Sei sulla pagina 1di 8

DESIGN OF BEAM COLUMNS - II

Job No: Sheet 1 of 6 Rev


Structural Steel Job Title: BEAM COLUMN
Design Project Worked Example - 1
Made by Date 3-1-00
SSSR
Checked by Date 10-1-00
Calculation Sheet VK

PROBLEM: 1
A non – sway intermediate column in a building frame with flexible joints is
4.0 m high and it is ISHB 300 @ 588 N/m steel section. Check the adequacy
of the section when the column is subjected to following load:

Factored axial load = 500 kN

Factored moments:
Mz My

Bottom + 7.0 kN –m - 1.0 kN - m


Top + 15.0 kN – m + 0.75 kN - m

[ fy = 250 N/mm2 ; E = 2* 105 N/mm2]

Assume effective length of the column as 3.4 m along both the axes.

CROSS-SECTION PROPERTIES:

Flange thickness = T = 10.6 mm

Clear depth between flanges = d = 300 – (10.6 * 2)


= 278.8 mm

Thickness of web = t = 7.6 mm

Flange width = 2b = 250 mm

b = 125 mm

Area of cross-section = Ag = 7485 mm2

C/c distance between flanges = hf = 289.4 mm

Version II 14-8
DESIGN OF BEAM COLUMNS - II

Job No: Sheet 2 of 6 Rev


Structural Steel Job Title: BEAM COLUMN
Design Project Worked Example - 1
Made by Date 3-1-00
SSSR
Checked by Date 10-1-00
Calculation Sheet VK

Rz = 129.5 mm

ry = 54.1 mm

Iz = 12545.2*104 mm4

Iy = 2193.6*104 mm4

Zz = 836.3*103 mm3

Zy = 175.5*103 mm3

Zpz = 953.4*103 mm3

Zpy = 200.1*103 mm3

(i) Type of section:


Table 3.1 of
IS: 800
b 125
= = 11 . 8 > 10 . 5 ε & < 15 . 7 ε
T 10 . 6

d 278 . 8
= = 36 . 7 < 42 ε
t 7 .6

250 250
where , ε = = = 1 .0
fy 250

Hence, cross- section is “ SEMI-COMPACT” (Class 3)

Version II 14-9
DESIGN OF BEAM COLUMNS - II

Job No: Sheet 3 of 6 Rev


Structural Steel Job Title: BEAM COLUMN
Design Project Worked Example - 1
Made by Date 3-1-00
SSSR
Checked by Date 10-1-00
Calculation Sheet VK

(ii) Check for resistance of cross-section to the combined effects


for yielding:

fyd = fy /γa = 250/1.15

= 217.4 N/mm2

Ag = 7485 mm2

Zz = 836.3*103 mm3

Zy = 175.5*103 mm3

P = 500 kN

Mz = 15 kN-m

My = 1.0 kN-m

The interaction equation is:

Pc Mz My
+ + ≤1
Ag f yd Z z f yd Z y f yd

500 × 10 3 15 × 10 6 1 × 10 6
= + +
7485 × 217.4 836.3 × 10 3 × 217.4 175.5 × 10 3 × 217.4

= 0.307 + 0.083 + 0.026 = 0.416 < 1.0

Hence, section is O.K. against combined effects

Version II 14-10
DESIGN OF BEAM COLUMNS - II

Job No: Sheet 4 of 6 Rev


Structural Steel Job Title: BEAM COLUMN
Design Project Worked Example - 1
Made by Date 3-1-00
SSSR
Checked by Date 10-1-00
Calculation Sheet VK

(iii) Check for resistance of cross-section to the combined effects for


buckling:

(a) Determination of Pdz, Pdy and Pd (Clause 7.1.2) --------

KLy = KLz = 3.4m

KL 3400 KL y
λz = z
= = 26.03, λ y = = 54.1 = 62.8
rz 129.5 ry
λ1 = π .(E / f y )1 / 2 = 88.857

Therefore, non-dimensional slenderness ratios


λz λy
λz = = 0.296 and λ y = = 0.706
λ1 λ1

Calculation of χ :

Imperfection factors: αz = 0.21 ; αy = 0.34

φ - values:
φ = 0.5[1 + α (λ − 0.2 )+ λ 2 ]

φz = 0.5[1 + 0.21(0.296 – 0.2) + (0.296)2] = 0.554

φy = 0.5[1 + 0.34(0.706 – 0.2) + (0.706)2] = 0.835

χ - values:
1
χ= ≤ 1 .0
φ + (φ − λ )
1
2 2 2

χz = 1/[0.554 + (0.554 2 – 0.296 2)1/2] = 0.978

χy = 1/[1.006 + (0.835 2 – 0.706 2)1/2] = 0.780

Version II 14-11
DESIGN OF BEAM COLUMNS - II

Job No: Sheet 5 of 6 Rev


Structural Steel Job Title: BEAM COLUMN
Design Project Worked Example - 1
Made by Date 3-1-00
SSSR
Checked by Date 10-1-00
Calculation Sheet VK
Therefore,

Pdz =7485 x0.978 x250 / 1.10 x 10 -3 =1663.7 kN

Pdy =7485 x0. 78 x250 / 1.10 x 10 -3 =1327.0 kN

Therefore Pd = Pdy = 1327.0 kN

(b) Determination of Mdz


Elastic Critical moment is given by
0.5
π 2 EI y h f ⎡ ⎡L / r ⎤ ⎤
2

M cr = ⎢1 + 1 ⎢ LT y ⎥ ⎥
2 L LT
2
⎢ 20 ⎣⎢ h f / t f ⎦⎥ ⎥
⎣ ⎦
0.5
π 2 x 2 E 5 x 2193.6 E 4 x 289.4 ⎡ ⎤ 2
1 ⎧ 3400 / 54.1 ⎫
M cr = ⎢1 + ⎨ ⎥ ⎬ = 6.319 x10 8 N − m
2 x(3400) ⎢⎣ 20 ⎩ 289.4 / 10.6 ⎭
2
⎥⎦ IS: 800
(Clause 9.3.2.2
λ LT = Z ez . f y / M cr = 836.3E 3x 250 / 6.319 E 8 = 0.5856
Clause 8.2.2)
[ ]
φ LT = 0.5 1 + α LT (λ LT − 0.2) + λ LT 2 = 0.5[1 + 0.21x(0.586 − 0.2) + 0.586 2 ] = 0.71

[αLT = 0.21]

1
χ LT =
[φ LT {
+ φ LT − λ L T
2
}
2 0.5
] = 0.90 ≤ 1.0
f bd = χ LT . f y / γ m = 0.90 x 250 / 1.1 = 204.55MPa

Mdz = Zez. fbd = 836.3 x 10 3 x 204.55 x 10 -6 = 179.42 kN-M


(c) Determination of Mdy --------

Mdy = Zey . fy / γm = 175.5 x 10 3 x 250 / 1.1 x10 -6 = 39.9 kN-M

Version II 14-12
DESIGN OF BEAM COLUMNS - II

Job No: Sheet 6 of 6 Rev


Structural Steel Job Title: BEAM COLUMN
Design Project Worked Example - 1
Made by Date 3-1-00
SSSR
Checked by Date 10-1-00
Calculation Sheet VK

The interaction equations to be satisfied

P C my M y Mz
+ky + k LT ≤ 1.0
Pdy M dy M dz
P C my M y C M
+ 0.6 k y + k z mz z ≤ 1.0
Pdz M dy M dz

(d) Determination of Cmy ------- 15 kN-m (M1)

ψz = M2 / M1 = 7/15 = 0.467

Cmy = 0.6 + 0.4 ψ ≥ 0.4

Cmy = 0.6 + 0.4 x 0.467 = 0.7868 ≥ 0.4


7 kN-m (M2)

(e) Determination of Cmz -------


0.75 kN-m (M2)
ψy = 0.75/(-1.0) = - 0.75

Cmz = 0.6 + 0.4 ψ ≥ 0.4

Cmz = 0.6 - 0.4 x 0.75 = 0.30 ≈ 0.4


- 1.0 kN-m (M1)

(f) Determination of CmLT -------

ψz = M2 / M1 = 7/15 = 0.467

CmLT = 0.6 + 0.4 ψ ≥ 0.4

CmLT = 0.6 + 0.4 x 0.467 = 0.7868 ≥ 0.4

Version II 14-13
DESIGN OF BEAM COLUMNS - II

Job No: Sheet 5 of 6 Rev


Structural Steel Job Title: BEAM COLUMN
Design Project Worked Example - 1
Made by Date 3-1-00
SSSR
Checked by Date 10-1-00
Calculation Sheet VK
(g) Determination of kz , ky & kLT------

ky = 1+(λy-0.2)ny ≤ 1+0.8 ny
kz = 1+(λz-0.2)nz ≤ 1+0.8 nz
0.1λLT n y 0.1n y
kLT = 1 − ≥1 −
( CmLT − 0.25) ( CmLT − 0.25)
ny = P / Pdy =500 / 1327 = 0.377
nz = P / Pdy =500 / 1663.7 = 0.30
λz λy
λz = = 0.296 ; λ y = = 0.706 and λ LT = 0.5856
λ1 λ1
Therefore,

ky = 1 + (0.706 – 0.2) x 0.377 = 1.19 [ ≤ 1.3016 = 1+0.8 ny]


kz = 1 + (0.296 – 0.2) x 0.30 = 1.03 [ ≤ 1.24 = 1+0.8 ny]
0.1x0.5856 x0.377 0.1x0.377
k LT = 1 − = 0.959 ≥ [ 1 − = 0.93 ]
(0.7868 − 0.25) (0.7868 − 0.25)
(h) Interaction checks------

Check no 1

P C my M y Mz
+ky + k LT
Pdy M dy M dz

500 0.7868 x1.0 15


= + 1.19 x + 0.93x
1327 39.9 179.42

= 0.3767 + 0.023 + 0.077 = 0.478 < 1.0

Version II 14-14
DESIGN OF BEAM COLUMNS - II

Job No: Sheet 6 of 6 Rev


Structural Steel Job Title: BEAM COLUMN
Design Project Worked Example - 1
Made by Date 3-1-00
SSSR
Checked by Date 10-1-00
Calculation Sheet VK

Check no 2

P C my M y C M
+ 0 .6 k y + k z mz z ≤1.0
Pdz M dy M dz
500 0.7868 x1.0 0.4 x15
= + 0.6 x1.19 x + 1.03 x
1663.7 39.9 179.42

= 0.30 + 0.014 + 0.034 = 0.348 < 1.0

Version II 14-15

Potrebbero piacerti anche