Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Prime Structures to
1 Canopy Complete Canopy Glass
Installation
unfinished
2 FIRESTOP
Firestop in between slab
level and Façade Wall not
done at 7th floor level
MALE TOILET / and Shower
Room
5
At 4th floor level, ceiling to
make good
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE
6
gaps on Aluminum Fins to
make good/ cover
Aluminim Box up
13 Alignment 1 pc Sticking out
from the rest
Aluminum Cladding
14
interface with Vertical Fins
at External Metal Staircase
to complete
15
16
18
19
38
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE
end capping on cladding at
7th floor roof need to
complete, nenkar water
tank
39
40
silver tape to be put in
place properly
48
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE
gap on ceiling and glass
wall need to be completed
at 4th floor
49