 62.78 S/ 2.61
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 S/ 41.27
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40 S/ -
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60 S/ -
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82 S/ -
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55 S/ -
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08 S/ -
0203010020 ACERO LISO DE 1" m S/ 161.83 S/ 33.70
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35 S/ -
0203010022 ACERO LISO DE 3/8' m S/ 644.91 S/ 42.98
0203010023 ACERO LISO DE 3/4" m S/ 633.70 S/ -
0204050001 ARENA GRUESA m3 S/ 14,604.83 S/ -
0204050002 ARENA FINA m3 S/ 0.10 S/ 0.00

E261
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94 S/ -
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 S/ 1,257.54
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21 S/ -
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 S/ 1,186.72
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76 S/ -
0205350001 AGUA m3 S/ 1,368.63 S/ -
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00 S/ -
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88 S/ -
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18 S/ -
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 S/ 1,783.95
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33 S/ -
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80

E262
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 S/ 1,984.48
0238100001 AFIRMADO m3 S/ 39,205.70 S/ 8,164.59
0243010001 MADERA TORNILLO p2 S/ 133,765.32 S/ -
0243010002 MADERA TORNILLO - A glb S/ 2,940.00 S/ -
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00 S/ -
0243010004 MADERA TORNILLO - C glb S/ 1,540.00 S/ -
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71 S/ -
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 S/ 3,863.60
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53

E263
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52
SALDO
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70 S/ -
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66 S/ -
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24 S/ -
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07 S/ -
0202300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69 S/ -
0202350009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 S/ 0.26
0202350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98 S/ -
0202350081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56 S/ 44.42
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31 S/ -
0202350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88 S/ -
0202350084 PERNO 5/8" und S/ 57.89 S/ 2.41
0202350085 PERNO 1 1/4' x 12" und S/ 598.40 S/ -
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 S/ 13.74
0202350087 PERNO 1/2' A36 x 4" und S/ 25.06 S/ -
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14 S/ 0.74
0202350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05 S/ -
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13 S/ -
0202350091 TUERCA DE 3/8" und S/ 62.78 S/ 2.61
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 S/ 41.27
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40 S/ -
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60 S/ -
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82 S/ -
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55 S/ -

E264
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08 S/ -
0203010020 ACERO LISO DE 1" m S/ 161.83 S/ 33.70
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35 S/ -
0203010022 ACERO LISO DE 3/8' m S/ 644.91 S/ 42.98
0203010023 ACERO LISO DE 3/4" m S/ 633.70 S/ -
0204050001 ARENA GRUESA m3 S/ 14,604.83 S/ -
0204050002 ARENA FINA m3 S/ 0.10 S/ 0.00
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94 S/ -
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 S/ 1,257.54
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21 S/ -
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 S/ 1,186.72
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76 S/ -
0205350001 AGUA m3 S/ 1,368.63 S/ -
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00 S/ -
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88 S/ -
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18 S/ -
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 S/ 1,783.95
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33 S/ -
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98

E265
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 S/ 1,984.48
0238100001 AFIRMADO m3 S/ 39,205.70 S/ 9,797.50
0243010001 MADERA TORNILLO p2 S/ 133,765.32 S/ -
0243010002 MADERA TORNILLO - A glb S/ 2,940.00 S/ -
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00 S/ -
0243010004 MADERA TORNILLO - C glb S/ 1,540.00 S/ -
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71 S/ -
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 S/ 3,863.60
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13

E266
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52
MEJORA
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 S/ 1.79
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70 S/ -
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66 S/ -
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24 S/ -
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07 S/ -
0202300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69 S/ -
0202350009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 S/ 0.26
0202350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98 S/ -
0202350081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56 S/ 44.42
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31 S/ -
0202350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88 S/ -
0202350084 PERNO 5/8" und S/ 57.89 S/ 2.41
0202350085 PERNO 1 1/4' x 12" und S/ 598.40 S/ -
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 S/ 13.74
0202350087 PERNO 1/2' A36 x 4" und S/ 25.06 S/ -
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14 S/ 0.74
0202350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05 S/ -

E267
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13 S/ -
0202350091 TUERCA DE 3/8" und S/ 62.78 S/ 2.61
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 S/ 41.27
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40 S/ -
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60 S/ -
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82 S/ -
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55 S/ -
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08 S/ -
0203010020 ACERO LISO DE 1" m S/ 161.83 S/ 33.70
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35 S/ -
0203010022 ACERO LISO DE 3/8' m S/ 644.91 S/ 42.98
0203010023 ACERO LISO DE 3/4" m S/ 633.70 S/ -
0204050001 ARENA GRUESA m3 S/ 14,604.83 S/ -
0204050002 ARENA FINA m3 S/ 0.10 S/ 0.00
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94 S/ -
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 S/ 1,257.54
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21 S/ -
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 S/ 1,186.72
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76 S/ -
0205350001 AGUA m3 S/ 1,368.63 S/ -
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00 S/ -
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88 S/ -
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18 S/ -
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 S/ 1,783.95
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33 S/ -
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60

E268
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 S/ 1,984.48
0238100001 AFIRMADO m3 S/ 39,205.70 S/ 9,797.50
0243010001 MADERA TORNILLO p2 S/ 133,765.32 S/ -
0243010002 MADERA TORNILLO - A glb S/ 2,940.00 S/ -
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00 S/ -
0243010004 MADERA TORNILLO - C glb S/ 1,540.00 S/ -
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71 S/ -
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 S/ 3,863.60
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11

E269
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52
DEFICIENCIA
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 S/ 1.79
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70 S/ -
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66 S/ -
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24 S/ -
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07 S/ -
0202300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69 S/ -
0202350009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 S/ 0.26
0202350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98 S/ -
0202350081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56 S/ 44.42
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31 S/ -

E270
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0202350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88 S/ -
0202350084 PERNO 5/8" und S/ 57.89 S/ 2.41
0202350085 PERNO 1 1/4' x 12" und S/ 598.40 S/ -
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 S/ 13.74
0202350087 PERNO 1/2' A36 x 4" und S/ 25.06 S/ -
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14 S/ 0.74
0202350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05 S/ -
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13 S/ -
0202350091 TUERCA DE 3/8" und S/ 62.78 S/ 2.61
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 S/ 41.27
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40 S/ -
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60 S/ -
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82 S/ -
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55 S/ -
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08 S/ -
0203010020 ACERO LISO DE 1" m S/ 161.83 S/ 33.70
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35 S/ -
0203010022 ACERO LISO DE 3/8' m S/ 644.91 S/ 42.98
0203010023 ACERO LISO DE 3/4" m S/ 633.70 S/ -
0204050001 ARENA GRUESA m3 S/ 14,604.83 S/ -
0204050002 ARENA FINA m3 S/ 0.10 S/ 0.00
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94 S/ -
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 S/ 1,257.54
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21 S/ -
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 S/ 1,186.72
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76 S/ -
0205350001 AGUA m3 S/ 1,368.63 S/ -
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00 S/ -
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88 S/ -
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18 S/ -
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 S/ 1,783.95
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33 S/ -
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74

E271
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 S/ 1,984.48
0238100001 AFIRMADO m3 S/ 39,205.70 S/ 9,797.50
0243010001 MADERA TORNILLO p2 S/ 133,765.32 S/ -
0243010002 MADERA TORNILLO - A glb S/ 2,940.00 S/ -
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00 S/ -
0243010004 MADERA TORNILLO - C glb S/ 1,540.00 S/ -

E272
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020
Código MATERIALES Unidad Parcial S/. A 29/02/2020
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71 S/ -
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 S/ 3,863.60
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52

TOTAL S/ 5,189,520.62 S/ 97,021.06


AVANCE PARCIAL 2.94%

E273
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 1.79 S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ 1,158.43 S/ 1,158.43 S/ 1,158.43 S/ - S/ -
S/ - S/ - S/ - S/ 4,418.66 S/ 4,418.66 S/ 4,418.66
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 251.21 S/ -
S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10
S/ 0.31 S/ 0.31 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35
S/ 53.32 S/ 99.98 S/ 99.98 S/ 79.99 S/ 79.99 S/ 99.98
S/ - S/ - S/ - S/ 10.66 S/ 10.66 S/ 13.33
S/ - S/ 152.72 S/ 152.72 S/ 152.72 S/ 152.72 S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 8.68 S/ 5.79 S/ 8.68
S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76
S/ 16.50 S/ 16.50 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76
S/ 0.89 S/ 1.67 S/ 1.67 S/ 1.34 S/ 1.34 S/ 1.67
S/ - S/ - S/ - S/ 226.08 S/ 226.08 S/ 282.61
S/ - S/ 280.28 S/ 280.28 S/ 280.28 S/ 280.28 S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 9.42 S/ 9.42 S/ 6.28
S/ 41.28 S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ 183.60 S/ 183.60 S/ 183.60 S/ - S/ -
S/ - S/ - S/ - S/ 29.15 S/ 29.15 S/ 29.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 54,707.71 S/ -
S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21
S/ 40.46 S/ 40.46 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35
S/ 51.59 S/ 96.74 S/ 96.74 S/ 77.39 S/ 77.39 S/ 96.74
S/ - S/ - S/ - S/ 50.70 S/ 50.70 S/ 63.37
S/ - S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.01 S/ 0.01 S/ 0.01
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29
S/ 1,509.65 S/ 1,509.65 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 19.23 S/ 12.82 S/ 19.23 S/ 19.23
S/ 1,187.20 S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ 1,033.19 S/ 1,033.19 S/ 1,033.19 S/ - S/ -
S/ - S/ - S/ - S/ 342.16 S/ 342.16 S/ 342.16
S/ - S/ - S/ - S/ - S/ - S/ -

E274
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020
S/ - S/ - S/ - S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33
S/ 2,141.60 S/ 2,141.60 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75

E275
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 2,382.33 S/ 2,382.33 S/ - S/ - S/ - S/ -
S/ 11,761.71 S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ 33,441.33 S/ 33,441.33 S/ 33,441.33 S/ - S/ -
S/ - S/ - S/ - S/ 735.00 S/ 735.00 S/ 735.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 308.00 S/ -
S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31
S/ 4,638.17 S/ 4,638.17 S/ - S/ - S/ - S/ -

E276
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 1.79 S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ 1,158.43 S/ 1,158.43 S/ 1,158.43 S/ - S/ -
S/ - S/ - S/ - S/ 4,418.66 S/ 4,418.66 S/ 4,418.66
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 251.21 S/ -
S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10
S/ 0.31 S/ 0.31 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35
S/ 53.32 S/ 99.98 S/ 99.98 S/ 79.99 S/ 79.99 S/ 99.98
S/ - S/ - S/ - S/ 10.66 S/ 10.66 S/ 13.33
S/ - S/ 152.72 S/ 152.72 S/ 152.72 S/ 152.72 S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 8.68 S/ 5.79 S/ 8.68
S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76
S/ 16.50 S/ 16.50 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76
S/ 0.89 S/ 1.67 S/ 1.67 S/ 1.34 S/ 1.34 S/ 1.67
S/ - S/ - S/ - S/ 226.08 S/ 226.08 S/ 282.61
S/ - S/ 280.28 S/ 280.28 S/ 280.28 S/ 280.28 S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 9.42 S/ 6.28 S/ 9.42
S/ 41.28 S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ 183.60 S/ 183.60 S/ 183.60 S/ - S/ -
S/ - S/ - S/ - S/ 29.15 S/ 29.15 S/ 29.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 54,707.71 S/ -
S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21
S/ 40.46 S/ 40.46 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35
S/ 51.59 S/ 96.74 S/ 96.74 S/ 77.39 S/ 77.39 S/ 96.74
S/ - S/ - S/ - S/ 50.70 S/ 50.70 S/ 63.37
S/ - S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.01 S/ 0.01 S/ 0.01

E277
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29
S/ 1,509.65 S/ 1,509.65 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23
S/ 1,187.20 S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ 1,033.19 S/ 1,033.19 S/ 1,033.19 S/ - S/ -
S/ - S/ - S/ - S/ 342.16 S/ 342.16 S/ 342.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33
S/ 2,141.60 S/ 2,141.60 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75

E278
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 2,382.33 S/ 2,382.33 S/ - S/ - S/ - S/ -
S/ 9,801.42 S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ 33,441.33 S/ 33,441.33 S/ 33,441.33 S/ - S/ -
S/ - S/ - S/ - S/ 735.00 S/ 735.00 S/ 735.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 308.00 S/ -
S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31
S/ 4,638.17 S/ 4,638.17 S/ - S/ - S/ - S/ -

E279
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ 1,158.43 S/ 1,158.43 S/ 1,158.43 S/ - S/ -
S/ - S/ - S/ - S/ 4,418.66 S/ 4,418.66 S/ 4,418.66
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 251.21 S/ -
S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10
S/ 0.31 S/ 0.31 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35
S/ 53.32 S/ 99.98 S/ 99.98 S/ 79.99 S/ 79.99 S/ 99.98
S/ - S/ - S/ - S/ 10.66 S/ 10.66 S/ 13.33
S/ - S/ 152.72 S/ 152.72 S/ 152.72 S/ 152.72 S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 8.68 S/ 5.79 S/ 8.68
S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76
S/ 16.50 S/ 16.50 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76
S/ 0.89 S/ 1.67 S/ 1.67 S/ 1.34 S/ 1.34 S/ 1.67
S/ - S/ - S/ - S/ 226.08 S/ 226.08 S/ 282.61
S/ - S/ 280.28 S/ 280.28 S/ 280.28 S/ 280.28 S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 9.42 S/ 6.28 S/ 9.42
S/ 41.28 S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ 183.60 S/ 183.60 S/ 183.60 S/ - S/ -
S/ - S/ - S/ - S/ 29.15 S/ 29.15 S/ 29.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 54,707.71 S/ -

E280
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020
S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21
S/ 40.46 S/ 40.46 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35
S/ 51.59 S/ 96.74 S/ 96.74 S/ 77.39 S/ 77.39 S/ 96.74
S/ - S/ - S/ - S/ 50.70 S/ 50.70 S/ 63.37
S/ - S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.01 S/ 0.01 S/ 0.01
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29
S/ 1,509.65 S/ 1,509.65 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23
S/ 1,187.20 S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ 1,033.19 S/ 1,033.19 S/ 1,033.19 S/ - S/ -
S/ - S/ - S/ - S/ 342.16 S/ 342.16 S/ 342.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33
S/ 2,141.60 S/ 2,141.60 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75

E281
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 2,382.33 S/ 2,382.33 S/ - S/ - S/ - S/ -
S/ 9,801.42 S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ 33,441.33 S/ 33,441.33 S/ 33,441.33 S/ - S/ -
S/ - S/ - S/ - S/ 735.00 S/ 735.00 S/ 735.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 308.00 S/ -
S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31
S/ 4,638.17 S/ 4,638.17 S/ - S/ - S/ - S/ -

E282
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 1.79 S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ 1,158.43 S/ 1,158.43 S/ 1,158.43 S/ - S/ -
S/ - S/ - S/ - S/ 4,418.66 S/ 4,418.66 S/ 4,418.66
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 251.21 S/ -
S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10
S/ 0.31 S/ 0.31 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35
S/ 53.32 S/ 99.98 S/ 99.98 S/ 79.99 S/ 79.99 S/ 99.98
S/ - S/ - S/ - S/ 10.66 S/ 10.66 S/ 13.33
S/ - S/ 152.72 S/ 152.72 S/ 152.72 S/ 152.72 S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 8.68 S/ 5.79 S/ 8.68
S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76
S/ 16.50 S/ 16.50 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76
S/ 0.89 S/ 1.67 S/ 1.67 S/ 1.34 S/ 1.34 S/ 1.67
S/ - S/ - S/ - S/ 226.08 S/ 226.08 S/ 282.61

E283
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020
S/ - S/ 280.28 S/ 280.28 S/ 280.28 S/ 280.28 S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 9.42 S/ 6.28 S/ 9.42
S/ 41.28 S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ 183.60 S/ 183.60 S/ 183.60 S/ - S/ -
S/ - S/ - S/ - S/ 29.15 S/ 29.15 S/ 29.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 54,707.71 S/ -
S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21
S/ 40.46 S/ 40.46 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35
S/ 51.59 S/ 96.74 S/ 96.74 S/ 77.39 S/ 77.39 S/ 96.74
S/ - S/ - S/ - S/ 50.70 S/ 50.70 S/ 63.37
S/ - S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.01 S/ 0.01 S/ 0.01
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29
S/ 1,509.65 S/ 1,509.65 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23
S/ 1,187.20 S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ 1,033.19 S/ 1,033.19 S/ 1,033.19 S/ - S/ -
S/ - S/ - S/ - S/ 342.16 S/ 342.16 S/ 342.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33
S/ 2,141.60 S/ 2,141.60 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75

E284
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 2,382.33 S/ 2,382.33 S/ - S/ - S/ - S/ -
S/ 9,801.42 S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ 33,441.33 S/ 33,441.33 S/ 33,441.33 S/ - S/ -
S/ - S/ - S/ - S/ 735.00 S/ 735.00 S/ 735.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 308.00 S/ -
S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31
S/ 4,638.17 S/ 4,638.17 S/ - S/ - S/ - S/ -

E285
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 1.79 S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ 1,158.43 S/ 1,158.43 S/ 1,158.43 S/ - S/ -
S/ - S/ - S/ - S/ 4,418.66 S/ 4,418.66 S/ 4,418.66
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 251.21 S/ -
S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10
S/ 0.31 S/ 0.31 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35
S/ 53.32 S/ 99.98 S/ 99.98 S/ 79.99 S/ 79.99 S/ 99.98
S/ - S/ - S/ - S/ 10.66 S/ 10.66 S/ 13.33

E286
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020
S/ - S/ 152.72 S/ 152.72 S/ 152.72 S/ 152.72 S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 8.68 S/ 5.79 S/ 8.68
S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76
S/ 16.50 S/ 16.50 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76
S/ 0.89 S/ 1.67 S/ 1.67 S/ 1.34 S/ 1.34 S/ 1.67
S/ - S/ - S/ - S/ 226.08 S/ 226.08 S/ 282.61
S/ - S/ 280.28 S/ 280.28 S/ 280.28 S/ 280.28 S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 9.42 S/ 6.28 S/ 9.42
S/ 41.28 S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ 183.60 S/ 183.60 S/ 183.60 S/ - S/ -
S/ - S/ - S/ - S/ 29.15 S/ 29.15 S/ 29.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 54,707.71 S/ -
S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21
S/ 40.46 S/ 40.46 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35
S/ 51.59 S/ 96.74 S/ 96.74 S/ 77.39 S/ 77.39 S/ 96.74
S/ - S/ - S/ - S/ 50.70 S/ 50.70 S/ 63.37
S/ - S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.01 S/ 0.01 S/ 0.01
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29
S/ 1,509.65 S/ 1,509.65 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23
S/ 1,187.20 S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ 1,033.19 S/ 1,033.19 S/ 1,033.19 S/ - S/ -
S/ - S/ - S/ - S/ 342.16 S/ 342.16 S/ 342.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33
S/ 2,141.60 S/ 2,141.60 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75

E287
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 2,382.33 S/ 2,382.33 S/ - S/ - S/ - S/ -
S/ 9,801.42 S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ 33,441.33 S/ 33,441.33 S/ 33,441.33 S/ - S/ -
S/ - S/ - S/ - S/ 735.00 S/ 735.00 S/ 735.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 308.00 S/ -

E288
RA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTU

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020
A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020
S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31
S/ 4,638.17 S/ 4,638.17 S/ - S/ - S/ - S/ -

S/ 350,119.08 S/ 313,886.05 S/ 447,713.11 S/ 476,630.77 S/ 573,862.03 S/ 277,687.97


7.61% 7.17% 10.03% 10.87% 12.94% 6.56%

E289
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 4,418.66 S/ - S/ - S/ - S/ -
S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ -
S/ 188.41 S/ - S/ - S/ 251.21 S/ 251.21
S/ 38.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 596.90 S/ 596.90 S/ 298.45 S/ -
S/ 99.98 S/ - S/ - S/ - S/ -
S/ 13.33 S/ 16.00 S/ 16.00 S/ 13.33 S/ 20.00
S/ - S/ - S/ - S/ - S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
S/ 59.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 2.51 S/ 2.51 S/ 1.25 S/ -
S/ 1.67 S/ - S/ - S/ - S/ -
S/ 282.61 S/ 339.13 S/ 339.13 S/ 282.61 S/ 423.91
S/ - S/ - S/ - S/ - S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 29.15 S/ - S/ - S/ - S/ -
S/ 137.95 S/ 137.95 S/ 137.95 S/ 137.95 S/ -
S/ 41,030.78 S/ - S/ - S/ 54,707.71 S/ 54,707.71
S/ 662.81 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 180.24 S/ 180.24 S/ 90.12 S/ -
S/ 96.74 S/ - S/ - S/ - S/ -
S/ 63.37 S/ 76.04 S/ 76.04 S/ 63.37 S/ 95.05
S/ - S/ - S/ - S/ - S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 5,264.19 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 12.82 S/ 12.82 S/ 6.41 S/ 6.41
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 342.16 S/ - S/ - S/ - S/ -
S/ 548.50 S/ 548.50 S/ 548.50 S/ 548.50 S/ -

E290
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 1,568.22 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 24,203.83 S/ 24,203.83 S/ 12,101.92 S/ -

E291
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 735.00 S/ - S/ - S/ - S/ -
S/ 385.00 S/ 385.00 S/ 385.00 S/ 385.00 S/ -
S/ 231.00 S/ - S/ - S/ 308.00 S/ 308.00
S/ 368.87 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

E292
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 4,418.66 S/ - S/ - S/ - S/ -
S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ -
S/ 188.41 S/ - S/ - S/ 251.21 S/ 128.12
S/ 38.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 596.90 S/ 596.90 S/ 298.45 S/ -
S/ 99.98 S/ - S/ - S/ - S/ -
S/ 13.33 S/ 16.00 S/ 16.00 S/ 13.33 S/ 10.20
S/ - S/ - S/ - S/ - S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 1.48
S/ 59.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 2.51 S/ 2.51 S/ 1.25 S/ -
S/ 1.67 S/ - S/ - S/ - S/ -
S/ 282.61 S/ 339.13 S/ 339.13 S/ 282.61 S/ 216.19
S/ - S/ - S/ - S/ - S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 1.60
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 29.15 S/ - S/ - S/ - S/ -
S/ 137.95 S/ 137.95 S/ 137.95 S/ 137.95 S/ -
S/ 41,030.78 S/ - S/ - S/ 54,707.71 S/ 27,900.93
S/ 662.81 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 180.24 S/ 180.24 S/ 90.12 S/ -
S/ 96.74 S/ - S/ - S/ - S/ -
S/ 63.37 S/ 76.04 S/ 76.04 S/ 63.37 S/ 48.48
S/ - S/ - S/ - S/ - S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00

E293
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021
S/ 5,264.19 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 12.82 S/ 12.82 S/ 6.41 S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 342.16 S/ - S/ - S/ - S/ -
S/ 548.50 S/ 548.50 S/ 548.50 S/ 548.50 S/ -

S/ 1,568.22 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 24,203.83 S/ 24,203.83 S/ 12,101.92 S/ -

E294
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 735.00 S/ - S/ - S/ - S/ -
S/ 385.00 S/ 385.00 S/ 385.00 S/ 385.00 S/ -
S/ 231.00 S/ - S/ - S/ 308.00 S/ 157.08
S/ 368.87 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

E295
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 4,418.66 S/ - S/ - S/ - S/ -
S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ -
S/ 188.41 S/ - S/ - S/ 251.21 S/ 128.12
S/ 38.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 596.90 S/ 596.90 S/ 298.45 S/ -
S/ 99.98 S/ - S/ - S/ - S/ -
S/ 13.33 S/ 16.00 S/ 16.00 S/ 13.33 S/ 10.20
S/ - S/ - S/ - S/ - S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 1.48
S/ 59.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 2.51 S/ 2.51 S/ 1.25 S/ -
S/ 1.67 S/ - S/ - S/ - S/ -
S/ 282.61 S/ 339.13 S/ 339.13 S/ 282.61 S/ 216.19
S/ - S/ - S/ - S/ - S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 1.60
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 29.15 S/ - S/ - S/ - S/ -
S/ 137.95 S/ 137.95 S/ 137.95 S/ 137.95 S/ -
S/ 41,030.78 S/ - S/ - S/ 54,707.71 S/ 27,900.93

E296
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021
S/ 662.81 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 180.24 S/ 180.24 S/ 90.12 S/ -
S/ 96.74 S/ - S/ - S/ - S/ -
S/ 63.37 S/ 76.04 S/ 76.04 S/ 63.37 S/ 48.48
S/ - S/ - S/ - S/ - S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 5,264.19 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 12.82 S/ 12.82 S/ 6.41 S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 342.16 S/ - S/ - S/ - S/ -
S/ 548.50 S/ 548.50 S/ 548.50 S/ 548.50 S/ -

S/ 1,568.22 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 24,203.83 S/ 24,203.83 S/ 12,101.92 S/ -

E297
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 735.00 S/ - S/ - S/ - S/ -
S/ 385.00 S/ 385.00 S/ 385.00 S/ 385.00 S/ -
S/ 231.00 S/ - S/ - S/ 308.00 S/ 157.08
S/ 368.87 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

E298
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 4,418.66 S/ - S/ - S/ - S/ -
S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ -
S/ 188.41 S/ - S/ - S/ 251.21 S/ 128.12
S/ 38.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 596.90 S/ 596.90 S/ 298.45 S/ -
S/ 99.98 S/ - S/ - S/ - S/ -
S/ 13.33 S/ 16.00 S/ 16.00 S/ 13.33 S/ 10.20
S/ - S/ - S/ - S/ - S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 1.48
S/ 59.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 2.51 S/ 2.51 S/ 1.25 S/ -
S/ 1.67 S/ - S/ - S/ - S/ -
S/ 282.61 S/ 339.13 S/ 339.13 S/ 282.61 S/ 216.19

E299
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021
S/ - S/ - S/ - S/ - S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 1.60
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 29.15 S/ - S/ - S/ - S/ -
S/ 137.95 S/ 137.95 S/ 137.95 S/ 137.95 S/ -
S/ 41,030.78 S/ - S/ - S/ 54,707.71 S/ 25,480.93
S/ 662.81 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 180.24 S/ 180.24 S/ 90.12 S/ -
S/ 96.74 S/ - S/ - S/ - S/ -
S/ 63.37 S/ 76.04 S/ 76.04 S/ 63.37 S/ 48.48
S/ - S/ - S/ - S/ - S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 5,264.19 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 12.82 S/ 12.82 S/ 6.41 S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 342.16 S/ - S/ - S/ - S/ -
S/ 548.50 S/ 548.50 S/ 548.50 S/ 548.50 S/ -

S/ 1,568.22 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 24,203.83 S/ 24,203.83 S/ 12,101.92 S/ -

E300
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 735.00 S/ - S/ - S/ - S/ -
S/ 385.00 S/ 385.00 S/ 385.00 S/ 385.00 S/ -
S/ 231.00 S/ - S/ - S/ 308.00 S/ 157.08
S/ 368.87 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

E301
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 4,418.66 S/ - S/ - S/ - S/ -
S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ 1,054.81 S/ -
S/ 188.41 S/ - S/ - S/ 251.21 S/ 128.12
S/ 38.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 596.90 S/ 596.90 S/ 298.45 S/ -
S/ 99.98 S/ - S/ - S/ - S/ -
S/ 13.33 S/ 16.00 S/ 16.00 S/ 13.33 S/ 10.20

E302
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021
S/ - S/ - S/ - S/ - S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 1.48
S/ 59.84 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 2.51 S/ 2.51 S/ 1.25 S/ -
S/ 1.67 S/ - S/ - S/ - S/ -
S/ 282.61 S/ 339.13 S/ 339.13 S/ 282.61 S/ 216.19
S/ - S/ - S/ - S/ - S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 1.60
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 29.15 S/ - S/ - S/ - S/ -
S/ 137.95 S/ 137.95 S/ 137.95 S/ 137.95 S/ -
S/ 41,030.78 S/ - S/ - S/ 54,707.71
S/ 662.81 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 180.24 S/ 180.24 S/ 90.12 S/ -
S/ 96.74 S/ - S/ - S/ - S/ -
S/ 63.37 S/ 76.04 S/ 76.04 S/ 63.37 S/ 48.48
S/ - S/ - S/ - S/ - S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 5,264.19 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 12.82 S/ 12.82 S/ 6.41 S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 342.16 S/ - S/ - S/ - S/ -
S/ 548.50 S/ 548.50 S/ 548.50 S/ 548.50 S/ -

S/ 1,568.22 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 24,203.83 S/ 24,203.83 S/ 12,101.92 S/ -

E303
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 735.00 S/ - S/ - S/ - S/ -
S/ 385.00 S/ 385.00 S/ 385.00 S/ 385.00 S/ -
S/ 231.00 S/ - S/ - S/ 308.00 S/ 157.08

E304
ELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA D

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021
S/ 368.87 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

S/ 475,608.02 S/ 137,798.82 S/ 137,798.82 S/ 351,283.40 S/ 139,353.73


10.68% 3.29% 3.29% 7.56% 5.95% 7.37%

E305
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020

0.00
0.00 #REF! S/ - S/ 5,367,798.64 S/ 5,367,798.64 S/ 5,367,798.64 S/ 5,367,798.64
0.00 #REF! S/ - S/ - S/ - S/ - S/ 78,098,376.86
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
492.57 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 21,738.50 S/ 21,738.50 S/ 21,738.50 S/ 21,738.50
0.00 #REF! S/ 0.32 S/ 0.38 S/ 0.38 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 5,344,306.98 S/ 5,344,306.98
0.00 #REF! S/ 29,608.30 S/ 35,544.18 S/ 66,645.34 S/ 66,645.34 S/ 53,316.27
39.21 #REF! S/ - S/ - S/ - S/ - S/ 1,421.77
15% 0.00 #REF! S/ - S/ - S/ 93,293.59 S/ 93,293.59 S/ 93,293.59
5.68 #REF! S/ 139.57 S/ 167.55 S/ 167.55 S/ 167.55 S/ 502.65
5% 0.00 #REF! S/ - S/ 53,712.38 S/ 53,712.38 S/ 53,712.38 S/ 53,712.38
0.00 #REF! S/ 907.14 S/ 1,089.00 S/ 1,089.00 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 94.17 S/ 94.17
0.00 #REF! S/ 8.26 S/ 9.92 S/ 18.60 S/ 18.60 S/ 14.88
831.19 #REF! S/ - S/ - S/ - S/ - S/ 638,926.89
15% 0.00 #REF! S/ - S/ - S/ 314,234.42 S/ 314,234.42 S/ 314,234.42
6.15 #REF! S/ 164.15 S/ 197.06 S/ 197.06 S/ 197.06 S/ 591.18
5% 0.00 #REF! S/ 6,815.04 S/ 6,817.77 S/ - S/ - S/ -
0.00 #REF! S/ - S/ 134,835.84 S/ 134,835.84 S/ 134,835.84 S/ 134,835.84
0.00 #REF! S/ - S/ - S/ - S/ - S/ 3,398.89
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
107,270.02 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 6,589,708.76 S/ 6,589,708.76 S/ 6,589,708.76 S/ 6,589,708.76
0.00 #REF! S/ 5,454.15 S/ 6,547.59 S/ 6,547.59 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 487,271.97 S/ 487,271.97
0.00 #REF! S/ 27,716.11 S/ 33,272.64 S/ 62,386.21 S/ 62,386.21 S/ 49,908.96
186.38 #REF! S/ - S/ - S/ - S/ - S/ 32,125.82
15% 0.00 #REF! S/ - S/ - S/ 53,325,236.49 S/ 53,325,236.49 S/ 53,325,236.49
0.01 #REF! S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
5% 0.00 #REF! S/ - S/ 415,676,105.17 S/ 415,676,105.17 S/ 415,676,105.17 S/ 415,676,105.17
0.00 #REF! S/ 7,593,811.51 S/ 9,116,220.30 S/ 9,116,220.30 S/ - S/ -
12.57 #REF! S/ - S/ - S/ - S/ 2,465.60 S/ 1,643.73
0.00 #REF! S/ 5,635,486.71 S/ 5,637,741.81 S/ - S/ - S/ -
0.00 #REF! S/ - S/ 4,269,923.35 S/ 4,269,923.35 S/ 4,269,923.35 S/ 4,269,923.35
0.00 #REF! S/ - S/ - S/ - S/ - S/ 468,288.39
0.00 #REF! S/ - S/ - S/ - S/ - S/ -

E306
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 36,889,609.29 S/ 36,889,609.29 S/ 36,889,609.29 S/ 36,889,609.29
0.00 #REF! S/ 15,282,081.11 S/ 18,345,835.66 S/ 18,345,835.66 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - ### ###
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -

E307
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ 18,910,824.67 S/ 22,702,070.43 S/ 22,702,070.43 S/ - S/ -
0.00 #REF! S/ 320,098,304.69 S/ 461,126,009.16 S/ - S/ - S/ -
0.00 #REF! S/ - ### ### ### ###
0.00 #REF! S/ - S/ - S/ - S/ - S/ 2,160,900.00
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
603.92 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 2,040,982.64 S/ 2,040,982.64 S/ 2,040,982.64 S/ 2,040,982.64
0.00 #REF! S/ 71,680,053.00 S/ 86,050,483.80 S/ 86,050,483.80 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -

E308
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00
0.00
0.00 #REF! S/ - S/ 5,367,798.64 S/ 5,367,798.64 S/ 5,367,798.64 S/ 5,367,798.64
0.00 #REF! S/ - S/ - S/ - S/ - S/ 78,098,376.86
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
65.34 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 21,738.50 S/ 21,738.50 S/ 21,738.50 S/ 21,738.50
0.00 #REF! S/ 0.32 S/ 0.38 S/ 0.38 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 5,344,306.98 S/ 5,344,306.98
0.00 #REF! S/ 29,608.30 S/ 35,544.18 S/ 66,645.34 S/ 66,645.34 S/ 53,316.27
5.20 #REF! S/ - S/ - S/ - S/ - S/ 1,421.77
15% 0.00 #REF! S/ - S/ - S/ 93,293.59 S/ 93,293.59 S/ 93,293.59
0.75 #REF! S/ 139.57 S/ 167.55 S/ 167.55 S/ 167.55 S/ 502.65
5% 0.00 #REF! S/ - S/ 53,712.38 S/ 53,712.38 S/ 53,712.38 S/ 53,712.38
0.00 #REF! S/ 907.14 S/ 1,089.00 S/ 1,089.00 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 94.17 S/ 94.17
0.00 #REF! S/ 8.26 S/ 9.92 S/ 18.60 S/ 18.60 S/ 14.88
110.26 #REF! S/ - S/ - S/ - S/ - S/ 638,926.89
15% 0.00 #REF! S/ - S/ - S/ 314,234.42 S/ 314,234.42 S/ 314,234.42
0.82 #REF! S/ 164.15 S/ 197.06 S/ 197.06 S/ 197.06 S/ 591.18
5% 0.00 #REF! S/ 6,815.04 S/ 6,817.77 S/ - S/ - S/ -
0.00 #REF! S/ - S/ 134,835.84 S/ 134,835.84 S/ 134,835.84 S/ 134,835.84
0.00 #REF! S/ - S/ - S/ - S/ - S/ 3,398.89
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
14,229.48 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 6,589,708.76 S/ 6,589,708.76 S/ 6,589,708.76 S/ 6,589,708.76
0.00 #REF! S/ 5,454.15 S/ 6,547.59 S/ 6,547.59 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 487,271.97 S/ 487,271.97
0.00 #REF! S/ 27,716.11 S/ 33,272.64 S/ 62,386.21 S/ 62,386.21 S/ 49,908.96
24.72 #REF! S/ - S/ - S/ - S/ - S/ 32,125.82
15% 0.00 #REF! S/ - S/ - S/ 53,325,236.49 S/ 53,325,236.49 S/ 53,325,236.49
0.01 #REF! S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00

E309
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
5% 0.00 #REF! S/ - S/ 415,676,105.17 S/ 415,676,105.17 S/ 415,676,105.17 S/ 415,676,105.17
0.00 #REF! S/ 7,593,811.51 S/ 9,116,220.30 S/ 9,116,220.30 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 2,465.60 S/ 2,465.60
0.00 #REF! S/ 5,635,486.71 S/ 5,637,741.81 S/ - S/ - S/ -
0.00 #REF! S/ - S/ 4,269,923.35 S/ 4,269,923.35 S/ 4,269,923.35 S/ 4,269,923.35
0.00 #REF! S/ - S/ - S/ - S/ - S/ 468,288.39
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 36,889,609.29 S/ 36,889,609.29 S/ 36,889,609.29 S/ 36,889,609.29
0.00 #REF! S/ 15,282,081.11 S/ 18,345,835.66 S/ 18,345,835.66 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - ### ###
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -

E310
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ 18,910,824.67 S/ 22,702,070.43 S/ 22,702,070.43 S/ - S/ -
0.00 #REF! S/ 320,098,304.69 S/ 384,271,674.30 S/ - S/ - S/ -
0.00 #REF! S/ - ### ### ### ###
0.00 #REF! S/ - S/ - S/ - S/ - S/ 2,160,900.00
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
308.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 2,040,982.64 S/ 2,040,982.64 S/ 2,040,982.64 S/ 2,040,982.64
0.00 #REF! S/ 71,680,053.00 S/ 86,050,483.80 S/ 86,050,483.80 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -

E311
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00
0.00
0.00 #REF! S/ - S/ 5,367,798.64 S/ 5,367,798.64 S/ 5,367,798.64 S/ 5,367,798.64
0.00 #REF! S/ - S/ - S/ - S/ - S/ 78,098,376.86
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
65.34 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 21,738.50 S/ 21,738.50 S/ 21,738.50 S/ 21,738.50
0.00 #REF! S/ 0.32 S/ 0.38 S/ 0.38 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 5,344,306.98 S/ 5,344,306.98
0.00 #REF! S/ 29,608.30 S/ 35,544.18 S/ 66,645.34 S/ 66,645.34 S/ 53,316.27
5.20 #REF! S/ - S/ - S/ - S/ - S/ 1,421.77
15% 0.00 #REF! S/ - S/ - S/ 93,293.59 S/ 93,293.59 S/ 93,293.59
0.75 #REF! S/ 139.57 S/ 167.55 S/ 167.55 S/ 167.55 S/ 502.65
5% 0.00 #REF! S/ - S/ 53,712.38 S/ 53,712.38 S/ 53,712.38 S/ 53,712.38
0.00 #REF! S/ 907.14 S/ 1,089.00 S/ 1,089.00 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 94.17 S/ 94.17
0.00 #REF! S/ 8.26 S/ 9.92 S/ 18.60 S/ 18.60 S/ 14.88
110.26 #REF! S/ - S/ - S/ - S/ - S/ 638,926.89
15% 0.00 #REF! S/ - S/ - S/ 314,234.42 S/ 314,234.42 S/ 314,234.42
0.82 #REF! S/ 164.15 S/ 197.06 S/ 197.06 S/ 197.06 S/ 591.18
5% 0.00 #REF! S/ 6,815.04 S/ 6,817.77 S/ - S/ - S/ -
0.00 #REF! S/ - S/ 134,835.84 S/ 134,835.84 S/ 134,835.84 S/ 134,835.84
0.00 #REF! S/ - S/ - S/ - S/ - S/ 3,398.89
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
14,229.48 #REF! S/ - S/ - S/ - S/ - S/ -

E312
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
25% 0.00 #REF! S/ - S/ 6,589,708.76 S/ 6,589,708.76 S/ 6,589,708.76 S/ 6,589,708.76
0.00 #REF! S/ 5,454.15 S/ 6,547.59 S/ 6,547.59 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 487,271.97 S/ 487,271.97
0.00 #REF! S/ 27,716.11 S/ 33,272.64 S/ 62,386.21 S/ 62,386.21 S/ 49,908.96
24.72 #REF! S/ - S/ - S/ - S/ - S/ 32,125.82
15% 0.00 #REF! S/ - S/ - S/ 53,325,236.49 S/ 53,325,236.49 S/ 53,325,236.49
0.01 #REF! S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
5% 0.00 #REF! S/ - S/ 415,676,105.17 S/ 415,676,105.17 S/ 415,676,105.17 S/ 415,676,105.17
0.00 #REF! S/ 7,593,811.51 S/ 9,116,220.30 S/ 9,116,220.30 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 2,465.60 S/ 2,465.60
0.00 #REF! S/ 5,635,486.71 S/ 5,637,741.81 S/ - S/ - S/ -
0.00 #REF! S/ - S/ 4,269,923.35 S/ 4,269,923.35 S/ 4,269,923.35 S/ 4,269,923.35
0.00 #REF! S/ - S/ - S/ - S/ - S/ 468,288.39
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 36,889,609.29 S/ 36,889,609.29 S/ 36,889,609.29 S/ 36,889,609.29
0.00 #REF! S/ 15,282,081.11 S/ 18,345,835.66 S/ 18,345,835.66 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - ### ###
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -

E313
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ 18,910,824.67 S/ 22,702,070.43 S/ 22,702,070.43 S/ - S/ -
0.00 #REF! S/ 384,117,965.63 S/ 384,271,674.30 S/ - S/ - S/ -
0.00 #REF! S/ - ### ### ### ###
0.00 #REF! S/ - S/ - S/ - S/ - S/ 2,160,900.00
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
308.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 2,040,982.64 S/ 2,040,982.64 S/ 2,040,982.64 S/ 2,040,982.64
0.00 #REF! S/ 71,680,053.00 S/ 86,050,483.80 S/ 86,050,483.80 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -

E314
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00
0.00
0.00 #REF! S/ - S/ 5,367,798.64 S/ 5,367,798.64 S/ 5,367,798.64 S/ 5,367,798.64
0.00 #REF! S/ - S/ - S/ - S/ - S/ 78,098,376.86
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
65.34 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 21,738.50 S/ 21,738.50 S/ 21,738.50 S/ 21,738.50
0.00 #REF! S/ 0.32 S/ 0.38 S/ 0.38 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 5,344,306.98 S/ 5,344,306.98
0.00 #REF! S/ 29,608.30 S/ 35,544.18 S/ 66,645.34 S/ 66,645.34 S/ 53,316.27
5.20 #REF! S/ - S/ - S/ - S/ - S/ 1,421.77
15% 0.00 #REF! S/ - S/ - S/ 93,293.59 S/ 93,293.59 S/ 93,293.59
0.75 #REF! S/ 139.57 S/ 167.55 S/ 167.55 S/ 167.55 S/ 502.65
5% 0.00 #REF! S/ - S/ 53,712.38 S/ 53,712.38 S/ 53,712.38 S/ 53,712.38
0.00 #REF! S/ 907.14 S/ 1,089.00 S/ 1,089.00 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 94.17 S/ 94.17
0.00 #REF! S/ 8.26 S/ 9.92 S/ 18.60 S/ 18.60 S/ 14.88
110.26 #REF! S/ - S/ - S/ - S/ - S/ 638,926.89

E315
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
15% 0.00 #REF! S/ - S/ - S/ 314,234.42 S/ 314,234.42 S/ 314,234.42
0.82 #REF! S/ 164.15 S/ 197.06 S/ 197.06 S/ 197.06 S/ 591.18
5% 0.00 #REF! S/ 6,815.04 S/ 6,817.77 S/ - S/ - S/ -
0.00 #REF! S/ - S/ 134,835.84 S/ 134,835.84 S/ 134,835.84 S/ 134,835.84
0.00 #REF! S/ - S/ - S/ - S/ - S/ 3,398.89
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
12,995.28 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 6,589,708.76 S/ 6,589,708.76 S/ 6,589,708.76 S/ 6,589,708.76
0.00 #REF! S/ 5,454.15 S/ 6,547.59 S/ 6,547.59 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 487,271.97 S/ 487,271.97
0.00 #REF! S/ 27,716.11 S/ 33,272.64 S/ 62,386.21 S/ 62,386.21 S/ 49,908.96
24.72 #REF! S/ - S/ - S/ - S/ - S/ 32,125.82
15% 0.00 #REF! S/ - S/ - S/ 53,325,236.49 S/ 53,325,236.49 S/ 53,325,236.49
0.01 #REF! S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
5% 0.00 #REF! S/ - S/ 415,676,105.17 S/ 415,676,105.17 S/ 415,676,105.17 S/ 415,676,105.17
0.00 #REF! S/ 7,593,811.51 S/ 9,116,220.30 S/ 9,116,220.30 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 2,465.60 S/ 2,465.60
0.00 #REF! S/ 5,635,486.71 S/ 5,637,741.81 S/ - S/ - S/ -
0.00 #REF! S/ - S/ 4,269,923.35 S/ 4,269,923.35 S/ 4,269,923.35 S/ 4,269,923.35
0.00 #REF! S/ - S/ - S/ - S/ - S/ 468,288.39
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 36,889,609.29 S/ 36,889,609.29 S/ 36,889,609.29 S/ 36,889,609.29
0.00 #REF! S/ 15,282,081.11 S/ 18,345,835.66 S/ 18,345,835.66 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - ### ###
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -

E316
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ 18,910,824.67 S/ 22,702,070.43 S/ 22,702,070.43 S/ - S/ -
0.00 #REF! S/ 384,117,965.63 S/ 384,271,674.30 S/ - S/ - S/ -
0.00 #REF! S/ - ### ### ### ###
0.00 #REF! S/ - S/ - S/ - S/ - S/ 2,160,900.00
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
308.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 2,040,982.64 S/ 2,040,982.64 S/ 2,040,982.64 S/ 2,040,982.64
0.00 #REF! S/ 71,680,053.00 S/ 86,050,483.80 S/ 86,050,483.80 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -

E317
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00
0.00
0.00 #REF! S/ - S/ 5,367,798.64 S/ 5,367,798.64 S/ 5,367,798.64 S/ 5,367,798.64
0.00 #REF! S/ - S/ - S/ - S/ - S/ 78,098,376.86
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
251.21 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 21,738.50 S/ 21,738.50 S/ 21,738.50 S/ 21,738.50
0.00 #REF! S/ 0.32 S/ 0.38 S/ 0.38 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 5,344,306.98 S/ 5,344,306.98
0.00 #REF! S/ 29,608.30 S/ 35,544.18 S/ 66,645.34 S/ 66,645.34 S/ 53,316.27
20.00 #REF! S/ - S/ - S/ - S/ - S/ 1,421.77

E318
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
15% 0.00 #REF! S/ - S/ - S/ 93,293.59 S/ 93,293.59 S/ 93,293.59
2.89 #REF! S/ 139.57 S/ 167.55 S/ 167.55 S/ 167.55 S/ 502.65
5% 0.00 #REF! S/ - S/ 53,712.38 S/ 53,712.38 S/ 53,712.38 S/ 53,712.38
0.00 #REF! S/ 907.14 S/ 1,089.00 S/ 1,089.00 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 94.17 S/ 94.17
0.00 #REF! S/ 8.26 S/ 9.92 S/ 18.60 S/ 18.60 S/ 14.88
423.91 #REF! S/ - S/ - S/ - S/ - S/ 638,926.89
15% 0.00 #REF! S/ - S/ - S/ 314,234.42 S/ 314,234.42 S/ 314,234.42
3.14 #REF! S/ 164.15 S/ 197.06 S/ 197.06 S/ 197.06 S/ 591.18
5% 0.00 #REF! S/ 6,815.04 S/ 6,817.77 S/ - S/ - S/ -
0.00 #REF! S/ - S/ 134,835.84 S/ 134,835.84 S/ 134,835.84 S/ 134,835.84
0.00 #REF! S/ - S/ - S/ - S/ - S/ 3,398.89
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 6,589,708.76 S/ 6,589,708.76 S/ 6,589,708.76 S/ 6,589,708.76
0.00 #REF! S/ 5,454.15 S/ 6,547.59 S/ 6,547.59 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 487,271.97 S/ 487,271.97
0.00 #REF! S/ 27,716.11 S/ 33,272.64 S/ 62,386.21 S/ 62,386.21 S/ 49,908.96
95.05 #REF! S/ - S/ - S/ - S/ - S/ 32,125.82
15% 0.00 #REF! S/ - S/ - S/ 53,325,236.49 S/ 53,325,236.49 S/ 53,325,236.49
0.01 #REF! S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
5% 0.00 #REF! S/ - S/ 415,676,105.17 S/ 415,676,105.17 S/ 415,676,105.17 S/ 415,676,105.17
0.00 #REF! S/ 7,593,811.51 S/ 9,116,220.30 S/ 9,116,220.30 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ 2,465.60 S/ 2,465.60
0.00 #REF! S/ 5,635,486.71 S/ 5,637,741.81 S/ - S/ - S/ -
0.00 #REF! S/ - S/ 4,269,923.35 S/ 4,269,923.35 S/ 4,269,923.35 S/ 4,269,923.35
0.00 #REF! S/ - S/ - S/ - S/ - S/ 468,288.39
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ 36,889,609.29 S/ 36,889,609.29 S/ 36,889,609.29 S/ 36,889,609.29
0.00 #REF! S/ 15,282,081.11 S/ 18,345,835.66 S/ 18,345,835.66 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - ### ###
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -

E319
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ 18,910,824.67 S/ 22,702,070.43 S/ 22,702,070.43 S/ - S/ -
0.00 #REF! S/ 384,117,965.63 S/ 384,271,674.30 S/ - S/ - S/ -
0.00 #REF! S/ - ### ### ### ###
0.00 #REF! S/ - S/ - S/ - S/ - S/ 2,160,900.00
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
308.00 #REF! S/ - S/ - S/ - S/ - S/ -

E320
EGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020
Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020
25% 0.00 #REF! S/ - S/ 2,040,982.64 S/ 2,040,982.64 S/ 2,040,982.64 S/ 2,040,982.64
0.00 #REF! S/ 71,680,053.00 S/ 86,050,483.80 S/ 86,050,483.80 S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
25% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
0.00 #REF! S/ - S/ - S/ - S/ - S/ -
5% 0.00 #REF! S/ - S/ - S/ - S/ - S/ -
15% 0.00
S/ 153,551.46
#REF! ### ### ### ### ###

E321
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ -
S/ 78,098,376.86 S/ 78,098,376.86 S/ 78,098,376.86 S/ - S/ -
S/ - S/ - S/ 4,450,496.92 S/ 4,450,496.92 S/ -
S/ 315,540.10 S/ - S/ 236,655.07 S/ - S/ 774.13
S/ 21,738.50 S/ 21,738.50 S/ 14,492.34 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 5,344,306.98 S/ 5,344,306.98 S/ 5,344,306.98 S/ 3,562,871.32 S/ -
S/ 53,316.27 S/ 66,645.34 S/ 66,645.34 S/ - S/ 438.07
S/ 1,421.77 S/ 1,777.21 S/ 1,777.21 S/ 2,132.65 S/ -
S/ 93,293.59 S/ - S/ - S/ - S/ 11.74
S/ 335.10 S/ 502.65 S/ 167.55 S/ 167.55 S/ -
S/ 53,712.38 S/ 53,712.38 S/ 35,808.26 S/ - S/ 2.12
S/ - S/ - S/ - S/ - S/ -
S/ 94.17 S/ 94.17 S/ 94.17 S/ 62.78 S/ -
S/ 14.88 S/ 18.60 S/ 18.60 S/ - S/ 1.84
S/ 638,926.89 S/ 798,658.62 S/ 798,658.62 S/ 958,390.34 S/ -
S/ 314,234.42 S/ - S/ - S/ - S/ 248.89
S/ 591.18 S/ 394.12 S/ 197.06 S/ 197.06 S/ -
S/ - S/ - S/ - S/ - S/ 2.30
S/ - S/ - S/ - S/ - S/ -
S/ 3,398.89 S/ 3,398.89 S/ 3,398.89 S/ - S/ -
S/ - S/ - S/ 76,125.77 S/ 76,125.77 S/ -
### S/ - ### S/ - S/ 101.25
S/ 6,589,708.76 S/ 6,589,708.76 S/ 4,393,139.17 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 487,271.97 S/ 487,271.97 S/ 487,271.97 S/ 324,847.98 S/ -
S/ 49,908.96 S/ 62,386.21 S/ 62,386.21 S/ - S/ 132.28
S/ 32,125.82 S/ 40,157.27 S/ 40,157.27 S/ 48,188.73 S/ -
S/ 53,325,236.49 S/ - S/ - S/ - S/ 55.81
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ -
S/ 415,676,105.17 S/ 415,676,105.17 S/ 277,117,403.45 S/ - S/ 0.00
S/ - S/ - S/ - S/ - S/ -
S/ 2,465.60 S/ 2,465.60 S/ 2,465.60 S/ 1,643.73 S/ -
S/ - S/ - S/ - S/ - S/ 9.41
S/ - S/ - S/ - S/ - S/ -
S/ 468,288.39 S/ 468,288.39 S/ 468,288.39 S/ - S/ -
S/ - S/ - S/ 1,203,409.00 S/ 1,203,409.00 S/ -

E322
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ - S/ - S/ - S/ - S/ 402.55
S/ 36,889,609.29 S/ 36,889,609.29 S/ 24,593,072.86 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
### ### ### ### S/ -
S/ - S/ - S/ - S/ - S/ 17,763.42
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 429.37
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 33.83
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 930.36
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 43.11
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.21
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 339.43
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 82.43
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 19.12
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 7.82
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 193.22
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 74.24
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

E323
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ - S/ - S/ - S/ - S/ 21.15
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 230.81
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.35
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 2,160,900.00 S/ 2,160,900.00 S/ 2,160,900.00 S/ - S/ -
S/ - S/ - S/ 592,900.00 S/ 592,900.00 S/ -
S/ 474,320.00 S/ - S/ 355,740.00 S/ - S/ 282.56
S/ 2,040,982.64 S/ 2,040,982.64 S/ 1,360,655.09 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 42.01
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.15
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 522.38
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1,436.20
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.03
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 6.40
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 13.97
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 84.75
S/ - S/ - S/ - S/ - S/ -

E324
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 188.08
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 82.06
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.07
S/ 0.05
S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 78,098,376.86 S/ 78,098,376.86 S/ 78,098,376.86 S/ - S/ -
S/ - S/ - S/ 4,450,496.92 S/ 4,450,496.92 S/ -
S/ 315,540.10 S/ - S/ 236,655.07 S/ - S/ 774.13
S/ 21,738.50 S/ 21,738.50 S/ 14,492.34 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 5,344,306.98 S/ 5,344,306.98 S/ 5,344,306.98 S/ 3,562,871.32 S/ -
S/ 53,316.27 S/ 66,645.34 S/ 66,645.34 S/ - S/ 438.07
S/ 1,421.77 S/ 1,777.21 S/ 1,777.21 S/ 2,132.65 S/ -
S/ 93,293.59 S/ - S/ - S/ - S/ 11.74
S/ 335.10 S/ 502.65 S/ 167.55 S/ 167.55 S/ -
S/ 53,712.38 S/ 53,712.38 S/ 35,808.26 S/ - S/ 2.12
S/ - S/ - S/ - S/ - S/ -
S/ 94.17 S/ 94.17 S/ 94.17 S/ 62.78 S/ -
S/ 14.88 S/ 18.60 S/ 18.60 S/ - S/ 1.84
S/ 638,926.89 S/ 798,658.62 S/ 798,658.62 S/ 958,390.34 S/ -
S/ 314,234.42 S/ - S/ - S/ - S/ 248.89
S/ 394.12 S/ 591.18 S/ 197.06 S/ 197.06 S/ -
S/ - S/ - S/ - S/ - S/ 2.30
S/ - S/ - S/ - S/ - S/ -
S/ 3,398.89 S/ 3,398.89 S/ 3,398.89 S/ - S/ -
S/ - S/ - S/ 76,125.77 S/ 76,125.77 S/ -
### S/ - ### S/ - S/ 101.25
S/ 6,589,708.76 S/ 6,589,708.76 S/ 4,393,139.17 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 487,271.97 S/ 487,271.97 S/ 487,271.97 S/ 324,847.98 S/ -
S/ 49,908.96 S/ 62,386.21 S/ 62,386.21 S/ - S/ 132.28
S/ 32,125.82 S/ 40,157.27 S/ 40,157.27 S/ 48,188.73 S/ -
S/ 53,325,236.49 S/ - S/ - S/ - S/ 55.81
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ -

E325
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ 415,676,105.17 S/ 415,676,105.17 S/ 277,117,403.45 S/ - S/ 0.00
S/ - S/ - S/ - S/ - S/ -
S/ 2,465.60 S/ 2,465.60 S/ 2,465.60 S/ 1,643.73 S/ -
S/ - S/ - S/ - S/ - S/ 9.41
S/ - S/ - S/ - S/ - S/ -
S/ 468,288.39 S/ 468,288.39 S/ 468,288.39 S/ - S/ -
S/ - S/ - S/ 1,203,409.00 S/ 1,203,409.00 S/ -
S/ - S/ - S/ - S/ - S/ 402.55
S/ 36,889,609.29 S/ 36,889,609.29 S/ 24,593,072.86 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
### ### ### ### S/ -
S/ - S/ - S/ - S/ - S/ 17,763.42
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 429.37
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 33.83
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 930.36
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 43.11
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.21
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 339.43
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 82.43
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 19.12
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 7.82
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 193.22
S/ - S/ - S/ - S/ - S/ -

E326
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 74.24
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.15
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 230.81
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.35
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 2,160,900.00 S/ 2,160,900.00 S/ 2,160,900.00 S/ - S/ -
S/ - S/ - S/ 592,900.00 S/ 592,900.00 S/ -
S/ 474,320.00 S/ - S/ 355,740.00 S/ - S/ 282.56
S/ 2,040,982.64 S/ 2,040,982.64 S/ 1,360,655.09 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 42.01
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.15
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 522.38
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1,436.20
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.03
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

E327
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 6.40
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 13.97
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 84.75
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 188.08
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 82.06
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.07
S/ 0.05
S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 78,098,376.86 S/ 78,098,376.86 S/ 78,098,376.86 S/ - S/ -
S/ - S/ - S/ 4,450,496.92 S/ 4,450,496.92 S/ -
S/ 315,540.10 S/ - S/ 236,655.07 S/ - S/ 774.13
S/ 21,738.50 S/ 21,738.50 S/ 14,492.34 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 5,344,306.98 S/ 5,344,306.98 S/ 5,344,306.98 S/ 3,562,871.32 S/ -
S/ 53,316.27 S/ 66,645.34 S/ 66,645.34 S/ - S/ 438.07
S/ 1,421.77 S/ 1,777.21 S/ 1,777.21 S/ 2,132.65 S/ -
S/ 93,293.59 S/ - S/ - S/ - S/ 11.74
S/ 335.10 S/ 502.65 S/ 167.55 S/ 167.55 S/ -
S/ 53,712.38 S/ 53,712.38 S/ 35,808.26 S/ - S/ 2.12
S/ - S/ - S/ - S/ - S/ -
S/ 94.17 S/ 94.17 S/ 94.17 S/ 62.78 S/ -
S/ 14.88 S/ 18.60 S/ 18.60 S/ - S/ 1.84
S/ 638,926.89 S/ 798,658.62 S/ 798,658.62 S/ 958,390.34 S/ -
S/ 314,234.42 S/ - S/ - S/ - S/ 248.89
S/ 394.12 S/ 591.18 S/ 197.06 S/ 197.06 S/ -
S/ - S/ - S/ - S/ - S/ 2.30
S/ - S/ - S/ - S/ - S/ -
S/ 3,398.89 S/ 3,398.89 S/ 3,398.89 S/ - S/ -
S/ - S/ - S/ 76,125.77 S/ 76,125.77 S/ -
### S/ - ### S/ - S/ 101.25

E328
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ 6,589,708.76 S/ 6,589,708.76 S/ 4,393,139.17 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 487,271.97 S/ 487,271.97 S/ 487,271.97 S/ 324,847.98 S/ -
S/ 49,908.96 S/ 62,386.21 S/ 62,386.21 S/ - S/ 132.28
S/ 32,125.82 S/ 40,157.27 S/ 40,157.27 S/ 48,188.73 S/ -
S/ 53,325,236.49 S/ - S/ - S/ - S/ 55.81
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ -
S/ 415,676,105.17 S/ 415,676,105.17 S/ 277,117,403.45 S/ - S/ 0.00
S/ - S/ - S/ - S/ - S/ -
S/ 2,465.60 S/ 2,465.60 S/ 2,465.60 S/ 1,643.73 S/ -
S/ - S/ - S/ - S/ - S/ 9.41
S/ - S/ - S/ - S/ - S/ -
S/ 468,288.39 S/ 468,288.39 S/ 468,288.39 S/ - S/ -
S/ - S/ - S/ 1,203,409.00 S/ 1,203,409.00 S/ -
S/ - S/ - S/ - S/ - S/ 402.55
S/ 36,889,609.29 S/ 36,889,609.29 S/ 24,593,072.86 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
### ### ### ### S/ -
S/ - S/ - S/ - S/ - S/ 17,763.42
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 429.37
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 33.83
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 930.36
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 43.11
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.21
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 339.43
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 82.43
S/ - S/ - S/ - S/ - S/ -

E329
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ - S/ - S/ - S/ - S/ 19.12
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 7.82
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 193.22
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 74.24
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.15
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 230.81
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.35
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 2,160,900.00 S/ 2,160,900.00 S/ 2,160,900.00 S/ - S/ -
S/ - S/ - S/ 592,900.00 S/ 592,900.00 S/ -
S/ 474,320.00 S/ - S/ 355,740.00 S/ - S/ 282.56
S/ 2,040,982.64 S/ 2,040,982.64 S/ 1,360,655.09 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 42.01
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.15
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 522.38
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

E330
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ - S/ - S/ - S/ - S/ 1,436.20
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.03
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 6.40
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 13.97
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 84.75
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 188.08
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 82.06
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.07
S/ 0.05
S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 78,098,376.86 S/ 78,098,376.86 S/ 78,098,376.86 S/ - S/ -
S/ - S/ - S/ 4,450,496.92 S/ 4,450,496.92 S/ -
S/ 315,540.10 S/ - S/ 236,655.07 S/ - S/ 774.13
S/ 21,738.50 S/ 21,738.50 S/ 14,492.34 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 5,344,306.98 S/ 5,344,306.98 S/ 5,344,306.98 S/ 3,562,871.32 S/ -
S/ 53,316.27 S/ 66,645.34 S/ 66,645.34 S/ - S/ 438.07
S/ 1,421.77 S/ 1,777.21 S/ 1,777.21 S/ 2,132.65 S/ -
S/ 93,293.59 S/ - S/ - S/ - S/ 11.74
S/ 335.10 S/ 502.65 S/ 167.55 S/ 167.55 S/ -
S/ 53,712.38 S/ 53,712.38 S/ 35,808.26 S/ - S/ 2.12
S/ - S/ - S/ - S/ - S/ -
S/ 94.17 S/ 94.17 S/ 94.17 S/ 62.78 S/ -
S/ 14.88 S/ 18.60 S/ 18.60 S/ - S/ 1.84
S/ 638,926.89 S/ 798,658.62 S/ 798,658.62 S/ 958,390.34 S/ -

E331
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ 314,234.42 S/ - S/ - S/ - S/ 248.89
S/ 394.12 S/ 591.18 S/ 197.06 S/ 197.06 S/ -
S/ - S/ - S/ - S/ - S/ 2.30
S/ - S/ - S/ - S/ - S/ -
S/ 3,398.89 S/ 3,398.89 S/ 3,398.89 S/ - S/ -
S/ - S/ - S/ 76,125.77 S/ 76,125.77 S/ -
### S/ - ### S/ - S/ 101.25
S/ 6,589,708.76 S/ 6,589,708.76 S/ 4,393,139.17 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 487,271.97 S/ 487,271.97 S/ 487,271.97 S/ 324,847.98 S/ -
S/ 49,908.96 S/ 62,386.21 S/ 62,386.21 S/ - S/ 132.28
S/ 32,125.82 S/ 40,157.27 S/ 40,157.27 S/ 48,188.73 S/ -
S/ 53,325,236.49 S/ - S/ - S/ - S/ 55.81
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ -
S/ 415,676,105.17 S/ 415,676,105.17 S/ 277,117,403.45 S/ - S/ 0.00
S/ - S/ - S/ - S/ - S/ -
S/ 2,465.60 S/ 2,465.60 S/ 2,465.60 S/ 1,643.73 S/ -
S/ - S/ - S/ - S/ - S/ 9.41
S/ - S/ - S/ - S/ - S/ -
S/ 468,288.39 S/ 468,288.39 S/ 468,288.39 S/ - S/ -
S/ - S/ - S/ 1,203,409.00 S/ 1,203,409.00 S/ -
S/ - S/ - S/ - S/ - S/ 402.55
S/ 36,889,609.29 S/ 36,889,609.29 S/ 24,593,072.86 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
### ### ### ### S/ -
S/ - S/ - S/ - S/ - S/ 17,763.42
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 429.37
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 33.83
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 930.36
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 43.11
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.21

E332
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 339.43
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 82.43
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 19.12
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 7.82
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 193.22
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 74.24
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.15
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 230.81
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.35
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 2,160,900.00 S/ 2,160,900.00 S/ 2,160,900.00 S/ - S/ -
S/ - S/ - S/ 592,900.00 S/ 592,900.00 S/ -
S/ 474,320.00 S/ - S/ 355,740.00 S/ - S/ 282.56
S/ 2,040,982.64 S/ 2,040,982.64 S/ 1,360,655.09 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 42.01
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.15
S/ - S/ - S/ - S/ - S/ -

E333
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 522.38
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1,436.20
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.03
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 6.40
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 13.97
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 84.75
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 188.08
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 82.06
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.07
S/ 0.05
S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 78,098,376.86 S/ 78,098,376.86 S/ 78,098,376.86 S/ - S/ -
S/ - S/ - S/ 4,450,496.92 S/ 4,450,496.92 S/ -
S/ 315,540.10 S/ - S/ 236,655.07 S/ - S/ 774.13
S/ 21,738.50 S/ 21,738.50 S/ 14,492.34 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 5,344,306.98 S/ 5,344,306.98 S/ 5,344,306.98 S/ 3,562,871.32 S/ -
S/ 53,316.27 S/ 66,645.34 S/ 66,645.34 S/ - S/ 438.07
S/ 1,421.77 S/ 1,777.21 S/ 1,777.21 S/ 2,132.65 S/ -

E334
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ 93,293.59 S/ - S/ - S/ - S/ 11.74
S/ 335.10 S/ 502.65 S/ 167.55 S/ 167.55 S/ -
S/ 53,712.38 S/ 53,712.38 S/ 35,808.26 S/ - S/ 2.12
S/ - S/ - S/ - S/ - S/ -
S/ 94.17 S/ 94.17 S/ 94.17 S/ 62.78 S/ -
S/ 14.88 S/ 18.60 S/ 18.60 S/ - S/ 1.84
S/ 638,926.89 S/ 798,658.62 S/ 798,658.62 S/ 958,390.34 S/ -
S/ 314,234.42 S/ - S/ - S/ - S/ 248.89
S/ 394.12 S/ 591.18 S/ 197.06 S/ 197.06 S/ -
S/ - S/ - S/ - S/ - S/ 2.30
S/ - S/ - S/ - S/ - S/ -
S/ 3,398.89 S/ 3,398.89 S/ 3,398.89 S/ - S/ -
S/ - S/ - S/ 76,125.77 S/ 76,125.77 S/ -
### S/ - ### S/ - S/ 101.25
S/ 6,589,708.76 S/ 6,589,708.76 S/ 4,393,139.17 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 487,271.97 S/ 487,271.97 S/ 487,271.97 S/ 324,847.98 S/ -
S/ 49,908.96 S/ 62,386.21 S/ 62,386.21 S/ - S/ 132.28
S/ 32,125.82 S/ 40,157.27 S/ 40,157.27 S/ 48,188.73 S/ -
S/ 53,325,236.49 S/ - S/ - S/ - S/ 55.81
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ -
S/ 415,676,105.17 S/ 415,676,105.17 S/ 277,117,403.45 S/ - S/ 0.00
S/ - S/ - S/ - S/ - S/ -
S/ 2,465.60 S/ 2,465.60 S/ 2,465.60 S/ 1,643.73 S/ -
S/ - S/ - S/ - S/ - S/ 9.41
S/ - S/ - S/ - S/ - S/ -
S/ 468,288.39 S/ 468,288.39 S/ 468,288.39 S/ - S/ -
S/ - S/ - S/ 1,203,409.00 S/ 1,203,409.00 S/ -
S/ - S/ - S/ - S/ - S/ 402.55
S/ 36,889,609.29 S/ 36,889,609.29 S/ 24,593,072.86 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
### ### ### ### S/ -
S/ - S/ - S/ - S/ - S/ 17,763.42
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 429.37
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 33.83
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

E335
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ - S/ - S/ - S/ - S/ 930.36
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 43.11
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.21
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 339.43
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 82.43
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 19.12
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 7.82
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 193.22
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 74.24
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.15
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 230.81
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.35
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 2,160,900.00 S/ 2,160,900.00 S/ 2,160,900.00 S/ - S/ -
S/ - S/ - S/ 592,900.00 S/ 592,900.00 S/ -
S/ 474,320.00 S/ - S/ 355,740.00 S/ - S/ 282.56

E336
Mes 07 Mes 08 Mes 09 Mes 10 Mes 11
DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020
A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020
S/ 2,040,982.64 S/ 2,040,982.64 S/ 1,360,655.09 S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 42.01
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.15
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 522.38
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1,436.20
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.03
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 6.40
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 13.97
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 84.75
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 188.08
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 82.06
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.07
S/ 0.05

### ### ### ### S/ 125,154.88

E337
CRONOGRAMA DE ADQUISICION DE EQUIPOS - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON
CODIGO UNICO N° 2131616

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15
DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

Código EQUIPOS Unidad Parcial S/. A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

DEMOLICIÓN
0349650003 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 h.h S/ 108,026.93 S/ - S/ - S/ - S/ - S/ - S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 10,802.69 S/ 10,802.69 S/ 5,401.35 S/ - S/ -
0349250017 TRACTOR S/ORUGAS 140/160 HP h-m S/ 17,295.59 S/ - S/ - S/ - S/ - S/ - S/ - S/ 1,383.65 S/ 1,383.65 S/ 1,729.56 S/ 1,729.56 S/ 2,075.47 S/ 2,075.47 S/ 1,729.56 S/ 2,594.34 S/ 2,594.34
0349100001 CARGADOR S/LLANTAS 110-125 HP h-m S/ 23,967.67 S/ - S/ - S/ 1,917.41 S/ 1,917.41 S/ 2,396.77 S/ 2,396.77 S/ 2,876.12 S/ 2,876.12 S/ 2,396.77 S/ 3,595.15 S/ 3,595.15 S/ - S/ - S/ - S/ -
0349500005 MEZCLADORA DE CONC.(TAMBOR) 11.12P3, 18 HP h.h S/ 9,155.34 S/ - S/ 1,373.30 S/ 1,831.07 S/ 1,831.07 S/ 1,831.07 S/ 2,288.84 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h.h S/ 3,543.24 S/ - S/ 531.49 S/ 708.65 S/ 708.65 S/ 708.65 S/ 885.81 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349350001 PLANCHA COMPACTADORA VIBRAT. 4.0 HP h.h S/ 16,413.39 S/ - S/ - S/ - S/ - S/ 4,103.35 S/ 4,103.35 S/ 4,103.35 S/ 4,103.35 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349350021 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON h.h S/ 14,125.80 S/ - S/ - S/ - S/ 2,118.87 S/ 706.29 S/ 1,412.58 S/ 1,412.58 S/ 2,118.87 S/ 2,118.87 S/ 1,412.58 S/ 1,412.58 S/ - S/ - S/ - S/ -
0349600105 MOTOBOMBA 7 .1Q HP, 3" h.h S/ 92.58 S/ - S/ 13.89 S/ 18.52 S/ 18.52 S/ 18.52 S/ 23.14 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349600103 SOLDADORA ELECTRICA h.h S/ 560.41 S/ - S/ 84.06 S/ 112.08 S/ 112.08 S/ 112.08 S/ 140.10 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
SUSTITUCIÓN
0349650003 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 h.h S/ 108,026.93 S/ - S/ - S/ - S/ - S/ - S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 10,802.69 S/ 10,802.69 S/ 5,401.35 S/ - S/ -
0349250017 TRACTOR S/ORUGAS 140/160 HP h-m S/ 17,295.59 S/ - S/ - S/ - S/ - S/ - S/ - S/ 1,383.65 S/ 1,383.65 S/ 1,729.56 S/ 1,729.56 S/ 2,075.47 S/ 2,075.47 S/ 1,729.56 S/ 2,594.34 S/ 2,594.34
0349100001 CARGADOR S/LLANTAS 110-125 HP h-m S/ 23,967.67 S/ - S/ - S/ 1,917.41 S/ 1,917.41 S/ 2,396.77 S/ 2,396.77 S/ 2,876.12 S/ 2,876.12 S/ 2,396.77 S/ 3,595.15 S/ 3,595.15 S/ - S/ - S/ - S/ -
0349500005 MEZCLADORA DE CONC.(TAMBOR) 11.12P3, 18 HP h.h S/ 9,155.34 S/ - S/ 1,373.30 S/ 1,831.07 S/ 1,831.07 S/ 1,831.07 S/ 2,288.84 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h.h S/ 3,543.24 S/ - S/ 531.49 S/ 708.65 S/ 708.65 S/ 708.65 S/ 885.81 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349350001 PLANCHA COMPACTADORA VIBRAT. 4.0 HP h.h S/ 16,413.39 S/ - S/ - S/ - S/ - S/ 2,462.01 S/ 3,282.68 S/ 3,282.68 S/ 3,282.68 S/ 4,103.35 S/ - S/ - S/ - S/ - S/ - S/ -
0349350021 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON h.h S/ 14,125.80 S/ - S/ - S/ - S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 1,412.58 S/ - S/ - S/ - S/ - S/ -
0349600105 MOTOBOMBA 7 .1Q HP, 3" h.h S/ 92.58 S/ - S/ 13.89 S/ 18.52 S/ 18.52 S/ 18.52 S/ 23.14 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349600103 SOLDADORA ELECTRICA h.h S/ 560.41 S/ - S/ 84.06 S/ 112.08 S/ 112.08 S/ 112.08 S/ 140.10 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
SALDO
0349650003 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 h.h S/ 108,026.93 S/ - S/ - S/ - S/ - S/ - S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 10,802.69 S/ 10,802.69 S/ 5,401.35 S/ - S/ -
0349250017 TRACTOR S/ORUGAS 140/160 HP h-m S/ 17,295.59 S/ - S/ - S/ - S/ - S/ - S/ - S/ 1,383.65 S/ 1,383.65 S/ 1,729.56 S/ 1,729.56 S/ 2,075.47 S/ 2,075.47 S/ 1,729.56 S/ 2,594.34 S/ 2,594.34
0349100001 CARGADOR S/LLANTAS 110-125 HP h-m S/ 23,967.67 S/ - S/ - S/ 1,917.41 S/ 1,917.41 S/ 2,396.77 S/ 2,396.77 S/ 2,876.12 S/ 2,876.12 S/ 2,396.77 S/ 3,595.15 S/ 3,595.15 S/ - S/ - S/ - S/ -
0349500005 MEZCLADORA DE CONC.(TAMBOR) 11.12P3, 18 HP h.h S/ 9,155.34 S/ - S/ 1,831.07 S/ 1,831.07 S/ 1,831.07 S/ 1,373.30 S/ 2,288.84 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h.h S/ 3,543.24 S/ - S/ 708.65 S/ 708.65 S/ 708.65 S/ 531.49 S/ 885.81 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349350001 PLANCHA COMPACTADORA VIBRAT. 4.0 HP h.h S/ 16,413.39 S/ - S/ - S/ - S/ - S/ 3,282.68 S/ 3,282.68 S/ 2,462.01 S/ 3,282.68 S/ 4,103.35 S/ - S/ - S/ - S/ - S/ - S/ -
0349350021 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON h.h S/ 14,125.80 S/ - S/ - S/ - S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 1,412.58 S/ 1,412.58 S/ - S/ - S/ - S/ -
0349600105 MOTOBOMBA 7 .1Q HP, 3" h.h S/ 92.58 S/ - S/ 18.52 S/ 18.52 S/ 18.52 S/ 13.89 S/ 23.14 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349600103 SOLDADORA ELECTRICA h.h S/ 560.41 S/ - S/ 112.08 S/ 112.08 S/ 112.08 S/ 84.06 S/ 140.10 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
MEJORA
0349650003 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 h.h S/ 108,026.93 S/ - S/ - S/ - S/ - S/ - S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 10,802.69 S/ 10,802.69 S/ 5,401.35 S/ - S/ -
0349250017 TRACTOR S/ORUGAS 140/160 HP h-m S/ 17,295.59 S/ - S/ - S/ - S/ - S/ - S/ - S/ 1,383.65 S/ 1,383.65 S/ 1,729.56 S/ 1,729.56 S/ 2,075.47 S/ 2,075.47 S/ 1,729.56 S/ 2,594.34 S/ 2,594.34
0349100001 CARGADOR S/LLANTAS 110-125 HP h-m S/ 23,967.67 S/ - S/ - S/ 1,917.41 S/ 1,917.41 S/ 2,396.77 S/ 2,396.77 S/ 2,876.12 S/ 2,876.12 S/ 2,396.77 S/ 3,595.15 S/ 3,595.15 S/ - S/ - S/ - S/ -
0349500005 MEZCLADORA DE CONC.(TAMBOR) 11.12P3, 18 HP h.h S/ 9,155.34 S/ - S/ 1,831.07 S/ 1,831.07 S/ 1,831.07 S/ 1,373.30 S/ 2,288.84 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h.h S/ 3,543.24 S/ - S/ 708.65 S/ 708.65 S/ 708.65 S/ 531.49 S/ 885.81 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349350001 PLANCHA COMPACTADORA VIBRAT. 4.0 HP h.h S/ 16,413.39 S/ - S/ - S/ - S/ - S/ 3,282.68 S/ 3,282.68 S/ 2,462.01 S/ 3,282.68 S/ 4,103.35 S/ - S/ - S/ - S/ - S/ - S/ -
0349350021 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON h.h S/ 14,125.80 S/ - S/ - S/ - S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 1,412.58 S/ 1,412.58 S/ 1,412.58 S/ 1,412.58 S/ - S/ - S/ - S/ -
0349600105 MOTOBOMBA 7 .1Q HP, 3" h.h S/ 92.58 S/ - S/ 18.52 S/ 18.52 S/ 18.52 S/ 13.89 S/ 23.14 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349600103 SOLDADORA ELECTRICA h.h S/ 560.41 S/ - S/ 112.08 S/ 112.08 S/ 112.08 S/ 84.06 S/ 140.10 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
DEFICIENCIA
0349650003 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 h.h S/ 108,026.93 S/ - S/ - S/ - S/ - S/ - S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 16,204.04 S/ 10,802.69 S/ 10,802.69 S/ 5,401.35 S/ - S/ -
0349250017 TRACTOR S/ORUGAS 140/160 HP h-m S/ 17,295.59 S/ - S/ - S/ - S/ - S/ - S/ - S/ 1,383.65 S/ 1,383.65 S/ 1,729.56 S/ 1,729.56 S/ 2,075.47 S/ 2,075.47 S/ 1,729.56 S/ 2,594.34 S/ 2,594.34
0349100001 CARGADOR S/LLANTAS 110-125 HP h-m S/ 23,967.67 S/ - S/ - S/ 1,917.41 S/ 1,917.41 S/ 3,595.15 S/ 3,595.15 S/ 2,876.12 S/ 2,876.12 S/ 3,595.15 S/ 3,595.15 S/ - S/ - S/ - S/ - S/ -
0349500005 MEZCLADORA DE CONC.(TAMBOR) 11.12P3, 18 HP h.h S/ 9,155.34 S/ - S/ 1,831.07 S/ 1,831.07 S/ 1,831.07 S/ 1,373.30 S/ 2,288.84 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h.h S/ 3,543.24 S/ - S/ 708.65 S/ 708.65 S/ 708.65 S/ 531.49 S/ 885.81 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349350001 PLANCHA COMPACTADORA VIBRAT. 4.0 HP h.h S/ 16,413.39 S/ - S/ - S/ - S/ - S/ 4,103.35 S/ 4,103.35 S/ 4,103.35 S/ 4,103.35 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349350021 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON h.h S/ 14,125.80 S/ - S/ - S/ - S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 2,118.87 S/ 1,412.58 S/ 1,412.58 S/ 1,412.58 S/ 1,412.58 S/ - S/ - S/ - S/ -
0349600105 MOTOBOMBA 7 .1Q HP, 3" h.h S/ 92.58 S/ - S/ 18.52 S/ 18.52 S/ 18.52 S/ 13.89 S/ 23.14 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
0349600103 SOLDADORA ELECTRICA h.h S/ 560.41 S/ - S/ 112.08 S/ 112.08 S/ 112.08 S/ 84.06 S/ 140.10 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

TOTAL S/ 965,904.73 S/ - S/ 12,016.42 S/ 22,938.64 S/ 33,532.99 S/ 50,946.88 S/ 138,834.67 S/ 128,620.48 S/ 129,555.53 S/ 124,342.02 S/ 114,706.64 S/ 84,421.74 S/ 64,390.82 S/ 35,654.53 S/ 12,971.69 S/ 12,971.69

AVANCE PARCIAL 0.00% 1.24% 2.37% 3.47% 5.27% 14.37% 13.32% 13.41% 12.87% 11.88% 8.74% 6.67% 3.69% 1.34% 1.34%

AVANCE ACUMULADO 0.00% 1.24% 3.62% 7.09% 12.37% 26.74% 40.05% 53.47% 66.34% 78.22% 86.96% 93.62% 97.31% 98.66% 100.00%

E338
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.

SUSTITUCIÓN
0202050031 FIERRO LISO 1/2" m S/ 35.93
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80
0202100004 ALAMBRE GALV.#16 kg S/ 108.67
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46
0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84
0202350050 ARANDELA 1/2" und S/ 0.12
0202350083 TORNILLO 3/8" und S/ 50.16
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65
0202400062 TARUGO 1" X 1/2" und S/ 369.09
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGOund S/ 2.60
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31
0204050001 ARENA GRUESA m3 S/ 6,093.86
0204050002 ARENA FINA S/ 11,373.27
0204100001 TIERRA DE CHACRA S/ 8,564.35
0204100026 GRASS AMERICANO m2 S/ 9,050.46
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24

A339
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41
0205350001 AGUA m3 S/ 1,652.76
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35
0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50
0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUA m2 S/ 208,162.94
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 11,780.45
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 15,110.46
0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 47,740.29
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE C m2 S/ 19,577.12
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 4,734.76
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 2,415.98
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mmm2 S/ 3,703.01
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.m2 S/ 1,873.43
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 m2 y S/ 1,959.24
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON m2 S/ 1,730.54
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_ m2 S/ 118.84
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LO m2 S/ 44,784.47
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE m2 S/ 157,467.84
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03
0224100017 CERAMICO m2 S/ 5.78
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL pza S/ 134.09
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16

A340
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIO pza S/ 21.15
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84
0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03
0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPOR und S/ 349.15
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58
0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 und S/ 317.80
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98
0226300033 CERROJO 2" pza S/ 84.26
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJpza S/ 63.34
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46
0226500005 MECANISMO DE IZAJE und S/ 4.37
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61
0230010015 AGUARRAS gal S/ 454.15
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44
0230010025 LIJA PARA FIERRO und S/ 114.48
0230010035 THINNER gal S/ 8.62
0230010080 RODOPLAST 6mm m S/ 545.96
0230010104 BASE ZINCROMATO gal S/ 280.68
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21
0230010150 FRAGUA X 1 KG und S/ 4,140.15
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38
0230010162 LIJA PARA MADERA und S/ 3,682.57
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 1m_x000D S/ 1,634.50
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37

A341
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADO und_x000 S/ 13,029.50
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97
0230010192 SELLADOR PARA MADERA gal S/ 1,238.36
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO m2 S/ 2,951.74
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑund S/ 832.39
0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000 S/ 355.95
0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kgpln S/ 148.95
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68
0230100002 SOLDADURA kg S/ 0.39
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPI m2 S/ 28,702.26
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA Cm2 S/ 1,222.87
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE m I 2_x000 S/ 5,897.43
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE Im2 S/ 21,785.89
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE m2 S/ 859.09
0230300002 CUERDA DE NYLON m S/ 1.17
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58
0230410094 ESPEJO BISELADO m2 S/ 1,788.39
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68
0230990175 WATER STOP DE 6"x25m rll S/ 177.24
0238010001 HORMIGON m3 S/ 345.84
0243010001 MADERA TORNILLO p2 S/ 89,826.90
0243100001 MADERA CEDRO p2 S/ 23,992.75
243100025 COLA SINTETICA gal S/ 174.35
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84
244040017 PLANCHA MDF e=3MM m2 S/ 42.20
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09

A342
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94
0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39
0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65
0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63
254010005 PINTURA LATEX gal S/ 8,516.06
254010006 PRESERVANTE DE MADERA gal S/ 225.62

A343
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


254100005 BARNIZ MARINO gal S/ 18.51
254150020 PINTURA ESMALTE gal S/ 152.14
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50
254150033 PINTURA OLEO MATE . gal S/ 11,500.04
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07
254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11
254200001 PINTURA ANTICORROSIVA gal S/ 179.77
254300001 PINTURA PARA TRAFICO gal S/ 413.05
254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11
265010030 TUBERIA FºGº 11/2" m S/ 163.89
265010046 TUBERIA FºGº 1" m S/ 1,218.74
265010058 TUBERIA FºGº 2" m S/ 400.87
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INST m S/ 13,481.12
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50
SALDO

A344
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0202050031 FIERRO LISO 1/2" m S/ 35.93
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80
0202100004 ALAMBRE GALV.#16 kg S/ 108.67
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46
0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84
0202350050 ARANDELA 1/2" und S/ 0.12
0202350083 TORNILLO 3/8" und S/ 50.16
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65
0202400062 TARUGO 1" X 1/2" und S/ 369.09
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGOund S/ 2.60
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31
0204050001 ARENA GRUESA m3 S/ 6,093.86
0204050002 ARENA FINA S/ 11,373.27
0204100001 TIERRA DE CHACRA S/ 8,564.35
0204100026 GRASS AMERICANO m2 S/ 9,050.46
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41
0205350001 AGUA m3 S/ 1,652.76
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35

A345
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50
0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUA m2 S/ 208,162.94
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 11,780.45
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 15,110.46
0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 47,740.29
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE C m2 S/ 19,577.12
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 4,734.76
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 2,415.98
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mmm2 S/ 3,703.01
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.m2 S/ 1,873.43
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 m2 y S/ 1,959.24
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON m2 S/ 1,730.54
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_ m2 S/ 118.84
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LO m2 S/ 44,784.47
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE m2 S/ 157,467.84
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03
0224100017 CERAMICO m2 S/ 5.78
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL pza S/ 134.09
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16
0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIO pza S/ 21.15
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84

A346
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03
0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPOR und S/ 349.15
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58
0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 und S/ 317.80
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98
0226300033 CERROJO 2" pza S/ 84.26
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJpza S/ 63.34
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46
0226500005 MECANISMO DE IZAJE und S/ 4.37
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61
0230010015 AGUARRAS gal S/ 454.15
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44
0230010025 LIJA PARA FIERRO und S/ 114.48
0230010035 THINNER gal S/ 8.62
0230010080 RODOPLAST 6mm m S/ 545.96
0230010104 BASE ZINCROMATO gal S/ 280.68
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21
0230010150 FRAGUA X 1 KG und S/ 4,140.15
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38
0230010162 LIJA PARA MADERA und S/ 3,682.57
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 1m_x000D S/ 1,634.50
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37
0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADOund_x000 S/ 13,029.50
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97

A347
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0230010192 SELLADOR PARA MADERA gal S/ 1,238.36
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO m2 S/ 2,951.74
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑund S/ 832.39
0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000 S/ 355.95
0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kgpln S/ 148.95
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68
0230100002 SOLDADURA kg S/ 0.39
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPI m2 S/ 28,702.26
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA Cm2 S/ 1,222.87
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE m I 2_x000 S/ 5,897.43
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE Im2 S/ 21,785.89
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE m2 S/ 859.09
0230300002 CUERDA DE NYLON m S/ 1.17
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58
0230410094 ESPEJO BISELADO m2 S/ 1,788.39
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68
0230990175 WATER STOP DE 6"x25m rll S/ 177.24
0238010001 HORMIGON m3 S/ 345.84
0243010001 MADERA TORNILLO p2 S/ 89,826.90
0243100001 MADERA CEDRO p2 S/ 23,992.75
243100025 COLA SINTETICA gal S/ 174.35
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84
244040017 PLANCHA MDF e=3MM m2 S/ 42.20
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09
0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94

A348
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39
0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65
0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63
254010005 PINTURA LATEX gal S/ 8,516.06
254010006 PRESERVANTE DE MADERA gal S/ 225.62
254100005 BARNIZ MARINO gal S/ 18.51
254150020 PINTURA ESMALTE gal S/ 152.14
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50

A349
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


254150033 PINTURA OLEO MATE . gal S/ 11,500.04
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07
254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11
254200001 PINTURA ANTICORROSIVA gal S/ 179.77
254300001 PINTURA PARA TRAFICO gal S/ 413.05
254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11
265010030 TUBERIA FºGº 11/2" m S/ 163.89
265010046 TUBERIA FºGº 1" m S/ 1,218.74
265010058 TUBERIA FºGº 2" m S/ 400.87
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INST m S/ 13,481.12
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50
MEJORA
0202050031 FIERRO LISO 1/2" m S/ 35.93
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80

A350
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0202100004 ALAMBRE GALV.#16 kg S/ 108.67
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46
0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84
0202350050 ARANDELA 1/2" und S/ 0.12
0202350083 TORNILLO 3/8" und S/ 50.16
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65
0202400062 TARUGO 1" X 1/2" und S/ 369.09
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGOund S/ 2.60
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31
0204050001 ARENA GRUESA m3 S/ 6,093.86
0204050002 ARENA FINA S/ 11,373.27
0204100001 TIERRA DE CHACRA S/ 8,564.35
0204100026 GRASS AMERICANO m2 S/ 9,050.46
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41
0205350001 AGUA m3 S/ 1,652.76
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35
0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50

A351
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUA m2 S/ 208,162.94
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 11,780.45
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 15,110.46
0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 47,740.29
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE C m2 S/ 19,577.12
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 4,734.76
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 2,415.98
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mmm2 S/ 3,703.01
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.m2 S/ 1,873.43
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 m2 y S/ 1,959.24
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON m2 S/ 1,730.54
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_ m2 S/ 118.84
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LO m2 S/ 44,784.47
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE m2 S/ 157,467.84
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03
0224100017 CERAMICO m2 S/ 5.78
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL pza S/ 134.09
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16
0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIO pza S/ 21.15
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84
0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03

A352
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPOR und S/ 349.15
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58
0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 und S/ 317.80
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98
0226300033 CERROJO 2" pza S/ 84.26
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJpza S/ 63.34
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46
0226500005 MECANISMO DE IZAJE und S/ 4.37
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61
0230010015 AGUARRAS gal S/ 454.15
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44
0230010025 LIJA PARA FIERRO und S/ 114.48
0230010035 THINNER gal S/ 8.62
0230010080 RODOPLAST 6mm m S/ 545.96
0230010104 BASE ZINCROMATO gal S/ 280.68
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21
0230010150 FRAGUA X 1 KG und S/ 4,140.15
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38
0230010162 LIJA PARA MADERA und S/ 3,682.57
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 1m_x000D S/ 1,634.50
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37
0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADOund_x000 S/ 13,029.50
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97
0230010192 SELLADOR PARA MADERA gal S/ 1,238.36
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO m2 S/ 2,951.74
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑund S/ 832.39

A353
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000 S/ 355.95
0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kgpln S/ 148.95
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68
0230100002 SOLDADURA kg S/ 0.39
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPI m2 S/ 28,702.26
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA Cm2 S/ 1,222.87
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE m I 2_x000 S/ 5,897.43
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE Im2 S/ 21,785.89
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE m2 S/ 859.09
0230300002 CUERDA DE NYLON m S/ 1.17
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58
0230410094 ESPEJO BISELADO m2 S/ 1,788.39
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68
0230990175 WATER STOP DE 6"x25m rll S/ 177.24
0238010001 HORMIGON m3 S/ 345.84
0243010001 MADERA TORNILLO p2 S/ 89,826.90
0243100001 MADERA CEDRO p2 S/ 23,992.75
243100025 COLA SINTETICA gal S/ 174.35
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84
244040017 PLANCHA MDF e=3MM m2 S/ 42.20
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09
0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94
0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39

A354
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65
0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63
254010005 PINTURA LATEX gal S/ 8,516.06
254010006 PRESERVANTE DE MADERA gal S/ 225.62
254100005 BARNIZ MARINO gal S/ 18.51
254150020 PINTURA ESMALTE gal S/ 152.14
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50
254150033 PINTURA OLEO MATE . gal S/ 11,500.04
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07

A355
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11
254200001 PINTURA ANTICORROSIVA gal S/ 179.77
254300001 PINTURA PARA TRAFICO gal S/ 413.05
254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11
265010030 TUBERIA FºGº 11/2" m S/ 163.89
265010046 TUBERIA FºGº 1" m S/ 1,218.74
265010058 TUBERIA FºGº 2" m S/ 400.87
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INST m S/ 13,481.12
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50
DEFICIENCIA
0202050031 FIERRO LISO 1/2" m S/ 35.93
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80
0202100004 ALAMBRE GALV.#16 kg S/ 108.67
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46

A356
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84
0202350050 ARANDELA 1/2" und S/ 0.12
0202350083 TORNILLO 3/8" und S/ 50.16
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65
0202400062 TARUGO 1" X 1/2" und S/ 369.09
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGOund S/ 2.60
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31
0204050001 ARENA GRUESA m3 S/ 6,093.86
0204050002 ARENA FINA S/ 11,373.27
0204100001 TIERRA DE CHACRA S/ 8,564.35
0204100026 GRASS AMERICANO m2 S/ 9,050.46
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41
0205350001 AGUA m3 S/ 1,652.76
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35
0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50
0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUA m2 S/ 208,162.94
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 11,780.45
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 15,110.46

A357
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 47,740.29
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE C m2 S/ 19,577.12
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 4,734.76
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 2,415.98
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mmm2 S/ 3,703.01
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.m2 S/ 1,873.43
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 m2 y S/ 1,959.24
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON m2 S/ 1,730.54
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_ m2 S/ 118.84
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LO m2 S/ 44,784.47
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE m2 S/ 157,467.84
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03
0224100017 CERAMICO m2 S/ 5.78
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL pza S/ 134.09
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16
0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIO pza S/ 21.15
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84
0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03
0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPOR und S/ 349.15
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58

A358
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 und S/ 317.80
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98
0226300033 CERROJO 2" pza S/ 84.26
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJpza S/ 63.34
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46
0226500005 MECANISMO DE IZAJE und S/ 4.37
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61
0230010015 AGUARRAS gal S/ 454.15
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44
0230010025 LIJA PARA FIERRO und S/ 114.48
0230010035 THINNER gal S/ 8.62
0230010080 RODOPLAST 6mm m S/ 545.96
0230010104 BASE ZINCROMATO gal S/ 280.68
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21
0230010150 FRAGUA X 1 KG und S/ 4,140.15
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38
0230010162 LIJA PARA MADERA und S/ 3,682.57
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 1m_x000D S/ 1,634.50
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37
0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADOund_x000 S/ 13,029.50
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97
0230010192 SELLADOR PARA MADERA gal S/ 1,238.36
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO m2 S/ 2,951.74
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑund S/ 832.39
0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000 S/ 355.95

A359
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kgpln S/ 148.95
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68
0230100002 SOLDADURA kg S/ 0.39
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPI m2 S/ 28,702.26
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA Cm2 S/ 1,222.87
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE m I 2_x000 S/ 5,897.43
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE Im2 S/ 21,785.89
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE m2 S/ 859.09
0230300002 CUERDA DE NYLON m S/ 1.17
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58
0230410094 ESPEJO BISELADO m2 S/ 1,788.39
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68
0230990175 WATER STOP DE 6"x25m rll S/ 177.24
0238010001 HORMIGON m3 S/ 345.84
0243010001 MADERA TORNILLO p2 S/ 89,826.90
0243100001 MADERA CEDRO p2 S/ 23,992.75
243100025 COLA SINTETICA gal S/ 174.35
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84
244040017 PLANCHA MDF e=3MM m2 S/ 42.20
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09
0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94
0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39
0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65

A360
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63
254010005 PINTURA LATEX gal S/ 8,516.06
254010006 PRESERVANTE DE MADERA gal S/ 225.62
254100005 BARNIZ MARINO gal S/ 18.51
254150020 PINTURA ESMALTE gal S/ 152.14
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50
254150033 PINTURA OLEO MATE . gal S/ 11,500.04
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07
254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11
254200001 PINTURA ANTICORROSIVA gal S/ 179.77
254300001 PINTURA PARA TRAFICO gal S/ 413.05

A361
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11
265010030 TUBERIA FºGº 11/2" m S/ 163.89
265010046 TUBERIA FºGº 1" m S/ 1,218.74
265010058 TUBERIA FºGº 2" m S/ 400.87
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INST m S/ 13,481.12
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50

TOTAL S/ 5,801,396.27

AVANCE PARCIAL
AVANCE ACUMULADO

A362
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020

S/ - S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ -


S/ - S/ - S/ - S/ - S/ 906.82 S/ 906.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ 27.17 S/ 21.73 S/ 32.60 S/ 21.73
S/ 290.27 S/ 348.46 S/ - S/ - S/ - S/ -
S/ - S/ 4.12 S/ 4.12 S/ 4.12 S/ 4.12 S/ -
S/ - S/ - S/ - S/ - S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.17
S/ - S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 10.45 S/ 12.54 S/ 12.54 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.47 S/ 16.47 S/ 16.47
S/ 3.89 S/ 4.67 S/ 8.75 S/ 8.75 S/ 7.00 S/ 7.00
S/ - S/ - S/ - S/ - S/ 3.49 S/ 3.49
S/ - S/ - S/ 2.72 S/ 2.72 S/ 2.72 S/ 2.72
S/ 2.36 S/ 2.83 S/ 2.83 S/ 2.83 S/ 8.49 S/ 5.66
S/ 1.43 S/ 1.71 S/ 1.71 S/ - S/ - S/ -
S/ 2.59 S/ 4.66 S/ 6.21 S/ 7.77 S/ 4.66 S/ 6.99
S/ - S/ - S/ - S/ - S/ 92.27 S/ 92.27
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.23
S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 0.54 S/ 0.65 S/ 0.65 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.70 S/ 0.70 S/ 0.70
S/ 8.61 S/ 10.34 S/ 19.38 S/ 19.38 S/ 15.51 S/ 15.51
S/ - S/ - S/ - S/ - S/ 46.68 S/ 46.68
S/ 1.15 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39
S/ 1.22 S/ 1.47 S/ 2.21 S/ 2.21 S/ 2.21 S/ 2.94
S/ - S/ - S/ 3.38 S/ 2.70 S/ 4.05 S/ 2.70
S/ 20.83 S/ 25.00 S/ - S/ - S/ - S/ -
S/ - S/ 0.18 S/ 0.18 S/ 0.18 S/ 0.18 S/ -
S/ - S/ - S/ - S/ - S/ 863.58 S/ 863.58
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 2,274.65
S/ - S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 1,284.65
S/ 1,884.76 S/ 2,262.61 S/ 2,262.61 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 2,978.59 S/ 2,978.59 S/ 2,978.59

A363
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 0.96 S/ 1.15 S/ 2.16 S/ 2.16 S/ 1.73 S/ 1.73
S/ 344.19 S/ 413.19 S/ 413.19 S/ - S/ - S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ - S/ - S/ - S/ - S/ 11,196.12 S/ 11,196.12
S/ 32,792.68 S/ 39,366.96 S/ 39,366.96 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 13,733.59 S/ 13,733.59 S/ 13,733.59
S/ 26.80 S/ 32.17 S/ 60.32 S/ 60.32 S/ 48.25 S/ 48.25
S/ - S/ - S/ - S/ - S/ 242.05 S/ 242.05
S/ - S/ - S/ 32,015.97 S/ 32,015.97 S/ 32,015.97 S/ 32,015.97
S/ 0.35 S/ 0.42 S/ 0.42 S/ 0.42 S/ 1.25 S/ 0.83
S/ 574.38 S/ 689.53 S/ 689.53 S/ - S/ - S/ -
S/ 51.21 S/ 92.22 S/ 122.96 S/ 153.70 S/ 92.22 S/ 138.33
S/ - S/ - S/ - S/ - S/ 84.31 S/ 84.31
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 405.81
S/ - S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87
S/ 32.03 S/ 38.45 S/ 38.45 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 106.90 S/ 106.90 S/ 106.90
S/ 73.33 S/ 88.03 S/ 165.06 S/ 165.06 S/ 132.05 S/ 132.05
S/ - S/ - S/ - S/ - S/ 10.73 S/ 10.73
S/ 0.80 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96

A364
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 0.70 S/ 0.85 S/ 1.27 S/ 1.27 S/ 1.27 S/ 1.69
S/ - S/ - S/ 67.06 S/ 53.65 S/ 80.48 S/ 53.65
S/ 31.00 S/ 37.21 S/ - S/ - S/ - S/ -
S/ - S/ 158.59 S/ 158.59 S/ 158.59 S/ 158.59 S/ -
S/ - S/ - S/ - S/ - S/ 36.20 S/ 36.20
S/ 11.67 S/ 14.01 S/ 14.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 52.37 S/ 52.37 S/ 52.37
S/ 34.56 S/ 41.49 S/ 77.80 S/ 77.80 S/ 62.24 S/ 62.24
S/ - S/ - S/ - S/ - S/ 13.97 S/ 13.97
S/ - S/ - S/ 79.45 S/ 79.45 S/ 79.45 S/ 79.45
S/ 32.40 S/ 38.90 S/ 38.90 S/ 38.90 S/ 116.69 S/ 77.80
S/ 81.01 S/ 97.25 S/ 97.25 S/ - S/ - S/ -
S/ 2.81 S/ 5.06 S/ 6.74 S/ 8.43 S/ 5.06 S/ 7.58
S/ - S/ - S/ - S/ - S/ 14.37 S/ 14.37
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 12.67
S/ - S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80
S/ 7.38 S/ 8.87 S/ 8.87 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.65 S/ 0.65 S/ 0.65
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A365
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ - S/ - S/ - S/ - S/ 27.67 S/ 27.67
S/ - S/ - S/ 22,456.72 S/ 22,456.72 S/ 22,456.72 S/ 22,456.72
S/ 999.30 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 3,598.91 S/ 2,399.27
S/ 36.31 S/ 43.59 S/ 43.59 S/ - S/ - S/ -
S/ 152.91 S/ 275.35 S/ 367.14 S/ 458.92 S/ 275.35 S/ 413.03
S/ - S/ - S/ - S/ - S/ 211.71 S/ 211.71
S/ - S/ - S/ - S/ - S/ - S/ -
S/ -
S/ -

A366
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A367
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 11.22 S/ 13.47 S/ 25.26 S/ 25.26 S/ 20.21 S/ 20.21
S/ -
S/ -
S/ -
S/ -
S/ -

A368
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ -
S/ - S/ - S/ - S/ - S/ 906.82 S/ 906.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ 27.17 S/ 21.73 S/ 32.60 S/ 21.73
S/ 290.27 S/ 348.46 S/ - S/ - S/ - S/ -
S/ - S/ 4.12 S/ 4.12 S/ 4.12 S/ 4.12 S/ -
S/ - S/ - S/ - S/ - S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.17
S/ - S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 10.45 S/ 12.54 S/ 12.54 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.47 S/ 16.47 S/ 16.47
S/ 3.89 S/ 4.67 S/ 8.75 S/ 8.75 S/ 7.00 S/ 7.00
S/ - S/ - S/ - S/ - S/ 3.49 S/ 3.49
S/ - S/ - S/ 2.72 S/ 2.72 S/ 2.72 S/ 2.72
S/ 2.36 S/ 2.83 S/ 2.83 S/ 2.83 S/ 8.49 S/ 5.66
S/ 1.43 S/ 1.71 S/ 1.71 S/ - S/ - S/ -
S/ 2.59 S/ 4.66 S/ 6.21 S/ 7.77 S/ 4.66 S/ 6.99
S/ - S/ - S/ - S/ - S/ 92.27 S/ 92.27
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.23
S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 0.54 S/ 0.65 S/ 0.65 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.70 S/ 0.70 S/ 0.70
S/ 8.61 S/ 10.34 S/ 19.38 S/ 19.38 S/ 15.51 S/ 15.51
S/ - S/ - S/ - S/ - S/ 46.68 S/ 46.68
S/ 1.15 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39
S/ 1.22 S/ 1.47 S/ 2.21 S/ 2.21 S/ 2.21 S/ 2.94
S/ - S/ - S/ 3.38 S/ 2.70 S/ 4.05 S/ 2.70
S/ 20.83 S/ 25.00 S/ - S/ - S/ - S/ -
S/ - S/ 0.18 S/ 0.18 S/ 0.18 S/ 0.18 S/ -
S/ - S/ - S/ - S/ - S/ 863.58 S/ 863.58
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 2,274.65
S/ - S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 1,284.65
S/ 1,884.76 S/ 2,262.61 S/ 2,262.61 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 2,978.59 S/ 2,978.59 S/ 2,978.59
S/ 0.96 S/ 1.15 S/ 2.16 S/ 2.16 S/ 1.73 S/ 1.73
S/ 344.19 S/ 413.19 S/ 413.19 S/ - S/ - S/ -
S/ -

A369
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ - S/ - S/ - S/ - S/ 11,196.12 S/ 11,196.12
S/ 32,792.68 S/ 39,366.96 S/ 39,366.96 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 13,733.59 S/ 13,733.59 S/ 13,733.59
S/ 26.80 S/ 32.17 S/ 60.32 S/ 60.32 S/ 48.25 S/ 48.25
S/ - S/ - S/ - S/ - S/ 242.05 S/ 242.05
S/ - S/ - S/ 32,015.97 S/ 32,015.97 S/ 32,015.97 S/ 32,015.97
S/ 0.35 S/ 0.42 S/ 0.42 S/ 0.42 S/ 1.25 S/ 0.83
S/ 574.38 S/ 689.53 S/ 689.53 S/ - S/ - S/ -
S/ 51.21 S/ 92.22 S/ 122.96 S/ 153.70 S/ 92.22 S/ 138.33
S/ - S/ - S/ - S/ - S/ 84.31 S/ 84.31
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 405.81
S/ - S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87
S/ 32.03 S/ 38.45 S/ 38.45 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 106.90 S/ 106.90 S/ 106.90
S/ 73.33 S/ 88.03 S/ 165.06 S/ 165.06 S/ 132.05 S/ 132.05
S/ - S/ - S/ - S/ - S/ 10.73 S/ 10.73
S/ 0.80 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96
S/ 0.70 S/ 0.85 S/ 1.27 S/ 1.27 S/ 1.27 S/ 1.69
S/ - S/ - S/ 67.06 S/ 53.65 S/ 80.48 S/ 53.65
S/ 31.00 S/ 37.21 S/ - S/ - S/ - S/ -

A370
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ 158.59 S/ 158.59 S/ 158.59 S/ 158.59 S/ -
S/ - S/ - S/ - S/ - S/ 36.20 S/ 36.20
S/ 11.67 S/ 14.01 S/ 14.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 52.37 S/ 52.37 S/ 52.37
S/ 34.56 S/ 41.49 S/ 77.80 S/ 77.80 S/ 62.24 S/ 62.24
S/ - S/ - S/ - S/ - S/ 13.97 S/ 13.97
S/ - S/ - S/ 79.45 S/ 79.45 S/ 79.45 S/ 79.45
S/ 32.40 S/ 38.90 S/ 38.90 S/ 38.90 S/ 116.69 S/ 77.80
S/ 81.01 S/ 97.25 S/ 97.25 S/ - S/ - S/ -
S/ 2.81 S/ 5.06 S/ 6.74 S/ 8.43 S/ 5.06 S/ 7.58
S/ - S/ - S/ - S/ - S/ 14.37 S/ 14.37
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 12.67
S/ - S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80
S/ 7.38 S/ 8.87 S/ 8.87 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.65 S/ 0.65 S/ 0.65
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A371
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ - S/ - S/ - S/ - S/ 27.67 S/ 27.67
S/ - S/ - S/ 22,456.72 S/ 22,456.72 S/ 22,456.72 S/ 22,456.72
S/ 999.30 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 3,598.91 S/ 2,399.27
S/ 36.31 S/ 43.59 S/ 43.59 S/ - S/ - S/ -
S/ 152.91 S/ 275.35 S/ 367.14 S/ 458.92 S/ 275.35 S/ 413.03
S/ - S/ - S/ - S/ - S/ 211.71 S/ 211.71
S/ - S/ - S/ - S/ - S/ - S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A372
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A373
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 11.22 S/ 13.47 S/ 25.26 S/ 25.26 S/ 20.21 S/ 20.21
S/ -
S/ -
S/ -
S/ -
S/ -
S/ - S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ -
S/ - S/ - S/ - S/ - S/ 906.82 S/ 906.82
S/ - S/ - S/ - S/ - S/ - S/ -

A374
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ 27.17 S/ 21.73 S/ 32.60 S/ 21.73
S/ 290.27 S/ 348.46 S/ - S/ - S/ - S/ -
S/ - S/ 4.12 S/ 4.12 S/ 4.12 S/ 4.12 S/ -
S/ - S/ - S/ - S/ - S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.17
S/ - S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 10.45 S/ 12.54 S/ 12.54 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.47 S/ 16.47 S/ 16.47
S/ 3.89 S/ 4.67 S/ 8.75 S/ 8.75 S/ 7.00 S/ 7.00
S/ - S/ - S/ - S/ - S/ 3.49 S/ 3.49
S/ - S/ - S/ 2.72 S/ 2.72 S/ 2.72 S/ 2.72
S/ 2.36 S/ 2.83 S/ 2.83 S/ 2.83 S/ 8.49 S/ 5.66
S/ 1.43 S/ 1.71 S/ 1.71 S/ - S/ - S/ -
S/ 2.59 S/ 4.66 S/ 6.21 S/ 7.77 S/ 4.66 S/ 6.99
S/ - S/ - S/ - S/ - S/ 92.27 S/ 92.27
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.23
S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 0.54 S/ 0.65 S/ 0.65 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.70 S/ 0.70 S/ 0.70
S/ 8.61 S/ 10.34 S/ 19.38 S/ 19.38 S/ 15.51 S/ 15.51
S/ - S/ - S/ - S/ - S/ 46.68 S/ 46.68
S/ 1.15 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39
S/ 1.22 S/ 1.47 S/ 2.21 S/ 2.21 S/ 2.21 S/ 2.94
S/ - S/ - S/ 3.38 S/ 2.70 S/ 4.05 S/ 2.70
S/ 20.83 S/ 25.00 S/ - S/ - S/ - S/ -
S/ - S/ 0.18 S/ 0.18 S/ 0.18 S/ 0.18 S/ -
S/ - S/ - S/ - S/ - S/ 863.58 S/ 863.58
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 2,274.65
S/ - S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 1,284.65
S/ 1,884.76 S/ 2,262.61 S/ 2,262.61 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 2,978.59 S/ 2,978.59 S/ 2,978.59
S/ 0.96 S/ 1.15 S/ 2.16 S/ 2.16 S/ 1.73 S/ 1.73
S/ 344.19 S/ 413.19 S/ 413.19 S/ - S/ - S/ -
S/ -
S/ -
S/ -
S/ -

A375
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ - S/ - S/ - S/ - S/ 11,196.12 S/ 11,196.12
S/ 32,792.68 S/ 39,366.96 S/ 39,366.96 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 13,733.59 S/ 13,733.59 S/ 13,733.59
S/ 26.80 S/ 32.17 S/ 60.32 S/ 60.32 S/ 48.25 S/ 48.25
S/ - S/ - S/ - S/ - S/ 242.05 S/ 242.05
S/ - S/ - S/ 32,015.97 S/ 32,015.97 S/ 32,015.97 S/ 32,015.97
S/ 0.35 S/ 0.42 S/ 0.42 S/ 0.42 S/ 1.25 S/ 0.83
S/ 574.38 S/ 689.53 S/ 689.53 S/ - S/ - S/ -
S/ 51.21 S/ 92.22 S/ 122.96 S/ 153.70 S/ 92.22 S/ 138.33
S/ - S/ - S/ - S/ - S/ 84.31 S/ 84.31
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 405.81
S/ - S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87
S/ 32.03 S/ 38.45 S/ 38.45 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 106.90 S/ 106.90 S/ 106.90
S/ 73.33 S/ 88.03 S/ 165.06 S/ 165.06 S/ 132.05 S/ 132.05
S/ - S/ - S/ - S/ - S/ 10.73 S/ 10.73
S/ 0.80 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96
S/ 0.70 S/ 0.85 S/ 1.27 S/ 1.27 S/ 1.27 S/ 1.69
S/ - S/ - S/ 67.06 S/ 53.65 S/ 80.48 S/ 53.65
S/ 31.00 S/ 37.21 S/ - S/ - S/ - S/ -
S/ - S/ 158.59 S/ 158.59 S/ 158.59 S/ 158.59 S/ -
S/ - S/ - S/ - S/ - S/ 36.20 S/ 36.20
S/ 11.67 S/ 14.01 S/ 14.01 S/ - S/ - S/ -

A376
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ - S/ 52.37 S/ 52.37 S/ 52.37
S/ 34.56 S/ 41.49 S/ 77.80 S/ 77.80 S/ 62.24 S/ 62.24
S/ - S/ - S/ - S/ - S/ 13.97 S/ 13.97
S/ - S/ - S/ 79.45 S/ 79.45 S/ 79.45 S/ 79.45
S/ 32.40 S/ 38.90 S/ 38.90 S/ 38.90 S/ 116.69 S/ 77.80
S/ 81.01 S/ 97.25 S/ 97.25 S/ - S/ - S/ -
S/ 2.81 S/ 5.06 S/ 6.74 S/ 8.43 S/ 5.06 S/ 7.58
S/ - S/ - S/ - S/ - S/ 14.37 S/ 14.37
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 12.67
S/ - S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80
S/ 7.38 S/ 8.87 S/ 8.87 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.65 S/ 0.65 S/ 0.65
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A377
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ - S/ - S/ - S/ - S/ 27.67 S/ 27.67
S/ - S/ - S/ 22,456.72 S/ 22,456.72 S/ 22,456.72 S/ 22,456.72
S/ 999.30 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 3,598.91 S/ 2,399.27
S/ 36.31 S/ 43.59 S/ 43.59 S/ - S/ - S/ -
S/ 152.91 S/ 275.35 S/ 367.14 S/ 458.92 S/ 275.35 S/ 413.03
S/ - S/ - S/ - S/ - S/ 211.71 S/ 211.71
S/ - S/ - S/ - S/ - S/ - S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A378
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A379
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 11.22 S/ 13.47 S/ 25.26 S/ 25.26 S/ 20.21 S/ 20.21
S/ -
S/ -
S/ -
S/ -
S/ -
S/ - S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ -
S/ - S/ - S/ - S/ - S/ 906.82 S/ 906.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ 27.17 S/ 21.73 S/ 32.60 S/ 21.73
S/ 290.27 S/ 348.46 S/ - S/ - S/ - S/ -
S/ - S/ 4.12 S/ 4.12 S/ 4.12 S/ 4.12 S/ -

A380
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ - S/ - S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.17
S/ - S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 10.45 S/ 12.54 S/ 12.54 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.47 S/ 16.47 S/ 16.47
S/ 3.89 S/ 4.67 S/ 8.75 S/ 8.75 S/ 7.00 S/ 7.00
S/ - S/ - S/ - S/ - S/ 3.49 S/ 3.49
S/ - S/ - S/ 2.72 S/ 2.72 S/ 2.72 S/ 2.72
S/ 2.36 S/ 2.83 S/ 2.83 S/ 2.83 S/ 8.49 S/ 5.66
S/ 1.43 S/ 1.71 S/ 1.71 S/ - S/ - S/ -
S/ 2.59 S/ 4.66 S/ 6.21 S/ 7.77 S/ 4.66 S/ 6.99
S/ - S/ - S/ - S/ - S/ 92.27 S/ 92.27
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.23
S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 0.54 S/ 0.65 S/ 0.65 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.70 S/ 0.70 S/ 0.70
S/ 8.61 S/ 10.34 S/ 19.38 S/ 19.38 S/ 15.51 S/ 15.51
S/ - S/ - S/ - S/ - S/ 46.68 S/ 46.68
S/ 1.15 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39
S/ 1.22 S/ 1.47 S/ 2.21 S/ 2.21 S/ 2.21 S/ 2.94
S/ - S/ - S/ 3.38 S/ 2.70 S/ 4.05 S/ 2.70
S/ 20.83 S/ 25.00 S/ - S/ - S/ - S/ -
S/ - S/ 0.18 S/ 0.18 S/ 0.18 S/ 0.18 S/ -
S/ - S/ - S/ - S/ - S/ 863.58 S/ 863.58
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 2,274.65
S/ - S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 1,284.65 S/ 1,284.65
S/ 1,884.76 S/ 2,262.61 S/ 2,262.61 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 2,978.59 S/ 2,978.59 S/ 2,978.59
S/ 0.96 S/ 1.15 S/ 2.16 S/ 2.16 S/ 1.73 S/ 1.73
S/ 344.19 S/ 413.19 S/ 413.19 S/ - S/ - S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A381
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ - S/ - S/ - S/ - S/ 11,196.12 S/ 11,196.12
S/ 32,792.68 S/ 39,366.96 S/ 39,366.96 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 13,733.59 S/ 13,733.59 S/ 13,733.59
S/ 26.80 S/ 32.17 S/ 60.32 S/ 60.32 S/ 48.25 S/ 48.25
S/ - S/ - S/ - S/ - S/ 242.05 S/ 242.05
S/ - S/ - S/ 32,015.97 S/ 32,015.97 S/ 32,015.97 S/ 32,015.97
S/ 0.35 S/ 0.42 S/ 0.42 S/ 0.42 S/ 1.25 S/ 0.83
S/ 574.38 S/ 689.53 S/ 689.53 S/ - S/ - S/ -
S/ 51.21 S/ 92.22 S/ 122.96 S/ 153.70 S/ 92.22 S/ 138.33
S/ - S/ - S/ - S/ - S/ 84.31 S/ 84.31
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 405.81
S/ - S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87
S/ 32.03 S/ 38.45 S/ 38.45 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 106.90 S/ 106.90 S/ 106.90
S/ 73.33 S/ 88.03 S/ 165.06 S/ 165.06 S/ 132.05 S/ 132.05
S/ - S/ - S/ - S/ - S/ 10.73 S/ 10.73
S/ 0.80 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96
S/ 0.70 S/ 0.85 S/ 1.27 S/ 1.27 S/ 1.27 S/ 1.69
S/ - S/ - S/ 67.06 S/ 53.65 S/ 80.48 S/ 53.65
S/ 31.00 S/ 37.21 S/ - S/ - S/ - S/ -
S/ - S/ 158.59 S/ 158.59 S/ 158.59 S/ 158.59 S/ -
S/ - S/ - S/ - S/ - S/ 36.20 S/ 36.20
S/ 11.67 S/ 14.01 S/ 14.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 52.37 S/ 52.37 S/ 52.37
S/ 34.56 S/ 41.49 S/ 77.80 S/ 77.80 S/ 62.24 S/ 62.24
S/ - S/ - S/ - S/ - S/ 13.97 S/ 13.97

A382
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ 79.45 S/ 79.45 S/ 79.45 S/ 79.45
S/ 32.40 S/ 38.90 S/ 38.90 S/ 38.90 S/ 116.69 S/ 77.80
S/ 81.01 S/ 97.25 S/ 97.25 S/ - S/ - S/ -
S/ 2.81 S/ 5.06 S/ 6.74 S/ 8.43 S/ 5.06 S/ 7.58
S/ - S/ - S/ - S/ - S/ 14.37 S/ 14.37
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 12.67
S/ - S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80
S/ 7.38 S/ 8.87 S/ 8.87 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.65 S/ 0.65 S/ 0.65
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A383
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ - S/ - S/ - S/ - S/ 27.67 S/ 27.67
S/ - S/ - S/ 22,456.72 S/ 22,456.72 S/ 22,456.72 S/ 22,456.72
S/ 999.30 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 3,598.91 S/ 2,399.27
S/ 36.31 S/ 43.59 S/ 43.59 S/ - S/ - S/ -
S/ 152.91 S/ 275.35 S/ 367.14 S/ 458.92 S/ 275.35 S/ 413.03
S/ - S/ - S/ - S/ - S/ 211.71 S/ 211.71
S/ - S/ - S/ - S/ - S/ - S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A384
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A385
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 11.22 S/ 13.47 S/ 25.26 S/ 25.26 S/ 20.21 S/ 20.21
S/ -
S/ -
S/ -

S/ 150,104.32 S/ 186,555.80 S/ 404,700.32 S/ 300,884.94 S/ 364,683.81 S/ 370,406.39


5.38% 6.09% 12.04% 9.48% 13.66% 12.56%
11.48% 17.57% 29.61% 39.10% 52.76% 65.32%

A386
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ - S/ - S/ -
S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20
S/ 5.43 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.44 S/ - S/ - S/ -
S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07
S/ - S/ 0.13 S/ - S/ - S/ 0.17
S/ 0.02 S/ 0.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49
S/ 8.75 S/ 8.75 S/ - S/ - S/ -
S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36
S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ -
S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88
S/ 92.27 S/ 92.27 S/ - S/ - S/ -
S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43
S/ - S/ 0.17 S/ - S/ - S/ 0.23
S/ 2.67 S/ 1.78 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23
S/ 19.38 S/ 19.38 S/ - S/ - S/ -
S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77
S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68
S/ 0.68 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ - S/ - S/ -
S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47
S/ - S/ 1,705.99 S/ - S/ - S/ 2,274.65
S/ 1,284.65 S/ 856.43 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86

A387
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 2.16 S/ 2.16 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86
S/ 60.32 S/ 60.32 S/ - S/ - S/ -
S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57
S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ -
S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85
S/ 84.31 S/ 84.31 S/ - S/ - S/ -
S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23
S/ - S/ 304.35 S/ - S/ - S/ 405.81
S/ 0.87 S/ 0.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63
S/ 165.06 S/ 165.06 S/ - S/ - S/ -
S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92

A388
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11
S/ 13.41 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46
S/ 77.80 S/ 77.80 S/ - S/ - S/ -
S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46
S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ -
S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21
S/ 14.37 S/ 14.37 S/ - S/ - S/ -
S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44
S/ - S/ 9.50 S/ - S/ - S/ 12.67
S/ 3.80 S/ 2.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22

A389
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58


S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ -
S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46
S/ 211.71 S/ 211.71 S/ - S/ - S/ -
S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55

A390
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

A391
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 25.26 S/ 25.26 S/ - S/ - S/ -

A392
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ - S/ - S/ -
S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20
S/ 5.43 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.44 S/ - S/ - S/ -
S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07
S/ - S/ 0.13 S/ - S/ - S/ 0.17
S/ 0.02 S/ 0.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49
S/ 8.75 S/ 8.75 S/ - S/ - S/ -
S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36
S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ -
S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88
S/ 92.27 S/ 92.27 S/ - S/ - S/ -
S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43
S/ - S/ 0.17 S/ - S/ - S/ 0.23
S/ 2.67 S/ 1.78 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23
S/ 19.38 S/ 19.38 S/ - S/ - S/ -
S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77
S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68
S/ 0.68 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ - S/ - S/ -
S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47
S/ - S/ 1,705.99 S/ - S/ - S/ 2,274.65
S/ 1,284.65 S/ 856.43 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86
S/ 2.16 S/ 2.16 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

A393
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86
S/ 60.32 S/ 60.32 S/ - S/ - S/ -
S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57
S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ -
S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85
S/ 84.31 S/ 84.31 S/ - S/ - S/ -
S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23
S/ - S/ 304.35 S/ - S/ - S/ 405.81
S/ 0.87 S/ 0.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63
S/ 165.06 S/ 165.06 S/ - S/ - S/ -
S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92
S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11
S/ 13.41 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

A394
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46
S/ 77.80 S/ 77.80 S/ - S/ - S/ -
S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46
S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ -
S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21
S/ 14.37 S/ 14.37 S/ - S/ - S/ -
S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44
S/ - S/ 9.50 S/ - S/ - S/ 12.67
S/ 3.80 S/ 2.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22

A395
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58


S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ -
S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46
S/ 211.71 S/ 211.71 S/ - S/ - S/ -
S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55

A396
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

A397
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 25.26 S/ 25.26 S/ - S/ - S/ -

S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ - S/ - S/ -
S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20

A398
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 5.43 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.44 S/ - S/ - S/ -
S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07
S/ - S/ 0.13 S/ - S/ - S/ 0.17
S/ 0.02 S/ 0.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49
S/ 8.75 S/ 8.75 S/ - S/ - S/ -
S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36
S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ -
S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88
S/ 92.27 S/ 92.27 S/ - S/ - S/ -
S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43
S/ - S/ 0.17 S/ - S/ - S/ 0.23
S/ 2.67 S/ 1.78 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23
S/ 19.38 S/ 19.38 S/ - S/ - S/ -
S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77
S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68
S/ 0.68 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ - S/ - S/ -
S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47
S/ - S/ 1,705.99 S/ - S/ - S/ 2,274.65
S/ 1,284.65 S/ 856.43 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86
S/ 2.16 S/ 2.16 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

A399
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86
S/ 60.32 S/ 60.32 S/ - S/ - S/ -
S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57
S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ -
S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85
S/ 84.31 S/ 84.31 S/ - S/ - S/ -
S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23
S/ - S/ 304.35 S/ - S/ - S/ 405.81
S/ 0.87 S/ 0.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63
S/ 165.06 S/ 165.06 S/ - S/ - S/ -
S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92
S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11
S/ 13.41 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

A400
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46
S/ 77.80 S/ 77.80 S/ - S/ - S/ -
S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46
S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ -
S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21
S/ 14.37 S/ 14.37 S/ - S/ - S/ -
S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44
S/ - S/ 9.50 S/ - S/ - S/ 12.67
S/ 3.80 S/ 2.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22

A401
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58


S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ -
S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46
S/ 211.71 S/ 211.71 S/ - S/ - S/ -
S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55

A402
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

A403
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 25.26 S/ 25.26 S/ - S/ - S/ -

S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ - S/ - S/ -
S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20
S/ 5.43 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

A404
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 0.44 S/ 0.44 S/ - S/ - S/ -
S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07
S/ - S/ 0.13 S/ - S/ - S/ 0.17
S/ 0.02 S/ 0.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49
S/ 8.75 S/ 8.75 S/ - S/ - S/ -
S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36
S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ -
S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88
S/ 92.27 S/ 92.27 S/ - S/ - S/ -
S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43
S/ - S/ 0.17 S/ - S/ - S/ 0.23
S/ 2.67 S/ 1.78 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23
S/ 19.38 S/ 19.38 S/ - S/ - S/ -
S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77
S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68
S/ 0.68 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ - S/ - S/ -
S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47
S/ - S/ 1,705.99 S/ - S/ - S/ 2,274.65
S/ 1,284.65 S/ 856.43 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86
S/ 2.16 S/ 2.16 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -

A405
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86
S/ 60.32 S/ 60.32 S/ - S/ - S/ -
S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57
S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ -
S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85
S/ 84.31 S/ 84.31 S/ - S/ - S/ -
S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23
S/ - S/ 304.35 S/ - S/ - S/ 405.81
S/ 0.87 S/ 0.58 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63
S/ 165.06 S/ 165.06 S/ - S/ - S/ -
S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92
S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11
S/ 13.41 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46
S/ 77.80 S/ 77.80 S/ - S/ - S/ -
S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46

A406
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ -
S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21
S/ 14.37 S/ 14.37 S/ - S/ - S/ -
S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44
S/ - S/ 9.50 S/ - S/ - S/ 12.67
S/ 3.80 S/ 2.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22

A407
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58


S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ -
S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46
S/ 211.71 S/ 211.71 S/ - S/ - S/ -
S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55

A408
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

A409
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ 25.26 S/ 25.26 S/ - S/ - S/ -

S/ 148,535.60 S/ 235,169.75 S/ 143,896.00 S/ 143,914.53 S/ 131,068.23


8.11% 8.45% 4.71% 4.87% 4.55% 1.95%
73.43% 81.88% 86.60% 91.46% 96.01% 97.96%

A410
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021

S/ -
S/ -
S/ -
S/ -
S/ 241.79
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 8.70
S/ -
S/ 3.24
S/ -
S/ -
S/ 1.96
S/ 1.19
S/ 2.16
S/ -
S/ -
S/ -
S/ -
S/ 0.45
S/ -
S/ 7.17
S/ -
S/ 0.96
S/ 1.02
S/ -
S/ 17.35
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 1,570.00
S/ -

A411
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ 0.80
S/ 286.71
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 27,316.30
S/ -
S/ 22.32
S/ -
S/ -
S/ 0.29
S/ 478.46
S/ 42.66
S/ -
S/ -
S/ -
S/ -
S/ 26.68
S/ -
S/ 61.08
S/ -
S/ 0.66

A412
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ 0.59
S/ -
S/ 25.82
S/ -
S/ -
S/ 9.72
S/ -
S/ 28.79
S/ -
S/ -
S/ 26.99
S/ 67.48
S/ 2.34
S/ -
S/ -
S/ -
S/ -
S/ 6.15
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A413
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 832.42
S/ 30.24
S/ 127.38
S/ -
S/ -
S/ -
S/ -

A414
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A415
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 9.35
S/ -
S/ -
S/ -
S/ -
S/ -

A416
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ 241.79
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 8.70
S/ -
S/ 3.24
S/ -
S/ -
S/ 1.96
S/ 1.19
S/ 2.16
S/ -
S/ -
S/ -
S/ -
S/ 0.45
S/ -
S/ 7.17
S/ -
S/ 0.96
S/ 1.02
S/ -
S/ 17.35
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 1,570.00
S/ -
S/ 0.80
S/ 286.71
S/ -

A417
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 27,316.30
S/ -
S/ 22.32
S/ -
S/ -
S/ 0.29
S/ 478.46
S/ 42.66
S/ -
S/ -
S/ -
S/ -
S/ 26.68
S/ -
S/ 61.08
S/ -
S/ 0.66
S/ 0.59
S/ -
S/ 25.82

A418
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ 9.72
S/ -
S/ 28.79
S/ -
S/ -
S/ 26.99
S/ 67.48
S/ 2.34
S/ -
S/ -
S/ -
S/ -
S/ 6.15
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A419
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 832.42
S/ 30.24
S/ 127.38
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A420
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A421
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 9.35
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A422
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ 241.79
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 8.70
S/ -
S/ 3.24
S/ -
S/ -
S/ 1.96
S/ 1.19
S/ 2.16
S/ -
S/ -
S/ -
S/ -
S/ 0.45
S/ -
S/ 7.17
S/ -
S/ 0.96
S/ 1.02
S/ -
S/ 17.35
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 1,570.00
S/ -
S/ 0.80
S/ 286.71
S/ -
S/ -
S/ -
S/ -

A423
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 27,316.30
S/ -
S/ 22.32
S/ -
S/ -
S/ 0.29
S/ 478.46
S/ 42.66
S/ -
S/ -
S/ -
S/ -
S/ 26.68
S/ -
S/ 61.08
S/ -
S/ 0.66
S/ 0.59
S/ -
S/ 25.82
S/ -
S/ -
S/ 9.72

A424
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ 28.79
S/ -
S/ -
S/ 26.99
S/ 67.48
S/ 2.34
S/ -
S/ -
S/ -
S/ -
S/ 6.15
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A425
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 832.42
S/ 30.24
S/ 127.38
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A426
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A427
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 9.35
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 241.79
S/ -

A428
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ 8.70
S/ -
S/ 3.24
S/ -
S/ -
S/ 1.96
S/ 1.19
S/ 2.16
S/ -
S/ -
S/ -
S/ -
S/ 0.45
S/ -
S/ 7.17
S/ -
S/ 0.96
S/ 1.02
S/ -
S/ 17.35
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 1,570.00
S/ -
S/ 0.80
S/ 286.71
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A429
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 27,316.30
S/ -
S/ 22.32
S/ -
S/ -
S/ 0.29
S/ 478.46
S/ 42.66
S/ -
S/ -
S/ -
S/ -
S/ 26.68
S/ -
S/ 61.08
S/ -
S/ 0.66
S/ 0.59
S/ -
S/ 25.82
S/ -
S/ -
S/ 9.72
S/ -
S/ 28.79
S/ -

A430
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ 26.99
S/ 67.48
S/ 2.34
S/ -
S/ -
S/ -
S/ -
S/ 6.15
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A431
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 832.42
S/ 30.24
S/ 127.38
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A432
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A433
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 9.35
S/ -
S/ -
S/ -
S/ -
S/ -

2.04%
100.00%

A434
A435
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES SANITARIAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15
DE 05/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
Código MAETRIALES Unidad Parcial S/. A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

SALDO
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 1,198.76
202100002 ALAMBRE NEGRO Nro.16 kg S/ 1,341.30
202200001 CLAVOS CON CABEZA DE 21/2 , 3", 4" kg S/ 858.42
202200003 CLAVOS CON CABEZA DE 3" kg S/ 123.87
202350071 VARILLA ROSCADA DE 1/2" und S/ 133.64
202350072 BROCA 3/4" X 8" und S/ 1,505.02
202350073 COLGADOR METALICO S/ DISEÑO und S/ 3,196.16
202350074 TUERCA DE 1/2" und S/ 75.15
202350075 ACERO CORRUGADO GRADO 60 kg S/ 25,645.27
202350076 ARENA GRUESA m3 S/ 3,663.27
204050002 ARENA FINA m3 S/ 10,749.72 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 13,044.92
205050036 GRAVA DE 1/2" m3 S/ 1,258.18
205050037 GRAVA DE 5/8" m3 S/ 6,880.11
205350001 AGUA m3 S/ 562.54
206200026 TRAMPA DE GRASA und S/ 5,271.30
206200032 TRAMPA DE SOLIDOS und S/ 1,986.49
210050011 URINARIO CADET BLANCO. und S/ 14,278.50
210050041 LAVATORIO LOSA BLANCA DE TIPO OVALIN CLASSIC INC._x000D_ TUBO und S/ 19,115.35
210050042 LAVATORIO LOSA BLANCA DE TIPO FONTANA INC. TUBO DE ABASTO Y T und S/ 386.68
210050043 INODORO ADULTO NAC. LOSA VITRIFI BLANCO P/FLUXOMETRO INC. ASIE und S/ 34,409.76
210050044 INODORO SIFÓN JET DE LOSA 1ra CALIDAD ADULTO TIPO_x000D_ SISTE und S/ 237.29
210050045 PORTA ROLLO METALICO INC. ACC. P/INSTALACION und S/ 10,722.60
210050046 DISPENSADOR DE JABON LIQUIDO INC. ACC. PilNSTALACION und S/ 2,375.00
210050047 DISPENSADOR DE PAPEL TOALLA INC. ACC. P/INSTALACION und S/ 995.52
210050048 GANCHO METALICO PORTA MULETAS INC. ACC._x000D_P/INSTALACION und S/ 2,491.58
210050049 GANCHO DOBLE DE LOSA INC. ACC P/INSTALACION und S/ 1,044.16
210050050 JABONERA DE LOSA DE SOBREPONER INC. ACC._x000D_ P/INSTALACION S/ 1,104.40
210150022 LAVAD. ACERO INOX. 1 POZA C/ESC 21"X38" und S/ 385.82
210150023 LAVAD. ACERO INOX. 02 POZAS C/ESC 21"X54" und S/ 1,256.06
210150024 LAVAD. ACERO INOX. 1 POZA S/ESC 21"X20" und S/ 2,882.18
210300047 GRIFERIA MEZCLADORA PARA DUCHA und S/ 5,162.73
210300049 GRIFERIA PARA DUCHA CROMADA 1 LLAVE INC ACC und S/ 648.00
210300050 FLUXOMETRO CROMADO DE MANIJA und S/ 26,052.75
210350020 LLAVE DE LAVADERO PICO GIRATORIO UECO CROMADA und S/ 1,112.02
210350088 LLAVE PARA LAVATORIO DE 1i2" CON TEMPORIZADOR und S/ 2,993.26
210350089 LLAVE DE MANIJA LARGA AL MUEBLE und S/ 7,070.28
210350090 LLAVE DE LAVADERO PICO GIRATORIO AF y AG UECO_x000D_CROMADA und S/ 348.80
210350091 GRIFERIA DE 1/2" und S/ 586.53
210350094 SUM. E INST. DE ELECTROBOMBAS PRES. CTE Y VELOC. VAR (Q:3.25 1/s, und S/ 6,939.00
210350095 SUM. E INST. DE ELECTROBOMBAS PRES. CTE Y VELOC. VAR. (Q:3.00 lis, und S/ 6,737.28
210350096 SUM. E INST. DE ELECTROBOMBAS SUMERGIBLES (Q:3.00 lis, HDT:10m. P und S/ 2,913.06
210350097 SUM. E INST. DE ELECTROBOMBA CON TRAMPA DE PELOS RECIRCULACION (und S/ 17,702.61
210350098 SUM. E INST. DE ELECTROBOMBA CON TRAMPA DE PELOS_x000D_ ASPIRACIund S/ 1,666.13
210350099 SUM. E INST. DE ELECTROBOMBA CON TRAMPA DE PELOS CALENTAMIENTO und S/ 10,968.68
210350100 SUM. E INST. DE ELECTROBOMBA DOSIFICADORA DE CLORO_x000D_ (Q:1.00und S/ 2,707.46
210350101 CLORINADOR DE PASTILLA TIPO PENTAR und S/ 1,138.52
210350102 SUM. E INST. DE ELECTROBOMBAS SUMERGIBLES (Q:3.00 l/s,_x000D_HDT: und S/ 2,913.06
210350103 CAÑON EMERGENTE AUTOMATIZADO (RADIO 40M, 4BAR) und S/ 37,810.14
210350104 SUM. E INST. DE ELECTROBOMBAS PRES. CTE Y VELOC. VAR._x000D_(Q:3.8 und S/ 13,474.56
210350105 SUM. E INST. EQ. BOMBEO; 02 ELECTROBOMBAS_x000D_ CENTRIFUGAS ( und S/ 2,186.44
212050162 CONTROLADOR DIGITAL TERMOSTATICO und S/ 815.28
212250183 CONTROL DE NIVEL AUTOMATICO DE ARRANQUE Y PARADA DE BOMBAS und S/ 355.95
212250184 VISOR D=6" und S/ 438.17
212250185 VISOR D=4" und S/ 611.44
212250186 MANIFOLD D=8" L=3.00 m. und S/ 1,752.40
212250187 MANIFOLD D=8" L=1.30 m. und S/ 876.20
213150009 FRAGUA (BOLSA DE 1KG) bl S/ 2.76
213150014 PEGAMENTO EXTRAFUERTE PARA CERAMICOS Y PORCELANATOS X 25K bl S/ 13.79
217100020 LADRILLO KK TIPO IV 24X13X09 CM und S/ 4,782.30
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 57,892.13 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
221030017 MARCO Y TAPA DE BUZON DE CONCRETO D=0.60M und S/ 288.75 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 373.44 S/ - S/ - S/ - S/ - S/ -
230010003 PEGAMENTO PARA TUBERIA PVC qal S/ 6,370.19
233570001 PEGAMENTO PARA TUBERIA CPVC qal S/ 509.11
237129999 CAL (BOLSA X 20 kg) bl S/ 955.08
230010030 CINTA TEFLON m S/ 151.16
230010032 CORDEL m S/ 168.21
230010143 SELLADOR BLANCO PARA MUROS qal S/ 34.77
230010163 GEOMEMBRANA IMPERMEABLE 1 mm m2 S/ 88,347.47
230010167 GEOTEXTIL NO TEJIDO CLASE 2 m2 S/ 3,476.68
230010176 FLUXOMETRO PARA INODORO und S/ 51,063.39
230010177 PORCELANA TO 60X60 m2 S/ 402.65
230010178 TUBO BASTON PARA VENTILACION DE CISTERNA ACERO_x000D_ SCH-40 m S/ 201.60
230010179 THINNER ACRILICO qal S/ 0.66
230010193 SUMINISTRO PARA LA INSTALACION DE TUBERIAS Y CAÑONES EMERGEN glb S/ 73,740.00
230020051 CARTUCHO DE EXPANSION 1/2"X 1 5/8" und S/ 480.36
230060002 SUM. E INST. DE CALENTADOR DE AGUA 50 LITROS und S/ 1,744.02
230060003 SUM. E INST. DE CALENTADOR DE AGUA 80 LITROS und S/ 2,777.91
230060004 SUM. E INST. DE CALENTADOR DE AGUA 110 LITROS und S/ 11,117.82
230060008 SUM. E INST. DE CALENTADOR DE AGUA 150 LITROS und S/ 9,883.88
230060009 CALENTADOR A GAS (400 000 BTU) und S/ 47,200.00
230060010 SUM. E INSTALACION DE COLECTOR SOLAR DE 5.00x1.20M und S/ 74,880.00
230060013 EQUIPOS DE LIMPIEZA DE PISCINA und S/ 2,766.12
230060015 TANQUE DE PRESIÓN CON MEMBRANA EQUIPADO, DE 50_x000D_ GALON und S/ 3,355.92
230060017 KIT DE ACCESORIOS Y VALVULAS-COLECTORES SOLARES und S/ 4,028.00
230060019 ELECTRODO TIPO 6011-CELLOCORD kg S/ 20,114.74
230300013 FILTRO DE ARENA DE 40" und S/ 14,058.00
230990153 HIPOCLORITO DE CALCIO 70% kg S/ 2,546.86
230990172 MANOMETRO GLICERINA 0 -100PSI, INC. VALVULA Y_x000D_ACCESORIOS und S/ 610.20
230990178 CERCO DE MALLA HOPE m S/ 3,853.33
230990179 POSTE DE CONCRETO Y MADERA und S/ 33,977.94
231250023 MARCO Y TAPA DE BUZON DE CONCRETO Ø=1.20M und S/ 12,160.00 S/ - S/ - S/ - S/ -
238010001 HORMIGON m3 S/ 23.63
238100001 AFIRMADO m3 S/ 3,605.90
243010001 MADERA TORNILLO p2 S/ 20,606.45
243010006 TRANQUERA TIPO BARANDA DE 2,40 X 1,20 m und S/ 512.00
243100001 MADERA CEDRO p2 S/ 6.10
251050024 PERFIL TEE 2"X 2" X 1/8" m S/ 32,884.00
251200099 PLATINA DE FIERRO 2" X 1/4" m S/ 235,576.85
251300054 TUBERIA DE Ø 2" ACEDRO CELULA 40 m S/ 502.80
251300055 TUBERIA DE Ø 1" ACEDRO CELULA 40 m S/ 18.70
251300058 TUBERIA SCH-40 Ø 2" m S/ 181.64
251300059 TUBERIA SCH-40 Ø 2 1/2" m S/ 256.00
251300060 TUBERIA SCH-40 Ø 4" m S/ 975.24
251300061 TUBERIA SCH-40 Ø 6" m S/ 2,725.87
251300062 TUBERIA SCH-40 Ø 8" m S/ 122.18
251300064 CODO Ø 2" ACEDRO CELULA 40 uno S/ 59.67
251300065 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE 02" uno S/ 56.10
251300066 TUBERIA DE Ø 3" ACEDRO CELULA 40 m S/ 2,150.30
251300067 CODO Ø 2 1/2" ACEDRO CELULA 40 uno S/ 57.78
251300068 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE Ø 2_x000D_ 1/2" uno S/ 56.31
251300069 TEE Ø 3" X 2" ACEDRO CELULA 40 uno S/ 228.60
251300070 TUBERIA DE Ø 2 1/2" ACEDRO CELULA 40 m S/ 270.90
251300071 TEE Ø 3" ACEDRO CELULA 40 uno S/ 45.72
251300072 REDUCCION CONCENTRICA 3" A 1" und S/ 9.00
251300073 UNION UNIVERSAL Ø 2" ACEDRO CELULA 40 und S/ 70.46
251300074 UNION UNIVERSAL Ø 1" ACEDRO CELULA 40 und S/ 39.66
251300075 UNION UNIVERSAL Ø 3" ACEDRO CELULA 40 und S/ 452.08
251300076 UNION UNIVERSAL Ø 11/2" ACEDRO CELULA 40 und S/ 54.70
251300077 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE 06" und S/ 168.64
251300078 MALLA PARA SOLDAR DE 6" und S/ 12.16
251300079 CODO Ø 3" ACEDRO CELULA 40 und S/ 161.67
251300080 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE 03" und S/ 283.08
251300081 TUBERIA DE Ø 2 1/2" ACEDRO CELULA 40 m S/ 81.27
251300082 TEE Ø 2 1/2" ACEDRO CELULA 40 und S/ 35.10
251300083 TUBERIA DE 0 11/2" ACEDRO CELULA 40 m S/ 208.08
251300084 CODO 011/2" ACEDRO CELULA 40 und S/ 24.30
251300085 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE Ø 1_x000D_ 1/2" und S/ 24.57
251300093 TUBERIA HDPE DN 110MM (4") m S/ 1,154.43
251300095 TUBERIA HOPE DN 90MM (3") m S/ 4,132.36
251300097 CODO 01" ACEDRO CELULA40 und S/ 3.45
251300098 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE 08" und S/ 67.74
251300099 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE 01" und S/ 5.30
251300100 REDUCCION EXCENTRICA ACERO SCH-40 1.1/2" A 1" S/ 5.28
251300101 REDUCCION EXCENTRICA ACERO SCH-40 1.1/2" A 3/4" und S/ 2.45
251300102 TEE Ø 11/2" ACEDRO CELULA 40 und S/ 7.92
251300103 TEE Ø 2" ACEDRO CELULA 40 und S/ 7.01
251300104 CODO Ø 3" X 45º ACEDRO CELULA 40 und S/ 11.66
251300106 BRIDA DE ACERO INOX. PARA SOLDAR ROMPE AGUA DE Ø4" und S/ 28.31
251350008 SOPORTE METALICO und S/ 7,000.00
251350009 CORREDERA PARA SOSTEN DE TUBERIA und S/ 25.92
253300001 BREA gal S/ 333.63
254150020 PINTURA ESMALTE gal S/ 74.95
254200001 PINTURA ANTICORROSIVA gal S/ 4.00
254200002 PINTURA BASE ZINCROMATO ANTICORROSIVA gal S/ 19.53
257010031 TAPA METALICA PARA VALVULAS und S/ 2,684.00
257010032 TAPA REJILLA P/ INGRESO ACAMARA (0.85m x 0.85m APROX .) und S/ 300.00
261020037 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS PRES. CTE Y VELOC und S/ 5,338.98
261020038 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS PRES. CTE Y VELOC und S/ 6,271.18
261020039 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS SUMERGIBLES (Q:und S/ 338.98
261020040 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS EN PISCINA S/ 3,089.28
261020041 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS SUMERGIBLES (Q:3 und S/ 338.98
261020046 TABLERO DE CONTROL EQUIPADO PARA ELECTROBOMBAS PRES. CTE Y VELOC und S/ 12,542.38
261020051 TABLERO DE CONTROL EQUIPADO PARA EQ. BOMBEO; 02 ELECTROBOMBAS und S/ 932.20
261020053 ABRAZADERA DE SUJECION DE 1.1/2" und S/ 5.10
261020054 ABRAZADERA DE SUJECION DE FºGº 2 und S/ 6.78
261020055 ABRAZADERAS DE FIJACION DE FºGº 3" und S/ 15.47
265010048 TUBERIA FºGº 4" "STANDARD m S/ 39.78
265010049 TUBERIA FºGº 6" "STANDARD m S/ 469.00
265010057 CANALETA SEMICIRCULAR06" FºGº, e=1/27" (DRENAJE PLUVIAL) m S/ 51,838.22
265010071 CANALETA METALICA RECTANGULAR 06" FºGº, e=1/27" (DRENAJE PLUVIAL m S/ 9,225.72
265010073 TAPON MACHO DE 1.1/2" FºGº und S/ 4.68
265010074 TAPON HEMBRA DE 3/4" FºGº und S/ 1.10
265010075 APOYO METALICOEN SOPORTE TEE Y CODO und S/ 75.00
265010076 TAPON DE 4" und S/ 5.62
265040003 CODO FºGº 1/2" X 90º und S/ 1.84
265250003 REJILLA DE FIERRO EN CAJA GRIFO und S/ 1,425.92
265250006 REJILLA METALICA PARA CAJA DE CONCRETO 030X0.60 und S/ 45.00
265250007 REJILLA METALICA PARA CAJA DE CONCRETO 030X0.40 und S/ 30.00
265560027 NIPLE FºGº 2" X 21/2" und S/ 53.06
265560034 NIPLE FºGº 3" x 2" und S/ 401.04
265560039 NIPLE FºGº 2" und S/ 51.52
265560040 NIPLE FºGº 1" und S/ 41.40
265560041 NIPLE FºGº 3/4" und S/ 50.88
265560042 NIPLE FºGº 1/2" und S/ 334.40
265560043 NIPLE FºGº 1 1/4" und S/ 74.70
265560044 NIPLE FºGº 1 1/2" und S/ 103.20
265570030 UNION UNIVERSAL FºGº 1/2" und S/ 1,388.40
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 794.64
265570032 UNION UNIVERSAL FºGº 1" und S/ 333.00
265570033 UNION UNIVERSAL FºGº 1 1/4" und S/ 666.00
265570034 UNION UNIVERSAL FºGº 1 1/2" und S/ 868.56
265570036 UNION UNIVERSAL FºGº 2 1/2" und S/ 394.56
265570038 UNION UNIVERSAL FºGº 2" und S/ 768.56
265570039 UNION UNIVERSAL FºGº 3" und S/ 2,071.76
265570047 UNION UNIVERSAL DE HIERRO DUCTIL DE 75 mm und S/ 209.50
265570048 UNION UNIVERSAL DE HIERRO DUCTIL DE 110 mm und S/ 270.60
265590038 CODO FºGº 4" x 90º m S/ 32.30
265590039 CODO FºGº 6" x 90º m S/ 411.92
265590040 CODO FºGº 3/4" x 90º m S/ 45.60
268110004 SUMIDERO DE FONDO 4" CON REJILLA 12" m S/ 1,191.72
272210042 TUBERIA PVC-CLASE 10 1/2" x 5m ROSCADA m S/ 970.28 S/ 64.66 S/ 77.62 S/ 145.54 S/ 145.54 S/ 116.43 S/ 116.43 S/ 145.54 S/ 145.54 S/ - S/ - S/ - S/ 53.86
272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 1,555.23 S/ - S/ - S/ - S/ - S/ 124.42 S/ 124.42 S/ 155.52 S/ 155.52 S/ 186.63 S/ 186.63 S/ 155.52 S/ -
272210044 TUBERIA PVC-CLASE 10 1" x 5m ROSCADA m S/ 1,684.90 S/ 70.18 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 168.49 S/ 58.46
272210046 TUBERIA PVC-CLASE 10 1,1/2" x 5m ROSCADA m S/ 1,619.03 S/ 53.95 S/ 64.76 S/ 97.14 S/ 97.14 S/ 97.14 S/ 129.52 S/ 113.33 S/ 113.33 S/ 113.33 S/ 242.85 S/ 161.90 S/ 44.94
272210047 TUBERIA PVC-CLASE 10 2" x 5m ROSCADA m S/ 4,605.48 S/ - S/ - S/ 1,151.37 S/ 921.10 S/ 1,381.64 S/ 921.10 S/ 230.27 S/ - S/ - S/ - S/ - S/ -
272210048 TUBERIA PVC-CLASE 10 2,1/2" x 5m ROSCADA m S/ 5,200.30 S/ 1,082.96 S/ 1,300.07 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 902.11
272210049 TUBERIA PVC-CLASE 10 3" x 5m ROSCADA m S/ 862.94 S/ - S/ 215.73 S/ 215.73 S/ 215.73 S/ 215.73 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272210051 TUBERIA PVC-CLASE 10 1,1/4" x 5m ROSCADA m S/ 4,348.96 S/ - S/ - S/ - S/ - S/ 1,087.24 S/ 1,087.24 S/ 1,087.24 S/ 1,087.24 S/ - S/ - S/ - S/ -
272210054 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 11O MM m S/ 9,397.72 S/ 391.41 S/ 469.89 S/ 469.89 S/ 469.89 S/ 939.77 S/ 1,409.66 S/ 1,409.66 S/ 469.89 S/ 469.89 S/ 469.89 S/ 469.89 S/ 326.05
272210055 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 315 MM m S/ 6,396.56 S/ 1,332.08 S/ 1,599.14 S/ 1,599.14 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 1,109.63
272210056 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 355 MM m S/ 6,702.91 S/ 223.34 S/ 402.17 S/ 536.23 S/ 670.29 S/ 402.17 S/ 603.26 S/ 1,072.46 S/ 1,206.52 S/ 536.23 S/ 536.23 S/ 335.15 S/ 186.04
272210057 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 400 MM m S/ 6,383.21 S/ - S/ - S/ - S/ - S/ 1,595.80 S/ 1,595.80 S/ 1,595.80 S/ 1,595.80 S/ - S/ - S/ - S/ -
272210058 ACOPLE FLEXIBLE DE 2.1/2" und S/ 124.08 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 31.02 S/ 31.02 S/ 31.02 S/ 31.02 S/ -
272210059 ACOPLE FLEXIBLE DE 2" und S/ 58.32 S/ - S/ - S/ - S/ - S/ - S/ 11.66 S/ - S/ 8.75 S/ - S/ - S/ 11.66 S/ -
272210060 ACOPLE FLEXIBLE DE 3" und S/ 109.35 S/ - S/ 16.40 S/ 16.40 S/ 16.40 S/ 16.40 S/ 16.40 S/ 16.40 S/ 10.94 S/ - S/ - S/ - S/ -
272210061 UNION UNIVERSAL PVC Ø 2" m S/ 59.56 S/ 12.40 S/ 14.89 S/ 14.89 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 10.33
272210062 TUBERIA PVC ISO 1452, DN 75mm C-1O m S/ 10,549.23 S/ - S/ - S/ - S/ 1,582.38 S/ 1,582.38 S/ 1,582.38 S/ 1,582.38 S/ 1,582.38 S/ 1,054.92 S/ 1,054.92 S/ 527.46 S/ -
272210063 TUBERIA PVC ISO 1452, DN 48mm C-10 m S/ 14.36 S/ 0.96 S/ 1.15 S/ 2.15 S/ 2.15 S/ 1.72 S/ 1.72 S/ 2.15 S/ 2.15 S/ - S/ - S/ - S/ 0.80
272220006 TUBO PVC-SAP - 2" (3M) m S/ 7,304.03 S/ - S/ - S/ - S/ - S/ 584.32 S/ 584.32 S/ 730.40 S/ 730.40 S/ 876.48 S/ 876.48 S/ 730.40 S/ -
272220023 TUBO PVC-SAP - 3" (3M) m S/ 1,761.78 S/ 73.38 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 176.18 S/ 61.12
272220032 TUBO PVC-SAP - 4" (3M) m S/ 26,929.13 S/ 897.28 S/ 1,077.17 S/ 1,615.75 S/ 1,615.75 S/ 1,615.75 S/ 2,154.33 S/ 1,885.04 S/ 1,885.04 S/ 1,885.04 S/ 4,039.37 S/ 2,692.91 S/ 747.43
272220033 TUBO PVC-SAP - 2 1/2" (3M) m S/ 17.74 S/ - S/ - S/ 4.43 S/ 3.55 S/ 5.32 S/ 3.55 S/ 0.89 S/ - S/ - S/ - S/ - S/ -
272220034 TUBO PVC-SAP - 6" (5M) m S/ 4,052.06 S/ 843.84 S/ 1,013.01 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 702.92
272220035 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 6" m S/ 9,589.96 S/ - S/ 2,397.49 S/ 2,397.49 S/ 2,397.49 S/ 2,397.49 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272220036 UNION DE POLIPROPILENO (PPR-PN10) D= 6" und S/ 644.54 S/ - S/ - S/ - S/ - S/ 161.13 S/ 161.13 S/ 161.13 S/ 161.13 S/ - S/ - S/ - S/ -
272220037 UNION DE POLIPROPILENO (PPR-PN10) D= 4" und S/ 1,266.61 S/ 52.75 S/ 63.33 S/ 63.33 S/ 63.33 S/ 126.66 S/ 189.99 S/ 189.99 S/ 63.33 S/ 63.33 S/ 63.33 S/ 63.33 S/ 43.94
272220038 UNION DE POLIPROPILENO (PPR-PN10) D= 3" und S/ 284.96 S/ 59.34 S/ 71.24 S/ 71.24 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 49.43
272220039 UNION DE POLIPROPILENO (PPR-PN10) D= 2" und S/ 19.89 S/ 0.66 S/ 1.19 S/ 1.59 S/ 1.99 S/ 1.19 S/ 1.79 S/ 3.18 S/ 3.58 S/ 1.59 S/ 1.59 S/ 0.99 S/ 0.55
272220040 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 4" m S/ 8,789.94 S/ - S/ - S/ - S/ - S/ 2,197.48 S/ 2,197.48 S/ 2,197.48 S/ 2,197.48 S/ - S/ - S/ - S/ -
272220041 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 3" m S/ 3,872.72 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 968.18 S/ 968.18 S/ 968.18 S/ 968.18 S/ -
272220042 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 2" m S/ 377.43 S/ - S/ - S/ - S/ - S/ - S/ 75.49 S/ - S/ 56.61 S/ - S/ - S/ 75.49 S/ -
272220043 AISLAMIENTO TERMICO PARA TUBERIA POLIPROPILENO D= 4" m S/ 2,370.87 S/ - S/ 355.63 S/ 355.63 S/ 355.63 S/ 355.63 S/ 355.63 S/ 355.63 S/ 237.09 S/ - S/ - S/ - S/ -
272220044 AISLAMIENTO TERMICO PARA TUBERIA POLIPROPILENO D= 3" m S/ 782.92 S/ 163.04 S/ 195.73 S/ 195.73 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 135.82
272220045 AISLAMIENTO TERMICO PARA TUBERIA PÓLIPROPILENO D= 2" m S/ 85.93 S/ - S/ - S/ - S/ 12.89 S/ 12.89 S/ 12.89 S/ 12.89 S/ 12.89 S/ 8.59 S/ 8.59 S/ 4.30 S/ -
272220046 AISLAMIENTO TERMICO PARA TUBERIA POLIPROPILENO D= 1 1/2" m S/ 1,438.76 S/ 95.88 S/ 115.10 S/ 215.81 S/ 215.81 S/ 172.65 S/ 172.65 S/ 215.81 S/ 215.81 S/ - S/ - S/ - S/ 79.87
272220047 UNION DE POLIPROPILENO (PPR-PN10) D= 1 und S/ 36.75 S/ - S/ - S/ - S/ - S/ 2.94 S/ 2.94 S/ 3.68 S/ 3.68 S/ 4.41 S/ 4.41 S/ 3.68 S/ -
272220048 TUBERIA DE POLIPROPILENO (PPR PN10) D= 1 1/ 2 m S/ 1,411.84 S/ 58.80 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 141.18 S/ 48.98
272220049 TUBERIA DE POLIPROPILENO (PPR-PN10) D= 1" m S/ 12.75 S/ 0.42 S/ 0.51 S/ 0.77 S/ 0.77 S/ 0.77 S/ 1.02 S/ 0.89 S/ 0.89 S/ 0.89 S/ 1.91 S/ 1.28 S/ 0.35
272220061 CODO PPR-PN10 DE 4" X 90º und S/ 376.88 S/ - S/ - S/ 94.22 S/ 75.38 S/ 113.06 S/ 75.38 S/ 18.84 S/ - S/ - S/ - S/ - S/ -

IS436
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES SANITARIAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15
DE 05/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
Código MAETRIALES Unidad Parcial S/. A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021
272220062 CODO PPR-PN10 DE 3" X 90º und S/ 422.56 S/ 88.00 S/ 105.64 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 73.30
272220063 TEE PPR-PN10 DE 4" und S/ 466.96 S/ - S/ 116.74 S/ 116.74 S/ 116.74 S/ 116.74 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272220064 TEE PPR-PN10 DE 3" und S/ 227.28 S/ - S/ - S/ - S/ - S/ 56.82 S/ 56.82 S/ 56.82 S/ 56.82 S/ - S/ - S/ - S/ -
272220065 REDUCCION PPR-PN10 DE 4" A 3" und S/ 164.08 S/ 6.83 S/ 8.20 S/ 8.20 S/ 8.20 S/ 16.41 S/ 24.61 S/ 24.61 S/ 8.20 S/ 8.20 S/ 8.20 S/ 8.20 S/ 5.69
272220073 TUBERIA UF DE 200 mm S25 m S/ 1,394.17 S/ 290.34 S/ 348.54 S/ 348.54 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 241.85
272220074 TUBERIA UF DE 400 mm S25 m S/ 9,301.31 S/ 309.92 S/ 558.08 S/ 744.10 S/ 930.13 S/ 558.08 S/ 837.12 S/ 1,488.21 S/ 1,674.24 S/ 744.10 S/ 744.10 S/ 465.07 S/ 258.16
272220075 TUBERIA PVC-UF NTP ISO 4435 SN2 DN 200 m S/ 8,239.64 S/ - S/ - S/ - S/ - S/ 2,059.91 S/ 2,059.91 S/ 2,059.91 S/ 2,059.91 S/ - S/ - S/ - S/ -
272220076 UNION PVC-UF NTP ISO 4435 SN2 DN 200 und S/ 851.06 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 212.77 S/ 212.77 S/ 212.77 S/ 212.77 S/ -
272220077 TUBERIA PVC-UF NTP ISO 4435 SN2 DN 160 m S/ 103.20 S/ - S/ - S/ - S/ - S/ - S/ 20.64 S/ - S/ 15.48 S/ - S/ - S/ 20.64 S/ -
272220078 UNION PVC-UF NTP ISO 4435 SN2 DN 160 und S/ 59.84 S/ - S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ 5.98 S/ - S/ - S/ - S/ -
272500023 UNION SIMPLE PVC-P (ELEC.) 100mm und S/ 15.13 S/ 3.15 S/ 3.78 S/ 3.78 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 2.62
272500034 UNION SIMPLE CPVC 1/2" und S/ 5.52 S/ - S/ - S/ - S/ 0.83 S/ 0.83 S/ 0.83 S/ 0.83 S/ 0.83 S/ 0.55 S/ 0.55 S/ 0.28 S/ -
272500035 UNION SIMPLE CPVC 3/4" und S/ 5.99 S/ 0.40 S/ 0.48 S/ 0.90 S/ 0.90 S/ 0.72 S/ 0.72 S/ 0.90 S/ 0.90 S/ - S/ - S/ - S/ 0.33
272510011 TEE PVC-SAP-CLASE 10 SP - 1/2" und S/ 243.20 S/ - S/ - S/ - S/ - S/ 19.46 S/ 19.46 S/ 24.32 S/ 24.32 S/ 29.18 S/ 29.18 S/ 24.32 S/ -
272510012 TEE PVC-SAP-CLASE 10 SP - 3/4" und S/ 16.17 S/ 0.67 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 1.62 S/ 0.56
272510027 UNION SIMPLE PVC-SAP-CLASE 10 SP -2 1/2" und S/ 316.64 S/ 10.55 S/ 12.67 S/ 19.00 S/ 19.00 S/ 19.00 S/ 25.33 S/ 22.17 S/ 22.17 S/ 22.17 S/ 47.50 S/ 31.66 S/ 8.79
272510079 TEE PVC-SAP-CLASE 1O SP - 1" und S/ 191.18 S/ - S/ - S/ 47.80 S/ 38.24 S/ 57.35 S/ 38.24 S/ 9.56 S/ - S/ - S/ - S/ - S/ -
272510080 CODO PVC-CLASE 1O SP -1 1/4" x 90º und S/ 1,111.32 S/ 231.43 S/ 277.83 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 192.78
272510081 TEE PVC-SAP-CLASE 10 SP -11/4" und S/ 1,230.39 S/ - S/ 307.60 S/ 307.60 S/ 307.60 S/ 307.60 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272510087 CODO PVC-CLASE 10 SP -1" x 90º und S/ 320.74 S/ - S/ - S/ - S/ - S/ 80.19 S/ 80.19 S/ 80.19 S/ 80.19 S/ - S/ - S/ - S/ -
272510089 TEE PVC-SAP-CLASE 10 SP - 2 1/2" und S/ 24.99 S/ 1.04 S/ 1.25 S/ 1.25 S/ 1.25 S/ 2.50 S/ 3.75 S/ 3.75 S/ 1.25 S/ 1.25 S/ 1.25 S/ 1.25 S/ 0.87
272510091 CODO PVC-CLASE 10 SP - 2 1/2" x 90º und S/ 49.45 S/ 10.30 S/ 12.36 S/ 12.36 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 8.58
272510092 TEE CPVC DE 1/2" und S/ 61.56 S/ 2.05 S/ 3.69 S/ 4.92 S/ 6.16 S/ 3.69 S/ 5.54 S/ 9.85 S/ 11.08 S/ 4.92 S/ 4.92 S/ 3.08 S/ 1.71
272510093 SOMBRERO PARA VENTILACION DE PVC DE 2" und S/ 181.79 S/ - S/ - S/ - S/ - S/ 45.45 S/ 45.45 S/ 45.45 S/ 45.45 S/ - S/ - S/ - S/ -
272510094 TEE CPVC DE 3/4" und S/ 4.68 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 1.17 S/ 1.17 S/ 1.17 S/ 1.17 S/ -
272510096 UNION SIMPLE PVC-SAP-CLASE 10 SP -3" und S/ 50.93 S/ - S/ - S/ - S/ - S/ - S/ 10.19 S/ - S/ 7.64 S/ - S/ - S/ 10.19 S/ -
272510103 SOMBRERO PARA VENTILACION DE PVC DE 4" und S/ 64.72 S/ - S/ 9.71 S/ 9.71 S/ 9.71 S/ 9.71 S/ 9.71 S/ 9.71 S/ 6.47 S/ - S/ - S/ - S/ -
272510107 UNION SIMPLE PVC-SAP-CLASE 10 SP -4" und S/ 1,005.72 S/ 209.44 S/ 251.43 S/ 251.43 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 174.46
272510124 BOQUILLA DE RETORNO DE 2" und S/ 1,577.34 S/ - S/ - S/ - S/ 236.60 S/ 236.60 S/ 236.60 S/ 236.60 S/ 236.60 S/ 157.73 S/ 157.73 S/ 78.87 S/ -
272510125 BOQUILLA DE ASPIRACION DE 2" und S/ 2,136.84 S/ 142.40 S/ 170.95 S/ 320.53 S/ 320.53 S/ 256.42 S/ 256.42 S/ 320.53 S/ 320.53 S/ - S/ - S/ - S/ 118.62
272510127 CODO PVC-CLASE 10 SP -1/2" x 90º und S/ 358.40 S/ - S/ - S/ - S/ - S/ 28.67 S/ 28.67 S/ 35.84 S/ 35.84 S/ 43.01 S/ 43.01 S/ 35.84 S/ -
272510128 CODO PVC-CLASE 10 SP - 3/4" x 90º und S/ 32.34 S/ 1.35 S/ 1.62 S/ 1.62 S/ 1.62 S/ 1.62 S/ 1.62 S/ 1.62 S/ 1.62 S/ 1.62 S/ 1.62 S/ 3.23 S/ 1.12
272510129 UNION SIMPLE PVC-SAP CLASE 10 1/2" und S/ 16.17 S/ 0.54 S/ 0.65 S/ 0.97 S/ 0.97 S/ 0.97 S/ 1.29 S/ 1.13 S/ 1.13 S/ 1.13 S/ 2.43 S/ 1.62 S/ 0.45
272510130 ROSCADA UNION SIMPLE PVC-SAP CLASE 10 3/4" und S/ 74.83 S/ - S/ - S/ 18.71 S/ 14.97 S/ 22.45 S/ 14.97 S/ 3.74 S/ - S/ - S/ - S/ - S/ -
272510131 ROSCADA UNION SIMPLE PVC-SAP CLASE 10 1" und S/ 23.52 S/ 4.90 S/ 5.88 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 4.08
272510132 ROSCADA UNION SIMPLE PVC-SAP CLASE 10 1,1/4" und S/ 147.95 S/ - S/ 36.99 S/ 36.99 S/ 36.99 S/ 36.99 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272510133 ROSCADA UNION SIMPLE PVC-SAP CLASE 10 1,1/2" und S/ 85.43 S/ - S/ - S/ - S/ - S/ 21.36 S/ 21.36 S/ 21.36 S/ 21.36 S/ - S/ - S/ - S/ -
272510134 ROSCADA UNION SIMPLE PVC-SAP CLASE 10 2" und S/ 370.52 S/ 15.43 S/ 18.53 S/ 18.53 S/ 18.53 S/ 37.05 S/ 55.58 S/ 55.58 S/ 18.53 S/ 18.53 S/ 18.53 S/ 18.53 S/ 12.85
272510145 ROSCADA SOMBRERO PARA VENTILACION DE PVC DE 3" und S/ 52.92 S/ 11.02 S/ 13.23 S/ 13.23 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 9.18
272510156 ANILLO PVC-U (NTP ISO 4435) SN4 DN 110 MM und S/ 460.62 S/ 15.35 S/ 27.64 S/ 36.85 S/ 46.06 S/ 27.64 S/ 41.46 S/ 73.70 S/ 82.91 S/ 36.85 S/ 36.85 S/ 23.03 S/ 12.78
272510167 ANILLO PVC-U (NTP ISO 4435) SN4 DN 315 MM und S/ 280.71 S/ - S/ - S/ - S/ - S/ 70.18 S/ 70.18 S/ 70.18 S/ 70.18 S/ - S/ - S/ - S/ -
272510151 ANILLO PVC-U (NTP ISO 4435) SN4 DN 355 MM und S/ 301.44 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 75.36 S/ 75.36 S/ 75.36 S/ 75.36 S/ -
272510152 ANILLO PVC-U (NTP ISO 4435) SN4 DN 400 MM und S/ 286.84 S/ - S/ - S/ - S/ - S/ - S/ 57.37 S/ - S/ 43.03 S/ - S/ - S/ 57.37 S/ -
272510153 CODO PVC-U (NTP ISO 4435) SN4 DN 11O MM und S/ 858.82 S/ - S/ 128.82 S/ 128.82 S/ 128.82 S/ 128.82 S/ 128.82 S/ 128.82 S/ 85.88 S/ - S/ - S/ - S/ -
272510154 TAPON PVC-U (NTP ISO 4435) SN4 DN 11O MM und S/ 123.64 S/ 25.75 S/ 30.91 S/ 30.91 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 21.45
272510155 SILLA TEE PVC-U (NTP ISO 4435) SN4 DN 315X11O MM und S/ 740.52 S/ - S/ - S/ - S/ 111.08 S/ 111.08 S/ 111.08 S/ 111.08 S/ 111.08 S/ 74.05 S/ 74.05 S/ 37.03 S/ -
272510156 BOQUILLA DE INGRESO DE 2" und S/ 10.11 S/ 0.67 S/ 0.81 S/ 1.52 S/ 1.52 S/ 1.21 S/ 1.21 S/ 1.52 S/ 1.52 S/ - S/ - S/ - S/ 0.56
272510157 REDUCCION CONCENTRICA 2" A 1" und S/ 2.46 S/ - S/ - S/ - S/ - S/ 0.20 S/ 0.20 S/ 0.25 S/ 0.25 S/ 0.30 S/ 0.30 S/ 0.25 S/ -
272510159 UNION SIMPLEPVC ISO 1452, DN 75mm und S/ 2,176.19 S/ 90.64 S/ 108.81 S/ 108.81 S/ 108.81 S/ 108.81 S/ 108.81 S/ 108.81 S/ 108.81 S/ 108.81 S/ 108.81 S/ 217.62 S/ 75.50
272510160 UNION SIMPLE PVC ISO 1452, DN 48mm und S/ 42.42 S/ 1.41 S/ 1.70 S/ 2.55 S/ 2.55 S/ 2.55 S/ 3.39 S/ 2.97 S/ 2.97 S/ 2.97 S/ 6.36 S/ 4.24 S/ 1.18
272510161 CODO PVC ISO 1452, 75mm X 11.25º C-1O und S/ 112.81 S/ - S/ - S/ 28.20 S/ 22.56 S/ 33.84 S/ 22.56 S/ 5.64 S/ - S/ - S/ - S/ - S/ -
272510162 CODO PVC ISO 1452, 75mm X 45º C-1O und S/ 338.43 S/ 70.48 S/ 84.61 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 58.71
272510163 CODO PVC ISO 1452, 75mm X 90º C10 und S/ 249.64 S/ - S/ 62.41 S/ 62.41 S/ 62.41 S/ 62.41 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272510164 TEE PVC ISO 1452, 75mm X 75mm C10 und S/ 138.36 S/ - S/ - S/ - S/ - S/ 34.59 S/ 34.59 S/ 34.59 S/ 34.59 S/ - S/ - S/ - S/ -
272510165 REDUCCION PVC ISO 1452, 110mm 75mm C-10 und S/ 211.10 S/ 8.79 S/ 10.56 S/ 10.56 S/ 10.56 S/ 21.11 S/ 31.67 S/ 31.67 S/ 10.56 S/ 10.56 S/ 10.56 S/ 10.56 S/ 7.32
272510166 TAPON PVC ISO 1452, 75mm C-10 und S/ 69.52 S/ 14.48 S/ 17.38 S/ 17.38 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 12.06
272510167 ANILLO PVC-U (NTP ISO 4435) SN4 DN 200 MM und S/ 444.33 S/ 14.80 S/ 26.66 S/ 35.55 S/ 44.43 S/ 26.66 S/ 39.99 S/ 71.09 S/ 79.98 S/ 35.55 S/ 35.55 S/ 22.22 S/ 12.33
272510168 ANILLO PVC-U (NTP ISO 4435) SN4 DN 160 MM und S/ 20.12 S/ - S/ - S/ - S/ - S/ 5.03 S/ 5.03 S/ 5.03 S/ 5.03 S/ - S/ - S/ - S/ -
272520001 CODO PVC-SAP 2" x 90 und S/ 1,075.70 S/ 35.84 S/ 43.03 S/ 64.54 S/ 64.54 S/ 64.54 S/ 86.06 S/ 86.06 S/ 107.57 S/ 107.57 S/ 161.36 S/ 107.57 S/ 29.86
272520003 CODO PVC-SAP 4" x 90 und S/ 3,315.05 S/ - S/ - S/ 828.76 S/ 663.01 S/ 994.51 S/ 663.01 S/ 165.75 S/ - S/ - S/ - S/ - S/ -
272520031 YEE PVC-SAP 2" x 2" und S/ 422.40 S/ 87.96 S/ 105.60 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 73.27
272520035 YEE PVC-SAP 4" x 4" und S/ 693.58 S/ - S/ 173.39 S/ 173.39 S/ 173.39 S/ 173.39 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272520036 CODO PVC-SAP 2" x 45 und S/ 225.28 S/ - S/ - S/ - S/ - S/ 56.32 S/ 56.32 S/ 56.32 S/ 56.32 S/ - S/ - S/ - S/ -
272520037 CODO CPVC DE1/2" X 90º und S/ 78.66 S/ 3.28 S/ 3.93 S/ 3.93 S/ 3.93 S/ 7.87 S/ 11.80 S/ 11.80 S/ 3.93 S/ 3.93 S/ 3.93 S/ 3.93 S/ 2.73
272520038 CODO CPVC DE 3/4" X 90º und S/ 7.68 S/ 1.60 S/ 1.92 S/ 1.92 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 1.33
272520064 CODO PVC-SAP 3" x 90 und S/ 593.46 S/ 19.77 S/ 35.61 S/ 47.48 S/ 59.35 S/ 35.61 S/ 53.41 S/ 94.95 S/ 106.82 S/ 47.48 S/ 47.48 S/ 29.67 S/ 16.47
272520068 YEE PVC-SAP 3" x 3" und S/ 208.66 S/ - S/ - S/ - S/ - S/ 52.16 S/ 52.16 S/ 52.16 S/ 52.16 S/ - S/ - S/ - S/ -
272610002 TUBO CPVC - 1/2" x 5 M m S/ 876.66 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 219.16 S/ 219.16 S/ 219.16 S/ 219.16 S/ -
272610003 TUBO CPVC - 3/4" x 5 M m S/ 574.83 S/ - S/ - S/ - S/ - S/ - S/ 114.97 S/ - S/ 86.22 S/ - S/ - S/ 114.97 S/ -
277010023 GRIFO DE RIEGO DE BRONCE 1/2" P/JARDIN und S/ 55.86 S/ - S/ -
277010024 GRIFO DE RIEGO DE BRONCE 3/4" P/JARDIN und S/ 1,131.30 S/ - S/ -
277010025 VALVULA MARIPOSA TIPO WAFER UNIÓN BRIDA D=6" und S/ 1,192.14 S/ - S/ -
277010026 VALVULA MARIPOSA TIPO WAFER UNIÓN BRIDA 0=4" und S/ 1,055.47 S/ - S/ -
277010027 VALVULA MARIPOSA TIPO WAFER UNIÓN BRIDA 0=3" und S/ 477.00 S/ - S/ -
277110007 VALVULA CHECK PESADA DE BRONCE 0=21/2" und S/ 1,309.35 S/ - S/ -
277110010 VALVULA COMPUERTADE BRONCE 0 =21/2" und S/ 2,514.82 S/ - S/ -
277110011 VALVULA CHECK PESADA DE BRONCE 0=2" und S/ 1,400.52 S/ - S/ -
277110013 VALVULA COMPUERTA DE BRONCE 0=11/2" und S/ 480.55 S/ - S/ -
277110014 VALVULA COMPUERTA DE BRONCE 0=2" und S/ 1,776.64 S/ - S/ -
277110015 VALVULA COMPUERTA DE BRONCE 0=3" und S/ 6,116.76 S/ - S/ -
277110019 VALVULA COMPUERTA DE BRONCE O= 3/4". und S/ 33.85 S/ - S/ -
277110020 VALVULA COMPUERTA DE BRONCE O= 1" und S/ 775.95 S/ - S/ -
277110022 VALVULA CHECK PESADA DE BRONCE 0=11 /2 1 und S/ 181.60 S/ - S/ -
277110023 VALVULA CHECK PESADA DE BRONCE 0=3" und S/ 1,760.28 S/ - S/ -
277110024 VALVULA CHECK PESADA DE BRONCE 0=4" und S/ 3,897.30 S/ - S/ -
277110025 VALVULA CHECK PESADA DE BRONCE 0=6" und S/ 7,043.43 S/ - S/ -
277110028 VALVULA ESFÉRICA DE BRONCE PESADA 01/2" und S/ 3,824.48 S/ - S/ -
277110029 VALVULA ESFÉRICA DE BRONCE PESADA 0 3/4" und S/ 1,995.18 S/ - S/ -
277110030 VALVULA ESFÉRICA DE BRONCE PESADA 0 1.1/4" und S/ 2,924.55 S/ - S/ -
277110031 VALVULA ESFÉRICA DE BRONCE PESADA 0 11/2" und S/ 4,298.80 S/ - S/ -
277110032 VALVULA ESFÉRICA DE BRONCE PESADA 0 2" und S/ 2,273.74 S/ - S/ -
277110033 VALVULA CHECK PESADA DE BRONCE D=1" und S/ 102.18 S/ - S/ -
277110035 ELECTRO VÁLVULAS DE CUATRO VIAS (AUTOMATICA) D=4" und S/ 680.00 S/ - S/ -
277110036 ELECTRO VÁLVULAS DE TRES VIAS (AUTOMATICA) D=4" und S/ 300.00 S/ - S/ -
277110042 VALVULA COMPUERTA HIERRO DUCTIL CIERRE ELASTOMERICO DE 75 m und S/ 331.69 S/ - S/ -
0277110043_x000D_ VALVULA COMPUERTA HIERRO DUCTIL CIERRE ELASTOMERICO DE 11O und S/ 515.00 S/ - S/ -
277110044 GRIFO CONTRA INCENDIO HIERRO DUCTIL 2 BOCAS TIPO POSTE INC. AC und S/ 1,396.61 S/ - S/ -
277210012 VÁLVULA FLOTADORA DE BRONCE DE 1,1/2" CON BOYA PVC und S/ 635.58 S/ - S/ -
277210017 VÁLVULA FLOTADORA DE BRONCE DE 2" CON BOYA PVC und S/ 552.08 S/ - S/ -
277210018 UNION TRANSICION ACERO A PVC DE Ø 2 und S/ 16.88 S/ - S/ -
277210019 UNION TRANSICION ACERO A PVC DE Ø 3 und S/ 24.60 S/ - S/ -
277210020 UNION TRANSICION ACERO A PVC DE Ø 11/2" und S/ 8.06 S/ - S/ -
277210021 VÁLVULA FLOTADORA DE BRONCE DE 1" CON BOYA PVC und S/ 66.95 S/ - S/ -
277320007 VALVULA DE PIE 3" C/CANASTILLA und S/ 3,817.08 S/ - S/ -
277320012 VALVULA DE PIE 2" C/CANASTILLA und S/ 301.78 S/ - S/ -
277320016 VALVULA DE PIE 2 1/2" C/CANASTILLA und S/ 1,355.82 S/ - S/ -
277510001 REGISTRO BRONCE DE 2" ROSCADO und S/ 263.52 S/ - S/ -
277510003 REGISTRO BRONCE DE 4" ROSCADO und S/ 1,486.08 S/ - S/ -
277510013 REGISTRO BRONCE DE 3" ROSCADO und S/ 394.25 S/ - S/ -
277510017 SUMIDERO DE BRONCE 2" und S/ 775.92 S/ - S/ -
277510018 SUMIDERODE BRONCE 3" und S/ 1,876.63 S/ - S/ -
277510019 REGISTRO DE BRONCE TIPO DADO 4" und S/ 346.08
277510020 VENTILACION LATERAL DE 2" und S/ 124.10

TOTAL S/ 1,520,409.88 S/ 7,207.94 S/ 12,834.57 S/ 13,387.67 S/ 12,687.88 S/ 21,575.98 S/ 19,389.98 S/ 19,064.39 S/ 19,403.73 S/ 8,413.19 S/ 10,781.87 S/ 8,560.30

AVANCE PARCIAL 4.77% 6.00% 10.16% 8.79% 12.80% 12.21% 9.55% 9.84% 4.38% 4.85% 4.86% 2.79% 2.97%

AVANCE ACUMULADO 10.79% 16.80% 26.96% 35.74% 48.54% 60.75% 70.30% 80.14% 84.53% 89.38% 94.23% 97.03% 100.00%

IS437
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

SALDO
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 13.65 S/ -
202100002 ALAMBRE NEGRO Nro.16 kg S/ 4.93 S/ -
202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 14.25 S/ -
202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.00 S/ -
203010010 ACERO CORRUGADO GRADO 60 kg S/ 485.76 S/ -
204050001 ARENA GRUESA m3 S/ 569.50 S/ -
204050002 ARENA FINA m3 S/ 81.02 S/ -
204100010 TIERRA CERNIDA m3 S/ 482.98 S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 2,074.95 S/ -
205350001 AGUA und S/ 19.11 S/ -
206200005 CONECTOR DE BARRA DE 5/8" Y 3/4" und S/ 536.35
207050009 CONEXIONA CAJA PVC ELEC. SAP 25MM und S/ 12.37 S/ -
207900013 CONECTOR PVC 25mm und S/ 6.01 S/ -
206200011 CONECTOR PVC 55mm und S/ 45.01
206200019 CONECTOR PVC 20mm und S/ 221.42
206200028 CONECTOR PVC 35mm und S/ 148.45
206200030 CONECTOR PVC 100mm und S/ 8.44
206200031 CONECTOR PVC 75mm und S/ 5.13
206300002 CABLE HELICOIDAL DE 9m Cu und S/ 843.76
206550023 VARILLA DE COBRE 3/4"x 2.40Ín C/PUNTA und S/ 1,728.27
206560001 CABLE 1x16mm2 COBRE DESNUDO m3 S/ 17.80
206560002 CABLE 1x50mm2 COBRE DESNUDO m S/ 925.75
207050015 CONDUCTOR N2XOH - 1 x 300mm m S/ 2,293.19 S/ -
207050016 CONDUCTOR N2XOH - 1 x 25mm2 m S/ 1,162.81 S/ -
207050017 CONDUCTOR N2XOH-1 x 10mm2 m S/ 11,248.14 S/ -
207050018 CONDUCTOR N2XOH - 1 x 6mm2 m S/ 3,531.68 S/ -
207050019 CONDUCTOR N2XOH - 1 x 16mm2 m S/ 2,900.81 S/ -
207050022 CONDUCTOR N2XOH -1 x 70mm2 m S/ 128.54 S/ -
207050023 CONDUCTOR N2XOH - 1 x 35mm2 m S/ 1,463.63 S/ -
207150013 CONDUCTOR NH-80, 4mm2 m S/ 4,475.89 S/ -
207150022 CONDUCTOR NH-80, 6mm2 m S/ 893.20 S/ -
207150023 CONDUCTOR NH-80, 2.5mm2 m S/ 10,650.04 S/ -
211250005 CORTACIRCUITO PARA POSTE DE CONCRETO und S/ 796.53 S/ -
211250010 SOPORTE P/TENSADO MOD.SA-9 DE FºGº C/AISLADOR und S/ 93.92 S/ -
211250012 SOPORTE P/TENSADO MOD.SA-7 DE FºGº C/AISLADOR und S/ 187.84 S/ -
211250041 CAPTOR CON DISPOSITIVO DE CEBADO und S/ 5,388.49 S/ -
212050115 ARTEF. ILUMINACION DE EMERGENCIA C/2 LAMP. 20W, 2 HORA und S/ 13,555.36 S/ -
212050123 ARTEFACTO SIMILAR RAS 3X36 und S/ 22,909.33 S/ -

IE438
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212050124 ARTEFACTO SIMILAR RAS 2X36 und S/ 6,236.49 S/ -


212050125 ARTEFACTO SIMILAR TPC 132 und S/ 5,162.99 S/ -
212050126 ARTEFACTO SIMILAR TPR 2X18 und S/ 5,796.57 S/ -
212050127 ARTEFACTO SIMILAR RSP 2X18W und S/ 4,633.93 S/ -
212050128 ARTEFACTO SIMILAR ULTR AA2X18 und S/ 747.43 S/ -
212050129 REFLECTOR TIPO ARAN 1X70 und S/ 520.66 S/ -
212050130 REFLECTOR TIPO MERH - 250 und S/ 1,249.60 S/ -
212050131 ARTEFACTO SIMILAR A GEOTEC 1X35 und S/ 890.91 S/ -
212050132 ARTEFACTO PARA ADOSAR TIPO ALPHA SP.O A 1X20W und S/ 104.13 S/ -
212050133 WALL SOKETE, CON LAMPARA AHORRADORA DE 20W und S/ 27.77 S/ -
212050134 BRAQUETE DE 2 LAMPARAS DE 18W SIMILAR A RSP-2 JOSFEL und S/ 2,343.00 S/ -
212050135 ARTEFACTO PARA ADOSAR, 1 LAMPARA DE 32 W, SIMILAR AL TI und S/ 1,703.25 S/ -
212050136 ARTEFACTO PARA ADOSAR Y/O COLGAR, CON LAMPARA FLUOREC und S/ 3,147.27 S/ -
212050137 ARTEFACTO ADOSADO, CON DOS LAMPARAS 18W, SIMILAR AL TI und S/ 87.93 S/ -
212050138 ARTEFACTO PARA SUSPENDER, CON 2 LAMPARAS FLUORECENTESund S/ 1,700.86 S/ -
212050139 ARTEFACTO PARA ADOSAR, CON 3 LAMPARAS DE 36W, SIMILARund_x000D_ S/ 1,041.33 S/ -
212050140 ARTEFACTO PARA SUSPENDER, CON 3 FLUORECENTES DE 36_x000D_ und S/ 370.27 S/ -
212050141 W, SIMILAR AL
ARTEFACTO TIPOADOSAR,
PARA ISP 3x36W
CON LAMPARA FLUORECENTE DE 36W und S/ 592.43 S/ -
212050142 ARTEFACTOREFLECTOR CON LAMPARA DE 250 W, SIMILAR AL T und S/ 6,768.67 S/ -
212050143 BRAQUETE REFLECTOR CON 2 LAMPARAS LED DE 18W SIMILAR und S/ 395.70 S/ -
212050144 ARTEFACTO PARA ADOSAR, SIMILAR AL TIPO ALPHA SPOT A, C und S/ 138.84 S/ -
212050145 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 842.31 S/ -
212050146 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 2,166.00 S/ -
212050147 ARTEFACTO DE ILUMINACION CON LAMAPARA LED DE 36W, PROT und S/ 1,230.82 S/ -
212050148 ARTEFACTO DE ILUMINACION CON LAMPARA LED DE 36W, PROTEC und S/ 3,429.50 S/ -
212050149 REFLECTORES CON LAMPARAS DE 250 W , HALOGENURO META und S/ 879.33 S/ -
212050150 ARTEFACTO TIPO ASTRO-70, CON LAMPARA DE 70W HALOGEN und S/ 5,825.58 S/ -
212050151 PASTORAL SIMPLE TIPO SUCRE und S/ 1,050.00 S/ -
212050152 PASTORAL DOBLE TIPO SUCRE und S/ 100.00 S/ -
212050153 REFLECTOR SIMILAR A ARAN, CON LAMPARA DE 150W HALO und S/ 1,475.20 S/ -
212050154 ARTEFACTO SIMILARA AHR-1X36 + KIT DE EMERGENCIA und S/ 3,471.07 S/ -
212050155 ARTEFACTO SIMILAR AHR-1X36 und S/ 1,423.11 S/ -
212050156 CAMPANILLA DE TIMBRE DE 8" DE DIAMETRO und S/ 229.97 S/ -
212050157 CAMPANILLA DE TIMBRE DE 4" DE DIAMETRO und S/ 72.63 S/ -
212050159 SENSOR DE TEMPERATURA Y/O HUMO und S/ 248.79 S/ -
212150002 CAJA GALV. RECT. PESADA 4" x 2" x 21/4" und S/ 846.77 S/ -
212150011 CAJA GALV. OCTOGONAL PESADA 4" und S/ 862.61 S/ -
212150035 CAJA DE PASE GALVANIZADA 4" x 4" x 2" und S/ 366.50 S/ -
212150036 CAJA DE PASE GALVANIZADA OCTOGONAL (100X55mm) und S/ 40.48 S/ -
212150039 CAJA DE PASE GALVANIZADA (150X150X75mm) und S/ 185.13 S/ -
212150041 CAJA DE PASE GALVANIZADA (200X200X100mm) und S/ 145.86 S/ -

IE439
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212150042 CAJA DE PASE GALVANIZADA (300X300X100mm) und S/ 224.00 S/ -


212150043 CAJA DE PASE GALVANIZADA (100X100X100mm) und S/ 93.51 S/ -
212150044 CAJA DE PASE GALVANIZADA (100X100X50mm) und S/ 31.64 S/ -
212150045 TAPA CIEGA DE 300X300 und S/ 57.72 S/ -
212150046 TAPA CIEGA DE 200X200 und S/ 5.10 S/ -
212150047 TAPA CIEGA DE 150X150 und S/ 3.63 S/ -
212150048 CAJA DE PASE GALVANIZADA (100X50X55mm) und S/ 9.71 S/ -
212150049 TAPA CIEGA OCTOGONAL DE 100 und S/ 20.88 S/ -
212250004 INTERRUPTOR 2 GOLPE SIMILAR TIPO TICINO und S/ 545.39 S/ -
212250078 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und S/ 1,140.92 S/ -
212250080 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und S/ 1,106.35 S/ -
212250092 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und S/ 752.00 S/ -
212250093 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und S/ 465.18 S/ -
212250095 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und S/ 77.53 S/ -
212250103 INTERRUPTOR TERMOMAGNETICO - 3 x 20 A und S/ 158.60 S/ -
212250132 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und S/ 354.38 S/ -
212250134 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und S/ 470.00 S/ -
212250140 INTERRUPTOR DIFERENCIAL 2X25A-30MA und S/ 13,844.08 S/ -
212250143 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und S/ 25.84 S/ -
212250144 INTERRUPTOR TERMOMAGNETICO - 2 x 50 A und S/ 24.68 S/ -
212250145 INTERRUPTOR 1 GOLPE SIMILAR TIPO TICINO und S/ 255.64 S/ -
212250146 INTERRUPTOR DE CONMUTACION SIMILAR TIPO TICINO und S/ 1,025.89 S/ -
212250147 INTERRUPTOR 3 GOLPES SIMILAR TIPO TICINO und S/ 300.07 S/ -
212250148 PULSADOR DE TIMBRE und S/ 28.82 S/ -
212250150 INTERRUPTOR TERMOMAGNETICO - 2 x 40 A und S/ 34.91 S/ -
212250152 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 16KA und S/ 62.56 S/ -
212250153 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 20KA und S/ 250.23 S/ -
212250154 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A 20KA und S/ 83.65 S/ -
212250155 INTERRUPTOR TERMOMAGNETICO- 3 x 70 A 16KA und S/ 62.56 S/ -
212250156 INTERRUPTOR DIFERENCIAL 2X40A-30MA und S/ 988.80 S/ -
212250164 INTERRUPTOR TERMOMAGNETICO- 3 x 60 A 10KA und S/ 16.29 S/ -
212250168 INTERRUPTOR TERMOMAGNETICO-3 x 125 A 25KA und S/ 167.30 S/ -
212250171 CONTACTOR ELECTRICO 2 X 20 A und S/ 319.32 S/ -
212250172 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A 20KA und S/ 125.11 S/ -
212250173 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 20KA und S/ 32.59 S/ -
212250174 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 16KA und S/ 32.59 S/ -
212250181 CONTROL DE NIVEL und S/ 281.19 S/ -
212250182 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA EN CISTERNA und S/ 86.52 S/ -
212250189 TG (TABLERO AUTOSOPORTADO, ITM: 11X40A 10KA, 4 2X20A 10KA, und S/ 4,549.17 S/ -
212250190 TG - 6 (TABLERO AUTOSOPORTADO, ITM: 2 2X40A, 3 2X20A, 1 2X60 2und S/ 3,536.33 S/ -
212300022 TOMA PARA RED DATA (DADO) und S/ 1,926.22 S/ -

IE440
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212300025 TOMACORRIENTE DOBLE C/ LINEA DE TIERRA SIMILAR TIPO TI und S/ 4,612.63 S/ -


212300028 TOMACORRIENTE DOBLE A PRUEBA DE AGUA und S/ 654.50 S/ -
212350060 PLACA SALIDA PARA TV o TELEFONO und S/ 662.15 S/ -
212350062 PLACA DE ALUMINIO ANODIZADO 1 PERFORACION und S/ 1,058.20 S/ -
212350063 PLACA DE ALUMINIO ANODIZADO 2 PERFORACION und S/ 929.13 S/ -
219600001 CABLE DESNUDO 50MM2 (1/0 AWG) m S/ 564.27 S/ -
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 4,488.01 S/ -
221030015 MARCO Y TAPA DE BUZON ELECTRICO und S/ 1,726.67 S/ -
221030016 MARCO Y TAPA DE BUZON COMUNICACIONES und S/ 2,461.01 S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 3.89 S/ -
230010030 CINTA TEFLON m S/ 0.11 S/ -
230010057 DOSIS QUIMICA THOR GEL DE 5 kg und S/ 1,362.78 S/ -
230010136 CINTA AISLANTE ml S/ 1,105.15 S/ -
230010143 SELLADOR BLANCO PARA MUROS gal S/ 0.28 S/ -
230010147 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal S/ 405.58 S/ -
230010151 ASCENSOR 03 PARADAS CON CUARTO DE MAQUINAS und S/ 29,880.67 S/ -
230010155 ASCENSOR 02 PARADAS CON CUARTO DE MAQUINAS und S/ 28,540.28 S/ -
230100010 EXTINTOR C02 DE 15 LIBRAS und S/ 736.71 S/ -
230990125 MANOMETRO DE GLICERINA DE 0-300psi und S/ 37.85 S/ -
230990126 MANOMETRO DE GLICERINA DE 0-100psi und S/ 36.45 S/ -
230990127 BALON DE GAS 100 LBS (INCLUYE GAS) und S/ 782.80 S/ -
230990128 REGULADOR FISHER C/NIPLES DE CONEX R962 und S/ 597.40 S/ -
230990168 SUM. E INSTALACION DE SUB ESTACION ZONA ACADEMICA glb S/ 44,373.52 S/ -
230990169 SUM. E INSTALACION DE SUB ESTACION ZONA DEPORTIVA glb S/ 47,022.71 S/ -
230990171 TANQUE DE GAS DE 1000 GALONES (INC. ACCESORIOS Y VALV und S/ 3,738.90 S/ -
230990176 MANOMETRO DE PRESION und S/ 48.00 S/ -
230990177 POOL DE CHICOTE COBRE ALTA PRESION TERMNAL TANQUE Y und S/ 17.33 S/ -
231250001 CAJA DE CONCRETO C/TAPA und S/ 126.20 S/ -
231250025 CAJA DE CONCRETO C/TAPA 40 X 40 X 40 cm und S/ 107.12 S/ -
243010001 MADERA TORNILLO p2 S/ 542.04 S/ -
243100001 MADERA CEDRO p2 S/ 0.06 S/ -
251050005 BALON DE GAS 100 LBS (INCLUYE GAS) m S/ 45.99 S/ -
251200002 PLATINA DE FIERRO 1/8" x 1" m S/ 1.76 S/ -
251200023 PLATINA DE FIERRO 114" X 1" m S/ 290.36 S/ -
251200096 PLATINA DE FIERRO 118" X 314" m S/ 1.36 S/ -
251300054 TUBERIA DE 0 2" ACEDRO CELULA 40 m S/ 36.86 S/ -
251300055 TUBERIA DE 0 1" ACEDRO CELULA 40 m S/ 17.85 S/ -
251300056 UNION DE 0 2 ACEDRO CELULA 40 und S/ 13.27 S/ -
251300057 UNION DE 01" ACEDRO CELULA 40 und S/ 6.43 S/ -
254150020 PINTURA ESMALTE qal S/ 4.94 S/ -
254200001 PINTURA ANTICORROSIVA qal S/ 14.65 S/ -

IE441
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

261020015 PCHA FºGº P/MASTIL 118" 15x20cm C/ABRAZ und S/ 63.17 S/ -


261020024 GABINETE METALICO CON BARRA DE COBRE 24 POLOS und S/ 4,482.22 S/ -
261020031 GABINETE METALICO CON BARRA DE COBRE 36 POLOS und S/ 1,184.50 S/ -
261020034 CAJA PARA INTERRUPTOR und S/ 45.00 S/ -
261020035 GABINETE PARA EXTINTOR und S/ 186.21 S/ -
262010017 POSTE DE CONCRETO CENTRIF. 8ML und S/ 4,729.50 S/ -
262010019 POSTE DE CONCRETO CENTRIF. 25MU1200/210/585 PARA PAR und S/ 15,038.00 S/ -
262010021 TRANSPORTE TERRESTRE kg S/ 2,900.00 S/ -
262010022 POSTE DE CONCRETO ARMADO DE 11 MTS und S/ 1,086.67 S/ -
262120005 PASTORAL DE CONCRETO CENTRIFUGADO PARA LUMINARIA und S/ 147.63 S/ -
265010035 TUBO PROTECTOR DE FºGº 2"x4m C/02 ABRAZ . und S/ 151.95 S/ -
265010037 MASTIL DE FºGº 4" X9M C/ACOPLE S/DISEñO und S/ 673.33 S/ -
265010046 TUBERIA FºGº 1" m S/ 47.76 S/ -
265010066 TUBERIA FºGº 314" m S/ 46.34 S/ -
265250008 CAJA METALICA PARA VALVULAS und S/ 35.31 S/ -
265560039 NIPLE FºGº 2" und S/ 2.45 S/ -
265560040 NIPLE FºGº 1" und S/ 1.84 S/ -
265560041 NIPLE FºGº 314" und S/ 1.28 S/ -
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 12.61 S/ -
265570032 UNION UNIVERSAL FºGº 1" und S/ 14.80 S/ -
265570038 UNION UNIVERSAL FºGº 2" und S/ 19.71 S/ -
265590040 CODO FºGº 314 x 90º S/ 5.70 S/ -
265590041 CODO FºGº 1" x 90º und S/ 8.00 S/ -
268010001 TUBERIA DE COBRE TIPO "L" 112" m S/ 299.44 S/ -
268010002 TUBERIA DE COBRE TIPO "K" 2" m S/ 320.46 S/ -
268010003 TUBERIA DE COBRE TIPO "K" 11/2" m S/ 160.23 S/ -
268120002 PITON DE BRONCE DE 1/2" PARA SALIDA DE GAS und S/ 22.32 S/ -
268120003 CODO DE COBRE 1/2" und S/ 25.98 S/ -
268120004 CODO DE COBRE 2" TIPO K und S/ 35.68 S/ -
268120005 CODO DE COBRE 1 1/2" TIPO K und S/ 14.08 S/ -
272200003 TUBO PVC-P (ELEC.) 20mm 3M m S/ 4,138.03 S/ -
272200004 TUBO PVC-P (ELEC.) 25mm 3M m S/ 308.98 S/ -
272200010 TUBO PVC-P (ELEC.) 100mm 3M m S/ 128.75 S/ -
272200011 TUBO PVC-P (ELEC.) 35mm 3M m S/ 1,310.68 S/ 272.95
272200012 TUBO PVC-P (ELEC.) 50mm 3M m S/ 1,492.58 S/ -
272200014 TUBO PVC-P (ELEC.) 75mm 3M m S/ 97.09 S/ 6.47
272220029 TUBERIA CONDUIT DE 20mm m S/ 122.62 S/ -
272220030 CONECTOR CONDUIT DE 20mm und S/ 47.10 S/ -
272220031 CURVA EMT CONDUIT DE 20mm und S/ 39.84 S/ 1.66
272500003 CURVA PVC-P (ELEC.) 20mm und S/ 551.41 S/ 114.83
272500004 CURVA PVC-P {ELEC.) 25mm und S/ 48.09 S/ 10.02

IE442
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

272500013 UNION SIMPLE PVC-P (ELEC.) 20mm und S/ 16.00 S/ -


272500025 CONECTOR PVC 025MM und S/ 8.36 S/ -
272500029 CURVA PVC-P (ELEC.) 100mm und S/ 41.91 S/ -
272500030 CURVA PVC-P (ELEC.) 35mm und S/ 310.33 S/ -
272500031 CURVA PVC-P (ELEC.) 50mm und S/ 200.35 S/ -
272500032 CURVA PVC-P (ELEC.) 75mm und S/ 30.29 S/ 6.31
272500033 UNION DE COBRE 1/2" und S/ 23.26 S/ -
272510147 UNION DE COBRE 2" TIPO K und S/ 6.31 S/ 0.42
272510148 UNION DE COBRE 11/2" TIPO K und S/ 2.80 S/ -
272520069 TAPON HEMBRA DE COBRE 1/2" und S/ 12.27 S/ -
272610005 TEE DE COBR E 1/2" und S/ 11.75 S/ 0.49
272610008 TEE DE COBRE 2" TIPO K m S/ 24.66 S/ 5.14
272610009 TEE DE COBRE 11/2" TIPO K m S/ 10.33 S/ 0.34
277010015 VALVULA DE GLOBO DE 1/2" PARA GAS und S/ 401.70 S/ -
277010020 VALVULA DE SEGURIDAD DE 1/2" PARA GAS und S/ 10.83 S/ -
277010021 VALVULA DE GLOBO DE 1" und S/ 109.80 S/ -
277010022 VALVULA DE GLOBO DE 3/4" und S/ 290.87 S/ -
277110011 VALVULA CHECK PESADA DE BRONCE D=2 " und S/ 42.44 S/ -
277110027 VALVULA T PESADA DE BRONCE D=2" und S/ 42.44 S/ -
277210014 VÁLVULA REGULADORA DE PRESION DE 1ER Y 2DAAETAPA INC und S/ 96.67 S/ -
277210022 VALVULA DE LLENADO S/ 32.62 S/ -
und
277210023 VALVULA DE RETORNO und S/ 30.56 S/ -
277210024 ACOPLES DE INYECCION und S/ 26.78 S/ -
277210025 ACOPLE DE RESTORNO und S/ 23.00 S/ -
277210026 VALVULA DE SEGURIDAD ESFERICA 11/2" und S/ 93.33 S/ -
277210027 VALVULA DE SEGURIDAD ESFERICA 3/4" und S/ 43.33 S/ -
277210028 VALVULA DE ALIVIO DE PRESION und S/ 90.00 S/ -
277510018 SUMIDERO DE BRONCE 3" und S/ 36.80 S/ -
MEJORA S/ -
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 13.65 S/ -
202100002 ALAMBRE NEGRO Nro.16 kg S/ 4.93 S/ -
202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 14.25 S/ -
202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.00 S/ -
203010010 ACERO CORRUGADO GRADO 60 kg S/ 485.76 S/ -
204050001 ARENA GRUESA m3 S/ 569.50 S/ -
204050002 ARENA FINA m3 S/ 81.02 S/ -
204100010 TIERRA CERNIDA m3 S/ 482.98 S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 2,074.95 S/ -
205350001 AGUA und S/ 19.11 S/ -
206200005 CONECTOR DE BARRA DE 5/8" Y 3/4" und S/ 536.35

IE443
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

207050009 CONEXIONA CAJA PVC ELEC. SAP 25MM und S/ 12.37 S/ -


207900013 CONECTOR PVC 25mm und S/ 6.01 S/ -
206200011 CONECTOR PVC 55mm und S/ 45.01
206200019 CONECTOR PVC 20mm und S/ 221.42
206200028 CONECTOR PVC 35mm und S/ 148.45
206200030 CONECTOR PVC 100mm und S/ 8.44
206200031 CONECTOR PVC 75mm und S/ 5.13
206300002 CABLE HELICOIDAL DE 9m Cu und S/ 843.76
206550023 VARILLA DE COBRE 3/4"x 2.40Ín C/PUNTA und S/ 1,728.27
206560001 CABLE 1x16mm2 COBRE DESNUDO m3 S/ 17.80
206560002 CABLE 1x50mm2 COBRE DESNUDO m S/ 925.75
207050015 CONDUCTOR N2XOH - 1 x 300mm m S/ 2,293.19 S/ -
207050016 CONDUCTOR N2XOH - 1 x 25mm2 m S/ 1,162.81 S/ -
207050017 CONDUCTOR N2XOH-1 x 10mm2 m S/ 11,248.14 S/ -
207050018 CONDUCTOR N2XOH - 1 x 6mm2 m S/ 3,531.68 S/ -
207050019 CONDUCTOR N2XOH - 1 x 16mm2 m S/ 2,900.81 S/ -
207050022 CONDUCTOR N2XOH -1 x 70mm2 m S/ 128.54 S/ -
207050023 CONDUCTOR N2XOH - 1 x 35mm2 m S/ 1,463.63 S/ -
207150013 CONDUCTOR NH-80, 4mm2 m S/ 4,475.89 S/ -
207150022 CONDUCTOR NH-80, 6mm2 m S/ 893.20 S/ -
207150023 CONDUCTOR NH-80, 2.5mm2 m S/ 10,650.04 S/ -
211250005 CORTACIRCUITO PARA POSTE DE CONCRETO und S/ 796.53 S/ -
211250010 SOPORTE P/TENSADO MOD.SA-9 DE FºGº C/AISLADOR und S/ 93.92 S/ -
211250012 SOPORTE P/TENSADO MOD.SA-7 DE FºGº C/AISLADOR und S/ 187.84 S/ -
211250041 CAPTOR CON DISPOSITIVO DE CEBADO und S/ 5,388.49 S/ -
212050115 ARTEF. ILUMINACION DE EMERGENCIA C/2 LAMP. 20W, 2 HORA und S/ 13,555.36 S/ -
212050123 ARTEFACTO SIMILAR RAS 3X36 und S/ 22,909.33 S/ -
212050124 ARTEFACTO SIMILAR RAS 2X36 und S/ 6,236.49 S/ -
212050125 ARTEFACTO SIMILAR TPC 132 und S/ 5,162.99 S/ -
212050126 ARTEFACTO SIMILAR TPR 2X18 und S/ 5,796.57 S/ -
212050127 ARTEFACTO SIMILAR RSP 2X18W und S/ 4,633.93 S/ -
212050128 ARTEFACTO SIMILAR ULTR AA2X18 und S/ 747.43 S/ -
212050129 REFLECTOR TIPO ARAN 1X70 und S/ 520.66 S/ -
212050130 REFLECTOR TIPO MERH - 250 und S/ 1,249.60 S/ -
212050131 ARTEFACTO SIMILAR A GEOTEC 1X35 und S/ 890.91 S/ -
212050132 ARTEFACTO PARA ADOSAR TIPO ALPHA SP.O A 1X20W und S/ 104.13 S/ -
212050133 WALL SOKETE, CON LAMPARA AHORRADORA DE 20W und S/ 27.77 S/ -
212050134 BRAQUETE DE 2 LAMPARAS DE 18W SIMILAR A RSP-2 JOSFEL und S/ 2,343.00 S/ -
212050135 ARTEFACTO PARA ADOSAR, 1 LAMPARA DE 32 W, SIMILAR AL TI und S/ 1,703.25 S/ -
212050136 ARTEFACTO PARA ADOSAR Y/O COLGAR, CON LAMPARA FLUOREC und S/ 3,147.27 S/ -
212050137 ARTEFACTO ADOSADO, CON DOS LAMPARAS 18W, SIMILAR AL TI und S/ 87.93 S/ -

IE444
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212050138 ARTEFACTO PARA SUSPENDER, CON 2 LAMPARAS FLUORECENTESund S/ 1,700.86 S/ -


212050139 ARTEFACTO PARA ADOSAR, CON 3 LAMPARAS DE 36W, SIMILARund_x000D_ S/ 1,041.33 S/ -
212050140 ARTEFACTO PARA SUSPENDER, CON 3 FLUORECENTES DE 36_x000D_ und S/ 370.27 S/ -
212050141 W, SIMILAR AL
ARTEFACTO TIPOADOSAR,
PARA ISP 3x36W
CON LAMPARA FLUORECENTE DE 36W und S/ 592.43 S/ -
212050142 ARTEFACTOREFLECTOR CON LAMPARA DE 250 W, SIMILAR AL T und S/ 6,768.67 S/ -
212050143 BRAQUETE REFLECTOR CON 2 LAMPARAS LED DE 18W SIMILAR und S/ 395.70 S/ -
212050144 ARTEFACTO PARA ADOSAR, SIMILAR AL TIPO ALPHA SPOT A, C und S/ 138.84 S/ -
212050145 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 842.31 S/ -
212050146 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 2,166.00 S/ -
212050147 ARTEFACTO DE ILUMINACION CON LAMAPARA LED DE 36W, PROT und S/ 1,230.82 S/ -
212050148 ARTEFACTO DE ILUMINACION CON LAMPARA LED DE 36W, PROTEC und S/ 3,429.50 S/ -
212050149 REFLECTORES CON LAMPARAS DE 250 W , HALOGENURO META und S/ 879.33 S/ -
212050150 ARTEFACTO TIPO ASTRO-70, CON LAMPARA DE 70W HALOGEN und S/ 5,825.58 S/ -
212050151 PASTORAL SIMPLE TIPO SUCRE und S/ 1,050.00 S/ -
212050152 PASTORAL DOBLE TIPO SUCRE und S/ 100.00 S/ -
212050153 REFLECTOR SIMILAR A ARAN, CON LAMPARA DE 150W HALO und S/ 1,475.20 S/ -
212050154 ARTEFACTO SIMILARA AHR-1X36 + KIT DE EMERGENCIA und S/ 3,471.07 S/ -
212050155 ARTEFACTO SIMILAR AHR-1X36 und S/ 1,423.11 S/ -
212050156 CAMPANILLA DE TIMBRE DE 8" DE DIAMETRO und S/ 229.97 S/ -
212050157 CAMPANILLA DE TIMBRE DE 4" DE DIAMETRO und S/ 72.63 S/ -
212050159 SENSOR DE TEMPERATURA Y/O HUMO und S/ 248.79 S/ -
212150002 CAJA GALV. RECT. PESADA 4" x 2" x 21/4" und S/ 846.77 S/ -
212150011 CAJA GALV. OCTOGONAL PESADA 4" und S/ 862.61 S/ -
212150035 CAJA DE PASE GALVANIZADA 4" x 4" x 2" und S/ 366.50 S/ -
212150036 CAJA DE PASE GALVANIZADA OCTOGONAL (100X55mm) und S/ 40.48 S/ -
212150039 CAJA DE PASE GALVANIZADA (150X150X75mm) und S/ 185.13 S/ -
212150041 CAJA DE PASE GALVANIZADA (200X200X100mm) und S/ 145.86 S/ -
212150042 CAJA DE PASE GALVANIZADA (300X300X100mm) und S/ 224.00 S/ -
212150043 CAJA DE PASE GALVANIZADA (100X100X100mm) und S/ 93.51 S/ -
212150044 CAJA DE PASE GALVANIZADA (100X100X50mm) und S/ 31.64 S/ -
212150045 TAPA CIEGA DE 300X300 und S/ 57.72 S/ -
212150046 TAPA CIEGA DE 200X200 und S/ 5.10 S/ -
212150047 TAPA CIEGA DE 150X150 und S/ 3.63 S/ -
212150048 CAJA DE PASE GALVANIZADA (100X50X55mm) und S/ 9.71 S/ -
212150049 TAPA CIEGA OCTOGONAL DE 100 und S/ 20.88 S/ -
212250004 INTERRUPTOR 2 GOLPE SIMILAR TIPO TICINO und S/ 545.39 S/ -
212250078 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und S/ 1,140.92 S/ -
212250080 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und S/ 1,106.35 S/ -
212250092 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und S/ 752.00 S/ -
212250093 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und S/ 465.18 S/ -
212250095 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und S/ 77.53 S/ -

IE445
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212250103 INTERRUPTOR TERMOMAGNETICO - 3 x 20 A und S/ 158.60 S/ -


212250132 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und S/ 354.38 S/ -
212250134 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und S/ 470.00 S/ -
212250140 INTERRUPTOR DIFERENCIAL 2X25A-30MA und S/ 13,844.08 S/ -
212250143 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und S/ 25.84 S/ -
212250144 INTERRUPTOR TERMOMAGNETICO - 2 x 50 A und S/ 24.68 S/ -
212250145 INTERRUPTOR 1 GOLPE SIMILAR TIPO TICINO und S/ 255.64 S/ -
212250146 INTERRUPTOR DE CONMUTACION SIMILAR TIPO TICINO und S/ 1,025.89 S/ -
212250147 INTERRUPTOR 3 GOLPES SIMILAR TIPO TICINO und S/ 300.07 S/ -
212250148 PULSADOR DE TIMBRE und S/ 28.82 S/ -
212250150 INTERRUPTOR TERMOMAGNETICO - 2 x 40 A und S/ 34.91 S/ -
212250152 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 16KA und S/ 62.56 S/ -
212250153 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 20KA und S/ 250.23 S/ -
212250154 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A 20KA und S/ 83.65 S/ -
212250155 INTERRUPTOR TERMOMAGNETICO- 3 x 70 A 16KA und S/ 62.56 S/ -
212250156 INTERRUPTOR DIFERENCIAL 2X40A-30MA und S/ 988.80 S/ -
212250164 INTERRUPTOR TERMOMAGNETICO- 3 x 60 A 10KA und S/ 16.29 S/ -
212250168 INTERRUPTOR TERMOMAGNETICO-3 x 125 A 25KA und S/ 167.30 S/ -
212250171 CONTACTOR ELECTRICO 2 X 20 A und S/ 319.32 S/ -
212250172 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A 20KA und S/ 125.11 S/ -
212250173 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 20KA und S/ 32.59 S/ -
212250174 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 16KA und S/ 32.59 S/ -
212250181 CONTROL DE NIVEL und S/ 281.19 S/ -
212250182 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA EN CISTERNA und S/ 86.52 S/ -
212250189 TG (TABLERO AUTOSOPORTADO, ITM: 11X40A 10KA, 4 2X20A 10KA, und S/ 4,549.17 S/ -
212250190 TG - 6 (TABLERO AUTOSOPORTADO, ITM: 2 2X40A, 3 2X20A, 1 2X60 2und S/ 3,536.33 S/ -
212300022 TOMA PARA RED DATA (DADO) und S/ 1,926.22 S/ -
212300025 TOMACORRIENTE DOBLE C/ LINEA DE TIERRA SIMILAR TIPO TI und S/ 4,612.63 S/ -
212300028 TOMACORRIENTE DOBLE A PRUEBA DE AGUA und S/ 654.50 S/ -
212350060 PLACA SALIDA PARA TV o TELEFONO und S/ 662.15 S/ -
212350062 PLACA DE ALUMINIO ANODIZADO 1 PERFORACION und S/ 1,058.20 S/ -
212350063 PLACA DE ALUMINIO ANODIZADO 2 PERFORACION und S/ 929.13 S/ -
219600001 CABLE DESNUDO 50MM2 (1/0 AWG) m S/ 564.27 S/ -
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 4,488.01 S/ -
221030015 MARCO Y TAPA DE BUZON ELECTRICO und S/ 1,726.67 S/ -
221030016 MARCO Y TAPA DE BUZON COMUNICACIONES und S/ 2,461.01 S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 3.89 S/ -
230010030 CINTA TEFLON m S/ 0.11 S/ -
230010057 DOSIS QUIMICA THOR GEL DE 5 kg und S/ 1,362.78 S/ -
230010136 CINTA AISLANTE ml S/ 1,105.15 S/ -
230010143 SELLADOR BLANCO PARA MUROS gal S/ 0.28 S/ -

IE446
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

230010147 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal S/ 405.58 S/ -


230010151 ASCENSOR 03 PARADAS CON CUARTO DE MAQUINAS und S/ 29,880.67 S/ -
230010155 ASCENSOR 02 PARADAS CON CUARTO DE MAQUINAS und S/ 28,540.28 S/ -
230100010 EXTINTOR C02 DE 15 LIBRAS und S/ 736.71 S/ -
230990125 MANOMETRO DE GLICERINA DE 0-300psi und S/ 37.85 S/ -
230990126 MANOMETRO DE GLICERINA DE 0-100psi und S/ 36.45 S/ -
230990127 BALON DE GAS 100 LBS (INCLUYE GAS) und S/ 782.80 S/ -
230990128 REGULADOR FISHER C/NIPLES DE CONEX R962 und S/ 597.40 S/ -
230990168 SUM. E INSTALACION DE SUB ESTACION ZONA ACADEMICA glb S/ 44,373.52 S/ -
230990169 SUM. E INSTALACION DE SUB ESTACION ZONA DEPORTIVA glb S/ 47,022.71 S/ -
230990171 TANQUE DE GAS DE 1000 GALONES (INC. ACCESORIOS Y VALV und S/ 3,738.90 S/ -
230990176 MANOMETRO DE PRESION und S/ 48.00 S/ -
230990177 POOL DE CHICOTE COBRE ALTA PRESION TERMNAL TANQUE Y und S/ 17.33 S/ -
231250001 CAJA DE CONCRETO C/TAPA und S/ 126.20 S/ -
231250025 CAJA DE CONCRETO C/TAPA 40 X 40 X 40 cm und S/ 107.12 S/ -
243010001 MADERA TORNILLO p2 S/ 542.04 S/ -
243100001 MADERA CEDRO p2 S/ 0.06 S/ -
251050005 BALON DE GAS 100 LBS (INCLUYE GAS) m S/ 45.99 S/ -
251200002 PLATINA DE FIERRO 1/8" x 1" m S/ 1.76 S/ -
251200023 PLATINA DE FIERRO 114" X 1" m S/ 290.36 S/ -
251200096 PLATINA DE FIERRO 118" X 314" m S/ 1.36 S/ -
251300054 TUBERIA DE 0 2" ACEDRO CELULA 40 m S/ 36.86 S/ -
251300055 TUBERIA DE 0 1" ACEDRO CELULA 40 m S/ 17.85 S/ -
251300056 UNION DE 0 2 ACEDRO CELULA 40 und S/ 13.27 S/ -
251300057 UNION DE 01" ACEDRO CELULA 40 und S/ 6.43 S/ -
254150020 PINTURA ESMALTE qal S/ 4.94 S/ -
254200001 PINTURA ANTICORROSIVA qal S/ 14.65 S/ -
261020015 PCHA FºGº P/MASTIL 118" 15x20cm C/ABRAZ und S/ 63.17 S/ -
261020024 GABINETE METALICO CON BARRA DE COBRE 24 POLOS und S/ 4,482.22 S/ -
261020031 GABINETE METALICO CON BARRA DE COBRE 36 POLOS und S/ 1,184.50 S/ -
261020034 CAJA PARA INTERRUPTOR und S/ 45.00 S/ -
261020035 GABINETE PARA EXTINTOR und S/ 186.21 S/ -
262010017 POSTE DE CONCRETO CENTRIF. 8ML und S/ 4,729.50 S/ -
262010019 POSTE DE CONCRETO CENTRIF. 25MU1200/210/585 PARA PAR und S/ 15,038.00 S/ -
262010021 TRANSPORTE TERRESTRE kg S/ 2,900.00 S/ -
262010022 POSTE DE CONCRETO ARMADO DE 11 MTS und S/ 1,086.67 S/ -
262120005 PASTORAL DE CONCRETO CENTRIFUGADO PARA LUMINARIA und S/ 147.63 S/ -
265010035 TUBO PROTECTOR DE FºGº 2"x4m C/02 ABRAZ . und S/ 151.95 S/ -
265010037 MASTIL DE FºGº 4" X9M C/ACOPLE S/DISEñO und S/ 673.33 S/ -
265010046 TUBERIA FºGº 1" m S/ 47.76 S/ -
265010066 TUBERIA FºGº 314" m S/ 46.34 S/ -

IE447
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

265250008 CAJA METALICA PARA VALVULAS und S/ 35.31 S/ -


265560039 NIPLE FºGº 2" und S/ 2.45 S/ -
265560040 NIPLE FºGº 1" und S/ 1.84 S/ -
265560041 NIPLE FºGº 314" und S/ 1.28 S/ -
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 12.61 S/ -
265570032 UNION UNIVERSAL FºGº 1" und S/ 14.80 S/ -
265570038 UNION UNIVERSAL FºGº 2" und S/ 19.71 S/ -
265590040 CODO FºGº 314 x 90º S/ 5.70 S/ -
265590041 CODO FºGº 1" x 90º und S/ 8.00 S/ -
268010001 TUBERIA DE COBRE TIPO "L" 112" m S/ 299.44 S/ -
268010002 TUBERIA DE COBRE TIPO "K" 2" m S/ 320.46 S/ -
268010003 TUBERIA DE COBRE TIPO "K" 11/2" m S/ 160.23 S/ -
268120002 PITON DE BRONCE DE 1/2" PARA SALIDA DE GAS und S/ 22.32 S/ -
268120003 CODO DE COBRE 1/2" und S/ 25.98 S/ -
268120004 CODO DE COBRE 2" TIPO K und S/ 35.68 S/ -
268120005 CODO DE COBRE 1 1/2" TIPO K und S/ 14.08 S/ -
272200003 TUBO PVC-P (ELEC.) 20mm 3M m S/ 4,138.03 S/ -
272200004 TUBO PVC-P (ELEC.) 25mm 3M m S/ 308.98 S/ -
272200010 TUBO PVC-P (ELEC.) 100mm 3M m S/ 128.75 S/ -
272200011 TUBO PVC-P (ELEC.) 35mm 3M m S/ 1,310.68 S/ 272.95
272200012 TUBO PVC-P (ELEC.) 50mm 3M m S/ 1,492.58 S/ -
272200014 TUBO PVC-P (ELEC.) 75mm 3M m S/ 97.09 S/ 6.47
272220029 TUBERIA CONDUIT DE 20mm m S/ 122.62 S/ -
272220030 CONECTOR CONDUIT DE 20mm und S/ 47.10 S/ -
272220031 CURVA EMT CONDUIT DE 20mm und S/ 39.84 S/ 1.66
272500003 CURVA PVC-P (ELEC.) 20mm und S/ 551.41 S/ 114.83
272500004 CURVA PVC-P {ELEC.) 25mm und S/ 48.09 S/ 10.02
272500013 UNION SIMPLE PVC-P (ELEC.) 20mm und S/ 16.00 S/ -
272500025 CONECTOR PVC 025MM und S/ 8.36 S/ -
272500029 CURVA PVC-P (ELEC.) 100mm und S/ 41.91 S/ -
272500030 CURVA PVC-P (ELEC.) 35mm und S/ 310.33 S/ -
272500031 CURVA PVC-P (ELEC.) 50mm und S/ 200.35 S/ -
272500032 CURVA PVC-P (ELEC.) 75mm und S/ 30.29 S/ 6.31
272500033 UNION DE COBRE 1/2" und S/ 23.26 S/ -
272510147 UNION DE COBRE 2" TIPO K und S/ 6.31 S/ 0.42
272510148 UNION DE COBRE 11/2" TIPO K und S/ 2.80 S/ -
272520069 TAPON HEMBRA DE COBRE 1/2" und S/ 12.27 S/ -
272610005 TEE DE COBR E 1/2" und S/ 11.75 S/ 0.49
272610008 TEE DE COBRE 2" TIPO K m S/ 24.66 S/ 5.14
272610009 TEE DE COBRE 11/2" TIPO K m S/ 10.33 S/ 0.34
277010015 VALVULA DE GLOBO DE 1/2" PARA GAS und S/ 401.70 S/ -

IE448
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

277010020 VALVULA DE SEGURIDAD DE 1/2" PARA GAS und S/ 10.83 S/ -


277010021 VALVULA DE GLOBO DE 1" und S/ 109.80 S/ -
277010022 VALVULA DE GLOBO DE 3/4" und S/ 290.87 S/ -
277110011 VALVULA CHECK PESADA DE BRONCE D=2 " und S/ 42.44 S/ -
277110027 VALVULA T PESADA DE BRONCE D=2" und S/ 42.44 S/ -
277210014 VÁLVULA REGULADORA DE PRESION DE 1ER Y 2DAAETAPA INC und S/ 96.67 S/ -
277210022 VALVULA DE LLENADO S/ 32.62 S/ -
und
277210023 VALVULA DE RETORNO und S/ 30.56 S/ -
277210024 ACOPLES DE INYECCION und S/ 26.78 S/ -
277210025 ACOPLE DE RESTORNO und S/ 23.00 S/ -
277210026 VALVULA DE SEGURIDAD ESFERICA 11/2" und S/ 93.33 S/ -
277210027 VALVULA DE SEGURIDAD ESFERICA 3/4" und S/ 43.33 S/ -
277210028 VALVULA DE ALIVIO DE PRESION und S/ 90.00 S/ -
277510018 SUMIDERO DE BRONCE 3" und S/ 36.80 S/ -
DEFICIENCIA S/ -
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 13.65 S/ -
202100002 ALAMBRE NEGRO Nro.16 kg S/ 4.93 S/ -
202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 14.25 S/ -
202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.00 S/ -
203010010 ACERO CORRUGADO GRADO 60 kg S/ 485.76 S/ -
204050001 ARENA GRUESA m3 S/ 569.50 S/ -
204050002 ARENA FINA m3 S/ 81.02 S/ -
204100010 TIERRA CERNIDA m3 S/ 482.98 S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 2,074.95 S/ -
205350001 AGUA und S/ 19.11 S/ -
206200005 CONECTOR DE BARRA DE 5/8" Y 3/4" und S/ 536.35
207050009 CONEXIONA CAJA PVC ELEC. SAP 25MM und S/ 12.37 S/ -
207900013 CONECTOR PVC 25mm und S/ 6.01 S/ -
206200011 CONECTOR PVC 55mm und S/ 45.01
206200019 CONECTOR PVC 20mm und S/ 221.42
206200028 CONECTOR PVC 35mm und S/ 148.45
206200030 CONECTOR PVC 100mm und S/ 8.44
206200031 CONECTOR PVC 75mm und S/ 5.13
206300002 CABLE HELICOIDAL DE 9m Cu und S/ 843.76
206550023 VARILLA DE COBRE 3/4"x 2.40Ín C/PUNTA und S/ 1,728.27
206560001 CABLE 1x16mm2 COBRE DESNUDO m3 S/ 17.80
206560002 CABLE 1x50mm2 COBRE DESNUDO m S/ 925.75
207050015 CONDUCTOR N2XOH - 1 x 300mm m S/ 2,293.19 S/ -
207050016 CONDUCTOR N2XOH - 1 x 25mm2 m S/ 1,162.81 S/ -
207050017 CONDUCTOR N2XOH-1 x 10mm2 m S/ 11,248.14 S/ -

IE449
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

207050018 CONDUCTOR N2XOH - 1 x 6mm2 m S/ 3,531.68 S/ -


207050019 CONDUCTOR N2XOH - 1 x 16mm2 m S/ 2,900.81 S/ -
207050022 CONDUCTOR N2XOH -1 x 70mm2 m S/ 128.54 S/ -
207050023 CONDUCTOR N2XOH - 1 x 35mm2 m S/ 1,463.63 S/ -
207150013 CONDUCTOR NH-80, 4mm2 m S/ 4,475.89 S/ -
207150022 CONDUCTOR NH-80, 6mm2 m S/ 893.20 S/ -
207150023 CONDUCTOR NH-80, 2.5mm2 m S/ 10,650.04 S/ -
211250005 CORTACIRCUITO PARA POSTE DE CONCRETO und S/ 796.53 S/ -
211250010 SOPORTE P/TENSADO MOD.SA-9 DE FºGº C/AISLADOR und S/ 93.92 S/ -
211250012 SOPORTE P/TENSADO MOD.SA-7 DE FºGº C/AISLADOR und S/ 187.84 S/ -
211250041 CAPTOR CON DISPOSITIVO DE CEBADO und S/ 5,388.49 S/ -
212050115 ARTEF. ILUMINACION DE EMERGENCIA C/2 LAMP. 20W, 2 HORA und S/ 13,555.36 S/ -
212050123 ARTEFACTO SIMILAR RAS 3X36 und S/ 22,909.33 S/ -
212050124 ARTEFACTO SIMILAR RAS 2X36 und S/ 6,236.49 S/ -
212050125 ARTEFACTO SIMILAR TPC 132 und S/ 5,162.99 S/ -
212050126 ARTEFACTO SIMILAR TPR 2X18 und S/ 5,796.57 S/ -
212050127 ARTEFACTO SIMILAR RSP 2X18W und S/ 4,633.93 S/ -
212050128 ARTEFACTO SIMILAR ULTR AA2X18 und S/ 747.43 S/ -
212050129 REFLECTOR TIPO ARAN 1X70 und S/ 520.66 S/ -
212050130 REFLECTOR TIPO MERH - 250 und S/ 1,249.60 S/ -
212050131 ARTEFACTO SIMILAR A GEOTEC 1X35 und S/ 890.91 S/ -
212050132 ARTEFACTO PARA ADOSAR TIPO ALPHA SP.O A 1X20W und S/ 104.13 S/ -
212050133 WALL SOKETE, CON LAMPARA AHORRADORA DE 20W und S/ 27.77 S/ -
212050134 BRAQUETE DE 2 LAMPARAS DE 18W SIMILAR A RSP-2 JOSFEL und S/ 2,343.00 S/ -
212050135 ARTEFACTO PARA ADOSAR, 1 LAMPARA DE 32 W, SIMILAR AL TI und S/ 1,703.25 S/ -
212050136 ARTEFACTO PARA ADOSAR Y/O COLGAR, CON LAMPARA FLUOREC und S/ 3,147.27 S/ -
212050137 ARTEFACTO ADOSADO, CON DOS LAMPARAS 18W, SIMILAR AL TI und S/ 87.93 S/ -
212050138 ARTEFACTO PARA SUSPENDER, CON 2 LAMPARAS FLUORECENTESund S/ 1,700.86 S/ -
212050139 ARTEFACTO PARA ADOSAR, CON 3 LAMPARAS DE 36W, SIMILARund_x000D_ S/ 1,041.33 S/ -
212050140 ARTEFACTO PARA SUSPENDER, CON 3 FLUORECENTES DE 36_x000D_ und S/ 370.27 S/ -
212050141 W, SIMILAR AL
ARTEFACTO TIPOADOSAR,
PARA ISP 3x36W
CON LAMPARA FLUORECENTE DE 36W und S/ 592.43 S/ -
212050142 ARTEFACTOREFLECTOR CON LAMPARA DE 250 W, SIMILAR AL T und S/ 6,768.67 S/ -
212050143 BRAQUETE REFLECTOR CON 2 LAMPARAS LED DE 18W SIMILAR und S/ 395.70 S/ -
212050144 ARTEFACTO PARA ADOSAR, SIMILAR AL TIPO ALPHA SPOT A, C und S/ 138.84 S/ -
212050145 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 842.31 S/ -
212050146 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 2,166.00 S/ -
212050147 ARTEFACTO DE ILUMINACION CON LAMAPARA LED DE 36W, PROT und S/ 1,230.82 S/ -
212050148 ARTEFACTO DE ILUMINACION CON LAMPARA LED DE 36W, PROTEC und S/ 3,429.50 S/ -
212050149 REFLECTORES CON LAMPARAS DE 250 W , HALOGENURO META und S/ 879.33 S/ -
212050150 ARTEFACTO TIPO ASTRO-70, CON LAMPARA DE 70W HALOGEN und S/ 5,825.58 S/ -
212050151 PASTORAL SIMPLE TIPO SUCRE und S/ 1,050.00 S/ -

IE450
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212050152 PASTORAL DOBLE TIPO SUCRE und S/ 100.00 S/ -


212050153 REFLECTOR SIMILAR A ARAN, CON LAMPARA DE 150W HALO und S/ 1,475.20 S/ -
212050154 ARTEFACTO SIMILARA AHR-1X36 + KIT DE EMERGENCIA und S/ 3,471.07 S/ -
212050155 ARTEFACTO SIMILAR AHR-1X36 und S/ 1,423.11 S/ -
212050156 CAMPANILLA DE TIMBRE DE 8" DE DIAMETRO und S/ 229.97 S/ -
212050157 CAMPANILLA DE TIMBRE DE 4" DE DIAMETRO und S/ 72.63 S/ -
212050159 SENSOR DE TEMPERATURA Y/O HUMO und S/ 248.79 S/ -
212150002 CAJA GALV. RECT. PESADA 4" x 2" x 21/4" und S/ 846.77 S/ -
212150011 CAJA GALV. OCTOGONAL PESADA 4" und S/ 862.61 S/ -
212150035 CAJA DE PASE GALVANIZADA 4" x 4" x 2" und S/ 366.50 S/ -
212150036 CAJA DE PASE GALVANIZADA OCTOGONAL (100X55mm) und S/ 40.48 S/ -
212150039 CAJA DE PASE GALVANIZADA (150X150X75mm) und S/ 185.13 S/ -
212150041 CAJA DE PASE GALVANIZADA (200X200X100mm) und S/ 145.86 S/ -
212150042 CAJA DE PASE GALVANIZADA (300X300X100mm) und S/ 224.00 S/ -
212150043 CAJA DE PASE GALVANIZADA (100X100X100mm) und S/ 93.51 S/ -
212150044 CAJA DE PASE GALVANIZADA (100X100X50mm) und S/ 31.64 S/ -
212150045 TAPA CIEGA DE 300X300 und S/ 57.72 S/ -
212150046 TAPA CIEGA DE 200X200 und S/ 5.10 S/ -
212150047 TAPA CIEGA DE 150X150 und S/ 3.63 S/ -
212150048 CAJA DE PASE GALVANIZADA (100X50X55mm) und S/ 9.71 S/ -
212150049 TAPA CIEGA OCTOGONAL DE 100 und S/ 20.88 S/ -
212250004 INTERRUPTOR 2 GOLPE SIMILAR TIPO TICINO und S/ 545.39 S/ -
212250078 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und S/ 1,140.92 S/ -
212250080 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und S/ 1,106.35 S/ -
212250092 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und S/ 752.00 S/ -
212250093 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und S/ 465.18 S/ -
212250095 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und S/ 77.53 S/ -
212250103 INTERRUPTOR TERMOMAGNETICO - 3 x 20 A und S/ 158.60 S/ -
212250132 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und S/ 354.38 S/ -
212250134 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und S/ 470.00 S/ -
212250140 INTERRUPTOR DIFERENCIAL 2X25A-30MA und S/ 13,844.08 S/ -
212250143 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und S/ 25.84 S/ -
212250144 INTERRUPTOR TERMOMAGNETICO - 2 x 50 A und S/ 24.68 S/ -
212250145 INTERRUPTOR 1 GOLPE SIMILAR TIPO TICINO und S/ 255.64 S/ -
212250146 INTERRUPTOR DE CONMUTACION SIMILAR TIPO TICINO und S/ 1,025.89 S/ -
212250147 INTERRUPTOR 3 GOLPES SIMILAR TIPO TICINO und S/ 300.07 S/ -
212250148 PULSADOR DE TIMBRE und S/ 28.82 S/ -
212250150 INTERRUPTOR TERMOMAGNETICO - 2 x 40 A und S/ 34.91 S/ -
212250152 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 16KA und S/ 62.56 S/ -
212250153 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 20KA und S/ 250.23 S/ -
212250154 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A 20KA und S/ 83.65 S/ -

IE451
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212250155 INTERRUPTOR TERMOMAGNETICO- 3 x 70 A 16KA und S/ 62.56 S/ -


212250156 INTERRUPTOR DIFERENCIAL 2X40A-30MA und S/ 988.80 S/ -
212250164 INTERRUPTOR TERMOMAGNETICO- 3 x 60 A 10KA und S/ 16.29 S/ -
212250168 INTERRUPTOR TERMOMAGNETICO-3 x 125 A 25KA und S/ 167.30 S/ -
212250171 CONTACTOR ELECTRICO 2 X 20 A und S/ 319.32 S/ -
212250172 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A 20KA und S/ 125.11 S/ -
212250173 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 20KA und S/ 32.59 S/ -
212250174 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 16KA und S/ 32.59 S/ -
212250181 CONTROL DE NIVEL und S/ 281.19 S/ -
212250182 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA EN CISTERNA und S/ 86.52 S/ -
212250189 TG (TABLERO AUTOSOPORTADO, ITM: 11X40A 10KA, 4 2X20A 10KA, und S/ 4,549.17 S/ -
212250190 TG - 6 (TABLERO AUTOSOPORTADO, ITM: 2 2X40A, 3 2X20A, 1 2X60 2und S/ 3,536.33 S/ -
212300022 TOMA PARA RED DATA (DADO) und S/ 1,926.22 S/ -
212300025 TOMACORRIENTE DOBLE C/ LINEA DE TIERRA SIMILAR TIPO TI und S/ 4,612.63 S/ -
212300028 TOMACORRIENTE DOBLE A PRUEBA DE AGUA und S/ 654.50 S/ -
212350060 PLACA SALIDA PARA TV o TELEFONO und S/ 662.15 S/ -
212350062 PLACA DE ALUMINIO ANODIZADO 1 PERFORACION und S/ 1,058.20 S/ -
212350063 PLACA DE ALUMINIO ANODIZADO 2 PERFORACION und S/ 929.13 S/ -
219600001 CABLE DESNUDO 50MM2 (1/0 AWG) m S/ 564.27 S/ -
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 4,488.01 S/ -
221030015 MARCO Y TAPA DE BUZON ELECTRICO und S/ 1,726.67 S/ -
221030016 MARCO Y TAPA DE BUZON COMUNICACIONES und S/ 2,461.01 S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 3.89 S/ -
230010030 CINTA TEFLON m S/ 0.11 S/ -
230010057 DOSIS QUIMICA THOR GEL DE 5 kg und S/ 1,362.78 S/ -
230010136 CINTA AISLANTE ml S/ 1,105.15 S/ -
230010143 SELLADOR BLANCO PARA MUROS gal S/ 0.28 S/ -
230010147 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal S/ 405.58 S/ -
230010151 ASCENSOR 03 PARADAS CON CUARTO DE MAQUINAS und S/ 29,880.67 S/ -
230010155 ASCENSOR 02 PARADAS CON CUARTO DE MAQUINAS und S/ 28,540.28 S/ -
230100010 EXTINTOR C02 DE 15 LIBRAS und S/ 736.71 S/ -
230990125 MANOMETRO DE GLICERINA DE 0-300psi und S/ 37.85 S/ -
230990126 MANOMETRO DE GLICERINA DE 0-100psi und S/ 36.45 S/ -
230990127 BALON DE GAS 100 LBS (INCLUYE GAS) und S/ 782.80 S/ -
230990128 REGULADOR FISHER C/NIPLES DE CONEX R962 und S/ 597.40 S/ -
230990168 SUM. E INSTALACION DE SUB ESTACION ZONA ACADEMICA glb S/ 44,373.52 S/ -
230990169 SUM. E INSTALACION DE SUB ESTACION ZONA DEPORTIVA glb S/ 47,022.71 S/ -
230990171 TANQUE DE GAS DE 1000 GALONES (INC. ACCESORIOS Y VALV und S/ 3,738.90 S/ -
230990176 MANOMETRO DE PRESION und S/ 48.00 S/ -
230990177 POOL DE CHICOTE COBRE ALTA PRESION TERMNAL TANQUE Y und S/ 17.33 S/ -
231250001 CAJA DE CONCRETO C/TAPA und S/ 126.20 S/ -

IE452
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

231250025 CAJA DE CONCRETO C/TAPA 40 X 40 X 40 cm und S/ 107.12 S/ -


243010001 MADERA TORNILLO p2 S/ 542.04 S/ -
243100001 MADERA CEDRO p2 S/ 0.06 S/ -
251050005 BALON DE GAS 100 LBS (INCLUYE GAS) m S/ 45.99 S/ -
251200002 PLATINA DE FIERRO 1/8" x 1" m S/ 1.76 S/ -
251200023 PLATINA DE FIERRO 114" X 1" m S/ 290.36 S/ -
251200096 PLATINA DE FIERRO 118" X 314" m S/ 1.36 S/ -
251300054 TUBERIA DE 0 2" ACEDRO CELULA 40 m S/ 36.86 S/ -
251300055 TUBERIA DE 0 1" ACEDRO CELULA 40 m S/ 17.85 S/ -
251300056 UNION DE 0 2 ACEDRO CELULA 40 und S/ 13.27 S/ -
251300057 UNION DE 01" ACEDRO CELULA 40 und S/ 6.43 S/ -
254150020 PINTURA ESMALTE qal S/ 4.94 S/ -
254200001 PINTURA ANTICORROSIVA qal S/ 14.65 S/ -
261020015 PCHA FºGº P/MASTIL 118" 15x20cm C/ABRAZ und S/ 63.17 S/ -
261020024 GABINETE METALICO CON BARRA DE COBRE 24 POLOS und S/ 4,482.22 S/ -
261020031 GABINETE METALICO CON BARRA DE COBRE 36 POLOS und S/ 1,184.50 S/ -
261020034 CAJA PARA INTERRUPTOR und S/ 45.00 S/ -
261020035 GABINETE PARA EXTINTOR und S/ 186.21 S/ -
262010017 POSTE DE CONCRETO CENTRIF. 8ML und S/ 4,729.50 S/ -
262010019 POSTE DE CONCRETO CENTRIF. 25MU1200/210/585 PARA PAR und S/ 15,038.00 S/ -
262010021 TRANSPORTE TERRESTRE kg S/ 2,900.00 S/ -
262010022 POSTE DE CONCRETO ARMADO DE 11 MTS und S/ 1,086.67 S/ -
262120005 PASTORAL DE CONCRETO CENTRIFUGADO PARA LUMINARIA und S/ 147.63 S/ -
265010035 TUBO PROTECTOR DE FºGº 2"x4m C/02 ABRAZ . und S/ 151.95 S/ -
265010037 MASTIL DE FºGº 4" X9M C/ACOPLE S/DISEñO und S/ 673.33 S/ -
265010046 TUBERIA FºGº 1" m S/ 47.76 S/ -
265010066 TUBERIA FºGº 314" m S/ 46.34 S/ -
265250008 CAJA METALICA PARA VALVULAS und S/ 35.31 S/ -
265560039 NIPLE FºGº 2" und S/ 2.45 S/ -
265560040 NIPLE FºGº 1" und S/ 1.84 S/ -
265560041 NIPLE FºGº 314" und S/ 1.28 S/ -
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 12.61 S/ -
265570032 UNION UNIVERSAL FºGº 1" und S/ 14.80 S/ -
265570038 UNION UNIVERSAL FºGº 2" und S/ 19.71 S/ -
265590040 CODO FºGº 314 x 90º S/ 5.70 S/ -
265590041 CODO FºGº 1" x 90º und S/ 8.00 S/ -
268010001 TUBERIA DE COBRE TIPO "L" 112" m S/ 299.44 S/ -
268010002 TUBERIA DE COBRE TIPO "K" 2" m S/ 320.46 S/ -
268010003 TUBERIA DE COBRE TIPO "K" 11/2" m S/ 160.23 S/ -
268120002 PITON DE BRONCE DE 1/2" PARA SALIDA DE GAS und S/ 22.32 S/ -
268120003 CODO DE COBRE 1/2" und S/ 25.98 S/ -

IE453
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

268120004 CODO DE COBRE 2" TIPO K und S/ 35.68 S/ -


268120005 CODO DE COBRE 1 1/2" TIPO K und S/ 14.08 S/ -
272200003 TUBO PVC-P (ELEC.) 20mm 3M m S/ 4,138.03 S/ -
272200004 TUBO PVC-P (ELEC.) 25mm 3M m S/ 308.98 S/ -
272200010 TUBO PVC-P (ELEC.) 100mm 3M m S/ 128.75 S/ -
272200011 TUBO PVC-P (ELEC.) 35mm 3M m S/ 1,310.68 S/ 272.95
272200012 TUBO PVC-P (ELEC.) 50mm 3M m S/ 1,492.58 S/ -
272200014 TUBO PVC-P (ELEC.) 75mm 3M m S/ 97.09 S/ 6.47
272220029 TUBERIA CONDUIT DE 20mm m S/ 122.62 S/ -
272220030 CONECTOR CONDUIT DE 20mm und S/ 47.10 S/ -
272220031 CURVA EMT CONDUIT DE 20mm und S/ 39.84 S/ 1.66
272500003 CURVA PVC-P (ELEC.) 20mm und S/ 551.41 S/ 114.83
272500004 CURVA PVC-P {ELEC.) 25mm und S/ 48.09 S/ 10.02
272500013 UNION SIMPLE PVC-P (ELEC.) 20mm und S/ 16.00 S/ -
272500025 CONECTOR PVC 025MM und S/ 8.36 S/ -
272500029 CURVA PVC-P (ELEC.) 100mm und S/ 41.91 S/ -
272500030 CURVA PVC-P (ELEC.) 35mm und S/ 310.33 S/ -
272500031 CURVA PVC-P (ELEC.) 50mm und S/ 200.35 S/ -
272500032 CURVA PVC-P (ELEC.) 75mm und S/ 30.29 S/ 6.31
272500033 UNION DE COBRE 1/2" und S/ 23.26 S/ -
272510147 UNION DE COBRE 2" TIPO K und S/ 6.31 S/ 0.42
272510148 UNION DE COBRE 11/2" TIPO K und S/ 2.80 S/ -
272520069 TAPON HEMBRA DE COBRE 1/2" und S/ 12.27 S/ -
272610005 TEE DE COBR E 1/2" und S/ 11.75 S/ 0.49
272610008 TEE DE COBRE 2" TIPO K m S/ 24.66 S/ 5.14
272610009 TEE DE COBRE 11/2" TIPO K m S/ 10.33 S/ 0.34
277010015 VALVULA DE GLOBO DE 1/2" PARA GAS und S/ 401.70 S/ -
277010020 VALVULA DE SEGURIDAD DE 1/2" PARA GAS und S/ 10.83 S/ -
277010021 VALVULA DE GLOBO DE 1" und S/ 109.80 S/ -
277010022 VALVULA DE GLOBO DE 3/4" und S/ 290.87 S/ -
277110011 VALVULA CHECK PESADA DE BRONCE D=2 " und S/ 42.44 S/ -
277110027 VALVULA T PESADA DE BRONCE D=2" und S/ 42.44 S/ -
277210014 VÁLVULA REGULADORA DE PRESION DE 1ER Y 2DAAETAPA INC und S/ 96.67 S/ -
277210022 VALVULA DE LLENADO S/ 32.62
und
277210023 VALVULA DE RETORNO und S/ 30.56
277210024 ACOPLES DE INYECCION und S/ 26.78
277210025 ACOPLE DE RESTORNO und S/ 23.00
277210026 VALVULA DE SEGURIDAD ESFERICA 11/2" und S/ 93.33
277210027 VALVULA DE SEGURIDAD ESFERICA 3/4" und S/ 43.33
277210028 VALVULA DE ALIVIO DE PRESION und S/ 90.00
277510018 SUMIDERO DE BRONCE 3" und S/ 36.80

IE454
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 05/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

TOTAL S/ 1,233,680.60 S/ 1,255.86

AVANCE PARCIAL 4.62%

AVANCE ACUMULADO 10.29%

IE455
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE456
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE457
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE458
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ - S/ -

IE459
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 46.35 S/ -
S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31
S/ 327.67 S/ 327.67 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 223.89 S/ 223.89 S/ 223.89 S/ 223.89
S/ 7.77 S/ 14.56 S/ 14.56 S/ 11.65 S/ 11.65 S/ 14.56
S/ - S/ - S/ - S/ 9.81 S/ 9.81 S/ 8.58
S/ - S/ 11.78 S/ 11.78 S/ 11.78 S/ 11.78 S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 3.98 S/ 5.98 S/ 5.98
S/ 137.85 S/ 137.85 S/ - S/ - S/ - S/ -
S/ 12.02 S/ - S/ - S/ - S/ - S/ -

IE460
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 4.00 S/ 4.00 S/ 4.00 S/ 4.00 S/ - S/ -


S/ - S/ - S/ - S/ 2.09 S/ 2.09 S/ 2.09
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 46.55 S/ -
S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05
S/ 7.57 S/ 7.57 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.49 S/ 3.49 S/ 3.49 S/ 3.49
S/ 0.50 S/ 0.95 S/ 0.95 S/ 0.76 S/ 0.76 S/ 0.95
S/ - S/ - S/ - S/ 0.22 S/ 0.22 S/ 0.20
S/ - S/ 3.07 S/ 3.07 S/ 3.07 S/ 3.07 S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 1.18 S/ 1.76 S/ 1.76
S/ 6.17 S/ 6.17 S/ - S/ - S/ - S/ -
S/ 0.62 S/ 0.83 S/ 1.03 S/ 0.62 S/ 0.93 S/ 1.65

IE461
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE462
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE463
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE464
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE465
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 61.80 S/ -
S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31
S/ 327.67 S/ 327.67 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 223.89 S/ 223.89 S/ 223.89 S/ 223.89
S/ 7.77 S/ 14.56 S/ 14.56 S/ 11.65 S/ 11.65 S/ 14.56
S/ - S/ - S/ - S/ 9.81 S/ 9.81 S/ 18.39
S/ - S/ 11.78 S/ 11.78 S/ 11.78 S/ 11.78 S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 5.98 S/ 3.98 S/ 5.98
S/ 137.85 S/ 137.85 S/ - S/ - S/ - S/ -
S/ 12.02 S/ - S/ - S/ - S/ - S/ -
S/ 4.00 S/ 4.00 S/ 4.00 S/ 4.00 S/ - S/ -
S/ - S/ - S/ - S/ 2.09 S/ 2.09 S/ 2.09
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 62.07 S/ -
S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05
S/ 7.57 S/ 7.57 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.49 S/ 3.49 S/ 3.49 S/ 3.49
S/ 0.50 S/ 0.95 S/ 0.95 S/ 0.76 S/ 0.76 S/ 0.95
S/ - S/ - S/ - S/ 0.22 S/ 0.22 S/ 0.42
S/ - S/ 3.07 S/ 3.07 S/ 3.07 S/ 3.07 S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 1.76 S/ 1.76 S/ 1.76
S/ 6.17 S/ 6.17 S/ - S/ - S/ - S/ -
S/ 0.62 S/ 0.83 S/ 1.03 S/ 0.62 S/ 0.93 S/ 1.65

IE466
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE467
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE468
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE469
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE470
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

IE471
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 61.80 S/ -
S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31
S/ 327.67 S/ 327.67 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 223.89 S/ 223.89 S/ 223.89 S/ 223.89
S/ 7.77 S/ 14.56 S/ 14.56 S/ 11.65 S/ 11.65 S/ 14.56
S/ - S/ - S/ - S/ 9.81 S/ 9.81 S/ 12.26
S/ - S/ 11.78 S/ 11.78 S/ 11.78 S/ 11.78 S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 5.98 S/ 3.98 S/ 5.98
S/ 137.85 S/ 137.85 S/ - S/ - S/ - S/ -
S/ 12.02 S/ - S/ - S/ - S/ - S/ -
S/ 4.00 S/ 4.00 S/ 4.00 S/ 4.00 S/ - S/ -
S/ - S/ - S/ - S/ 2.09 S/ 2.09 S/ 2.09
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 62.07 S/ -
S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05
S/ 7.57 S/ 7.57 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.49 S/ 3.49 S/ 3.49 S/ 3.49
S/ 0.50 S/ 0.95 S/ 0.95 S/ 0.76 S/ 0.76 S/ 0.95
S/ - S/ - S/ - S/ 0.22 S/ 0.22 S/ 0.28
S/ - S/ 3.07 S/ 3.07 S/ 3.07 S/ 3.07 S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 1.76 S/ 1.18 S/ 1.76
S/ 6.17 S/ 6.17 S/ - S/ - S/ - S/ -
S/ 0.62 S/ 0.83 S/ 1.03 S/ 0.62 S/ 0.93 S/ 1.65

IE472
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 1,668.35 S/ 1,699.15 S/ 944.12 S/ 982.84 S/ 1,310.40 S/ 951.33


7.70% 9.97% 7.51% 9.27% 11.14% 6.75%
17.99% 27.96% 35.47% 44.73% 55.87% 62.62%

IE473
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE474
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE475
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE476
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -

IE477
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ 1,034.51


S/ 30.90 S/ - S/ - S/ 77.24
S/ 12.88 S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 223.89 S/ 149.26 S/ 149.26 S/ 74.63
S/ 14.56 S/ - S/ - S/ -
S/ 9.81 S/ 14.71 S/ 14.71 S/ 18.39
S/ - S/ - S/ - S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -

IE478
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ 2.09 S/ - S/ - S/ -
S/ 10.48 S/ 10.48 S/ 10.48 S/ 10.48
S/ 31.03 S/ - S/ - S/ 77.58
S/ 20.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 3.49 S/ 2.33 S/ 2.33 S/ 1.16
S/ 0.95 S/ - S/ - S/ -
S/ 0.22 S/ 0.34 S/ 0.34 S/ 0.42
S/ - S/ - S/ - S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59
S/ - S/ - S/ - S/ -
S/ 1.86 S/ 0.83 S/ 0.83 S/ 0.52

IE479
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE480
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE481
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE482
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE483
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ 1,034.51


S/ 61.80 S/ - S/ - S/ 46.35
S/ 12.88 S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 223.89 S/ 149.26 S/ 149.26 S/ 74.63
S/ 14.56 S/ - S/ - S/ -
S/ 12.26 S/ 14.71 S/ 14.71 S/ 12.26
S/ - S/ - S/ - S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2.09 S/ - S/ - S/ -
S/ 10.48 S/ 10.48 S/ 10.48 S/ 10.48
S/ 62.07 S/ - S/ - S/ 46.55
S/ 20.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 3.49 S/ 2.33 S/ 2.33 S/ 1.16
S/ 0.95 S/ - S/ - S/ -
S/ 0.28 S/ 0.34 S/ 0.34 S/ 0.28
S/ - S/ - S/ - S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59
S/ - S/ - S/ - S/ -
S/ 1.86 S/ 0.83 S/ 0.83 S/ 0.52

IE484
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ -

IE485
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE486
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE487
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE488
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

IE489
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ 1,034.51


S/ 46.35 S/ - S/ - S/ 61.80
S/ 12.88 S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 223.89 S/ 149.26 S/ 149.26 S/ 74.63
S/ 14.56 S/ - S/ - S/ -
S/ 12.26 S/ 14.71 S/ 14.71 S/ 12.26
S/ - S/ - S/ - S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2.09 S/ - S/ - S/ -
S/ 10.48 S/ 10.48 S/ 10.48 S/ 10.48
S/ 46.55 S/ - S/ - S/ 62.07
S/ 20.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 3.49 S/ 2.33 S/ 2.33 S/ 1.16
S/ 0.95 S/ - S/ - S/ -
S/ 0.28 S/ 0.34 S/ 0.34 S/ 0.28
S/ - S/ - S/ - S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59
S/ - S/ - S/ - S/ -
S/ 1.86 S/ 0.83 S/ 0.83 S/ 0.52

IE490
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 4,295.73 S/ 3,645.07 S/ 3,645.07 S/ 3,787.10


9.27% 3.34% 4.09% 7.63% 6.33% 6.74%
71.89% 75.22% 79.31% 86.94% 93.26% 100.00%

IE491
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE492
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE493
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE494
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE495
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
227.37
0.00
5.39
0.00
0.00
1.38
95.65
8.34

IE496
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
5.25
0.00
0.35
0.00
0.00
0.41
4.28
0.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE497
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE498
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE499
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE500
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE501
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
227.37
0.00
5.39
0.00
0.00
1.38
95.65
8.34
0.00
0.00
0.00
0.00
0.00
5.25
0.00
0.35
0.00
0.00
0.41
4.28
0.29
0.00

IE502
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE503
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE504
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE505
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE506
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE507
ORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

0.00
0.00
0.00
0.00
0.00
227.37
0.00
5.39
0.00
0.00
1.38
95.65
8.34
0.00
0.00
0.00
0.00
0.00
5.25
0.00
0.35
0.00
0.00
0.41
4.28
0.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

IE508
IE509
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02

DEMOLICIÓN
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 15% 25%
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07
0202300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69
0202350009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 25%
0202350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98
0202350081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31
0202350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88
0202350084 PERNO 5/8" und S/ 57.89 5% 5%
0202350085 PERNO 1 1/4' x 12" und S/ 598.40
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 25%
0202350087 PERNO 1/2' A36 x 4" und S/ 25.06
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14
0202350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13
0202350091 TUERCA DE 3/8" und S/ 62.78 5% 5%
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 20% 25%
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08
0203010020 ACERO LISO DE 1" m S/ 161.83 25%
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35
0203010022 ACERO LISO DE 3/8' m S/ 644.91
0203010023 ACERO LISO DE 3/4" m S/ 633.70
0204050001 ARENA GRUESA m3 S/ 14,604.83
0204050002 ARENA FINA m3 S/ 0.10 5% 5%
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 25%
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 20% 25%
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76
0205350001 AGUA m3 S/ 1,368.63
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00

E510
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 25%
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03 5% 5%
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03 25%
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67 20% 25%
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00 25%
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98 5% 5%
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41 25%
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80 20% 25%
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86 25%
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24

E511
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60 5% 5%
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 25%
0238100001 AFIRMADO m3 S/ 39,205.70 20% 25%
0243010001 MADERA TORNILLO p2 S/ 133,765.32
0243010002 MADERA TORNILLO - A glb S/ 2,940.00
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00
0243010004 MADERA TORNILLO - C glb S/ 1,540.00
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 25%
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11 20% 25%
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92 25%
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53 25%
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62 5% 5%
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86 25%
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45 25%
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84 5% 5%

E512
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0272220052 TUBO PVC-SAP 3/4" m S/ 0.52
SUSTITUCIÓN
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 25% 25%
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07
0202300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69
0202350009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 25%
0202350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98
0202350081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31
0202350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88
0202350084 PERNO 5/8" und S/ 57.89 5% 5%
0202350085 PERNO 1 1/4' x 12" und S/ 598.40
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 25%
0202350087 PERNO 1/2' A36 x 4" und S/ 25.06
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14
0202350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13
0202350091 TUERCA DE 3/8" und S/ 62.78 5% 5%
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 20% 25%
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08
0203010020 ACERO LISO DE 1" m S/ 161.83 25%
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35
0203010022 ACERO LISO DE 3/8' m S/ 644.91
0203010023 ACERO LISO DE 3/4" m S/ 633.70
0204050001 ARENA GRUESA m3 S/ 14,604.83
0204050002 ARENA FINA m3 S/ 0.10 5% 5%
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 25%
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 20% 25%
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76
0205350001 AGUA m3 S/ 1,368.63
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88

E513
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18
0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 25%
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03 5% 5%
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03 25%
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67 20% 25%
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00 25%
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98 5% 5%
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41 25%
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80 20% 25%
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86 25%
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60 5% 5%

E514
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42
0238010001 HORMIGON m3 S/ 9,529.34 25%
0238100001 AFIRMADO m3 S/ 39,205.70 25% 25%
0243010001 MADERA TORNILLO p2 S/ 133,765.32
0243010002 MADERA TORNILLO - A glb S/ 2,940.00
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00
0243010004 MADERA TORNILLO - C glb S/ 1,540.00
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 25%
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11 25% 25%
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92 25%
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39 20% 25%
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53 25%
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62 5% 5%
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86 25%
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45 25%
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84 5% 5%
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52

E515
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02

SALDO
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 25% 25%
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07
0202300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69
0202350009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 25%
0202350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98
0202350081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31
0202350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88
0202350084 PERNO 5/8" und S/ 57.89 5% 5%
0202350085 PERNO 1 1/4' x 12" und S/ 598.40
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 25%
0202350087 PERNO 1/2' A36 x 4" und S/ 25.06
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14
0202350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13
0202350091 TUERCA DE 3/8" und S/ 62.78 5% 5%
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 20% 25%
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08
0203010020 ACERO LISO DE 1" m S/ 161.83 25%
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35
0203010022 ACERO LISO DE 3/8' m S/ 644.91
0203010023 ACERO LISO DE 3/4" m S/ 633.70
0204050001 ARENA GRUESA m3 S/ 14,604.83
0204050002 ARENA FINA m3 S/ 0.10 5% 5%
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 25%
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 20% 25%
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76
0205350001 AGUA m3 S/ 1,368.63
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18

E516
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 25%
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03 5% 5%
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03 25%
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67 25% 25%
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00 25%
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98 5% 5%
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41 25%
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80 20% 25%
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86 25%
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60 5% 5%
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42

E517
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0238010001 HORMIGON m3 S/ 9,529.34 25%
0238100001 AFIRMADO m3 S/ 39,205.70 20% 25%
0243010001 MADERA TORNILLO p2 S/ 133,765.32
0243010002 MADERA TORNILLO - A glb S/ 2,940.00
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00
0243010004 MADERA TORNILLO - C glb S/ 1,540.00
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 25%
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11 20% 25%
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92 25%
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39 25% 25%
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53 25%
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62 5% 5%
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86 25%
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45 25%
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84 5% 5%
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52

E518
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02

MEJORA
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 20% 25%
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07
0202300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69
0202350009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 25%
0202350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98
0202350081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31
0202350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88
0202350084 PERNO 5/8" und S/ 57.89 5% 5%
0202350085 PERNO 1 1/4' x 12" und S/ 598.40
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 25%
0202350087 PERNO 1/2' A36 x 4" und S/ 25.06
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14
0202350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13
0202350091 TUERCA DE 3/8" und S/ 62.78 5% 5%
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 20% 25%
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08
0203010020 ACERO LISO DE 1" m S/ 161.83 25%
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35
0203010022 ACERO LISO DE 3/8' m S/ 644.91
0203010023 ACERO LISO DE 3/4" m S/ 633.70
0204050001 ARENA GRUESA m3 S/ 14,604.83
0204050002 ARENA FINA m3 S/ 0.10 5% 5%
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 25%
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 20% 25%
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76
0205350001 AGUA m3 S/ 1,368.63
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18

E519
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 25%
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03 5% 5%
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03 25%
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67 20% 25%
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00 25%
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98 5% 5%
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41 25%
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80 20% 25%
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86 25%
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60 5% 5%
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42

E520
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0238010001 HORMIGON m3 S/ 9,529.34 25%
0238100001 AFIRMADO m3 S/ 39,205.70 20% 25%
0243010001 MADERA TORNILLO p2 S/ 133,765.32
0243010002 MADERA TORNILLO - A glb S/ 2,940.00
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00
0243010004 MADERA TORNILLO - C glb S/ 1,540.00
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 25%
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11 20% 30%
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92 25%
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39 20% 25%
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53 25%
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62 5% 5%
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86 25%
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45 25%
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84 5% 5%
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52

E521
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02

DEFICIENCIA
0202050036 FIERRO ROSCADO DE 1 1/8" m S/ 7.17 20% 25%
0202050037 ALAMBRE NEGRO Nro. 8 kg S/ 4,633.70
0202050038 ALAMBRE NEGRO Nro.16 kg S/ 17,674.66
0202200001 CLAVOS CON CABEZA DE 21/2 ", 3", 4" kg S/ 4,219.24
0202200003 CLAVOS CON CABEZA DE 3" und S/ 1,256.07
0202300017 PERNO DE EXPANSION DE 1/2" und S/ 380.69
0202350009 PERNO 1/4" X 7" CON TUERCA und S/ 1.24 25%
0202350079 BROCA DIAMANTADA 0 = 1/2" und S/ 5,968.98
0202350081 PERNO TIPO HILTI 3/4" X10" und S/ 666.56
0202350082 PERNO DE ANCJALE DE 3/4" X 800MM (A36) und S/ 133.31
0202350083 PERNO TIPO HILTI 5/8 "X10" und S/ 610.88
0202350084 PERNO 5/8" und S/ 57.89 5% 5%
0202350085 PERNO 1 1/4' x 12" und S/ 598.40
0202350086 EJE MELIIZO DE 2" X 0.40 und S/ 66.00 25%
0202350087 PERNO 1/2' A36 x 4" und S/ 25.06
0202350088 PERNO 5/8" x 25cm A-36 PARA TUERCA C/ARANDELA und S/ 11.14
0202350089 BROCA DIAMANTADA 0 = 5/8" und S/ 2,826.05
0202350090 BROCA DIAMANTADA 0 = 3/4 und S/ 1,121.13
0202350091 TUERCA DE 3/8" und S/ 62.78 5% 5%
0202350092 BROCA DIAMANTADA 0 = 1" und S/ 165.14 20% 25%
0202350093 BROCA DIAMANTADA 0 = 3/8" und S/ 734.40
0202350094 BROCA DIAMANTADA 0 = 7/16" und S/ 116.60
0202350095 PERNO 1/2' x 12" CON TUERCA und S/ 551.82
0203010010 ACERO CORRUGADO GRADO 60 m S/ 273,538.55
0203010019 ACERO LISO DE 1/2" m S/ 6,628.08
0203010020 ACERO LISO DE 1" m S/ 161.83 25%
0203010021 ACERO LISO DE 5/8" m S/ 1,802.35
0203010022 ACERO LISO DE 3/8' m S/ 644.91
0203010023 ACERO LISO DE 3/4" m S/ 633.70
0204050001 ARENA GRUESA m3 S/ 14,604.83
0204050002 ARENA FINA m3 S/ 0.10 5% 5%
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 52,641.94
0205050038 GRAVA DIVERSA GRANULOMETRIA m3 S/ 6,038.62 25%
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 128.21
0205100002 PIEDRA GRANDE (MAX. 8") m3 S/ 4,748.79 20% 25%
0205100016 PIEDRA MEDIANA (MAX. 6") m3 S/ 4,132.76
0205350001 AGUA m3 S/ 1,368.63
0205350008 AGUA PARA LA OBRA glb S/ 2,194.00
0212250188 PUENTE DE ADHERENCIA UNION CONCRETO FRESCO-ENDU kg S/ 3,227.88
0217100027 LADRILLO PARA TECHO 15x30x30 CM und S/ 15,682.18

E522
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0217100028 LACA PROTECTORA ENCOFRADO P/CONCRETO CARAVISTA qal S/ 8,566.41 25%
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 242,038.33
0224100018 CERCO PREFABRICADO TIPO UNI H=2.40m m S/ 9,081.08
0230010010 CAL (BOLSA X 20 kg) bl S/ 4,875.37
0230010025 LIJA PARA FIERRO und S/ 188.68
0230010032 CORDEL m S/ 922.03 5% 5%
0230010047 ADITIVO INCORPORADORDE AIRE (ANTICONGELANTE) qal S/ 1,223.39
0230010162 LIJA PARA MADERA und S/ 2.03 25%
0230010173 ADITIVO EPÓXICO P/ANCLAJE ESTRUCTURAL 500 ml und S/ 12,676.74
0230010179 THINNER ACRILICO qal S/ 202.48
0230010180 GROUT DE NIVELACION (bolsa 25kg) bl S/ 489.53
0230010181 IMPERMEABILIZANTELIQUIDO PARA CONCRETO qal S/ 2,026.67 20% 25%
0230010182 ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA qal S/ 1,270.64
0230010183 SOLVENTE PARA LACA PROTECTORA qal S/ 1,934.22
0230010186 POLIESTERENO E=2" pln S/ 115.61
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 8,838.60
0230100006 EXTINTOR DE POLVO SECO 6kg und S/ 292.38
0230990035 CASCO DE PROTECCION und S/ 814.00 25%
0230990036 BOTINES DE CUERO par S/ 4,625.00
0230990037 TAPONES AUDITIVOS par S/ 347.20
0230990042 CHALECOS REFLECTIVOS und S/ 936.00
0230990043 LENTES DE PROTECCION und S/ 1,876.00
0230990047 CAMILLA und S/ 520.98 5% 5%
0230990048 BOTIQUIN CON MEDICINA und S/ 164.80
0230990049 CILINDRO CON ARENA und S/ 64.41 25%
0230990109 MALLA DE SEGURIDAD (Rollo 50yd) und S/ 106.54
0230990116 ALARMA AUDIBLE C/PULSADOR und S/ 203.39
0230990129 ENERGIA PARA LA OBRA glb S/ 2,194.00
0230990132 GUANTES DE CUERO par S/ 2,567.60
0230990133 RESPIRADOR CONTRA POLVO uno S/ 366.80 20% 25%
0230990134 ARNES DE SEGURIDAD und S/ 626.76
0230990135 LINEA DE VIDA und S/ 338.64
0230990136 POSTE DE SEÑALIZACION DE CONCRETO Y MADERA und S/ 404.64
0230990137 BARANDAS RIGIDAS (M) und S/ 2,036.44
0230990139 CONOS REFLECTIVOS SEGURIDAD 28" und S/ 453.20
0230990140 CARTEL DE SEÑALIZACION 1.20x0.80 und S/ 211.86 25%
0230990141 SEÑALIZACIONES VARIAS und S/ 288.20
0230990142 CARTEL DE ORIENTACION und S/ 593.22
0230990143 MATERIAL PARA CAPACITACION (para cada trabajador) und S/ 2,620.80
0230990163 CINTA SEÑALIZACION 300m (Roll0) und S/ 355.24
0230990173 MANGUITO TUBO FIERRO ROSCADO 1 3/8" und S/ 9.60 5% 5%
0230990174 TRANSFORMADOR DE OXIDO gal S/ 176.42

E523
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02


0238010001 HORMIGON m3 S/ 9,529.34 25%
0238100001 AFIRMADO m3 S/ 39,205.70 20% 25%
0243010001 MADERA TORNILLO p2 S/ 133,765.32
0243010002 MADERA TORNILLO - A glb S/ 2,940.00
0243010003 MADERA TORNILLO - SS.HH glb S/ 1,540.00
0243010004 MADERA TORNILLO - C glb S/ 1,540.00
0244010007 TRIPLAY LUPUNA 4 mm x 4' x 8' und S/ 3,688.71
0244010009 TRIPLAY LUPUNA 18 mm x 4' x 8' und S/ 18,552.68 25%
0251100026 ANGULO FIERRO 2" x 2" x 1/4" m S/ 572.48
0251100027 ANGULO FIERRO 1" x 1" x 1/8" m S/ 1,040.67
0251100028 ANGULO FIERRO 3" x 3" x 1/4" m S/ 13.11
0251100029 ANGULO FIERRO 21/2 " x 21/2" x 1/4" m S/ 7,888.92
0251100030 ANGULO FIERRO 1 1/2" x 11/2" x 1/8" m S/ 100.11 20% 25%
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 3,261.31
0251300086 TUBO DE FIERRO NEGRO 0 2" (3.00mm) m S/ 3,521.95
0251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 2,847.10
0251300088 TUBO DE FIERRO NEGRO 0 8" (4.50mm) m S/ 5,114.45
0251300089 TUBO DE FIERRO NEGRO 0 6" (4.50mm) m S/ 552.75
0251300090 TUBO DEFIERRO NEGRO 10"X12" (8.00mm) m S/ 2,871.92 25%
0251300091 TUBO DE FIERRO NEGRO 0 4" (2.00mm) m S/ 19,569.13
0251300092 TUBO DE FIERRO NEGRO 0 2" (1.5mm) m S/ 8,767.39 20% 25%
0254150020 PINTURA ESMALTE qal S/ 1,477.99
0254200001 PINTURA ANTICORROSIVA qal S/ 2,084.42
0254400010 BARNIZ SELLADOR PARA MADERA qal S/ 5.59
0261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 346.07
0261020043 PLANCHA DE ACERO LAG (6.0mm) pln S/ 40.73
0261020044 PLANCHA DE ACERO LAG (12.0mm) pln S/ 460.53 25%
0261020045 PLANCHA DE ACERO LAG (16.0mm) pln S/ 87.24
0261020047 PLANCHA DE ACERO LAC (4.5mm) pln S/ 57.25
0261020048 PLANCHA DE ACERO LAG (10.00mm) pln S/ 158.68
0261020049 PLANCHA DE ACERO LAG (5/8") pln S/ 953.23
0261020050 PLANCHA DE ACERO LAG (1/2") pln S/ 2,309.62 5% 5%
0261020052 PLANCHA DE ACERO LAG (9.0mm) pln S/ 26.82
0265010067 TUBO DE F.N. CUADRADO 4"x4.50MM m S/ 4,136.86 25%
0265010068 TUBO DE F.N. RECTANGULAR 2"x4"x3MM m S/ 3,927.45 25%
0265010069 TUBO DE F.N. RECTANGULAR 4"x6"x6MM m S/ 2,562.65
0265010070 TUBO DE F.N. RECTANGULAR 2"x6"x3MM m S/ 3,425.21
0265010072 CANAL 3"X4.10 lib/pie m S/ 931.72
0272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 314.53
0272220006 TUBO PVC-SAP-2" (3M) m S/ 1.84 5% 5%
0272220052 TUBO PVC-SAP 3/4" m S/ 0.52

E524
CRONOGRAMA DE ADQUISICION DE MATERIALES - ESTRUCTURAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MATERIALES Unidad Parcial S/. Mes 01 Mes 02

TOTAL S/ 5,189,520.62
AVANCE PARCIAL
AVANCE ACUMULADO

E525
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14

35% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 15% 10% 5% 5% 5% 5% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 10% 15% 15% 15% 10% 10% 5% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%

E526
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 15% 10% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 10% 15% 15% 10% 10% 5% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%

E527
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
25% 30%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%

E528
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
8% 8% 15% 15% 12% 12% 15% 15%

25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%

E529
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%

E530
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
8% 8% 10% 10% 12% 12% 10% 15%

E531
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14

25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%

E532
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%

E533
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
8% 8% 10% 10% 12% 12% 10% 15%

E534
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14

30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%

E535
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%

E536
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
8% 8% 10% 10% 12% 12% 10% 15%

E537
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14

30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%

E538
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%

E539
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14
25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
30% 25%
25% 25% 25% 25%
25% 25% 25% 25%
25% 25% 25% 25%
20% 15% 20% 20%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
15% 15% 15% 15% 15% 15% 10%
25% 25% 25%
25% 25% 25%
15% 15% 15% 15% 15% 10% 10% 5%
8% 8% 15% 15% 12% 12% 15% 15%
8% 8% 10% 10% 12% 12% 10% 15%
25% 25% 25% 25%
5% 5% 5% 5% 15% 10% 15% 5% 5% 5% 5% 5%
8% 8% 10% 10% 12% 12% 10% 15%

E540
E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCA

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14

E541
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

100% S/ 1.08 S/ 1.79 S/ 2.51 S/ 1.79 S/ -


100% S/ - S/ - S/ - S/ 1,158.43 S/ 1,158.43
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 57.10 S/ 57.10
100% S/ - S/ 0.31 S/ 0.31 S/ 0.31 S/ 0.31
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 53.32 S/ 53.32 S/ 99.98
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 152.72
5% 100% S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
100% S/ - S/ - S/ - S/ 89.76 S/ 89.76
100% S/ - S/ 16.50 S/ 16.50 S/ 16.50 S/ 16.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 0.89 S/ 0.89 S/ 1.67
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 280.28
5% 100% S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
100% S/ 33.03 S/ 41.28 S/ 49.54 S/ 41.28 S/ -
100% S/ - S/ - S/ - S/ 183.60 S/ 183.60
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 994.21 S/ 994.21
100% S/ - S/ 40.46 S/ 40.46 S/ 40.46 S/ 40.46
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 51.59 S/ 51.59 S/ 96.74
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 3,651.21
5% 100% S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
100% S/ - S/ - S/ - S/ 7,896.29 S/ 7,896.29
100% S/ - S/ 1,509.65 S/ 1,509.65 S/ 1,509.65 S/ 1,509.65
100% S/ - S/ - S/ - S/ - S/ -
100% S/ 949.76 S/ 1,187.20 S/ 1,424.64 S/ 1,187.20 S/ -
100% S/ - S/ - S/ - S/ 1,033.19 S/ 1,033.19
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -

E542
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 2,352.33 S/ 2,352.33
100% S/ - S/ 2,141.60 S/ 2,141.60 S/ 2,141.60 S/ 2,141.60
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 726.49 S/ 726.49 S/ 1,362.16
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 47.17
5% 100% S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10
100% S/ - S/ - S/ - S/ 183.51 S/ 183.51
100% S/ - S/ 0.51 S/ 0.51 S/ 0.51 S/ 0.51
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 16.20 S/ 16.20 S/ 30.37
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ 405.33 S/ 506.67 S/ 608.00 S/ 506.67 S/ -
100% S/ - S/ - S/ - S/ 317.66 S/ 317.66
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 43.86 S/ 43.86
100% S/ - S/ 203.50 S/ 203.50 S/ 203.50 S/ 203.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 27.78 S/ 27.78 S/ 52.08
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 469.00
5% 100% S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05
100% S/ - S/ - S/ - S/ 24.72 S/ 24.72
100% S/ - S/ 16.10 S/ 16.10 S/ 16.10 S/ 16.10
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 16.27 S/ 16.27 S/ 30.51
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 641.90
100% S/ 73.36 S/ 91.70 S/ 110.04 S/ 91.70 S/ -
100% S/ - S/ - S/ - S/ 156.69 S/ 156.69
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 67.98 S/ 67.98
100% S/ - S/ 52.97 S/ 52.97 S/ 52.97 S/ 52.97
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 47.46 S/ 47.46 S/ 88.98
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 88.81

E543
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

5% 100% S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48


100% S/ - S/ - S/ - S/ 26.46 S/ 26.46
100% S/ - S/ 2,382.33 S/ 2,382.33 S/ 2,382.33 S/ 2,382.33
100% S/ 7,841.14 S/ 9,801.42 S/ 9,801.42 S/ 11,761.71 S/ -
100% S/ - S/ - S/ - S/ 33,441.33 S/ 33,441.33
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 553.31 S/ 553.31
100% S/ - S/ 4,638.17 S/ 4,638.17 S/ 4,638.17 S/ 4,638.17
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 83.25 S/ 83.25 S/ 156.10
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 1,972.23
100% S/ 20.02 S/ 25.03 S/ 30.03 S/ 25.03 S/ -
100% S/ - S/ - S/ - S/ 815.33 S/ 815.33
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 82.91 S/ 82.91
100% S/ - S/ 717.98 S/ 717.98 S/ 717.98 S/ 717.98
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 2,191.85
100% S/ - S/ - S/ - S/ 369.50 S/ 369.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 6.11 S/ 6.11
100% S/ - S/ 115.13 S/ 115.13 S/ 115.13 S/ 115.13
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 4.58 S/ 4.58 S/ 8.59
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 238.31
5% 100% S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48
100% S/ - S/ - S/ - S/ 4.02 S/ 4.02
100% S/ - S/ 1,034.21 S/ 1,034.21 S/ 1,034.21 S/ 1,034.21
100% S/ - S/ 981.86 S/ 981.86 S/ 981.86 S/ 981.86
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 274.02 S/ 274.02 S/ 513.78
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 78.63
5% 100% S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09

E544
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

100% S/ - S/ - S/ - S/ - S/ -
0%

100% S/ 1.79 S/ 1.79 S/ 1.79 S/ 1.79 S/ -


100% S/ - S/ - S/ - S/ 1,158.43 S/ 1,158.43
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 57.10 S/ 57.10
100% S/ - S/ 0.31 S/ 0.31 S/ 0.31 S/ 0.31
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 53.32 S/ 53.32 S/ 99.98
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 152.72
5% 100% S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
100% S/ - S/ - S/ - S/ 89.76 S/ 89.76
100% S/ - S/ 16.50 S/ 16.50 S/ 16.50 S/ 16.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 0.89 S/ 0.89 S/ 1.67
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 280.28
5% 100% S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
100% S/ 33.03 S/ 41.28 S/ 49.54 S/ 41.28 S/ -
100% S/ - S/ - S/ - S/ 183.60 S/ 183.60
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 994.21 S/ 994.21
100% S/ - S/ 40.46 S/ 40.46 S/ 40.46 S/ 40.46
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 51.59 S/ 51.59 S/ 96.74
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 3,651.21
5% 100% S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
100% S/ - S/ - S/ - S/ 7,896.29 S/ 7,896.29
100% S/ - S/ 1,509.65 S/ 1,509.65 S/ 1,509.65 S/ 1,509.65
100% S/ - S/ - S/ - S/ - S/ -
100% S/ 949.76 S/ 1,187.20 S/ 1,424.64 S/ 1,187.20 S/ -
100% S/ - S/ - S/ - S/ 1,033.19 S/ 1,033.19
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -

E545
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

100% S/ - S/ - S/ - S/ 2,352.33 S/ 2,352.33


100% S/ - S/ 2,141.60 S/ 2,141.60 S/ 2,141.60 S/ 2,141.60
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 726.49 S/ 726.49 S/ 1,362.16
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 47.17
5% 100% S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10
100% S/ - S/ - S/ - S/ 183.51 S/ 183.51
100% S/ - S/ 0.51 S/ 0.51 S/ 0.51 S/ 0.51
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 16.20 S/ 16.20 S/ 30.37
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ 405.33 S/ 506.67 S/ 608.00 S/ 506.67 S/ -
100% S/ - S/ - S/ - S/ 317.66 S/ 317.66
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 43.86 S/ 43.86
100% S/ - S/ 203.50 S/ 203.50 S/ 203.50 S/ 203.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 27.78 S/ 27.78 S/ 52.08
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 469.00
5% 100% S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05
100% S/ - S/ - S/ - S/ 24.72 S/ 24.72
100% S/ - S/ 16.10 S/ 16.10 S/ 16.10 S/ 16.10
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 16.27 S/ 16.27 S/ 30.51
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 641.90
100% S/ 73.36 S/ 91.70 S/ 110.04 S/ 91.70 S/ -
100% S/ - S/ - S/ - S/ 156.69 S/ 156.69
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 67.98 S/ 67.98
100% S/ - S/ 52.97 S/ 52.97 S/ 52.97 S/ 52.97
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 47.46 S/ 47.46 S/ 88.98
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 88.81
5% 100% S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48

E546
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

100% S/ - S/ - S/ - S/ 26.46 S/ 26.46


100% S/ - S/ 2,382.33 S/ 2,382.33 S/ 2,382.33 S/ 2,382.33
100% S/ 9,801.42 S/ 9,801.42 S/ 9,801.42 S/ 9,801.42 S/ -
100% S/ - S/ - S/ - S/ 33,441.33 S/ 33,441.33
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 553.31 S/ 553.31
100% S/ - S/ 4,638.17 S/ 4,638.17 S/ 4,638.17 S/ 4,638.17
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 83.25 S/ 83.25 S/ 156.10
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 1,972.23
100% S/ 25.03 S/ 25.03 S/ 25.03 S/ 25.03 S/ -
100% S/ - S/ - S/ - S/ 815.33 S/ 815.33
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 82.91 S/ 82.91
100% S/ - S/ 717.98 S/ 717.98 S/ 717.98 S/ 717.98
100% S/ - S/ - S/ - S/ - S/ -
100% S/ 1,753.48 S/ 2,191.85 S/ 2,630.22 S/ 2,191.85 S/ -
100% S/ - S/ - S/ - S/ 369.50 S/ 369.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 6.11 S/ 6.11
100% S/ - S/ 115.13 S/ 115.13 S/ 115.13 S/ 115.13
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 4.58 S/ 4.58 S/ 8.59
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 238.31
5% 100% S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48
100% S/ - S/ - S/ - S/ 4.02 S/ 4.02
100% S/ - S/ 1,034.21 S/ 1,034.21 S/ 1,034.21 S/ 1,034.21
100% S/ - S/ 981.86 S/ 981.86 S/ 981.86 S/ 981.86
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 274.02 S/ 274.02 S/ 513.78
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 78.63
5% 100% S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09
15% 100% S/ - S/ - S/ - S/ - S/ -

E547
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

0%

100% S/ 1.79 S/ 1.79 S/ 1.79 S/ 1.79 S/ -


100% S/ - S/ - S/ - S/ 1,158.43 S/ 1,158.43
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 57.10 S/ 57.10
100% S/ - S/ 0.31 S/ 0.31 S/ 0.31 S/ 0.31
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 53.32 S/ 53.32 S/ 99.98
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 152.72
5% 100% S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
100% S/ - S/ - S/ - S/ 89.76 S/ 89.76
100% S/ - S/ 16.50 S/ 16.50 S/ 16.50 S/ 16.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 0.89 S/ 0.89 S/ 1.67
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 280.28
5% 100% S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
100% S/ 33.03 S/ 41.28 S/ 49.54 S/ 41.28 S/ -
100% S/ - S/ - S/ - S/ 183.60 S/ 183.60
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 994.21 S/ 994.21
100% S/ - S/ 40.46 S/ 40.46 S/ 40.46 S/ 40.46
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 51.59 S/ 51.59 S/ 96.74
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 3,651.21
5% 100% S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
100% S/ - S/ - S/ - S/ 7,896.29 S/ 7,896.29
100% S/ - S/ 1,509.65 S/ 1,509.65 S/ 1,509.65 S/ 1,509.65
100% S/ - S/ - S/ - S/ - S/ -
100% S/ 949.76 S/ 1,187.20 S/ 1,424.64 S/ 1,187.20 S/ -
100% S/ - S/ - S/ - S/ 1,033.19 S/ 1,033.19
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 2,352.33 S/ 2,352.33

E548
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

100% S/ - S/ 2,141.60 S/ 2,141.60 S/ 2,141.60 S/ 2,141.60


100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 726.49 S/ 726.49 S/ 1,362.16
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 47.17
5% 100% S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10
100% S/ - S/ - S/ - S/ 183.51 S/ 183.51
100% S/ - S/ 0.51 S/ 0.51 S/ 0.51 S/ 0.51
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 16.20 S/ 16.20 S/ 30.37
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ 506.67 S/ 506.67 S/ 506.67 S/ 506.67 S/ -
100% S/ - S/ - S/ - S/ 317.66 S/ 317.66
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 43.86 S/ 43.86
100% S/ - S/ 203.50 S/ 203.50 S/ 203.50 S/ 203.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 27.78 S/ 27.78 S/ 52.08
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 469.00
5% 100% S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05
100% S/ - S/ - S/ - S/ 24.72 S/ 24.72
100% S/ - S/ 16.10 S/ 16.10 S/ 16.10 S/ 16.10
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 16.27 S/ 16.27 S/ 30.51
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 641.90
100% S/ 73.36 S/ 91.70 S/ 110.04 S/ 91.70 S/ -
100% S/ - S/ - S/ - S/ 156.69 S/ 156.69
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 67.98 S/ 67.98
100% S/ - S/ 52.97 S/ 52.97 S/ 52.97 S/ 52.97
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 47.46 S/ 47.46 S/ 88.98
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 88.81
5% 100% S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48
100% S/ - S/ - S/ - S/ 26.46 S/ 26.46

E549
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

100% S/ - S/ 2,382.33 S/ 2,382.33 S/ 2,382.33 S/ 2,382.33


100% S/ 7,841.14 S/ 9,801.42 S/ 11,761.71 S/ 9,801.42 S/ -
100% S/ - S/ - S/ - S/ 33,441.33 S/ 33,441.33
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 553.31 S/ 553.31
100% S/ - S/ 4,638.17 S/ 4,638.17 S/ 4,638.17 S/ 4,638.17
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 83.25 S/ 83.25 S/ 156.10
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 1,972.23
100% S/ 20.02 S/ 25.03 S/ 30.03 S/ 25.03 S/ -
100% S/ - S/ - S/ - S/ 815.33 S/ 815.33
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 82.91 S/ 82.91
100% S/ - S/ 717.98 S/ 717.98 S/ 717.98 S/ 717.98
100% S/ - S/ - S/ - S/ - S/ -
100% S/ 2,191.85 S/ 2,191.85 S/ 2,191.85 S/ 2,191.85 S/ -
100% S/ - S/ - S/ - S/ 369.50 S/ 369.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 6.11 S/ 6.11
100% S/ - S/ 115.13 S/ 115.13 S/ 115.13 S/ 115.13
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 4.58 S/ 4.58 S/ 8.59
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 238.31
5% 100% S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48
100% S/ - S/ - S/ - S/ 4.02 S/ 4.02
100% S/ - S/ 1,034.21 S/ 1,034.21 S/ 1,034.21 S/ 1,034.21
100% S/ - S/ 981.86 S/ 981.86 S/ 981.86 S/ 981.86
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 274.02 S/ 274.02 S/ 513.78
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 78.63
5% 100% S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09
15% 100% S/ - S/ - S/ - S/ - S/ -

E550
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

0%

100% S/ 1.43 S/ 1.79 S/ 2.15 S/ 1.79 S/ -


100% S/ - S/ - S/ - S/ 1,158.43 S/ 1,158.43
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 57.10 S/ 57.10
100% S/ - S/ 0.31 S/ 0.31 S/ 0.31 S/ 0.31
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 53.32 S/ 53.32 S/ 99.98
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 152.72
5% 100% S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
100% S/ - S/ - S/ - S/ 89.76 S/ 89.76
100% S/ - S/ 16.50 S/ 16.50 S/ 16.50 S/ 16.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 0.89 S/ 0.89 S/ 1.67
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 280.28
5% 100% S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
100% S/ 33.03 S/ 41.28 S/ 49.54 S/ 41.28 S/ -
100% S/ - S/ - S/ - S/ 183.60 S/ 183.60
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 994.21 S/ 994.21
100% S/ - S/ 40.46 S/ 40.46 S/ 40.46 S/ 40.46
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 51.59 S/ 51.59 S/ 96.74
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 3,651.21
5% 100% S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
100% S/ - S/ - S/ - S/ 7,896.29 S/ 7,896.29
100% S/ - S/ 1,509.65 S/ 1,509.65 S/ 1,509.65 S/ 1,509.65
100% S/ - S/ - S/ - S/ - S/ -
100% S/ 949.76 S/ 1,187.20 S/ 1,424.64 S/ 1,187.20 S/ -
100% S/ - S/ - S/ - S/ 1,033.19 S/ 1,033.19
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 2,352.33 S/ 2,352.33

E551
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

100% S/ - S/ 2,141.60 S/ 2,141.60 S/ 2,141.60 S/ 2,141.60


100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 726.49 S/ 726.49 S/ 1,362.16
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 47.17
5% 100% S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10
100% S/ - S/ - S/ - S/ 183.51 S/ 183.51
100% S/ - S/ 0.51 S/ 0.51 S/ 0.51 S/ 0.51
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 16.20 S/ 16.20 S/ 30.37
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ 405.33 S/ 506.67 S/ 608.00 S/ 506.67 S/ -
100% S/ - S/ - S/ - S/ 317.66 S/ 317.66
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 43.86 S/ 43.86
100% S/ - S/ 203.50 S/ 203.50 S/ 203.50 S/ 203.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 27.78 S/ 27.78 S/ 52.08
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 469.00
5% 100% S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05
100% S/ - S/ - S/ - S/ 24.72 S/ 24.72
100% S/ - S/ 16.10 S/ 16.10 S/ 16.10 S/ 16.10
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 16.27 S/ 16.27 S/ 30.51
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 641.90
100% S/ 73.36 S/ 91.70 S/ 110.04 S/ 91.70 S/ -
100% S/ - S/ - S/ - S/ 156.69 S/ 156.69
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 67.98 S/ 67.98
100% S/ - S/ 52.97 S/ 52.97 S/ 52.97 S/ 52.97
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 47.46 S/ 47.46 S/ 88.98
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 88.81
5% 100% S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48
100% S/ - S/ - S/ - S/ 26.46 S/ 26.46

E552
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

100% S/ - S/ 2,382.33 S/ 2,382.33 S/ 2,382.33 S/ 2,382.33


100% S/ 7,841.14 S/ 9,801.42 S/ 11,761.71 S/ 9,801.42 S/ -
100% S/ - S/ - S/ - S/ 33,441.33 S/ 33,441.33
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 553.31 S/ 553.31
100% S/ - S/ 4,638.17 S/ 4,638.17 S/ 4,638.17 S/ 4,638.17
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 83.25 S/ 83.25 S/ 156.10
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 1,972.23
100% S/ 20.02 S/ 30.03 S/ 25.03 S/ 25.03 S/ -
100% S/ - S/ - S/ - S/ 815.33 S/ 815.33
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 82.91 S/ 82.91
100% S/ - S/ 717.98 S/ 717.98 S/ 717.98 S/ 717.98
100% S/ - S/ - S/ - S/ - S/ -
100% S/ 1,753.48 S/ 2,191.85 S/ 2,630.22 S/ 2,191.85 S/ -
100% S/ - S/ - S/ - S/ 369.50 S/ 369.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 6.11 S/ 6.11
100% S/ - S/ 115.13 S/ 115.13 S/ 115.13 S/ 115.13
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 4.58 S/ 4.58 S/ 8.59
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 238.31
5% 100% S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48
100% S/ - S/ - S/ - S/ 4.02 S/ 4.02
100% S/ - S/ 1,034.21 S/ 1,034.21 S/ 1,034.21 S/ 1,034.21
100% S/ - S/ 981.86 S/ 981.86 S/ 981.86 S/ 981.86
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 274.02 S/ 274.02 S/ 513.78
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 78.63
5% 100% S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09
15% 100% S/ - S/ - S/ - S/ - S/ -

E553
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

0%

100% S/ 1.43 S/ 1.79 S/ 2.15 S/ 1.79 S/ -


100% S/ - S/ - S/ - S/ 1,158.43 S/ 1,158.43
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 57.10 S/ 57.10
100% S/ - S/ 0.31 S/ 0.31 S/ 0.31 S/ 0.31
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 53.32 S/ 53.32 S/ 99.98
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 152.72
5% 100% S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
100% S/ - S/ - S/ - S/ 89.76 S/ 89.76
100% S/ - S/ 16.50 S/ 16.50 S/ 16.50 S/ 16.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 0.89 S/ 0.89 S/ 1.67
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 280.28
5% 100% S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
100% S/ 33.03 S/ 41.28 S/ 49.54 S/ 41.28 S/ -
100% S/ - S/ - S/ - S/ 183.60 S/ 183.60
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 994.21 S/ 994.21
100% S/ - S/ 40.46 S/ 40.46 S/ 40.46 S/ 40.46
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 51.59 S/ 51.59 S/ 96.74
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 3,651.21
5% 100% S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
100% S/ - S/ - S/ - S/ 7,896.29 S/ 7,896.29
100% S/ - S/ 1,509.65 S/ 1,509.65 S/ 1,509.65 S/ 1,509.65
100% S/ - S/ - S/ - S/ - S/ -
100% S/ 949.76 S/ 1,187.20 S/ 1,424.64 S/ 1,187.20 S/ -
100% S/ - S/ - S/ - S/ 1,033.19 S/ 1,033.19
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 2,352.33 S/ 2,352.33

E554
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

100% S/ - S/ 2,141.60 S/ 2,141.60 S/ 2,141.60 S/ 2,141.60


100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 726.49 S/ 726.49 S/ 1,362.16
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 47.17
5% 100% S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10
100% S/ - S/ - S/ - S/ 183.51 S/ 183.51
100% S/ - S/ 0.51 S/ 0.51 S/ 0.51 S/ 0.51
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 16.20 S/ 16.20 S/ 30.37
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ 405.33 S/ 506.67 S/ 608.00 S/ 506.67 S/ -
100% S/ - S/ - S/ - S/ 317.66 S/ 317.66
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 43.86 S/ 43.86
100% S/ - S/ 203.50 S/ 203.50 S/ 203.50 S/ 203.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 27.78 S/ 27.78 S/ 52.08
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 469.00
5% 100% S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05
100% S/ - S/ - S/ - S/ 24.72 S/ 24.72
100% S/ - S/ 16.10 S/ 16.10 S/ 16.10 S/ 16.10
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 16.27 S/ 16.27 S/ 30.51
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 641.90
100% S/ 73.36 S/ 91.70 S/ 110.04 S/ 91.70 S/ -
100% S/ - S/ - S/ - S/ 156.69 S/ 156.69
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 67.98 S/ 67.98
100% S/ - S/ 52.97 S/ 52.97 S/ 52.97 S/ 52.97
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 47.46 S/ 47.46 S/ 88.98
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 88.81
5% 100% S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48
100% S/ - S/ - S/ - S/ 26.46 S/ 26.46

E555
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

100% S/ - S/ 2,382.33 S/ 2,382.33 S/ 2,382.33 S/ 2,382.33


100% S/ 7,841.14 S/ 9,801.42 S/ 11,761.71 S/ 9,801.42 S/ -
100% S/ - S/ - S/ - S/ 33,441.33 S/ 33,441.33
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 553.31 S/ 553.31
100% S/ - S/ 4,638.17 S/ 4,638.17 S/ 4,638.17 S/ 4,638.17
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 83.25 S/ 83.25 S/ 156.10
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 1,972.23
100% S/ 20.02 S/ 25.03 S/ 30.03 S/ 25.03 S/ -
100% S/ - S/ - S/ - S/ 815.33 S/ 815.33
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 82.91 S/ 82.91
100% S/ - S/ 717.98 S/ 717.98 S/ 717.98 S/ 717.98
100% S/ - S/ - S/ - S/ - S/ -
100% S/ 1,753.48 S/ 2,191.85 S/ 2,630.22 S/ 2,191.85 S/ -
100% S/ - S/ - S/ - S/ 369.50 S/ 369.50
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ -
25% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ 6.11 S/ 6.11
100% S/ - S/ 115.13 S/ 115.13 S/ 115.13 S/ 115.13
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 4.58 S/ 4.58 S/ 8.59
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 238.31
5% 100% S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48
100% S/ - S/ - S/ - S/ 4.02 S/ 4.02
100% S/ - S/ 1,034.21 S/ 1,034.21 S/ 1,034.21 S/ 1,034.21
100% S/ - S/ 981.86 S/ 981.86 S/ 981.86 S/ 981.86
100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ 274.02 S/ 274.02 S/ 513.78
15% 100% S/ - S/ - S/ - S/ - S/ -
100% S/ - S/ - S/ - S/ - S/ 78.63
5% 100% S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09
15% 100% S/ - S/ - S/ - S/ - S/ -
0%

E556
RUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE

Mes 01 Mes 02 Mes 03 Mes 04 Mes 05


DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020

Mes 15 A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020

S/ 57,110.85 S/ 137,275.53 S/ 152,717.69 S/ 395,031.51 S/ 372,017.08


1.10% 2.65% 2.94% 7.61% 7.17%
1.10% 3.75% 6.69% 14.30% 21.47%

E557
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ 1,158.43 S/ - S/ - S/ - S/ -
S/ - S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ -
S/ - S/ - S/ - S/ - S/ 1,054.81 S/ 1,054.81
S/ - S/ - S/ 251.21 S/ - S/ 188.41 S/ -
S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 38.07 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 596.90
S/ 99.98 S/ 79.99 S/ 79.99 S/ 99.98 S/ 99.98 S/ -
S/ - S/ 10.66 S/ 10.66 S/ 13.33 S/ 13.33 S/ 16.00
S/ 152.72 S/ 152.72 S/ 152.72 S/ - S/ - S/ -
S/ 2.89 S/ 8.68 S/ 5.79 S/ 8.68 S/ 2.89 S/ 2.89
S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 59.84 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 2.51
S/ 1.67 S/ 1.34 S/ 1.34 S/ 1.67 S/ 1.67 S/ -
S/ - S/ 226.08 S/ 226.08 S/ 282.61 S/ 282.61 S/ 339.13
S/ 280.28 S/ 280.28 S/ 280.28 S/ - S/ - S/ -
S/ 3.14 S/ 9.42 S/ 9.42 S/ 6.28 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ 183.60 S/ - S/ - S/ - S/ -
S/ - S/ 29.15 S/ 29.15 S/ 29.15 S/ 29.15 S/ -
S/ - S/ - S/ - S/ - S/ 137.95 S/ 137.95
S/ - S/ - S/ 54,707.71 S/ - S/ 41,030.78 S/ -
S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 662.81 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 180.24
S/ 96.74 S/ 77.39 S/ 77.39 S/ 96.74 S/ 96.74 S/ -
S/ - S/ 50.70 S/ 50.70 S/ 63.37 S/ 63.37 S/ 76.04
S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ - S/ - S/ -
S/ 0.00 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.00 S/ 0.00
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 5,264.19 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 12.82 S/ 19.23 S/ 19.23 S/ 19.23 S/ 12.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ 1,033.19 S/ - S/ - S/ - S/ -
S/ - S/ 342.16 S/ 342.16 S/ 342.16 S/ 342.16 S/ -
S/ - S/ - S/ - S/ - S/ 548.50 S/ 548.50

E558
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ 645.58 S/ - S/ 484.18 S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 1,568.22 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 24,203.83
S/ 1,362.16 S/ 1,089.73 S/ 1,089.73 S/ 1,362.16 S/ 1,362.16 S/ -
S/ - S/ 390.03 S/ 390.03 S/ 487.54 S/ 487.54 S/ 585.04
S/ 47.17 S/ 47.17 S/ 47.17 S/ - S/ - S/ -
S/ 46.10 S/ 138.30 S/ 138.30 S/ 92.20 S/ 46.10 S/ 46.10
S/ 183.51 S/ 183.51 S/ 183.51 S/ 183.51 S/ 122.34 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,267.67
S/ 30.37 S/ 24.30 S/ 24.30 S/ 30.37 S/ 30.37 S/ -
S/ - S/ 39.16 S/ 39.16 S/ 48.95 S/ 48.95 S/ 58.74
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 317.66 S/ 317.66 S/ - S/ - S/ - S/ -
S/ - S/ 483.55 S/ 483.55 S/ 483.55 S/ 483.55 S/ -
S/ - S/ - S/ - S/ - S/ 28.90 S/ 28.90
S/ - S/ - S/ 1,767.72 S/ - S/ 1,325.79 S/ -
S/ 43.86 S/ 43.86 S/ 43.86 S/ 43.86 S/ 29.24 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 693.75 S/ 693.75 S/ 462.50 S/ 693.75 S/ 693.75 S/ 462.50
S/ 52.08 S/ 41.66 S/ 41.66 S/ 52.08 S/ 52.08 S/ -
S/ - S/ 74.88 S/ 74.88 S/ 93.60 S/ 93.60 S/ 112.32
S/ 469.00 S/ 469.00 S/ 469.00 S/ - S/ - S/ -
S/ 26.05 S/ 78.15 S/ 52.10 S/ 78.15 S/ 26.05 S/ 26.05
S/ 24.72 S/ 24.72 S/ 24.72 S/ 24.72 S/ 16.48 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 15.98 S/ 15.98 S/ 15.98 S/ 15.98 S/ 15.98 S/ 10.65
S/ 30.51 S/ 24.41 S/ 24.41 S/ 30.51 S/ 30.51 S/ -
S/ - S/ 175.52 S/ 175.52 S/ 219.40 S/ 219.40 S/ 263.28
S/ 641.90 S/ 641.90 S/ 641.90 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 156.69 S/ 156.69 S/ - S/ - S/ - S/ -
S/ - S/ 84.66 S/ 84.66 S/ 84.66 S/ 84.66 S/ -
S/ - S/ - S/ - S/ - S/ 101.16 S/ 101.16
S/ - S/ - S/ 407.29 S/ - S/ 305.47 S/ -
S/ 67.98 S/ 67.98 S/ 67.98 S/ 67.98 S/ 45.32 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 43.23 S/ 43.23 S/ 43.23 S/ 43.23 S/ 43.23 S/ 28.82
S/ 88.98 S/ 71.19 S/ 71.19 S/ 88.98 S/ 88.98 S/ -
S/ - S/ 209.66 S/ 209.66 S/ 262.08 S/ 262.08 S/ 314.50
S/ 88.81 S/ 88.81 S/ 88.81 S/ - S/ - S/ -

E559
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ 0.48 S/ 1.44 S/ 0.96 S/ 1.44 S/ 0.48 S/ 0.48


S/ 26.46 S/ 26.46 S/ 26.46 S/ 26.46 S/ 17.64 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ 33,441.33 S/ - S/ - S/ - S/ -
S/ - S/ 735.00 S/ 735.00 S/ 735.00 S/ 735.00 S/ -
S/ - S/ - S/ - S/ - S/ 385.00 S/ 385.00
S/ - S/ - S/ 308.00 S/ - S/ 231.00 S/ -
S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 368.87 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 85.87 S/ 85.87 S/ 85.87 S/ 85.87 S/ 85.87 S/ 57.25
S/ 156.10 S/ 124.88 S/ 124.88 S/ 156.10 S/ 156.10 S/ -
S/ - S/ 1.05 S/ 1.05 S/ 1.31 S/ 1.31 S/ 1.57
S/ 1,972.23 S/ 1,972.23 S/ 1,972.23 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 815.33 S/ 815.33 S/ - S/ - S/ - S/ -
S/ - S/ 880.49 S/ 880.49 S/ 880.49 S/ 880.49 S/ -
S/ - S/ - S/ - S/ - S/ 711.77 S/ 711.77
S/ - S/ - S/ 1,022.89 S/ - S/ 767.17 S/ -
S/ 82.91 S/ 82.91 S/ 82.91 S/ 82.91 S/ 55.27 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 1,956.91
S/ 2,191.85 S/ 2,191.85 S/ 2,191.85 S/ - S/ - S/ -
S/ 369.50 S/ 369.50 S/ - S/ - S/ - S/ -
S/ - S/ 521.11 S/ 521.11 S/ 521.11 S/ 521.11 S/ -
S/ - S/ - S/ - S/ - S/ 1.40 S/ 1.40
S/ - S/ - S/ 69.21 S/ - S/ 51.91 S/ -
S/ 6.11 S/ 6.11 S/ 6.11 S/ 6.11 S/ 4.07 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13.09 S/ 13.09 S/ 13.09 S/ 13.09 S/ 13.09 S/ 8.72
S/ 8.59 S/ 6.87 S/ 6.87 S/ 8.59 S/ 8.59 S/ -
S/ - S/ 12.69 S/ 12.69 S/ 15.87 S/ 15.87 S/ 19.04
S/ 238.31 S/ 238.31 S/ 238.31 S/ - S/ - S/ -
S/ 115.48 S/ 346.44 S/ 230.96 S/ 346.44 S/ 115.48 S/ 115.48
S/ 4.02 S/ 4.02 S/ 4.02 S/ 4.02 S/ 2.68 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 384.40 S/ 384.40 S/ 384.40 S/ 384.40 S/ 384.40 S/ 256.26
S/ 513.78 S/ 411.03 S/ 411.03 S/ 513.78 S/ 513.78 S/ -
S/ - S/ 74.54 S/ 74.54 S/ 93.17 S/ 93.17 S/ 111.81
S/ 78.63 S/ 78.63 S/ 78.63 S/ - S/ - S/ -
S/ 0.09 S/ 0.28 S/ 0.18 S/ 0.28 S/ 0.09 S/ 0.09

E560
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ 0.04 S/ 0.04 S/ 0.08 S/ 0.08 S/ 0.06

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ 1,158.43 S/ - S/ - S/ - S/ -
S/ - S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ -
S/ - S/ - S/ - S/ - S/ 1,054.81 S/ 1,054.81
S/ - S/ - S/ 251.21 S/ - S/ 188.41 S/ -
S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 38.07 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 596.90
S/ 99.98 S/ 79.99 S/ 79.99 S/ 99.98 S/ 99.98 S/ -
S/ - S/ 10.66 S/ 10.66 S/ 13.33 S/ 13.33 S/ 16.00
S/ 152.72 S/ 152.72 S/ 152.72 S/ - S/ - S/ -
S/ 2.89 S/ 8.68 S/ 5.79 S/ 8.68 S/ 2.89 S/ 2.89
S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 59.84 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 2.51
S/ 1.67 S/ 1.34 S/ 1.34 S/ 1.67 S/ 1.67 S/ -
S/ - S/ 226.08 S/ 226.08 S/ 282.61 S/ 282.61 S/ 339.13
S/ 280.28 S/ 280.28 S/ 280.28 S/ - S/ - S/ -
S/ 3.14 S/ 9.42 S/ 6.28 S/ 9.42 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ 183.60 S/ - S/ - S/ - S/ -
S/ - S/ 29.15 S/ 29.15 S/ 29.15 S/ 29.15 S/ -
S/ - S/ - S/ - S/ - S/ 137.95 S/ 137.95
S/ - S/ - S/ 54,707.71 S/ - S/ 41,030.78 S/ -
S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 662.81 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 180.24
S/ 96.74 S/ 77.39 S/ 77.39 S/ 96.74 S/ 96.74 S/ -
S/ - S/ 50.70 S/ 50.70 S/ 63.37 S/ 63.37 S/ 76.04
S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ - S/ - S/ -
S/ 0.00 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.00 S/ 0.00
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 5,264.19 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 12.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ 1,033.19 S/ - S/ - S/ - S/ -
S/ - S/ 342.16 S/ 342.16 S/ 342.16 S/ 342.16 S/ -
S/ - S/ - S/ - S/ - S/ 548.50 S/ 548.50
S/ - S/ - S/ 645.58 S/ - S/ 484.18 S/ -

E561
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 1,568.22 S/ -


S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 24,203.83
S/ 1,362.16 S/ 1,089.73 S/ 1,089.73 S/ 1,362.16 S/ 1,362.16 S/ -
S/ - S/ 390.03 S/ 390.03 S/ 487.54 S/ 487.54 S/ 585.04
S/ 47.17 S/ 47.17 S/ 47.17 S/ - S/ - S/ -
S/ 46.10 S/ 138.30 S/ 92.20 S/ 138.30 S/ 46.10 S/ 46.10
S/ 183.51 S/ 183.51 S/ 183.51 S/ 183.51 S/ 122.34 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,267.67
S/ 30.37 S/ 24.30 S/ 24.30 S/ 30.37 S/ 30.37 S/ -
S/ - S/ 39.16 S/ 39.16 S/ 48.95 S/ 48.95 S/ 58.74
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 317.66 S/ 317.66 S/ - S/ - S/ - S/ -
S/ - S/ 483.55 S/ 483.55 S/ 483.55 S/ 483.55 S/ -
S/ - S/ - S/ - S/ - S/ 28.90 S/ 28.90
S/ - S/ - S/ 1,767.72 S/ - S/ 1,325.79 S/ -
S/ 43.86 S/ 43.86 S/ 43.86 S/ 43.86 S/ 29.24 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 693.75 S/ 693.75 S/ 693.75 S/ 693.75 S/ 693.75 S/ 462.50
S/ 52.08 S/ 41.66 S/ 41.66 S/ 52.08 S/ 52.08 S/ -
S/ - S/ 74.88 S/ 74.88 S/ 93.60 S/ 93.60 S/ 112.32
S/ 469.00 S/ 469.00 S/ 469.00 S/ - S/ - S/ -
S/ 26.05 S/ 78.15 S/ 52.10 S/ 78.15 S/ 26.05 S/ 26.05
S/ 24.72 S/ 24.72 S/ 24.72 S/ 24.72 S/ 16.48 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 15.98 S/ 15.98 S/ 15.98 S/ 15.98 S/ 15.98 S/ 10.65
S/ 30.51 S/ 24.41 S/ 24.41 S/ 30.51 S/ 30.51 S/ -
S/ - S/ 175.52 S/ 175.52 S/ 219.40 S/ 219.40 S/ 263.28
S/ 641.90 S/ 641.90 S/ 641.90 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 156.69 S/ 156.69 S/ - S/ - S/ - S/ -
S/ - S/ 84.66 S/ 84.66 S/ 84.66 S/ 84.66 S/ -
S/ - S/ - S/ - S/ - S/ 101.16 S/ 101.16
S/ - S/ - S/ 407.29 S/ - S/ 305.47 S/ -
S/ 67.98 S/ 67.98 S/ 67.98 S/ 67.98 S/ 45.32 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 43.23 S/ 43.23 S/ 43.23 S/ 43.23 S/ 43.23 S/ 28.82
S/ 88.98 S/ 71.19 S/ 71.19 S/ 88.98 S/ 88.98 S/ -
S/ - S/ 209.66 S/ 209.66 S/ 262.08 S/ 262.08 S/ 314.50
S/ 88.81 S/ 88.81 S/ 88.81 S/ - S/ - S/ -
S/ 0.48 S/ 1.44 S/ 0.96 S/ 1.44 S/ 0.48 S/ 0.48

E562
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ 26.46 S/ 26.46 S/ 26.46 S/ 26.46 S/ 17.64 S/ -


S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ 33,441.33 S/ - S/ - S/ - S/ -
S/ - S/ 735.00 S/ 735.00 S/ 735.00 S/ 735.00 S/ -
S/ - S/ - S/ - S/ - S/ 385.00 S/ 385.00
S/ - S/ - S/ 308.00 S/ - S/ 231.00 S/ -
S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 368.87 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 85.87 S/ 85.87 S/ 85.87 S/ 85.87 S/ 85.87 S/ 57.25
S/ 156.10 S/ 124.88 S/ 124.88 S/ 156.10 S/ 156.10 S/ -
S/ - S/ 1.05 S/ 1.05 S/ 1.31 S/ 1.31 S/ 1.57
S/ 1,972.23 S/ 1,972.23 S/ 1,972.23 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 815.33 S/ 815.33 S/ - S/ - S/ - S/ -
S/ - S/ 880.49 S/ 880.49 S/ 880.49 S/ 880.49 S/ -
S/ - S/ - S/ - S/ - S/ 711.77 S/ 711.77
S/ - S/ - S/ 1,022.89 S/ - S/ 767.17 S/ -
S/ 82.91 S/ 82.91 S/ 82.91 S/ 82.91 S/ 55.27 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 1,956.91
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 369.50 S/ 369.50 S/ - S/ - S/ - S/ -
S/ - S/ 521.11 S/ 521.11 S/ 521.11 S/ 521.11 S/ -
S/ - S/ - S/ - S/ - S/ 1.40 S/ 1.40
S/ - S/ - S/ 69.21 S/ - S/ 51.91 S/ -
S/ 6.11 S/ 6.11 S/ 6.11 S/ 6.11 S/ 4.07 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13.09 S/ 13.09 S/ 13.09 S/ 13.09 S/ 13.09 S/ 8.72
S/ 8.59 S/ 6.87 S/ 6.87 S/ 8.59 S/ 8.59 S/ -
S/ - S/ 12.69 S/ 12.69 S/ 15.87 S/ 15.87 S/ 19.04
S/ 238.31 S/ 238.31 S/ 238.31 S/ - S/ - S/ -
S/ 115.48 S/ 346.44 S/ 230.96 S/ 346.44 S/ 115.48 S/ 115.48
S/ 4.02 S/ 4.02 S/ 4.02 S/ 4.02 S/ 2.68 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 384.40 S/ 384.40 S/ 384.40 S/ 384.40 S/ 384.40 S/ 256.26
S/ 513.78 S/ 411.03 S/ 411.03 S/ 513.78 S/ 513.78 S/ -
S/ - S/ 74.54 S/ 74.54 S/ 93.17 S/ 93.17 S/ 111.81
S/ 78.63 S/ 78.63 S/ 78.63 S/ - S/ - S/ -
S/ 0.09 S/ 0.28 S/ 0.18 S/ 0.28 S/ 0.09 S/ 0.09
S/ - S/ 0.04 S/ 0.04 S/ 0.05 S/ 0.05 S/ 0.06

E563
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ 1,158.43 S/ - S/ - S/ - S/ -
S/ - S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ -
S/ - S/ - S/ - S/ - S/ 1,054.81 S/ 1,054.81
S/ - S/ - S/ 251.21 S/ - S/ 188.41 S/ -
S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 38.07 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 596.90
S/ 99.98 S/ 79.99 S/ 79.99 S/ 99.98 S/ 99.98 S/ -
S/ - S/ 10.66 S/ 10.66 S/ 13.33 S/ 13.33 S/ 16.00
S/ 152.72 S/ 152.72 S/ 152.72 S/ - S/ - S/ -
S/ 2.89 S/ 8.68 S/ 5.79 S/ 8.68 S/ 2.89 S/ 2.89
S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 59.84 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 2.51
S/ 1.67 S/ 1.34 S/ 1.34 S/ 1.67 S/ 1.67 S/ -
S/ - S/ 226.08 S/ 226.08 S/ 282.61 S/ 282.61 S/ 339.13
S/ 280.28 S/ 280.28 S/ 280.28 S/ - S/ - S/ -
S/ 3.14 S/ 9.42 S/ 6.28 S/ 9.42 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ 183.60 S/ - S/ - S/ - S/ -
S/ - S/ 29.15 S/ 29.15 S/ 29.15 S/ 29.15 S/ -
S/ - S/ - S/ - S/ - S/ 137.95 S/ 137.95
S/ - S/ - S/ 54,707.71 S/ - S/ 41,030.78 S/ -
S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 662.81 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 180.24
S/ 96.74 S/ 77.39 S/ 77.39 S/ 96.74 S/ 96.74 S/ -
S/ - S/ 50.70 S/ 50.70 S/ 63.37 S/ 63.37 S/ 76.04
S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ - S/ - S/ -
S/ 0.00 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.00 S/ 0.00
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 5,264.19 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 12.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ 1,033.19 S/ - S/ - S/ - S/ -
S/ - S/ 342.16 S/ 342.16 S/ 342.16 S/ 342.16 S/ -
S/ - S/ - S/ - S/ - S/ 548.50 S/ 548.50
S/ - S/ - S/ 645.58 S/ - S/ 484.18 S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 1,568.22 S/ -

E564
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 24,203.83
S/ 1,362.16 S/ 1,089.73 S/ 1,089.73 S/ 1,362.16 S/ 1,362.16 S/ -
S/ - S/ 390.03 S/ 390.03 S/ 487.54 S/ 487.54 S/ 585.04
S/ 47.17 S/ 47.17 S/ 47.17 S/ - S/ - S/ -
S/ 46.10 S/ 138.30 S/ 92.20 S/ 138.30 S/ 46.10 S/ 46.10
S/ 183.51 S/ 183.51 S/ 183.51 S/ 183.51 S/ 122.34 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,267.67
S/ 30.37 S/ 24.30 S/ 24.30 S/ 30.37 S/ 30.37 S/ -
S/ - S/ 39.16 S/ 39.16 S/ 48.95 S/ 48.95 S/ 58.74
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 317.66 S/ 317.66 S/ - S/ - S/ - S/ -
S/ - S/ 483.55 S/ 483.55 S/ 483.55 S/ 483.55 S/ -
S/ - S/ - S/ - S/ - S/ 28.90 S/ 28.90
S/ - S/ - S/ 1,767.72 S/ - S/ 1,325.79 S/ -
S/ 43.86 S/ 43.86 S/ 43.86 S/ 43.86 S/ 29.24 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 693.75 S/ 693.75 S/ 693.75 S/ 693.75 S/ 693.75 S/ 462.50
S/ 52.08 S/ 41.66 S/ 41.66 S/ 52.08 S/ 52.08 S/ -
S/ - S/ 74.88 S/ 74.88 S/ 93.60 S/ 93.60 S/ 112.32
S/ 469.00 S/ 469.00 S/ 469.00 S/ - S/ - S/ -
S/ 26.05 S/ 78.15 S/ 52.10 S/ 78.15 S/ 26.05 S/ 26.05
S/ 24.72 S/ 24.72 S/ 24.72 S/ 24.72 S/ 16.48 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 15.98 S/ 15.98 S/ 15.98 S/ 15.98 S/ 15.98 S/ 10.65
S/ 30.51 S/ 24.41 S/ 24.41 S/ 30.51 S/ 30.51 S/ -
S/ - S/ 175.52 S/ 175.52 S/ 219.40 S/ 219.40 S/ 263.28
S/ 641.90 S/ 641.90 S/ 641.90 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 156.69 S/ 156.69 S/ - S/ - S/ - S/ -
S/ - S/ 84.66 S/ 84.66 S/ 84.66 S/ 84.66 S/ -
S/ - S/ - S/ - S/ - S/ 101.16 S/ 101.16
S/ - S/ - S/ 407.29 S/ - S/ 305.47 S/ -
S/ 67.98 S/ 67.98 S/ 67.98 S/ 67.98 S/ 45.32 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 43.23 S/ 43.23 S/ 43.23 S/ 43.23 S/ 43.23 S/ 28.82
S/ 88.98 S/ 71.19 S/ 71.19 S/ 88.98 S/ 88.98 S/ -
S/ - S/ 209.66 S/ 209.66 S/ 262.08 S/ 262.08 S/ 314.50
S/ 88.81 S/ 88.81 S/ 88.81 S/ - S/ - S/ -
S/ 0.48 S/ 1.44 S/ 0.96 S/ 1.44 S/ 0.48 S/ 0.48
S/ 26.46 S/ 26.46 S/ 26.46 S/ 26.46 S/ 17.64 S/ -

E565
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ 33,441.33 S/ - S/ - S/ - S/ -
S/ - S/ 735.00 S/ 735.00 S/ 735.00 S/ 735.00 S/ -
S/ - S/ - S/ - S/ - S/ 385.00 S/ 385.00
S/ - S/ - S/ 308.00 S/ - S/ 231.00 S/ -
S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 368.87 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 85.87 S/ 85.87 S/ 85.87 S/ 85.87 S/ 85.87 S/ 57.25
S/ 156.10 S/ 124.88 S/ 124.88 S/ 156.10 S/ 156.10 S/ -
S/ - S/ 1.05 S/ 1.05 S/ 1.31 S/ 1.31 S/ 1.57
S/ 1,972.23 S/ 1,972.23 S/ 1,972.23 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 815.33 S/ 815.33 S/ - S/ - S/ - S/ -
S/ - S/ 880.49 S/ 880.49 S/ 880.49 S/ 880.49 S/ -
S/ - S/ - S/ - S/ - S/ 711.77 S/ 711.77
S/ - S/ - S/ 1,022.89 S/ - S/ 767.17 S/ -
S/ 82.91 S/ 82.91 S/ 82.91 S/ 82.91 S/ 55.27 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 1,956.91
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 369.50 S/ 369.50 S/ - S/ - S/ - S/ -
S/ - S/ 521.11 S/ 521.11 S/ 521.11 S/ 521.11 S/ -
S/ - S/ - S/ - S/ - S/ 1.40 S/ 1.40
S/ - S/ - S/ 69.21 S/ - S/ 51.91 S/ -
S/ 6.11 S/ 6.11 S/ 6.11 S/ 6.11 S/ 4.07 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13.09 S/ 13.09 S/ 13.09 S/ 13.09 S/ 13.09 S/ 8.72
S/ 8.59 S/ 6.87 S/ 6.87 S/ 8.59 S/ 8.59 S/ -
S/ - S/ 12.69 S/ 12.69 S/ 15.87 S/ 15.87 S/ 19.04
S/ 238.31 S/ 238.31 S/ 238.31 S/ - S/ - S/ -
S/ 115.48 S/ 346.44 S/ 230.96 S/ 346.44 S/ 115.48 S/ 115.48
S/ 4.02 S/ 4.02 S/ 4.02 S/ 4.02 S/ 2.68 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 384.40 S/ 384.40 S/ 384.40 S/ 384.40 S/ 384.40 S/ 256.26
S/ 513.78 S/ 411.03 S/ 411.03 S/ 513.78 S/ 513.78 S/ -
S/ - S/ 74.54 S/ 74.54 S/ 93.17 S/ 93.17 S/ 111.81
S/ 78.63 S/ 78.63 S/ 78.63 S/ - S/ - S/ -
S/ 0.09 S/ 0.28 S/ 0.18 S/ 0.28 S/ 0.09 S/ 0.09
S/ - S/ 0.04 S/ 0.04 S/ 0.05 S/ 0.05 S/ 0.06

E566
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ 1,158.43 S/ - S/ - S/ - S/ -
S/ - S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ -
S/ - S/ - S/ - S/ - S/ 1,054.81 S/ 1,054.81
S/ - S/ - S/ 251.21 S/ - S/ 188.41 S/ -
S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 38.07 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 596.90
S/ 99.98 S/ 79.99 S/ 79.99 S/ 99.98 S/ 99.98 S/ -
S/ - S/ 10.66 S/ 10.66 S/ 13.33 S/ 13.33 S/ 16.00
S/ 152.72 S/ 152.72 S/ 152.72 S/ - S/ - S/ -
S/ 2.89 S/ 8.68 S/ 5.79 S/ 8.68 S/ 2.89 S/ 2.89
S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 59.84 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 2.51
S/ 1.67 S/ 1.34 S/ 1.34 S/ 1.67 S/ 1.67 S/ -
S/ - S/ 226.08 S/ 226.08 S/ 282.61 S/ 282.61 S/ 339.13
S/ 280.28 S/ 280.28 S/ 280.28 S/ - S/ - S/ -
S/ 3.14 S/ 9.42 S/ 6.28 S/ 9.42 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ 183.60 S/ - S/ - S/ - S/ -
S/ - S/ 29.15 S/ 29.15 S/ 29.15 S/ 29.15 S/ -
S/ - S/ - S/ - S/ - S/ 137.95 S/ 137.95
S/ - S/ - S/ 54,707.71 S/ - S/ 41,030.78 S/ -
S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 662.81 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 180.24
S/ 96.74 S/ 77.39 S/ 77.39 S/ 96.74 S/ 96.74 S/ -
S/ - S/ 50.70 S/ 50.70 S/ 63.37 S/ 63.37 S/ 76.04
S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ - S/ - S/ -
S/ 0.00 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.00 S/ 0.00
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 5,264.19 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 12.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ 1,033.19 S/ - S/ - S/ - S/ -
S/ - S/ 342.16 S/ 342.16 S/ 342.16 S/ 342.16 S/ -
S/ - S/ - S/ - S/ - S/ 548.50 S/ 548.50
S/ - S/ - S/ 645.58 S/ - S/ 484.18 S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 1,568.22 S/ -

E567
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 24,203.83
S/ 1,362.16 S/ 1,089.73 S/ 1,089.73 S/ 1,362.16 S/ 1,362.16 S/ -
S/ - S/ 390.03 S/ 390.03 S/ 487.54 S/ 487.54 S/ 585.04
S/ 47.17 S/ 47.17 S/ 47.17 S/ - S/ - S/ -
S/ 46.10 S/ 138.30 S/ 92.20 S/ 138.30 S/ 46.10 S/ 46.10
S/ 183.51 S/ 183.51 S/ 183.51 S/ 183.51 S/ 122.34 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,267.67
S/ 30.37 S/ 24.30 S/ 24.30 S/ 30.37 S/ 30.37 S/ -
S/ - S/ 39.16 S/ 39.16 S/ 48.95 S/ 48.95 S/ 58.74
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 317.66 S/ 317.66 S/ - S/ - S/ - S/ -
S/ - S/ 483.55 S/ 483.55 S/ 483.55 S/ 483.55 S/ -
S/ - S/ - S/ - S/ - S/ 28.90 S/ 28.90
S/ - S/ - S/ 1,767.72 S/ - S/ 1,325.79 S/ -
S/ 43.86 S/ 43.86 S/ 43.86 S/ 43.86 S/ 29.24 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 693.75 S/ 693.75 S/ 693.75 S/ 693.75 S/ 693.75 S/ 462.50
S/ 52.08 S/ 41.66 S/ 41.66 S/ 52.08 S/ 52.08 S/ -
S/ - S/ 74.88 S/ 74.88 S/ 93.60 S/ 93.60 S/ 112.32
S/ 469.00 S/ 469.00 S/ 469.00 S/ - S/ - S/ -
S/ 26.05 S/ 78.15 S/ 52.10 S/ 78.15 S/ 26.05 S/ 26.05
S/ 24.72 S/ 24.72 S/ 24.72 S/ 24.72 S/ 16.48 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 15.98 S/ 15.98 S/ 15.98 S/ 15.98 S/ 15.98 S/ 10.65
S/ 30.51 S/ 24.41 S/ 24.41 S/ 30.51 S/ 30.51 S/ -
S/ - S/ 175.52 S/ 175.52 S/ 219.40 S/ 219.40 S/ 263.28
S/ 641.90 S/ 641.90 S/ 641.90 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 156.69 S/ 156.69 S/ - S/ - S/ - S/ -
S/ - S/ 84.66 S/ 84.66 S/ 84.66 S/ 84.66 S/ -
S/ - S/ - S/ - S/ - S/ 101.16 S/ 101.16
S/ - S/ - S/ 407.29 S/ - S/ 305.47 S/ -
S/ 67.98 S/ 67.98 S/ 67.98 S/ 67.98 S/ 45.32 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 43.23 S/ 43.23 S/ 43.23 S/ 43.23 S/ 43.23 S/ 28.82
S/ 88.98 S/ 71.19 S/ 71.19 S/ 88.98 S/ 88.98 S/ -
S/ - S/ 209.66 S/ 209.66 S/ 262.08 S/ 262.08 S/ 314.50
S/ 88.81 S/ 88.81 S/ 88.81 S/ - S/ - S/ -
S/ 0.48 S/ 1.44 S/ 0.96 S/ 1.44 S/ 0.48 S/ 0.48
S/ 26.46 S/ 26.46 S/ 26.46 S/ 26.46 S/ 17.64 S/ -

E568
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ 33,441.33 S/ - S/ - S/ - S/ -
S/ - S/ 735.00 S/ 735.00 S/ 735.00 S/ 735.00 S/ -
S/ - S/ - S/ - S/ - S/ 385.00 S/ 385.00
S/ - S/ - S/ 308.00 S/ - S/ 231.00 S/ -
S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 368.87 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 85.87 S/ 85.87 S/ 85.87 S/ 85.87 S/ 85.87 S/ 57.25
S/ 156.10 S/ 124.88 S/ 124.88 S/ 156.10 S/ 156.10 S/ -
S/ - S/ 1.05 S/ 1.05 S/ 1.31 S/ 1.31 S/ 1.57
S/ 1,972.23 S/ 1,972.23 S/ 1,972.23 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 815.33 S/ 815.33 S/ - S/ - S/ - S/ -
S/ - S/ 880.49 S/ 880.49 S/ 880.49 S/ 880.49 S/ -
S/ - S/ - S/ - S/ - S/ 711.77 S/ 711.77
S/ - S/ - S/ 1,022.89 S/ - S/ 767.17 S/ -
S/ 82.91 S/ 82.91 S/ 82.91 S/ 82.91 S/ 55.27 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 1,956.91
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 369.50 S/ 369.50 S/ - S/ - S/ - S/ -
S/ - S/ 521.11 S/ 521.11 S/ 521.11 S/ 521.11 S/ -
S/ - S/ - S/ - S/ - S/ 1.40 S/ 1.40
S/ - S/ - S/ 69.21 S/ - S/ 51.91 S/ -
S/ 6.11 S/ 6.11 S/ 6.11 S/ 6.11 S/ 4.07 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13.09 S/ 13.09 S/ 13.09 S/ 13.09 S/ 13.09 S/ 8.72
S/ 8.59 S/ 6.87 S/ 6.87 S/ 8.59 S/ 8.59 S/ -
S/ - S/ 12.69 S/ 12.69 S/ 15.87 S/ 15.87 S/ 19.04
S/ 238.31 S/ 238.31 S/ 238.31 S/ - S/ - S/ -
S/ 115.48 S/ 346.44 S/ 230.96 S/ 346.44 S/ 115.48 S/ 115.48
S/ 4.02 S/ 4.02 S/ 4.02 S/ 4.02 S/ 2.68 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 384.40 S/ 384.40 S/ 384.40 S/ 384.40 S/ 384.40 S/ 256.26
S/ 513.78 S/ 411.03 S/ 411.03 S/ 513.78 S/ 513.78 S/ -
S/ - S/ 74.54 S/ 74.54 S/ 93.17 S/ 93.17 S/ 111.81
S/ 78.63 S/ 78.63 S/ 78.63 S/ - S/ - S/ -
S/ 0.09 S/ 0.28 S/ 0.18 S/ 0.28 S/ 0.09 S/ 0.09
S/ - S/ 0.04 S/ 0.04 S/ 0.05 S/ 0.05 S/ 0.06

E569
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,158.43 S/ 1,158.43 S/ - S/ - S/ - S/ -
S/ - S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ 4,418.66 S/ -
S/ - S/ - S/ - S/ - S/ 1,054.81 S/ 1,054.81
S/ - S/ - S/ 251.21 S/ - S/ 188.41 S/ -
S/ 57.10 S/ 57.10 S/ 57.10 S/ 57.10 S/ 38.07 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 895.35 S/ 596.90
S/ 99.98 S/ 79.99 S/ 79.99 S/ 99.98 S/ 99.98 S/ -
S/ - S/ 10.66 S/ 10.66 S/ 13.33 S/ 13.33 S/ 16.00
S/ 152.72 S/ 152.72 S/ 152.72 S/ - S/ - S/ -
S/ 2.89 S/ 8.68 S/ 5.79 S/ 8.68 S/ 2.89 S/ 2.89
S/ 89.76 S/ 89.76 S/ 89.76 S/ 89.76 S/ 59.84 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 3.76 S/ 2.51
S/ 1.67 S/ 1.34 S/ 1.34 S/ 1.67 S/ 1.67 S/ -
S/ - S/ 226.08 S/ 226.08 S/ 282.61 S/ 282.61 S/ 339.13
S/ 280.28 S/ 280.28 S/ 280.28 S/ - S/ - S/ -
S/ 3.14 S/ 9.42 S/ 6.28 S/ 9.42 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 183.60 S/ 183.60 S/ - S/ - S/ - S/ -
S/ - S/ 29.15 S/ 29.15 S/ 29.15 S/ 29.15 S/ -
S/ - S/ - S/ - S/ - S/ 137.95 S/ 137.95
S/ - S/ - S/ 54,707.71 S/ - S/ 41,030.78 S/ -
S/ 994.21 S/ 994.21 S/ 994.21 S/ 994.21 S/ 662.81 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 270.35 S/ 180.24
S/ 96.74 S/ 77.39 S/ 77.39 S/ 96.74 S/ 96.74 S/ -
S/ - S/ 50.70 S/ 50.70 S/ 63.37 S/ 63.37 S/ 76.04
S/ 3,651.21 S/ 3,651.21 S/ 3,651.21 S/ - S/ - S/ -
S/ 0.00 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.00 S/ 0.00
S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 7,896.29 S/ 5,264.19 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 19.23 S/ 12.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,033.19 S/ 1,033.19 S/ - S/ - S/ - S/ -
S/ - S/ 342.16 S/ 342.16 S/ 342.16 S/ 342.16 S/ -
S/ - S/ - S/ - S/ - S/ 548.50 S/ 548.50
S/ - S/ - S/ 645.58 S/ - S/ 484.18 S/ -
S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 2,352.33 S/ 1,568.22 S/ -

E570
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 36,305.75 S/ 24,203.83
S/ 1,362.16 S/ 1,089.73 S/ 1,089.73 S/ 1,362.16 S/ 1,362.16 S/ -
S/ - S/ 390.03 S/ 390.03 S/ 487.54 S/ 487.54 S/ 585.04
S/ 47.17 S/ 47.17 S/ 47.17 S/ - S/ - S/ -
S/ 46.10 S/ 138.30 S/ 92.20 S/ 138.30 S/ 46.10 S/ 46.10
S/ 183.51 S/ 183.51 S/ 183.51 S/ 183.51 S/ 122.34 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,901.51 S/ 1,267.67
S/ 30.37 S/ 24.30 S/ 24.30 S/ 30.37 S/ 30.37 S/ -
S/ - S/ 39.16 S/ 39.16 S/ 48.95 S/ 48.95 S/ 58.74
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 317.66 S/ 317.66 S/ - S/ - S/ - S/ -
S/ - S/ 483.55 S/ 483.55 S/ 483.55 S/ 483.55 S/ -
S/ - S/ - S/ - S/ - S/ 28.90 S/ 28.90
S/ - S/ - S/ 1,767.72 S/ - S/ 1,325.79 S/ -
S/ 43.86 S/ 43.86 S/ 43.86 S/ 43.86 S/ 29.24 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 693.75 S/ 693.75 S/ 693.75 S/ 693.75 S/ 693.75 S/ 462.50
S/ 52.08 S/ 41.66 S/ 41.66 S/ 52.08 S/ 52.08 S/ -
S/ - S/ 74.88 S/ 74.88 S/ 93.60 S/ 93.60 S/ 112.32
S/ 469.00 S/ 469.00 S/ 469.00 S/ - S/ - S/ -
S/ 26.05 S/ 78.15 S/ 52.10 S/ 78.15 S/ 26.05 S/ 26.05
S/ 24.72 S/ 24.72 S/ 24.72 S/ 24.72 S/ 16.48 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 15.98 S/ 15.98 S/ 15.98 S/ 15.98 S/ 15.98 S/ 10.65
S/ 30.51 S/ 24.41 S/ 24.41 S/ 30.51 S/ 30.51 S/ -
S/ - S/ 175.52 S/ 175.52 S/ 219.40 S/ 219.40 S/ 263.28
S/ 641.90 S/ 641.90 S/ 641.90 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 156.69 S/ 156.69 S/ - S/ - S/ - S/ -
S/ - S/ 84.66 S/ 84.66 S/ 84.66 S/ 84.66 S/ -
S/ - S/ - S/ - S/ - S/ 101.16 S/ 101.16
S/ - S/ - S/ 407.29 S/ - S/ 305.47 S/ -
S/ 67.98 S/ 67.98 S/ 67.98 S/ 67.98 S/ 45.32 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 43.23 S/ 43.23 S/ 43.23 S/ 43.23 S/ 43.23 S/ 28.82
S/ 88.98 S/ 71.19 S/ 71.19 S/ 88.98 S/ 88.98 S/ -
S/ - S/ 209.66 S/ 209.66 S/ 262.08 S/ 262.08 S/ 314.50
S/ 88.81 S/ 88.81 S/ 88.81 S/ - S/ - S/ -
S/ 0.48 S/ 1.44 S/ 0.96 S/ 1.44 S/ 0.48 S/ 0.48
S/ 26.46 S/ 26.46 S/ 26.46 S/ 26.46 S/ 17.64 S/ -

E571
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33,441.33 S/ 33,441.33 S/ - S/ - S/ - S/ -
S/ - S/ 735.00 S/ 735.00 S/ 735.00 S/ 735.00 S/ -
S/ - S/ - S/ - S/ - S/ 385.00 S/ 385.00
S/ - S/ - S/ 308.00 S/ - S/ 231.00 S/ -
S/ 553.31 S/ 553.31 S/ 553.31 S/ 553.31 S/ 368.87 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 85.87 S/ 85.87 S/ 85.87 S/ 85.87 S/ 85.87 S/ 57.25
S/ 156.10 S/ 124.88 S/ 124.88 S/ 156.10 S/ 156.10 S/ -
S/ - S/ 1.05 S/ 1.05 S/ 1.31 S/ 1.31 S/ 1.57
S/ 1,972.23 S/ 1,972.23 S/ 1,972.23 S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 815.33 S/ 815.33 S/ - S/ - S/ - S/ -
S/ - S/ 880.49 S/ 880.49 S/ 880.49 S/ 880.49 S/ -
S/ - S/ - S/ - S/ - S/ 711.77 S/ 711.77
S/ - S/ - S/ 1,022.89 S/ - S/ 767.17 S/ -
S/ 82.91 S/ 82.91 S/ 82.91 S/ 82.91 S/ 55.27 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 2,935.37 S/ 1,956.91
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 369.50 S/ 369.50 S/ - S/ - S/ - S/ -
S/ - S/ 521.11 S/ 521.11 S/ 521.11 S/ 521.11 S/ -
S/ - S/ - S/ - S/ - S/ 1.40 S/ 1.40
S/ - S/ - S/ 69.21 S/ - S/ 51.91 S/ -
S/ 6.11 S/ 6.11 S/ 6.11 S/ 6.11 S/ 4.07 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13.09 S/ 13.09 S/ 13.09 S/ 13.09 S/ 13.09 S/ 8.72
S/ 8.59 S/ 6.87 S/ 6.87 S/ 8.59 S/ 8.59 S/ -
S/ - S/ 12.69 S/ 12.69 S/ 15.87 S/ 15.87 S/ 19.04
S/ 238.31 S/ 238.31 S/ 238.31 S/ - S/ - S/ -
S/ 115.48 S/ 346.44 S/ 230.96 S/ 346.44 S/ 115.48 S/ 115.48
S/ 4.02 S/ 4.02 S/ 4.02 S/ 4.02 S/ 2.68 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 384.40 S/ 384.40 S/ 384.40 S/ 384.40 S/ 384.40 S/ 256.26
S/ 513.78 S/ 411.03 S/ 411.03 S/ 513.78 S/ 513.78 S/ -
S/ - S/ 74.54 S/ 74.54 S/ 93.17 S/ 93.17 S/ 111.81
S/ 78.63 S/ 78.63 S/ 78.63 S/ - S/ - S/ -
S/ 0.09 S/ 0.28 S/ 0.18 S/ 0.28 S/ 0.09 S/ 0.09
S/ - S/ 0.04 S/ 0.04 S/ 0.05 S/ 0.05 S/ 0.06

E572
E MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11


DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020

A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020

S/ 520,598.81 S/ 563,892.87 S/ 671,265.52 S/ 340,200.58 S/ 554,440.82 S/ 170,531.82


10.03% 10.87% 12.94% 6.56% 10.68% 3.29%
31.50% 42.37% 55.30% 61.86% 72.54% 75.83%

E573
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,054.81 S/ 1,054.81 S/ - S/ -
S/ - S/ 251.21 S/ 251.21 S/ 314.02
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 596.90 S/ 298.45 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 16.00 S/ 13.33 S/ 20.00 S/ 20.00
S/ - S/ - S/ - S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2.51 S/ 1.25 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 339.13 S/ 282.61 S/ 423.91 S/ 423.91
S/ - S/ - S/ - S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 137.95 S/ 137.95 S/ - S/ -
S/ - S/ 54,707.71 S/ 54,707.71 S/ 68,384.64
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 180.24 S/ 90.12 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 76.04 S/ 63.37 S/ 95.05 S/ 95.05
S/ - S/ - S/ - S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 12.82 S/ 6.41 S/ 6.41 S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 548.50 S/ 548.50 S/ - S/ -

E574
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ 645.58 S/ 645.58 S/ 806.97


S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 24,203.83 S/ 12,101.92 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 585.04 S/ 487.54 S/ 731.30 S/ 731.30
S/ - S/ - S/ - S/ -
S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,267.67 S/ 633.84 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 58.74 S/ 48.95 S/ 73.43 S/ 73.43
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 28.90 S/ 28.90 S/ - S/ -
S/ - S/ 1,767.72 S/ 1,767.72 S/ 2,209.65
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 462.50 S/ 231.25 S/ 231.25 S/ -
S/ - S/ - S/ - S/ -
S/ 112.32 S/ 93.60 S/ 140.40 S/ 140.40
S/ - S/ - S/ - S/ -
S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 10.65 S/ 5.33 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 263.28 S/ 219.40 S/ 329.10 S/ 329.10
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 101.16 S/ 101.16 S/ - S/ -
S/ - S/ 407.29 S/ 407.29 S/ 509.11
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 28.82 S/ 14.41 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 314.50 S/ 262.08 S/ 393.12 S/ 393.12
S/ - S/ - S/ - S/ -

E575
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48


S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 385.00 S/ 385.00 S/ - S/ -
S/ - S/ 308.00 S/ 308.00 S/ 385.00
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 57.25 S/ 28.62 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1.57 S/ 1.31 S/ 1.97 S/ 1.97
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 711.77 S/ 711.77 S/ - S/ -
S/ - S/ 1,022.89 S/ 1,022.89 S/ 1,278.61
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,956.91 S/ 978.46 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1.40 S/ 1.40 S/ - S/ -
S/ - S/ 69.21 S/ 69.21 S/ 86.52
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 8.72 S/ 4.36 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 19.04 S/ 15.87 S/ 23.80 S/ 23.80
S/ - S/ - S/ - S/ -
S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 256.26 S/ 128.13 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 111.81 S/ 93.17 S/ 139.76 S/ 139.76
S/ - S/ - S/ - S/ -
S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09

E576
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 0.06 S/ 0.08 S/ 0.08 S/ -

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,054.81 S/ 1,054.81 S/ - S/ -
S/ - S/ 251.21 S/ 251.21 S/ 314.02
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 596.90 S/ 298.45 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 16.00 S/ 13.33 S/ 20.00 S/ 20.00
S/ - S/ - S/ - S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2.51 S/ 1.25 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 339.13 S/ 282.61 S/ 423.91 S/ 423.91
S/ - S/ - S/ - S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 137.95 S/ 137.95 S/ - S/ -
S/ - S/ 54,707.71 S/ 54,707.71 S/ 68,384.64
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 180.24 S/ 90.12 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 76.04 S/ 63.37 S/ 95.05 S/ 95.05
S/ - S/ - S/ - S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 12.82 S/ 6.41 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 548.50 S/ 548.50 S/ - S/ -
S/ - S/ 645.58 S/ 645.58 S/ 806.97

E577
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 24,203.83 S/ 12,101.92 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 585.04 S/ 487.54 S/ 731.30 S/ 731.30
S/ - S/ - S/ - S/ -
S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,267.67 S/ 633.84 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 58.74 S/ 48.95 S/ 73.43 S/ 73.43
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 28.90 S/ 28.90 S/ - S/ -
S/ - S/ 1,767.72 S/ 1,767.72 S/ 2,209.65
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 462.50 S/ 231.25 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 112.32 S/ 93.60 S/ 140.40 S/ 140.40
S/ - S/ - S/ - S/ -
S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 10.65 S/ 5.33 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 263.28 S/ 219.40 S/ 329.10 S/ 329.10
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 101.16 S/ 101.16 S/ - S/ -
S/ - S/ 407.29 S/ 407.29 S/ 509.11
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 28.82 S/ 14.41 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 314.50 S/ 262.08 S/ 393.12 S/ 393.12
S/ - S/ - S/ - S/ -
S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48

E578
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 385.00 S/ 385.00 S/ - S/ -
S/ - S/ 308.00 S/ 308.00 S/ 385.00
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 57.25 S/ 28.62 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1.57 S/ 1.31 S/ 1.97 S/ 1.97
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 711.77 S/ 711.77 S/ - S/ -
S/ - S/ 1,022.89 S/ 1,022.89 S/ 1,278.61
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,956.91 S/ 978.46 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1.40 S/ 1.40 S/ - S/ -
S/ - S/ 69.21 S/ 69.21 S/ 86.52
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 8.72 S/ 4.36 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 19.04 S/ 15.87 S/ 23.80 S/ 23.80
S/ - S/ - S/ - S/ -
S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 256.26 S/ 128.13 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 111.81 S/ 93.17 S/ 139.76 S/ 139.76
S/ - S/ - S/ - S/ -
S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09
S/ 0.06 S/ 0.05 S/ 0.08 S/ 0.08

E579
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,054.81 S/ 1,054.81 S/ - S/ -
S/ - S/ 251.21 S/ 251.21 S/ 314.02
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 596.90 S/ 298.45 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 16.00 S/ 13.33 S/ 20.00 S/ 20.00
S/ - S/ - S/ - S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2.51 S/ 1.25 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 339.13 S/ 282.61 S/ 423.91 S/ 423.91
S/ - S/ - S/ - S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 137.95 S/ 137.95 S/ - S/ -
S/ - S/ 54,707.71 S/ 54,707.71 S/ 68,384.64
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 180.24 S/ 90.12 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 76.04 S/ 63.37 S/ 95.05 S/ 95.05
S/ - S/ - S/ - S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 12.82 S/ 6.41 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 548.50 S/ 548.50 S/ - S/ -
S/ - S/ 645.58 S/ 645.58 S/ 806.97
S/ - S/ - S/ - S/ -

E580
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ 24,203.83 S/ 12,101.92 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 585.04 S/ 487.54 S/ 731.30 S/ 731.30
S/ - S/ - S/ - S/ -
S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,267.67 S/ 633.84 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 58.74 S/ 48.95 S/ 73.43 S/ 73.43
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 28.90 S/ 28.90 S/ - S/ -
S/ - S/ 1,767.72 S/ 1,767.72 S/ 2,209.65
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 462.50 S/ 231.25 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 112.32 S/ 93.60 S/ 140.40 S/ 140.40
S/ - S/ - S/ - S/ -
S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 10.65 S/ 5.33 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 263.28 S/ 219.40 S/ 329.10 S/ 329.10
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 101.16 S/ 101.16 S/ - S/ -
S/ - S/ 407.29 S/ 407.29 S/ 509.11
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 28.82 S/ 14.41 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 314.50 S/ 262.08 S/ 393.12 S/ 393.12
S/ - S/ - S/ - S/ -
S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48
S/ - S/ - S/ - S/ -

E581
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 385.00 S/ 385.00 S/ - S/ -
S/ - S/ 308.00 S/ 308.00 S/ 385.00
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 57.25 S/ 28.62 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1.57 S/ 1.31 S/ 1.97 S/ 1.97
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 711.77 S/ 711.77 S/ - S/ -
S/ - S/ 1,022.89 S/ 1,022.89 S/ 1,278.61
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,956.91 S/ 978.46 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1.40 S/ 1.40 S/ - S/ -
S/ - S/ 69.21 S/ 69.21 S/ 86.52
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 8.72 S/ 4.36 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 19.04 S/ 15.87 S/ 23.80 S/ 23.80
S/ - S/ - S/ - S/ -
S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 256.26 S/ 128.13 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 111.81 S/ 93.17 S/ 139.76 S/ 139.76
S/ - S/ - S/ - S/ -
S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09
S/ 0.06 S/ 0.05 S/ 0.08 S/ 0.08

E582
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,054.81 S/ 1,054.81 S/ - S/ -
S/ - S/ 251.21 S/ 251.21 S/ 314.02
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 596.90 S/ 298.45 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 16.00 S/ 13.33 S/ 20.00 S/ 20.00
S/ - S/ - S/ - S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2.51 S/ 1.25 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 339.13 S/ 282.61 S/ 423.91 S/ 423.91
S/ - S/ - S/ - S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 137.95 S/ 137.95 S/ - S/ -
S/ - S/ 54,707.71 S/ 54,707.71 S/ 68,384.64
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 180.24 S/ 90.12 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 76.04 S/ 63.37 S/ 95.05 S/ 95.05
S/ - S/ - S/ - S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 12.82 S/ 6.41 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 548.50 S/ 548.50 S/ - S/ -
S/ - S/ 645.58 S/ 645.58 S/ 806.97
S/ - S/ - S/ - S/ -

E583
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ 24,203.83 S/ 12,101.92 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 585.04 S/ 487.54 S/ 731.30 S/ 731.30
S/ - S/ - S/ - S/ -
S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,267.67 S/ 633.84 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 58.74 S/ 48.95 S/ 73.43 S/ 73.43
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 28.90 S/ 28.90 S/ - S/ -
S/ - S/ 1,767.72 S/ 1,767.72 S/ 2,209.65
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 462.50 S/ 231.25 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 112.32 S/ 93.60 S/ 140.40 S/ 140.40
S/ - S/ - S/ - S/ -
S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 10.65 S/ 5.33 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 263.28 S/ 219.40 S/ 329.10 S/ 329.10
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 101.16 S/ 101.16 S/ - S/ -
S/ - S/ 407.29 S/ 407.29 S/ 509.11
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 28.82 S/ 14.41 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 314.50 S/ 262.08 S/ 393.12 S/ 393.12
S/ - S/ - S/ - S/ -
S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48
S/ - S/ - S/ - S/ -

E584
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 385.00 S/ 385.00 S/ - S/ -
S/ - S/ 308.00 S/ 308.00 S/ 385.00
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 57.25 S/ 28.62 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1.57 S/ 1.31 S/ 1.97 S/ 1.97
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 711.77 S/ 711.77 S/ - S/ -
S/ - S/ 1,022.89 S/ 1,022.89 S/ 1,278.61
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,956.91 S/ 978.46 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1.40 S/ 1.40 S/ - S/ -
S/ - S/ 69.21 S/ 69.21 S/ 86.52
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 8.72 S/ 4.36 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 19.04 S/ 15.87 S/ 23.80 S/ 23.80
S/ - S/ - S/ - S/ -
S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 256.26 S/ 128.13 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 111.81 S/ 93.17 S/ 139.76 S/ 139.76
S/ - S/ - S/ - S/ -
S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09
S/ 0.06 S/ 0.05 S/ 0.08 S/ 0.08

E585
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,054.81 S/ 1,054.81 S/ - S/ -
S/ - S/ 251.21 S/ 251.21 S/ 314.02
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 596.90 S/ 298.45 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 16.00 S/ 13.33 S/ 20.00 S/ 20.00
S/ - S/ - S/ - S/ -
S/ 2.89 S/ 2.89 S/ 2.89 S/ 2.89
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 2.51 S/ 1.25 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 339.13 S/ 282.61 S/ 423.91 S/ 423.91
S/ - S/ - S/ - S/ -
S/ 3.14 S/ 3.14 S/ 3.14 S/ 3.14
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 137.95 S/ 137.95 S/ - S/ -
S/ - S/ 54,707.71 S/ 54,707.71 S/ 68,384.64
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 180.24 S/ 90.12 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 76.04 S/ 63.37 S/ 95.05 S/ 95.05
S/ - S/ - S/ - S/ -
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 12.82 S/ 6.41 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 548.50 S/ 548.50 S/ - S/ -
S/ - S/ 645.58 S/ 645.58 S/ 806.97
S/ - S/ - S/ - S/ -

E586
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ 24,203.83 S/ 12,101.92 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 585.04 S/ 487.54 S/ 731.30 S/ 731.30
S/ - S/ - S/ - S/ -
S/ 46.10 S/ 46.10 S/ 46.10 S/ 46.10
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,267.67 S/ 633.84 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 58.74 S/ 48.95 S/ 73.43 S/ 73.43
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 28.90 S/ 28.90 S/ - S/ -
S/ - S/ 1,767.72 S/ 1,767.72 S/ 2,209.65
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 462.50 S/ 231.25 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 112.32 S/ 93.60 S/ 140.40 S/ 140.40
S/ - S/ - S/ - S/ -
S/ 26.05 S/ 26.05 S/ 26.05 S/ 26.05
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 10.65 S/ 5.33 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 263.28 S/ 219.40 S/ 329.10 S/ 329.10
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 101.16 S/ 101.16 S/ - S/ -
S/ - S/ 407.29 S/ 407.29 S/ 509.11
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 28.82 S/ 14.41 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 314.50 S/ 262.08 S/ 393.12 S/ 393.12
S/ - S/ - S/ - S/ -
S/ 0.48 S/ 0.48 S/ 0.48 S/ 0.48
S/ - S/ - S/ - S/ -

E587
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 385.00 S/ 385.00 S/ - S/ -
S/ - S/ 308.00 S/ 308.00 S/ 385.00
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 57.25 S/ 28.62 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1.57 S/ 1.31 S/ 1.97 S/ 1.97
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 711.77 S/ 711.77 S/ - S/ -
S/ - S/ 1,022.89 S/ 1,022.89 S/ 1,278.61
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1,956.91 S/ 978.46 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 1.40 S/ 1.40 S/ - S/ -
S/ - S/ 69.21 S/ 69.21 S/ 86.52
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 8.72 S/ 4.36 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 19.04 S/ 15.87 S/ 23.80 S/ 23.80
S/ - S/ - S/ - S/ -
S/ 115.48 S/ 115.48 S/ 115.48 S/ 115.48
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 256.26 S/ 128.13 S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 111.81 S/ 93.17 S/ 139.76 S/ 139.76
S/ - S/ - S/ - S/ -
S/ 0.09 S/ 0.09 S/ 0.09 S/ 0.09
S/ 0.06 S/ 0.05 S/ 0.08 S/ 0.08

E588
Mes 12 Mes 13 Mes 14 Mes 15
DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 170,531.82 S/ 392,235.90 S/ 308,966.52 S/ 382,703.29


3.29% 7.56% 5.95% 7.37%
79.11% 86.67% 92.63% 100.00%

E589
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.

SUSTITUCIÓN
0202050031 FIERRO LISO 1/2" m S/ 35.93
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80
0202100004 ALAMBRE GALV.#16 kg S/ 108.67
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46
0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84
0202350050 ARANDELA 1/2" und S/ 0.12
0202350083 TORNILLO 3/8" und S/ 50.16
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65
0202400062 TARUGO 1" X 1/2" und S/ 369.09
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGOund S/ 2.60
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31
0204050001 ARENA GRUESA m3 S/ 6,093.86
0204050002 ARENA FINA S/ 11,373.27
0204100001 TIERRA DE CHACRA S/ 8,564.35
0204100026 GRASS AMERICANO m2 S/ 9,050.46
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24

A590
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41
0205350001 AGUA m3 S/ 1,652.76
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35
0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50
0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUA m2 S/ 208,162.94
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 11,780.45
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 15,110.46
0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 47,740.29
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE C m2 S/ 19,577.12
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 4,734.76
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 2,415.98
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mmm2 S/ 3,703.01
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.m2 S/ 1,873.43
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 m2 y S/ 1,959.24
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON m2 S/ 1,730.54
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_ m2 S/ 118.84
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LO m2 S/ 44,784.47
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE m2 S/ 157,467.84
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03
0224100017 CERAMICO m2 S/ 5.78
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL pza S/ 134.09
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16

A591
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIO pza S/ 21.15
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84
0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03
0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPOR und S/ 349.15
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58
0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 und S/ 317.80
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98
0226300033 CERROJO 2" pza S/ 84.26
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJpza S/ 63.34
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46
0226500005 MECANISMO DE IZAJE und S/ 4.37
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61
0230010015 AGUARRAS gal S/ 454.15
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44
0230010025 LIJA PARA FIERRO und S/ 114.48
0230010035 THINNER gal S/ 8.62
0230010080 RODOPLAST 6mm m S/ 545.96
0230010104 BASE ZINCROMATO gal S/ 280.68
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21
0230010150 FRAGUA X 1 KG und S/ 4,140.15
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38
0230010162 LIJA PARA MADERA und S/ 3,682.57
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 1m_x000D S/ 1,634.50
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37

A592
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADO und_x000 S/ 13,029.50
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97
0230010192 SELLADOR PARA MADERA gal S/ 1,238.36
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO m2 S/ 2,951.74
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑund S/ 832.39
0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000 S/ 355.95
0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kgpln S/ 148.95
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68
0230100002 SOLDADURA kg S/ 0.39
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPI m2 S/ 28,702.26
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA Cm2 S/ 1,222.87
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE m I 2_x000 S/ 5,897.43
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE Im2 S/ 21,785.89
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE m2 S/ 859.09
0230300002 CUERDA DE NYLON m S/ 1.17
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58
0230410094 ESPEJO BISELADO m2 S/ 1,788.39
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68
0230990175 WATER STOP DE 6"x25m rll S/ 177.24
0238010001 HORMIGON m3 S/ 345.84
0243010001 MADERA TORNILLO p2 S/ 89,826.90
0243100001 MADERA CEDRO p2 S/ 23,992.75
243100025 COLA SINTETICA gal S/ 174.35
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84
244040017 PLANCHA MDF e=3MM m2 S/ 42.20
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09

A593
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94
0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39
0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65
0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63
254010005 PINTURA LATEX gal S/ 8,516.06
254010006 PRESERVANTE DE MADERA gal S/ 225.62

A594
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


254100005 BARNIZ MARINO gal S/ 18.51
254150020 PINTURA ESMALTE gal S/ 152.14
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50
254150033 PINTURA OLEO MATE . gal S/ 11,500.04
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07
254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11
254200001 PINTURA ANTICORROSIVA gal S/ 179.77
254300001 PINTURA PARA TRAFICO gal S/ 413.05
254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11
265010030 TUBERIA FºGº 11/2" m S/ 163.89
265010046 TUBERIA FºGº 1" m S/ 1,218.74
265010058 TUBERIA FºGº 2" m S/ 400.87
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INST m S/ 13,481.12
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50
SALDO

A595
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0202050031 FIERRO LISO 1/2" m S/ 35.93
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80
0202100004 ALAMBRE GALV.#16 kg S/ 108.67
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46
0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84
0202350050 ARANDELA 1/2" und S/ 0.12
0202350083 TORNILLO 3/8" und S/ 50.16
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65
0202400062 TARUGO 1" X 1/2" und S/ 369.09
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGOund S/ 2.60
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31
0204050001 ARENA GRUESA m3 S/ 6,093.86
0204050002 ARENA FINA S/ 11,373.27
0204100001 TIERRA DE CHACRA S/ 8,564.35
0204100026 GRASS AMERICANO m2 S/ 9,050.46
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41
0205350001 AGUA m3 S/ 1,652.76
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35

A596
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50
0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUA m2 S/ 208,162.94
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 11,780.45
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 15,110.46
0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 47,740.29
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE C m2 S/ 19,577.12
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 4,734.76
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 2,415.98
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mmm2 S/ 3,703.01
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.m2 S/ 1,873.43
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 m2 y S/ 1,959.24
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON m2 S/ 1,730.54
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_ m2 S/ 118.84
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LO m2 S/ 44,784.47
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE m2 S/ 157,467.84
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03
0224100017 CERAMICO m2 S/ 5.78
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL pza S/ 134.09
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16
0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIO pza S/ 21.15
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84

A597
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03
0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPOR und S/ 349.15
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58
0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 und S/ 317.80
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98
0226300033 CERROJO 2" pza S/ 84.26
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJpza S/ 63.34
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46
0226500005 MECANISMO DE IZAJE und S/ 4.37
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61
0230010015 AGUARRAS gal S/ 454.15
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44
0230010025 LIJA PARA FIERRO und S/ 114.48
0230010035 THINNER gal S/ 8.62
0230010080 RODOPLAST 6mm m S/ 545.96
0230010104 BASE ZINCROMATO gal S/ 280.68
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21
0230010150 FRAGUA X 1 KG und S/ 4,140.15
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38
0230010162 LIJA PARA MADERA und S/ 3,682.57
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 1m_x000D S/ 1,634.50
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37
0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADOund_x000 S/ 13,029.50
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97

A598
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0230010192 SELLADOR PARA MADERA gal S/ 1,238.36
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO m2 S/ 2,951.74
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑund S/ 832.39
0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000 S/ 355.95
0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kgpln S/ 148.95
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68
0230100002 SOLDADURA kg S/ 0.39
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPI m2 S/ 28,702.26
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA Cm2 S/ 1,222.87
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE m I 2_x000 S/ 5,897.43
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE Im2 S/ 21,785.89
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE m2 S/ 859.09
0230300002 CUERDA DE NYLON m S/ 1.17
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58
0230410094 ESPEJO BISELADO m2 S/ 1,788.39
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68
0230990175 WATER STOP DE 6"x25m rll S/ 177.24
0238010001 HORMIGON m3 S/ 345.84
0243010001 MADERA TORNILLO p2 S/ 89,826.90
0243100001 MADERA CEDRO p2 S/ 23,992.75
243100025 COLA SINTETICA gal S/ 174.35
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84
244040017 PLANCHA MDF e=3MM m2 S/ 42.20
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09
0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94

A599
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39
0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65
0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63
254010005 PINTURA LATEX gal S/ 8,516.06
254010006 PRESERVANTE DE MADERA gal S/ 225.62
254100005 BARNIZ MARINO gal S/ 18.51
254150020 PINTURA ESMALTE gal S/ 152.14
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50

A600
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


254150033 PINTURA OLEO MATE . gal S/ 11,500.04
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07
254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11
254200001 PINTURA ANTICORROSIVA gal S/ 179.77
254300001 PINTURA PARA TRAFICO gal S/ 413.05
254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11
265010030 TUBERIA FºGº 11/2" m S/ 163.89
265010046 TUBERIA FºGº 1" m S/ 1,218.74
265010058 TUBERIA FºGº 2" m S/ 400.87
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INST m S/ 13,481.12
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50
MEJORA
0202050031 FIERRO LISO 1/2" m S/ 35.93
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80

A601
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0202100004 ALAMBRE GALV.#16 kg S/ 108.67
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46
0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84
0202350050 ARANDELA 1/2" und S/ 0.12
0202350083 TORNILLO 3/8" und S/ 50.16
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65
0202400062 TARUGO 1" X 1/2" und S/ 369.09
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGOund S/ 2.60
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31
0204050001 ARENA GRUESA m3 S/ 6,093.86
0204050002 ARENA FINA S/ 11,373.27
0204100001 TIERRA DE CHACRA S/ 8,564.35
0204100026 GRASS AMERICANO m2 S/ 9,050.46
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41
0205350001 AGUA m3 S/ 1,652.76
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35
0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50

A602
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUA m2 S/ 208,162.94
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 11,780.45
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 15,110.46
0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 47,740.29
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE C m2 S/ 19,577.12
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 4,734.76
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 2,415.98
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mmm2 S/ 3,703.01
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.m2 S/ 1,873.43
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 m2 y S/ 1,959.24
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON m2 S/ 1,730.54
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_ m2 S/ 118.84
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LO m2 S/ 44,784.47
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE m2 S/ 157,467.84
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03
0224100017 CERAMICO m2 S/ 5.78
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL pza S/ 134.09
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16
0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIO pza S/ 21.15
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84
0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03

A603
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPOR und S/ 349.15
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58
0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 und S/ 317.80
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98
0226300033 CERROJO 2" pza S/ 84.26
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJpza S/ 63.34
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46
0226500005 MECANISMO DE IZAJE und S/ 4.37
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61
0230010015 AGUARRAS gal S/ 454.15
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44
0230010025 LIJA PARA FIERRO und S/ 114.48
0230010035 THINNER gal S/ 8.62
0230010080 RODOPLAST 6mm m S/ 545.96
0230010104 BASE ZINCROMATO gal S/ 280.68
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21
0230010150 FRAGUA X 1 KG und S/ 4,140.15
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38
0230010162 LIJA PARA MADERA und S/ 3,682.57
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 1m_x000D S/ 1,634.50
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37
0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADOund_x000 S/ 13,029.50
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97
0230010192 SELLADOR PARA MADERA gal S/ 1,238.36
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO m2 S/ 2,951.74
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑund S/ 832.39

A604
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000 S/ 355.95
0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kgpln S/ 148.95
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68
0230100002 SOLDADURA kg S/ 0.39
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPI m2 S/ 28,702.26
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA Cm2 S/ 1,222.87
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE m I 2_x000 S/ 5,897.43
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE Im2 S/ 21,785.89
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE m2 S/ 859.09
0230300002 CUERDA DE NYLON m S/ 1.17
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58
0230410094 ESPEJO BISELADO m2 S/ 1,788.39
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68
0230990175 WATER STOP DE 6"x25m rll S/ 177.24
0238010001 HORMIGON m3 S/ 345.84
0243010001 MADERA TORNILLO p2 S/ 89,826.90
0243100001 MADERA CEDRO p2 S/ 23,992.75
243100025 COLA SINTETICA gal S/ 174.35
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84
244040017 PLANCHA MDF e=3MM m2 S/ 42.20
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09
0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94
0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39

A605
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65
0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63
254010005 PINTURA LATEX gal S/ 8,516.06
254010006 PRESERVANTE DE MADERA gal S/ 225.62
254100005 BARNIZ MARINO gal S/ 18.51
254150020 PINTURA ESMALTE gal S/ 152.14
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50
254150033 PINTURA OLEO MATE . gal S/ 11,500.04
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07

A606
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11
254200001 PINTURA ANTICORROSIVA gal S/ 179.77
254300001 PINTURA PARA TRAFICO gal S/ 413.05
254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11
265010030 TUBERIA FºGº 11/2" m S/ 163.89
265010046 TUBERIA FºGº 1" m S/ 1,218.74
265010058 TUBERIA FºGº 2" m S/ 400.87
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INST m S/ 13,481.12
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50
DEFICIENCIA
0202050031 FIERRO LISO 1/2" m S/ 35.93
0202100001 ALAMBRE NEGRO Nro. 8 kg S/ 3,627.26
0202100002 ALAMBRE NEGRO Nro.16 kg S/ 44.80
0202100004 ALAMBRE GALV.#16 kg S/ 108.67
0202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 1,393.84
0202200003 CLAVOS CON CABEZA DE 3" kg S/ 16.46

A607
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0202200006 CLAVOS SIN CABEZA DE 1" kg S/ 1.75
0202300016 PERNOS DE EXPANSION DE 3/8"x2"C/ARANDELA und S/ 36.30
0202350017 PERNO 1/2" x 3" CON TUERCA und S/ 0.84
0202350050 ARANDELA 1/2" und S/ 0.12
0202350083 TORNILLO 3/8" und S/ 50.16
0202350116 TORNILLO DE FIJACION 1" und S/ 109.80
202400042 TORNILLO AUTOROSCANTE 6x32mm mll S/ 58.32
202400044 TORNILLO WAFER P/FINA 8x13mm mll S/ 43.60
0202400055 TORNILLO AUTOROSCANTE 32mm CABEZA PLANA und S/ 10.90
0202400056 TORNILLO AUTOROSCANTE und S/ 56.60
0202400057 TORNILLO AUTOROSCANTE 1 1/2" und S/ 6.86
0202400061 TORNILLO DE FIJACION 2" C TARUGOS PLASTICOS und S/ 77.65
0202400062 TARUGO 1" X 1/2" und S/ 369.09
0202400063 TARUGO 2" X 1.5 cm und S/ 21.70
0202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.16
0202400065 TORNILLO AUTOROSCANTE 6x1" cto S/ 17.83
0202400066 TORNILLO AUTOROSCANTE DE CABEZA DE LENTEJA DE 11/4" C/TARUGOund S/ 2.60
0202400067 TORNILLO PASANTE DE ALUMINIO CO und S/ 4.68
0202450011 TIRAFON DE 3/16" X 11/2" C/TARUGO DE PLASTICO und S/ 129.23
0202450012 TIRAFONES 5" C/ARANDELA PLASTICA P/TEJA ANDINA und S/ 583.51
0202450013 TIRAFONES 1/4" X 2" und S/ 27.70
0202450014 TIRADOR TIPO ALESSA DE AC ERO DE 96 m O SIMILAR und S/ 36.75
0202450015 TIRADOR DE 6" PARA PUERTA METALICA und S/ 13.50
0202450016 TIRADOR DE ACERO INOX 01" P/ MAMPARA und S/ 100.00
0202500005 ARMELLA 2"+GANCHO DE FIJACION und S/ 0.71
0203010010 ACERO CORRUGADO GRADO 60 kg S/ 3,454.31
0204050001 ARENA GRUESA m3 S/ 6,093.86
0204050002 ARENA FINA S/ 11,373.27
0204100001 TIERRA DE CHACRA S/ 8,564.35
0204100026 GRASS AMERICANO m2 S/ 9,050.46
0205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 19,857.24
0205100001 PIEDRA MEDIANA (MAX. 4") m3 S/ 14.41
0205350001 AGUA m3 S/ 1,652.76
0206200033 CONCRETO ESTAMPADO TIPO ADOQUIN RUSTICO m2 S/ 22,057.35
0206200034 CONCRETO ASFALTICO EN FRIO E= 2" m2 S/ 27,642.59
0210050048 GANCHO METALICO PORTA MULETAS INC. ACC. P/INSTALACION und S/ 311.45
0210350107 SUMINISTRO E INSTALACION DE PISO TIPO SPRAY DECK m2 S/ 10,119.50
0210350108 SUMINISTRO E INSTALACION DE GRASS SINTETICO INC. ARENA DE CUA m2 S/ 208,162.94
0210350110 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 11,780.45
0210350111 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CRIm2 S/ 15,110.46

A608
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0210350112 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 47,740.29
0210350113 SUMINISTRO E INSTALACION DE VTA. ALTA DE ALUM. NATURAL MATE C m2 S/ 19,577.12
0210350114 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 4,734.76
0210350115 SUMINISTRO E INSTALACION DE VTA. DE ALUM. NATURAL MATE CON CR m2 S/ 2,415.98
0210350116 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO 10mmm2 S/ 3,703.01
0210350117 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8.m2 S/ 1,873.43
0210350118 SUMINISTRO E INSTALACION DE MAMPARA DE CRISTAL TEMPLADO DE 8 m2 y S/ 1,959.24
0210350119 SUMINISTRO E INSTALACION DE VTA. CON ANGULO DE FIJACION CON m2 S/ 1,730.54
0210350120 SUMINISTRO E INSTALACION DE VTA. FIJA CON CANAL DE ALUMINIO U_ m2 S/ 118.84
0212250149 GABINETE METALICO P/EXTINTOR und S/ 1,641.01
0213150009 FRAGUA (BOLSA DE 1KG) bl S/ 576.70
0213150010 PEGAMENTO P/AZULEJOS-CERAMICOS(BOLSA 25KG) bl S/ 1,236.90
0213300001 ASFALTO LIQUIDO RC-250 qal S/ 10,012.81
0216010002 SUM. E INST. DE PISO SINTETICO DE POLIURETANO DE 7+2=9mm EN LO m2 S/ 44,784.47
0216010003 SUM. E INST. DE PAVIMENTO SINTETICO TIPO TARTAN INC. PINTADO DE m2 S/ 157,467.84
0216010004 LADRILLO KK TIPO IV 24X13X09 CM und S/ 91,557.28
0216010005 LADRILLO PASTELERO (HUECO) 24X24X3CM und S/ 402.10
0217100029 CUMBRERA PLANCHA FIBROCEMENTO TIPO TEJA ANDINA und S/ 3,025.67
0221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 128,063.88
0221010016 MICROCEMENTO BOLSA DE 5 kg bl S/ 8.32
0224100009 PISO CERAMICO NACIONAL 30X30 ALTO TRAFICO m2 S/ 2,758.14
0224100012 PISO PORCELANA TO, ALTO TRANSITO DE 30X30cm. m2 S/ 1,537.03
0224100013 PISO PORCELANA TO, ALTO TRANSITO DE 40X40cm . m2 S/ 337.25
0224100014 PISO PORCELANA TO, ALTO TRANSITO DE 60X60cm. m2 S/ 83,320.91
0224100015 PISO DE TERRAZO TIPO LAVADO m2 S/ 2,029.03
0224100017 CERAMICO m2 S/ 5.78
0224100019 TERRAZO PREMEZCLADO GRIS CLARO GR# 01 BOLSA 40 KG bl S/ 153.81
0226010056 CERRADURA DOS GOLPES SIMILAR FORTE CON TIRADOR pza S/ 712.64
0226010059 CERRADURA TRES GOLPES CON TIRADOR pza S/ 1,100.40
0226010060 CERRADURA CON MANIJA PARA SH DISCAPACITADO TIPO ALEGRA CANTOL pza S/ 134.09
0226010061 CERRADURA DE MANIJA DE ACERO CON LLAVE pza S/ 19.16
0226010062 CERRADURA DE ACERO EMBUTIDA TIP PRINCIPAL CON MANIJA INTERIO pza S/ 21.15
0226010063 CERRADURA CILINDRICA TIPO YALE pza S/ 268.25
0226010064 BISAGRA CAPUCHINA ALU MINIZ. 3 1/2 "x 3 1/2" pza S/ 148.84
0226010065 BISAGRA CAPUCHINA ALUMINIZ 4" x 4" pza S/ 634.34
0226010066 BISAGRA PIN DE ROTULACION pza S/ 144.78
0226010067 BISAGRA DE FIERRO 3" x 4" x 1 /8" und S/ 56.03
0226010068 BARRA DE ACERO INOXIDABLED=11/2" L= 1.80m· P/INODORO INC.SOPOR und S/ 349.15
0226300028 BARRA DE ACERO INOXIDABLED=11/2"EN SSHH L= 0.90m und S/ 518.64
0226300029 BARRA DE ACERO INO XIDABLEEN "L" DE 0=1-1/2" L=1.70 m und S/ 174.58

A609
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0226300030 BARRA DE ACERO INOXIDAB LE EN DE 0=1, ANCLADA A TABLERO L=0.50 und S/ 317.80
0226300031 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 0.75m und S/ 777.96
0226300032 BARRA DE ACERO INOXIDABLE D=1 1/2" EN SSHH L= 1.10m und S/ 388.98
0226300033 CERROJO 2" pza S/ 84.26
0226300034 MANIJA DE ACERO INOX 01" pza S/ 57.47
0226300035 MANIJA DE BRONCE DE 4" pza S/ 225.77
0226300036 TUBO REDONDO ACERO INOX. 01"e=2MM PARA RECORRIDO DE BANDEJpza S/ 63.34
0226300037 CERROJO HORIZONTAL PORTA CANDADO S/D pza S/ 25.34
0226450006 CANDADO DE BRONCE 60mm TIPO PESADO und S/ 35.46
0226500005 MECANISMO DE IZAJE und S/ 4.37
0230010009 PEGAMENTO EN BASE A CAUCHO SINTETICO Y RESINAS gal S/ 391.40
0230010010 CAL (BOLSA X 20 kg) bl S/ 2,742.61
0230010015 AGUARRAS gal S/ 454.15
0230010018 RIEGO DE LIGA-IMPRIMACION ASFALTICA m2 S/ 2,563.44
0230010025 LIJA PARA FIERRO und S/ 114.48
0230010035 THINNER gal S/ 8.62
0230010080 RODOPLAST 6mm m S/ 545.96
0230010104 BASE ZINCROMATO gal S/ 280.68
0230010125 IMPERMEABILIZANTE EN POLVO DE (BOL.1KG) bl S/ 112.36
0230010131 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n º10 m2 S/ 364.75
0230010143 SELLADOR BLANCO PARA MUROS gal S/ 1,485.58
0230010148 PEGAMENTO FLEXIBLEP/CERAMICOS 25KG bl S/ 6,698.55
0230010149 CRUCETAS SEPARADORAS P/CERAMICO cto S/ 0.21
0230010150 FRAGUA X 1 KG und S/ 4,140.15
0230010156 PLATAFORMA (PODIO) DE LANZAMIENTO S/DISEÑO und S/ 1,811.38
0230010162 LIJA PARA MADERA und S/ 3,682.57
0230010168 LANA DE VIDRIO AGLUTINADA e=3.5" d=10kg/m3 rol S/ 47.23
0230010181 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO qal S/ 555.04
0230010184 PISO DE POLIURETANO OUTDOOR m2 S/ 29,934.03
0230010185_x000D_ ANDARIVER CON BOYAS INCLUYE ANCLAJES DE A.INOX . DE 4_x000D_x 1m_x000D S/ 1,634.50
0230010188 SELLADOR BLANCO SELLADOR DE POLIURETANO ELASTOMÉRICO gal S/ 1,068.37
0230010189 PLANCHA DE POLIESTERENO EXPANDIDO E=2" pln S/ 0.59
0230010190_x000D_ SUMINISTRO E INSTALACION DE PIZARRA BLANCA DE ACERO VITRIFICADOund_x000 S/ 13,029.50
0230010191 ADITIVO SELLADOR DE CONCRETO CARAVISTA gal S/ 6,833.97
0230010192 SELLADOR PARA MADERA gal S/ 1,238.36
0230010194 SUMINISTRO E INSTALACION DE PUERTA METALICA _x000D_CORTAFUEGO m2 S/ 2,951.74
0230010195 ESCALERA DE ACERO INOXIDABLE DE ALTA GAMA DE 0 = 2" DE 4 PELDAÑund S/ 832.39
0230010197 ESCALERA DE GATO DE FºGº L= 2.50m (9 pasos) und S/ 375.00
0230010198 TOPE DE GOMA PARA PUERTA und S/ 199.87
0230010199 MALLA ELECTROSOLDADA GALVANIZADA DE 2X2, ALAMBRE n_x000D_º8 m2_x000 S/ 355.95

A610
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0230010200 TECKNOPOR DE 11/4"X 1.20m X 2.4m (POLIESTIRENO EXPANDIDO) D=10kgpln S/ 148.95
0230060016 REJILLA FELXIBLE DE PVC TIPO ABS - TAPA DE CANALETA DE PISCINA m S/ 2,035.68
0230100002 SOLDADURA kg S/ 0.39
0230100004 ELECTRODO TIPO 6011-CELLOCORD kg S/ 1,181.19
0230100007 EXTINTOR TIPO ABC 9KG und S/ 1,325.03
0230100011 EXTINTOR "K" DE ACETATO DE POTASIO DE 6 LITROS und S/ 145.12
0230150061 CINTA P/JUNT A PAPEL 52mmX152m(ROLLO) rol S/ 8.24
0230150084 MELAMINE 18MM (1.80x2.50) m2 S/ 3,550.53
0230150085 CINTA P/JUNTA MALLA 52mmX91 m(ROLLO) rol S/ 7.38
0230150087 COBERTURA C/PLANCHA DE ALUZINC TIPO CU AZ - 200 (e= 4 mm), PREPI m2 S/ 28,702.26
0230150088 CERRAMIENTO LATERAL ALUZINC TIPO DR 0.4mm PREPINTADA C/AZUL m2 S/ 5,152.01
0230150089 MANDIL DE ALUZINC, a=0.50 m ENCUENTRO DE TECHO DE TEJA ANDINA Cm2 S/ 1,222.87
0230150090 FLASHING - PLANCHA DE ALUMINIO 4"X4", E=0.05mm m S/ 1,302.09
0230150091_x000D_ COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE m I 2_x000 S/ 5,897.43
0230150092 COBERTURA DE PLANCHA DE ACERO TIPO CU COLOR SEGÚN DETALLE Im2 S/ 21,785.89
0230150093 COBERTURA DE PLANCHA DE ACERO TIPO DR COLOR SEGÚN DETALLE m2 S/ 859.09
0230300002 CUERDA DE NYLON m S/ 1.17
0230300005 RED DE VOLEY DE NYLON Nº42 FILETE DE LONA und S/ 62.85
0230410087 CRISTAL TEMPLADO IMPORTAD0 6MM . m2 S/ 2,333.58
0230410094 ESPEJO BISELADO m2 S/ 1,788.39
0230990170 SEÑAL MATERIAL ACRILICA C/SUPERFICE FOTOLUMINISCENTE 30x20cm und S/ 1,396.68
0230990175 WATER STOP DE 6"x25m rll S/ 177.24
0238010001 HORMIGON m3 S/ 345.84
0243010001 MADERA TORNILLO p2 S/ 89,826.90
0243100001 MADERA CEDRO p2 S/ 23,992.75
243100025 COLA SINTETICA gal S/ 174.35
244010003 TRIPLAY LUPUNA 6 mm x 4' x 8' und S/ 4,589.20
244010006 TRIPLAY LUPUNA 9 mm x 4' x 8' und S/ 846.84
244040017 PLANCHA MDF e=3MM m2 S/ 42.20
0251000044 PARANTE METALICO PC 89x38x0.90mm L=3.00 und S/ 1,052.31
0251000047 PARANTE METALICO PC 89x38x0.90mm L=2.44 und S/ 186.09
0251000048 PARANTE METALICO PC 89x50x0.90mm L=3.00 und S/ 118.37
0251000049 RIEL METALICO PU 90x32x0.90mm L=3.00 und S/ 345.42
0251000050 RIEL METALICO PU 90x32x0.90mm L=2.44 und S/ 89.94
0251000051 ESQUINERO METALICO 32x32x0.25mm L=2.40m und S/ 26.63
0251000052 RIEL CORREDERA METALICA PARA CAJON jgo S/ 80.77
0251050005 PERFIL TEE 1/8" X 1" X 1" m S/ 72.39
0251050022 PERFIL L DE ALUMINIO 1"XX1/2"X1mm L=6m und S/ 35.34
0251050025 PERFIL TEE 1/8" X 3/4" X 3/4" m S/ 100.31
0251100032 ANGULO DE FIERRO 11/4"X11/4"X1/8" X6M m S/ 88.65

A611
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


0251100033 ANGULO FIERRO 11/2" x 11/2" x 1/16" m S/ 228.11
0251200094 PLATINA METALICA TT-100X0.9MM L=6M und S/ 34.62
0251200101 PLATINA DE FIERRO 3/16" x 1" m S/ 10.81
251200102 PLATINA DE FIERRO 3/16" x 3" "X6M m S/ 629.44
251200103 PLATINA DE FIERRO 1/4" X 11/2" m S/ 282.62
251200104 PLATINA DE FIERRO 5/8" e= 1/8" m S/ 55.45
251300040 TUBO DE FIERRO NEGRO D=2" (3.25mm) m S/ 162.79
251300042 TUBO DE FIERRO NEGRO D=3" (3.25mm) m S/ 8,099.66
251300043 TUBO DE FIERRO NEGRO D=4" (3.25mm) m S/ 2,764.65
251300087 TUBO DE FIERRO NEGRO 01" (2.00mm) m S/ 767.54
251300108 ARCO Y TABLERO DE FUTBOL- BASQUET und S/ 5,720.34
251300109 ARCO PARA CAMPO DE FUTBOL und S/ 1,800.85
251300110 TUBO DE FIERRO NEGRO 0 2" (2.00mm) m S/ 769.26
251300111 TUBO DE FIERRO NEGRO 0 2" STANDARD m S/ 2,689.33
251300112 TUBO DE FIERRO NEGRO 0 2" (2.5mm) m S/ 195.99
251350006 ACCESORIOS D/FIJACION DET-1 EN MUROS C/ARRIOSTR und S/ 256.20
251350007 ACCESORIOS D/FIJACION DET-2 EN MUROS C/ARRIOSTR und S/ 141.91
252100006 PERFIL DE ALUMINIO 041122 m S/ 795.44
252100007 PERFIL DE ALUMINIO 041311 m S/ 1,733.18
252100008 PERFIL DE ALUMINIO 041710 m S/ 2,208.88
252100009 PLATINA DE ALUMINIO PARA TERRAZO m S/ 22.06
252100010 PERFIL DE ALUMINIO 041309 O SIMILAR m S/ 440.55
252100012 PERFIL TIPO T071 O SIMILAR m S/ 2,201.31
252100013 PERFIL TIPO LIME 050 O SIMILAR m S/ 285.66
252100014 PERFIL TIPO ALN 315 O SIMILAR m S/ 5,662.39
252200022 ANGULO DE FIERRO 1/8"X3/4"X3/4"X6M m S/ 171.62
252200023 ANGULO DE FIERRO 1/8"X1"X1""X6M m S/ 106.10
252200024 ANGULO DE ALUMINIO DE 1"X1" m S/ 208.70
252200027 ANGULO DE ALUMINIO DE 1 1/2" X 11/2" e=3/32" (2.3MM) m S/ 25.63
254010005 PINTURA LATEX gal S/ 8,516.06
254010006 PRESERVANTE DE MADERA gal S/ 225.62
254100005 BARNIZ MARINO gal S/ 18.51
254150020 PINTURA ESMALTE gal S/ 152.14
254150031 PINTURA ESMALTE SINTETICO gal S/ 1.50
254150033 PINTURA OLEO MATE . gal S/ 11,500.04
254150037 PINTURA ESMALTE ANTICORROSIVO PARA F G gal S/ 77.18
254150038 DISOLVENTE PARA ESMALTE ANTICORROSIVO gal S/ 3.07
254150039 PINTURA ESMALTE C/RESINA ACRILICA gal S/ 194.11
254200001 PINTURA ANTICORROSIVA gal S/ 179.77
254300001 PINTURA PARA TRAFICO gal S/ 413.05

A612
CRONOGRAMA DE ADQUISICION DE MATERIALES - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA S

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS

Código MAETRIALES Unidad Parcial S/.


254300002 SELLADOR BLANCO PARA PINTURA OLEO gal S/ 9,952.00
254300003 SELLADOR BLANCO PARA MUROS gal S/ 2,500.68
254400006 PASTA PARA JUNTA HAMILTON (balde de 4.5gal) und S/ 148.86
757010001 PLANCHA DE ACERO LAF 1/16" x 4' x 8' und S/ 1,161.58
1259619996 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und S/ 1,496.34
1762229991 PLANCHA DE ACERO LAF 1/8" x 4' x 8' und S/ 100.30
260010003 ESPUMA PLASTICA DURA A/DENSIDAD 2X1m E=2" und S/ 733.86
260010004 SILICONA (TUBO DE 305 mi) und S/ 256.87
260010009 JEBE MICROPOROSO 1"x1cm und S/ 1,063.04
260010011 JUNTA CON SELLO ELASTOMERICO E= 6MM Y CORDON DE RESPALDO m S/ 815.63
261020003 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m2 S/ 0.36
261020029 PLANCHA DE ACERO LAC DE 1mm m2 S/ 43.61
261020042 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza S/ 867.27
261020056 PLANCHA DE ACERO GALVANIZADA 1/16" und S/ 765.71
261020057 PLANCHA DE ACERO LAC DE 1.5mm m2 S/ 108.11
265010030 TUBERIA FºGº 11/2" m S/ 163.89
265010046 TUBERIA FºGº 1" m S/ 1,218.74
265010058 TUBERIA FºGº 2" m S/ 400.87
265010077 TUBO DE F.N. 11/2" STANDARD m S/ 608.69
265010078 CANAL "U" DE ALUMINIO DE 1" X 11/2" (Sim. m S/ 210.77
265010079 TUBO DE F.N. CUADRADO 2"x1/8" m S/ 22.23
265010081 TUBO DE FIERRO NEGRO CUADRADO 1 1/2" X 1 /1, 2" (e=2.5mm) m S/ 411.27
265010083 TUBO DE FIERRO NEGRO CUADRADO 1" X 1" (e=2.0mm) m S/ 422.55
265010084 TUBO DE FIERRO NEGRO CUADRADO 11/2" X 11/2" (e=1/16") m S/ 995.89
272200015 PERFIL DE PVC HUECO PARA JUNTA DE DILATACION INC. ACCES. P/INST m S/ 13,481.12
298010104 ACERO DE CONSTRUC . CORRUGADO kg S/ 168.38
298010107 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX 10MM pln S/ 2,221.17
298010108 PLANCHA FIBROCEMENTO e=4" DE 1.22X2.44mX12MM pln S/ 958.29
298010110 PLANCHA FIBROCEMENTO DE 1.22X2.44mX6MM und S/ 386.03
298010111 PLANCHA TEJA ANDINA FIBROCEMENTO DE 1.14X0.72 und S/ 82,092.50

TOTAL S/ 5,801,396.27

AVANCE PARCIAL
AVANCE ACUMULADO

A613
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020

S/ - S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ -


S/ - S/ - S/ - S/ - S/ 906.82 S/ 906.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ 27.17 S/ 21.73 S/ 32.60 S/ 21.73
S/ 348.46 S/ 348.46 S/ - S/ - S/ - S/ -
S/ - S/ 4.12 S/ 4.12 S/ 4.12 S/ 4.12 S/ -
S/ - S/ - S/ - S/ - S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.17
S/ - S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 12.54 S/ 12.54 S/ 12.54 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.47 S/ 16.47 S/ 16.47
S/ 4.67 S/ 4.67 S/ 8.75 S/ 8.75 S/ 7.00 S/ 7.00
S/ - S/ - S/ - S/ - S/ 3.49 S/ 3.49
S/ - S/ - S/ 2.72 S/ 2.72 S/ 2.72 S/ 2.72
S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83 S/ 8.49 S/ 5.66
S/ 1.71 S/ 1.71 S/ 1.71 S/ - S/ - S/ -
S/ 3.11 S/ 4.66 S/ 6.21 S/ 7.77 S/ 4.66 S/ 6.99
S/ - S/ - S/ - S/ - S/ 92.27 S/ 92.27
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.23
S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 0.65 S/ 0.65 S/ 0.65 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.70 S/ 0.70 S/ 0.70
S/ 10.34 S/ 10.34 S/ 19.38 S/ 19.38 S/ 15.51 S/ 15.51
S/ - S/ - S/ - S/ - S/ 46.68 S/ 46.68
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39
S/ 1.47 S/ 1.47 S/ 2.21 S/ 2.21 S/ 2.21 S/ 2.94
S/ - S/ - S/ 3.38 S/ 2.70 S/ 4.05 S/ 2.70
S/ 25.00 S/ 25.00 S/ - S/ - S/ - S/ -
S/ - S/ 0.18 S/ 0.18 S/ 0.18 S/ 0.18 S/ -
S/ - S/ - S/ - S/ - S/ 863.58 S/ 863.58
S/ - S/ - S/ - S/ - S/ - S/ -

S/ 2,262.61 S/ 2,262.61 S/ 2,262.61 S/ - S/ - S/ -


S/ - S/ - S/ - S/ 2,978.59 S/ 2,978.59 S/ 2,978.59

A614
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 1.15 S/ 1.15 S/ 2.16 S/ 2.16 S/ 1.73 S/ 1.73
S/ 413.19 S/ 413.19 S/ 413.19 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 3,308.60 S/ 3,308.60 S/ 3,308.60
S/ 2,211.41 S/ 2,211.41 S/ 4,146.39 S/ 4,146.39 S/ 3,317.11 S/ 3,317.11
S/ - S/ - S/ - S/ - S/ 24.92 S/ 24.92
S/ - S/ - S/ 2,529.87 S/ 2,529.87 S/ 2,529.87 S/ 2,529.87
S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 31,224.44 S/ 20,816.29
S/ 2,945.11 S/ 2,945.11 S/ 2,945.11 S/ - S/ - S/ -
S/ 604.42 S/ 906.63 S/ 1,208.84 S/ 1,511.05 S/ 906.63 S/ 1,359.94
S/ - S/ - S/ - S/ - S/ 11,935.07 S/ 11,935.07
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 946.95
S/ - S/ 362.40 S/ 362.40 S/ 362.40 S/ 362.40 S/ 362.40
S/ 925.75 S/ 925.75 S/ 925.75 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 281.01 S/ 281.01 S/ 281.01
S/ 156.74 S/ 156.74 S/ 293.89 S/ 293.89 S/ 235.11 S/ 235.11
S/ - S/ - S/ - S/ - S/ 138.44 S/ 138.44
S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94
S/ 65.64 S/ 65.64 S/ 98.46 S/ 98.46 S/ 98.46 S/ 131.28
S/ - S/ - S/ 144.18 S/ 115.34 S/ 173.01 S/ 115.34
S/ 309.22 S/ 309.22 S/ - S/ - S/ - S/ -
S/ - S/ 2,503.20 S/ 2,503.20 S/ 2,503.20 S/ 2,503.20 S/ -
S/ - S/ - S/ - S/ - S/ 11,196.12 S/ 11,196.12
S/ 39,366.96 S/ 39,366.96 S/ 39,366.96 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 13,733.59 S/ 13,733.59 S/ 13,733.59
S/ 32.17 S/ 32.17 S/ 60.32 S/ 60.32 S/ 48.25 S/ 48.25
S/ - S/ - S/ - S/ - S/ 242.05 S/ 242.05
S/ - S/ - S/ 32,015.97 S/ 32,015.97 S/ 32,015.97 S/ 32,015.97
S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42 S/ 1.25 S/ 0.83
S/ 689.53 S/ 689.53 S/ 689.53 S/ - S/ - S/ -
S/ 61.48 S/ 92.22 S/ 122.96 S/ 153.70 S/ 92.22 S/ 138.33
S/ - S/ - S/ - S/ - S/ 84.31 S/ 84.31
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 405.81
S/ - S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87
S/ 38.45 S/ 38.45 S/ 38.45 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 106.90 S/ 106.90 S/ 106.90
S/ 88.03 S/ 88.03 S/ 165.06 S/ 165.06 S/ 132.05 S/ 132.05
S/ - S/ - S/ - S/ - S/ 10.73 S/ 10.73
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96

A615
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 0.85 S/ 0.85 S/ 1.27 S/ 1.27 S/ 1.27 S/ 1.69
S/ - S/ - S/ 67.06 S/ 53.65 S/ 80.48 S/ 53.65
S/ 37.21 S/ 37.21 S/ - S/ - S/ - S/ -
S/ - S/ 158.59 S/ 158.59 S/ 158.59 S/ 158.59 S/ -
S/ - S/ - S/ - S/ - S/ 36.20 S/ 36.20
S/ 14.01 S/ 14.01 S/ 14.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 52.37 S/ 52.37 S/ 52.37
S/ 41.49 S/ 41.49 S/ 77.80 S/ 77.80 S/ 62.24 S/ 62.24
S/ - S/ - S/ - S/ - S/ 13.97 S/ 13.97
S/ - S/ - S/ 79.45 S/ 79.45 S/ 79.45 S/ 79.45
S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90 S/ 116.69 S/ 77.80
S/ 97.25 S/ 97.25 S/ 97.25 S/ - S/ - S/ -
S/ 3.37 S/ 5.06 S/ 6.74 S/ 8.43 S/ 5.06 S/ 7.58
S/ - S/ - S/ - S/ - S/ 14.37 S/ 14.37
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 12.67
S/ - S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80
S/ 8.87 S/ 8.87 S/ 8.87 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.65 S/ 0.65 S/ 0.65
S/ 31.31 S/ 31.31 S/ 58.71 S/ 58.71 S/ 46.97 S/ 46.97
S/ - S/ - S/ - S/ - S/ 219.41 S/ 219.41
S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71
S/ 102.54 S/ 102.54 S/ 153.81 S/ 153.81 S/ 153.81 S/ 205.08
S/ - S/ - S/ 28.62 S/ 22.90 S/ 34.34 S/ 22.90
S/ 2.16 S/ 2.16 S/ - S/ - S/ - S/ -
S/ - S/ 136.49 S/ 136.49 S/ 136.49 S/ 136.49 S/ -
S/ 70.17 S/ 70.17 S/ 70.17 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.85 S/ 16.85 S/ 16.85
S/ 29.18 S/ 29.18 S/ 54.71 S/ 54.71 S/ 43.77 S/ 43.77
S/ - S/ - S/ - S/ - S/ 118.85 S/ 118.85
S/ - S/ - S/ 1,674.64 S/ 1,674.64 S/ 1,674.64 S/ 1,674.64
S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.03 S/ 0.02
S/ 1,035.04 S/ 1,035.04 S/ 1,035.04 S/ - S/ - S/ -
S/ 72.46 S/ 108.68 S/ 144.91 S/ 181.14 S/ 108.68 S/ 163.02
S/ - S/ - S/ - S/ - S/ 920.64 S/ 920.64
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 111.01
S/ - S/ 4,490.10 S/ 4,490.10 S/ 4,490.10 S/ 4,490.10 S/ 4,490.10
S/ 408.63 S/ 408.63 S/ 408.63 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 160.26 S/ 160.26 S/ 160.26

A616
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 0.05 S/ 0.05 S/ 0.09 S/ 0.09 S/ 0.07 S/ 0.07
S/ - S/ - S/ - S/ - S/ 1,042.36 S/ 1,042.36
S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70
S/ 49.53 S/ 49.53 S/ 74.30 S/ 74.30 S/ 74.30 S/ 99.07
S/ - S/ - S/ 737.94 S/ 590.35 S/ 885.52 S/ 590.35
S/ 208.10 S/ 208.10 S/ - S/ - S/ - S/ -
S/ 93.75 S/ 93.75 S/ 93.75 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 29.98 S/ 29.98 S/ 29.98
S/ 28.48 S/ 28.48 S/ 53.39 S/ 53.39 S/ 42.71 S/ 42.71
S/ - S/ - S/ - S/ - S/ 11.92 S/ 11.92
S/ - S/ - S/ 508.92 S/ 508.92 S/ 508.92 S/ 508.92
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.06 S/ 0.04
S/ 295.30 S/ 295.30 S/ 295.30 S/ - S/ - S/ -
S/ 53.00 S/ 79.50 S/ 106.00 S/ 132.50 S/ 79.50 S/ 119.25
S/ - S/ - S/ - S/ - S/ 36.28 S/ 36.28
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 710.11
S/ - S/ 1.11 S/ 1.11 S/ 1.11 S/ 1.11 S/ 1.11
S/ 7,175.57 S/ 7,175.57 S/ 7,175.57 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 772.80 S/ 772.80 S/ 772.80
S/ 97.83 S/ 97.83 S/ 183.43 S/ 183.43 S/ 146.74 S/ 146.74
S/ - S/ - S/ - S/ - S/ 104.17 S/ 104.17
S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87
S/ 871.44 S/ 871.44 S/ 1,307.15 S/ 1,307.15 S/ 1,307.15 S/ 1,742.87
S/ - S/ - S/ 214.77 S/ 171.82 S/ 257.73 S/ 171.82
S/ 0.29 S/ 0.29 S/ - S/ - S/ - S/ -
S/ - S/ 15.71 S/ 15.71 S/ 15.71 S/ 15.71 S/ -
S/ - S/ - S/ - S/ - S/ 583.39 S/ 583.39
S/ 447.10 S/ 447.10 S/ 447.10 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 209.50 S/ 209.50 S/ 209.50
S/ 14.18 S/ 14.18 S/ 26.59 S/ 26.59 S/ 21.27 S/ 21.27
S/ - S/ - S/ - S/ - S/ 27.67 S/ 27.67
S/ - S/ - S/ 22,456.72 S/ 22,456.72 S/ 22,456.72 S/ 22,456.72
S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 3,598.91 S/ 2,399.27
S/ 43.59 S/ 43.59 S/ 43.59 S/ - S/ - S/ -
S/ 183.57 S/ 275.35 S/ 367.14 S/ 458.92 S/ 275.35 S/ 413.03
S/ - S/ - S/ - S/ - S/ 211.71 S/ 211.71
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 210.46
S/ - S/ 27.91 S/ 27.91 S/ 27.91 S/ 27.91 S/ 27.91

A617
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 29.59 S/ 29.59 S/ 29.59 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 51.81 S/ 51.81 S/ 51.81
S/ 7.20 S/ 7.20 S/ 13.49 S/ 13.49 S/ 10.79 S/ 10.79
S/ - S/ - S/ - S/ - S/ 2.13 S/ 2.13
S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04
S/ 2.90 S/ 2.90 S/ 4.34 S/ 4.34 S/ 4.34 S/ 5.79
S/ - S/ - S/ 8.83 S/ 7.07 S/ 10.60 S/ 7.07
S/ 25.08 S/ 25.08 S/ - S/ - S/ - S/ -
S/ - S/ 22.16 S/ 22.16 S/ 22.16 S/ 22.16 S/ -
S/ 57.03 S/ 57.03 S/ 57.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 5.19 S/ 5.19 S/ 5.19
S/ 0.86 S/ 0.86 S/ 1.62 S/ 1.62 S/ 1.30 S/ 1.30
S/ - S/ - S/ - S/ - S/ 50.35 S/ 50.35
S/ - S/ - S/ 70.66 S/ 70.66 S/ 70.66 S/ 70.66
S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77 S/ 8.32 S/ 5.55
S/ 40.70 S/ 40.70 S/ 40.70 S/ - S/ - S/ -
S/ 323.99 S/ 485.98 S/ 647.97 S/ 809.97 S/ 485.98 S/ 728.97
S/ - S/ - S/ - S/ - S/ 691.16 S/ 691.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 1,144.07
S/ - S/ 270.13 S/ 270.13 S/ 270.13 S/ 270.13 S/ 270.13
S/ 192.31 S/ 192.31 S/ 192.31 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 403.40 S/ 403.40 S/ 403.40
S/ 15.68 S/ 15.68 S/ 29.40 S/ 29.40 S/ 23.52 S/ 23.52
S/ - S/ - S/ - S/ - S/ 20.50 S/ 20.50
S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10
S/ 31.82 S/ 31.82 S/ 47.73 S/ 47.73 S/ 47.73 S/ 63.64
S/ - S/ - S/ 433.29 S/ 346.64 S/ 519.95 S/ 346.64
S/ 552.22 S/ 552.22 S/ - S/ - S/ - S/ -
S/ 5.52 S/ 5.52 S/ 5.52 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 66.08 S/ 66.08 S/ 66.08
S/ 176.10 S/ 176.10 S/ 330.20 S/ 330.20 S/ 264.16 S/ 264.16
S/ - S/ - S/ - S/ - S/ 22.85 S/ 22.85
S/ - S/ - S/ 1,415.60 S/ 1,415.60 S/ 1,415.60 S/ 1,415.60
S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58 S/ 25.74 S/ 17.16
S/ 26.52 S/ 26.52 S/ 26.52 S/ - S/ - S/ -
S/ 8.35 S/ 12.52 S/ 16.70 S/ 20.87 S/ 12.52 S/ 18.78
S/ - S/ - S/ - S/ - S/ 6.41 S/ 6.41
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 45.12

A618
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ 2.78 S/ 2.78 S/ 2.78 S/ 2.78 S/ 2.78
S/ 38.03 S/ 38.03 S/ 38.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.23 S/ 0.23 S/ 0.23
S/ 920.00 S/ 920.00 S/ 1,725.01 S/ 1,725.01 S/ 1,380.00 S/ 1,380.00
S/ - S/ - S/ - S/ - S/ 6.17 S/ 6.17
S/ 0.15 S/ 0.31 S/ 0.31 S/ 0.31 S/ 0.15 S/ 0.15
S/ 48.53 S/ 48.53 S/ 48.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 26.97 S/ 26.97 S/ 26.97
S/ 33.04 S/ 33.04 S/ 61.96 S/ 61.96 S/ 49.57 S/ 49.57
S/ - S/ - S/ - S/ - S/ 796.16 S/ 796.16
S/ - S/ - S/ 625.17 S/ 625.17 S/ 625.17 S/ 625.17
S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44 S/ 22.33 S/ 14.89
S/ 290.40 S/ 290.40 S/ 290.40 S/ - S/ - S/ -
S/ 59.85 S/ 89.78 S/ 119.71 S/ 149.63 S/ 89.78 S/ 134.67
S/ - S/ - S/ - S/ - S/ 25.08 S/ 25.08
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 51.37
S/ - S/ 159.46 S/ 159.46 S/ 159.46 S/ 159.46 S/ 159.46
S/ 203.91 S/ 203.91 S/ 203.91 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.05 S/ 0.05 S/ 0.05
S/ 3.49 S/ 3.49 S/ 6.54 S/ 6.54 S/ 5.23 S/ 5.23
S/ - S/ - S/ - S/ - S/ 69.38 S/ 69.38
S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29
S/ 4.32 S/ 4.32 S/ 6.49 S/ 6.49 S/ 6.49 S/ 8.65
S/ - S/ - S/ 40.97 S/ 32.78 S/ 49.17 S/ 32.78
S/ 304.69 S/ 304.69 S/ - S/ - S/ - S/ -
S/ - S/ 100.22 S/ 100.22 S/ 100.22 S/ 100.22 S/ -
S/ - S/ - S/ - S/ - S/ 152.17 S/ 152.17
S/ 52.69 S/ 52.69 S/ 52.69 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 3.33 S/ 3.33 S/ 3.33
S/ 32.90 S/ 32.90 S/ 61.69 S/ 61.69 S/ 49.35 S/ 49.35
S/ - S/ - S/ - S/ - S/ 33.80 S/ 33.80
S/ 248.97 S/ 248.97 S/ 248.97 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 2,022.17 S/ 2,022.17 S/ 2,022.17
S/ 13.47 S/ 13.47 S/ 25.26 S/ 25.26 S/ 20.21 S/ 20.21
S/ - S/ - S/ - S/ - S/ 177.69 S/ 177.69
S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91
S/ 15.44 S/ 15.44 S/ 23.16 S/ 23.16 S/ 23.16 S/ 30.88
S/ - S/ - S/ 20,523.12 S/ 16,418.50 S/ 24,627.75 S/ 16,418.50

A619
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ -
S/ - S/ - S/ - S/ - S/ 906.82 S/ 906.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ 27.17 S/ 21.73 S/ 32.60 S/ 21.73
S/ 348.46 S/ 348.46 S/ - S/ - S/ - S/ -
S/ - S/ 4.12 S/ 4.12 S/ 4.12 S/ 4.12 S/ -
S/ - S/ - S/ - S/ - S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.17
S/ - S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 12.54 S/ 12.54 S/ 12.54 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.47 S/ 16.47 S/ 16.47
S/ 4.67 S/ 4.67 S/ 8.75 S/ 8.75 S/ 7.00 S/ 7.00
S/ - S/ - S/ - S/ - S/ 3.49 S/ 3.49
S/ - S/ - S/ 2.72 S/ 2.72 S/ 2.72 S/ 2.72
S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83 S/ 8.49 S/ 5.66
S/ 1.71 S/ 1.71 S/ 1.71 S/ - S/ - S/ -
S/ 3.11 S/ 4.66 S/ 6.21 S/ 7.77 S/ 4.66 S/ 6.99
S/ - S/ - S/ - S/ - S/ 92.27 S/ 92.27
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.23
S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 0.65 S/ 0.65 S/ 0.65 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.70 S/ 0.70 S/ 0.70
S/ 10.34 S/ 10.34 S/ 19.38 S/ 19.38 S/ 15.51 S/ 15.51
S/ - S/ - S/ - S/ - S/ 46.68 S/ 46.68
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39
S/ 1.47 S/ 1.47 S/ 2.21 S/ 2.21 S/ 2.21 S/ 2.94
S/ - S/ - S/ 3.38 S/ 2.70 S/ 4.05 S/ 2.70
S/ 25.00 S/ 25.00 S/ - S/ - S/ - S/ -
S/ - S/ 0.18 S/ 0.18 S/ 0.18 S/ 0.18 S/ -
S/ - S/ - S/ - S/ - S/ 863.58 S/ 863.58
S/ - S/ - S/ - S/ - S/ - S/ -

S/ 2,262.61 S/ 2,262.61 S/ 2,262.61 S/ - S/ - S/ -


S/ - S/ - S/ - S/ 2,978.59 S/ 2,978.59 S/ 2,978.59
S/ 1.15 S/ 1.15 S/ 2.16 S/ 2.16 S/ 1.73 S/ 1.73
S/ 413.19 S/ 413.19 S/ 413.19 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 3,308.60 S/ 3,308.60 S/ 3,308.60

A620
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 2,211.41 S/ 2,211.41 S/ 4,146.39 S/ 4,146.39 S/ 3,317.11 S/ 3,317.11
S/ - S/ - S/ - S/ - S/ 24.92 S/ 24.92
S/ - S/ - S/ 2,529.87 S/ 2,529.87 S/ 2,529.87 S/ 2,529.87
S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 31,224.44 S/ 20,816.29
S/ 2,945.11 S/ 2,945.11 S/ 2,945.11 S/ - S/ - S/ -
S/ 604.42 S/ 906.63 S/ 1,208.84 S/ 1,511.05 S/ 906.63 S/ 1,359.94
S/ - S/ - S/ - S/ - S/ 11,935.07 S/ 11,935.07
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 946.95
S/ - S/ 362.40 S/ 362.40 S/ 362.40 S/ 362.40 S/ 362.40
S/ 925.75 S/ 925.75 S/ 925.75 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 281.01 S/ 281.01 S/ 281.01
S/ 156.74 S/ 156.74 S/ 293.89 S/ 293.89 S/ 235.11 S/ 235.11
S/ - S/ - S/ - S/ - S/ 138.44 S/ 138.44
S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94
S/ 65.64 S/ 65.64 S/ 98.46 S/ 98.46 S/ 98.46 S/ 131.28
S/ - S/ - S/ 144.18 S/ 115.34 S/ 173.01 S/ 115.34
S/ 309.22 S/ 309.22 S/ - S/ - S/ - S/ -
S/ - S/ 2,503.20 S/ 2,503.20 S/ 2,503.20 S/ 2,503.20 S/ -
S/ - S/ - S/ - S/ - S/ 11,196.12 S/ 11,196.12
S/ 39,366.96 S/ 39,366.96 S/ 39,366.96 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 13,733.59 S/ 13,733.59 S/ 13,733.59
S/ 32.17 S/ 32.17 S/ 60.32 S/ 60.32 S/ 48.25 S/ 48.25
S/ - S/ - S/ - S/ - S/ 242.05 S/ 242.05
S/ - S/ - S/ 32,015.97 S/ 32,015.97 S/ 32,015.97 S/ 32,015.97
S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42 S/ 1.25 S/ 0.83
S/ 689.53 S/ 689.53 S/ 689.53 S/ - S/ - S/ -
S/ 61.48 S/ 92.22 S/ 122.96 S/ 153.70 S/ 92.22 S/ 138.33
S/ - S/ - S/ - S/ - S/ 84.31 S/ 84.31
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 405.81
S/ - S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87
S/ 38.45 S/ 38.45 S/ 38.45 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 106.90 S/ 106.90 S/ 106.90
S/ 88.03 S/ 88.03 S/ 165.06 S/ 165.06 S/ 132.05 S/ 132.05
S/ - S/ - S/ - S/ - S/ 10.73 S/ 10.73
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96
S/ 0.85 S/ 0.85 S/ 1.27 S/ 1.27 S/ 1.27 S/ 1.69
S/ - S/ - S/ 67.06 S/ 53.65 S/ 80.48 S/ 53.65
S/ 37.21 S/ 37.21 S/ - S/ - S/ - S/ -

A621
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ 158.59 S/ 158.59 S/ 158.59 S/ 158.59 S/ -
S/ - S/ - S/ - S/ - S/ 36.20 S/ 36.20
S/ 14.01 S/ 14.01 S/ 14.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 52.37 S/ 52.37 S/ 52.37
S/ 41.49 S/ 41.49 S/ 77.80 S/ 77.80 S/ 62.24 S/ 62.24
S/ - S/ - S/ - S/ - S/ 13.97 S/ 13.97
S/ - S/ - S/ 79.45 S/ 79.45 S/ 79.45 S/ 79.45
S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90 S/ 116.69 S/ 77.80
S/ 97.25 S/ 97.25 S/ 97.25 S/ - S/ - S/ -
S/ 3.37 S/ 5.06 S/ 6.74 S/ 8.43 S/ 5.06 S/ 7.58
S/ - S/ - S/ - S/ - S/ 14.37 S/ 14.37
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 12.67
S/ - S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80
S/ 8.87 S/ 8.87 S/ 8.87 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.65 S/ 0.65 S/ 0.65
S/ 31.31 S/ 31.31 S/ 58.71 S/ 58.71 S/ 46.97 S/ 46.97
S/ - S/ - S/ - S/ - S/ 219.41 S/ 219.41
S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71
S/ 102.54 S/ 102.54 S/ 153.81 S/ 153.81 S/ 153.81 S/ 205.08
S/ - S/ - S/ 28.62 S/ 22.90 S/ 34.34 S/ 22.90
S/ 2.16 S/ 2.16 S/ - S/ - S/ - S/ -
S/ - S/ 136.49 S/ 136.49 S/ 136.49 S/ 136.49 S/ -
S/ 70.17 S/ 70.17 S/ 70.17 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.85 S/ 16.85 S/ 16.85
S/ 29.18 S/ 29.18 S/ 54.71 S/ 54.71 S/ 43.77 S/ 43.77
S/ - S/ - S/ - S/ - S/ 118.85 S/ 118.85
S/ - S/ - S/ 1,674.64 S/ 1,674.64 S/ 1,674.64 S/ 1,674.64
S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.03 S/ 0.02
S/ 1,035.04 S/ 1,035.04 S/ 1,035.04 S/ - S/ - S/ -
S/ 72.46 S/ 108.68 S/ 144.91 S/ 181.14 S/ 108.68 S/ 163.02
S/ - S/ - S/ - S/ - S/ 920.64 S/ 920.64
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 111.01
S/ - S/ 4,490.10 S/ 4,490.10 S/ 4,490.10 S/ 4,490.10 S/ 4,490.10
S/ 408.63 S/ 408.63 S/ 408.63 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 160.26 S/ 160.26 S/ 160.26
S/ 0.05 S/ 0.05 S/ 0.09 S/ 0.09 S/ 0.07 S/ 0.07
S/ - S/ - S/ - S/ - S/ 1,042.36 S/ 1,042.36
S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70

A622
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 49.53 S/ 49.53 S/ 74.30 S/ 74.30 S/ 74.30 S/ 99.07
S/ - S/ - S/ 737.94 S/ 590.35 S/ 885.52 S/ 590.35
S/ 208.10 S/ 208.10 S/ - S/ - S/ - S/ -
S/ 93.75 S/ 93.75 S/ 93.75 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 29.98 S/ 29.98 S/ 29.98
S/ 28.48 S/ 28.48 S/ 53.39 S/ 53.39 S/ 42.71 S/ 42.71
S/ - S/ - S/ - S/ - S/ 11.92 S/ 11.92
S/ - S/ - S/ 508.92 S/ 508.92 S/ 508.92 S/ 508.92
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.06 S/ 0.04
S/ 295.30 S/ 295.30 S/ 295.30 S/ - S/ - S/ -
S/ 53.00 S/ 79.50 S/ 106.00 S/ 132.50 S/ 79.50 S/ 119.25
S/ - S/ - S/ - S/ - S/ 36.28 S/ 36.28
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 710.11
S/ - S/ 1.11 S/ 1.11 S/ 1.11 S/ 1.11 S/ 1.11
S/ 7,175.57 S/ 7,175.57 S/ 7,175.57 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 772.80 S/ 772.80 S/ 772.80
S/ 97.83 S/ 97.83 S/ 183.43 S/ 183.43 S/ 146.74 S/ 146.74
S/ - S/ - S/ - S/ - S/ 104.17 S/ 104.17
S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87
S/ 871.44 S/ 871.44 S/ 1,307.15 S/ 1,307.15 S/ 1,307.15 S/ 1,742.87
S/ - S/ - S/ 214.77 S/ 171.82 S/ 257.73 S/ 171.82
S/ 0.29 S/ 0.29 S/ - S/ - S/ - S/ -
S/ - S/ 15.71 S/ 15.71 S/ 15.71 S/ 15.71 S/ -
S/ - S/ - S/ - S/ - S/ 583.39 S/ 583.39
S/ 447.10 S/ 447.10 S/ 447.10 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 209.50 S/ 209.50 S/ 209.50
S/ 14.18 S/ 14.18 S/ 26.59 S/ 26.59 S/ 21.27 S/ 21.27
S/ - S/ - S/ - S/ - S/ 27.67 S/ 27.67
S/ - S/ - S/ 22,456.72 S/ 22,456.72 S/ 22,456.72 S/ 22,456.72
S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 3,598.91 S/ 2,399.27
S/ 43.59 S/ 43.59 S/ 43.59 S/ - S/ - S/ -
S/ 183.57 S/ 275.35 S/ 367.14 S/ 458.92 S/ 275.35 S/ 413.03
S/ - S/ - S/ - S/ - S/ 211.71 S/ 211.71
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 210.46
S/ - S/ 27.91 S/ 27.91 S/ 27.91 S/ 27.91 S/ 27.91
S/ 29.59 S/ 29.59 S/ 29.59 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 51.81 S/ 51.81 S/ 51.81
S/ 7.20 S/ 7.20 S/ 13.49 S/ 13.49 S/ 10.79 S/ 10.79

A623
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ - S/ - S/ 2.13 S/ 2.13
S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04
S/ 2.90 S/ 2.90 S/ 4.34 S/ 4.34 S/ 4.34 S/ 5.79
S/ - S/ - S/ 8.83 S/ 7.07 S/ 10.60 S/ 7.07
S/ 25.08 S/ 25.08 S/ - S/ - S/ - S/ -
S/ - S/ 22.16 S/ 22.16 S/ 22.16 S/ 22.16 S/ -
S/ 57.03 S/ 57.03 S/ 57.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 5.19 S/ 5.19 S/ 5.19
S/ 0.86 S/ 0.86 S/ 1.62 S/ 1.62 S/ 1.30 S/ 1.30
S/ - S/ - S/ - S/ - S/ 50.35 S/ 50.35
S/ - S/ - S/ 70.66 S/ 70.66 S/ 70.66 S/ 70.66
S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77 S/ 8.32 S/ 5.55
S/ 40.70 S/ 40.70 S/ 40.70 S/ - S/ - S/ -
S/ 323.99 S/ 485.98 S/ 647.97 S/ 809.97 S/ 485.98 S/ 728.97
S/ - S/ - S/ - S/ - S/ 691.16 S/ 691.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 1,144.07
S/ - S/ 270.13 S/ 270.13 S/ 270.13 S/ 270.13 S/ 270.13
S/ 192.31 S/ 192.31 S/ 192.31 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 403.40 S/ 403.40 S/ 403.40
S/ 15.68 S/ 15.68 S/ 29.40 S/ 29.40 S/ 23.52 S/ 23.52
S/ - S/ - S/ - S/ - S/ 20.50 S/ 20.50
S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10
S/ 31.82 S/ 31.82 S/ 47.73 S/ 47.73 S/ 47.73 S/ 63.64
S/ - S/ - S/ 433.29 S/ 346.64 S/ 519.95 S/ 346.64
S/ 552.22 S/ 552.22 S/ - S/ - S/ - S/ -
S/ 5.52 S/ 5.52 S/ 5.52 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 66.08 S/ 66.08 S/ 66.08
S/ 176.10 S/ 176.10 S/ 330.20 S/ 330.20 S/ 264.16 S/ 264.16
S/ - S/ - S/ - S/ - S/ 22.85 S/ 22.85
S/ - S/ - S/ 1,415.60 S/ 1,415.60 S/ 1,415.60 S/ 1,415.60
S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58 S/ 25.74 S/ 17.16
S/ 26.52 S/ 26.52 S/ 26.52 S/ - S/ - S/ -
S/ 8.35 S/ 12.52 S/ 16.70 S/ 20.87 S/ 12.52 S/ 18.78
S/ - S/ - S/ - S/ - S/ 6.41 S/ 6.41
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 45.12
S/ - S/ 2.78 S/ 2.78 S/ 2.78 S/ 2.78 S/ 2.78
S/ 38.03 S/ 38.03 S/ 38.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.23 S/ 0.23 S/ 0.23

A624
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 920.00 S/ 920.00 S/ 1,725.01 S/ 1,725.01 S/ 1,380.00 S/ 1,380.00
S/ - S/ - S/ - S/ - S/ 6.17 S/ 6.17
S/ 0.15 S/ 0.31 S/ 0.31 S/ 0.31 S/ 0.15 S/ 0.15
S/ 48.53 S/ 48.53 S/ 48.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 26.97 S/ 26.97 S/ 26.97
S/ 33.04 S/ 33.04 S/ 61.96 S/ 61.96 S/ 49.57 S/ 49.57
S/ - S/ - S/ - S/ - S/ 796.16 S/ 796.16
S/ - S/ - S/ 625.17 S/ 625.17 S/ 625.17 S/ 625.17
S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44 S/ 22.33 S/ 14.89
S/ 290.40 S/ 290.40 S/ 290.40 S/ - S/ - S/ -
S/ 59.85 S/ 89.78 S/ 119.71 S/ 149.63 S/ 89.78 S/ 134.67
S/ - S/ - S/ - S/ - S/ 25.08 S/ 25.08
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 51.37
S/ - S/ 159.46 S/ 159.46 S/ 159.46 S/ 159.46 S/ 159.46
S/ 203.91 S/ 203.91 S/ 203.91 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.05 S/ 0.05 S/ 0.05
S/ 3.49 S/ 3.49 S/ 6.54 S/ 6.54 S/ 5.23 S/ 5.23
S/ - S/ - S/ - S/ - S/ 69.38 S/ 69.38
S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29
S/ 4.32 S/ 4.32 S/ 6.49 S/ 6.49 S/ 6.49 S/ 8.65
S/ - S/ - S/ 40.97 S/ 32.78 S/ 49.17 S/ 32.78
S/ 304.69 S/ 304.69 S/ - S/ - S/ - S/ -
S/ - S/ 100.22 S/ 100.22 S/ 100.22 S/ 100.22 S/ -
S/ - S/ - S/ - S/ - S/ 152.17 S/ 152.17
S/ 52.69 S/ 52.69 S/ 52.69 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 3.33 S/ 3.33 S/ 3.33
S/ 32.90 S/ 32.90 S/ 61.69 S/ 61.69 S/ 49.35 S/ 49.35
S/ - S/ - S/ - S/ - S/ 33.80 S/ 33.80
S/ 248.97 S/ 248.97 S/ 248.97 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 2,022.17 S/ 2,022.17 S/ 2,022.17
S/ 13.47 S/ 13.47 S/ 25.26 S/ 25.26 S/ 20.21 S/ 20.21
S/ - S/ - S/ - S/ - S/ 177.69 S/ 177.69
S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91
S/ 15.44 S/ 15.44 S/ 23.16 S/ 23.16 S/ 23.16 S/ 30.88
S/ - S/ - S/ 20,523.12 S/ 16,418.50 S/ 24,627.75 S/ 16,418.50

S/ - S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ -


S/ - S/ - S/ - S/ - S/ 906.82 S/ 906.82
S/ - S/ - S/ - S/ - S/ - S/ -

A625
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ 27.17 S/ 21.73 S/ 32.60 S/ 21.73
S/ 348.46 S/ 348.46 S/ - S/ - S/ - S/ -
S/ - S/ 4.12 S/ 4.12 S/ 4.12 S/ 4.12 S/ -
S/ - S/ - S/ - S/ - S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.17
S/ - S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 12.54 S/ 12.54 S/ 12.54 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.47 S/ 16.47 S/ 16.47
S/ 4.67 S/ 4.67 S/ 8.75 S/ 8.75 S/ 7.00 S/ 7.00
S/ - S/ - S/ - S/ - S/ 3.49 S/ 3.49
S/ - S/ - S/ 2.72 S/ 2.72 S/ 2.72 S/ 2.72
S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83 S/ 8.49 S/ 5.66
S/ 1.71 S/ 1.71 S/ 1.71 S/ - S/ - S/ -
S/ 3.11 S/ 4.66 S/ 6.21 S/ 7.77 S/ 4.66 S/ 6.99
S/ - S/ - S/ - S/ - S/ 92.27 S/ 92.27
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.23
S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 0.65 S/ 0.65 S/ 0.65 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.70 S/ 0.70 S/ 0.70
S/ 10.34 S/ 10.34 S/ 19.38 S/ 19.38 S/ 15.51 S/ 15.51
S/ - S/ - S/ - S/ - S/ 46.68 S/ 46.68
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39
S/ 1.47 S/ 1.47 S/ 2.21 S/ 2.21 S/ 2.21 S/ 2.94
S/ - S/ - S/ 3.38 S/ 2.70 S/ 4.05 S/ 2.70
S/ 25.00 S/ 25.00 S/ - S/ - S/ - S/ -
S/ - S/ 0.18 S/ 0.18 S/ 0.18 S/ 0.18 S/ -
S/ - S/ - S/ - S/ - S/ 863.58 S/ 863.58
S/ - S/ - S/ - S/ - S/ - S/ -

S/ 2,262.61 S/ 2,262.61 S/ 2,262.61 S/ - S/ - S/ -


S/ - S/ - S/ - S/ 2,978.59 S/ 2,978.59 S/ 2,978.59
S/ 1.15 S/ 1.15 S/ 2.16 S/ 2.16 S/ 1.73 S/ 1.73
S/ 413.19 S/ 413.19 S/ 413.19 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 3,308.60 S/ 3,308.60 S/ 3,308.60
S/ 2,211.41 S/ 2,211.41 S/ 4,146.39 S/ 4,146.39 S/ 3,317.11 S/ 3,317.11
S/ - S/ - S/ - S/ - S/ 24.92 S/ 24.92
S/ - S/ - S/ 2,529.87 S/ 2,529.87 S/ 2,529.87 S/ 2,529.87

A626
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 31,224.44 S/ 20,816.29
S/ 2,945.11 S/ 2,945.11 S/ 2,945.11 S/ - S/ - S/ -
S/ 604.42 S/ 906.63 S/ 1,208.84 S/ 1,511.05 S/ 906.63 S/ 1,359.94
S/ - S/ - S/ - S/ - S/ 11,935.07 S/ 11,935.07
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 946.95
S/ - S/ 362.40 S/ 362.40 S/ 362.40 S/ 362.40 S/ 362.40
S/ 925.75 S/ 925.75 S/ 925.75 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 281.01 S/ 281.01 S/ 281.01
S/ 156.74 S/ 156.74 S/ 293.89 S/ 293.89 S/ 235.11 S/ 235.11
S/ - S/ - S/ - S/ - S/ 138.44 S/ 138.44
S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94
S/ 65.64 S/ 65.64 S/ 98.46 S/ 98.46 S/ 98.46 S/ 131.28
S/ - S/ - S/ 144.18 S/ 115.34 S/ 173.01 S/ 115.34
S/ 309.22 S/ 309.22 S/ - S/ - S/ - S/ -
S/ - S/ 2,503.20 S/ 2,503.20 S/ 2,503.20 S/ 2,503.20 S/ -
S/ - S/ - S/ - S/ - S/ 11,196.12 S/ 11,196.12
S/ 39,366.96 S/ 39,366.96 S/ 39,366.96 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 13,733.59 S/ 13,733.59 S/ 13,733.59
S/ 32.17 S/ 32.17 S/ 60.32 S/ 60.32 S/ 48.25 S/ 48.25
S/ - S/ - S/ - S/ - S/ 242.05 S/ 242.05
S/ - S/ - S/ 32,015.97 S/ 32,015.97 S/ 32,015.97 S/ 32,015.97
S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42 S/ 1.25 S/ 0.83
S/ 689.53 S/ 689.53 S/ 689.53 S/ - S/ - S/ -
S/ 61.48 S/ 92.22 S/ 122.96 S/ 153.70 S/ 92.22 S/ 138.33
S/ - S/ - S/ - S/ - S/ 84.31 S/ 84.31
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 405.81
S/ - S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87
S/ 38.45 S/ 38.45 S/ 38.45 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 106.90 S/ 106.90 S/ 106.90
S/ 88.03 S/ 88.03 S/ 165.06 S/ 165.06 S/ 132.05 S/ 132.05
S/ - S/ - S/ - S/ - S/ 10.73 S/ 10.73
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96
S/ 0.85 S/ 0.85 S/ 1.27 S/ 1.27 S/ 1.27 S/ 1.69
S/ - S/ - S/ 67.06 S/ 53.65 S/ 80.48 S/ 53.65
S/ 37.21 S/ 37.21 S/ - S/ - S/ - S/ -
S/ - S/ 158.59 S/ 158.59 S/ 158.59 S/ 158.59 S/ -
S/ - S/ - S/ - S/ - S/ 36.20 S/ 36.20
S/ 14.01 S/ 14.01 S/ 14.01 S/ - S/ - S/ -

A627
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ - S/ 52.37 S/ 52.37 S/ 52.37
S/ 41.49 S/ 41.49 S/ 77.80 S/ 77.80 S/ 62.24 S/ 62.24
S/ - S/ - S/ - S/ - S/ 13.97 S/ 13.97
S/ - S/ - S/ 79.45 S/ 79.45 S/ 79.45 S/ 79.45
S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90 S/ 116.69 S/ 77.80
S/ 97.25 S/ 97.25 S/ 97.25 S/ - S/ - S/ -
S/ 3.37 S/ 5.06 S/ 6.74 S/ 8.43 S/ 5.06 S/ 7.58
S/ - S/ - S/ - S/ - S/ 14.37 S/ 14.37
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 12.67
S/ - S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80
S/ 8.87 S/ 8.87 S/ 8.87 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.65 S/ 0.65 S/ 0.65
S/ 31.31 S/ 31.31 S/ 58.71 S/ 58.71 S/ 46.97 S/ 46.97
S/ - S/ - S/ - S/ - S/ 219.41 S/ 219.41
S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71
S/ 102.54 S/ 102.54 S/ 153.81 S/ 153.81 S/ 153.81 S/ 205.08
S/ - S/ - S/ 28.62 S/ 22.90 S/ 34.34 S/ 22.90
S/ 2.16 S/ 2.16 S/ - S/ - S/ - S/ -
S/ - S/ 136.49 S/ 136.49 S/ 136.49 S/ 136.49 S/ -
S/ 70.17 S/ 70.17 S/ 70.17 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.85 S/ 16.85 S/ 16.85
S/ 29.18 S/ 29.18 S/ 54.71 S/ 54.71 S/ 43.77 S/ 43.77
S/ - S/ - S/ - S/ - S/ 118.85 S/ 118.85
S/ - S/ - S/ 1,674.64 S/ 1,674.64 S/ 1,674.64 S/ 1,674.64
S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.03 S/ 0.02
S/ 1,035.04 S/ 1,035.04 S/ 1,035.04 S/ - S/ - S/ -
S/ 72.46 S/ 108.68 S/ 144.91 S/ 181.14 S/ 108.68 S/ 163.02
S/ - S/ - S/ - S/ - S/ 920.64 S/ 920.64
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 111.01
S/ - S/ 4,490.10 S/ 4,490.10 S/ 4,490.10 S/ 4,490.10 S/ 4,490.10
S/ 408.63 S/ 408.63 S/ 408.63 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 160.26 S/ 160.26 S/ 160.26
S/ 0.05 S/ 0.05 S/ 0.09 S/ 0.09 S/ 0.07 S/ 0.07
S/ - S/ - S/ - S/ - S/ 1,042.36 S/ 1,042.36
S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70
S/ 49.53 S/ 49.53 S/ 74.30 S/ 74.30 S/ 74.30 S/ 99.07
S/ - S/ - S/ 737.94 S/ 590.35 S/ 885.52 S/ 590.35
S/ 208.10 S/ 208.10 S/ - S/ - S/ - S/ -

A628
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 93.75 S/ 93.75 S/ 93.75 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 29.98 S/ 29.98 S/ 29.98
S/ 28.48 S/ 28.48 S/ 53.39 S/ 53.39 S/ 42.71 S/ 42.71
S/ - S/ - S/ - S/ - S/ 11.92 S/ 11.92
S/ - S/ - S/ 508.92 S/ 508.92 S/ 508.92 S/ 508.92
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.06 S/ 0.04
S/ 295.30 S/ 295.30 S/ 295.30 S/ - S/ - S/ -
S/ 53.00 S/ 79.50 S/ 106.00 S/ 132.50 S/ 79.50 S/ 119.25
S/ - S/ - S/ - S/ - S/ 36.28 S/ 36.28
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 710.11
S/ - S/ 1.11 S/ 1.11 S/ 1.11 S/ 1.11 S/ 1.11
S/ 7,175.57 S/ 7,175.57 S/ 7,175.57 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 772.80 S/ 772.80 S/ 772.80
S/ 97.83 S/ 97.83 S/ 183.43 S/ 183.43 S/ 146.74 S/ 146.74
S/ - S/ - S/ - S/ - S/ 104.17 S/ 104.17
S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87
S/ 871.44 S/ 871.44 S/ 1,307.15 S/ 1,307.15 S/ 1,307.15 S/ 1,742.87
S/ - S/ - S/ 214.77 S/ 171.82 S/ 257.73 S/ 171.82
S/ 0.29 S/ 0.29 S/ - S/ - S/ - S/ -
S/ - S/ 15.71 S/ 15.71 S/ 15.71 S/ 15.71 S/ -
S/ - S/ - S/ - S/ - S/ 583.39 S/ 583.39
S/ 447.10 S/ 447.10 S/ 447.10 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 209.50 S/ 209.50 S/ 209.50
S/ 14.18 S/ 14.18 S/ 26.59 S/ 26.59 S/ 21.27 S/ 21.27
S/ - S/ - S/ - S/ - S/ 27.67 S/ 27.67
S/ - S/ - S/ 22,456.72 S/ 22,456.72 S/ 22,456.72 S/ 22,456.72
S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 3,598.91 S/ 2,399.27
S/ 43.59 S/ 43.59 S/ 43.59 S/ - S/ - S/ -
S/ 183.57 S/ 275.35 S/ 367.14 S/ 458.92 S/ 275.35 S/ 413.03
S/ - S/ - S/ - S/ - S/ 211.71 S/ 211.71
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 210.46
S/ - S/ 27.91 S/ 27.91 S/ 27.91 S/ 27.91 S/ 27.91
S/ 29.59 S/ 29.59 S/ 29.59 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 51.81 S/ 51.81 S/ 51.81
S/ 7.20 S/ 7.20 S/ 13.49 S/ 13.49 S/ 10.79 S/ 10.79
S/ - S/ - S/ - S/ - S/ 2.13 S/ 2.13
S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04
S/ 2.90 S/ 2.90 S/ 4.34 S/ 4.34 S/ 4.34 S/ 5.79

A629
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ 8.83 S/ 7.07 S/ 10.60 S/ 7.07
S/ 25.08 S/ 25.08 S/ - S/ - S/ - S/ -
S/ - S/ 22.16 S/ 22.16 S/ 22.16 S/ 22.16 S/ -
S/ 57.03 S/ 57.03 S/ 57.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 5.19 S/ 5.19 S/ 5.19
S/ 0.86 S/ 0.86 S/ 1.62 S/ 1.62 S/ 1.30 S/ 1.30
S/ - S/ - S/ - S/ - S/ 50.35 S/ 50.35
S/ - S/ - S/ 70.66 S/ 70.66 S/ 70.66 S/ 70.66
S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77 S/ 8.32 S/ 5.55
S/ 40.70 S/ 40.70 S/ 40.70 S/ - S/ - S/ -
S/ 323.99 S/ 485.98 S/ 647.97 S/ 809.97 S/ 485.98 S/ 728.97
S/ - S/ - S/ - S/ - S/ 691.16 S/ 691.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 1,144.07
S/ - S/ 270.13 S/ 270.13 S/ 270.13 S/ 270.13 S/ 270.13
S/ 192.31 S/ 192.31 S/ 192.31 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 403.40 S/ 403.40 S/ 403.40
S/ 15.68 S/ 15.68 S/ 29.40 S/ 29.40 S/ 23.52 S/ 23.52
S/ - S/ - S/ - S/ - S/ 20.50 S/ 20.50
S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10
S/ 31.82 S/ 31.82 S/ 47.73 S/ 47.73 S/ 47.73 S/ 63.64
S/ - S/ - S/ 433.29 S/ 346.64 S/ 519.95 S/ 346.64
S/ 552.22 S/ 552.22 S/ - S/ - S/ - S/ -
S/ 5.52 S/ 5.52 S/ 5.52 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 66.08 S/ 66.08 S/ 66.08
S/ 176.10 S/ 176.10 S/ 330.20 S/ 330.20 S/ 264.16 S/ 264.16
S/ - S/ - S/ - S/ - S/ 22.85 S/ 22.85
S/ - S/ - S/ 1,415.60 S/ 1,415.60 S/ 1,415.60 S/ 1,415.60
S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58 S/ 25.74 S/ 17.16
S/ 26.52 S/ 26.52 S/ 26.52 S/ - S/ - S/ -
S/ 8.35 S/ 12.52 S/ 16.70 S/ 20.87 S/ 12.52 S/ 18.78
S/ - S/ - S/ - S/ - S/ 6.41 S/ 6.41
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 45.12
S/ - S/ 2.78 S/ 2.78 S/ 2.78 S/ 2.78 S/ 2.78
S/ 38.03 S/ 38.03 S/ 38.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.23 S/ 0.23 S/ 0.23
S/ - S/ - S/ - S/ - S/ 920.00 S/ 920.00
S/ - S/ - S/ 19.29 S/ 19.29 S/ 19.29 S/ 19.29
S/ 0.15 S/ 0.15 S/ 0.15 S/ 0.15 S/ 0.46 S/ 0.31

A630
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 48.53 S/ 48.53 S/ 48.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 26.97 S/ 26.97 S/ 26.97
S/ 33.04 S/ 33.04 S/ 61.96 S/ 61.96 S/ 49.57 S/ 49.57
S/ - S/ - S/ - S/ - S/ 796.16 S/ 796.16
S/ - S/ - S/ 625.17 S/ 625.17 S/ 625.17 S/ 625.17
S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44 S/ 22.33 S/ 14.89
S/ 290.40 S/ 290.40 S/ 290.40 S/ - S/ - S/ -
S/ 59.85 S/ 89.78 S/ 119.71 S/ 149.63 S/ 89.78 S/ 134.67
S/ - S/ - S/ - S/ - S/ 25.08 S/ 25.08
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 51.37
S/ - S/ 159.46 S/ 159.46 S/ 159.46 S/ 159.46 S/ 159.46
S/ 203.91 S/ 203.91 S/ 203.91 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.05 S/ 0.05 S/ 0.05
S/ 3.49 S/ 3.49 S/ 6.54 S/ 6.54 S/ 5.23 S/ 5.23
S/ - S/ - S/ - S/ - S/ 69.38 S/ 69.38
S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29
S/ 4.32 S/ 4.32 S/ 6.49 S/ 6.49 S/ 6.49 S/ 8.65
S/ - S/ - S/ 40.97 S/ 32.78 S/ 49.17 S/ 32.78
S/ 304.69 S/ 304.69 S/ - S/ - S/ - S/ -
S/ - S/ 100.22 S/ 100.22 S/ 100.22 S/ 100.22 S/ -
S/ - S/ - S/ - S/ - S/ 152.17 S/ 152.17
S/ 52.69 S/ 52.69 S/ 52.69 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 3.33 S/ 3.33 S/ 3.33
S/ 32.90 S/ 32.90 S/ 61.69 S/ 61.69 S/ 49.35 S/ 49.35
S/ - S/ - S/ - S/ - S/ 33.80 S/ 33.80
S/ 248.97 S/ 248.97 S/ 248.97 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 2,022.17 S/ 2,022.17 S/ 2,022.17
S/ 13.47 S/ 13.47 S/ 25.26 S/ 25.26 S/ 20.21 S/ 20.21
S/ - S/ - S/ - S/ - S/ 177.69 S/ 177.69
S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91
S/ 15.44 S/ 15.44 S/ 23.16 S/ 23.16 S/ 23.16 S/ 30.88
S/ - S/ - S/ 20,523.12 S/ 16,418.50 S/ 24,627.75 S/ 16,418.50

S/ - S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ -


S/ - S/ - S/ - S/ - S/ 906.82 S/ 906.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ 27.17 S/ 21.73 S/ 32.60 S/ 21.73
S/ 348.46 S/ 348.46 S/ - S/ - S/ - S/ -
S/ - S/ 4.12 S/ 4.12 S/ 4.12 S/ 4.12 S/ -

A631
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ - S/ - S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.17
S/ - S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 12.54 S/ 12.54 S/ 12.54 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.47 S/ 16.47 S/ 16.47
S/ 4.67 S/ 4.67 S/ 8.75 S/ 8.75 S/ 7.00 S/ 7.00
S/ - S/ - S/ - S/ - S/ 3.49 S/ 3.49
S/ - S/ - S/ 2.72 S/ 2.72 S/ 2.72 S/ 2.72
S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83 S/ 8.49 S/ 5.66
S/ 1.71 S/ 1.71 S/ 1.71 S/ - S/ - S/ -
S/ 3.11 S/ 4.66 S/ 6.21 S/ 7.77 S/ 4.66 S/ 6.99
S/ - S/ - S/ - S/ - S/ 92.27 S/ 92.27
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 0.23
S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 0.65 S/ 0.65 S/ 0.65 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.70 S/ 0.70 S/ 0.70
S/ 10.34 S/ 10.34 S/ 19.38 S/ 19.38 S/ 15.51 S/ 15.51
S/ - S/ - S/ - S/ - S/ 46.68 S/ 46.68
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39
S/ 1.47 S/ 1.47 S/ 2.21 S/ 2.21 S/ 2.21 S/ 2.94
S/ - S/ - S/ 3.38 S/ 2.70 S/ 4.05 S/ 2.70
S/ 25.00 S/ 25.00 S/ - S/ - S/ - S/ -
S/ - S/ 0.18 S/ 0.18 S/ 0.18 S/ 0.18 S/ -
S/ - S/ - S/ - S/ - S/ 863.58 S/ 863.58
S/ - S/ - S/ - S/ - S/ - S/ -

S/ 2,262.61 S/ 2,262.61 S/ 2,262.61 S/ - S/ - S/ -


S/ - S/ - S/ - S/ 2,978.59 S/ 2,978.59 S/ 2,978.59
S/ 1.15 S/ 1.15 S/ 2.16 S/ 2.16 S/ 1.73 S/ 1.73
S/ 413.19 S/ 413.19 S/ 413.19 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 3,308.60 S/ 3,308.60 S/ 3,308.60
S/ 2,211.41 S/ 2,211.41 S/ 4,146.39 S/ 4,146.39 S/ 3,317.11 S/ 3,317.11
S/ - S/ - S/ - S/ - S/ 24.92 S/ 24.92
S/ - S/ - S/ 2,529.87 S/ 2,529.87 S/ 2,529.87 S/ 2,529.87
S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 31,224.44 S/ 20,816.29
S/ 2,945.11 S/ 2,945.11 S/ 2,945.11 S/ - S/ - S/ -
S/ 604.42 S/ 906.63 S/ 1,208.84 S/ 1,511.05 S/ 906.63 S/ 1,359.94

A632
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ - S/ - S/ 11,935.07 S/ 11,935.07
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 946.95
S/ - S/ 362.40 S/ 362.40 S/ 362.40 S/ 362.40 S/ 362.40
S/ 925.75 S/ 925.75 S/ 925.75 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 281.01 S/ 281.01 S/ 281.01
S/ 156.74 S/ 156.74 S/ 293.89 S/ 293.89 S/ 235.11 S/ 235.11
S/ - S/ - S/ - S/ - S/ 138.44 S/ 138.44
S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94
S/ 65.64 S/ 65.64 S/ 98.46 S/ 98.46 S/ 98.46 S/ 131.28
S/ - S/ - S/ 144.18 S/ 115.34 S/ 173.01 S/ 115.34
S/ 309.22 S/ 309.22 S/ - S/ - S/ - S/ -
S/ - S/ 2,503.20 S/ 2,503.20 S/ 2,503.20 S/ 2,503.20 S/ -
S/ - S/ - S/ - S/ - S/ 11,196.12 S/ 11,196.12
S/ 39,366.96 S/ 39,366.96 S/ 39,366.96 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 13,733.59 S/ 13,733.59 S/ 13,733.59
S/ 32.17 S/ 32.17 S/ 60.32 S/ 60.32 S/ 48.25 S/ 48.25
S/ - S/ - S/ - S/ - S/ 242.05 S/ 242.05
S/ - S/ - S/ 32,015.97 S/ 32,015.97 S/ 32,015.97 S/ 32,015.97
S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42 S/ 1.25 S/ 0.83
S/ 689.53 S/ 689.53 S/ 689.53 S/ - S/ - S/ -
S/ 61.48 S/ 92.22 S/ 122.96 S/ 153.70 S/ 92.22 S/ 138.33
S/ - S/ - S/ - S/ - S/ 84.31 S/ 84.31
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 405.81
S/ - S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87 S/ 0.87
S/ 38.45 S/ 38.45 S/ 38.45 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 106.90 S/ 106.90 S/ 106.90
S/ 88.03 S/ 88.03 S/ 165.06 S/ 165.06 S/ 132.05 S/ 132.05
S/ - S/ - S/ - S/ - S/ 10.73 S/ 10.73
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96
S/ 0.85 S/ 0.85 S/ 1.27 S/ 1.27 S/ 1.27 S/ 1.69
S/ - S/ - S/ 67.06 S/ 53.65 S/ 80.48 S/ 53.65
S/ 37.21 S/ 37.21 S/ - S/ - S/ - S/ -
S/ - S/ 158.59 S/ 158.59 S/ 158.59 S/ 158.59 S/ -
S/ - S/ - S/ - S/ - S/ 36.20 S/ 36.20
S/ 14.01 S/ 14.01 S/ 14.01 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 52.37 S/ 52.37 S/ 52.37
S/ 41.49 S/ 41.49 S/ 77.80 S/ 77.80 S/ 62.24 S/ 62.24
S/ - S/ - S/ - S/ - S/ 13.97 S/ 13.97

A633
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ 79.45 S/ 79.45 S/ 79.45 S/ 79.45
S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90 S/ 116.69 S/ 77.80
S/ 97.25 S/ 97.25 S/ 97.25 S/ - S/ - S/ -
S/ 3.37 S/ 5.06 S/ 6.74 S/ 8.43 S/ 5.06 S/ 7.58
S/ - S/ - S/ - S/ - S/ 14.37 S/ 14.37
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 12.67
S/ - S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80 S/ 3.80
S/ 8.87 S/ 8.87 S/ 8.87 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.65 S/ 0.65 S/ 0.65
S/ 31.31 S/ 31.31 S/ 58.71 S/ 58.71 S/ 46.97 S/ 46.97
S/ - S/ - S/ - S/ - S/ 219.41 S/ 219.41
S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71
S/ 102.54 S/ 102.54 S/ 153.81 S/ 153.81 S/ 153.81 S/ 205.08
S/ - S/ - S/ 28.62 S/ 22.90 S/ 34.34 S/ 22.90
S/ 2.16 S/ 2.16 S/ - S/ - S/ - S/ -
S/ - S/ 136.49 S/ 136.49 S/ 136.49 S/ 136.49 S/ -
S/ 70.17 S/ 70.17 S/ 70.17 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 16.85 S/ 16.85 S/ 16.85
S/ 29.18 S/ 29.18 S/ 54.71 S/ 54.71 S/ 43.77 S/ 43.77
S/ - S/ - S/ - S/ - S/ 118.85 S/ 118.85
S/ - S/ - S/ 1,674.64 S/ 1,674.64 S/ 1,674.64 S/ 1,674.64
S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.03 S/ 0.02
S/ 1,035.04 S/ 1,035.04 S/ 1,035.04 S/ - S/ - S/ -
S/ 72.46 S/ 108.68 S/ 144.91 S/ 181.14 S/ 108.68 S/ 163.02
S/ - S/ - S/ - S/ - S/ 920.64 S/ 920.64
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 111.01
S/ - S/ 4,490.10 S/ 4,490.10 S/ 4,490.10 S/ 4,490.10 S/ 4,490.10
S/ 408.63 S/ 408.63 S/ 408.63 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 160.26 S/ 160.26 S/ 160.26
S/ 0.05 S/ 0.05 S/ 0.09 S/ 0.09 S/ 0.07 S/ 0.07
S/ - S/ - S/ - S/ - S/ 1,042.36 S/ 1,042.36
S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70
S/ 49.53 S/ 49.53 S/ 74.30 S/ 74.30 S/ 74.30 S/ 99.07
S/ - S/ - S/ 737.94 S/ 590.35 S/ 885.52 S/ 590.35
S/ 208.10 S/ 208.10 S/ - S/ - S/ - S/ -
S/ 93.75 S/ 93.75 S/ 93.75 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 29.98 S/ 29.98 S/ 29.98
S/ 28.48 S/ 28.48 S/ 53.39 S/ 53.39 S/ 42.71 S/ 42.71

A634
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ - S/ - S/ 11.92 S/ 11.92
S/ - S/ - S/ 508.92 S/ 508.92 S/ 508.92 S/ 508.92
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.06 S/ 0.04
S/ 295.30 S/ 295.30 S/ 295.30 S/ - S/ - S/ -
S/ 53.00 S/ 79.50 S/ 106.00 S/ 132.50 S/ 79.50 S/ 119.25
S/ - S/ - S/ - S/ - S/ 36.28 S/ 36.28
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 710.11
S/ - S/ 1.11 S/ 1.11 S/ 1.11 S/ 1.11 S/ 1.11
S/ 7,175.57 S/ 7,175.57 S/ 7,175.57 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 772.80 S/ 772.80 S/ 772.80
S/ 97.83 S/ 97.83 S/ 183.43 S/ 183.43 S/ 146.74 S/ 146.74
S/ - S/ - S/ - S/ - S/ 104.17 S/ 104.17
S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87
S/ 871.44 S/ 871.44 S/ 1,307.15 S/ 1,307.15 S/ 1,307.15 S/ 1,742.87
S/ - S/ - S/ 214.77 S/ 171.82 S/ 257.73 S/ 171.82
S/ 0.29 S/ 0.29 S/ - S/ - S/ - S/ -
S/ - S/ 15.71 S/ 15.71 S/ 15.71 S/ 15.71 S/ -
S/ - S/ - S/ - S/ - S/ 583.39 S/ 583.39
S/ 447.10 S/ 447.10 S/ 447.10 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 209.50 S/ 209.50 S/ 209.50
S/ 14.18 S/ 14.18 S/ 26.59 S/ 26.59 S/ 21.27 S/ 21.27
S/ - S/ - S/ - S/ - S/ 27.67 S/ 27.67
S/ - S/ - S/ 22,456.72 S/ 22,456.72 S/ 22,456.72 S/ 22,456.72
S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 3,598.91 S/ 2,399.27
S/ 43.59 S/ 43.59 S/ 43.59 S/ - S/ - S/ -
S/ 183.57 S/ 275.35 S/ 367.14 S/ 458.92 S/ 275.35 S/ 413.03
S/ - S/ - S/ - S/ - S/ 211.71 S/ 211.71
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 210.46
S/ - S/ 27.91 S/ 27.91 S/ 27.91 S/ 27.91 S/ 27.91
S/ 29.59 S/ 29.59 S/ 29.59 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 51.81 S/ 51.81 S/ 51.81
S/ 7.20 S/ 7.20 S/ 13.49 S/ 13.49 S/ 10.79 S/ 10.79
S/ - S/ - S/ - S/ - S/ 2.13 S/ 2.13
S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04
S/ 2.90 S/ 2.90 S/ 4.34 S/ 4.34 S/ 4.34 S/ 5.79
S/ - S/ - S/ 8.83 S/ 7.07 S/ 10.60 S/ 7.07
S/ 25.08 S/ 25.08 S/ - S/ - S/ - S/ -
S/ - S/ 22.16 S/ 22.16 S/ 22.16 S/ 22.16 S/ -

A635
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ 57.03 S/ 57.03 S/ 57.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 5.19 S/ 5.19 S/ 5.19
S/ 0.86 S/ 0.86 S/ 1.62 S/ 1.62 S/ 1.30 S/ 1.30
S/ - S/ - S/ - S/ - S/ 50.35 S/ 50.35
S/ - S/ - S/ 70.66 S/ 70.66 S/ 70.66 S/ 70.66
S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77 S/ 8.32 S/ 5.55
S/ 40.70 S/ 40.70 S/ 40.70 S/ - S/ - S/ -
S/ 323.99 S/ 485.98 S/ 647.97 S/ 809.97 S/ 485.98 S/ 728.97
S/ - S/ - S/ - S/ - S/ 691.16 S/ 691.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 1,144.07
S/ - S/ 270.13 S/ 270.13 S/ 270.13 S/ 270.13 S/ 270.13
S/ 192.31 S/ 192.31 S/ 192.31 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 403.40 S/ 403.40 S/ 403.40
S/ 15.68 S/ 15.68 S/ 29.40 S/ 29.40 S/ 23.52 S/ 23.52
S/ - S/ - S/ - S/ - S/ 20.50 S/ 20.50
S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10
S/ 31.82 S/ 31.82 S/ 47.73 S/ 47.73 S/ 47.73 S/ 63.64
S/ - S/ - S/ 433.29 S/ 346.64 S/ 519.95 S/ 346.64
S/ 552.22 S/ 552.22 S/ - S/ - S/ - S/ -
S/ 5.52 S/ 5.52 S/ 5.52 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 66.08 S/ 66.08 S/ 66.08
S/ 176.10 S/ 176.10 S/ 330.20 S/ 330.20 S/ 264.16 S/ 264.16
S/ - S/ - S/ - S/ - S/ 22.85 S/ 22.85
S/ - S/ - S/ 1,415.60 S/ 1,415.60 S/ 1,415.60 S/ 1,415.60
S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58 S/ 25.74 S/ 17.16
S/ 26.52 S/ 26.52 S/ 26.52 S/ - S/ - S/ -
S/ 8.35 S/ 12.52 S/ 16.70 S/ 20.87 S/ 12.52 S/ 18.78
S/ - S/ - S/ - S/ - S/ 6.41 S/ 6.41
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 45.12
S/ - S/ 2.78 S/ 2.78 S/ 2.78 S/ 2.78 S/ 2.78
S/ 38.03 S/ 38.03 S/ 38.03 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.23 S/ 0.23 S/ 0.23
S/ 920.00 S/ 920.00 S/ 1,725.01 S/ 1,725.01 S/ 1,380.00 S/ 1,380.00
S/ - S/ - S/ - S/ - S/ 6.17 S/ 6.17
S/ 0.15 S/ 0.31 S/ 0.31 S/ 0.31 S/ 0.15 S/ 0.15
S/ 48.53 S/ 48.53 S/ 48.53 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 26.97 S/ 26.97 S/ 26.97
S/ 33.04 S/ 33.04 S/ 61.96 S/ 61.96 S/ 49.57 S/ 49.57

A636
E INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE

Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08


DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020
A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020
S/ - S/ - S/ - S/ - S/ 796.16 S/ 796.16
S/ - S/ - S/ 625.17 S/ 625.17 S/ 625.17 S/ 625.17
S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44 S/ 22.33 S/ 14.89
S/ 290.40 S/ 290.40 S/ 290.40 S/ - S/ - S/ -
S/ 59.85 S/ 89.78 S/ 119.71 S/ 149.63 S/ 89.78 S/ 134.67
S/ - S/ - S/ - S/ - S/ 25.08 S/ 25.08
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ 51.37
S/ - S/ 159.46 S/ 159.46 S/ 159.46 S/ 159.46 S/ 159.46
S/ 203.91 S/ 203.91 S/ 203.91 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 0.05 S/ 0.05 S/ 0.05
S/ 3.49 S/ 3.49 S/ 6.54 S/ 6.54 S/ 5.23 S/ 5.23
S/ - S/ - S/ - S/ - S/ 69.38 S/ 69.38
S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29
S/ 4.32 S/ 4.32 S/ 6.49 S/ 6.49 S/ 6.49 S/ 8.65
S/ - S/ - S/ 40.97 S/ 32.78 S/ 49.17 S/ 32.78
S/ 304.69 S/ 304.69 S/ - S/ - S/ - S/ -
S/ - S/ 100.22 S/ 100.22 S/ 100.22 S/ 100.22 S/ -
S/ - S/ - S/ - S/ - S/ 152.17 S/ 152.17
S/ 52.69 S/ 52.69 S/ 52.69 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 3.33 S/ 3.33 S/ 3.33
S/ 32.90 S/ 32.90 S/ 61.69 S/ 61.69 S/ 49.35 S/ 49.35
S/ - S/ - S/ - S/ - S/ 33.80 S/ 33.80
S/ 248.97 S/ 248.97 S/ 248.97 S/ - S/ - S/ -
S/ - S/ - S/ - S/ 2,022.17 S/ 2,022.17 S/ 2,022.17
S/ 13.47 S/ 13.47 S/ 25.26 S/ 25.26 S/ 20.21 S/ 20.21
S/ - S/ - S/ - S/ - S/ 177.69 S/ 177.69
S/ 47.91 S/ 95.83 S/ 95.83 S/ 95.83 S/ 47.91 S/ 47.91
S/ 15.44 S/ 15.44 S/ 23.16 S/ 23.16 S/ 23.16 S/ 30.88
S/ - S/ - S/ 20,523.12 S/ 16,418.50 S/ 24,627.75 S/ 16,418.50

S/ 312,261.98 S/ 348,141.08 S/ 693,405.17 S/ 545,039.09 S/ 787,506.60 S/ 714,430.42


5.38% 6.09% 11.95% 9.39% 13.57% 12.31%
11.48% 17.57% 29.52% 38.92% 52.49% 64.81%

A637
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ - S/ - S/ - S/ -
S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20 S/ -
S/ 5.43 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.44 S/ - S/ - S/ - S/ -
S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07 S/ -
S/ - S/ 0.13 S/ - S/ - S/ 0.17 S/ 0.17
S/ 0.02 S/ 0.01 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49 S/ -
S/ 8.75 S/ 8.75 S/ - S/ - S/ - S/ -
S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36 S/ 6.54
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88 S/ -
S/ 92.27 S/ 92.27 S/ - S/ - S/ - S/ -
S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43 S/ -
S/ - S/ 0.17 S/ - S/ - S/ 0.23 S/ 0.23
S/ 2.67 S/ 1.78 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23 S/ -
S/ 19.38 S/ 19.38 S/ - S/ - S/ - S/ -
S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35 S/ 87.53
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77 S/ 4.16
S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68 S/ 2.57
S/ 0.68 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ - S/ - S/ - S/ -
S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ -

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86 S/ -

A638
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 2.16 S/ 2.16 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3,308.60 S/ 3,308.60 S/ 2,205.74 S/ 2,205.74 S/ 1,102.87 S/ -
S/ 4,146.39 S/ 4,146.39 S/ - S/ - S/ - S/ -
S/ 31.14 S/ 31.14 S/ 37.37 S/ 37.37 S/ 31.14 S/ 46.72
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 31,224.44 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,417.67 S/ 2,719.88 S/ 1,208.84 S/ 1,208.84 S/ 755.52 S/ -
S/ 11,935.07 S/ 11,935.07 S/ - S/ - S/ - S/ -
S/ - S/ 4,894.28 S/ 4,894.28 S/ 4,894.28 S/ 4,894.28 S/ -
S/ - S/ 710.21 S/ - S/ - S/ 946.95 S/ 946.95
S/ 362.40 S/ 241.60 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 281.01 S/ 281.01 S/ 187.34 S/ 187.34 S/ 93.67 S/ -
S/ 293.89 S/ 293.89 S/ - S/ - S/ - S/ -
S/ 173.05 S/ 173.05 S/ 207.66 S/ 207.66 S/ 173.05 S/ 259.58
S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 11.88 S/ 17.83
S/ 114.87 S/ 114.87 S/ 114.87 S/ 246.15 S/ 164.10 S/ 114.87
S/ 28.84 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86 S/ -
S/ 60.32 S/ 60.32 S/ - S/ - S/ - S/ -
S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57 S/ 453.85
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85 S/ -
S/ 84.31 S/ 84.31 S/ - S/ - S/ - S/ -
S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ -
S/ - S/ 304.35 S/ - S/ - S/ 405.81 S/ 405.81
S/ 0.87 S/ 0.58 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63 S/ -
S/ 165.06 S/ 165.06 S/ - S/ - S/ - S/ -
S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41 S/ 20.11
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92 S/ 2.87

A639
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11 S/ 1.48
S/ 13.41 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46 S/ -
S/ 77.80 S/ 77.80 S/ - S/ - S/ - S/ -
S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46 S/ 26.19
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21 S/ -
S/ 14.37 S/ 14.37 S/ - S/ - S/ - S/ -
S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44 S/ -
S/ - S/ 9.50 S/ - S/ - S/ 12.67 S/ 12.67
S/ 3.80 S/ 2.53 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22 S/ -
S/ 58.71 S/ 58.71 S/ - S/ - S/ - S/ -
S/ 274.26 S/ 274.26 S/ 329.11 S/ 329.11 S/ 274.26 S/ 411.39
S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 45.41 S/ 68.12
S/ 179.44 S/ 179.44 S/ 179.44 S/ 384.52 S/ 256.34 S/ 179.44
S/ 5.72 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.85 S/ 16.85 S/ 11.24 S/ 11.24 S/ 5.62 S/ -
S/ 54.71 S/ 54.71 S/ - S/ - S/ - S/ -
S/ 148.56 S/ 148.56 S/ 178.27 S/ 178.27 S/ 148.56 S/ 222.84
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.03 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 289.82 S/ 326.05 S/ 144.91 S/ 144.91 S/ 90.57 S/ -
S/ 920.64 S/ 920.64 S/ - S/ - S/ - S/ -
S/ - S/ 11.81 S/ 11.81 S/ 11.81 S/ 11.81 S/ -
S/ - S/ 83.26 S/ - S/ - S/ 111.01 S/ 111.01
S/ 4,490.10 S/ 2,993.40 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 160.26 S/ 160.26 S/ 106.84 S/ 106.84 S/ 53.42 S/ -

A640
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 0.09 S/ 0.09 S/ - S/ - S/ - S/ -
S/ 1,302.95 S/ 1,302.95 S/ 1,563.54 S/ 1,563.54 S/ 1,302.95 S/ 1,954.43
S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 683.40 S/ 1,025.09
S/ 86.69 S/ 86.69 S/ 86.69 S/ 185.75 S/ 123.84 S/ 86.69
S/ 147.59 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 29.98 S/ 29.98 S/ 19.99 S/ 19.99 S/ 9.99 S/ -
S/ 53.39 S/ 53.39 S/ - S/ - S/ - S/ -
S/ 14.89 S/ 14.89 S/ 17.87 S/ 17.87 S/ 14.89 S/ 22.34
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.06 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 212.00 S/ 238.51 S/ 106.00 S/ 106.00 S/ 66.25 S/ -
S/ 36.28 S/ 36.28 S/ - S/ - S/ - S/ -
S/ - S/ 2.06 S/ 2.06 S/ 2.06 S/ 2.06 S/ -
S/ - S/ 532.58 S/ - S/ - S/ 710.11 S/ 710.11
S/ 1.11 S/ 0.74 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 772.80 S/ 772.80 S/ 515.20 S/ 515.20 S/ 257.60 S/ -
S/ 183.43 S/ 183.43 S/ - S/ - S/ - S/ -
S/ 130.21 S/ 130.21 S/ 156.25 S/ 156.25 S/ 130.21 S/ 195.31
S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 589.74 S/ 884.62
S/ 1,525.01 S/ 1,525.01 S/ 1,525.01 S/ 3,267.88 S/ 2,178.59 S/ 1,525.01
S/ 42.95 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 583.39 S/ 583.39 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 209.50 S/ 209.50 S/ 139.67 S/ 139.67 S/ 69.83 S/ -
S/ 26.59 S/ 26.59 S/ - S/ - S/ - S/ -
S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58 S/ 51.88
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46 S/ -
S/ 211.71 S/ 211.71 S/ - S/ - S/ - S/ -
S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55 S/ -
S/ - S/ 157.85 S/ - S/ - S/ 210.46 S/ 210.46
S/ 27.91 S/ 18.61 S/ - S/ - S/ - S/ -

A641
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 51.81 S/ 51.81 S/ 34.54 S/ 34.54 S/ 17.27 S/ -
S/ 13.49 S/ 13.49 S/ - S/ - S/ - S/ -
S/ 2.66 S/ 2.66 S/ 3.20 S/ 3.20 S/ 2.66 S/ 3.99
S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 8.08 S/ 12.12
S/ 5.07 S/ 5.07 S/ 5.07 S/ 10.86 S/ 7.24 S/ 5.07
S/ 1.77 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 5.19 S/ 5.19 S/ 3.46 S/ 3.46 S/ 1.73 S/ -
S/ 1.62 S/ 1.62 S/ - S/ - S/ - S/ -
S/ 62.94 S/ 62.94 S/ 75.53 S/ 75.53 S/ 62.94 S/ 94.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.32 S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,295.95 S/ 1,457.94 S/ 647.97 S/ 647.97 S/ 404.98 S/ -
S/ 691.16 S/ 691.16 S/ - S/ - S/ - S/ -
S/ - S/ 191.88 S/ 191.88 S/ 191.88 S/ 191.88 S/ -
S/ - S/ 858.05 S/ - S/ - S/ 1,144.07 S/ 1,144.07
S/ 270.13 S/ 180.09 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 403.40 S/ 403.40 S/ 268.93 S/ 268.93 S/ 134.47 S/ -
S/ 29.40 S/ 29.40 S/ - S/ - S/ - S/ -
S/ 25.62 S/ 25.62 S/ 30.74 S/ 30.74 S/ 25.62 S/ 38.43
S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 14.19 S/ 21.29
S/ 55.68 S/ 55.68 S/ 55.68 S/ 119.32 S/ 79.54 S/ 55.68
S/ 86.66 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 66.08 S/ 66.08 S/ 44.06 S/ 44.06 S/ 22.03 S/ -
S/ 330.20 S/ 330.20 S/ - S/ - S/ - S/ -
S/ 28.57 S/ 28.57 S/ 34.28 S/ 34.28 S/ 28.57 S/ 42.85
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 25.74 S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33.39 S/ 37.57 S/ 16.70 S/ 16.70 S/ 10.43 S/ -
S/ 6.41 S/ 6.41 S/ - S/ - S/ - S/ -
S/ - S/ 2,129.01 S/ 2,129.01 S/ 2,129.01 S/ 2,129.01 S/ -
S/ - S/ 33.84 S/ - S/ - S/ 45.12 S/ 45.12

A642
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 2.78 S/ 1.85 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.23 S/ 0.23 S/ 0.15 S/ 0.15 S/ 0.08 S/ -
S/ 1,725.01 S/ 1,725.01 S/ - S/ - S/ - S/ -
S/ 11.58 S/ 11.58 S/ 9.26 S/ 9.26 S/ 11.58 S/ 11.58
S/ 0.15 S/ 0.15 S/ 0.15 S/ 0.15 S/ 0.31 S/ 0.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 26.97 S/ 26.97 S/ 17.98 S/ 17.98 S/ 8.99 S/ -
S/ 61.96 S/ 61.96 S/ - S/ - S/ - S/ -
S/ 995.20 S/ 995.20 S/ 1,194.24 S/ 1,194.24 S/ 995.20 S/ 1,492.80
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 22.33 S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 239.41 S/ 269.34 S/ 119.71 S/ 119.71 S/ 74.82 S/ -
S/ 25.08 S/ 25.08 S/ - S/ - S/ - S/ -
S/ - S/ 183.47 S/ 183.47 S/ 183.47 S/ 183.47 S/ -
S/ - S/ 38.53 S/ - S/ - S/ 51.37 S/ 51.37
S/ 159.46 S/ 106.30 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.05 S/ 0.05 S/ 0.04 S/ 0.04 S/ 0.02 S/ -
S/ 6.54 S/ 6.54 S/ - S/ - S/ - S/ -
S/ 86.73 S/ 86.73 S/ 104.07 S/ 104.07 S/ 86.73 S/ 130.09
S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 76.57 S/ 114.86
S/ 7.57 S/ 7.57 S/ 7.57 S/ 16.22 S/ 10.81 S/ 7.57
S/ 8.19 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 152.17 S/ 152.17 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.33 S/ 3.33 S/ 2.22 S/ 2.22 S/ 1.11 S/ -
S/ 61.69 S/ 61.69 S/ - S/ - S/ - S/ -
S/ 63.38 S/ 63.38 S/ 50.71 S/ 50.71 S/ 63.38 S/ 63.38
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,022.17 S/ 2,022.17 S/ 1,348.11 S/ 1,348.11 S/ 674.06 S/ -
S/ 25.26 S/ 25.26 S/ - S/ - S/ - S/ -
S/ 222.12 S/ 222.12 S/ 266.54 S/ 266.54 S/ 222.12 S/ 333.18
S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91 S/ 95.83 S/ 143.74
S/ 27.02 S/ 27.02 S/ 27.02 S/ 57.90 S/ 38.60 S/ 27.02
S/ 4,104.62 S/ - S/ - S/ - S/ - S/ -

A643
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ - S/ - S/ - S/ -
S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20 S/ -
S/ 5.43 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.44 S/ - S/ - S/ - S/ -
S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07 S/ -
S/ - S/ 0.13 S/ - S/ - S/ 0.17 S/ 0.17
S/ 0.02 S/ 0.01 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49 S/ -
S/ 8.75 S/ 8.75 S/ - S/ - S/ - S/ -
S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36 S/ 6.54
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88 S/ -
S/ 92.27 S/ 92.27 S/ - S/ - S/ - S/ -
S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43 S/ -
S/ - S/ 0.17 S/ - S/ - S/ 0.23 S/ 0.23
S/ 2.67 S/ 1.78 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23 S/ -
S/ 19.38 S/ 19.38 S/ - S/ - S/ - S/ -
S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35 S/ 87.53
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77 S/ 4.16
S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68 S/ 2.57
S/ 0.68 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ - S/ - S/ - S/ -
S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ -

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86 S/ -
S/ 2.16 S/ 2.16 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3,308.60 S/ 3,308.60 S/ 2,205.74 S/ 2,205.74 S/ 1,102.87 S/ -

A644
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 4,146.39 S/ 4,146.39 S/ - S/ - S/ - S/ -
S/ 31.14 S/ 31.14 S/ 37.37 S/ 37.37 S/ 31.14 S/ 46.72
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 31,224.44 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,417.67 S/ 2,719.88 S/ 1,208.84 S/ 1,208.84 S/ 755.52 S/ -
S/ 11,935.07 S/ 11,935.07 S/ - S/ - S/ - S/ -
S/ - S/ 4,894.28 S/ 4,894.28 S/ 4,894.28 S/ 4,894.28 S/ -
S/ - S/ 710.21 S/ - S/ - S/ 946.95 S/ 946.95
S/ 362.40 S/ 241.60 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 281.01 S/ 281.01 S/ 187.34 S/ 187.34 S/ 93.67 S/ -
S/ 293.89 S/ 293.89 S/ - S/ - S/ - S/ -
S/ 173.05 S/ 173.05 S/ 207.66 S/ 207.66 S/ 173.05 S/ 259.58
S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 11.88 S/ 17.83
S/ 114.87 S/ 114.87 S/ 114.87 S/ 246.15 S/ 164.10 S/ 114.87
S/ 28.84 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86 S/ -
S/ 60.32 S/ 60.32 S/ - S/ - S/ - S/ -
S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57 S/ 453.85
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85 S/ -
S/ 84.31 S/ 84.31 S/ - S/ - S/ - S/ -
S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ -
S/ - S/ 304.35 S/ - S/ - S/ 405.81 S/ 405.81
S/ 0.87 S/ 0.58 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63 S/ -
S/ 165.06 S/ 165.06 S/ - S/ - S/ - S/ -
S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41 S/ 20.11
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92 S/ 2.87
S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11 S/ 1.48
S/ 13.41 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

A645
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46 S/ -
S/ 77.80 S/ 77.80 S/ - S/ - S/ - S/ -
S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46 S/ 26.19
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21 S/ -
S/ 14.37 S/ 14.37 S/ - S/ - S/ - S/ -
S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44 S/ -
S/ - S/ 9.50 S/ - S/ - S/ 12.67 S/ 12.67
S/ 3.80 S/ 2.53 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22 S/ -
S/ 58.71 S/ 58.71 S/ - S/ - S/ - S/ -
S/ 274.26 S/ 274.26 S/ 329.11 S/ 329.11 S/ 274.26 S/ 411.39
S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 45.41 S/ 68.12
S/ 179.44 S/ 179.44 S/ 179.44 S/ 384.52 S/ 256.34 S/ 179.44
S/ 5.72 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.85 S/ 16.85 S/ 11.24 S/ 11.24 S/ 5.62 S/ -
S/ 54.71 S/ 54.71 S/ - S/ - S/ - S/ -
S/ 148.56 S/ 148.56 S/ 178.27 S/ 178.27 S/ 148.56 S/ 222.84
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.03 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 289.82 S/ 326.05 S/ 144.91 S/ 144.91 S/ 90.57 S/ -
S/ 920.64 S/ 920.64 S/ - S/ - S/ - S/ -
S/ - S/ 11.81 S/ 11.81 S/ 11.81 S/ 11.81 S/ -
S/ - S/ 83.26 S/ - S/ - S/ 111.01 S/ 111.01
S/ 4,490.10 S/ 2,993.40 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 160.26 S/ 160.26 S/ 106.84 S/ 106.84 S/ 53.42 S/ -
S/ 0.09 S/ 0.09 S/ - S/ - S/ - S/ -
S/ 1,302.95 S/ 1,302.95 S/ 1,563.54 S/ 1,563.54 S/ 1,302.95 S/ 1,954.43
S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 683.40 S/ 1,025.09

A646
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 86.69 S/ 86.69 S/ 86.69 S/ 185.75 S/ 123.84 S/ 86.69
S/ 147.59 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 29.98 S/ 29.98 S/ 19.99 S/ 19.99 S/ 9.99 S/ -
S/ 53.39 S/ 53.39 S/ - S/ - S/ - S/ -
S/ 14.89 S/ 14.89 S/ 17.87 S/ 17.87 S/ 14.89 S/ 22.34
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.06 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 212.00 S/ 238.51 S/ 106.00 S/ 106.00 S/ 66.25 S/ -
S/ 36.28 S/ 36.28 S/ - S/ - S/ - S/ -
S/ - S/ 2.06 S/ 2.06 S/ 2.06 S/ 2.06 S/ -
S/ - S/ 532.58 S/ - S/ - S/ 710.11 S/ 710.11
S/ 1.11 S/ 0.74 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 772.80 S/ 772.80 S/ 515.20 S/ 515.20 S/ 257.60 S/ -
S/ 183.43 S/ 183.43 S/ - S/ - S/ - S/ -
S/ 130.21 S/ 130.21 S/ 156.25 S/ 156.25 S/ 130.21 S/ 195.31
S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 589.74 S/ 884.62
S/ 1,525.01 S/ 1,525.01 S/ 1,525.01 S/ 3,267.88 S/ 2,178.59 S/ 1,525.01
S/ 42.95 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 583.39 S/ 583.39 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 209.50 S/ 209.50 S/ 139.67 S/ 139.67 S/ 69.83 S/ -
S/ 26.59 S/ 26.59 S/ - S/ - S/ - S/ -
S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58 S/ 51.88
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46 S/ -
S/ 211.71 S/ 211.71 S/ - S/ - S/ - S/ -
S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55 S/ -
S/ - S/ 157.85 S/ - S/ - S/ 210.46 S/ 210.46
S/ 27.91 S/ 18.61 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 51.81 S/ 51.81 S/ 34.54 S/ 34.54 S/ 17.27 S/ -
S/ 13.49 S/ 13.49 S/ - S/ - S/ - S/ -

A647
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 2.66 S/ 2.66 S/ 3.20 S/ 3.20 S/ 2.66 S/ 3.99
S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 8.08 S/ 12.12
S/ 5.07 S/ 5.07 S/ 5.07 S/ 10.86 S/ 7.24 S/ 5.07
S/ 1.77 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 5.19 S/ 5.19 S/ 3.46 S/ 3.46 S/ 1.73 S/ -
S/ 1.62 S/ 1.62 S/ - S/ - S/ - S/ -
S/ 62.94 S/ 62.94 S/ 75.53 S/ 75.53 S/ 62.94 S/ 94.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.32 S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,295.95 S/ 1,457.94 S/ 647.97 S/ 647.97 S/ 404.98 S/ -
S/ 691.16 S/ 691.16 S/ - S/ - S/ - S/ -
S/ - S/ 191.88 S/ 191.88 S/ 191.88 S/ 191.88 S/ -
S/ - S/ 858.05 S/ - S/ - S/ 1,144.07 S/ 1,144.07
S/ 270.13 S/ 180.09 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 403.40 S/ 403.40 S/ 268.93 S/ 268.93 S/ 134.47 S/ -
S/ 29.40 S/ 29.40 S/ - S/ - S/ - S/ -
S/ 25.62 S/ 25.62 S/ 30.74 S/ 30.74 S/ 25.62 S/ 38.43
S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 14.19 S/ 21.29
S/ 55.68 S/ 55.68 S/ 55.68 S/ 119.32 S/ 79.54 S/ 55.68
S/ 86.66 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 66.08 S/ 66.08 S/ 44.06 S/ 44.06 S/ 22.03 S/ -
S/ 330.20 S/ 330.20 S/ - S/ - S/ - S/ -
S/ 28.57 S/ 28.57 S/ 34.28 S/ 34.28 S/ 28.57 S/ 42.85
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 25.74 S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33.39 S/ 37.57 S/ 16.70 S/ 16.70 S/ 10.43 S/ -
S/ 6.41 S/ 6.41 S/ - S/ - S/ - S/ -
S/ - S/ 2,129.01 S/ 2,129.01 S/ 2,129.01 S/ 2,129.01 S/ -
S/ - S/ 33.84 S/ - S/ - S/ 45.12 S/ 45.12
S/ 2.78 S/ 1.85 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.23 S/ 0.23 S/ 0.15 S/ 0.15 S/ 0.08 S/ -

A648
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 1,725.01 S/ 1,725.01 S/ - S/ - S/ - S/ -
S/ 11.58 S/ 11.58 S/ 9.26 S/ 9.26 S/ 11.58 S/ 11.58
S/ 0.15 S/ 0.15 S/ 0.15 S/ 0.15 S/ 0.31 S/ 0.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 26.97 S/ 26.97 S/ 17.98 S/ 17.98 S/ 8.99 S/ -
S/ 61.96 S/ 61.96 S/ - S/ - S/ - S/ -
S/ 995.20 S/ 995.20 S/ 1,194.24 S/ 1,194.24 S/ 995.20 S/ 1,492.80
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 22.33 S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 239.41 S/ 269.34 S/ 119.71 S/ 119.71 S/ 74.82 S/ -
S/ 25.08 S/ 25.08 S/ - S/ - S/ - S/ -
S/ - S/ 183.47 S/ 183.47 S/ 183.47 S/ 183.47 S/ -
S/ - S/ 38.53 S/ - S/ - S/ 51.37 S/ 51.37
S/ 159.46 S/ 106.30 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.05 S/ 0.05 S/ 0.04 S/ 0.04 S/ 0.02 S/ -
S/ 6.54 S/ 6.54 S/ - S/ - S/ - S/ -
S/ 86.73 S/ 86.73 S/ 104.07 S/ 104.07 S/ 86.73 S/ 130.09
S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 76.57 S/ 114.86
S/ 7.57 S/ 7.57 S/ 7.57 S/ 16.22 S/ 10.81 S/ 7.57
S/ 8.19 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 152.17 S/ 152.17 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.33 S/ 3.33 S/ 2.22 S/ 2.22 S/ 1.11 S/ -
S/ 61.69 S/ 61.69 S/ - S/ - S/ - S/ -
S/ 63.38 S/ 63.38 S/ 50.71 S/ 50.71 S/ 63.38 S/ 63.38
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,022.17 S/ 2,022.17 S/ 1,348.11 S/ 1,348.11 S/ 674.06 S/ -
S/ 25.26 S/ 25.26 S/ - S/ - S/ - S/ -
S/ 222.12 S/ 222.12 S/ 266.54 S/ 266.54 S/ 222.12 S/ 333.18
S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91 S/ 95.83 S/ 143.74
S/ 27.02 S/ 27.02 S/ 27.02 S/ 57.90 S/ 38.60 S/ 27.02
S/ 4,104.62 S/ - S/ - S/ - S/ - S/ -

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ - S/ - S/ - S/ -
S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20 S/ -

A649
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 5.43 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.44 S/ - S/ - S/ - S/ -
S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07 S/ -
S/ - S/ 0.13 S/ - S/ - S/ 0.17 S/ 0.17
S/ 0.02 S/ 0.01 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49 S/ -
S/ 8.75 S/ 8.75 S/ - S/ - S/ - S/ -
S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36 S/ 6.54
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88 S/ -
S/ 92.27 S/ 92.27 S/ - S/ - S/ - S/ -
S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43 S/ -
S/ - S/ 0.17 S/ - S/ - S/ 0.23 S/ 0.23
S/ 2.67 S/ 1.78 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23 S/ -
S/ 19.38 S/ 19.38 S/ - S/ - S/ - S/ -
S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35 S/ 87.53
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77 S/ 4.16
S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68 S/ 2.57
S/ 0.68 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ - S/ - S/ - S/ -
S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ -

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86 S/ -
S/ 2.16 S/ 2.16 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3,308.60 S/ 3,308.60 S/ 2,205.74 S/ 2,205.74 S/ 1,102.87 S/ -
S/ 4,146.39 S/ 4,146.39 S/ - S/ - S/ - S/ -
S/ 31.14 S/ 31.14 S/ 37.37 S/ 37.37 S/ 31.14 S/ 46.72
S/ - S/ - S/ - S/ - S/ - S/ -

A650
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 31,224.44 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,417.67 S/ 2,719.88 S/ 1,208.84 S/ 1,208.84 S/ 755.52 S/ -
S/ 11,935.07 S/ 11,935.07 S/ - S/ - S/ - S/ -
S/ - S/ 4,894.28 S/ 4,894.28 S/ 4,894.28 S/ 4,894.28 S/ -
S/ - S/ 710.21 S/ - S/ - S/ 946.95 S/ 946.95
S/ 362.40 S/ 241.60 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 281.01 S/ 281.01 S/ 187.34 S/ 187.34 S/ 93.67 S/ -
S/ 293.89 S/ 293.89 S/ - S/ - S/ - S/ -
S/ 173.05 S/ 173.05 S/ 207.66 S/ 207.66 S/ 173.05 S/ 259.58
S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 11.88 S/ 17.83
S/ 114.87 S/ 114.87 S/ 114.87 S/ 246.15 S/ 164.10 S/ 114.87
S/ 28.84 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86 S/ -
S/ 60.32 S/ 60.32 S/ - S/ - S/ - S/ -
S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57 S/ 453.85
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85 S/ -
S/ 84.31 S/ 84.31 S/ - S/ - S/ - S/ -
S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ -
S/ - S/ 304.35 S/ - S/ - S/ 405.81 S/ 405.81
S/ 0.87 S/ 0.58 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63 S/ -
S/ 165.06 S/ 165.06 S/ - S/ - S/ - S/ -
S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41 S/ 20.11
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92 S/ 2.87
S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11 S/ 1.48
S/ 13.41 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

A651
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46 S/ -
S/ 77.80 S/ 77.80 S/ - S/ - S/ - S/ -
S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46 S/ 26.19
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21 S/ -
S/ 14.37 S/ 14.37 S/ - S/ - S/ - S/ -
S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44 S/ -
S/ - S/ 9.50 S/ - S/ - S/ 12.67 S/ 12.67
S/ 3.80 S/ 2.53 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22 S/ -
S/ 58.71 S/ 58.71 S/ - S/ - S/ - S/ -
S/ 274.26 S/ 274.26 S/ 329.11 S/ 329.11 S/ 274.26 S/ 411.39
S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 45.41 S/ 68.12
S/ 179.44 S/ 179.44 S/ 179.44 S/ 384.52 S/ 256.34 S/ 179.44
S/ 5.72 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.85 S/ 16.85 S/ 11.24 S/ 11.24 S/ 5.62 S/ -
S/ 54.71 S/ 54.71 S/ - S/ - S/ - S/ -
S/ 148.56 S/ 148.56 S/ 178.27 S/ 178.27 S/ 148.56 S/ 222.84
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.03 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 289.82 S/ 326.05 S/ 144.91 S/ 144.91 S/ 90.57 S/ -
S/ 920.64 S/ 920.64 S/ - S/ - S/ - S/ -
S/ - S/ 11.81 S/ 11.81 S/ 11.81 S/ 11.81 S/ -
S/ - S/ 83.26 S/ - S/ - S/ 111.01 S/ 111.01
S/ 4,490.10 S/ 2,993.40 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 160.26 S/ 160.26 S/ 106.84 S/ 106.84 S/ 53.42 S/ -
S/ 0.09 S/ 0.09 S/ - S/ - S/ - S/ -
S/ 1,302.95 S/ 1,302.95 S/ 1,563.54 S/ 1,563.54 S/ 1,302.95 S/ 1,954.43
S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 683.40 S/ 1,025.09
S/ 86.69 S/ 86.69 S/ 86.69 S/ 185.75 S/ 123.84 S/ 86.69
S/ 147.59 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

A652
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 29.98 S/ 29.98 S/ 19.99 S/ 19.99 S/ 9.99 S/ -
S/ 53.39 S/ 53.39 S/ - S/ - S/ - S/ -
S/ 14.89 S/ 14.89 S/ 17.87 S/ 17.87 S/ 14.89 S/ 22.34
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.06 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 212.00 S/ 238.51 S/ 106.00 S/ 106.00 S/ 66.25 S/ -
S/ 36.28 S/ 36.28 S/ - S/ - S/ - S/ -
S/ - S/ 2.06 S/ 2.06 S/ 2.06 S/ 2.06 S/ -
S/ - S/ 532.58 S/ - S/ - S/ 710.11 S/ 710.11
S/ 1.11 S/ 0.74 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 772.80 S/ 772.80 S/ 515.20 S/ 515.20 S/ 257.60 S/ -
S/ 183.43 S/ 183.43 S/ - S/ - S/ - S/ -
S/ 130.21 S/ 130.21 S/ 156.25 S/ 156.25 S/ 130.21 S/ 195.31
S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 589.74 S/ 884.62
S/ 1,525.01 S/ 1,525.01 S/ 1,525.01 S/ 3,267.88 S/ 2,178.59 S/ 1,525.01
S/ 42.95 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 583.39 S/ 583.39 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 209.50 S/ 209.50 S/ 139.67 S/ 139.67 S/ 69.83 S/ -
S/ 26.59 S/ 26.59 S/ - S/ - S/ - S/ -
S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58 S/ 51.88
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46 S/ -
S/ 211.71 S/ 211.71 S/ - S/ - S/ - S/ -
S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55 S/ -
S/ - S/ 157.85 S/ - S/ - S/ 210.46 S/ 210.46
S/ 27.91 S/ 18.61 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 51.81 S/ 51.81 S/ 34.54 S/ 34.54 S/ 17.27 S/ -
S/ 13.49 S/ 13.49 S/ - S/ - S/ - S/ -
S/ 2.66 S/ 2.66 S/ 3.20 S/ 3.20 S/ 2.66 S/ 3.99
S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 8.08 S/ 12.12
S/ 5.07 S/ 5.07 S/ 5.07 S/ 10.86 S/ 7.24 S/ 5.07

A653
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 1.77 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 5.19 S/ 5.19 S/ 3.46 S/ 3.46 S/ 1.73 S/ -
S/ 1.62 S/ 1.62 S/ - S/ - S/ - S/ -
S/ 62.94 S/ 62.94 S/ 75.53 S/ 75.53 S/ 62.94 S/ 94.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.32 S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,295.95 S/ 1,457.94 S/ 647.97 S/ 647.97 S/ 404.98 S/ -
S/ 691.16 S/ 691.16 S/ - S/ - S/ - S/ -
S/ - S/ 191.88 S/ 191.88 S/ 191.88 S/ 191.88 S/ -
S/ - S/ 858.05 S/ - S/ - S/ 1,144.07 S/ 1,144.07
S/ 270.13 S/ 180.09 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 403.40 S/ 403.40 S/ 268.93 S/ 268.93 S/ 134.47 S/ -
S/ 29.40 S/ 29.40 S/ - S/ - S/ - S/ -
S/ 25.62 S/ 25.62 S/ 30.74 S/ 30.74 S/ 25.62 S/ 38.43
S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 14.19 S/ 21.29
S/ 55.68 S/ 55.68 S/ 55.68 S/ 119.32 S/ 79.54 S/ 55.68
S/ 86.66 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 66.08 S/ 66.08 S/ 44.06 S/ 44.06 S/ 22.03 S/ -
S/ 330.20 S/ 330.20 S/ - S/ - S/ - S/ -
S/ 28.57 S/ 28.57 S/ 34.28 S/ 34.28 S/ 28.57 S/ 42.85
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 25.74 S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33.39 S/ 37.57 S/ 16.70 S/ 16.70 S/ 10.43 S/ -
S/ 6.41 S/ 6.41 S/ - S/ - S/ - S/ -
S/ - S/ 2,129.01 S/ 2,129.01 S/ 2,129.01 S/ 2,129.01 S/ -
S/ - S/ 33.84 S/ - S/ - S/ 45.12 S/ 45.12
S/ 2.78 S/ 1.85 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.23 S/ 0.23 S/ 0.15 S/ 0.15 S/ 0.08 S/ -
S/ 1,150.00 S/ 1,150.00 S/ 1,380.00 S/ 1,380.00 S/ 1,150.00 S/ 1,725.01
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.46 S/ 0.15 S/ 0.15 S/ 0.15 S/ 0.15 S/ 0.15

A654
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 26.97 S/ 26.97 S/ 17.98 S/ 17.98 S/ 8.99 S/ -
S/ 61.96 S/ 61.96 S/ - S/ - S/ - S/ -
S/ 995.20 S/ 995.20 S/ 1,194.24 S/ 1,194.24 S/ 995.20 S/ 1,492.80
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 22.33 S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 239.41 S/ 269.34 S/ 119.71 S/ 119.71 S/ 74.82 S/ -
S/ 25.08 S/ 25.08 S/ - S/ - S/ - S/ -
S/ - S/ 183.47 S/ 183.47 S/ 183.47 S/ 183.47 S/ -
S/ - S/ 38.53 S/ - S/ - S/ 51.37 S/ 51.37
S/ 159.46 S/ 106.30 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.05 S/ 0.05 S/ 0.04 S/ 0.04 S/ 0.02 S/ -
S/ 6.54 S/ 6.54 S/ - S/ - S/ - S/ -
S/ 86.73 S/ 86.73 S/ 104.07 S/ 104.07 S/ 86.73 S/ 130.09
S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 76.57 S/ 114.86
S/ 7.57 S/ 7.57 S/ 7.57 S/ 16.22 S/ 10.81 S/ 7.57
S/ 8.19 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 152.17 S/ 152.17 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.33 S/ 3.33 S/ 2.22 S/ 2.22 S/ 1.11 S/ -
S/ 61.69 S/ 61.69 S/ - S/ - S/ - S/ -
S/ 63.38 S/ 63.38 S/ 50.71 S/ 50.71 S/ 63.38 S/ 63.38
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,022.17 S/ 2,022.17 S/ 1,348.11 S/ 1,348.11 S/ 674.06 S/ -
S/ 25.26 S/ 25.26 S/ - S/ - S/ - S/ -
S/ 222.12 S/ 222.12 S/ 266.54 S/ 266.54 S/ 222.12 S/ 333.18
S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91 S/ 95.83 S/ 143.74
S/ 27.02 S/ 27.02 S/ 27.02 S/ 57.90 S/ 38.60 S/ 27.02
S/ 4,104.62 S/ - S/ - S/ - S/ - S/ -

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 906.82 S/ 906.82 S/ - S/ - S/ - S/ -
S/ - S/ 11.20 S/ 11.20 S/ 11.20 S/ 11.20 S/ -
S/ 5.43 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

A655
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 0.44 S/ 0.44 S/ - S/ - S/ - S/ -
S/ - S/ 9.07 S/ 9.07 S/ 9.07 S/ 9.07 S/ -
S/ - S/ 0.13 S/ - S/ - S/ 0.17 S/ 0.17
S/ 0.02 S/ 0.01 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.47 S/ 16.47 S/ 10.98 S/ 10.98 S/ 5.49 S/ -
S/ 8.75 S/ 8.75 S/ - S/ - S/ - S/ -
S/ 4.36 S/ 4.36 S/ 5.23 S/ 5.23 S/ 4.36 S/ 6.54
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.49 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83 S/ 2.83
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 12.42 S/ 13.98 S/ 6.21 S/ 6.21 S/ 3.88 S/ -
S/ 92.27 S/ 92.27 S/ - S/ - S/ - S/ -
S/ - S/ 5.43 S/ 5.43 S/ 5.43 S/ 5.43 S/ -
S/ - S/ 0.17 S/ - S/ - S/ 0.23 S/ 0.23
S/ 2.67 S/ 1.78 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.70 S/ 0.70 S/ 0.47 S/ 0.47 S/ 0.23 S/ -
S/ 19.38 S/ 19.38 S/ - S/ - S/ - S/ -
S/ 58.35 S/ 58.35 S/ 70.02 S/ 70.02 S/ 58.35 S/ 87.53
S/ 1.39 S/ 1.39 S/ 1.39 S/ 1.39 S/ 2.77 S/ 4.16
S/ 2.57 S/ 2.57 S/ 2.57 S/ 5.51 S/ 3.68 S/ 2.57
S/ 0.68 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 863.58 S/ 863.58 S/ - S/ - S/ - S/ -
S/ - S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ 1,523.47 S/ -

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,978.59 S/ 2,978.59 S/ 1,985.72 S/ 1,985.72 S/ 992.86 S/ -
S/ 2.16 S/ 2.16 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3,308.60 S/ 3,308.60 S/ 2,205.74 S/ 2,205.74 S/ 1,102.87 S/ -
S/ 4,146.39 S/ 4,146.39 S/ - S/ - S/ - S/ -
S/ 31.14 S/ 31.14 S/ 37.37 S/ 37.37 S/ 31.14 S/ 46.72
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 31,224.44 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15 S/ 10,408.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,417.67 S/ 2,719.88 S/ 1,208.84 S/ 1,208.84 S/ 755.52 S/ -

A656
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 11,935.07 S/ 11,935.07 S/ - S/ - S/ - S/ -
S/ - S/ 4,894.28 S/ 4,894.28 S/ 4,894.28 S/ 4,894.28 S/ -
S/ - S/ 710.21 S/ - S/ - S/ 946.95 S/ 946.95
S/ 362.40 S/ 241.60 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 281.01 S/ 281.01 S/ 187.34 S/ 187.34 S/ 93.67 S/ -
S/ 293.89 S/ 293.89 S/ - S/ - S/ - S/ -
S/ 173.05 S/ 173.05 S/ 207.66 S/ 207.66 S/ 173.05 S/ 259.58
S/ 5.94 S/ 5.94 S/ 5.94 S/ 5.94 S/ 11.88 S/ 17.83
S/ 114.87 S/ 114.87 S/ 114.87 S/ 246.15 S/ 164.10 S/ 114.87
S/ 28.84 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 11,196.12 S/ 11,196.12 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13,733.59 S/ 13,733.59 S/ 9,155.73 S/ 9,155.73 S/ 4,577.86 S/ -
S/ 60.32 S/ 60.32 S/ - S/ - S/ - S/ -
S/ 302.57 S/ 302.57 S/ 363.08 S/ 363.08 S/ 302.57 S/ 453.85
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.25 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 245.92 S/ 276.66 S/ 122.96 S/ 122.96 S/ 76.85 S/ -
S/ 84.31 S/ 84.31 S/ - S/ - S/ - S/ -
S/ - S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ 20,830.23 S/ -
S/ - S/ 304.35 S/ - S/ - S/ 405.81 S/ 405.81
S/ 0.87 S/ 0.58 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 106.90 S/ 106.90 S/ 71.26 S/ 71.26 S/ 35.63 S/ -
S/ 165.06 S/ 165.06 S/ - S/ - S/ - S/ -
S/ 13.41 S/ 13.41 S/ 16.09 S/ 16.09 S/ 13.41 S/ 20.11
S/ 0.96 S/ 0.96 S/ 0.96 S/ 0.96 S/ 1.92 S/ 2.87
S/ 1.48 S/ 1.48 S/ 1.48 S/ 3.17 S/ 2.11 S/ 1.48
S/ 13.41 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 36.20 S/ 36.20 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 52.37 S/ 52.37 S/ 34.92 S/ 34.92 S/ 17.46 S/ -
S/ 77.80 S/ 77.80 S/ - S/ - S/ - S/ -
S/ 17.46 S/ 17.46 S/ 20.95 S/ 20.95 S/ 17.46 S/ 26.19

A657
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 116.69 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90 S/ 38.90
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 13.48 S/ 15.17 S/ 6.74 S/ 6.74 S/ 4.21 S/ -
S/ 14.37 S/ 14.37 S/ - S/ - S/ - S/ -
S/ - S/ 56.44 S/ 56.44 S/ 56.44 S/ 56.44 S/ -
S/ - S/ 9.50 S/ - S/ - S/ 12.67 S/ 12.67
S/ 3.80 S/ 2.53 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.65 S/ 0.65 S/ 0.44 S/ 0.44 S/ 0.22 S/ -
S/ 58.71 S/ 58.71 S/ - S/ - S/ - S/ -
S/ 274.26 S/ 274.26 S/ 329.11 S/ 329.11 S/ 274.26 S/ 411.39
S/ 22.71 S/ 22.71 S/ 22.71 S/ 22.71 S/ 45.41 S/ 68.12
S/ 179.44 S/ 179.44 S/ 179.44 S/ 384.52 S/ 256.34 S/ 179.44
S/ 5.72 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 16.85 S/ 16.85 S/ 11.24 S/ 11.24 S/ 5.62 S/ -
S/ 54.71 S/ 54.71 S/ - S/ - S/ - S/ -
S/ 148.56 S/ 148.56 S/ 178.27 S/ 178.27 S/ 148.56 S/ 222.84
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.03 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01 S/ 0.01
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 289.82 S/ 326.05 S/ 144.91 S/ 144.91 S/ 90.57 S/ -
S/ 920.64 S/ 920.64 S/ - S/ - S/ - S/ -
S/ - S/ 11.81 S/ 11.81 S/ 11.81 S/ 11.81 S/ -
S/ - S/ 83.26 S/ - S/ - S/ 111.01 S/ 111.01
S/ 4,490.10 S/ 2,993.40 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 160.26 S/ 160.26 S/ 106.84 S/ 106.84 S/ 53.42 S/ -
S/ 0.09 S/ 0.09 S/ - S/ - S/ - S/ -
S/ 1,302.95 S/ 1,302.95 S/ 1,563.54 S/ 1,563.54 S/ 1,302.95 S/ 1,954.43
S/ 341.70 S/ 341.70 S/ 341.70 S/ 341.70 S/ 683.40 S/ 1,025.09
S/ 86.69 S/ 86.69 S/ 86.69 S/ 185.75 S/ 123.84 S/ 86.69
S/ 147.59 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 29.98 S/ 29.98 S/ 19.99 S/ 19.99 S/ 9.99 S/ -
S/ 53.39 S/ 53.39 S/ - S/ - S/ - S/ -

A658
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 14.89 S/ 14.89 S/ 17.87 S/ 17.87 S/ 14.89 S/ 22.34
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.06 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 212.00 S/ 238.51 S/ 106.00 S/ 106.00 S/ 66.25 S/ -
S/ 36.28 S/ 36.28 S/ - S/ - S/ - S/ -
S/ - S/ 2.06 S/ 2.06 S/ 2.06 S/ 2.06 S/ -
S/ - S/ 532.58 S/ - S/ - S/ 710.11 S/ 710.11
S/ 1.11 S/ 0.74 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 772.80 S/ 772.80 S/ 515.20 S/ 515.20 S/ 257.60 S/ -
S/ 183.43 S/ 183.43 S/ - S/ - S/ - S/ -
S/ 130.21 S/ 130.21 S/ 156.25 S/ 156.25 S/ 130.21 S/ 195.31
S/ 294.87 S/ 294.87 S/ 294.87 S/ 294.87 S/ 589.74 S/ 884.62
S/ 1,525.01 S/ 1,525.01 S/ 1,525.01 S/ 3,267.88 S/ 2,178.59 S/ 1,525.01
S/ 42.95 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 583.39 S/ 583.39 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 209.50 S/ 209.50 S/ 139.67 S/ 139.67 S/ 69.83 S/ -
S/ 26.59 S/ 26.59 S/ - S/ - S/ - S/ -
S/ 34.58 S/ 34.58 S/ 41.50 S/ 41.50 S/ 34.58 S/ 51.88
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3,598.91 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64 S/ 1,199.64
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 734.27 S/ 826.06 S/ 367.14 S/ 367.14 S/ 229.46 S/ -
S/ 211.71 S/ 211.71 S/ - S/ - S/ - S/ -
S/ - S/ 10.55 S/ 10.55 S/ 10.55 S/ 10.55 S/ -
S/ - S/ 157.85 S/ - S/ - S/ 210.46 S/ 210.46
S/ 27.91 S/ 18.61 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 51.81 S/ 51.81 S/ 34.54 S/ 34.54 S/ 17.27 S/ -
S/ 13.49 S/ 13.49 S/ - S/ - S/ - S/ -
S/ 2.66 S/ 2.66 S/ 3.20 S/ 3.20 S/ 2.66 S/ 3.99
S/ 4.04 S/ 4.04 S/ 4.04 S/ 4.04 S/ 8.08 S/ 12.12
S/ 5.07 S/ 5.07 S/ 5.07 S/ 10.86 S/ 7.24 S/ 5.07
S/ 1.77 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

A659
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 5.19 S/ 5.19 S/ 3.46 S/ 3.46 S/ 1.73 S/ -
S/ 1.62 S/ 1.62 S/ - S/ - S/ - S/ -
S/ 62.94 S/ 62.94 S/ 75.53 S/ 75.53 S/ 62.94 S/ 94.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.32 S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77 S/ 2.77
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,295.95 S/ 1,457.94 S/ 647.97 S/ 647.97 S/ 404.98 S/ -
S/ 691.16 S/ 691.16 S/ - S/ - S/ - S/ -
S/ - S/ 191.88 S/ 191.88 S/ 191.88 S/ 191.88 S/ -
S/ - S/ 858.05 S/ - S/ - S/ 1,144.07 S/ 1,144.07
S/ 270.13 S/ 180.09 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 403.40 S/ 403.40 S/ 268.93 S/ 268.93 S/ 134.47 S/ -
S/ 29.40 S/ 29.40 S/ - S/ - S/ - S/ -
S/ 25.62 S/ 25.62 S/ 30.74 S/ 30.74 S/ 25.62 S/ 38.43
S/ 7.10 S/ 7.10 S/ 7.10 S/ 7.10 S/ 14.19 S/ 21.29
S/ 55.68 S/ 55.68 S/ 55.68 S/ 119.32 S/ 79.54 S/ 55.68
S/ 86.66 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 66.08 S/ 66.08 S/ 44.06 S/ 44.06 S/ 22.03 S/ -
S/ 330.20 S/ 330.20 S/ - S/ - S/ - S/ -
S/ 28.57 S/ 28.57 S/ 34.28 S/ 34.28 S/ 28.57 S/ 42.85
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 25.74 S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58 S/ 8.58
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 33.39 S/ 37.57 S/ 16.70 S/ 16.70 S/ 10.43 S/ -
S/ 6.41 S/ 6.41 S/ - S/ - S/ - S/ -
S/ - S/ 2,129.01 S/ 2,129.01 S/ 2,129.01 S/ 2,129.01 S/ -
S/ - S/ 33.84 S/ - S/ - S/ 45.12 S/ 45.12
S/ 2.78 S/ 1.85 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.23 S/ 0.23 S/ 0.15 S/ 0.15 S/ 0.08 S/ -
S/ 1,725.01 S/ 1,725.01 S/ - S/ - S/ - S/ -
S/ 11.58 S/ 11.58 S/ 9.26 S/ 9.26 S/ 11.58 S/ 11.58
S/ 0.15 S/ 0.15 S/ 0.15 S/ 0.15 S/ 0.31 S/ 0.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 26.97 S/ 26.97 S/ 17.98 S/ 17.98 S/ 8.99 S/ -
S/ 61.96 S/ 61.96 S/ - S/ - S/ - S/ -

A660
REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA R

Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14


DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021
A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021
S/ 995.20 S/ 995.20 S/ 1,194.24 S/ 1,194.24 S/ 995.20 S/ 1,492.80
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 22.33 S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44 S/ 7.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 239.41 S/ 269.34 S/ 119.71 S/ 119.71 S/ 74.82 S/ -
S/ 25.08 S/ 25.08 S/ - S/ - S/ - S/ -
S/ - S/ 183.47 S/ 183.47 S/ 183.47 S/ 183.47 S/ -
S/ - S/ 38.53 S/ - S/ - S/ 51.37 S/ 51.37
S/ 159.46 S/ 106.30 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.05 S/ 0.05 S/ 0.04 S/ 0.04 S/ 0.02 S/ -
S/ 6.54 S/ 6.54 S/ - S/ - S/ - S/ -
S/ 86.73 S/ 86.73 S/ 104.07 S/ 104.07 S/ 86.73 S/ 130.09
S/ 38.29 S/ 38.29 S/ 38.29 S/ 38.29 S/ 76.57 S/ 114.86
S/ 7.57 S/ 7.57 S/ 7.57 S/ 16.22 S/ 10.81 S/ 7.57
S/ 8.19 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 152.17 S/ 152.17 S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.33 S/ 3.33 S/ 2.22 S/ 2.22 S/ 1.11 S/ -
S/ 61.69 S/ 61.69 S/ - S/ - S/ - S/ -
S/ 63.38 S/ 63.38 S/ 50.71 S/ 50.71 S/ 63.38 S/ 63.38
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2,022.17 S/ 2,022.17 S/ 1,348.11 S/ 1,348.11 S/ 674.06 S/ -
S/ 25.26 S/ 25.26 S/ - S/ - S/ - S/ -
S/ 333.18 S/ 333.18 S/ 266.54 S/ 266.54 S/ 333.18 S/ 333.18
S/ 47.91 S/ 47.91 S/ 47.91 S/ 47.91 S/ 95.83 S/ 143.74
S/ 30.88 S/ 38.60 S/ 38.60 S/ 57.90 S/ 38.60 S/ 27.02
S/ 4,104.62 S/ - S/ - S/ - S/ - S/ -

S/ 465,337.11 S/ 480,212.67 S/ 273,325.60 S/ 282,481.56 S/ 254,707.96 S/ 104,019.85


8.02% 8.28% 4.71% 4.87% 4.39% 1.79%
72.83% 81.11% 85.82% 90.69% 95.08% 96.87%

A661
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021

S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 0.21
S/ -
S/ -
S/ -
S/ -
S/ 6.54
S/ -
S/ 2.83
S/ -
S/ -
S/ -
S/ -
S/ 0.29
S/ -
S/ -
S/ -
S/ -
S/ 87.53
S/ 4.16
S/ 2.57
S/ -
S/ -
S/ -
S/ -
S/ -

S/ -
S/ -

A662
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ 46.72
S/ -
S/ 10,408.15
S/ -
S/ -
S/ -
S/ -
S/ 1,183.69
S/ -
S/ -
S/ -
S/ -
S/ 259.58
S/ 17.83
S/ 114.87
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 453.85
S/ -
S/ 0.42
S/ -
S/ -
S/ -
S/ -
S/ 507.26
S/ -
S/ -
S/ -
S/ -
S/ 20.11
S/ 2.87

A663
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ 1.48
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 26.19
S/ -
S/ 38.90
S/ -
S/ -
S/ -
S/ -
S/ 15.83
S/ -
S/ -
S/ -
S/ -
S/ 411.39
S/ 68.12
S/ 179.44
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 222.84
S/ -
S/ 0.01
S/ -
S/ -
S/ -
S/ -
S/ 138.76
S/ -
S/ -
S/ -

A664
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ 1,954.43
S/ 1,025.09
S/ 86.69
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 22.34
S/ -
S/ 0.02
S/ -
S/ -
S/ -
S/ -
S/ 887.63
S/ -
S/ -
S/ -
S/ -
S/ 195.31
S/ 884.62
S/ 1,525.01
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 51.88
S/ -
S/ 1,199.64
S/ -
S/ -
S/ -
S/ -
S/ 263.08
S/ -

A665
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ 3.99
S/ 12.12
S/ 5.07
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 94.42
S/ -
S/ 2.77
S/ -
S/ -
S/ -
S/ -
S/ 1,430.09
S/ -
S/ -
S/ -
S/ -
S/ 38.43
S/ 21.29
S/ 55.68
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 42.85
S/ -
S/ 8.58
S/ -
S/ -
S/ -
S/ -
S/ 56.40

A666
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 1,492.80
S/ -
S/ 7.44
S/ -
S/ -
S/ -
S/ -
S/ 64.22
S/ -
S/ -
S/ -
S/ -
S/ 130.09
S/ 114.86
S/ 7.57
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 333.18
S/ 143.74
S/ 27.02
S/ -

A667
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 0.21
S/ -
S/ -
S/ -
S/ -
S/ 6.54
S/ -
S/ 2.83
S/ -
S/ -
S/ -
S/ -
S/ 0.29
S/ -
S/ -
S/ -
S/ -
S/ 87.53
S/ 4.16
S/ 2.57
S/ -
S/ -
S/ -
S/ -
S/ -

S/ -
S/ -
S/ -
S/ -
S/ -

A668
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ 46.72
S/ -
S/ 10,408.15
S/ -
S/ -
S/ -
S/ -
S/ 1,183.69
S/ -
S/ -
S/ -
S/ -
S/ 259.58
S/ 17.83
S/ 114.87
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 453.85
S/ -
S/ 0.42
S/ -
S/ -
S/ -
S/ -
S/ 507.26
S/ -
S/ -
S/ -
S/ -
S/ 20.11
S/ 2.87
S/ 1.48
S/ -
S/ -

A669
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 26.19
S/ -
S/ 38.90
S/ -
S/ -
S/ -
S/ -
S/ 15.83
S/ -
S/ -
S/ -
S/ -
S/ 411.39
S/ 68.12
S/ 179.44
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 222.84
S/ -
S/ 0.01
S/ -
S/ -
S/ -
S/ -
S/ 138.76
S/ -
S/ -
S/ -
S/ -
S/ 1,954.43
S/ 1,025.09

A670
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ 86.69
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 22.34
S/ -
S/ 0.02
S/ -
S/ -
S/ -
S/ -
S/ 887.63
S/ -
S/ -
S/ -
S/ -
S/ 195.31
S/ 884.62
S/ 1,525.01
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 51.88
S/ -
S/ 1,199.64
S/ -
S/ -
S/ -
S/ -
S/ 263.08
S/ -
S/ -
S/ -
S/ -

A671
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ 3.99
S/ 12.12
S/ 5.07
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 94.42
S/ -
S/ 2.77
S/ -
S/ -
S/ -
S/ -
S/ 1,430.09
S/ -
S/ -
S/ -
S/ -
S/ 38.43
S/ 21.29
S/ 55.68
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 42.85
S/ -
S/ 8.58
S/ -
S/ -
S/ -
S/ -
S/ 56.40
S/ -
S/ -
S/ -

A672
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 1,492.80
S/ -
S/ 7.44
S/ -
S/ -
S/ -
S/ -
S/ 64.22
S/ -
S/ -
S/ -
S/ -
S/ 130.09
S/ 114.86
S/ 7.57
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 333.18
S/ 143.74
S/ 27.02
S/ -

S/ -
S/ -
S/ -

A673
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 0.21
S/ -
S/ -
S/ -
S/ -
S/ 6.54
S/ -
S/ 2.83
S/ -
S/ -
S/ -
S/ -
S/ 0.29
S/ -
S/ -
S/ -
S/ -
S/ 87.53
S/ 4.16
S/ 2.57
S/ -
S/ -
S/ -
S/ -
S/ -

S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 46.72
S/ -

A674
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ 10,408.15
S/ -
S/ -
S/ -
S/ -
S/ 1,183.69
S/ -
S/ -
S/ -
S/ -
S/ 259.58
S/ 17.83
S/ 114.87
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 453.85
S/ -
S/ 0.42
S/ -
S/ -
S/ -
S/ -
S/ 507.26
S/ -
S/ -
S/ -
S/ -
S/ 20.11
S/ 2.87
S/ 1.48
S/ -
S/ -
S/ -
S/ -
S/ -

A675
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ 26.19
S/ -
S/ 38.90
S/ -
S/ -
S/ -
S/ -
S/ 15.83
S/ -
S/ -
S/ -
S/ -
S/ 411.39
S/ 68.12
S/ 179.44
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 222.84
S/ -
S/ 0.01
S/ -
S/ -
S/ -
S/ -
S/ 138.76
S/ -
S/ -
S/ -
S/ -
S/ 1,954.43
S/ 1,025.09
S/ 86.69
S/ -
S/ -

A676
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ 22.34
S/ -
S/ 0.02
S/ -
S/ -
S/ -
S/ -
S/ 887.63
S/ -
S/ -
S/ -
S/ -
S/ 195.31
S/ 884.62
S/ 1,525.01
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 51.88
S/ -
S/ 1,199.64
S/ -
S/ -
S/ -
S/ -
S/ 263.08
S/ -
S/ -
S/ -
S/ -
S/ 3.99
S/ 12.12
S/ 5.07

A677
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 94.42
S/ -
S/ 2.77
S/ -
S/ -
S/ -
S/ -
S/ 1,430.09
S/ -
S/ -
S/ -
S/ -
S/ 38.43
S/ 21.29
S/ 55.68
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 42.85
S/ -
S/ 8.58
S/ -
S/ -
S/ -
S/ -
S/ 56.40
S/ -
S/ -
S/ -
S/ 1,725.01
S/ -
S/ 0.15

A678
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ 1,492.80
S/ -
S/ 7.44
S/ -
S/ -
S/ -
S/ -
S/ 64.22
S/ -
S/ -
S/ -
S/ -
S/ 130.09
S/ 114.86
S/ 7.57
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 333.18
S/ 143.74
S/ 27.02
S/ -

S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A679
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ 0.21
S/ -
S/ -
S/ -
S/ -
S/ 6.54
S/ -
S/ 2.83
S/ -
S/ -
S/ -
S/ -
S/ 0.29
S/ -
S/ -
S/ -
S/ -
S/ 87.53
S/ 4.16
S/ 2.57
S/ -
S/ -
S/ -
S/ -
S/ -

S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 46.72
S/ -
S/ 10,408.15
S/ -
S/ -

A680
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ 1,183.69
S/ -
S/ -
S/ -
S/ -
S/ 259.58
S/ 17.83
S/ 114.87
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 453.85
S/ -
S/ 0.42
S/ -
S/ -
S/ -
S/ -
S/ 507.26
S/ -
S/ -
S/ -
S/ -
S/ 20.11
S/ 2.87
S/ 1.48
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 26.19

A681
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ 38.90
S/ -
S/ -
S/ -
S/ -
S/ 15.83
S/ -
S/ -
S/ -
S/ -
S/ 411.39
S/ 68.12
S/ 179.44
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 222.84
S/ -
S/ 0.01
S/ -
S/ -
S/ -
S/ -
S/ 138.76
S/ -
S/ -
S/ -
S/ -
S/ 1,954.43
S/ 1,025.09
S/ 86.69
S/ -
S/ -
S/ -
S/ -
S/ -

A682
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ 22.34
S/ -
S/ 0.02
S/ -
S/ -
S/ -
S/ -
S/ 887.63
S/ -
S/ -
S/ -
S/ -
S/ 195.31
S/ 884.62
S/ 1,525.01
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 51.88
S/ -
S/ 1,199.64
S/ -
S/ -
S/ -
S/ -
S/ 263.08
S/ -
S/ -
S/ -
S/ -
S/ 3.99
S/ 12.12
S/ 5.07
S/ -
S/ -
S/ -

A683
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ -
S/ -
S/ -
S/ 94.42
S/ -
S/ 2.77
S/ -
S/ -
S/ -
S/ -
S/ 1,430.09
S/ -
S/ -
S/ -
S/ -
S/ 38.43
S/ 21.29
S/ 55.68
S/ -
S/ -
S/ -
S/ -
S/ -
S/ 42.85
S/ -
S/ 8.58
S/ -
S/ -
S/ -
S/ -
S/ 56.40
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

A684
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON CODIGO U

Mes 15
DE 01/02/2021
A 12/02/2021
S/ 1,492.80
S/ -
S/ 7.44
S/ -
S/ -
S/ -
S/ -
S/ 64.22
S/ -
S/ -
S/ -
S/ -
S/ 130.09
S/ 114.86
S/ 7.57
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -
S/ -

S/ 106,864.23
2.04%
98.91%

A685
CRONOGRAMA DE ADQUISICION DE EQUIPOS - ARQUITECTURA

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO
DE AYAVIRI”, CON CODIGO UNICO N° 2131616

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15
DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

Código EQUIPOS Unidad Parcial S/. A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

SUSTITUCIÓN
349500003 MEZCLADORA DE CONC.(TAMBOR) 11-12 P3, 18 HP h-m S/ 2,973.52 S/ - S/ - S/ 237.88 S/ 237.88 S/ 446.03 S/ 446.03 S/ 356.82 S/ 356.82 S/ 446.03 S/ 446.03 S/ - S/ - S/ - S/ - S/ -
349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m S/ 129.00 S/ - S/ - S/ 10.32 S/ 10.32 S/ 19.35 S/ 19.35 S/ 15.48 S/ 15.48 S/ 19.35 S/ 19.35 S/ - S/ - S/ - S/ - S/ -
349500013 MEZCLADORA DE CONC.(TAMBOR) 9 P3, 8 HP h-m S/ 738.98 S/ - S/ - S/ - S/ - S/ - S/ - S/ 59.12 S/ 59.12 S/ 110.85 S/ 73.90 S/ 88.68 S/ 88.68 S/ 73.90 S/ 73.90 S/ 110.85
349600103 SOLDADORA ELECTRICA h-m S/ 34.18 S/ - S/ 8.55 S/ 8.55 S/ 8.55 S/ 8.55 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
SALDO
349500003 MEZCLADORA DE CONC.(TAMBOR) 11-12 P3, 18 HP h-m S/ 2,973.52 S/ - S/ - S/ 237.88 S/ 237.88 S/ 446.03 S/ 446.03 S/ 356.82 S/ 356.82 S/ 446.03 S/ 446.03 S/ - S/ - S/ - S/ - S/ -
349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m S/ 129.00 S/ - S/ - S/ 10.32 S/ 10.32 S/ 19.35 S/ 19.35 S/ 15.48 S/ 15.48 S/ 19.35 S/ 19.35 S/ - S/ - S/ - S/ - S/ -
349500013 MEZCLADORA DE CONC.(TAMBOR) 9 P3, 8 HP h-m S/ 738.98 S/ - S/ - S/ - S/ - S/ - S/ - S/ 59.12 S/ 59.12 S/ 73.90 S/ 73.90 S/ 88.68 S/ 88.68 S/ 73.90 S/ 110.85 S/ 110.85
349600103 SOLDADORA ELECTRICA h-m S/ 34.18 S/ - S/ 8.55 S/ 8.55 S/ 8.55 S/ 8.55 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
MEJORA
349500003 MEZCLADORA DE CONC.(TAMBOR) 11-12 P3, 18 HP h-m S/ 2,973.52 S/ - S/ - S/ 237.88 S/ 237.88 S/ 446.03 S/ 446.03 S/ 356.82 S/ 356.82 S/ 446.03 S/ 446.03 S/ - S/ - S/ - S/ - S/ -
349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m S/ 129.00 S/ - S/ - S/ 10.32 S/ 10.32 S/ 19.35 S/ 19.35 S/ 15.48 S/ 15.48 S/ 19.35 S/ 19.35 S/ - S/ - S/ - S/ - S/ -
349500013 MEZCLADORA DE CONC.(TAMBOR) 9 P3, 8 HP h-m S/ 738.98 S/ - S/ - S/ - S/ - S/ - S/ - S/ 59.12 S/ 59.12 S/ 73.90 S/ 73.90 S/ 88.68 S/ 88.68 S/ 73.90 S/ 110.85 S/ 110.85
349600103 SOLDADORA ELECTRICA h-m S/ 34.18 S/ - S/ 8.55 S/ 8.55 S/ 8.55 S/ 8.55 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
DEFICIENCIA
349500003 MEZCLADORA DE CONC.(TAMBOR) 11-12 P3, 18 HP h-m S/ 2,973.52 S/ - S/ - S/ 237.88 S/ 237.88 S/ 446.03 S/ 446.03 S/ 356.82 S/ 356.82 S/ 446.03 S/ 446.03 S/ - S/ - S/ - S/ - S/ -
349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m S/ 129.00 S/ - S/ - S/ 10.32 S/ 10.32 S/ 19.35 S/ 19.35 S/ 15.48 S/ 15.48 S/ 19.35 S/ 19.35 S/ - S/ - S/ - S/ - S/ -
349500013 MEZCLADORA DE CONC.(TAMBOR) 9 P3, 8 HP h-m S/ 738.98 S/ - S/ - S/ - S/ - S/ - S/ - S/ 59.12 S/ 59.12 S/ 73.90 S/ 73.90 S/ 88.68 S/ 88.68 S/ 73.90 S/ 110.85 S/ 110.85
349600103 SOLDADORA ELECTRICA h-m S/ 34.18 S/ - S/ 8.55 S/ 8.55 S/ 8.55 S/ 8.55 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -

TOTAL S/ 15,502.74 S/ - S/ 34.18 S/ 1,026.99 S/ 1,026.99 S/ 1,895.70 S/ 1,861.51 S/ 1,725.68 S/ 1,725.68 S/ 2,194.05 S/ 2,157.11 S/ 354.71 S/ 354.71 S/ 295.59 S/ 406.44 S/ 443.39

AVANCE PARCIAL 0.00% 0.22% 6.62% 6.62% 12.23% 12.01% 11.13% 11.13% 14.15% 13.91% 2.29% 2.29% 1.91% 2.62% 2.86%

AVANCE ACUMULADO 0.00% 0.22% 6.85% 13.47% 25.70% 37.71% 48.84% 59.97% 74.12% 88.04% 90.32% 92.61% 94.52% 97.14% 100.00%

A686
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES SANITARIAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIR

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15
DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
Código MAETRIALES Unidad Parcial S/. A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

SALDO
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 1,198.76 S/ 59.94 S/ 59.94 S/ 59.94 S/ 59.94 S/ 59.94 S/ 59.94 S/ 59.94 S/ 59.94 S/ 59.94 S/ 59.94 S/ 119.88 S/ 179.81 S/ 179.81
202100002 ALAMBRE NEGRO Nro.16 kg S/ 1,341.30 S/ 53.65 S/ 53.65 S/ 80.48 S/ 80.48 S/ 80.48 S/ 107.30 S/ 93.89 S/ 93.89 S/ 93.89 S/ 201.19 S/ 134.13 S/ 93.89 S/ 93.89
202200001 CLAVOS CON CABEZA DE 21/2 , 3", 4" kg S/ 858.42 S/ - S/ - S/ 214.61 S/ 171.68 S/ 257.53 S/ 171.68 S/ 42.92 S/ - S/ - S/ - S/ - S/ - S/ -
202200003 CLAVOS CON CABEZA DE 3" kg S/ 123.87 S/ 30.97 S/ 30.97 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
202350071 VARILLA ROSCADA DE 1/2" und S/ 133.64 S/ - S/ 33.41 S/ 33.41 S/ 33.41 S/ 33.41 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
202350072 BROCA 3/4" X 8" und S/ 1,505.02 S/ - S/ - S/ - S/ - S/ 376.25 S/ 376.25 S/ 376.25 S/ 376.25 S/ - S/ - S/ - S/ - S/ -
202350073 COLGADOR METALICO S/ DISEÑO und S/ 3,196.16 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 799.04 S/ 799.04 S/ 799.04 S/ 799.04 S/ - S/ -
202350074 TUERCA DE 1/2" und S/ 75.15 S/ - S/ - S/ 18.79 S/ 15.03 S/ 22.54 S/ 15.03 S/ 3.76 S/ - S/ - S/ - S/ - S/ - S/ -
202350075 ACERO CORRUGADO GRADO 60 kg S/ 25,645.27 S/ 6,411.32 S/ 6,411.32 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
202350076 ARENA GRUESA m3 S/ 3,663.27 S/ - S/ 915.82 S/ 915.82 S/ 915.82 S/ 915.82 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
204050002 ARENA FINA m3 S/ 10,749.72 S/ - S/ - S/ - S/ - S/ 2,687.43 S/ 2,687.43 S/ 2,687.43 S/ 2,687.43 S/ - S/ - S/ - S/ - S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 13,044.92 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 3,261.23 S/ 3,261.23 S/ 3,261.23 S/ 3,261.23 S/ - S/ -
205050036 GRAVA DE 1/2" m3 S/ 1,258.18 S/ - S/ - S/ - S/ - S/ - S/ 251.64 S/ - S/ 188.73 S/ - S/ - S/ 251.64 S/ 251.64 S/ 314.54
205050037 GRAVA DE 5/8" m3 S/ 6,880.11 S/ - S/ 1,032.02 S/ 1,032.02 S/ 1,032.02 S/ 1,032.02 S/ 1,032.02 S/ 1,032.02 S/ 688.01 S/ - S/ - S/ - S/ - S/ -
205350001 AGUA m3 S/ 562.54 S/ 140.64 S/ 140.64 S/ 140.64 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
206200026 TRAMPA DE GRASA und S/ 5,271.30 S/ - S/ - S/ - S/ 790.70 S/ 790.70 S/ 790.70 S/ 790.70 S/ 790.70 S/ 527.13 S/ 527.13 S/ 263.57 S/ - S/ -
206200032 TRAMPA DE SOLIDOS und S/ 1,986.49 S/ 158.92 S/ 158.92 S/ 297.97 S/ 297.97 S/ 238.38 S/ 238.38 S/ 297.97 S/ 297.97 S/ - S/ - S/ - S/ - S/ -
210050011 URINARIO CADET BLANCO. und S/ 14,278.50 S/ - S/ - S/ - S/ - S/ 1,142.28 S/ 1,142.28 S/ 1,427.85 S/ 1,427.85 S/ 1,713.42 S/ 1,713.42 S/ 1,427.85 S/ 2,141.78 S/ 2,141.78
210050041 LAVATORIO LOSA BLANCA DE TIPO OVALIN CLASSIC INC._x000D_ TUBO D und S/ 19,115.35 S/ - S/ - S/ 4,778.84 S/ 4,778.84 S/ 4,778.84 S/ 4,778.84 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
210050042 LAVATORIO LOSA BLANCA DE TIPO FONTANA INC. TUBO DE ABASTO Y TR und S/ 386.68 S/ 19.33 S/ 19.33 S/ 19.33 S/ 19.33 S/ 38.67 S/ 58.00 S/ 58.00 S/ 19.33 S/ 19.33 S/ 19.33 S/ 19.33 S/ 19.33 S/ 19.33
210050043 INODORO ADULTO NAC. LOSA VITRIFI BLANCO P/FLUXOMETRO INC. ASIEN und S/ 34,409.76 S/ 8,602.44 S/ 8,602.44 S/ 8,602.44 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
210050044 INODORO SIFÓN JET DE LOSA 1ra CALIDAD ADULTO TIPO_x000D_ SISTEM und S/ 237.29 S/ 9.49 S/ 14.24 S/ 18.98 S/ 23.73 S/ 14.24 S/ 21.36 S/ 37.97 S/ 42.71 S/ 18.98 S/ 18.98 S/ 11.86 S/ - S/ -
210050045 PORTA ROLLO METALICO INC. ACC. P/INSTALACION und S/ 10,722.60 S/ - S/ - S/ - S/ - S/ 2,680.65 S/ 2,680.65 S/ 2,680.65 S/ 2,680.65 S/ - S/ - S/ - S/ - S/ -
210050046 DISPENSADOR DE JABON LIQUIDO INC. ACC. PilNSTALACION und S/ 2,375.00 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 593.75 S/ 593.75 S/ 593.75 S/ 593.75 S/ - S/ -
210050047 DISPENSADOR DE PAPEL TOALLA INC. ACC. P/INSTALACION und S/ 995.52 S/ - S/ - S/ - S/ - S/ - S/ 199.10 S/ - S/ 149.33 S/ - S/ - S/ 199.10 S/ 199.10 S/ 248.88
210050048 GANCHO METALICO PORTA MULETAS INC. ACC._x000D_P/INSTALACION und S/ 2,491.58 S/ - S/ 373.74 S/ 373.74 S/ 373.74 S/ 373.74 S/ 373.74 S/ 373.74 S/ 249.16 S/ - S/ - S/ - S/ - S/ -
210050049 GANCHO DOBLE DE LOSA INC. ACC P/INSTALACION und S/ 1,044.16 S/ 261.04 S/ 261.04 S/ 261.04 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
210050050 JABONERA DE LOSA DE SOBREPONER INC. ACC._x000D_ P/INSTALACION S/ 1,104.40
210150022 LAVAD. ACERO INOX. 1 POZA C/ESC 21"X38" und S/ 385.82 S/ 30.87 S/ 30.87 S/ 57.87 S/ 57.87 S/ 46.30 S/ 46.30 S/ 57.87 S/ 57.87 S/ - S/ - S/ - S/ - S/ -
210150023 LAVAD. ACERO INOX. 02 POZAS C/ESC 21"X54" und S/ 1,256.06 S/ - S/ - S/ - S/ - S/ 100.48 S/ 100.48 S/ 125.61 S/ 125.61 S/ 150.73 S/ 150.73 S/ 125.61 S/ 188.41 S/ 188.41
210150024 LAVAD. ACERO INOX. 1 POZA S/ESC 21"X20" und S/ 2,882.18 S/ 144.11 S/ 144.11 S/ 144.11 S/ 144.11 S/ 144.11 S/ 144.11 S/ 144.11 S/ 144.11 S/ 144.11 S/ 144.11 S/ 288.22 S/ 432.33 S/ 432.33
210300047 GRIFERIA MEZCLADORA PARA DUCHA und S/ 5,162.73 S/ 206.51 S/ 206.51 S/ 309.76 S/ 309.76 S/ 309.76 S/ 413.02 S/ 361.39 S/ 361.39 S/ 361.39 S/ 774.41 S/ 516.27 S/ 361.39 S/ 361.39
210300049 GRIFERIA PARA DUCHA CROMADA 1 LLAVE INC ACC und S/ 648.00 S/ - S/ - S/ 162.00 S/ 129.60 S/ 194.40 S/ 129.60 S/ 32.40 S/ - S/ - S/ - S/ - S/ - S/ -
210300050 FLUXOMETRO CROMADO DE MANIJA und S/ 26,052.75 S/ 6,513.19 S/ 6,513.19 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
210350020 LLAVE DE LAVADERO PICO GIRATORIO UECO CROMADA und S/ 1,112.02 S/ - S/ 278.01 S/ 278.01 S/ 278.01 S/ 278.01 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
210350088 LLAVE PARA LAVATORIO DE 1i2" CON TEMPORIZADOR und S/ 2,993.26 S/ - S/ - S/ - S/ - S/ 748.32 S/ 748.32 S/ 748.32 S/ 748.32 S/ - S/ - S/ - S/ - S/ -
210350089 LLAVE DE MANIJA LARGA AL MUEBLE und S/ 7,070.28 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 1,767.57 S/ 1,767.57 S/ 1,767.57 S/ 1,767.57 S/ - S/ -
210350090 LLAVE DE LAVADERO PICO GIRATORIO AF y AG UECO_x000D_CROMADA und S/ 348.80 S/ - S/ - S/ - S/ - S/ - S/ 69.76 S/ - S/ 52.32 S/ - S/ - S/ 69.76 S/ 69.76 S/ 87.20
210350091 GRIFERIA DE 1/2" und S/ 586.53 S/ - S/ 87.98 S/ 87.98 S/ 87.98 S/ 87.98 S/ 87.98 S/ 87.98 S/ 58.65 S/ - S/ - S/ - S/ - S/ -
210350094 SUM. E INST. DE ELECTROBOMBAS PRES. CTE Y VELOC. VAR (Q:3.25 1/s, H und S/ 6,939.00 S/ 1,734.75 S/ 1,734.75 S/ 1,734.75 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
210350095 SUM. E INST. DE ELECTROBOMBAS PRES. CTE Y VELOC. VAR. (Q:3.00 lis, und S/ 6,737.28 S/ - S/ - S/ - S/ 1,010.59 S/ 1,010.59 S/ 1,010.59 S/ 1,010.59 S/ 1,010.59 S/ 673.73 S/ 673.73 S/ 336.86 S/ - S/ -
210350096 SUM. E INST. DE ELECTROBOMBAS SUMERGIBLES (Q:3.00 lis, HDT:10m. POT und S/ 2,913.06 S/ 233.04 S/ 233.04 S/ 436.96 S/ 436.96 S/ 349.57 S/ 349.57 S/ 436.96 S/ 436.96 S/ - S/ - S/ - S/ - S/ -
210350097 SUM. E INST. DE ELECTROBOMBA CON TRAMPA DE PELOS RECIRCULACION (Qund S/ 17,702.61 S/ - S/ - S/ - S/ - S/ 1,416.21 S/ 1,416.21 S/ 1,770.26 S/ 1,770.26 S/ 2,124.31 S/ 2,124.31 S/ 1,770.26 S/ 2,655.39 S/ 2,655.39
210350098 SUM. E INST. DE ELECTROBOMBA CON TRAMPA DE PELOS_x000D_ ASPIRACIOund S/ 1,666.13 S/ - S/ - S/ 416.53 S/ 416.53 S/ 416.53 S/ 416.53 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
210350099 SUM. E INST. DE ELECTROBOMBA CON TRAMPA DE PELOS CALENTAMIENTO Sund S/ 10,968.68 S/ 548.43 S/ 548.43 S/ 548.43 S/ 548.43 S/ 1,096.87 S/ 1,645.30 S/ 1,645.30 S/ 548.43 S/ 548.43 S/ 548.43 S/ 548.43 S/ 548.43 S/ 548.43
210350100 SUM. E INST. DE ELECTROBOMBA DOSIFICADORA DE CLORO_x000D_ (Q:1.00 und S/ 2,707.46 S/ 676.87 S/ 676.87 S/ 676.87 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
210350101 CLORINADOR DE PASTILLA TIPO PENTAR und S/ 1,138.52 S/ 45.54 S/ 68.31 S/ 91.08 S/ 113.85 S/ 68.31 S/ 102.47 S/ 182.16 S/ 204.93 S/ 91.08 S/ 91.08 S/ 56.93 S/ - S/ -
210350102 SUM. E INST. DE ELECTROBOMBAS SUMERGIBLES (Q:3.00 l/s,_x000D_HDT:8 und S/ 2,913.06 S/ - S/ - S/ - S/ - S/ 728.27 S/ 728.27 S/ 728.27 S/ 728.27 S/ - S/ - S/ - S/ - S/ -
210350103 CAÑON EMERGENTE AUTOMATIZADO (RADIO 40M, 4BAR) und S/ 37,810.14 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 9,452.54 S/ 9,452.54 S/ 9,452.54 S/ 9,452.54 S/ - S/ -
210350104 SUM. E INST. DE ELECTROBOMBAS PRES. CTE Y VELOC. VAR._x000D_(Q:3.80 und S/ 13,474.56 S/ - S/ - S/ - S/ - S/ - S/ 2,694.91 S/ - S/ 2,021.18 S/ - S/ - S/ 2,694.91 S/ 2,694.91 S/ 3,368.64
210350105 SUM. E INST. EQ. BOMBEO; 02 ELECTROBOMBAS_x000D_ CENTRIFUGAS (Q= und S/ 2,186.44 S/ - S/ 327.97 S/ 327.97 S/ 327.97 S/ 327.97 S/ 327.97 S/ 327.97 S/ 218.64 S/ - S/ - S/ - S/ - S/ -
212050162 CONTROLADOR DIGITAL TERMOSTATICO und S/ 815.28 S/ 203.82 S/ 203.82 S/ 203.82 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
212250183 CONTROL DE NIVEL AUTOMATICO DE ARRANQUE Y PARADA DE BOMBAS und S/ 355.95 S/ - S/ - S/ - S/ 53.39 S/ 53.39 S/ 53.39 S/ 53.39 S/ 53.39 S/ 35.60 S/ 35.60 S/ 17.80 S/ - S/ -
212250184 VISOR D=6" und S/ 438.17 S/ 35.05 S/ 35.05 S/ 65.73 S/ 65.73 S/ 52.58 S/ 52.58 S/ 65.73 S/ 65.73 S/ - S/ - S/ - S/ - S/ -
212250185 VISOR D=4" und S/ 611.44 S/ - S/ - S/ - S/ - S/ 48.92 S/ 48.92 S/ 61.14 S/ 61.14 S/ 73.37 S/ 73.37 S/ 61.14 S/ 91.72 S/ 91.72
212250186 MANIFOLD D=8" L=3.00 m. und S/ 1,752.40 S/ 87.62 S/ 87.62 S/ 87.62 S/ 87.62 S/ 87.62 S/ 87.62 S/ 87.62 S/ 87.62 S/ 87.62 S/ 87.62 S/ 175.24 S/ 262.86 S/ 262.86
212250187 MANIFOLD D=8" L=1.30 m. und S/ 876.20 S/ 35.05 S/ 35.05 S/ 52.57 S/ 52.57 S/ 52.57 S/ 70.10 S/ 61.33 S/ 61.33 S/ 61.33 S/ 131.43 S/ 87.62 S/ 61.33 S/ 61.33
213150009 FRAGUA (BOLSA DE 1KG) bl S/ 2.76 S/ - S/ - S/ 0.69 S/ 0.55 S/ 0.83 S/ 0.55 S/ 0.14 S/ - S/ - S/ - S/ - S/ - S/ -
213150014 PEGAMENTO EXTRAFUERTE PARA CERAMICOS Y PORCELANATOS X 25K bl S/ 13.79 S/ 3.45 S/ 3.45 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
217100020 LADRILLO KK TIPO IV 24X13X09 CM und S/ 4,782.30 S/ - S/ 1,195.58 S/ 1,195.58 S/ 1,195.58 S/ 1,195.58 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 57,892.13 S/ - S/ - S/ - S/ - S/ 14,473.03 S/ 14,473.03 S/ 14,473.03 S/ 14,473.03 S/ - S/ - S/ - S/ - S/ -
221030017 MARCO Y TAPA DE BUZON DE CONCRETO D=0.60M und S/ 288.75 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 72.19 S/ 72.19 S/ 72.19 S/ 72.19 S/ - S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 373.44 S/ - S/ - S/ - S/ - S/ - S/ 74.69 S/ - S/ 56.02 S/ - S/ - S/ 74.69 S/ 74.69 S/ 93.36
230010003 PEGAMENTO PARA TUBERIA PVC qal S/ 6,370.19 S/ - S/ 955.53 S/ 955.53 S/ 955.53 S/ 955.53 S/ 955.53 S/ 955.53 S/ 637.02 S/ - S/ - S/ - S/ - S/ -
233570001 PEGAMENTO PARA TUBERIA CPVC qal S/ 509.11 S/ 127.28 S/ 127.28 S/ 127.28 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
237129999 CAL (BOLSA X 20 kg) bl S/ 955.08 S/ - S/ - S/ - S/ 143.26 S/ 143.26 S/ 143.26 S/ 143.26 S/ 143.26 S/ 95.51 S/ 95.51 S/ 47.75 S/ - S/ -
230010030 CINTA TEFLON m S/ 151.16 S/ 12.09 S/ 12.09 S/ 22.67 S/ 22.67 S/ 18.14 S/ 18.14 S/ 22.67 S/ 22.67 S/ - S/ - S/ - S/ - S/ -
230010032 CORDEL m S/ 168.21 S/ - S/ - S/ - S/ - S/ 13.46 S/ 13.46 S/ 16.82 S/ 16.82 S/ 20.19 S/ 20.19 S/ 16.82 S/ 25.23 S/ 25.23
230010143 SELLADOR BLANCO PARA MUROS qal S/ 34.77 S/ - S/ - S/ 8.69 S/ 8.69 S/ 8.69 S/ 8.69 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
230010163 GEOMEMBRANA IMPERMEABLE 1 mm m2 S/ 88,347.47 S/ 4,417.37 S/ 4,417.37 S/ 4,417.37 S/ 4,417.37 S/ 8,834.75 S/ 13,252.12 S/ 13,252.12 S/ 4,417.37 S/ 4,417.37 S/ 4,417.37 S/ 4,417.37 S/ 4,417.37 S/ 4,417.37
230010167 GEOTEXTIL NO TEJIDO CLASE 2 m2 S/ 3,476.68 S/ 869.17 S/ 869.17 S/ 869.17 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
230010176 FLUXOMETRO PARA INODORO und S/ 51,063.39 S/ 2,042.54 S/ 3,063.80 S/ 4,085.07 S/ 5,106.34 S/ 3,063.80 S/ 4,595.71 S/ 8,170.14 S/ 9,191.41 S/ 4,085.07 S/ 4,085.07 S/ 2,553.17 S/ - S/ -
230010177 PORCELANA TO 60X60 m2 S/ 402.65 S/ - S/ - S/ - S/ - S/ 100.66 S/ 100.66 S/ 100.66 S/ 100.66 S/ - S/ - S/ - S/ - S/ -
230010178 TUBO BASTON PARA VENTILACION DE CISTERNA ACERO_x000D_ SCH-40 m S/ 201.60 S/ 10.08 S/ 10.08 S/ 10.08 S/ 10.08 S/ 20.16 S/ 30.24 S/ 30.24 S/ 10.08 S/ 10.08 S/ 10.08 S/ 10.08 S/ 10.08 S/ 10.08
230010179 THINNER ACRILICO qal S/ 0.66 S/ 0.16 S/ 0.16 S/ 0.16 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
230010193 SUMINISTRO PARA LA INSTALACION DE TUBERIAS Y CAÑONES EMERGEN glb S/ 73,740.00 S/ 2,949.60 S/ 4,424.40 S/ 5,899.20 S/ 7,374.00 S/ 4,424.40 S/ 6,636.60 S/ 11,798.40 S/ 13,273.20 S/ 5,899.20 S/ 5,899.20 S/ 3,687.00 S/ - S/ -
230020051 CARTUCHO DE EXPANSION 1/2"X 1 5/8" und S/ 480.36 S/ - S/ - S/ - S/ - S/ 120.09 S/ 120.09 S/ 120.09 S/ 120.09 S/ - S/ - S/ - S/ - S/ -
230060002 SUM. E INST. DE CALENTADOR DE AGUA 50 LITROS und S/ 1,744.02 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 436.01 S/ 436.01 S/ 436.01 S/ 436.01 S/ - S/ -
230060003 SUM. E INST. DE CALENTADOR DE AGUA 80 LITROS und S/ 2,777.91 S/ - S/ - S/ - S/ - S/ - S/ 555.58 S/ - S/ 416.69 S/ - S/ - S/ 555.58 S/ 555.58 S/ 694.48
230060004 SUM. E INST. DE CALENTADOR DE AGUA 110 LITROS und S/ 11,117.82 S/ - S/ 1,667.67 S/ 1,667.67 S/ 1,667.67 S/ 1,667.67 S/ 1,667.67 S/ 1,667.67 S/ 1,111.78 S/ - S/ - S/ - S/ - S/ -
230060008 SUM. E INST. DE CALENTADOR DE AGUA 150 LITROS und S/ 9,883.88 S/ 2,470.97 S/ 2,470.97 S/ 2,470.97 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
230060009 CALENTADOR A GAS (400 000 BTU) und S/ 47,200.00 S/ - S/ - S/ - S/ 7,080.00 S/ 7,080.00 S/ 7,080.00 S/ 7,080.00 S/ 7,080.00 S/ 4,720.00 S/ 4,720.00 S/ 2,360.00 S/ - S/ -
230060010 SUM. E INSTALACION DE COLECTOR SOLAR DE 5.00x1.20M und S/ 74,880.00 S/ 5,990.40 S/ 5,990.40 S/ 11,232.00 S/ 11,232.00 S/ 8,985.60 S/ 8,985.60 S/ 11,232.00 S/ 11,232.00 S/ - S/ - S/ - S/ - S/ -
230060013 EQUIPOS DE LIMPIEZA DE PISCINA und S/ 2,766.12 S/ - S/ - S/ - S/ - S/ 221.29 S/ 221.29 S/ 276.61 S/ 276.61 S/ 331.93 S/ 331.93 S/ 276.61 S/ 414.92 S/ 414.92
230060015 TANQUE DE PRESIÓN CON MEMBRANA EQUIPADO, DE 50_x000D_ GALON und S/ 3,355.92 S/ 167.80 S/ 167.80 S/

IS687
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES SANITARIAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIR

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15
DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
Código MAETRIALES Unidad Parcial S/. A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021
265560043 NIPLE FºGº 1 1/4" und S/ 74.70 S/ - S/ - S/ - S/ - S/ 5.98 S/ 5.98 S/ 7.47 S/ 7.47 S/ 8.96 S/ 8.96 S/ 7.47 S/ 11.21 S/ 11.21
265560044 NIPLE FºGº 1 1/2" und S/ 103.20 S/ 5.16 S/ 5.16 S/ 5.16 S/ 5.16 S/ 5.16 S/ 5.16 S/ 5.16 S/ 5.16 S/ 5.16 S/ 5.16 S/ 10.32 S/ 15.48 S/ 15.48
265570030 UNION UNIVERSAL FºGº 1/2" und S/ 1,388.40 S/ 55.54 S/ 55.54 S/ 83.30 S/ 83.30 S/ 83.30 S/ 111.07 S/ 97.19 S/ 97.19 S/ 97.19 S/ 208.26 S/ 138.84 S/ 97.19 S/ 97.19
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 794.64 S/ - S/ - S/ 198.66 S/ 158.93 S/ 238.39 S/ 158.93 S/ 39.73 S/ - S/ - S/ - S/ - S/ - S/ -
265570032 UNION UNIVERSAL FºGº 1" und S/ 333.00 S/ 83.25 S/ 83.25 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
265570033 UNION UNIVERSAL FºGº 1 1/4" und S/ 666.00 S/ - S/ 166.50 S/ 166.50 S/ 166.50 S/ 166.50 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
265570034 UNION UNIVERSAL FºGº 1 1/2" und S/ 868.56 S/ - S/ - S/ - S/ - S/ 217.14 S/ 217.14 S/ 217.14 S/ 217.14 S/ - S/ - S/ - S/ - S/ -
265570036 UNION UNIVERSAL FºGº 2 1/2" und S/ 394.56 S/ 19.73 S/ 19.73 S/ 19.73 S/ 19.73 S/ 39.46 S/ 59.18 S/ 59.18 S/ 19.73 S/ 19.73 S/ 19.73 S/ 19.73 S/ 19.73 S/ 19.73
265570038 UNION UNIVERSAL FºGº 2" und S/ 768.56 S/ 192.14 S/ 192.14 S/ 192.14 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
265570039 UNION UNIVERSAL FºGº 3" und S/ 2,071.76 S/ 82.87 S/ 124.31 S/ 165.74 S/ 207.18 S/ 124.31 S/ 186.46 S/ 331.48 S/ 372.92 S/ 165.74 S/ 165.74 S/ 103.59 S/ - S/ -
265570047 UNION UNIVERSAL DE HIERRO DUCTIL DE 75 mm und S/ 209.50 S/ - S/ - S/ - S/ - S/ 52.38 S/ 52.38 S/ 52.38 S/ 52.38 S/ - S/ - S/ - S/ - S/ -
265570048 UNION UNIVERSAL DE HIERRO DUCTIL DE 110 mm und S/ 270.60 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 67.65 S/ 67.65 S/ 67.65 S/ 67.65 S/ - S/ -
265590038 CODO FºGº 4" x 90º m S/ 32.30 S/ - S/ - S/ - S/ - S/ - S/ 6.46 S/ - S/ 4.85 S/ - S/ - S/ 6.46 S/ 6.46 S/ 8.08
265590039 CODO FºGº 6" x 90º m S/ 411.92 S/ - S/ 61.79 S/ 61.79 S/ 61.79 S/ 61.79 S/ 61.79 S/ 61.79 S/ 41.19 S/ - S/ - S/ - S/ - S/ -
265590040 CODO FºGº 3/4" x 90º m S/ 45.60 S/ 11.40 S/ 11.40 S/ 11.40 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
268110004 SUMIDERO DE FONDO 4" CON REJILLA 12" m S/ 1,191.72 S/ - S/ - S/ - S/ 178.76 S/ 178.76 S/ 178.76 S/ 178.76 S/ 178.76 S/ 119.17 S/ 119.17 S/ 59.59 S/ - S/ -
272210042 TUBERIA PVC-CLASE 10 1/2" x 5m ROSCADA m S/ 970.28 S/ 77.62 S/ 77.62 S/ 145.54 S/ 145.54 S/ 116.43 S/ 116.43 S/ 145.54 S/ 145.54 S/ - S/ - S/ - S/ - S/ -
272210043 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m S/ 1,555.23 S/ - S/ - S/ - S/ - S/ 124.42 S/ 124.42 S/ 155.52 S/ 155.52 S/ 186.63 S/ 186.63 S/ 155.52 S/ 233.28 S/ 233.28
272210044 TUBERIA PVC-CLASE 10 1" x 5m ROSCADA m S/ 1,684.90 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 84.24 S/ 168.49 S/ 252.73 S/ 252.73
272210046 TUBERIA PVC-CLASE 10 1,1/2" x 5m ROSCADA m S/ 1,619.03 S/ 64.76 S/ 64.76 S/ 97.14 S/ 97.14 S/ 97.14 S/ 129.52 S/ 113.33 S/ 113.33 S/ 113.33 S/ 242.85 S/ 161.90 S/ 113.33 S/ 113.33
272210047 TUBERIA PVC-CLASE 10 2" x 5m ROSCADA m S/ 4,605.48 S/ - S/ - S/ 1,151.37 S/ 921.10 S/ 1,381.64 S/ 921.10 S/ 230.27 S/ - S/ - S/ - S/ - S/ - S/ -
272210048 TUBERIA PVC-CLASE 10 2,1/2" x 5m ROSCADA m S/ 5,200.30 S/ 1,300.07 S/ 1,300.07 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272210049 TUBERIA PVC-CLASE 10 3" x 5m ROSCADA m S/ 862.94 S/ - S/ 215.73 S/ 215.73 S/ 215.73 S/ 215.73 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272210051 TUBERIA PVC-CLASE 10 1,1/4" x 5m ROSCADA m S/ 4,348.96 S/ - S/ - S/ - S/ - S/ 1,087.24 S/ 1,087.24 S/ 1,087.24 S/ 1,087.24 S/ - S/ - S/ - S/ - S/ -
272210054 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 11O MM m S/ 9,397.72 S/ 469.89 S/ 469.89 S/ 469.89 S/ 469.89 S/ 939.77 S/ 1,409.66 S/ 1,409.66 S/ 469.89 S/ 469.89 S/ 469.89 S/ 469.89 S/ 469.89 S/ 469.89
272210055 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 315 MM m S/ 6,396.56 S/ 1,599.14 S/ 1,599.14 S/ 1,599.14 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272210056 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 355 MM m S/ 6,702.91 S/ 268.12 S/ 402.17 S/ 536.23 S/ 670.29 S/ 402.17 S/ 603.26 S/ 1,072.46 S/ 1,206.52 S/ 536.23 S/ 536.23 S/ 335.15 S/ - S/ -
272210057 TUBERIA DE PVC-U (NTP ISO 4435) SN4 DN 400 MM m S/ 6,383.21 S/ - S/ - S/ - S/ - S/ 1,595.80 S/ 1,595.80 S/ 1,595.80 S/ 1,595.80 S/ - S/ - S/ - S/ - S/ -
272210058 ACOPLE FLEXIBLE DE 2.1/2" und S/ 124.08 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 31.02 S/ 31.02 S/ 31.02 S/ 31.02 S/ - S/ -
272210059 ACOPLE FLEXIBLE DE 2" und S/ 58.32 S/ - S/ - S/ - S/ - S/ - S/ 11.66 S/ - S/ 8.75 S/ - S/ - S/ 11.66 S/ 11.66 S/ 14.58
272210060 ACOPLE FLEXIBLE DE 3" und S/ 109.35 S/ - S/ 16.40 S/ 16.40 S/ 16.40 S/ 16.40 S/ 16.40 S/ 16.40 S/ 10.94 S/ - S/ - S/ - S/ - S/ -
272210061 UNION UNIVERSAL PVC Ø 2" m S/ 59.56 S/ 14.89 S/ 14.89 S/ 14.89 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272210062 TUBERIA PVC ISO 1452, DN 75mm C-1O m S/ 10,549.23 S/ - S/ - S/ - S/ 1,582.38 S/ 1,582.38 S/ 1,582.38 S/ 1,582.38 S/ 1,582.38 S/ 1,054.92 S/ 1,054.92 S/ 527.46 S/ - S/ -
272210063 TUBERIA PVC ISO 1452, DN 48mm C-10 m S/ 14.36 S/ 1.15 S/ 1.15 S/ 2.15 S/ 2.15 S/ 1.72 S/ 1.72 S/ 2.15 S/ 2.15 S/ - S/ - S/ - S/ - S/ -
272220006 TUBO PVC-SAP - 2" (3M) m S/ 7,304.03 S/ - S/ - S/ - S/ - S/ 584.32 S/ 584.32 S/ 730.40 S/ 730.40 S/ 876.48 S/ 876.48 S/ 730.40 S/ 1,095.60 S/ 1,095.60
272220023 TUBO PVC-SAP - 3" (3M) m S/ 1,761.78 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 88.09 S/ 176.18 S/ 264.27 S/ 264.27
272220032 TUBO PVC-SAP - 4" (3M) m S/ 26,929.13 S/ 1,077.17 S/ 1,077.17 S/ 1,615.75 S/ 1,615.75 S/ 1,615.75 S/ 2,154.33 S/ 1,885.04 S/ 1,885.04 S/ 1,885.04 S/ 4,039.37 S/ 2,692.91 S/ 1,885.04 S/ 1,885.04
272220033 TUBO PVC-SAP - 2 1/2" (3M) m S/ 17.74 S/ - S/ - S/ 4.43 S/ 3.55 S/ 5.32 S/ 3.55 S/ 0.89 S/ - S/ - S/ - S/ - S/ - S/ -
272220034 TUBO PVC-SAP - 6" (5M) m S/ 4,052.06 S/ 1,013.01 S/ 1,013.01 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272220035 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 6" m S/ 9,589.96 S/ - S/ 2,397.49 S/ 2,397.49 S/ 2,397.49 S/ 2,397.49 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272220036 UNION DE POLIPROPILENO (PPR-PN10) D= 6" und S/ 644.54 S/ - S/ - S/ - S/ - S/ 161.13 S/ 161.13 S/ 161.13 S/ 161.13 S/ - S/ - S/ - S/ - S/ -
272220037 UNION DE POLIPROPILENO (PPR-PN10) D= 4" und S/ 1,266.61 S/ 63.33 S/ 63.33 S/ 63.33 S/ 63.33 S/ 126.66 S/ 189.99 S/ 189.99 S/ 63.33 S/ 63.33 S/ 63.33 S/ 63.33 S/ 63.33 S/ 63.33
272220038 UNION DE POLIPROPILENO (PPR-PN10) D= 3" und S/ 284.96 S/ 71.24 S/ 71.24 S/ 71.24 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272220039 UNION DE POLIPROPILENO (PPR-PN10) D= 2" und S/ 19.89 S/ 0.80 S/ 1.19 S/ 1.59 S/ 1.99 S/ 1.19 S/ 1.79 S/ 3.18 S/ 3.58 S/ 1.59 S/ 1.59 S/ 0.99 S/ - S/ -
272220040 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 4" m S/ 8,789.94 S/ - S/ - S/ - S/ - S/ 2,197.48 S/ 2,197.48 S/ 2,197.48 S/ 2,197.48 S/ - S/ - S/ - S/ - S/ -
272220041 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 3" m S/ 3,872.72 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 968.18 S/ 968.18 S/ 968.18 S/ 968.18 S/ - S/ -
272220042 TUBERÍA DE POLIPROPILENO (PPR-PN10) D= 2" m S/ 377.43 S/ - S/ - S/ - S/ - S/ - S/ 75.49 S/ - S/ 56.61 S/ - S/ - S/ 75.49 S/ 75.49 S/ 94.36
272220043 AISLAMIENTO TERMICO PARA TUBERIA POLIPROPILENO D= 4" m S/ 2,370.87 S/ - S/ 355.63 S/ 355.63 S/ 355.63 S/ 355.63 S/ 355.63 S/ 355.63 S/ 237.09 S/ - S/ - S/ - S/ - S/ -
272220044 AISLAMIENTO TERMICO PARA TUBERIA POLIPROPILENO D= 3" m S/ 782.92 S/ 195.73 S/ 195.73 S/ 195.73 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272220045 AISLAMIENTO TERMICO PARA TUBERIA PÓLIPROPILENO D= 2" m S/ 85.93 S/ - S/ - S/ - S/ 12.89 S/ 12.89 S/ 12.89 S/ 12.89 S/ 12.89 S/ 8.59 S/ 8.59 S/ 4.30 S/ - S/ -
272220046 AISLAMIENTO TERMICO PARA TUBERIA POLIPROPILENO D= 1 1/2" m S/ 1,438.76 S/ 115.10 S/ 115.10 S/ 215.81 S/ 215.81 S/ 172.65 S/ 172.65 S/ 215.81 S/ 215.81 S/ - S/ - S/ - S/ - S/ -
272220047 UNION DE POLIPROPILENO (PPR-PN10) D= 1 und S/ 36.75 S/ - S/ - S/ - S/ - S/ 2.94 S/ 2.94 S/ 3.68 S/ 3.68 S/ 4.41 S/ 4.41 S/ 3.68 S/ 5.51 S/ 5.51
272220048 TUBERIA DE POLIPROPILENO (PPR PN10) D= 1 1/ 2 m S/ 1,411.84 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 70.59 S/ 141.18 S/ 211.78 S/ 211.78
272220049 TUBERIA DE POLIPROPILENO (PPR-PN10) D= 1" m S/ 12.75 S/ 0.51 S/ 0.51 S/ 0.77 S/ 0.77 S/ 0.77 S/ 1.02 S/ 0.89 S/ 0.89 S/ 0.89 S/ 1.91 S/ 1.28 S/ 0.89 S/ 0.89
272220061 CODO PPR-PN10 DE 4" X 90º und S/ 376.88 S/ - S/ - S/ 94.22 S/ 75.38 S/ 113.06 S/ 75.38 S/ 18.84 S/ - S/ - S/ - S/ - S/ - S/ -
272220062 CODO PPR-PN10 DE 3" X 90º und S/ 422.56 S/ 105.64 S/ 105.64 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272220063 TEE PPR-PN10 DE 4" und S/ 466.96 S/ - S/ 116.74 S/ 116.74 S/ 116.74 S/ 116.74 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272220064 TEE PPR-PN10 DE 3" und S/ 227.28 S/ - S/ - S/ - S/ - S/ 56.82 S/ 56.82 S/ 56.82 S/ 56.82 S/ - S/ - S/ - S/ - S/ -
272220065 REDUCCION PPR-PN10 DE 4" A 3" und S/ 164.08 S/ 8.20 S/ 8.20 S/ 8.20 S/ 8.20 S/ 16.41 S/ 24.61 S/ 24.61 S/ 8.20 S/ 8.20 S/ 8.20 S/ 8.20 S/ 8.20 S/ 8.20
272220073 TUBERIA UF DE 200 mm S25 m S/ 1,394.17 S/ 348.54 S/ 348.54 S/ 348.54 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272220074 TUBERIA UF DE 400 mm S25 m S/ 9,301.31 S/ 372.05 S/ 558.08 S/ 744.10 S/ 930.13 S/ 558.08 S/ 837.12 S/ 1,488.21 S/ 1,674.24 S/ 744.10 S/ 744.10 S/ 465.07 S/ - S/ -
272220075 TUBERIA PVC-UF NTP ISO 4435 SN2 DN 200 m S/ 8,239.64 S/ - S/ - S/ - S/ - S/ 2,059.91 S/ 2,059.91 S/ 2,059.91 S/ 2,059.91 S/ - S/ - S/ - S/ - S/ -
272220076 UNION PVC-UF NTP ISO 4435 SN2 DN 200 und S/ 851.06 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 212.77 S/ 212.77 S/ 212.77 S/ 212.77 S/ - S/ -
272220077 TUBERIA PVC-UF NTP ISO 4435 SN2 DN 160 m S/ 103.20 S/ - S/ - S/ - S/ - S/ - S/ 20.64 S/ - S/ 15.48 S/ - S/ - S/ 20.64 S/ 20.64 S/ 25.80
272220078 UNION PVC-UF NTP ISO 4435 SN2 DN 160 und S/ 59.84 S/ - S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ 8.98 S/ 5.98 S/ - S/ - S/ - S/ - S/ -
272500023 UNION SIMPLE PVC-P (ELEC.) 100mm und S/ 15.13 S/ 3.78 S/ 3.78 S/ 3.78 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272500034 UNION SIMPLE CPVC 1/2" und S/ 5.52 S/ - S/ - S/ - S/ 0.83 S/ 0.83 S/ 0.83 S/ 0.83 S/ 0.83 S/ 0.55 S/ 0.55 S/ 0.28 S/ - S/ -
272500035 UNION SIMPLE CPVC 3/4" und S/ 5.99 S/ 0.48 S/ 0.48 S/ 0.90 S/ 0.90 S/ 0.72 S/ 0.72 S/ 0.90 S/ 0.90 S/ - S/ - S/ - S/ - S/ -
272510011 TEE PVC-SAP-CLASE 10 SP - 1/2" und S/ 243.20 S/ - S/ - S/ - S/ - S/ 19.46 S/ 19.46 S/ 24.32 S/ 24.32 S/ 29.18 S/ 29.18 S/ 24.32 S/ 36.48 S/ 36.48
272510012 TEE PVC-SAP-CLASE 10 SP - 3/4" und S/ 16.17 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 0.81 S/ 1.62 S/ 2.43 S/ 2.43
272510027 UNION SIMPLE PVC-SAP-CLASE 10 SP -2 1/2" und S/ 316.64 S/ 12.67 S/ 12.67 S/ 19.00 S/ 19.00 S/ 19.00 S/ 25.33 S/ 22.17 S/ 22.17 S/ 22.17 S/ 47.50 S/ 31.66 S/ 22.17 S/ 22.17
272510079 TEE PVC-SAP-CLASE 1O SP - 1" und S/ 191.18 S/ - S/ - S/ 47.80 S/ 38.24 S/ 57.35 S/ 38.24 S/ 9.56 S/ - S/ - S/ - S/ - S/ - S/ -
272510080 CODO PVC-CLASE 1O SP -1 1/4" x 90º und S/ 1,111.32 S/ 277.83 S/ 277.83 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272510081 TEE PVC-SAP-CLASE 10 SP -11/4" und S/ 1,230.39 S/ - S/ 307.60 S/ 307.60 S/ 307.60 S/ 307.60 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272510087 CODO PVC-CLASE 10 SP -1" x 90º und S/ 320.74 S/ - S/ - S/ - S/ - S/ 80.19 S/ 80.19 S/ 80.19 S/ 80.19 S/ - S/ - S/ - S/ - S/ -
272510089 TEE PVC-SAP-CLASE 10 SP - 2 1/2" und S/ 24.99 S/ 1.25 S/ 1.25 S/ 1.25 S/ 1.25 S/ 2.50 S/ 3.75 S/ 3.75 S/ 1.25 S/ 1.25 S/ 1.25 S/ 1.25 S/ 1.25 S/ 1.25
272510091 CODO PVC-CLASE 10 SP - 2 1/2" x 90º und S/ 49.45 S/ 12.36 S/ 12.36 S/ 12.36 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272510092 TEE CPVC DE 1/2" und S/ 61.56 S/ 2.46 S/ 3.69 S/ 4.92 S/ 6.16 S/ 3.69 S/ 5.54 S/ 9.85 S/ 11.08 S/ 4.92 S/ 4.92 S/ 3.08 S/ - S/ -
272510093 SOMBRERO PARA VENTILACION DE PVC DE 2" und S/ 181.79 S/ - S/ - S/ - S/ - S/ 45.45 S/ 45.45 S/ 45.45 S/ 45.45 S/ - S/ - S/ - S/ - S/ -
272510094 TEE CPVC DE 3/4" und S/ 4.68 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 1.17 S/ 1.17 S/ 1.17 S/ 1.17 S/ - S/ -
272510096 UNION SIMPLE PVC-SAP-CLASE 10 SP -3" und S/ 50.93 S/ - S/ - S/ - S/ - S/ - S/ 10.19 S/ - S/ 7.64 S/ - S/ - S/ 10.19 S/ 10.19 S/ 12.73
272510103 SOMBRERO PARA VENTILACION DE PVC DE 4" und S/ 64.72 S/ - S/ 9.71 S/ 9.71 S/ 9.71 S/ 9.71 S/ 9.71 S/ 9.71 S/ 6.47 S/ - S/ - S/ - S/ - S/ -
272510107 UNION SIMPLE PVC-SAP-CLASE 10 SP -4" und S/ 1,005.72 S/ 251.43 S/ 251.43 S/ 251.43 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ -
272510124 BOQUILLA DE RETORNO DE 2" und S/ 1,577.34 S/ - S/ - S/ - S/ 236.60 S/ 236.60 S/ 236.60 S/ 236.60 S/ 236.60 S/

IS688
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

SALDO
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 13.65 S/ 3.41
202100002 ALAMBRE NEGRO Nro.16 kg S/ 4.93 S/ -
202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 14.25 S/ -
202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.00 S/ -
203010010 ACERO CORRUGADO GRADO 60 kg S/ 485.76 S/ -
204050001 ARENA GRUESA m3 S/ 569.50 S/ -
204050002 ARENA FINA m3 S/ 81.02 S/ 20.25
204100010 TIERRA CERNIDA m3 S/ 482.98 S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 2,074.95 S/ 166.00
205350001 AGUA und S/ 19.11 S/ -
206200005 CONECTOR DE BARRA DE 5/8" Y 3/4" und S/ 536.35 S/ 26.82
207050009 CONEXIONA CAJA PVC ELEC. SAP 25MM und S/ 12.37 S/ 0.49
207900013 CONECTOR PVC 25mm und S/ 6.01 S/ -
206200011 CONECTOR PVC 55mm und S/ 45.01 S/ 11.25
206200019 CONECTOR PVC 20mm und S/ 221.42 S/ -
206200028 CONECTOR PVC 35mm und S/ 148.45 S/ -
206200030 CONECTOR PVC 100mm und S/ 8.44 S/ -
206200031 CONECTOR PVC 75mm und S/ 5.13 S/ -
206300002 CABLE HELICOIDAL DE 9m Cu und S/ 843.76 S/ -
206550023 VARILLA DE COBRE 3/4"x 2.40Ín C/PUNTA und S/ 1,728.27 S/ 432.07
206560001 CABLE 1x16mm2 COBRE DESNUDO m3 S/ 17.80 S/ -
206560002 CABLE 1x50mm2 COBRE DESNUDO m S/ 925.75 S/ 74.06
207050015 CONDUCTOR N2XOH - 1 x 300mm m S/ 2,293.19 S/ -
207050016 CONDUCTOR N2XOH - 1 x 25mm2 m S/ 1,162.81 S/ -
207050017 CONDUCTOR N2XOH-1 x 10mm2 m S/ 11,248.14 S/ 562.41
207050018 CONDUCTOR N2XOH - 1 x 6mm2 m S/ 3,531.68 S/ 882.92
207050019 CONDUCTOR N2XOH - 1 x 16mm2 m S/ 2,900.81 S/ 116.03
207050022 CONDUCTOR N2XOH -1 x 70mm2 m S/ 128.54 S/ -
207050023 CONDUCTOR N2XOH - 1 x 35mm2 m S/ 1,463.63 S/ -
207150013 CONDUCTOR NH-80, 4mm2 m S/ 4,475.89 S/ -
207150022 CONDUCTOR NH-80, 6mm2 m S/ 893.20 S/ -
207150023 CONDUCTOR NH-80, 2.5mm2 m S/ 10,650.04 S/ 2,662.51
211250005 CORTACIRCUITO PARA POSTE DE CONCRETO und S/ 796.53 S/ -
211250010 SOPORTE P/TENSADO MOD.SA-9 DE FºGº C/AISLADOR und S/ 93.92 S/ 7.51
211250012 SOPORTE P/TENSADO MOD.SA-7 DE FºGº C/AISLADOR und S/ 187.84 S/ -
211250041 CAPTOR CON DISPOSITIVO DE CEBADO und S/ 5,388.49 S/ 269.42
212050115 ARTEF. ILUMINACION DE EMERGENCIA C/2 LAMP. 20W, 2 HORA und S/ 13,555.36 S/ 542.21
212050123 ARTEFACTO SIMILAR RAS 3X36 und S/ 22,909.33 S/ -

IE689
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212050124 ARTEFACTO SIMILAR RAS 2X36 und S/ 6,236.49 S/ 1,559.12


212050125 ARTEFACTO SIMILAR TPC 132 und S/ 5,162.99 S/ -
212050126 ARTEFACTO SIMILAR TPR 2X18 und S/ 5,796.57 S/ -
212050127 ARTEFACTO SIMILAR RSP 2X18W und S/ 4,633.93 S/ -
212050128 ARTEFACTO SIMILAR ULTR AA2X18 und S/ 747.43 S/ -
212050129 REFLECTOR TIPO ARAN 1X70 und S/ 520.66 S/ -
212050130 REFLECTOR TIPO MERH - 250 und S/ 1,249.60 S/ 312.40
212050131 ARTEFACTO SIMILAR A GEOTEC 1X35 und S/ 890.91 S/ -
212050132 ARTEFACTO PARA ADOSAR TIPO ALPHA SP.O A 1X20W und S/ 104.13 S/ 8.33
212050133 WALL SOKETE, CON LAMPARA AHORRADORA DE 20W und S/ 27.77 S/ -
212050134 BRAQUETE DE 2 LAMPARAS DE 18W SIMILAR A RSP-2 JOSFEL und S/ 2,343.00 S/ -
212050135 ARTEFACTO PARA ADOSAR, 1 LAMPARA DE 32 W, SIMILAR AL TI und S/ 1,703.25 S/ 85.16
212050136 ARTEFACTO PARA ADOSAR Y/O COLGAR, CON LAMPARA FLUOREC und S/ 3,147.27 S/ 786.82
212050137 ARTEFACTO ADOSADO, CON DOS LAMPARAS 18W, SIMILAR AL TI und S/ 87.93 S/ 3.52
212050138 ARTEFACTO PARA SUSPENDER, CON 2 LAMPARAS FLUORECENTESund S/ 1,700.86 S/ -
212050139 ARTEFACTO PARA ADOSAR, CON 3 LAMPARAS DE 36W, SIMILARund_x000D_ S/ 1,041.33 S/ -
212050140 ARTEFACTO PARA SUSPENDER, CON 3 FLUORECENTES DE 36_x000D_ und S/ 370.27 S/ -
212050141 W, SIMILAR AL
ARTEFACTO TIPOADOSAR,
PARA ISP 3x36W
CON LAMPARA FLUORECENTE DE 36W und S/ 592.43 S/ -
212050142 ARTEFACTOREFLECTOR CON LAMPARA DE 250 W, SIMILAR AL T und S/ 6,768.67 S/ 1,692.17
212050143 BRAQUETE REFLECTOR CON 2 LAMPARAS LED DE 18W SIMILAR und S/ 395.70 S/ -
212050144 ARTEFACTO PARA ADOSAR, SIMILAR AL TIPO ALPHA SPOT A, C und S/ 138.84 S/ 11.11
212050145 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 842.31 S/ -
212050146 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 2,166.00 S/ 108.30
212050147 ARTEFACTO DE ILUMINACION CON LAMAPARA LED DE 36W, PROT und S/ 1,230.82 S/ 49.23
212050148 ARTEFACTO DE ILUMINACION CON LAMPARA LED DE 36W, PROTEC und S/ 3,429.50 S/ -
212050149 REFLECTORES CON LAMPARAS DE 250 W , HALOGENURO META und S/ 879.33 S/ 219.83
212050150 ARTEFACTO TIPO ASTRO-70, CON LAMPARA DE 70W HALOGEN und S/ 5,825.58 S/ -
212050151 PASTORAL SIMPLE TIPO SUCRE und S/ 1,050.00 S/ -
212050152 PASTORAL DOBLE TIPO SUCRE und S/ 100.00 S/ -
212050153 REFLECTOR SIMILAR A ARAN, CON LAMPARA DE 150W HALO und S/ 1,475.20 S/ -
212050154 ARTEFACTO SIMILARA AHR-1X36 + KIT DE EMERGENCIA und S/ 3,471.07 S/ -
212050155 ARTEFACTO SIMILAR AHR-1X36 und S/ 1,423.11 S/ 355.78
212050156 CAMPANILLA DE TIMBRE DE 8" DE DIAMETRO und S/ 229.97 S/ -
212050157 CAMPANILLA DE TIMBRE DE 4" DE DIAMETRO und S/ 72.63 S/ 5.81
212050159 SENSOR DE TEMPERATURA Y/O HUMO und S/ 248.79 S/ -
212150002 CAJA GALV. RECT. PESADA 4" x 2" x 21/4" und S/ 846.77 S/ -
212150011 CAJA GALV. OCTOGONAL PESADA 4" und S/ 862.61 S/ 43.13
212150035 CAJA DE PASE GALVANIZADA 4" x 4" x 2" und S/ 366.50 S/ 91.62
212150036 CAJA DE PASE GALVANIZADA OCTOGONAL (100X55mm) und S/ 40.48 S/ 1.62
212150039 CAJA DE PASE GALVANIZADA (150X150X75mm) und S/ 185.13 S/ -
212150041 CAJA DE PASE GALVANIZADA (200X200X100mm) und S/ 145.86 S/ -

IE690
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212150042 CAJA DE PASE GALVANIZADA (300X300X100mm) und S/ 224.00 S/ -


212150043 CAJA DE PASE GALVANIZADA (100X100X100mm) und S/ 93.51 S/ -
212150044 CAJA DE PASE GALVANIZADA (100X100X50mm) und S/ 31.64 S/ 7.91
212150045 TAPA CIEGA DE 300X300 und S/ 57.72 S/ -
212150046 TAPA CIEGA DE 200X200 und S/ 5.10 S/ 0.41
212150047 TAPA CIEGA DE 150X150 und S/ 3.63 S/ -
212150048 CAJA DE PASE GALVANIZADA (100X50X55mm) und S/ 9.71 S/ 0.49
212150049 TAPA CIEGA OCTOGONAL DE 100 und S/ 20.88 S/ 0.84
212250004 INTERRUPTOR 2 GOLPE SIMILAR TIPO TICINO und S/ 545.39 S/ -
212250078 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und S/ 1,140.92 S/ 285.23
212250080 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und S/ 1,106.35 S/ -
212250092 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und S/ 752.00 S/ -
212250093 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und S/ 465.18 S/ -
212250095 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und S/ 77.53 S/ -
212250103 INTERRUPTOR TERMOMAGNETICO - 3 x 20 A und S/ 158.60 S/ -
212250132 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und S/ 354.38 S/ 88.59
212250134 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und S/ 470.00 S/ -
212250140 INTERRUPTOR DIFERENCIAL 2X25A-30MA und S/ 13,844.08 S/ 1,107.53
212250143 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und S/ 25.84 S/ -
212250144 INTERRUPTOR TERMOMAGNETICO - 2 x 50 A und S/ 24.68 S/ -
212250145 INTERRUPTOR 1 GOLPE SIMILAR TIPO TICINO und S/ 255.64 S/ 12.78
212250146 INTERRUPTOR DE CONMUTACION SIMILAR TIPO TICINO und S/ 1,025.89 S/ 256.47
212250147 INTERRUPTOR 3 GOLPES SIMILAR TIPO TICINO und S/ 300.07 S/ 12.00
212250148 PULSADOR DE TIMBRE und S/ 28.82 S/ -
212250150 INTERRUPTOR TERMOMAGNETICO - 2 x 40 A und S/ 34.91 S/ -
212250152 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 16KA und S/ 62.56 S/ -
212250153 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 20KA und S/ 250.23 S/ -
212250154 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A 20KA und S/ 83.65 S/ 20.91
212250155 INTERRUPTOR TERMOMAGNETICO- 3 x 70 A 16KA und S/ 62.56 S/ -
212250156 INTERRUPTOR DIFERENCIAL 2X40A-30MA und S/ 988.80 S/ 79.10
212250164 INTERRUPTOR TERMOMAGNETICO- 3 x 60 A 10KA und S/ 16.29 S/ -
212250168 INTERRUPTOR TERMOMAGNETICO-3 x 125 A 25KA und S/ 167.30 S/ 8.37
212250171 CONTACTOR ELECTRICO 2 X 20 A und S/ 319.32 S/ 12.77
212250172 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A 20KA und S/ 125.11 S/ -
212250173 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 20KA und S/ 32.59 S/ 8.15
212250174 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 16KA und S/ 32.59 S/ -
212250181 CONTROL DE NIVEL und S/ 281.19 S/ -
212250182 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA EN CISTERNA und S/ 86.52 S/ -
212250189 TG (TABLERO AUTOSOPORTADO, ITM: 11X40A 10KA, 4 2X20A 10KA, und S/ 4,549.17 S/ -
212250190 TG - 6 (TABLERO AUTOSOPORTADO, ITM: 2 2X40A, 3 2X20A, 1 2X60 2und S/ 3,536.33 S/ -
212300022 TOMA PARA RED DATA (DADO) und S/ 1,926.22 S/ 481.56

IE691
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212300025 TOMACORRIENTE DOBLE C/ LINEA DE TIERRA SIMILAR TIPO TI und S/ 4,612.63 S/ -


212300028 TOMACORRIENTE DOBLE A PRUEBA DE AGUA und S/ 654.50 S/ 52.36
212350060 PLACA SALIDA PARA TV o TELEFONO und S/ 662.15 S/ -
212350062 PLACA DE ALUMINIO ANODIZADO 1 PERFORACION und S/ 1,058.20 S/ -
212350063 PLACA DE ALUMINIO ANODIZADO 2 PERFORACION und S/ 929.13 S/ 46.46
219600001 CABLE DESNUDO 50MM2 (1/0 AWG) m S/ 564.27 S/ 141.07
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 4,488.01 S/ 179.52
221030015 MARCO Y TAPA DE BUZON ELECTRICO und S/ 1,726.67 S/ -
221030016 MARCO Y TAPA DE BUZON COMUNICACIONES und S/ 2,461.01 S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 3.89 S/ -
230010030 CINTA TEFLON m S/ 0.11 S/ -
230010057 DOSIS QUIMICA THOR GEL DE 5 kg und S/ 1,362.78 S/ 340.70
230010136 CINTA AISLANTE ml S/ 1,105.15 S/ -
230010143 SELLADOR BLANCO PARA MUROS gal S/ 0.28 S/ 0.02
230010147 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal S/ 405.58 S/ -
230010151 ASCENSOR 03 PARADAS CON CUARTO DE MAQUINAS und S/ 29,880.67 S/ 1,494.03
230010155 ASCENSOR 02 PARADAS CON CUARTO DE MAQUINAS und S/ 28,540.28 S/ 1,141.61
230100010 EXTINTOR C02 DE 15 LIBRAS und S/ 736.71 S/ -
230990125 MANOMETRO DE GLICERINA DE 0-300psi und S/ 37.85 S/ 9.46
230990126 MANOMETRO DE GLICERINA DE 0-100psi und S/ 36.45 S/ -
230990127 BALON DE GAS 100 LBS (INCLUYE GAS) und S/ 782.80 S/ -
230990128 REGULADOR FISHER C/NIPLES DE CONEX R962 und S/ 597.40 S/ -
230990168 SUM. E INSTALACION DE SUB ESTACION ZONA ACADEMICA glb S/ 44,373.52 S/ -
230990169 SUM. E INSTALACION DE SUB ESTACION ZONA DEPORTIVA glb S/ 47,022.71 S/ -
230990171 TANQUE DE GAS DE 1000 GALONES (INC. ACCESORIOS Y VALV und S/ 3,738.90 S/ 934.73
230990176 MANOMETRO DE PRESION und S/ 48.00 S/ -
230990177 POOL DE CHICOTE COBRE ALTA PRESION TERMNAL TANQUE Y und S/ 17.33 S/ 1.39
231250001 CAJA DE CONCRETO C/TAPA und S/ 126.20 S/ -
231250025 CAJA DE CONCRETO C/TAPA 40 X 40 X 40 cm und S/ 107.12 S/ -
243010001 MADERA TORNILLO p2 S/ 542.04 S/ 27.10
243100001 MADERA CEDRO p2 S/ 0.06 S/ 0.02
251050005 BALON DE GAS 100 LBS (INCLUYE GAS) m S/ 45.99 S/ 1.84
251200002 PLATINA DE FIERRO 1/8" x 1" m S/ 1.76 S/ -
251200023 PLATINA DE FIERRO 114" X 1" m S/ 290.36 S/ -
251200096 PLATINA DE FIERRO 118" X 314" m S/ 1.36 S/ -
251300054 TUBERIA DE 0 2" ACEDRO CELULA 40 m S/ 36.86 S/ -
251300055 TUBERIA DE 0 1" ACEDRO CELULA 40 m S/ 17.85 S/ 4.46
251300056 UNION DE 0 2 ACEDRO CELULA 40 und S/ 13.27 S/ -
251300057 UNION DE 01" ACEDRO CELULA 40 und S/ 6.43 S/ 0.51
254150020 PINTURA ESMALTE qal S/ 4.94 S/ -
254200001 PINTURA ANTICORROSIVA qal S/ 14.65 S/ 0.73

IE692
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

261020015 PCHA FºGº P/MASTIL 118" 15x20cm C/ABRAZ und S/ 63.17 S/ 2.53
261020024 GABINETE METALICO CON BARRA DE COBRE 24 POLOS und S/ 4,482.22 S/ -
261020031 GABINETE METALICO CON BARRA DE COBRE 36 POLOS und S/ 1,184.50 S/ 296.13
261020034 CAJA PARA INTERRUPTOR und S/ 45.00 S/ -
261020035 GABINETE PARA EXTINTOR und S/ 186.21 S/ -
262010017 POSTE DE CONCRETO CENTRIF. 8ML und S/ 4,729.50 S/ -
262010019 POSTE DE CONCRETO CENTRIF. 25MU1200/210/585 PARA PAR und S/ 15,038.00 S/ -
262010021 TRANSPORTE TERRESTRE kg S/ 2,900.00 S/ -
262010022 POSTE DE CONCRETO ARMADO DE 11 MTS und S/ 1,086.67 S/ 271.67
262120005 PASTORAL DE CONCRETO CENTRIFUGADO PARA LUMINARIA und S/ 147.63 S/ -
265010035 TUBO PROTECTOR DE FºGº 2"x4m C/02 ABRAZ . und S/ 151.95 S/ 12.16
265010037 MASTIL DE FºGº 4" X9M C/ACOPLE S/DISEñO und S/ 673.33 S/ -
265010046 TUBERIA FºGº 1" m S/ 47.76 S/ -
265010066 TUBERIA FºGº 314" m S/ 46.34 S/ 2.32
265250008 CAJA METALICA PARA VALVULAS und S/ 35.31 S/ 8.83
265560039 NIPLE FºGº 2" und S/ 2.45 S/ 0.10
265560040 NIPLE FºGº 1" und S/ 1.84 S/ -
265560041 NIPLE FºGº 314" und S/ 1.28 S/ -
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 12.61 S/ -
265570032 UNION UNIVERSAL FºGº 1" und S/ 14.80 S/ -
265570038 UNION UNIVERSAL FºGº 2" und S/ 19.71 S/ 4.93
265590040 CODO FºGº 314 x 90º S/ 5.70
265590041 CODO FºGº 1" x 90º und S/ 8.00 S/ 0.64
268010001 TUBERIA DE COBRE TIPO "L" 112" m S/ 299.44 S/ -
268010002 TUBERIA DE COBRE TIPO "K" 2" m S/ 320.46 S/ 16.02
268010003 TUBERIA DE COBRE TIPO "K" 11/2" m S/ 160.23 S/ 6.41
268120002 PITON DE BRONCE DE 1/2" PARA SALIDA DE GAS und S/ 22.32 S/ -
268120003 CODO DE COBRE 1/2" und S/ 25.98 S/ 6.49
268120004 CODO DE COBRE 2" TIPO K und S/ 35.68 S/ -
268120005 CODO DE COBRE 1 1/2" TIPO K und S/ 14.08 S/ -
272200003 TUBO PVC-P (ELEC.) 20mm 3M m S/ 4,138.03 S/ -
272200004 TUBO PVC-P (ELEC.) 25mm 3M m S/ 308.98 S/ -
272200010 TUBO PVC-P (ELEC.) 100mm 3M m S/ 128.75 S/ -
272200011 TUBO PVC-P (ELEC.) 35mm 3M m S/ 1,310.68 S/ 327.67
272200012 TUBO PVC-P (ELEC.) 50mm 3M m S/ 1,492.58 S/ -
272200014 TUBO PVC-P (ELEC.) 75mm 3M m S/ 97.09 S/ 7.77
272220029 TUBERIA CONDUIT DE 20mm m S/ 122.62 S/ -
272220030 CONECTOR CONDUIT DE 20mm und S/ 47.10 S/ -
272220031 CURVA EMT CONDUIT DE 20mm und S/ 39.84 S/ 1.99
272500003 CURVA PVC-P (ELEC.) 20mm und S/ 551.41 S/ 137.85
272500004 CURVA PVC-P {ELEC.) 25mm und S/ 48.09 S/ 12.02

IE693
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

272500013 UNION SIMPLE PVC-P (ELEC.) 20mm und S/ 16.00 S/ -


272500025 CONECTOR PVC 025MM und S/ 8.36 S/ -
272500029 CURVA PVC-P (ELEC.) 100mm und S/ 41.91 S/ -
272500030 CURVA PVC-P (ELEC.) 35mm und S/ 310.33 S/ -
272500031 CURVA PVC-P (ELEC.) 50mm und S/ 200.35 S/ -
272500032 CURVA PVC-P (ELEC.) 75mm und S/ 30.29 S/ 7.57
272500033 UNION DE COBRE 1/2" und S/ 23.26 S/ -
272510147 UNION DE COBRE 2" TIPO K und S/ 6.31 S/ 0.50
272510148 UNION DE COBRE 11/2" TIPO K und S/ 2.80 S/ -
272520069 TAPON HEMBRA DE COBRE 1/2" und S/ 12.27 S/ -
272610005 TEE DE COBR E 1/2" und S/ 11.75 S/ 0.59
272610008 TEE DE COBRE 2" TIPO K m S/ 24.66 S/ 6.17
272610009 TEE DE COBRE 11/2" TIPO K m S/ 10.33 S/ 0.41
277010015 VALVULA DE GLOBO DE 1/2" PARA GAS und S/ 401.70 S/ -
277010020 VALVULA DE SEGURIDAD DE 1/2" PARA GAS und S/ 10.83 S/ -
277010021 VALVULA DE GLOBO DE 1" und S/ 109.80 S/ -
277010022 VALVULA DE GLOBO DE 3/4" und S/ 290.87 S/ -
277110011 VALVULA CHECK PESADA DE BRONCE D=2 " und S/ 42.44 S/ 10.61
277110027 VALVULA T PESADA DE BRONCE D=2" und S/ 42.44 S/ -
277210014 VÁLVULA REGULADORA DE PRESION DE 1ER Y 2DAAETAPA INC und S/ 96.67 S/ 3.87
277210022 VALVULA DE LLENADO S/ 32.62 S/ -
und
277210023 VALVULA DE RETORNO und S/ 30.56 S/ -
277210024 ACOPLES DE INYECCION und S/ 26.78 S/ -
277210025 ACOPLE DE RESTORNO und S/ 23.00 S/ 0.92
277210026 VALVULA DE SEGURIDAD ESFERICA 11/2" und S/ 93.33 S/ -
277210027 VALVULA DE SEGURIDAD ESFERICA 3/4" und S/ 43.33 S/ -
277210028 VALVULA DE ALIVIO DE PRESION und S/ 90.00 S/ -
277510018 SUMIDERO DE BRONCE 3" und S/ 36.80 S/ -
MEJORA
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 13.65 S/ 3.41
202100002 ALAMBRE NEGRO Nro.16 kg S/ 4.93 S/ -
202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 14.25 S/ -
202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.00 S/ -
203010010 ACERO CORRUGADO GRADO 60 kg S/ 485.76 S/ -
204050001 ARENA GRUESA m3 S/ 569.50 S/ -
204050002 ARENA FINA m3 S/ 81.02 S/ 20.25
204100010 TIERRA CERNIDA m3 S/ 482.98 S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 2,074.95 S/ 166.00
205350001 AGUA und S/ 19.11 S/ -
206200005 CONECTOR DE BARRA DE 5/8" Y 3/4" und S/ 536.35 S/ 26.82

IE694
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

207050009 CONEXIONA CAJA PVC ELEC. SAP 25MM und S/ 12.37 S/ 0.49
207900013 CONECTOR PVC 25mm und S/ 6.01 S/ -
206200011 CONECTOR PVC 55mm und S/ 45.01 S/ 11.25
206200019 CONECTOR PVC 20mm und S/ 221.42 S/ -
206200028 CONECTOR PVC 35mm und S/ 148.45 S/ -
206200030 CONECTOR PVC 100mm und S/ 8.44 S/ -
206200031 CONECTOR PVC 75mm und S/ 5.13 S/ -
206300002 CABLE HELICOIDAL DE 9m Cu und S/ 843.76 S/ -
206550023 VARILLA DE COBRE 3/4"x 2.40Ín C/PUNTA und S/ 1,728.27 S/ 432.07
206560001 CABLE 1x16mm2 COBRE DESNUDO m3 S/ 17.80 S/ -
206560002 CABLE 1x50mm2 COBRE DESNUDO m S/ 925.75 S/ 74.06
207050015 CONDUCTOR N2XOH - 1 x 300mm m S/ 2,293.19 S/ -
207050016 CONDUCTOR N2XOH - 1 x 25mm2 m S/ 1,162.81 S/ -
207050017 CONDUCTOR N2XOH-1 x 10mm2 m S/ 11,248.14 S/ 562.41
207050018 CONDUCTOR N2XOH - 1 x 6mm2 m S/ 3,531.68 S/ 882.92
207050019 CONDUCTOR N2XOH - 1 x 16mm2 m S/ 2,900.81 S/ 116.03
207050022 CONDUCTOR N2XOH -1 x 70mm2 m S/ 128.54 S/ -
207050023 CONDUCTOR N2XOH - 1 x 35mm2 m S/ 1,463.63 S/ -
207150013 CONDUCTOR NH-80, 4mm2 m S/ 4,475.89 S/ -
207150022 CONDUCTOR NH-80, 6mm2 m S/ 893.20 S/ -
207150023 CONDUCTOR NH-80, 2.5mm2 m S/ 10,650.04 S/ 2,662.51
211250005 CORTACIRCUITO PARA POSTE DE CONCRETO und S/ 796.53 S/ -
211250010 SOPORTE P/TENSADO MOD.SA-9 DE FºGº C/AISLADOR und S/ 93.92 S/ 7.51
211250012 SOPORTE P/TENSADO MOD.SA-7 DE FºGº C/AISLADOR und S/ 187.84 S/ -
211250041 CAPTOR CON DISPOSITIVO DE CEBADO und S/ 5,388.49 S/ 269.42
212050115 ARTEF. ILUMINACION DE EMERGENCIA C/2 LAMP. 20W, 2 HORA und S/ 13,555.36 S/ 542.21
212050123 ARTEFACTO SIMILAR RAS 3X36 und S/ 22,909.33 S/ -
212050124 ARTEFACTO SIMILAR RAS 2X36 und S/ 6,236.49 S/ 1,559.12
212050125 ARTEFACTO SIMILAR TPC 132 und S/ 5,162.99 S/ -
212050126 ARTEFACTO SIMILAR TPR 2X18 und S/ 5,796.57 S/ -
212050127 ARTEFACTO SIMILAR RSP 2X18W und S/ 4,633.93 S/ -
212050128 ARTEFACTO SIMILAR ULTR AA2X18 und S/ 747.43 S/ -
212050129 REFLECTOR TIPO ARAN 1X70 und S/ 520.66 S/ -
212050130 REFLECTOR TIPO MERH - 250 und S/ 1,249.60 S/ 312.40
212050131 ARTEFACTO SIMILAR A GEOTEC 1X35 und S/ 890.91 S/ -
212050132 ARTEFACTO PARA ADOSAR TIPO ALPHA SP.O A 1X20W und S/ 104.13 S/ 8.33
212050133 WALL SOKETE, CON LAMPARA AHORRADORA DE 20W und S/ 27.77 S/ -
212050134 BRAQUETE DE 2 LAMPARAS DE 18W SIMILAR A RSP-2 JOSFEL und S/ 2,343.00 S/ -
212050135 ARTEFACTO PARA ADOSAR, 1 LAMPARA DE 32 W, SIMILAR AL TI und S/ 1,703.25 S/ 85.16
212050136 ARTEFACTO PARA ADOSAR Y/O COLGAR, CON LAMPARA FLUOREC und S/ 3,147.27 S/ 786.82
212050137 ARTEFACTO ADOSADO, CON DOS LAMPARAS 18W, SIMILAR AL TI und S/ 87.93 S/ 3.52

IE695
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212050138 ARTEFACTO PARA SUSPENDER, CON 2 LAMPARAS FLUORECENTESund S/ 1,700.86 S/ -


212050139 ARTEFACTO PARA ADOSAR, CON 3 LAMPARAS DE 36W, SIMILARund_x000D_ S/ 1,041.33 S/ -
212050140 ARTEFACTO PARA SUSPENDER, CON 3 FLUORECENTES DE 36_x000D_ und S/ 370.27 S/ -
212050141 W, SIMILAR AL
ARTEFACTO TIPOADOSAR,
PARA ISP 3x36W
CON LAMPARA FLUORECENTE DE 36W und S/ 592.43 S/ -
212050142 ARTEFACTOREFLECTOR CON LAMPARA DE 250 W, SIMILAR AL T und S/ 6,768.67 S/ 1,692.17
212050143 BRAQUETE REFLECTOR CON 2 LAMPARAS LED DE 18W SIMILAR und S/ 395.70 S/ -
212050144 ARTEFACTO PARA ADOSAR, SIMILAR AL TIPO ALPHA SPOT A, C und S/ 138.84 S/ 11.11
212050145 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 842.31 S/ -
212050146 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 2,166.00 S/ 108.30
212050147 ARTEFACTO DE ILUMINACION CON LAMAPARA LED DE 36W, PROT und S/ 1,230.82 S/ 49.23
212050148 ARTEFACTO DE ILUMINACION CON LAMPARA LED DE 36W, PROTEC und S/ 3,429.50 S/ -
212050149 REFLECTORES CON LAMPARAS DE 250 W , HALOGENURO META und S/ 879.33 S/ 219.83
212050150 ARTEFACTO TIPO ASTRO-70, CON LAMPARA DE 70W HALOGEN und S/ 5,825.58 S/ -
212050151 PASTORAL SIMPLE TIPO SUCRE und S/ 1,050.00 S/ -
212050152 PASTORAL DOBLE TIPO SUCRE und S/ 100.00 S/ -
212050153 REFLECTOR SIMILAR A ARAN, CON LAMPARA DE 150W HALO und S/ 1,475.20 S/ -
212050154 ARTEFACTO SIMILARA AHR-1X36 + KIT DE EMERGENCIA und S/ 3,471.07 S/ -
212050155 ARTEFACTO SIMILAR AHR-1X36 und S/ 1,423.11 S/ 355.78
212050156 CAMPANILLA DE TIMBRE DE 8" DE DIAMETRO und S/ 229.97 S/ -
212050157 CAMPANILLA DE TIMBRE DE 4" DE DIAMETRO und S/ 72.63 S/ 5.81
212050159 SENSOR DE TEMPERATURA Y/O HUMO und S/ 248.79 S/ -
212150002 CAJA GALV. RECT. PESADA 4" x 2" x 21/4" und S/ 846.77 S/ -
212150011 CAJA GALV. OCTOGONAL PESADA 4" und S/ 862.61 S/ 43.13
212150035 CAJA DE PASE GALVANIZADA 4" x 4" x 2" und S/ 366.50 S/ 91.62
212150036 CAJA DE PASE GALVANIZADA OCTOGONAL (100X55mm) und S/ 40.48 S/ 1.62
212150039 CAJA DE PASE GALVANIZADA (150X150X75mm) und S/ 185.13 S/ -
212150041 CAJA DE PASE GALVANIZADA (200X200X100mm) und S/ 145.86 S/ -
212150042 CAJA DE PASE GALVANIZADA (300X300X100mm) und S/ 224.00 S/ -
212150043 CAJA DE PASE GALVANIZADA (100X100X100mm) und S/ 93.51 S/ -
212150044 CAJA DE PASE GALVANIZADA (100X100X50mm) und S/ 31.64 S/ 7.91
212150045 TAPA CIEGA DE 300X300 und S/ 57.72 S/ -
212150046 TAPA CIEGA DE 200X200 und S/ 5.10 S/ 0.41
212150047 TAPA CIEGA DE 150X150 und S/ 3.63 S/ -
212150048 CAJA DE PASE GALVANIZADA (100X50X55mm) und S/ 9.71 S/ 0.49
212150049 TAPA CIEGA OCTOGONAL DE 100 und S/ 20.88 S/ 0.84
212250004 INTERRUPTOR 2 GOLPE SIMILAR TIPO TICINO und S/ 545.39 S/ -
212250078 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und S/ 1,140.92 S/ 285.23
212250080 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und S/ 1,106.35 S/ -
212250092 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und S/ 752.00 S/ -
212250093 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und S/ 465.18 S/ -
212250095 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und S/ 77.53 S/ -

IE696
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212250103 INTERRUPTOR TERMOMAGNETICO - 3 x 20 A und S/ 158.60 S/ -


212250132 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und S/ 354.38 S/ 88.59
212250134 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und S/ 470.00 S/ -
212250140 INTERRUPTOR DIFERENCIAL 2X25A-30MA und S/ 13,844.08 S/ 1,107.53
212250143 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und S/ 25.84 S/ -
212250144 INTERRUPTOR TERMOMAGNETICO - 2 x 50 A und S/ 24.68 S/ -
212250145 INTERRUPTOR 1 GOLPE SIMILAR TIPO TICINO und S/ 255.64 S/ 12.78
212250146 INTERRUPTOR DE CONMUTACION SIMILAR TIPO TICINO und S/ 1,025.89 S/ 256.47
212250147 INTERRUPTOR 3 GOLPES SIMILAR TIPO TICINO und S/ 300.07 S/ 12.00
212250148 PULSADOR DE TIMBRE und S/ 28.82 S/ -
212250150 INTERRUPTOR TERMOMAGNETICO - 2 x 40 A und S/ 34.91 S/ -
212250152 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 16KA und S/ 62.56 S/ -
212250153 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 20KA und S/ 250.23 S/ -
212250154 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A 20KA und S/ 83.65 S/ 20.91
212250155 INTERRUPTOR TERMOMAGNETICO- 3 x 70 A 16KA und S/ 62.56 S/ -
212250156 INTERRUPTOR DIFERENCIAL 2X40A-30MA und S/ 988.80 S/ 79.10
212250164 INTERRUPTOR TERMOMAGNETICO- 3 x 60 A 10KA und S/ 16.29 S/ -
212250168 INTERRUPTOR TERMOMAGNETICO-3 x 125 A 25KA und S/ 167.30 S/ 8.37
212250171 CONTACTOR ELECTRICO 2 X 20 A und S/ 319.32 S/ 12.77
212250172 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A 20KA und S/ 125.11 S/ -
212250173 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 20KA und S/ 32.59 S/ 8.15
212250174 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 16KA und S/ 32.59 S/ -
212250181 CONTROL DE NIVEL und S/ 281.19 S/ -
212250182 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA EN CISTERNA und S/ 86.52 S/ -
212250189 TG (TABLERO AUTOSOPORTADO, ITM: 11X40A 10KA, 4 2X20A 10KA, und S/ 4,549.17 S/ -
212250190 TG - 6 (TABLERO AUTOSOPORTADO, ITM: 2 2X40A, 3 2X20A, 1 2X60 2und S/ 3,536.33 S/ -
212300022 TOMA PARA RED DATA (DADO) und S/ 1,926.22 S/ 481.56
212300025 TOMACORRIENTE DOBLE C/ LINEA DE TIERRA SIMILAR TIPO TI und S/ 4,612.63 S/ -
212300028 TOMACORRIENTE DOBLE A PRUEBA DE AGUA und S/ 654.50 S/ 52.36
212350060 PLACA SALIDA PARA TV o TELEFONO und S/ 662.15 S/ -
212350062 PLACA DE ALUMINIO ANODIZADO 1 PERFORACION und S/ 1,058.20 S/ -
212350063 PLACA DE ALUMINIO ANODIZADO 2 PERFORACION und S/ 929.13 S/ 46.46
219600001 CABLE DESNUDO 50MM2 (1/0 AWG) m S/ 564.27 S/ 141.07
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 4,488.01 S/ 179.52
221030015 MARCO Y TAPA DE BUZON ELECTRICO und S/ 1,726.67 S/ -
221030016 MARCO Y TAPA DE BUZON COMUNICACIONES und S/ 2,461.01 S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 3.89 S/ -
230010030 CINTA TEFLON m S/ 0.11 S/ -
230010057 DOSIS QUIMICA THOR GEL DE 5 kg und S/ 1,362.78 S/ 340.70
230010136 CINTA AISLANTE ml S/ 1,105.15 S/ -
230010143 SELLADOR BLANCO PARA MUROS gal S/ 0.28 S/ 0.02

IE697
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

230010147 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal S/ 405.58 S/ -


230010151 ASCENSOR 03 PARADAS CON CUARTO DE MAQUINAS und S/ 29,880.67 S/ 1,494.03
230010155 ASCENSOR 02 PARADAS CON CUARTO DE MAQUINAS und S/ 28,540.28 S/ 1,141.61
230100010 EXTINTOR C02 DE 15 LIBRAS und S/ 736.71 S/ -
230990125 MANOMETRO DE GLICERINA DE 0-300psi und S/ 37.85 S/ 9.46
230990126 MANOMETRO DE GLICERINA DE 0-100psi und S/ 36.45 S/ -
230990127 BALON DE GAS 100 LBS (INCLUYE GAS) und S/ 782.80 S/ -
230990128 REGULADOR FISHER C/NIPLES DE CONEX R962 und S/ 597.40 S/ -
230990168 SUM. E INSTALACION DE SUB ESTACION ZONA ACADEMICA glb S/ 44,373.52 S/ -
230990169 SUM. E INSTALACION DE SUB ESTACION ZONA DEPORTIVA glb S/ 47,022.71 S/ -
230990171 TANQUE DE GAS DE 1000 GALONES (INC. ACCESORIOS Y VALV und S/ 3,738.90 S/ 934.73
230990176 MANOMETRO DE PRESION und S/ 48.00 S/ -
230990177 POOL DE CHICOTE COBRE ALTA PRESION TERMNAL TANQUE Y und S/ 17.33 S/ 1.39
231250001 CAJA DE CONCRETO C/TAPA und S/ 126.20 S/ -
231250025 CAJA DE CONCRETO C/TAPA 40 X 40 X 40 cm und S/ 107.12 S/ -
243010001 MADERA TORNILLO p2 S/ 542.04 S/ 27.10
243100001 MADERA CEDRO p2 S/ 0.06 S/ 0.02
251050005 BALON DE GAS 100 LBS (INCLUYE GAS) m S/ 45.99 S/ 1.84
251200002 PLATINA DE FIERRO 1/8" x 1" m S/ 1.76 S/ -
251200023 PLATINA DE FIERRO 114" X 1" m S/ 290.36 S/ -
251200096 PLATINA DE FIERRO 118" X 314" m S/ 1.36 S/ -
251300054 TUBERIA DE 0 2" ACEDRO CELULA 40 m S/ 36.86 S/ -
251300055 TUBERIA DE 0 1" ACEDRO CELULA 40 m S/ 17.85 S/ 4.46
251300056 UNION DE 0 2 ACEDRO CELULA 40 und S/ 13.27 S/ -
251300057 UNION DE 01" ACEDRO CELULA 40 und S/ 6.43 S/ 0.51
254150020 PINTURA ESMALTE qal S/ 4.94 S/ -
254200001 PINTURA ANTICORROSIVA qal S/ 14.65 S/ 0.73
261020015 PCHA FºGº P/MASTIL 118" 15x20cm C/ABRAZ und S/ 63.17 S/ 2.53
261020024 GABINETE METALICO CON BARRA DE COBRE 24 POLOS und S/ 4,482.22 S/ -
261020031 GABINETE METALICO CON BARRA DE COBRE 36 POLOS und S/ 1,184.50 S/ 296.13
261020034 CAJA PARA INTERRUPTOR und S/ 45.00 S/ -
261020035 GABINETE PARA EXTINTOR und S/ 186.21 S/ -
262010017 POSTE DE CONCRETO CENTRIF. 8ML und S/ 4,729.50 S/ -
262010019 POSTE DE CONCRETO CENTRIF. 25MU1200/210/585 PARA PAR und S/ 15,038.00 S/ -
262010021 TRANSPORTE TERRESTRE kg S/ 2,900.00 S/ -
262010022 POSTE DE CONCRETO ARMADO DE 11 MTS und S/ 1,086.67 S/ 271.67
262120005 PASTORAL DE CONCRETO CENTRIFUGADO PARA LUMINARIA und S/ 147.63 S/ -
265010035 TUBO PROTECTOR DE FºGº 2"x4m C/02 ABRAZ . und S/ 151.95 S/ 12.16
265010037 MASTIL DE FºGº 4" X9M C/ACOPLE S/DISEñO und S/ 673.33 S/ -
265010046 TUBERIA FºGº 1" m S/ 47.76 S/ -
265010066 TUBERIA FºGº 314" m S/ 46.34 S/ 2.32

IE698
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

265250008 CAJA METALICA PARA VALVULAS und S/ 35.31 S/ 8.83


265560039 NIPLE FºGº 2" und S/ 2.45 S/ 0.10
265560040 NIPLE FºGº 1" und S/ 1.84 S/ -
265560041 NIPLE FºGº 314" und S/ 1.28 S/ -
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 12.61 S/ -
265570032 UNION UNIVERSAL FºGº 1" und S/ 14.80 S/ -
265570038 UNION UNIVERSAL FºGº 2" und S/ 19.71 S/ 4.93
265590040 CODO FºGº 314 x 90º S/ 5.70
265590041 CODO FºGº 1" x 90º und S/ 8.00 S/ 0.64
268010001 TUBERIA DE COBRE TIPO "L" 112" m S/ 299.44 S/ -
268010002 TUBERIA DE COBRE TIPO "K" 2" m S/ 320.46 S/ 16.02
268010003 TUBERIA DE COBRE TIPO "K" 11/2" m S/ 160.23 S/ 6.41
268120002 PITON DE BRONCE DE 1/2" PARA SALIDA DE GAS und S/ 22.32 S/ -
268120003 CODO DE COBRE 1/2" und S/ 25.98 S/ 6.49
268120004 CODO DE COBRE 2" TIPO K und S/ 35.68 S/ -
268120005 CODO DE COBRE 1 1/2" TIPO K und S/ 14.08 S/ -
272200003 TUBO PVC-P (ELEC.) 20mm 3M m S/ 4,138.03 S/ -
272200004 TUBO PVC-P (ELEC.) 25mm 3M m S/ 308.98 S/ -
272200010 TUBO PVC-P (ELEC.) 100mm 3M m S/ 128.75 S/ -
272200011 TUBO PVC-P (ELEC.) 35mm 3M m S/ 1,310.68 S/ 327.67
272200012 TUBO PVC-P (ELEC.) 50mm 3M m S/ 1,492.58 S/ -
272200014 TUBO PVC-P (ELEC.) 75mm 3M m S/ 97.09 S/ 7.77
272220029 TUBERIA CONDUIT DE 20mm m S/ 122.62 S/ -
272220030 CONECTOR CONDUIT DE 20mm und S/ 47.10 S/ -
272220031 CURVA EMT CONDUIT DE 20mm und S/ 39.84 S/ 1.99
272500003 CURVA PVC-P (ELEC.) 20mm und S/ 551.41 S/ 137.85
272500004 CURVA PVC-P {ELEC.) 25mm und S/ 48.09 S/ 12.02
272500013 UNION SIMPLE PVC-P (ELEC.) 20mm und S/ 16.00 S/ -
272500025 CONECTOR PVC 025MM und S/ 8.36 S/ -
272500029 CURVA PVC-P (ELEC.) 100mm und S/ 41.91 S/ -
272500030 CURVA PVC-P (ELEC.) 35mm und S/ 310.33 S/ -
272500031 CURVA PVC-P (ELEC.) 50mm und S/ 200.35 S/ -
272500032 CURVA PVC-P (ELEC.) 75mm und S/ 30.29 S/ 7.57
272500033 UNION DE COBRE 1/2" und S/ 23.26 S/ -
272510147 UNION DE COBRE 2" TIPO K und S/ 6.31 S/ 0.50
272510148 UNION DE COBRE 11/2" TIPO K und S/ 2.80 S/ -
272520069 TAPON HEMBRA DE COBRE 1/2" und S/ 12.27 S/ -
272610005 TEE DE COBR E 1/2" und S/ 11.75 S/ 0.59
272610008 TEE DE COBRE 2" TIPO K m S/ 24.66 S/ 6.17
272610009 TEE DE COBRE 11/2" TIPO K m S/ 10.33 S/ 0.41
277010015 VALVULA DE GLOBO DE 1/2" PARA GAS und S/ 401.70 S/ -

IE699
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

277010020 VALVULA DE SEGURIDAD DE 1/2" PARA GAS und S/ 10.83 S/ -


277010021 VALVULA DE GLOBO DE 1" und S/ 109.80 S/ -
277010022 VALVULA DE GLOBO DE 3/4" und S/ 290.87 S/ -
277110011 VALVULA CHECK PESADA DE BRONCE D=2 " und S/ 42.44 S/ 10.61
277110027 VALVULA T PESADA DE BRONCE D=2" und S/ 42.44 S/ -
277210014 VÁLVULA REGULADORA DE PRESION DE 1ER Y 2DAAETAPA INC und S/ 96.67 S/ 3.87
277210022 VALVULA DE LLENADO S/ 32.62 S/ -
und
277210023 VALVULA DE RETORNO und S/ 30.56 S/ -
277210024 ACOPLES DE INYECCION und S/ 26.78 S/ -
277210025 ACOPLE DE RESTORNO und S/ 23.00 S/ 0.92
277210026 VALVULA DE SEGURIDAD ESFERICA 11/2" und S/ 93.33 S/ -
277210027 VALVULA DE SEGURIDAD ESFERICA 3/4" und S/ 43.33 S/ -
277210028 VALVULA DE ALIVIO DE PRESION und S/ 90.00 S/ -
277510018 SUMIDERO DE BRONCE 3" und S/ 36.80 S/ -
DEFICIENCIA
202100001 ALAMBRE NEGRO Nro. 8 kg S/ 13.65 S/ 3.41
202100002 ALAMBRE NEGRO Nro.16 kg S/ 4.93 S/ -
202200001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg S/ 14.25 S/ -
202400064 TORNILLO DE FIJACION 1" C TARUGOS PLASTICOS und S/ 1.00 S/ -
203010010 ACERO CORRUGADO GRADO 60 kg S/ 485.76 S/ -
204050001 ARENA GRUESA m3 S/ 569.50 S/ -
204050002 ARENA FINA m3 S/ 81.02 S/ 20.25
204100010 TIERRA CERNIDA m3 S/ 482.98 S/ -
205050001 PIEDRA CHANGADA DE 1/2" Y 3/4" m3 S/ 2,074.95 S/ 166.00
205350001 AGUA und S/ 19.11 S/ -
206200005 CONECTOR DE BARRA DE 5/8" Y 3/4" und S/ 536.35 S/ 26.82
207050009 CONEXIONA CAJA PVC ELEC. SAP 25MM und S/ 12.37 S/ 0.49
207900013 CONECTOR PVC 25mm und S/ 6.01 S/ -
206200011 CONECTOR PVC 55mm und S/ 45.01 S/ 11.25
206200019 CONECTOR PVC 20mm und S/ 221.42 S/ -
206200028 CONECTOR PVC 35mm und S/ 148.45 S/ -
206200030 CONECTOR PVC 100mm und S/ 8.44 S/ -
206200031 CONECTOR PVC 75mm und S/ 5.13 S/ -
206300002 CABLE HELICOIDAL DE 9m Cu und S/ 843.76 S/ -
206550023 VARILLA DE COBRE 3/4"x 2.40Ín C/PUNTA und S/ 1,728.27 S/ 432.07
206560001 CABLE 1x16mm2 COBRE DESNUDO m3 S/ 17.80 S/ -
206560002 CABLE 1x50mm2 COBRE DESNUDO m S/ 925.75 S/ 74.06
207050015 CONDUCTOR N2XOH - 1 x 300mm m S/ 2,293.19 S/ -
207050016 CONDUCTOR N2XOH - 1 x 25mm2 m S/ 1,162.81 S/ -
207050017 CONDUCTOR N2XOH-1 x 10mm2 m S/ 11,248.14 S/ 562.41

IE700
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

207050018 CONDUCTOR N2XOH - 1 x 6mm2 m S/ 3,531.68 S/ 882.92


207050019 CONDUCTOR N2XOH - 1 x 16mm2 m S/ 2,900.81 S/ 116.03
207050022 CONDUCTOR N2XOH -1 x 70mm2 m S/ 128.54 S/ -
207050023 CONDUCTOR N2XOH - 1 x 35mm2 m S/ 1,463.63 S/ -
207150013 CONDUCTOR NH-80, 4mm2 m S/ 4,475.89 S/ -
207150022 CONDUCTOR NH-80, 6mm2 m S/ 893.20 S/ -
207150023 CONDUCTOR NH-80, 2.5mm2 m S/ 10,650.04 S/ 2,662.51
211250005 CORTACIRCUITO PARA POSTE DE CONCRETO und S/ 796.53 S/ -
211250010 SOPORTE P/TENSADO MOD.SA-9 DE FºGº C/AISLADOR und S/ 93.92 S/ 7.51
211250012 SOPORTE P/TENSADO MOD.SA-7 DE FºGº C/AISLADOR und S/ 187.84 S/ -
211250041 CAPTOR CON DISPOSITIVO DE CEBADO und S/ 5,388.49 S/ 269.42
212050115 ARTEF. ILUMINACION DE EMERGENCIA C/2 LAMP. 20W, 2 HORA und S/ 13,555.36 S/ 542.21
212050123 ARTEFACTO SIMILAR RAS 3X36 und S/ 22,909.33 S/ -
212050124 ARTEFACTO SIMILAR RAS 2X36 und S/ 6,236.49 S/ 1,559.12
212050125 ARTEFACTO SIMILAR TPC 132 und S/ 5,162.99 S/ -
212050126 ARTEFACTO SIMILAR TPR 2X18 und S/ 5,796.57 S/ -
212050127 ARTEFACTO SIMILAR RSP 2X18W und S/ 4,633.93 S/ -
212050128 ARTEFACTO SIMILAR ULTR AA2X18 und S/ 747.43 S/ -
212050129 REFLECTOR TIPO ARAN 1X70 und S/ 520.66 S/ -
212050130 REFLECTOR TIPO MERH - 250 und S/ 1,249.60 S/ 312.40
212050131 ARTEFACTO SIMILAR A GEOTEC 1X35 und S/ 890.91 S/ -
212050132 ARTEFACTO PARA ADOSAR TIPO ALPHA SP.O A 1X20W und S/ 104.13 S/ 8.33
212050133 WALL SOKETE, CON LAMPARA AHORRADORA DE 20W und S/ 27.77 S/ -
212050134 BRAQUETE DE 2 LAMPARAS DE 18W SIMILAR A RSP-2 JOSFEL und S/ 2,343.00 S/ -
212050135 ARTEFACTO PARA ADOSAR, 1 LAMPARA DE 32 W, SIMILAR AL TI und S/ 1,703.25 S/ 85.16
212050136 ARTEFACTO PARA ADOSAR Y/O COLGAR, CON LAMPARA FLUOREC und S/ 3,147.27 S/ 786.82
212050137 ARTEFACTO ADOSADO, CON DOS LAMPARAS 18W, SIMILAR AL TI und S/ 87.93 S/ 3.52
212050138 ARTEFACTO PARA SUSPENDER, CON 2 LAMPARAS FLUORECENTESund S/ 1,700.86 S/ -
212050139 ARTEFACTO PARA ADOSAR, CON 3 LAMPARAS DE 36W, SIMILARund_x000D_ S/ 1,041.33 S/ -
212050140 ARTEFACTO PARA SUSPENDER, CON 3 FLUORECENTES DE 36_x000D_ und S/ 370.27 S/ -
212050141 W, SIMILAR AL
ARTEFACTO TIPOADOSAR,
PARA ISP 3x36W
CON LAMPARA FLUORECENTE DE 36W und S/ 592.43 S/ -
212050142 ARTEFACTOREFLECTOR CON LAMPARA DE 250 W, SIMILAR AL T und S/ 6,768.67 S/ 1,692.17
212050143 BRAQUETE REFLECTOR CON 2 LAMPARAS LED DE 18W SIMILAR und S/ 395.70 S/ -
212050144 ARTEFACTO PARA ADOSAR, SIMILAR AL TIPO ALPHA SPOT A, C und S/ 138.84 S/ 11.11
212050145 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 842.31 S/ -
212050146 ARTEFACTO PARA SUSPENDER, CON LAMPARA LED DE 36W, PROT und S/ 2,166.00 S/ 108.30
212050147 ARTEFACTO DE ILUMINACION CON LAMAPARA LED DE 36W, PROT und S/ 1,230.82 S/ 49.23
212050148 ARTEFACTO DE ILUMINACION CON LAMPARA LED DE 36W, PROTEC und S/ 3,429.50 S/ -
212050149 REFLECTORES CON LAMPARAS DE 250 W , HALOGENURO META und S/ 879.33 S/ 219.83
212050150 ARTEFACTO TIPO ASTRO-70, CON LAMPARA DE 70W HALOGEN und S/ 5,825.58 S/ -
212050151 PASTORAL SIMPLE TIPO SUCRE und S/ 1,050.00 S/ -

IE701
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212050152 PASTORAL DOBLE TIPO SUCRE und S/ 100.00 S/ -


212050153 REFLECTOR SIMILAR A ARAN, CON LAMPARA DE 150W HALO und S/ 1,475.20 S/ -
212050154 ARTEFACTO SIMILARA AHR-1X36 + KIT DE EMERGENCIA und S/ 3,471.07 S/ -
212050155 ARTEFACTO SIMILAR AHR-1X36 und S/ 1,423.11 S/ 355.78
212050156 CAMPANILLA DE TIMBRE DE 8" DE DIAMETRO und S/ 229.97 S/ -
212050157 CAMPANILLA DE TIMBRE DE 4" DE DIAMETRO und S/ 72.63 S/ 5.81
212050159 SENSOR DE TEMPERATURA Y/O HUMO und S/ 248.79 S/ -
212150002 CAJA GALV. RECT. PESADA 4" x 2" x 21/4" und S/ 846.77 S/ -
212150011 CAJA GALV. OCTOGONAL PESADA 4" und S/ 862.61 S/ 43.13
212150035 CAJA DE PASE GALVANIZADA 4" x 4" x 2" und S/ 366.50 S/ 91.62
212150036 CAJA DE PASE GALVANIZADA OCTOGONAL (100X55mm) und S/ 40.48 S/ 1.62
212150039 CAJA DE PASE GALVANIZADA (150X150X75mm) und S/ 185.13 S/ -
212150041 CAJA DE PASE GALVANIZADA (200X200X100mm) und S/ 145.86 S/ -
212150042 CAJA DE PASE GALVANIZADA (300X300X100mm) und S/ 224.00 S/ -
212150043 CAJA DE PASE GALVANIZADA (100X100X100mm) und S/ 93.51 S/ -
212150044 CAJA DE PASE GALVANIZADA (100X100X50mm) und S/ 31.64 S/ 7.91
212150045 TAPA CIEGA DE 300X300 und S/ 57.72 S/ -
212150046 TAPA CIEGA DE 200X200 und S/ 5.10 S/ 0.41
212150047 TAPA CIEGA DE 150X150 und S/ 3.63 S/ -
212150048 CAJA DE PASE GALVANIZADA (100X50X55mm) und S/ 9.71 S/ 0.49
212150049 TAPA CIEGA OCTOGONAL DE 100 und S/ 20.88 S/ 0.84
212250004 INTERRUPTOR 2 GOLPE SIMILAR TIPO TICINO und S/ 545.39 S/ -
212250078 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und S/ 1,140.92 S/ 285.23
212250080 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und S/ 1,106.35 S/ -
212250092 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und S/ 752.00 S/ -
212250093 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und S/ 465.18 S/ -
212250095 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und S/ 77.53 S/ -
212250103 INTERRUPTOR TERMOMAGNETICO - 3 x 20 A und S/ 158.60 S/ -
212250132 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und S/ 354.38 S/ 88.59
212250134 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und S/ 470.00 S/ -
212250140 INTERRUPTOR DIFERENCIAL 2X25A-30MA und S/ 13,844.08 S/ 1,107.53
212250143 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und S/ 25.84 S/ -
212250144 INTERRUPTOR TERMOMAGNETICO - 2 x 50 A und S/ 24.68 S/ -
212250145 INTERRUPTOR 1 GOLPE SIMILAR TIPO TICINO und S/ 255.64 S/ 12.78
212250146 INTERRUPTOR DE CONMUTACION SIMILAR TIPO TICINO und S/ 1,025.89 S/ 256.47
212250147 INTERRUPTOR 3 GOLPES SIMILAR TIPO TICINO und S/ 300.07 S/ 12.00
212250148 PULSADOR DE TIMBRE und S/ 28.82 S/ -
212250150 INTERRUPTOR TERMOMAGNETICO - 2 x 40 A und S/ 34.91 S/ -
212250152 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 16KA und S/ 62.56 S/ -
212250153 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A 20KA und S/ 250.23 S/ -
212250154 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A 20KA und S/ 83.65 S/ 20.91

IE702
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

212250155 INTERRUPTOR TERMOMAGNETICO- 3 x 70 A 16KA und S/ 62.56 S/ -


212250156 INTERRUPTOR DIFERENCIAL 2X40A-30MA und S/ 988.80 S/ 79.10
212250164 INTERRUPTOR TERMOMAGNETICO- 3 x 60 A 10KA und S/ 16.29 S/ -
212250168 INTERRUPTOR TERMOMAGNETICO-3 x 125 A 25KA und S/ 167.30 S/ 8.37
212250171 CONTACTOR ELECTRICO 2 X 20 A und S/ 319.32 S/ 12.77
212250172 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A 20KA und S/ 125.11 S/ -
212250173 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 20KA und S/ 32.59 S/ 8.15
212250174 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A 16KA und S/ 32.59 S/ -
212250181 CONTROL DE NIVEL und S/ 281.19 S/ -
212250182 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA EN CISTERNA und S/ 86.52 S/ -
212250189 TG (TABLERO AUTOSOPORTADO, ITM: 11X40A 10KA, 4 2X20A 10KA, und S/ 4,549.17 S/ -
212250190 TG - 6 (TABLERO AUTOSOPORTADO, ITM: 2 2X40A, 3 2X20A, 1 2X60 2und S/ 3,536.33 S/ -
212300022 TOMA PARA RED DATA (DADO) und S/ 1,926.22 S/ 481.56
212300025 TOMACORRIENTE DOBLE C/ LINEA DE TIERRA SIMILAR TIPO TI und S/ 4,612.63 S/ -
212300028 TOMACORRIENTE DOBLE A PRUEBA DE AGUA und S/ 654.50 S/ 52.36
212350060 PLACA SALIDA PARA TV o TELEFONO und S/ 662.15 S/ -
212350062 PLACA DE ALUMINIO ANODIZADO 1 PERFORACION und S/ 1,058.20 S/ -
212350063 PLACA DE ALUMINIO ANODIZADO 2 PERFORACION und S/ 929.13 S/ 46.46
219600001 CABLE DESNUDO 50MM2 (1/0 AWG) m S/ 564.27 S/ 141.07
221010001 CEMENTO PORTLAND TIPO I x 42.5 kg bl S/ 4,488.01 S/ 179.52
221030015 MARCO Y TAPA DE BUZON ELECTRICO und S/ 1,726.67 S/ -
221030016 MARCO Y TAPA DE BUZON COMUNICACIONES und S/ 2,461.01 S/ -
226450005 CANDADO DE BRONCE 40mm TIPO PESADO und S/ 3.89 S/ -
230010030 CINTA TEFLON m S/ 0.11 S/ -
230010057 DOSIS QUIMICA THOR GEL DE 5 kg und S/ 1,362.78 S/ 340.70
230010136 CINTA AISLANTE ml S/ 1,105.15 S/ -
230010143 SELLADOR BLANCO PARA MUROS gal S/ 0.28 S/ 0.02
230010147 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal S/ 405.58 S/ -
230010151 ASCENSOR 03 PARADAS CON CUARTO DE MAQUINAS und S/ 29,880.67 S/ 1,494.03
230010155 ASCENSOR 02 PARADAS CON CUARTO DE MAQUINAS und S/ 28,540.28 S/ 1,141.61
230100010 EXTINTOR C02 DE 15 LIBRAS und S/ 736.71 S/ -
230990125 MANOMETRO DE GLICERINA DE 0-300psi und S/ 37.85 S/ 9.46
230990126 MANOMETRO DE GLICERINA DE 0-100psi und S/ 36.45 S/ -
230990127 BALON DE GAS 100 LBS (INCLUYE GAS) und S/ 782.80 S/ -
230990128 REGULADOR FISHER C/NIPLES DE CONEX R962 und S/ 597.40 S/ -
230990168 SUM. E INSTALACION DE SUB ESTACION ZONA ACADEMICA glb S/ 44,373.52 S/ -
230990169 SUM. E INSTALACION DE SUB ESTACION ZONA DEPORTIVA glb S/ 47,022.71 S/ -
230990171 TANQUE DE GAS DE 1000 GALONES (INC. ACCESORIOS Y VALV und S/ 3,738.90 S/ 934.73
230990176 MANOMETRO DE PRESION und S/ 48.00 S/ -
230990177 POOL DE CHICOTE COBRE ALTA PRESION TERMNAL TANQUE Y und S/ 17.33 S/ 1.39
231250001 CAJA DE CONCRETO C/TAPA und S/ 126.20 S/ -

IE703
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

231250025 CAJA DE CONCRETO C/TAPA 40 X 40 X 40 cm und S/ 107.12 S/ -


243010001 MADERA TORNILLO p2 S/ 542.04 S/ 27.10
243100001 MADERA CEDRO p2 S/ 0.06 S/ 0.02
251050005 BALON DE GAS 100 LBS (INCLUYE GAS) m S/ 45.99 S/ 1.84
251200002 PLATINA DE FIERRO 1/8" x 1" m S/ 1.76 S/ -
251200023 PLATINA DE FIERRO 114" X 1" m S/ 290.36 S/ -
251200096 PLATINA DE FIERRO 118" X 314" m S/ 1.36 S/ -
251300054 TUBERIA DE 0 2" ACEDRO CELULA 40 m S/ 36.86 S/ -
251300055 TUBERIA DE 0 1" ACEDRO CELULA 40 m S/ 17.85 S/ 4.46
251300056 UNION DE 0 2 ACEDRO CELULA 40 und S/ 13.27 S/ -
251300057 UNION DE 01" ACEDRO CELULA 40 und S/ 6.43 S/ 0.51
254150020 PINTURA ESMALTE qal S/ 4.94 S/ -
254200001 PINTURA ANTICORROSIVA qal S/ 14.65 S/ 0.73
261020015 PCHA FºGº P/MASTIL 118" 15x20cm C/ABRAZ und S/ 63.17 S/ 2.53
261020024 GABINETE METALICO CON BARRA DE COBRE 24 POLOS und S/ 4,482.22 S/ -
261020031 GABINETE METALICO CON BARRA DE COBRE 36 POLOS und S/ 1,184.50 S/ 296.13
261020034 CAJA PARA INTERRUPTOR und S/ 45.00 S/ -
261020035 GABINETE PARA EXTINTOR und S/ 186.21 S/ -
262010017 POSTE DE CONCRETO CENTRIF. 8ML und S/ 4,729.50 S/ -
262010019 POSTE DE CONCRETO CENTRIF. 25MU1200/210/585 PARA PAR und S/ 15,038.00 S/ -
262010021 TRANSPORTE TERRESTRE kg S/ 2,900.00 S/ -
262010022 POSTE DE CONCRETO ARMADO DE 11 MTS und S/ 1,086.67 S/ 271.67
262120005 PASTORAL DE CONCRETO CENTRIFUGADO PARA LUMINARIA und S/ 147.63 S/ -
265010035 TUBO PROTECTOR DE FºGº 2"x4m C/02 ABRAZ . und S/ 151.95 S/ 12.16
265010037 MASTIL DE FºGº 4" X9M C/ACOPLE S/DISEñO und S/ 673.33 S/ -
265010046 TUBERIA FºGº 1" m S/ 47.76 S/ -
265010066 TUBERIA FºGº 314" m S/ 46.34 S/ 2.32
265250008 CAJA METALICA PARA VALVULAS und S/ 35.31 S/ 8.83
265560039 NIPLE FºGº 2" und S/ 2.45 S/ 0.10
265560040 NIPLE FºGº 1" und S/ 1.84 S/ -
265560041 NIPLE FºGº 314" und S/ 1.28 S/ -
265570031 UNION UNIVERSAL FºGº 3/4" und S/ 12.61 S/ -
265570032 UNION UNIVERSAL FºGº 1" und S/ 14.80 S/ -
265570038 UNION UNIVERSAL FºGº 2" und S/ 19.71 S/ 4.93
265590040 CODO FºGº 314 x 90º S/ 5.70
265590041 CODO FºGº 1" x 90º und S/ 8.00 S/ 0.64
268010001 TUBERIA DE COBRE TIPO "L" 112" m S/ 299.44 S/ -
268010002 TUBERIA DE COBRE TIPO "K" 2" m S/ 320.46 S/ 16.02
268010003 TUBERIA DE COBRE TIPO "K" 11/2" m S/ 160.23 S/ 6.41
268120002 PITON DE BRONCE DE 1/2" PARA SALIDA DE GAS und S/ 22.32 S/ -
268120003 CODO DE COBRE 1/2" und S/ 25.98 S/ 6.49

IE704
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

268120004 CODO DE COBRE 2" TIPO K und S/ 35.68 S/ -


268120005 CODO DE COBRE 1 1/2" TIPO K und S/ 14.08 S/ -
272200003 TUBO PVC-P (ELEC.) 20mm 3M m S/ 4,138.03 S/ -
272200004 TUBO PVC-P (ELEC.) 25mm 3M m S/ 308.98 S/ -
272200010 TUBO PVC-P (ELEC.) 100mm 3M m S/ 128.75 S/ -
272200011 TUBO PVC-P (ELEC.) 35mm 3M m S/ 1,310.68 S/ 327.67
272200012 TUBO PVC-P (ELEC.) 50mm 3M m S/ 1,492.58 S/ -
272200014 TUBO PVC-P (ELEC.) 75mm 3M m S/ 97.09 S/ 7.77
272220029 TUBERIA CONDUIT DE 20mm m S/ 122.62 S/ -
272220030 CONECTOR CONDUIT DE 20mm und S/ 47.10 S/ -
272220031 CURVA EMT CONDUIT DE 20mm und S/ 39.84 S/ 1.99
272500003 CURVA PVC-P (ELEC.) 20mm und S/ 551.41 S/ 137.85
272500004 CURVA PVC-P {ELEC.) 25mm und S/ 48.09 S/ 12.02
272500013 UNION SIMPLE PVC-P (ELEC.) 20mm und S/ 16.00 S/ -
272500025 CONECTOR PVC 025MM und S/ 8.36 S/ -
272500029 CURVA PVC-P (ELEC.) 100mm und S/ 41.91 S/ -
272500030 CURVA PVC-P (ELEC.) 35mm und S/ 310.33 S/ -
272500031 CURVA PVC-P (ELEC.) 50mm und S/ 200.35 S/ -
272500032 CURVA PVC-P (ELEC.) 75mm und S/ 30.29 S/ 7.57
272500033 UNION DE COBRE 1/2" und S/ 23.26 S/ -
272510147 UNION DE COBRE 2" TIPO K und S/ 6.31 S/ 0.50
272510148 UNION DE COBRE 11/2" TIPO K und S/ 2.80 S/ -
272520069 TAPON HEMBRA DE COBRE 1/2" und S/ 12.27 S/ -
272610005 TEE DE COBR E 1/2" und S/ 11.75 S/ 0.59
272610008 TEE DE COBRE 2" TIPO K m S/ 24.66 S/ 6.17
272610009 TEE DE COBRE 11/2" TIPO K m S/ 10.33 S/ 0.41
277010015 VALVULA DE GLOBO DE 1/2" PARA GAS und S/ 401.70 S/ -
277010020 VALVULA DE SEGURIDAD DE 1/2" PARA GAS und S/ 10.83 S/ -
277010021 VALVULA DE GLOBO DE 1" und S/ 109.80 S/ -
277010022 VALVULA DE GLOBO DE 3/4" und S/ 290.87 S/ -
277110011 VALVULA CHECK PESADA DE BRONCE D=2 " und S/ 42.44 S/ 10.61
277110027 VALVULA T PESADA DE BRONCE D=2" und S/ 42.44 S/ -
277210014 VÁLVULA REGULADORA DE PRESION DE 1ER Y 2DAAETAPA INC und S/ 96.67 S/ 3.87
277210022 VALVULA DE LLENADO S/ 32.62 S/ -
und
277210023 VALVULA DE RETORNO und S/ 30.56 S/ -
277210024 ACOPLES DE INYECCION und S/ 26.78 S/ -
277210025 ACOPLE DE RESTORNO und S/ 23.00 S/ 0.92
277210026 VALVULA DE SEGURIDAD ESFERICA 11/2" und S/ 93.33 S/ -
277210027 VALVULA DE SEGURIDAD ESFERICA 3/4" und S/ 43.33 S/ -
277210028 VALVULA DE ALIVIO DE PRESION und S/ 90.00 S/ -
277510018 SUMIDERO DE BRONCE 3" und S/ 36.80 S/ -

IE705
CRONOGRAMA DE ADQUISICION DE MATERIALES - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑO
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 03
DE 01/02/2020

Código MAETRIALES Unidad Parcial S/. A 29/02/2020

TOTAL S/ 1,233,680.60 S/ 57,049.78

AVANCE PARCIAL 4.62%

AVANCE ACUMULADO 10.29%

IE706
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 3.41 S/ - S/ - S/ - S/ - S/ -
S/ 1.23 S/ 1.23 S/ 1.23 S/ 1.23 S/ - S/ -
S/ - S/ - S/ - S/ 3.56 S/ 3.56 S/ 3.56
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 121.44 S/ -
S/ 85.42 S/ 85.42 S/ 85.42 S/ 85.42 S/ 85.42 S/ 85.42
S/ 20.25 S/ 20.25 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 72.45 S/ 72.45 S/ 72.45 S/ 72.45
S/ 166.00 S/ 311.24 S/ 311.24 S/ 248.99 S/ 248.99 S/ 311.24
S/ - S/ - S/ - S/ - S/ 1.53 S/ 1.53
S/ 26.82 S/ 26.82 S/ 26.82 S/ 26.82 S/ 26.82 S/ 26.82
S/ 0.49 S/ 0.74 S/ 0.74 S/ 0.74 S/ 0.99 S/ 0.99
S/ - S/ 1.50 S/ 1.20 S/ 1.80 S/ 1.20 S/ 0.30
S/ 11.25 S/ - S/ - S/ - S/ - S/ -
S/ 55.36 S/ 55.36 S/ 55.36 S/ 55.36 S/ - S/ -
S/ - S/ - S/ - S/ 37.11 S/ 37.11 S/ 37.11
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.28 S/ -
S/ 126.56 S/ 126.56 S/ 126.56 S/ 126.56 S/ 126.56 S/ 126.56
S/ 432.07 S/ 432.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 74.06 S/ 138.86 S/ 138.86 S/ 111.09 S/ 111.09 S/ 138.86
S/ - S/ - S/ - S/ 183.45 S/ 183.45 S/ 183.45
S/ - S/ 290.70 S/ 290.70 S/ 290.70 S/ 290.70 S/ -
S/ 562.41 S/ 562.41 S/ 562.41 S/ 1,124.81 S/ 1,687.22 S/ 1,687.22
S/ 882.92 S/ 882.92 S/ - S/ - S/ - S/ -
S/ 174.05 S/ 232.06 S/ 290.08 S/ 174.05 S/ 261.07 S/ 464.13
S/ - S/ - S/ - S/ 32.14 S/ 32.14 S/ 32.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1,118.97 S/ -
S/ 133.98 S/ 133.98 S/ 133.98 S/ 133.98 S/ 133.98 S/ 133.98
S/ 2,662.51 S/ 2,662.51 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 119.48 S/ 119.48 S/ 119.48 S/ 119.48
S/ 7.51 S/ 14.09 S/ 14.09 S/ 11.27 S/ 11.27 S/ 14.09
S/ - S/ - S/ - S/ 15.03 S/ 15.03 S/ 15.03
S/ 269.42 S/ 269.42 S/ 269.42 S/ 269.42 S/ 269.42 S/ 269.42
S/ 542.21 S/ 813.32 S/ 813.32 S/ 813.32 S/ 1,084.43 S/ 1,084.43
S/ - S/ 5,727.33 S/ 4,581.87 S/ 6,872.80 S/ 4,581.87 S/ 1,145.47

IE707
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 1,559.12 S/ - S/ - S/ - S/ - S/ -
S/ 1,290.75 S/ 1,290.75 S/ 1,290.75 S/ 1,290.75 S/ - S/ -
S/ - S/ - S/ - S/ 1,449.14 S/ 1,449.14 S/ 1,449.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 74.74 S/ -
S/ 78.10 S/ 78.10 S/ 78.10 S/ 78.10 S/ 78.10 S/ 78.10
S/ 312.40 S/ 312.40 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 133.64 S/ 133.64 S/ 133.64 S/ 133.64
S/ 8.33 S/ 15.62 S/ 15.62 S/ 12.50 S/ 12.50 S/ 15.62
S/ - S/ - S/ - S/ 2.22 S/ 2.22 S/ 2.22
S/ - S/ 585.75 S/ 585.75 S/ 585.75 S/ 585.75 S/ -
S/ 85.16 S/ 85.16 S/ 85.16 S/ 170.33 S/ 255.49 S/ 255.49
S/ 786.82 S/ 786.82 S/ - S/ - S/ - S/ -
S/ 5.28 S/ 7.03 S/ 8.79 S/ 5.28 S/ 7.91 S/ 14.07
S/ - S/ - S/ - S/ 425.22 S/ 425.22 S/ 425.22
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 55.54 S/ -
S/ 88.86 S/ 88.86 S/ 88.86 S/ 88.86 S/ 88.86 S/ 88.86
S/ 1,692.17 S/ 1,692.17 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 59.36 S/ 59.36 S/ 59.36 S/ 59.36
S/ 11.11 S/ 20.83 S/ 20.83 S/ 16.66 S/ 16.66 S/ 20.83
S/ - S/ - S/ - S/ 67.39 S/ 67.39 S/ 67.39
S/ 108.30 S/ 108.30 S/ 108.30 S/ 108.30 S/ 108.30 S/ 108.30
S/ 49.23 S/ 73.85 S/ 73.85 S/ 73.85 S/ 86.16 S/ 98.47
S/ - S/ 857.38 S/ 685.90 S/ 1,028.85 S/ 685.90 S/ 171.48
S/ 219.83 S/ - S/ - S/ - S/ - S/ -
S/ 1,456.40 S/ 1,456.40 S/ 1,456.40 S/ 1,456.40 S/ - S/ -
S/ - S/ - S/ - S/ 262.50 S/ 262.50 S/ 262.50
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 368.80 S/ -
S/ 520.66 S/ 520.66 S/ 520.66 S/ 520.66 S/ 520.66 S/ 520.66
S/ 355.78 S/ 355.78 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 34.50 S/ 34.50 S/ 34.50 S/ 34.50
S/ 5.81 S/ 10.89 S/ 10.89 S/ 8.72 S/ 8.72 S/ 10.89
S/ - S/ - S/ - S/ 19.90 S/ 19.90 S/ 24.88
S/ - S/ 211.69 S/ 211.69 S/ 211.69 S/ 211.69 S/ -
S/ 43.13 S/ 43.13 S/ 43.13 S/ 86.26 S/ 129.39 S/ 129.39
S/ 91.62 S/ 91.62 S/ - S/ - S/ - S/ -
S/ 2.43 S/ 3.24 S/ 4.05 S/ 2.43 S/ 3.64 S/ 6.48
S/ - S/ - S/ - S/ 46.28 S/ 46.28 S/ 46.28
S/ - S/ - S/ - S/ - S/ - S/ -

IE708
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ - S/ - S/ 22.40 S/ -
S/ 14.03 S/ 14.03 S/ 14.03 S/ 14.03 S/ 14.03 S/ 14.03
S/ 7.91 S/ 7.91 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 8.66 S/ 8.66 S/ 8.66 S/ 8.66
S/ 0.41 S/ 0.77 S/ 0.77 S/ 0.61 S/ 0.61 S/ 0.77
S/ - S/ - S/ - S/ 0.29 S/ 0.29 S/ 0.29
S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.49
S/ 0.84 S/ 1.25 S/ 1.25 S/ 1.25 S/ 1.67 S/ 1.46
S/ - S/ 136.35 S/ 109.08 S/ 163.62 S/ 109.08 S/ 27.27
S/ 285.23 S/ - S/ - S/ - S/ - S/ -
S/ 276.59 S/ 276.59 S/ 276.59 S/ 276.59 S/ - S/ -
S/ - S/ - S/ - S/ 188.00 S/ 188.00 S/ 188.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 19.38 S/ -
S/ 23.79 S/ 23.79 S/ 23.79 S/ 23.79 S/ 23.79 S/ 23.79
S/ 88.59 S/ 88.59 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 70.50 S/ 70.50 S/ 70.50 S/ 70.50
S/ 1,107.53 S/ 2,076.61 S/ 2,076.61 S/ 1,661.29 S/ 1,661.29 S/ 2,076.61
S/ - S/ - S/ - S/ 2.07 S/ 2.07 S/ 2.58
S/ - S/ 6.17 S/ 6.17 S/ 6.17 S/ 6.17 S/ -
S/ 12.78 S/ 12.78 S/ 12.78 S/ 38.35 S/ 38.35 S/ 38.35
S/ 256.47 S/ 256.47 S/ - S/ - S/ - S/ -
S/ 18.00 S/ 24.01 S/ 30.01 S/ 18.00 S/ 27.01 S/ 48.01
S/ - S/ - S/ - S/ 7.21 S/ 7.21 S/ 7.21
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 9.38 S/ -
S/ 37.53 S/ 37.53 S/ 37.53 S/ 37.53 S/ 37.53 S/ 37.53
S/ 20.91 S/ 20.91 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 9.38 S/ 9.38 S/ 9.38 S/ 9.38
S/ 79.10 S/ 148.32 S/ 148.32 S/ 118.66 S/ 118.66 S/ 148.32
S/ - S/ - S/ - S/ 1.30 S/ 1.30 S/ 1.63
S/ 8.37 S/ 8.37 S/ 8.37 S/ 8.37 S/ 8.37 S/ 8.37
S/ 12.77 S/ 19.16 S/ 19.16 S/ 19.16 S/ 25.55 S/ 25.55
S/ - S/ 31.28 S/ 25.02 S/ 37.53 S/ 25.02 S/ 6.26
S/ 8.15 S/ - S/ - S/ - S/ - S/ -
S/ 8.15 S/ 8.15 S/ 8.15 S/ 8.15 S/ - S/ -
S/ - S/ - S/ - S/ 70.30 S/ 70.30 S/ 70.30
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 682.38 S/ -
S/ 530.45 S/ 530.45 S/ 530.45 S/ 530.45 S/ 530.45 S/ 530.45
S/ 481.56 S/ 481.56 S/ - S/ - S/ - S/ -

IE709
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ 691.89 S/ 691.89 S/ 691.89 S/ 691.89


S/ 52.36 S/ 98.18 S/ 98.18 S/ 78.54 S/ 78.54 S/ 98.18
S/ - S/ - S/ - S/ 52.97 S/ 52.97 S/ 52.97
S/ - S/ 264.55 S/ 264.55 S/ 264.55 S/ 264.55 S/ -
S/ 46.46 S/ 46.46 S/ 46.46 S/ 139.37 S/ 139.37 S/ 139.37
S/ 141.07 S/ 141.07 S/ - S/ - S/ - S/ -
S/ 269.28 S/ 359.04 S/ 448.80 S/ 269.28 S/ 403.92 S/ 718.08
S/ - S/ - S/ - S/ 431.67 S/ 431.67 S/ 431.67
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.58 S/ -
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 340.70 S/ 340.70 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 165.77 S/ 165.77 S/ 165.77 S/ 165.77
S/ 0.02 S/ 0.04 S/ 0.04 S/ 0.03 S/ 0.03 S/ 0.04
S/ - S/ - S/ - S/ 32.45 S/ 32.45 S/ 32.45
S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 1,494.03
S/ 1,141.61 S/ 1,712.42 S/ 1,712.42 S/ 1,712.42 S/ 2,283.22 S/ 1,997.82
S/ - S/ 184.18 S/ 147.34 S/ 221.01 S/ 147.34 S/ 36.84
S/ 9.46 S/ - S/ - S/ - S/ - S/ -
S/ 9.11 S/ 9.11 S/ 9.11 S/ 9.11 S/ - S/ -
S/ - S/ - S/ - S/ 195.70 S/ 195.70 S/ 195.70
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 6,656.03 S/ -
S/ 7,053.41 S/ 7,053.41 S/ 7,053.41 S/ 7,053.41 S/ 7,053.41 S/ 7,053.41
S/ 934.73 S/ 934.73 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 7.20 S/ 7.20 S/ 7.20 S/ 7.20
S/ 1.39 S/ 2.60 S/ 2.60 S/ 2.08 S/ 2.08 S/ 2.60
S/ - S/ - S/ - S/ 10.10 S/ 10.10 S/ 8.83
S/ - S/ 26.78 S/ 26.78 S/ 26.78 S/ 26.78 S/ -
S/ 27.10 S/ 27.10 S/ 27.10 S/ 54.20 S/ 81.31 S/ 81.31
S/ 0.02 S/ 0.02 S/ - S/ - S/ - S/ -
S/ 2.76 S/ 3.68 S/ 4.60 S/ 2.76 S/ 4.14 S/ 7.36
S/ - S/ - S/ - S/ 0.44 S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.20 S/ -
S/ 5.53 S/ 5.53 S/ 5.53 S/ 5.53 S/ 5.53 S/ 5.53
S/ 4.46 S/ 4.46 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ 0.51 S/ 0.96 S/ 0.96 S/ 0.77 S/ 0.77 S/ 0.96
S/ - S/ - S/ - S/ 0.40 S/ 0.40 S/ 0.35
S/ 0.73 S/ 0.73 S/ 0.73 S/ 0.73 S/ 0.73 S/ 0.73

IE710
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 2.53 S/ 3.79 S/ 3.79 S/ 3.79 S/ 5.05 S/ 4.42


S/ - S/ 1,120.55 S/ 896.44 S/ 1,344.67 S/ 896.44 S/ 224.11
S/ 296.13 S/ - S/ - S/ - S/ - S/ -
S/ 11.25 S/ 11.25 S/ 11.25 S/ 11.25 S/ - S/ -
S/ - S/ - S/ - S/ 46.55 S/ 46.55 S/ 46.55
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 2,255.70 S/ -
S/ 435.00 S/ 435.00 S/ 435.00 S/ 435.00 S/ 435.00 S/ 435.00
S/ 271.67 S/ 271.67 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 22.15 S/ 22.15 S/ 22.15 S/ 22.15
S/ 12.16 S/ 22.79 S/ 22.79 S/ 18.23 S/ 18.23 S/ 22.79
S/ - S/ - S/ - S/ 53.87 S/ 53.87 S/ 47.13
S/ - S/ 11.94 S/ 11.94 S/ 11.94 S/ 11.94 S/ -
S/ 2.32 S/ 2.32 S/ 2.32 S/ 4.63 S/ 6.95 S/ 6.95
S/ 8.83 S/ 8.83 S/ - S/ - S/ - S/ -
S/ 0.15 S/ 0.20 S/ 0.25 S/ 0.15 S/ 0.22 S/ 0.39
S/ - S/ - S/ - S/ 0.46 S/ 0.46 S/ 0.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.89 S/ -
S/ 2.22 S/ 2.22 S/ 2.22 S/ 2.22 S/ 2.22 S/ 2.22
S/ 4.93 S/ 4.93 S/ - S/ - S/ - S/ -

S/ 0.64 S/ 1.20 S/ 1.20 S/ 0.96 S/ 0.96 S/ 1.20


S/ - S/ - S/ - S/ 23.96 S/ 23.96 S/ 20.96
S/ 16.02 S/ 16.02 S/ 16.02 S/ 16.02 S/ 16.02 S/ 16.02
S/ 6.41 S/ 9.61 S/ 9.61 S/ 9.61 S/ 11.22 S/ 11.22
S/ - S/ 5.58 S/ 4.46 S/ 6.70 S/ 4.46 S/ 1.12
S/ 6.49 S/ - S/ - S/ - S/ - S/ -
S/ 8.92 S/ 8.92 S/ 8.92 S/ 8.92 S/ - S/ -
S/ - S/ - S/ - S/ 3.52 S/ 3.52 S/ 3.52
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 46.35 S/ -
S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31
S/ 327.67 S/ 327.67 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 223.89 S/ 223.89 S/ 223.89 S/ 223.89
S/ 7.77 S/ 14.56 S/ 14.56 S/ 11.65 S/ 11.65 S/ 14.56
S/ - S/ - S/ - S/ 9.81 S/ 9.81 S/ 8.58
S/ - S/ 11.78 S/ 11.78 S/ 11.78 S/ 11.78 S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 3.98 S/ 5.98 S/ 5.98
S/ 137.85 S/ 137.85 S/ - S/ - S/ - S/ -
S/ 12.02 S/ - S/ - S/ - S/ - S/ -

IE711
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 4.00 S/ 4.00 S/ 4.00 S/ 4.00 S/ - S/ -


S/ - S/ - S/ - S/ 2.09 S/ 2.09 S/ 2.09
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 46.55 S/ -
S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05
S/ 7.57 S/ 7.57 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.49 S/ 3.49 S/ 3.49 S/ 3.49
S/ 0.50 S/ 0.95 S/ 0.95 S/ 0.76 S/ 0.76 S/ 0.95
S/ - S/ - S/ - S/ 0.22 S/ 0.22 S/ 0.20
S/ - S/ 3.07 S/ 3.07 S/ 3.07 S/ 3.07 S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 1.18 S/ 1.76 S/ 1.76
S/ 6.17 S/ 6.17 S/ - S/ - S/ - S/ -
S/ 0.62 S/ 0.83 S/ 1.03 S/ 0.62 S/ 0.93 S/ 1.65
S/ - S/ - S/ - S/ 100.43 S/ 100.43 S/ 100.43
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 16.47 S/ -
S/ 43.63 S/ 43.63 S/ 43.63 S/ 43.63 S/ 43.63 S/ 43.63
S/ 10.61 S/ 10.61 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 6.37 S/ 6.37 S/ 6.37 S/ 6.37
S/ 5.80 S/ 7.73 S/ 9.67 S/ 5.80 S/ 8.70 S/ 15.47
S/ - S/ - S/ - S/ 8.15 S/ 8.15 S/ 8.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 4.02 S/ -
S/ 1.38 S/ 1.84 S/ 2.30 S/ 1.38 S/ 2.07 S/ 3.68
S/ - S/ - S/ - S/ 23.33 S/ 23.33 S/ 23.33
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 13.50 S/ -
S/ 5.52 S/ 5.52 S/ 5.52 S/ 5.52 S/ 5.52 S/ 5.52

S/ 3.41 S/ - S/ - S/ - S/ - S/ -
S/ 1.23 S/ 1.23 S/ 1.23 S/ 1.23 S/ - S/ -
S/ - S/ - S/ - S/ 3.56 S/ 3.56 S/ 3.56
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 72.86 S/ -
S/ 85.42 S/ 85.42 S/ 85.42 S/ 85.42 S/ 85.42 S/ 85.42
S/ 20.25 S/ 20.25 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 72.45 S/ 72.45 S/ 72.45 S/ 72.45
S/ 166.00 S/ 311.24 S/ 311.24 S/ 248.99 S/ 248.99 S/ 311.24
S/ - S/ - S/ - S/ 1.53 S/ 1.53 S/ 1.34
S/ 26.82 S/ 26.82 S/ 26.82 S/ 26.82 S/ 26.82 S/ 26.82

IE712
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 0.49 S/ 0.74 S/ 0.74 S/ 0.74 S/ 0.99 S/ 0.87


S/ - S/ 1.50 S/ 1.20 S/ 1.80 S/ 1.20 S/ 0.30
S/ 11.25 S/ - S/ - S/ - S/ - S/ -
S/ 55.36 S/ 55.36 S/ 55.36 S/ 55.36 S/ - S/ -
S/ - S/ - S/ - S/ 37.11 S/ 37.11 S/ 37.11
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.51 S/ -
S/ 126.56 S/ 126.56 S/ 126.56 S/ 126.56 S/ 126.56 S/ 126.56
S/ 432.07 S/ 432.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 74.06 S/ 138.86 S/ 138.86 S/ 111.09 S/ 111.09 S/ 138.86
S/ - S/ - S/ - S/ 183.45 S/ 183.45 S/ 160.52
S/ - S/ 290.70 S/ 290.70 S/ 290.70 S/ 290.70 S/ -
S/ 562.41 S/ 562.41 S/ 562.41 S/ 1,124.81 S/ 1,687.22 S/ 1,687.22
S/ 882.92 S/ 882.92 S/ - S/ - S/ - S/ -
S/ 174.05 S/ 232.06 S/ 290.08 S/ 174.05 S/ 261.07 S/ 464.13
S/ - S/ - S/ - S/ 32.14 S/ 32.14 S/ 32.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 671.38 S/ -
S/ 133.98 S/ 133.98 S/ 133.98 S/ 133.98 S/ 133.98 S/ 133.98
S/ 2,662.51 S/ 2,662.51 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 119.48 S/ 119.48 S/ 119.48 S/ 119.48
S/ 7.51 S/ 14.09 S/ 14.09 S/ 11.27 S/ 11.27 S/ 14.09
S/ - S/ - S/ - S/ 15.03 S/ 15.03 S/ 13.15
S/ 269.42 S/ 269.42 S/ 269.42 S/ 269.42 S/ 269.42 S/ 269.42
S/ 542.21 S/ 813.32 S/ 813.32 S/ 813.32 S/ 1,084.43 S/ 948.88
S/ - S/ 5,727.33 S/ 4,581.87 S/ 6,872.80 S/ 4,581.87 S/ 1,145.47
S/ 1,559.12 S/ - S/ - S/ - S/ - S/ -
S/ 1,290.75 S/ 1,290.75 S/ 1,290.75 S/ 1,290.75 S/ - S/ -
S/ - S/ - S/ - S/ 1,449.14 S/ 1,449.14 S/ 1,449.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 112.12 S/ -
S/ 78.10 S/ 78.10 S/ 78.10 S/ 78.10 S/ 78.10 S/ 78.10
S/ 312.40 S/ 312.40 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 133.64 S/ 133.64 S/ 133.64 S/ 133.64
S/ 8.33 S/ 15.62 S/ 15.62 S/ 12.50 S/ 12.50 S/ 15.62
S/ - S/ - S/ - S/ 2.22 S/ 2.22 S/ 1.94
S/ - S/ 585.75 S/ 585.75 S/ 585.75 S/ 585.75 S/ -
S/ 85.16 S/ 85.16 S/ 85.16 S/ 170.33 S/ 255.49 S/ 255.49
S/ 786.82 S/ 786.82 S/ - S/ - S/ - S/ -
S/ 5.28 S/ 7.03 S/ 8.79 S/ 5.28 S/ 7.91 S/ 14.07

IE713
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ - S/ 425.22 S/ 425.22 S/ 425.22


S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 55.54 S/ -
S/ 88.86 S/ 88.86 S/ 88.86 S/ 88.86 S/ 88.86 S/ 88.86
S/ 1,692.17 S/ 1,692.17 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 59.36 S/ 59.36 S/ 59.36 S/ 59.36
S/ 11.11 S/ 20.83 S/ 20.83 S/ 16.66 S/ 16.66 S/ 20.83
S/ - S/ - S/ - S/ 67.39 S/ 67.39 S/ 58.96
S/ 108.30 S/ 108.30 S/ 108.30 S/ 108.30 S/ 108.30 S/ 108.30
S/ 49.23 S/ 73.85 S/ 73.85 S/ 73.85 S/ 98.47 S/ 86.16
S/ - S/ 857.38 S/ 685.90 S/ 1,028.85 S/ 685.90 S/ 171.48
S/ 219.83 S/ - S/ - S/ - S/ - S/ -
S/ 1,456.40 S/ 1,456.40 S/ 1,456.40 S/ 1,456.40 S/ - S/ -
S/ - S/ - S/ - S/ 262.50 S/ 262.50 S/ 262.50
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 221.28 S/ -
S/ 520.66 S/ 520.66 S/ 520.66 S/ 520.66 S/ 520.66 S/ 520.66
S/ 355.78 S/ 355.78 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 34.50 S/ 34.50 S/ 34.50 S/ 34.50
S/ 5.81 S/ 10.89 S/ 10.89 S/ 8.72 S/ 8.72 S/ 10.89
S/ - S/ - S/ - S/ 19.90 S/ 19.90 S/ 17.42
S/ - S/ 211.69 S/ 211.69 S/ 211.69 S/ 211.69 S/ -
S/ 43.13 S/ 43.13 S/ 43.13 S/ 86.26 S/ 129.39 S/ 129.39
S/ 91.62 S/ 91.62 S/ - S/ - S/ - S/ -
S/ 2.43 S/ 3.24 S/ 4.05 S/ 2.43 S/ 3.64 S/ 6.48
S/ - S/ - S/ - S/ 46.28 S/ 46.28 S/ 46.28
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 33.60 S/ -
S/ 14.03 S/ 14.03 S/ 14.03 S/ 14.03 S/ 14.03 S/ 14.03
S/ 7.91 S/ 7.91 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 8.66 S/ 8.66 S/ 8.66 S/ 8.66
S/ 0.41 S/ 0.77 S/ 0.77 S/ 0.61 S/ 0.61 S/ 0.77
S/ - S/ - S/ - S/ 0.29 S/ 0.29 S/ 0.25
S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.49
S/ 0.84 S/ 1.25 S/ 1.25 S/ 1.25 S/ 1.67 S/ 1.46
S/ - S/ 136.35 S/ 109.08 S/ 163.62 S/ 109.08 S/ 27.27
S/ 285.23 S/ - S/ - S/ - S/ - S/ -
S/ 276.59 S/ 276.59 S/ 276.59 S/ 276.59 S/ - S/ -
S/ - S/ - S/ - S/ 188.00 S/ 188.00 S/ 188.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 11.63 S/ -

IE714
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 23.79 S/ 23.79 S/ 23.79 S/ 23.79 S/ 23.79 S/ 23.79


S/ 88.59 S/ 88.59 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 70.50 S/ 70.50 S/ 70.50 S/ 70.50
S/ 1,107.53 S/ 2,076.61 S/ 2,076.61 S/ 1,661.29 S/ 1,661.29 S/ 2,076.61
S/ - S/ - S/ - S/ 2.07 S/ 2.07 S/ 2.58
S/ - S/ 6.17 S/ 6.17 S/ 6.17 S/ 6.17 S/ -
S/ 12.78 S/ 12.78 S/ 12.78 S/ 25.56 S/ 38.35 S/ 38.35
S/ 256.47 S/ 256.47 S/ - S/ - S/ - S/ -
S/ 18.00 S/ 24.01 S/ 30.01 S/ 18.00 S/ 27.01 S/ 48.01
S/ - S/ - S/ - S/ 7.21 S/ 7.21 S/ 7.21
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 9.38 S/ -
S/ 37.53 S/ 37.53 S/ 37.53 S/ 37.53 S/ 37.53 S/ 37.53
S/ 20.91 S/ 20.91 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 9.38 S/ 9.38 S/ 9.38 S/ 9.38
S/ 79.10 S/ 148.32 S/ 148.32 S/ 118.66 S/ 118.66 S/ 148.32
S/ - S/ - S/ - S/ 1.30 S/ 1.30 S/ 1.14
S/ 8.37 S/ 8.37 S/ 8.37 S/ 8.37 S/ 8.37 S/ 8.37
S/ 12.77 S/ 19.16 S/ 19.16 S/ 19.16 S/ 25.55 S/ 22.35
S/ - S/ 31.28 S/ 25.02 S/ 37.53 S/ 25.02 S/ 6.26
S/ 8.15 S/ - S/ - S/ - S/ - S/ -
S/ 8.15 S/ 8.15 S/ 8.15 S/ 8.15 S/ - S/ -
S/ - S/ - S/ - S/ 70.30 S/ 70.30 S/ 70.30
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 682.38 S/ -
S/ 530.45 S/ 530.45 S/ 530.45 S/ 530.45 S/ 530.45 S/ 530.45
S/ 481.56 S/ 481.56 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 691.89 S/ 691.89 S/ 691.89 S/ 691.89
S/ 52.36 S/ 98.18 S/ 98.18 S/ 78.54 S/ 78.54 S/ 98.18
S/ - S/ - S/ - S/ 52.97 S/ 52.97 S/ 46.35
S/ - S/ 264.55 S/ 264.55 S/ 264.55 S/ 264.55 S/ -
S/ 46.46 S/ 46.46 S/ 46.46 S/ 139.37 S/ 92.91 S/ 139.37
S/ 141.07 S/ 141.07 S/ - S/ - S/ - S/ -
S/ 269.28 S/ 359.04 S/ 448.80 S/ 269.28 S/ 403.92 S/ 718.08
S/ - S/ - S/ - S/ 431.67 S/ 431.67 S/ 431.67
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.58 S/ -
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 340.70 S/ 340.70 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 165.77 S/ 165.77 S/ 165.77 S/ 165.77
S/ 0.02 S/ 0.04 S/ 0.04 S/ 0.03 S/ 0.03 S/ 0.04

IE715
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ - S/ 32.45 S/ 32.45 S/ 40.56


S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 1,494.03
S/ 1,141.61 S/ 1,712.42 S/ 1,712.42 S/ 1,712.42 S/ 2,283.22 S/ 1,997.82
S/ - S/ 184.18 S/ 147.34 S/ 221.01 S/ 147.34 S/ 36.84
S/ 9.46 S/ - S/ - S/ - S/ - S/ -
S/ 9.11 S/ 9.11 S/ 9.11 S/ 9.11 S/ - S/ -
S/ - S/ - S/ - S/ 195.70 S/ 195.70 S/ 195.70
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 6,656.03 S/ -
S/ 7,053.41 S/ 7,053.41 S/ 7,053.41 S/ 7,053.41 S/ 7,053.41 S/ 7,053.41
S/ 934.73 S/ 934.73 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 7.20 S/ 7.20 S/ 7.20 S/ 7.20
S/ 1.39 S/ 2.60 S/ 2.60 S/ 2.08 S/ 2.08 S/ 2.60
S/ - S/ - S/ - S/ 10.10 S/ 10.10 S/ 8.83
S/ - S/ 26.78 S/ 26.78 S/ 26.78 S/ 26.78 S/ -
S/ 27.10 S/ 27.10 S/ 27.10 S/ 81.31 S/ 54.20 S/ 81.31
S/ 0.02 S/ 0.02 S/ - S/ - S/ - S/ -
S/ 2.76 S/ 3.68 S/ 4.60 S/ 2.76 S/ 4.14 S/ 7.36
S/ - S/ - S/ - S/ 0.44 S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.27 S/ -
S/ 5.53 S/ 5.53 S/ 5.53 S/ 5.53 S/ 5.53 S/ 5.53
S/ 4.46 S/ 4.46 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ 0.51 S/ 0.96 S/ 0.96 S/ 0.77 S/ 0.77 S/ 0.96
S/ - S/ - S/ - S/ 0.40 S/ 0.40 S/ 0.49
S/ 0.73 S/ 0.73 S/ 0.73 S/ 0.73 S/ 0.73 S/ 0.73
S/ 2.53 S/ 3.79 S/ 3.79 S/ 3.79 S/ 5.05 S/ 4.42
S/ - S/ 1,120.55 S/ 896.44 S/ 1,344.67 S/ 896.44 S/ 224.11
S/ 296.13 S/ - S/ - S/ - S/ - S/ -
S/ 11.25 S/ 11.25 S/ 11.25 S/ 11.25 S/ - S/ -
S/ - S/ - S/ - S/ 46.55 S/ 46.55 S/ 46.55
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 3,007.60 S/ -
S/ 435.00 S/ 435.00 S/ 435.00 S/ 435.00 S/ 435.00 S/ 435.00
S/ 271.67 S/ 271.67 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 22.15 S/ 22.15 S/ 22.15 S/ 22.15
S/ 12.16 S/ 22.79 S/ 22.79 S/ 18.23 S/ 18.23 S/ 22.79
S/ - S/ - S/ - S/ 53.87 S/ 53.87 S/ 67.33
S/ - S/ 11.94 S/ 11.94 S/ 11.94 S/ 11.94 S/ -
S/ 2.32 S/ 2.32 S/ 2.32 S/ 6.95 S/ 4.63 S/ 6.95

IE716
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 8.83 S/ 8.83 S/ - S/ - S/ - S/ -
S/ 0.15 S/ 0.20 S/ 0.25 S/ 0.15 S/ 0.22 S/ 0.39
S/ - S/ - S/ - S/ 0.46 S/ 0.46 S/ 0.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 2.52 S/ -
S/ 2.22 S/ 2.22 S/ 2.22 S/ 2.22 S/ 2.22 S/ 2.22
S/ 4.93 S/ 4.93 S/ - S/ - S/ - S/ -

S/ 0.64 S/ 1.20 S/ 1.20 S/ 0.96 S/ 0.96 S/ 1.20


S/ - S/ - S/ - S/ 23.96 S/ 23.96 S/ 29.94
S/ 16.02 S/ 16.02 S/ 16.02 S/ 16.02 S/ 16.02 S/ 16.02
S/ 6.41 S/ 9.61 S/ 9.61 S/ 9.61 S/ 12.82 S/ 11.22
S/ - S/ 5.58 S/ 4.46 S/ 6.70 S/ 4.46 S/ 1.12
S/ 6.49 S/ - S/ - S/ - S/ - S/ -
S/ 8.92 S/ 8.92 S/ 8.92 S/ 8.92 S/ - S/ -
S/ - S/ - S/ - S/ 3.52 S/ 3.52 S/ 3.52
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 61.80 S/ -
S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31
S/ 327.67 S/ 327.67 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 223.89 S/ 223.89 S/ 223.89 S/ 223.89
S/ 7.77 S/ 14.56 S/ 14.56 S/ 11.65 S/ 11.65 S/ 14.56
S/ - S/ - S/ - S/ 9.81 S/ 9.81 S/ 18.39
S/ - S/ 11.78 S/ 11.78 S/ 11.78 S/ 11.78 S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 5.98 S/ 3.98 S/ 5.98
S/ 137.85 S/ 137.85 S/ - S/ - S/ - S/ -
S/ 12.02 S/ - S/ - S/ - S/ - S/ -
S/ 4.00 S/ 4.00 S/ 4.00 S/ 4.00 S/ - S/ -
S/ - S/ - S/ - S/ 2.09 S/ 2.09 S/ 2.09
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 62.07 S/ -
S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05
S/ 7.57 S/ 7.57 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.49 S/ 3.49 S/ 3.49 S/ 3.49
S/ 0.50 S/ 0.95 S/ 0.95 S/ 0.76 S/ 0.76 S/ 0.95
S/ - S/ - S/ - S/ 0.22 S/ 0.22 S/ 0.42
S/ - S/ 3.07 S/ 3.07 S/ 3.07 S/ 3.07 S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 1.76 S/ 1.76 S/ 1.76
S/ 6.17 S/ 6.17 S/ - S/ - S/ - S/ -
S/ 0.62 S/ 0.83 S/ 1.03 S/ 0.62 S/ 0.93 S/ 1.65
S/ - S/ - S/ - S/ 100.43 S/ 100.43 S/ 100.43

IE717
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.96 S/ -
S/ 43.63 S/ 43.63 S/ 43.63 S/ 43.63 S/ 43.63 S/ 43.63
S/ 10.61 S/ 10.61 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 6.37 S/ 6.37 S/ 6.37 S/ 6.37
S/ 5.80 S/ 7.73 S/ 9.67 S/ 5.80 S/ 8.70 S/ 15.47
S/ - S/ - S/ - S/ 8.15 S/ 8.15 S/ 8.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 5.36 S/ -
S/ 1.38 S/ 1.84 S/ 2.30 S/ 1.38 S/ 2.07 S/ 3.68
S/ - S/ - S/ - S/ 23.33 S/ 23.33 S/ 23.33
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 18.00 S/ -
S/ 5.52 S/ 5.52 S/ 5.52 S/ 5.52 S/ 5.52 S/ 5.52

S/ 3.41 S/ - S/ - S/ - S/ - S/ -
S/ 1.23 S/ 1.23 S/ 1.23 S/ 1.23 S/ - S/ -
S/ - S/ - S/ - S/ 3.56 S/ 3.56 S/ 3.56
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 72.86 S/ -
S/ 85.42 S/ 85.42 S/ 85.42 S/ 85.42 S/ 85.42 S/ 85.42
S/ 20.25 S/ 20.25 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 72.45 S/ 72.45 S/ 72.45 S/ 72.45
S/ 166.00 S/ 311.24 S/ 311.24 S/ 248.99 S/ 248.99 S/ 311.24
S/ - S/ - S/ - S/ 1.53 S/ 1.53 S/ 1.91
S/ 26.82 S/ 26.82 S/ 26.82 S/ 26.82 S/ 26.82 S/ 26.82
S/ 0.49 S/ 0.74 S/ 0.74 S/ 0.74 S/ 0.99 S/ 0.87
S/ - S/ 1.50 S/ 1.20 S/ 1.80 S/ 1.20 S/ 0.30
S/ 11.25 S/ - S/ - S/ - S/ - S/ -
S/ 55.36 S/ 55.36 S/ 55.36 S/ 55.36 S/ - S/ -
S/ - S/ - S/ - S/ 37.11 S/ 37.11 S/ 37.11
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 1.03 S/ -
S/ 126.56 S/ 126.56 S/ 126.56 S/ 126.56 S/ 126.56 S/ 126.56
S/ 432.07 S/ 432.07 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 2.67 S/ 2.67 S/ 2.67 S/ 2.67
S/ 74.06 S/ 138.86 S/ 138.86 S/ 111.09 S/ 111.09 S/ 138.86
S/ - S/ - S/ - S/ 183.45 S/ 183.45 S/ 229.32
S/ - S/ 290.70 S/ 290.70 S/ 290.70 S/ 290.70 S/ -
S/ 562.41 S/ 562.41 S/ 562.41 S/ 1,687.22 S/ 1,687.22 S/ 1,124.81

IE718
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 882.92 S/ 882.92 S/ - S/ - S/ - S/ -
S/ 174.05 S/ 232.06 S/ 290.08 S/ 174.05 S/ 261.07 S/ 464.13
S/ - S/ - S/ - S/ 32.14 S/ 32.14 S/ 32.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 671.38 S/ -
S/ 133.98 S/ 133.98 S/ 133.98 S/ 133.98 S/ 133.98 S/ 133.98
S/ 2,662.51 S/ 2,662.51 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 119.48 S/ 119.48 S/ 119.48 S/ 119.48
S/ 7.51 S/ 14.09 S/ 14.09 S/ 11.27 S/ 11.27 S/ 14.09
S/ - S/ - S/ - S/ 15.03 S/ 15.03 S/ 28.18
S/ 538.85 S/ 269.42 S/ 269.42 S/ 269.42 S/ 269.42 S/ 269.42
S/ 542.21 S/ 813.32 S/ 813.32 S/ 813.32 S/ 1,084.43 S/ 948.88
S/ - S/ 5,727.33 S/ 4,581.87 S/ 6,872.80 S/ 4,581.87 S/ 1,145.47
S/ 1,559.12 S/ - S/ - S/ - S/ - S/ -
S/ 1,290.75 S/ 1,290.75 S/ 1,290.75 S/ 1,290.75 S/ - S/ -
S/ - S/ - S/ - S/ 1,449.14 S/ 1,449.14 S/ 1,449.14
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 149.49 S/ -
S/ 78.10 S/ 78.10 S/ 78.10 S/ 78.10 S/ 78.10 S/ 78.10
S/ 312.40 S/ 312.40 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 133.64 S/ 133.64 S/ 133.64 S/ 133.64
S/ 8.33 S/ 15.62 S/ 15.62 S/ 12.50 S/ 12.50 S/ 15.62
S/ - S/ - S/ - S/ 2.22 S/ 2.22 S/ 4.17
S/ - S/ 585.75 S/ 585.75 S/ 585.75 S/ 585.75 S/ -
S/ 85.16 S/ 85.16 S/ 85.16 S/ 255.49 S/ 255.49 S/ 170.33
S/ 786.82 S/ 786.82 S/ - S/ - S/ - S/ -
S/ 5.28 S/ 7.03 S/ 8.79 S/ 5.28 S/ 7.91 S/ 14.07
S/ - S/ - S/ - S/ 425.22 S/ 425.22 S/ 425.22
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 74.05 S/ -
S/ 88.86 S/ 88.86 S/ 88.86 S/ 88.86 S/ 88.86 S/ 88.86
S/ 1,692.17 S/ 1,692.17 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 59.36 S/ 59.36 S/ 59.36 S/ 59.36
S/ 11.11 S/ 20.83 S/ 20.83 S/ 16.66 S/ 16.66 S/ 20.83
S/ - S/ - S/ - S/ 67.39 S/ 67.39 S/ 126.35
S/ 216.60 S/ 108.30 S/ 108.30 S/ 108.30 S/ 108.30 S/ 108.30
S/ 49.23 S/ 73.85 S/ 73.85 S/ 73.85 S/ 98.47 S/ 86.16
S/ - S/ 857.38 S/ 685.90 S/ 1,028.85 S/ 685.90 S/ 171.48
S/ 219.83 S/ - S/ - S/ - S/ - S/ -
S/ 1,456.40 S/ 1,456.40 S/ 1,456.40 S/ 1,456.40 S/ - S/ -
S/ - S/ - S/ - S/ 262.50 S/ 262.50 S/ 262.50

IE719
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 295.04 S/ -
S/ 520.66 S/ 520.66 S/ 520.66 S/ 520.66 S/ 520.66 S/ 520.66
S/ 355.78 S/ 355.78 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 34.50 S/ 34.50 S/ 34.50 S/ 34.50
S/ 5.81 S/ 10.89 S/ 10.89 S/ 8.72 S/ 8.72 S/ 10.89
S/ - S/ - S/ - S/ 19.90 S/ 19.90 S/ 37.32
S/ - S/ 211.69 S/ 211.69 S/ 211.69 S/ 211.69 S/ -
S/ 43.13 S/ 43.13 S/ 43.13 S/ 129.39 S/ 129.39 S/ 86.26
S/ 91.62 S/ 91.62 S/ - S/ - S/ - S/ -
S/ 2.43 S/ 3.24 S/ 4.05 S/ 2.43 S/ 3.64 S/ 6.48
S/ - S/ - S/ - S/ 46.28 S/ 46.28 S/ 46.28
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 44.80 S/ -
S/ 14.03 S/ 14.03 S/ 14.03 S/ 14.03 S/ 14.03 S/ 14.03
S/ 7.91 S/ 7.91 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 8.66 S/ 8.66 S/ 8.66 S/ 8.66
S/ 0.41 S/ 0.77 S/ 0.77 S/ 0.61 S/ 0.61 S/ 0.77
S/ - S/ - S/ - S/ 0.29 S/ 0.29 S/ 0.55
S/ 0.97 S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.49
S/ 0.84 S/ 1.25 S/ 1.25 S/ 1.25 S/ 1.46 S/ 1.46
S/ - S/ 136.35 S/ 109.08 S/ 163.62 S/ 109.08 S/ 27.27
S/ 285.23 S/ - S/ - S/ - S/ - S/ -
S/ 276.59 S/ 276.59 S/ 276.59 S/ 276.59 S/ - S/ -
S/ - S/ - S/ - S/ 188.00 S/ 188.00 S/ 188.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 11.63 S/ -
S/ 23.79 S/ 23.79 S/ 23.79 S/ 23.79 S/ 23.79 S/ 23.79
S/ 88.59 S/ 88.59 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 70.50 S/ 70.50 S/ 70.50 S/ 70.50
S/ 1,107.53 S/ 2,076.61 S/ 2,076.61 S/ 1,661.29 S/ 1,661.29 S/ 2,076.61
S/ - S/ - S/ - S/ 2.07 S/ 2.07 S/ 1.81
S/ - S/ 6.17 S/ 6.17 S/ 6.17 S/ 6.17 S/ -
S/ 12.78 S/ 12.78 S/ 12.78 S/ 38.35 S/ 38.35 S/ 25.56
S/ 256.47 S/ 256.47 S/ - S/ - S/ - S/ -
S/ 18.00 S/ 24.01 S/ 30.01 S/ 18.00 S/ 27.01 S/ 48.01
S/ - S/ - S/ - S/ 7.21 S/ 7.21 S/ 7.21
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 9.38 S/ -
S/ 37.53 S/ 37.53 S/ 37.53 S/ 37.53 S/ 37.53 S/ 37.53
S/ 20.91 S/ 20.91 S/ - S/ - S/ - S/ -

IE720
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ - S/ 9.38 S/ 9.38 S/ 9.38 S/ 9.38


S/ 79.10 S/ 148.32 S/ 148.32 S/ 118.66 S/ 118.66 S/ 148.32
S/ - S/ - S/ - S/ 1.30 S/ 1.14 S/ 1.14
S/ 8.37 S/ 8.37 S/ 8.37 S/ 8.37 S/ 8.37 S/ 8.37
S/ 12.77 S/ 19.16 S/ 19.16 S/ 19.16 S/ 25.55 S/ 22.35
S/ - S/ 31.28 S/ 25.02 S/ 37.53 S/ 25.02 S/ 6.26
S/ 8.15 S/ - S/ - S/ - S/ - S/ -
S/ 8.15 S/ 8.15 S/ 8.15 S/ 8.15 S/ - S/ -
S/ - S/ - S/ - S/ 70.30 S/ 70.30 S/ 70.30
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 909.83 S/ -
S/ 530.45 S/ 530.45 S/ 530.45 S/ 530.45 S/ 530.45 S/ 530.45
S/ 481.56 S/ 481.56 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 691.89 S/ 691.89 S/ 691.89 S/ 691.89
S/ 52.36 S/ 98.18 S/ 98.18 S/ 78.54 S/ 78.54 S/ 98.18
S/ - S/ - S/ - S/ 52.97 S/ 52.97 S/ 46.35
S/ - S/ 264.55 S/ 264.55 S/ 264.55 S/ 264.55 S/ -
S/ 46.46 S/ 46.46 S/ 46.46 S/ 139.37 S/ 139.37 S/ 92.91
S/ 141.07 S/ 141.07 S/ - S/ - S/ - S/ -
S/ 269.28 S/ 359.04 S/ 448.80 S/ 269.28 S/ 403.92 S/ 718.08
S/ - S/ - S/ - S/ 431.67 S/ 431.67 S/ 431.67
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.78 S/ -
S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02 S/ 0.02
S/ 340.70 S/ 340.70 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 165.77 S/ 165.77 S/ 165.77 S/ 165.77
S/ 0.02 S/ 0.04 S/ 0.04 S/ 0.03 S/ 0.03 S/ 0.04
S/ - S/ - S/ - S/ 32.45 S/ 32.45 S/ 40.56
S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 1,494.03
S/ 1,141.61 S/ 1,712.42 S/ 1,712.42 S/ 1,712.42 S/ 2,283.22 S/ 2,283.22
S/ - S/ 184.18 S/ 147.34 S/ 221.01 S/ 147.34 S/ 36.84
S/ 9.46 S/ - S/ - S/ - S/ - S/ -
S/ 9.11 S/ 9.11 S/ 9.11 S/ 9.11 S/ - S/ -
S/ - S/ - S/ - S/ 195.70 S/ 195.70 S/ 195.70
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 8,874.70 S/ -
S/ 7,053.41 S/ 7,053.41 S/ 7,053.41 S/ 7,053.41 S/ 7,053.41 S/ 7,053.41
S/ 934.73 S/ 934.73 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 7.20 S/ 7.20 S/ 7.20 S/ 7.20
S/ 1.39 S/ 2.60 S/ 2.60 S/ 2.08 S/ 2.08 S/ 2.60
S/ - S/ - S/ - S/ 10.10 S/ 10.10 S/ 12.62

IE721
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ - S/ 26.78 S/ 26.78 S/ 26.78 S/ 26.78 S/ -


S/ 27.10 S/ 27.10 S/ 27.10 S/ 81.31 S/ 54.20 S/ 81.31
S/ 0.02 S/ 0.02 S/ - S/ - S/ - S/ -
S/ 2.76 S/ 3.68 S/ 4.60 S/ 2.76 S/ 4.14 S/ 7.36
S/ - S/ - S/ - S/ 0.44 S/ 0.44 S/ 0.44
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 0.27 S/ -
S/ 5.53 S/ 5.53 S/ 5.53 S/ 5.53 S/ 5.53 S/ 5.53
S/ 4.46 S/ 4.46 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ 0.51 S/ 0.96 S/ 0.96 S/ 0.77 S/ 0.77 S/ 0.96
S/ - S/ - S/ - S/ 0.40 S/ 0.40 S/ 0.49
S/ 0.73 S/ 0.73 S/ 0.73 S/ 0.73 S/ 0.73 S/ 0.73
S/ 2.53 S/ 3.79 S/ 3.79 S/ 3.79 S/ 5.05 S/ 4.42
S/ - S/ 1,120.55 S/ 896.44 S/ 1,344.67 S/ 896.44 S/ 224.11
S/ 296.13 S/ - S/ - S/ - S/ - S/ -
S/ 11.25 S/ 11.25 S/ 11.25 S/ 11.25 S/ - S/ -
S/ - S/ - S/ - S/ 46.55 S/ 46.55 S/ 46.55
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 3,007.60 S/ -
S/ 435.00 S/ 435.00 S/ 435.00 S/ 435.00 S/ 435.00 S/ 435.00
S/ 271.67 S/ 271.67 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 22.15 S/ 22.15 S/ 22.15 S/ 22.15
S/ 12.16 S/ 22.79 S/ 22.79 S/ 18.23 S/ 18.23 S/ 22.79
S/ - S/ - S/ - S/ 53.87 S/ 53.87 S/ 67.33
S/ - S/ 11.94 S/ 11.94 S/ 11.94 S/ 11.94 S/ -
S/ 2.32 S/ 2.32 S/ 2.32 S/ 6.95 S/ 4.63 S/ 6.95
S/ 8.83 S/ 8.83 S/ - S/ - S/ - S/ -
S/ 0.15 S/ 0.20 S/ 0.25 S/ 0.15 S/ 0.22 S/ 0.39
S/ - S/ - S/ - S/ 0.46 S/ 0.46 S/ 0.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 2.52 S/ -
S/ 2.22 S/ 2.22 S/ 2.22 S/ 2.22 S/ 2.22 S/ 2.22
S/ 4.93 S/ 4.93 S/ - S/ - S/ - S/ -

S/ 0.64 S/ 1.20 S/ 1.20 S/ 0.96 S/ 0.96 S/ 1.20


S/ - S/ - S/ - S/ 23.96 S/ 23.96 S/ 29.94
S/ 16.02 S/ 16.02 S/ 16.02 S/ 16.02 S/ 16.02 S/ 16.02
S/ 6.41 S/ 9.61 S/ 9.61 S/ 9.61 S/ 12.82 S/ 11.22
S/ - S/ 5.58 S/ 4.46 S/ 6.70 S/ 4.46 S/ 1.12
S/ 6.49 S/ - S/ - S/ - S/ - S/ -

IE722
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 8.92 S/ 8.92 S/ 8.92 S/ 8.92 S/ - S/ -


S/ - S/ - S/ - S/ 3.52 S/ 3.52 S/ 3.52
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 61.80 S/ -
S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31 S/ 19.31
S/ 327.67 S/ 327.67 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 223.89 S/ 223.89 S/ 223.89 S/ 223.89
S/ 7.77 S/ 14.56 S/ 14.56 S/ 11.65 S/ 11.65 S/ 14.56
S/ - S/ - S/ - S/ 9.81 S/ 9.81 S/ 12.26
S/ - S/ 11.78 S/ 11.78 S/ 11.78 S/ 11.78 S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 5.98 S/ 3.98 S/ 5.98
S/ 137.85 S/ 137.85 S/ - S/ - S/ - S/ -
S/ 12.02 S/ - S/ - S/ - S/ - S/ -
S/ 4.00 S/ 4.00 S/ 4.00 S/ 4.00 S/ - S/ -
S/ - S/ - S/ - S/ 2.09 S/ 2.09 S/ 2.09
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 62.07 S/ -
S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05 S/ 30.05
S/ 7.57 S/ 7.57 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 3.49 S/ 3.49 S/ 3.49 S/ 3.49
S/ 0.50 S/ 0.95 S/ 0.95 S/ 0.76 S/ 0.76 S/ 0.95
S/ - S/ - S/ - S/ 0.22 S/ 0.22 S/ 0.28
S/ - S/ 3.07 S/ 3.07 S/ 3.07 S/ 3.07 S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 1.76 S/ 1.18 S/ 1.76
S/ 6.17 S/ 6.17 S/ - S/ - S/ - S/ -
S/ 0.62 S/ 0.83 S/ 1.03 S/ 0.62 S/ 0.93 S/ 1.65
S/ - S/ - S/ - S/ 100.43 S/ 100.43 S/ 100.43
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 21.96 S/ -
S/ 43.63 S/ 43.63 S/ 43.63 S/ 43.63 S/ 43.63 S/ 43.63
S/ 10.61 S/ 10.61 S/ - S/ - S/ - S/ -
S/ - S/ - S/ 6.37 S/ 6.37 S/ 6.37 S/ 6.37
S/ 5.80 S/ 7.73 S/ 9.67 S/ 5.80 S/ 8.70 S/ 15.47
S/ - S/ - S/ - S/ 8.15 S/ 8.15 S/ 8.15
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 5.36 S/ -
S/ 1.38 S/ 1.84 S/ 2.30 S/ 1.38 S/ 2.07 S/ 3.68
S/ - S/ - S/ - S/ 23.33 S/ 23.33 S/ 23.33
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ 18.00 S/ -
S/ 5.52 S/ 5.52 S/ 5.52 S/ 5.52 S/ 5.52 S/ 5.52

IE723
ELECTRICAS

ESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRA

Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09


DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020

A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020

S/ 94,975.20 S/ 122,937.22 S/ 92,613.88 S/ 114,300.39 S/ 137,432.54 S/ 83,212.52


7.70% 9.97% 7.51% 9.26% 11.14% 6.75%
17.99% 27.96% 35.47% 44.73% 55.87% 62.62%

IE724
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.56 S/ - S/ - S/ - S/ - S/ -
S/ 0.25 S/ 0.25 S/ 0.25 S/ 0.25 S/ - S/ -
S/ 121.44 S/ - S/ - S/ - S/ 121.44 S/ 121.44
S/ 56.95 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 72.45 S/ 48.30 S/ 48.30 S/ 24.15 S/ - S/ -
S/ 311.24 S/ - S/ - S/ - S/ - S/ -
S/ 2.87 S/ 2.29 S/ 2.29 S/ 2.87 S/ 2.87 S/ 2.87
S/ 26.82 S/ 26.82 S/ 26.82 S/ 53.64 S/ 80.45 S/ 80.45
S/ 1.24 S/ 1.24 S/ 1.86 S/ 1.24 S/ 0.87 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 37.11 S/ - S/ - S/ - S/ - S/ -
S/ 2.11 S/ 2.11 S/ 2.11 S/ 2.11 S/ - S/ -
S/ 1.28 S/ - S/ - S/ 0.77 S/ 0.51 S/ 1.28
S/ 84.38 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.67 S/ 1.78 S/ 1.78 S/ 0.89 S/ - S/ -
S/ 138.86 S/ - S/ - S/ - S/ - S/ -
S/ 160.52 S/ 275.18 S/ 275.18 S/ 343.98 S/ 343.98 S/ 343.98
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 562.41 S/ 562.41 S/ 562.41 S/ 562.41 S/ 562.41 S/ 562.41
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 522.15 S/ 232.06 S/ 232.06 S/ 145.04 S/ - S/ -
S/ 32.14 S/ - S/ - S/ - S/ - S/ -
S/ 365.91 S/ 365.91 S/ 365.91 S/ 365.91 S/ - S/ -
S/ 671.38 S/ - S/ - S/ 447.59 S/ 1,118.97 S/ 1,118.97
S/ 89.32 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 119.48 S/ 79.65 S/ 79.65 S/ 39.83 S/ - S/ -
S/ 14.09 S/ - S/ - S/ - S/ - S/ -
S/ 13.15 S/ 22.54 S/ 22.54 S/ 28.18 S/ 28.18 S/ 28.18
S/ 269.42 S/ 269.42 S/ 269.42 S/ 538.85 S/ 808.27 S/ 808.27
S/ 1,355.54 S/ 1,355.54 S/ 2,033.30 S/ 1,355.54 S/ 948.88 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

IE725
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,449.14 S/ - S/ - S/ - S/ - S/ -
S/ 1,158.48 S/ 1,158.48 S/ 1,158.48 S/ 1,158.48 S/ - S/ -
S/ 112.12 S/ - S/ - S/ 186.86 S/ 186.86 S/ 186.86
S/ 52.07 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 133.64 S/ 89.09 S/ 89.09 S/ 44.55 S/ - S/ -
S/ 15.62 S/ - S/ - S/ - S/ - S/ -
S/ 1.94 S/ 3.33 S/ 3.33 S/ 4.17 S/ 4.17 S/ 4.17
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 85.16 S/ 85.16 S/ 85.16 S/ 85.16 S/ 85.16 S/ 85.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 15.83 S/ 7.03 S/ 7.03 S/ 4.40 S/ - S/ -
S/ 425.22 S/ - S/ - S/ - S/ - S/ -
S/ 260.33 S/ 260.33 S/ 260.33 S/ 260.33 S/ - S/ -
S/ 37.03 S/ - S/ - S/ 92.57 S/ 92.57 S/ 92.57
S/ 59.24 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 59.36 S/ 39.57 S/ 39.57 S/ 19.79 S/ - S/ -
S/ 20.83 S/ - S/ - S/ - S/ - S/ -
S/ 58.96 S/ 101.08 S/ 101.08 S/ 126.35 S/ 126.35 S/ 126.35
S/ 108.30 S/ 108.30 S/ 108.30 S/ 216.60 S/ 324.90 S/ 324.90
S/ 86.16 S/ 86.16 S/ 184.62 S/ 123.08 S/ 86.16 S/ 86.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 262.50 S/ - S/ - S/ - S/ - S/ -
S/ 25.00 S/ 25.00 S/ 25.00 S/ 25.00 S/ - S/ -
S/ 221.28 S/ - S/ - S/ 147.52 S/ 368.80 S/ 368.80
S/ 347.11 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 34.50 S/ 23.00 S/ 23.00 S/ 11.50 S/ - S/ -
S/ 10.89 S/ - S/ - S/ - S/ - S/ -
S/ 24.88 S/ 29.85 S/ 29.85 S/ 24.88 S/ 37.32 S/ 37.32
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 43.13 S/ 43.13 S/ 43.13 S/ 43.13 S/ 43.13 S/ 43.13
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 7.29 S/ 3.24 S/ 3.24 S/ 2.02 S/ - S/ -
S/ 46.28 S/ - S/ - S/ - S/ - S/ -
S/ 36.47 S/ 36.47 S/ 36.47 S/ 36.47 S/ - S/ -

IE726
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 33.60 S/ - S/ - S/ 56.00 S/ 56.00 S/ 56.00


S/ 9.35 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.66 S/ 5.77 S/ 5.77 S/ 2.89 S/ - S/ -
S/ 0.77 S/ - S/ - S/ - S/ - S/ -
S/ 0.25 S/ 0.44 S/ 0.44 S/ 0.55 S/ 0.55 S/ 0.55
S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.97 S/ 1.46 S/ 1.46
S/ 1.46 S/ 1.46 S/ 3.13 S/ 2.09 S/ 1.46 S/ 1.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 188.00 S/ - S/ - S/ - S/ - S/ -
S/ 116.30 S/ 116.30 S/ 116.30 S/ 116.30 S/ - S/ -
S/ 11.63 S/ - S/ - S/ 7.75 S/ 19.38 S/ 19.38
S/ 15.86 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 70.50 S/ 47.00 S/ 47.00 S/ 23.50 S/ - S/ -
S/ 2,076.61 S/ - S/ - S/ - S/ - S/ -
S/ 2.58 S/ 3.10 S/ 3.10 S/ 2.58 S/ 3.88 S/ 3.88
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 12.78 S/ 12.78 S/ 12.78 S/ 12.78 S/ 12.78 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 54.01 S/ 24.01 S/ 24.01 S/ 15.00 S/ - S/ -
S/ 7.21 S/ - S/ - S/ - S/ - S/ -
S/ 8.73 S/ 8.73 S/ 8.73 S/ 8.73 S/ - S/ -
S/ 6.26 S/ - S/ - S/ 15.64 S/ 15.64 S/ 15.64
S/ 25.02 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 9.38 S/ 6.26 S/ 6.26 S/ 3.13 S/ - S/ -
S/ 148.32 S/ - S/ - S/ - S/ - S/ -
S/ 1.63 S/ 1.96 S/ 1.96 S/ 1.63 S/ 2.44 S/ 2.44
S/ 8.37 S/ 8.37 S/ 8.37 S/ 16.73 S/ 25.10 S/ 25.10
S/ 31.93 S/ 31.93 S/ 47.90 S/ 31.93 S/ 22.35 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 70.30 S/ - S/ - S/ - S/ - S/ -
S/ 21.63 S/ 21.63 S/ 21.63 S/ 21.63 S/ - S/ -
S/ 454.92 S/ - S/ - S/ 1,137.29 S/ 1,137.29 S/ 1,137.29
S/ 353.63 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

IE727
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 691.89 S/ 461.26 S/ 461.26 S/ 230.63 S/ - S/ -


S/ 98.18 S/ - S/ - S/ - S/ - S/ -
S/ 46.35 S/ 79.46 S/ 79.46 S/ 99.32 S/ 99.32 S/ 99.32
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 46.46 S/ 46.46 S/ 46.46 S/ 46.46 S/ 46.46 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 807.84 S/ 359.04 S/ 359.04 S/ 224.40 S/ - S/ -
S/ 431.67 S/ - S/ - S/ - S/ - S/ -
S/ 615.25 S/ 615.25 S/ 615.25 S/ 615.25 S/ - S/ -
S/ 0.39 S/ - S/ - S/ 0.97 S/ 0.97 S/ 0.97
S/ 0.01 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 165.77 S/ 110.51 S/ 110.51 S/ 55.26 S/ - S/ -
S/ 0.04 S/ - S/ - S/ - S/ - S/ -
S/ 28.39 S/ 48.67 S/ 48.67 S/ 60.84 S/ 60.84 S/ 60.84
S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 2,988.07 S/ 4,482.10 S/ 4,482.10
S/ 1,997.82 S/ 1,997.82 S/ 4,281.04 S/ 2,854.03 S/ 1,997.82 S/ 1,997.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 195.70 S/ - S/ - S/ - S/ - S/ -
S/ 149.35 S/ 149.35 S/ 149.35 S/ 149.35 S/ - S/ -
S/ 4,437.35 S/ - S/ - S/ 11,093.38 S/ 11,093.38 S/ 11,093.38
S/ 4,702.27 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 7.20 S/ 4.80 S/ 4.80 S/ 2.40 S/ - S/ -
S/ 2.60 S/ - S/ - S/ - S/ - S/ -
S/ 10.10 S/ 15.14 S/ 15.14 S/ 18.93 S/ 18.93 S/ 18.93
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 27.10 S/ 27.10 S/ 27.10 S/ 27.10 S/ 27.10 S/ 27.10
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.28 S/ 3.68 S/ 3.68 S/ 2.30 S/ - S/ -
S/ 0.44 S/ - S/ - S/ - S/ - S/ -
S/ 72.59 S/ 72.59 S/ 72.59 S/ 72.59 S/ - S/ -
S/ 0.14 S/ - S/ - S/ 0.34 S/ 0.34 S/ 0.34
S/ 3.69 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.99 S/ 1.33 S/ 1.33 S/ 0.66 S/ - S/ -
S/ 0.96 S/ - S/ - S/ - S/ - S/ -
S/ 0.40 S/ 0.59 S/ 0.59 S/ 0.74 S/ 0.74 S/ 0.74
S/ 0.73 S/ 0.73 S/ 0.73 S/ 1.46 S/ 2.20 S/ 2.20

IE728
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 4.42 S/ 4.42 S/ 9.48 S/ 6.32 S/ 4.42 S/ 4.42


S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 46.55 S/ - S/ - S/ - S/ - S/ -
S/ 1,182.38 S/ 1,182.38 S/ 1,182.38 S/ 1,182.38 S/ - S/ -
S/ 1,503.80 S/ - S/ - S/ 3,759.50 S/ 3,759.50 S/ 3,759.50
S/ 290.00 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 22.15 S/ 14.76 S/ 14.76 S/ 7.38 S/ - S/ -
S/ 22.79 S/ - S/ - S/ - S/ - S/ -
S/ 53.87 S/ 80.80 S/ 80.80 S/ 101.00 S/ 101.00 S/ 101.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.32 S/ 2.32 S/ 2.32 S/ 2.32 S/ 2.32 S/ 2.32
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.20 S/ 0.20 S/ 0.12 S/ - S/ -
S/ 0.46 S/ - S/ - S/ - S/ - S/ -
S/ 0.32 S/ 0.32 S/ 0.32 S/ 0.32 S/ - S/ -
S/ 1.89 S/ - S/ - S/ 2.52 S/ 3.15 S/ 3.15
S/ 1.48 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

S/ 1.20 S/ - S/ - S/ - S/ - S/ -
S/ 23.96 S/ 35.93 S/ 35.93 S/ 44.92 S/ 44.92 S/ 44.92
S/ 16.02 S/ 16.02 S/ 16.02 S/ 32.05 S/ 48.07 S/ 48.07
S/ 11.22 S/ 12.82 S/ 24.03 S/ 16.02 S/ 11.22 S/ 11.22
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.52 S/ - S/ - S/ - S/ - S/ -
S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ - S/ -
S/ 30.90 S/ - S/ - S/ 77.24 S/ 77.24 S/ 77.24
S/ 12.88 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 223.89 S/ 149.26 S/ 149.26 S/ 74.63 S/ - S/ -
S/ 14.56 S/ - S/ - S/ - S/ - S/ -
S/ 9.81 S/ 14.71 S/ 14.71 S/ 18.39 S/ 18.39 S/ 18.39
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

IE729
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.09 S/ - S/ - S/ - S/ - S/ -
S/ 10.48 S/ 10.48 S/ 10.48 S/ 10.48 S/ - S/ -
S/ 31.03 S/ - S/ - S/ 77.58 S/ 77.58 S/ 77.58
S/ 20.03 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.49 S/ 2.33 S/ 2.33 S/ 1.16 S/ - S/ -
S/ 0.95 S/ - S/ - S/ - S/ - S/ -
S/ 0.22 S/ 0.34 S/ 0.34 S/ 0.42 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.86 S/ 0.83 S/ 0.83 S/ 0.52 S/ - S/ -
S/ 100.43 S/ - S/ - S/ - S/ - S/ -
S/ 2.71 S/ 2.71 S/ 2.71 S/ 2.71 S/ - S/ -
S/ 10.98 S/ - S/ - S/ 27.45 S/ 27.45 S/ 27.45
S/ 29.09 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 6.37 S/ 4.24 S/ 4.24 S/ 2.12 S/ - S/ -
S/ 17.40 S/ 7.73 S/ 7.73 S/ 4.83 S/ - S/ -
S/ 8.15 S/ - S/ - S/ - S/ - S/ -
S/ 7.64 S/ 7.64 S/ 7.64 S/ 7.64 S/ - S/ -
S/ 2.68 S/ - S/ - S/ 6.70 S/ 6.70 S/ 6.70
S/ 4.14 S/ 1.84 S/ 1.84 S/ 1.15 S/ - S/ -
S/ 23.33 S/ - S/ - S/ - S/ - S/ -
S/ 10.83 S/ 10.83 S/ 10.83 S/ 10.83 S/ - S/ -
S/ 9.00 S/ - S/ - S/ 22.50 S/ 22.50 S/ 22.50
S/ 3.68 S/ - S/ - S/ - S/ - S/ -

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.56 S/ - S/ - S/ - S/ - S/ -
S/ 0.25 S/ 0.25 S/ 0.25 S/ 0.25 S/ - S/ -
S/ 48.58 S/ - S/ - S/ 121.44 S/ 121.44 S/ 121.44
S/ 56.95 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 72.45 S/ 48.30 S/ 48.30 S/ 24.15 S/ - S/ -
S/ 311.24 S/ - S/ - S/ - S/ - S/ -
S/ 1.53 S/ 2.29 S/ 2.29 S/ 2.87 S/ 2.87 S/ 2.87
S/ 26.82 S/ 26.82 S/ 26.82 S/ 53.64 S/ 80.45 S/ 80.45

IE730
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 0.87 S/ 0.87 S/ 1.86 S/ 1.24 S/ 0.87 S/ 0.87


S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 37.11 S/ - S/ - S/ - S/ - S/ -
S/ 2.11 S/ 2.11 S/ 2.11 S/ 2.11 S/ - S/ -
S/ 0.77 S/ - S/ - S/ 1.28 S/ 1.28 S/ 1.28
S/ 84.38 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.67 S/ 1.78 S/ 1.78 S/ 0.89 S/ - S/ -
S/ 138.86 S/ - S/ - S/ - S/ - S/ -
S/ 183.45 S/ 275.18 S/ 275.18 S/ 343.98 S/ 343.98 S/ 343.98
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 562.41 S/ 562.41 S/ 562.41 S/ 562.41 S/ 562.41 S/ 562.41
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 522.15 S/ 232.06 S/ 232.06 S/ 145.04 S/ - S/ -
S/ 32.14 S/ - S/ - S/ - S/ - S/ -
S/ 365.91 S/ 365.91 S/ 365.91 S/ 365.91 S/ - S/ -
S/ 447.59 S/ - S/ - S/ 1,118.97 S/ 1,118.97 S/ 1,118.97
S/ 89.32 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 119.48 S/ 79.65 S/ 79.65 S/ 39.83 S/ - S/ -
S/ 14.09 S/ - S/ - S/ - S/ - S/ -
S/ 15.03 S/ 22.54 S/ 22.54 S/ 28.18 S/ 28.18 S/ 28.18
S/ 269.42 S/ 269.42 S/ 269.42 S/ 538.85 S/ 808.27 S/ 808.27
S/ 948.88 S/ 948.88 S/ 2,033.30 S/ 1,355.54 S/ 948.88 S/ 948.88
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,449.14 S/ - S/ - S/ - S/ - S/ -
S/ 1,158.48 S/ 1,158.48 S/ 1,158.48 S/ 1,158.48 S/ - S/ -
S/ 74.74 S/ - S/ - S/ 186.86 S/ 186.86 S/ 186.86
S/ 52.07 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 133.64 S/ 89.09 S/ 89.09 S/ 44.55 S/ - S/ -
S/ 15.62 S/ - S/ - S/ - S/ - S/ -
S/ 2.22 S/ 3.33 S/ 3.33 S/ 4.17 S/ 4.17 S/ 4.17
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 85.16 S/ 85.16 S/ 85.16 S/ 85.16 S/ 85.16 S/ 85.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 15.83 S/ 7.03 S/ 7.03 S/ 4.40 S/ - S/ -

IE731
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 425.22 S/ - S/ - S/ - S/ - S/ -
S/ 260.33 S/ 260.33 S/ 260.33 S/ 260.33 S/ - S/ -
S/ 37.03 S/ - S/ - S/ 92.57 S/ 92.57 S/ 92.57
S/ 59.24 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 59.36 S/ 39.57 S/ 39.57 S/ 19.79 S/ - S/ -
S/ 20.83 S/ - S/ - S/ - S/ - S/ -
S/ 67.39 S/ 101.08 S/ 101.08 S/ 126.35 S/ 126.35 S/ 126.35
S/ 108.30 S/ 108.30 S/ 108.30 S/ 216.60 S/ 324.90 S/ 324.90
S/ 86.16 S/ 86.16 S/ 184.62 S/ 123.08 S/ 86.16 S/ 86.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 262.50 S/ - S/ - S/ - S/ - S/ -
S/ 25.00 S/ 25.00 S/ 25.00 S/ 25.00 S/ - S/ -
S/ 147.52 S/ - S/ - S/ 368.80 S/ 368.80 S/ 368.80
S/ 347.11 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 34.50 S/ 23.00 S/ 23.00 S/ 11.50 S/ - S/ -
S/ 10.89 S/ - S/ - S/ - S/ - S/ -
S/ 19.90 S/ 29.85 S/ 29.85 S/ 37.32 S/ 37.32 S/ 37.32
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 43.13 S/ 43.13 S/ 43.13 S/ 43.13 S/ 43.13 S/ 43.13
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 7.29 S/ 3.24 S/ 3.24 S/ 2.02 S/ - S/ -
S/ 46.28 S/ - S/ - S/ - S/ - S/ -
S/ 36.47 S/ 36.47 S/ 36.47 S/ 36.47 S/ - S/ -
S/ 44.80 S/ - S/ - S/ 44.80 S/ 44.80 S/ 56.00
S/ 9.35 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.66 S/ 5.77 S/ 5.77 S/ 2.89 S/ - S/ -
S/ 0.77 S/ - S/ - S/ - S/ - S/ -
S/ 0.29 S/ 0.44 S/ 0.44 S/ 0.55 S/ 0.55 S/ 0.55
S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.97 S/ 1.46 S/ 1.46
S/ 1.46 S/ 1.46 S/ 3.13 S/ 2.09 S/ 1.46 S/ 1.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 188.00 S/ - S/ - S/ - S/ - S/ -
S/ 116.30 S/ 116.30 S/ 116.30 S/ 116.30 S/ - S/ -
S/ 11.63 S/ - S/ - S/ 15.51 S/ 19.38 S/ 19.38

IE732
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 15.86 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 70.50 S/ 47.00 S/ 47.00 S/ 23.50 S/ - S/ -
S/ 2,076.61 S/ - S/ - S/ - S/ - S/ -
S/ 2.58 S/ 3.10 S/ 3.10 S/ 2.58 S/ 3.88 S/ 3.88
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 12.78 S/ 12.78 S/ 12.78 S/ 12.78 S/ 12.78 S/ 12.78
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 54.01 S/ 24.01 S/ 24.01 S/ 15.00 S/ - S/ -
S/ 7.21 S/ - S/ - S/ - S/ - S/ -
S/ 8.73 S/ 8.73 S/ 8.73 S/ 8.73 S/ - S/ -
S/ 12.51 S/ - S/ - S/ 12.51 S/ 12.51 S/ 15.64
S/ 25.02 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 9.38 S/ 6.26 S/ 6.26 S/ 3.13 S/ - S/ -
S/ 148.32 S/ - S/ - S/ - S/ - S/ -
S/ 1.30 S/ 1.96 S/ 1.96 S/ 2.44 S/ 2.44 S/ 2.44
S/ 8.37 S/ 8.37 S/ 8.37 S/ 16.73 S/ 25.10 S/ 25.10
S/ 22.35 S/ 22.35 S/ 47.90 S/ 31.93 S/ 22.35 S/ 22.35
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 70.30 S/ - S/ - S/ - S/ - S/ -
S/ 21.63 S/ 21.63 S/ 21.63 S/ 21.63 S/ - S/ -
S/ 909.83 S/ - S/ - S/ 909.83 S/ 909.83 S/ 1,137.29
S/ 353.63 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 691.89 S/ 461.26 S/ 461.26 S/ 230.63 S/ - S/ -
S/ 98.18 S/ - S/ - S/ - S/ - S/ -
S/ 52.97 S/ 79.46 S/ 79.46 S/ 99.32 S/ 99.32 S/ 99.32
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 46.46 S/ 46.46 S/ 46.46 S/ 46.46 S/ 46.46 S/ 46.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 807.84 S/ 359.04 S/ 359.04 S/ 224.40 S/ - S/ -
S/ 431.67 S/ - S/ - S/ - S/ - S/ -
S/ 615.25 S/ 615.25 S/ 615.25 S/ 615.25 S/ - S/ -
S/ 0.78 S/ - S/ - S/ 0.78 S/ 0.78 S/ 0.97
S/ 0.01 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 165.77 S/ 110.51 S/ 110.51 S/ 55.26 S/ - S/ -
S/ 0.04 S/ - S/ - S/ - S/ - S/ -

IE733
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 40.56 S/ 48.67 S/ 48.67 S/ 40.56 S/ 60.84 S/ 60.84


S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 2,988.07 S/ 4,482.10 S/ 4,482.10
S/ 1,997.82 S/ 1,997.82 S/ 4,281.04 S/ 2,854.03 S/ 1,997.82 S/ 1,997.82
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 195.70 S/ - S/ - S/ - S/ - S/ -
S/ 149.35 S/ 149.35 S/ 149.35 S/ 149.35 S/ - S/ -
S/ 8,874.70 S/ - S/ - S/ 8,874.70 S/ 8,874.70 S/ 11,093.38
S/ 4,702.27 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 7.20 S/ 4.80 S/ 4.80 S/ 2.40 S/ - S/ -
S/ 2.60 S/ - S/ - S/ - S/ - S/ -
S/ 10.10 S/ 15.14 S/ 15.14 S/ 18.93 S/ 18.93 S/ 18.93
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 27.10 S/ 27.10 S/ 27.10 S/ 27.10 S/ 27.10 S/ 27.10
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.28 S/ 3.68 S/ 3.68 S/ 2.30 S/ - S/ -
S/ 0.44 S/ - S/ - S/ - S/ - S/ -
S/ 72.59 S/ 72.59 S/ 72.59 S/ 72.59 S/ - S/ -
S/ 0.27 S/ - S/ - S/ 0.27 S/ 0.20 S/ 0.34
S/ 3.69 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.99 S/ 1.33 S/ 1.33 S/ 0.66 S/ - S/ -
S/ 0.96 S/ - S/ - S/ - S/ - S/ -
S/ 0.49 S/ 0.59 S/ 0.59 S/ 0.49 S/ 0.74 S/ 0.74
S/ 0.73 S/ 0.73 S/ 0.73 S/ 1.46 S/ 2.20 S/ 2.20
S/ 4.42 S/ 4.42 S/ 9.48 S/ 6.32 S/ 4.42 S/ 4.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 46.55 S/ - S/ - S/ - S/ - S/ -
S/ 1,182.38 S/ 1,182.38 S/ 1,182.38 S/ 1,182.38 S/ - S/ -
S/ 3,007.60 S/ - S/ - S/ 3,007.60 S/ 2,255.70 S/ 3,759.50
S/ 290.00 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 22.15 S/ 14.76 S/ 14.76 S/ 7.38 S/ - S/ -
S/ 22.79 S/ - S/ - S/ - S/ - S/ -
S/ 67.33 S/ 80.80 S/ 80.80 S/ 67.33 S/ 101.00 S/ 101.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.32 S/ 2.32 S/ 2.32 S/ 2.32 S/ 2.32 S/ 2.32

IE734
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.20 S/ 0.20 S/ 0.12 S/ - S/ -
S/ 0.46 S/ - S/ - S/ - S/ - S/ -
S/ 0.32 S/ 0.32 S/ 0.32 S/ 0.32 S/ - S/ -
S/ 2.52 S/ - S/ - S/ 2.52 S/ 1.89 S/ 3.15
S/ 1.48 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

S/ 1.20 S/ - S/ - S/ - S/ - S/ -
S/ 29.94 S/ 35.93 S/ 35.93 S/ 29.94 S/ 44.92 S/ 44.92
S/ 16.02 S/ 16.02 S/ 16.02 S/ 32.05 S/ 48.07 S/ 48.07
S/ 11.22 S/ 11.22 S/ 24.03 S/ 16.02 S/ 11.22 S/ 11.22
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.52 S/ - S/ - S/ - S/ - S/ -
S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ - S/ -
S/ 61.80 S/ - S/ - S/ 46.35 S/ 61.80 S/ 77.24
S/ 12.88 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 223.89 S/ 149.26 S/ 149.26 S/ 74.63 S/ - S/ -
S/ 14.56 S/ - S/ - S/ - S/ - S/ -
S/ 12.26 S/ 14.71 S/ 14.71 S/ 12.26 S/ 12.26 S/ 18.39
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.09 S/ - S/ - S/ - S/ - S/ -
S/ 10.48 S/ 10.48 S/ 10.48 S/ 10.48 S/ - S/ -
S/ 62.07 S/ - S/ - S/ 46.55 S/ 62.07 S/ 77.58
S/ 20.03 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.49 S/ 2.33 S/ 2.33 S/ 1.16 S/ - S/ -
S/ 0.95 S/ - S/ - S/ - S/ - S/ -
S/ 0.28 S/ 0.34 S/ 0.34 S/ 0.28 S/ 0.28 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.86 S/ 0.83 S/ 0.83 S/ 0.52 S/ - S/ -
S/ 100.43 S/ - S/ - S/ - S/ - S/ -

IE735
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 2.71 S/ 2.71 S/ 2.71 S/ 2.71 S/ - S/ -


S/ 16.47 S/ - S/ - S/ 21.96 S/ 21.96 S/ 27.45
S/ 29.09 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 6.37 S/ 4.24 S/ 4.24 S/ 2.12 S/ - S/ -
S/ 17.40 S/ 7.73 S/ 7.73 S/ 4.83 S/ - S/ -
S/ 8.15 S/ - S/ - S/ - S/ - S/ -
S/ 7.64 S/ 7.64 S/ 7.64 S/ 7.64 S/ - S/ -
S/ 4.02 S/ - S/ - S/ 5.36 S/ 5.36 S/ 6.70
S/ 4.14 S/ 1.84 S/ 1.84 S/ 1.15 S/ - S/ -
S/ 23.33 S/ - S/ - S/ - S/ - S/ -
S/ 10.83 S/ 10.83 S/ 10.83 S/ 10.83 S/ - S/ -
S/ 13.50 S/ - S/ - S/ 18.00 S/ 18.00 S/ 22.50
S/ 3.68 S/ - S/ - S/ - S/ - S/ -

S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.56 S/ - S/ - S/ - S/ - S/ -
S/ 0.25 S/ 0.25 S/ 0.25 S/ 0.25 S/ - S/ -
S/ 97.15 S/ - S/ - S/ 97.15 S/ 97.15 S/ 121.44
S/ 56.95 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 72.45 S/ 48.30 S/ 48.30 S/ 24.15 S/ - S/ -
S/ 311.24 S/ - S/ - S/ - S/ - S/ -
S/ 1.91 S/ 2.29 S/ 2.29 S/ 1.91 S/ 2.87 S/ 2.87
S/ 26.82 S/ 26.82 S/ 26.82 S/ 53.64 S/ 80.45 S/ 80.45
S/ 0.87 S/ 0.87 S/ 1.86 S/ 1.24 S/ 0.87 S/ 0.87
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 37.11 S/ - S/ - S/ - S/ - S/ -
S/ 2.11 S/ 2.11 S/ 2.11 S/ 2.11 S/ - S/ -
S/ 0.77 S/ - S/ - S/ 1.03 S/ 1.03 S/ 1.28
S/ 84.38 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.67 S/ 1.78 S/ 1.78 S/ 0.89 S/ - S/ -
S/ 138.86 S/ - S/ - S/ - S/ - S/ -
S/ 229.32 S/ 275.18 S/ 275.18 S/ 229.32 S/ 343.98 S/ 343.98
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 562.41 S/ 562.41 S/ 562.41 S/ 562.41 S/ 562.41 S/ 562.41

IE736
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 522.15 S/ 232.06 S/ 232.06 S/ 145.04 S/ - S/ -
S/ 32.14 S/ - S/ - S/ - S/ - S/ -
S/ 365.91 S/ 365.91 S/ 365.91 S/ 365.91 S/ - S/ -
S/ 895.18 S/ - S/ - S/ 895.18 S/ 895.18 S/ 1,118.97
S/ 89.32 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 119.48 S/ 79.65 S/ 79.65 S/ 39.83 S/ - S/ -
S/ 14.09 S/ - S/ - S/ - S/ - S/ -
S/ 18.78 S/ 22.54 S/ 22.54 S/ 18.78 S/ 18.78 S/ 28.18
S/ 269.42 S/ 269.42 S/ 269.42 S/ 538.85 S/ 538.85 S/ 808.27
S/ 948.88 S/ 948.88 S/ 2,033.30 S/ 1,355.54 S/ 948.88 S/ 948.88
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1,449.14 S/ - S/ - S/ - S/ - S/ -
S/ 1,158.48 S/ 1,158.48 S/ 1,158.48 S/ 1,158.48 S/ - S/ -
S/ 112.12 S/ - S/ - S/ 149.49 S/ 149.49 S/ 186.86
S/ 52.07 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 133.64 S/ 89.09 S/ 89.09 S/ 44.55 S/ - S/ -
S/ 15.62 S/ - S/ - S/ - S/ - S/ -
S/ 2.78 S/ 3.33 S/ 3.33 S/ 2.78 S/ 2.78 S/ 4.17
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 85.16 S/ 85.16 S/ 85.16 S/ 85.16 S/ 85.16 S/ 85.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 15.83 S/ 7.03 S/ 7.03 S/ 4.40 S/ - S/ -
S/ 425.22 S/ - S/ - S/ - S/ - S/ -
S/ 260.33 S/ 260.33 S/ 260.33 S/ 260.33 S/ - S/ -
S/ 55.54 S/ - S/ - S/ 74.05 S/ 74.05 S/ 92.57
S/ 59.24 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 59.36 S/ 39.57 S/ 39.57 S/ 19.79 S/ - S/ -
S/ 20.83 S/ - S/ - S/ - S/ - S/ -
S/ 84.23 S/ 101.08 S/ 101.08 S/ 84.23 S/ 84.23 S/ 126.35
S/ 108.30 S/ 108.30 S/ 108.30 S/ 216.60 S/ 216.60 S/ 324.90
S/ 86.16 S/ 86.16 S/ 184.62 S/ 123.08 S/ 86.16 S/ 86.16
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 262.50 S/ - S/ - S/ - S/ - S/ -

IE737
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 25.00 S/ 25.00 S/ 25.00 S/ 25.00 S/ - S/ -


S/ 221.28 S/ - S/ - S/ 295.04 S/ 295.04 S/ 368.80
S/ 347.11 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 34.50 S/ 23.00 S/ 23.00 S/ 11.50 S/ - S/ -
S/ 10.89 S/ - S/ - S/ - S/ - S/ -
S/ 24.88 S/ 29.85 S/ 29.85 S/ 24.88 S/ 24.88 S/ 37.32
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 43.13 S/ 43.13 S/ 43.13 S/ 43.13 S/ 43.13 S/ 43.13
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 7.29 S/ 3.24 S/ 3.24 S/ 2.02 S/ - S/ -
S/ 46.28 S/ - S/ - S/ - S/ - S/ -
S/ 36.47 S/ 36.47 S/ 36.47 S/ 36.47 S/ - S/ -
S/ 33.60 S/ - S/ - S/ 44.80 S/ 44.80 S/ 56.00
S/ 9.35 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.66 S/ 5.77 S/ 5.77 S/ 2.89 S/ - S/ -
S/ 0.77 S/ - S/ - S/ - S/ - S/ -
S/ 0.36 S/ 0.44 S/ 0.44 S/ 0.36 S/ 0.36 S/ 0.55
S/ 0.49 S/ 0.49 S/ 0.49 S/ 0.97 S/ 0.97 S/ 1.46
S/ 1.46 S/ 1.67 S/ 3.13 S/ 2.09 S/ 1.46 S/ 1.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 188.00 S/ - S/ - S/ - S/ - S/ -
S/ 116.30 S/ 116.30 S/ 116.30 S/ 116.30 S/ - S/ -
S/ 15.51 S/ - S/ - S/ 15.51 S/ 15.51 S/ 19.38
S/ 15.86 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 70.50 S/ 47.00 S/ 47.00 S/ 23.50 S/ - S/ -
S/ 2,076.61 S/ - S/ - S/ - S/ - S/ -
S/ 2.07 S/ 3.10 S/ 3.10 S/ 3.88 S/ 3.88 S/ 3.88
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 12.78 S/ 12.78 S/ 12.78 S/ 12.78 S/ 12.78 S/ 12.78
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 54.01 S/ 24.01 S/ 24.01 S/ 15.00 S/ - S/ -
S/ 7.21 S/ - S/ - S/ - S/ - S/ -
S/ 8.73 S/ 8.73 S/ 8.73 S/ 8.73 S/ - S/ -
S/ 12.51 S/ - S/ - S/ 12.51 S/ 12.51 S/ 15.64
S/ 25.02 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

IE738
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 9.38 S/ 6.26 S/ 6.26 S/ 3.13 S/ - S/ -


S/ 148.32 S/ - S/ - S/ - S/ - S/ -
S/ 1.47 S/ 1.96 S/ 1.96 S/ 2.44 S/ 2.44 S/ 2.44
S/ 8.37 S/ 8.37 S/ 8.37 S/ 16.73 S/ 25.10 S/ 25.10
S/ 22.35 S/ 22.35 S/ 47.90 S/ 31.93 S/ 22.35 S/ 22.35
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 70.30 S/ - S/ - S/ - S/ - S/ -
S/ 21.63 S/ 21.63 S/ 21.63 S/ 21.63 S/ - S/ -
S/ 682.38 S/ - S/ - S/ 909.83 S/ 909.83 S/ 1,137.29
S/ 353.63 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 691.89 S/ 461.26 S/ 461.26 S/ 230.63 S/ - S/ -
S/ 98.18 S/ - S/ - S/ - S/ - S/ -
S/ 52.97 S/ 79.46 S/ 79.46 S/ 99.32 S/ 99.32 S/ 99.32
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 46.46 S/ 46.46 S/ 46.46 S/ 46.46 S/ 46.46 S/ 46.46
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 807.84 S/ 359.04 S/ 359.04 S/ 224.40 S/ - S/ -
S/ 431.67 S/ - S/ - S/ - S/ - S/ -
S/ 615.25 S/ 615.25 S/ 615.25 S/ 615.25 S/ - S/ -
S/ 0.58 S/ - S/ - S/ 0.78 S/ 0.78 S/ 0.97
S/ 0.01 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 165.77 S/ 110.51 S/ 110.51 S/ 55.26 S/ - S/ -
S/ 0.04 S/ - S/ - S/ - S/ - S/ -
S/ 40.56 S/ 48.67 S/ 48.67 S/ 40.56 S/ 60.84 S/ 60.84
S/ 1,494.03 S/ 1,494.03 S/ 1,494.03 S/ 2,988.07 S/ 4,482.10 S/ 4,482.10
S/ 2,854.03 S/ 2,854.03 S/ 4,281.04 S/ 2,854.03 S/ 1,997.82 S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 195.70 S/ - S/ - S/ - S/ - S/ -
S/ 149.35 S/ 149.35 S/ 149.35 S/ 149.35 S/ - S/ -
S/ 6,656.03 S/ - S/ - S/ 8,874.70 S/ 8,874.70 S/ 11,093.38
S/ 4,702.27 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 7.20 S/ 4.80 S/ 4.80 S/ 2.40 S/ - S/ -
S/ 2.60 S/ - S/ - S/ - S/ - S/ -
S/ 12.62 S/ 15.14 S/ 15.14 S/ 12.62 S/ 18.93 S/ 18.93

IE739
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 27.10 S/ 27.10 S/ 27.10 S/ 27.10 S/ 27.10 S/ 27.10
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 8.28 S/ 3.68 S/ 3.68 S/ 2.30 S/ - S/ -
S/ 0.44 S/ - S/ - S/ - S/ - S/ -
S/ 72.59 S/ 72.59 S/ 72.59 S/ 72.59 S/ - S/ -
S/ 0.20 S/ - S/ - S/ 0.27 S/ 0.27 S/ 0.34
S/ 3.69 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.99 S/ 1.33 S/ 1.33 S/ 0.66 S/ - S/ -
S/ 0.96 S/ - S/ - S/ - S/ - S/ -
S/ 0.49 S/ 0.59 S/ 0.59 S/ 0.49 S/ 0.74 S/ 0.74
S/ 0.73 S/ 0.73 S/ 0.73 S/ 1.46 S/ 2.20 S/ 2.20
S/ 4.42 S/ 4.42 S/ 9.48 S/ 6.32 S/ 4.42 S/ 4.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 46.55 S/ - S/ - S/ - S/ - S/ -
S/ 1,182.38 S/ 1,182.38 S/ 1,182.38 S/ 1,182.38 S/ - S/ -
S/ 2,255.70 S/ - S/ - S/ 3,007.60 S/ 3,007.60 S/ 3,759.50
S/ 290.00 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 22.15 S/ 14.76 S/ 14.76 S/ 7.38 S/ - S/ -
S/ 22.79 S/ - S/ - S/ - S/ - S/ -
S/ 67.33 S/ 80.80 S/ 80.80 S/ 67.33 S/ 101.00 S/ 101.00
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.32 S/ 2.32 S/ 2.32 S/ 2.32 S/ 2.32 S/ 2.32
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.44 S/ 0.20 S/ 0.20 S/ 0.12 S/ - S/ -
S/ 0.46 S/ - S/ - S/ - S/ - S/ -
S/ 0.32 S/ 0.32 S/ 0.32 S/ 0.32 S/ - S/ -
S/ 1.89 S/ - S/ - S/ 2.52 S/ 2.52 S/ 3.15
S/ 1.48 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

S/ 1.20 S/ - S/ - S/ - S/ - S/ -
S/ 29.94 S/ 35.93 S/ 35.93 S/ 29.94 S/ 44.92 S/ 44.92
S/ 16.02 S/ 16.02 S/ 16.02 S/ 32.05 S/ 48.07 S/ 48.07
S/ 11.22 S/ 11.22 S/ 24.03 S/ 16.02 S/ 11.22 S/ 11.22
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -

IE740
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.52 S/ - S/ - S/ - S/ - S/ -
S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ 1,034.51 S/ - S/ -
S/ 46.35 S/ - S/ - S/ 61.80 S/ 61.80 S/ 77.24
S/ 12.88 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 223.89 S/ 149.26 S/ 149.26 S/ 74.63 S/ - S/ -
S/ 14.56 S/ - S/ - S/ - S/ - S/ -
S/ 12.26 S/ 14.71 S/ 14.71 S/ 12.26 S/ 18.39 S/ 18.39
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99 S/ 1.99
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 2.09 S/ - S/ - S/ - S/ - S/ -
S/ 10.48 S/ 10.48 S/ 10.48 S/ 10.48 S/ - S/ -
S/ 46.55 S/ - S/ - S/ 62.07 S/ 62.07 S/ 77.58
S/ 20.03 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 3.49 S/ 2.33 S/ 2.33 S/ 1.16 S/ - S/ -
S/ 0.95 S/ - S/ - S/ - S/ - S/ -
S/ 0.28 S/ 0.34 S/ 0.34 S/ 0.28 S/ 0.42 S/ 0.42
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59 S/ 0.59
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 1.86 S/ 0.83 S/ 0.83 S/ 0.52 S/ - S/ -
S/ 100.43 S/ - S/ - S/ - S/ - S/ -
S/ 2.71 S/ 2.71 S/ 2.71 S/ 2.71 S/ - S/ -
S/ 16.47 S/ - S/ - S/ 21.96 S/ 21.96 S/ 27.45
S/ 29.09 S/ - S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ - S/ - S/ -
S/ 6.37 S/ 4.24 S/ 4.24 S/ 2.12 S/ - S/ -
S/ 17.40 S/ 7.73 S/ 7.73 S/ 4.83 S/ - S/ -
S/ 8.15 S/ - S/ - S/ - S/ - S/ -
S/ 7.64 S/ 7.64 S/ 7.64 S/ 7.64 S/ - S/ -
S/ 4.02 S/ - S/ - S/ 5.36 S/ 5.36 S/ 6.70
S/ 4.14 S/ 1.84 S/ 1.84 S/ 1.15 S/ - S/ -
S/ 23.33 S/ - S/ - S/ - S/ - S/ -
S/ 10.83 S/ 10.83 S/ 10.83 S/ 10.83 S/ - S/ -
S/ 13.50 S/ - S/ - S/ 18.00 S/ 18.00 S/ 22.50
S/ 3.68 S/ - S/ - S/ - S/ - S/ -

IE741
TACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION P

Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15


DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

S/ 114,352.24 S/ 41,188.23 S/ 50,450.19 S/ 94,073.27 S/ 78,030.62 S/ 83,097.21


9.27% 3.34% 4.09% 7.63% 6.33% 6.74%
71.88% 75.22% 79.31% 86.94% 93.26% 100.00%

IE742
CRONOGRAMA DE ADQUISICION DE EQUIPOS- INSTALACIONES SANITARIAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y
DISTRITO DE AYAVIRI”, CON CODIGO UNICO N° 2131616

EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C


SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15
DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021
Código EQUIPOS Unidad Parcial S/. A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

SALDO
349350001 PLANCHA COMPACTADORA VIBRAT. 4.0 HP h-m S/ 27,657.01 S/ - S/ - S/ - S/ - S/ - S/ - S/ 5,531.40 S/ 4,148.55 S/ 5,531.40 S/ 5,531.40 S/ 6,914.25 S/ - S/ - S/ - S/ -
349500003 MEZCLADORA DE CONC.(TAMBOR) 11-12 P3, 18 HP h-m S/ 1,690.97 S/ - S/ - S/ - S/ - S/ 507.29 S/ 507.29 S/ 338.19 S/ 169.10 S/ 169.10 S/ - S/ - S/ - S/ - S/ - S/ -
349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m S/ 857.50 S/ - S/ - S/ - S/ - S/ 171.50 S/ 171.50 S/ 171.50 S/ 171.50 S/ 171.50 S/ - S/ - S/ - S/ - S/ - S/ -
349600103 SOLDADORA ELECTRICA h-m S/ 5,009.35 S/ - S/ - S/ - S/ 1,252.34 S/ 1,001.87 S/ 1,001.87 S/ 751.40 S/ 1,001.87 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
349600105 MOTOBOMBA 7 -10 HP, 3" h-m S/ 1,160.32 S/ - S/ - S/ - S/ 290.08 S/ 232.06 S/ 232.06 S/ 116.03 S/ 290.08 S/ - S/ - S/ - S/ - S/ - S/ - S/ -
349650003 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 h-m S/ 15,125.50 S/ - S/ - S/ - S/ - S/ - S/ - S/ 3,025.10 S/ 2,268.82 S/ 3,025.10 S/ 3,025.10 S/ 3,781.37 S/ - S/ - S/ - S/ -

TOTAL S/ 51,500.64 S/ - S/ - S/ - S/ 1,542.42 S/ 1,912.72 S/ 1,912.72 S/ 9,933.63 S/ 8,049.92 S/ 8,897.10 S/ 8,556.50 S/ 10,695.63 S/ - S/ - S/ - S/ -

AVANCE PARCIAL 0.00% 0.00% 0.00% 2.99% 3.71% 3.71% 19.29% 15.63% 17.28% 16.61% 20.77% 0.00% 0.00% 0.00% 0.00%

AVANCE ACUMULADO 0.00% 0.00% 0.00% 2.99% 6.71% 10.42% 29.71% 45.34% 62.62% 79.23% 100.00% 100.00% 100.00% 100.00% 100.00%

IS743
CRONOGRAMA DE ADQUISICION DE EQUIPOS - INSTALACIONES ELECTRICAS

Obra : SALDO DE OBRA DEL PROYECTO “ADECUACION, MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA DE LA I.E NUESTRA SEÑORA DE ALTA GRACIA AYAVIRI – MELGAR - PUNO”; DEL PROYECTO DE INVERSION PUBLICA: “REHABILITACION Y REMODELACION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DE ALTA GRACIA; UBICADA EN LA REGION PUNO PROVINCIA DE MELGAR Y DISTRITO DE AYAVIRI”, CON
CODIGO UNICO N° 2131616
EJECUTOR : GRUPO JOHESA CONSTRUCTORES S.A.C
SUPERVISION : CONSORCIO NORTE INGENIEROS
UBICACIÓN : PUNO - MELGAR - AYAVIRI
INICIO DE OBRA : 21 DE DICIEMBRE DEL 2019
FIN DE OBRA : 12 DE FEBRERO DEL 2021
PLAZO EJEC. : 420 DIAS CALENDARIOS
Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06 Mes 07 Mes 08 Mes 09 Mes 10 Mes 11 Mes 12 Mes 13 Mes 14 Mes 15
DE 21/12/2019 DE 01/01/2020 DE 01/02/2020 DE 01/03/2020 DE 01/04/2020 DE 01/05/2020 DE 01/06/2020 DE 01/07/2020 DE 01/08/2020 DE 01/09/2020 DE 01/10/2020 DE 01/11/2020 DE 01/12/2020 DE 01/01/2021 DE 01/02/2021

Código EQUIPOS Unidad Parcial S/. A 31/12/2019 A 31/01/2020 A 29/02/2020 A 31/03/2020 A 30/04/2020 A 31/05/2020 A 30/06/2020 A 31/07/2020 A 31/08/2020 A 30/09/2020 A 31/10/2020 A 30/11/2020 A 31/12/2020 A 31/01/2021 A 12/02/2021

SALDO
349500005 MEZCLADORA DE CONCM(TAMBOR) 11-12 P3, 18 HP h-m S/ 91.30 S/ - S/ - S/ - S/ - S/ - S/ 9.13 S/ 13.69 S/ 13.69 S/ 13.69 S/ 13.69 S/ 9.13 S/ 9.13 S/ 4.56 S/ 4.56 S/ -
349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m S/ 46.29 S/ - S/ 0.93 S/ 1.85 S/ 2.78 S/ 3.70 S/ 4.63 S/ 2.78 S/ 4.17 S/ 7.41 S/ 6.02 S/ 3.70 S/ 3.70 S/ 2.31 S/ 2.31 S/ -
349600103 SOLDADORA ELECTRICA h-m S/ 8.90 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 1.34 S/ 1.78 S/ 1.78 S/ 1.78 S/ 2.23 S/ -
MEJORA
349500005 MEZCLADORA DE CONCM(TAMBOR) 11-12 P3, 18 HP h-m S/ 91.30 S/ - S/ - S/ - S/ - S/ - S/ 13.69 S/ 13.69 S/ 13.69 S/ 9.13 S/ 13.69 S/ 9.13 S/ 9.13 S/ 4.56 S/ 4.56 S/ -
349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m S/ 46.29 S/ - S/ 0.93 S/ 1.85 S/ 2.78 S/ 3.70 S/ 4.63 S/ 2.78 S/ 4.17 S/ 5.09 S/ 8.33 S/ 3.70 S/ 3.70 S/ 2.31 S/ 2.31 S/ -
349600103 SOLDADORA ELECTRICA h-m S/ 8.90 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 1.34 S/ 1.78 S/ 1.78 S/ 1.78 S/ 2.23 S/ -
DEFICIENCIA
349500005 MEZCLADORA DE CONCM(TAMBOR) 11-12 P3, 18 HP h-m S/ 91.30 S/ - S/ - S/ - S/ - S/ - S/ 13.69 S/ 13.69 S/ 13.69 S/ 13.69 S/ 9.13 S/ 9.13 S/ 9.13 S/ 4.56 S/ 4.56 S/ -
349500012 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m S/ 46.29 S/ - S/ 0.93 S/ 1.85 S/ 2.78 S/ 3.70 S/ 4.63 S/ 2.78 S/ 4.17 S/ 7.41 S/ 6.02 S/ 3.70 S/ 3.70 S/ 2.31 S/ 2.31 S/ -
349600103 SOLDADORA ELECTRICA h-m S/ 8.90 S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ - S/ 1.34 S/ 1.78 S/ 1.78 S/ 1.78 S/ 2.23 S/ -

TOTAL S/ 439.47 S/ - S/ 2.78 S/ 5.55 S/ 8.33 S/ 11.11 S/ 50.41 S/ 49.42 S/ 53.58 S/ 56.42 S/ 60.89 S/ 43.84 S/ 43.84 S/ 25.98 S/ 27.32 S/ -

AVANCE PARCIAL 0.00% 0.63% 1.26% 1.90% 2.53% 11.47% 11.24% 12.19% 12.84% 13.86% 9.98% 9.98% 5.91% 6.22% 0.00%

AVANCE ACUMULADO 0.00% 0.63% 1.90% 3.79% 6.32% 17.79% 29.03% 41.23% 54.06% 67.92% 77.90% 87.87% 93.78% 100.00% 100.00%

IE744