Sei sulla pagina 1di 40

ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS

PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO


PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

Prime Structures to
1 Canopy Complete Canopy Glass
Installation

unfinished
2 FIRESTOP
Firestop in between slab
level and Façade Wall not
done at 7th floor level
MALE TOILET / and Shower
Room

Painting of Architectural Fin


4
Supports should match
adjacent colour of Arch.
Fins
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

5
At 4th floor level, ceiling to
make good
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

6
gaps on Aluminum Fins to
make good/ cover

Painting of Architectural Fin


7 Supports to matched
adjacent material colour

red triangular sticker


pointing arrow down to be
in placed at latch so that
8 fireman knows where to
open the screen in case of
emergency( 2nd to 7th
floor level)
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

AT 6TH FLOOR LEVEL


9
Broken glass need to be
replaced at near Gate2 @
Kung Chong Road

AT 1st FLOOR High Level


10
Broken glass need to be
replaced location near
Gate2 Kung Chong Road

Broken glass to be replaced


11 at 1st floor High Level
near Gate 1 Hoy Fatt Road
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

Broken glass to be replaced


12 at 2ND FLOOR Level near
Gate1 Hoy Fatt Road

Aluminim Box up
13 Alignment 1 pc Sticking out
from the rest

Aluminum Cladding
14
interface with Vertical Fins
at External Metal Staircase
to complete

15

Cleaning/ Painting of Steel


Hollow Section At 7th Floor
to match adjacent paint
colour MATTE GREY
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
Cleaning/ Painting of Steel
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE
Hollow Section At 7th Floor
to match adjacent paint
colour MATTE GREY

16

Cleaning/ Painting of Steel


17
Hollow Section At 2ND
Floor to match adjacent
paint colour MATTE GREY
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

18

Cleaning/ Painting of Steel


Hollow Section At 2ND
Floor to match adjacent
paint colour MATTE GREY

19

Cleaning of brown coloured


spots on Aluminum
20 Cladding at Architectural
Fins and at base of Fins at
2nd floor level
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

Gap in between aluminum


Box up and Glass Railing to
21 make good, to properly
sealed off no water ingress
in the future

All Fireman Access Panels


need to install properly,
Many damaged Lock ,
water ingress during water
tightness test, take note
22 that Glass Façade Haven't
tested for water tightness
test Glass Façade need to
be thoroughly Cleaned
prior to Handover to
Owner

Cleaning of brown coloured


spots on Aluminum
23 Cladding at Architectural
Fins and at base of Fins at
2nd floor level
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

Cleaning of brown coloured


spots on Aluminum
24 Cladding at Architectural
Fins and at base of Fins at
2nd floor level

Cleaning/ Painting of Steel


25
Hollow Section At 3RD
Floor to match adjacent
paint colour MATTE GREY

Cleaning of brown coloured


spots on Aluminum
26 Cladding at Architectural
Fins and at base of Fins at
3rd floor level

Cleaning/ Painting of Steel


27
Hollow Section At 3RD
Floor to match adjacent
paint colour MATTE GREY
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

Cleaning/ Painting of Steel


28
Hollow Section At 4TH
Floor to match adjacent
paint colour MATTE GREY
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

Cleaning of brown coloured


spots on Aluminum
29 Cladding at Architectural
Fins and at base of Fins at
4TH floor level

Cleaning/ Painting of Steel


30
Hollow Section At 5TH
Floor to match adjacent
paint colour MATTE GREY

Cleaning of brown coloured


spots on Aluminum
31 Cladding at Architectural
Fins and at base of Fins at
5TH floor level
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

Cleaning/ Painting of Steel


32
Hollow Section At 6TH
Floor to match adjacent
paint colour MATTE GREY

Cleaning of brown coloured


spots on Aluminum
33 Cladding at Architectural
Fins and at base of Fins at
6TH floor level
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

Cleaning/ Painting of Steel


34
Hollow Section At 7TH
Floor to match adjacent
paint colour MATTE GREY

Cleaning/ Painting of Steel


35
Hollow Section At 7TH
Floor to match adjacent
paint colour MATTE GREY

Cleaning of brown coloured


spots on Aluminum
36 Cladding at Architectural
Fins and at base of Fins at
7TH floor level

end capping on cladding at


7th floor roof need to
complete near Genset at
7th floor level
37
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE
sealant on gaps need to
complete at 7th floor

38
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE
end capping on cladding at
7th floor roof need to
complete, nenkar water
tank
39

40
silver tape to be put in
place properly

gap on glass wall and


41 concrete precast wall need
to complete

gap on ceiling and glass


wall at 4th floor level sky
terrace need to complete
42
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

43 gap needs to have sealant


ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE
at 4th floor level, ceiling
access panel need to be
completed
44

gap on ceiling and glass


wall at 4th floor level sky
terrace need to complete
45

gap on ceiling and glass


46
wall / door not installed at
4th floor level sky terrace
need to complete

doors at 4th floor sky


47 terrace needs to be
completed
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE
gap on ceiling and door
need to be completed

48
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE
gap on ceiling and glass
wall need to be completed
at 4th floor
49

exposed structural support


50 of Aluminum cladding need
to make good

gap on floor and aluminum


51 cladding need to make
good
ZDC - PRIME STRUCTURES ARCHITECTURAL OUTSTANDING WORKS
PART 1 PREPARED BY :ALFREDO JR. ARIOS CLARO
PRIME DESCRIPTION/
S/N before Poto after Photo
STRUCTURES LOCATION/GRIDLINE

platform paint colour not


52
matched adjacent matte
grey colour, 2nd floor level
to 7th floor roof level

gap on glass railing and


concrete need to make
good, gap on glass façade
and Aluminum cladding
53 box up need to make good
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

PREPARED BY :ALFREDO JR. ARIOS CLARO


Action to be done by/ to be
completed on

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:
PREPARED BY :ALFREDO JR. ARIOS CLARO
Action to be done by/ to be
completed on
Action By: ZhengDa Corporation
Pte., Ltd. / To be Closed : / Date
Closed:

Action By: ZhengDa Corporation


Pte., Ltd. / To be Closed : / Date
Closed:

Potrebbero piacerti anche