Building Study Report

STEFFI ELSA MARK


1120230
SEMESTER VII
2011-16
CONTENTS

• ACKNOWLEDGEMENT
• INTRODUCTION
• PROJECT BRIEF
• LOCATION
• SITE DETAILS
• CONCEPT
• PHASE PLAN
• CIRCULATION
• AREA
• PHASE I
-JUNIOR BLOCK
-POOL BLOCK
• PHASE II
-MIDDLE & SENIOR BLOCKS
• PHASE III
-ADMIN & DINING BLOCK
• SERVICES
• MATERIALS USED
• SITE PICTURES
ACKNOWLEDGEMENT
APART FROM MY EFFORTS, THE SUCCESS OF THIS
PROJECT DEPENDS ON THE ENCOURAGEMENT AND
GUIDANCE OF MANY OTHERS. I TAKE THIS
OPPORTUNITY TO EXPRESS MY GRATITUDE TO THE
PEOPLE WHO HAVE BEEN INSTRUMENTAL IN THE
SUCCESSFUL COMPLETION OF THIS PROJECT.
TOWARDS BRINGING THIS PROJECT TO ITS FINAL
CONCLUSION, I WOULD FOREMOST HAVE TO THANK MY
PARENTS WITHOUT WHOM I WOULDN’T HAVE ENJOYED
MY WORK AS I DO. THEY STOOD BY ME AND
ENCOURAGED AND SUPPORTED ME THROUGHOUT THE
PROCESS.
I WOULD LIKE TO THANK AR. RAMAN SIKKA FOR HIS
SUPPORT AND PROFESSIONAL GUIDANCE THROUGHOUT
MY TRAINING PERIOD.
I BELIEVE IT IS MY EARNEST DUTY TO THANKS AR. RENU
BALA, AT SAA. IT WAS DUE TO HIS CONTINUOUS AND
STIMULATING SCHOLARLY GUIDANCE THAT I COULD
FINISH THE PROJECT REPORT. RIGHT FROM THE
BEGINNING TO THE END HE MADE STRENUOUS EFFORTS
AND DEVOTED HIS VALUABLE TIME FOR THE
COMPLETION OF THIS PROJECT REPORT.
INTRODUCTION

•S H I V N A D A R S C H O O L C A M P U S I S L O C A T E D A D J A C E N T
TO GREATER NOIDA EXPRESSWAY IN SECTOR 168, NOIDA
WITH SITE EXTENT OF 5.0 ACRES AND TOTAL BUILT UP
AREA OF 2,00,000 SQ.FT.
•T H E C A M P U S C O N S I S T S O F
•1 . J U N I O R B L O C K
2. MIDDLE/SENIOR BLOCK
3. POOL BLOCK
4. ADMINISTRATION BLOCK / INDOOR MULTIPURPOSE
HALL
5. DINING/LIBRARY/INDOOR SPORTS
6. AMPHITHEATRE
•T H E B U I L D I N G B L O C K S I N T H E C A M P U S A R E O R G A N I Z E D
AROUND THE MAIN SPORTING FIELD TO TAKE ADVANTAGE
OF MAXIMUM VIEWS AND VENTILATION.
•A L L T H E A C A D E M I C B L O C K S A N D T H E
ADMINISTRATION/DINING BLOCKS ARE WELL CONNECTED
WITH EACH OTHER USING A CENTRAL SPINE.
•T H E C L A S S R O O M S I N A L L T H E A C A D E M I C B L O C K S A R E
ARRANGED AROUND THE CENTRAL COURTYARD TO
PROVIDE MAXIMUM DAYLIGHT, VENTILATION AND
INTERACTIVE COURT SPACE FOR THE STUDENTS ALL
THROUGH OUT THE YEAR.
PROJECT BRIEF

 Architects: Sikka Associate Architects, New


Delhi.

 Located in Greater Noida , Sector 167.

 The site is approximately 5.5 acre in size (22258


m2).

 The construction was divided into 3 phases.

 Phase I is complete.

 Phase II has reached a 95 % completion.

 Phase III has reached a 65 % completion.


PROJECT BRIEF

 The project is envisaged as Shiv Nadar School (SNS),


Sector 168, NOIDA, an Institutional Building includes
Class rooms & Admin Block.

 Few salient Features relating to the Project are:

 Total Plot Area : 5 Acre


 Total Built up area : 1.90 lac sq ft

 The Complex consists of the following structures:

• Admin Block : Basement + G.F. +2


• Dinning Block : Basement + G.F. +3
• Senior Block :G+3
• Middle Block :G+3
• Junior Block :G+2
• Swimming Pool : Below Ground
LOCATION
The site is
located in
sector 167,
Noida, just off
the Yamuna
expressway,
connecting
Noida and
greater Noida
in the national
capital region
of new Delhi.

KEY LOCATION
PLAN
SITE DETAILS
The site is
approximately
5 acres in size.

the design of
the school is
done in
different
blocks defined
by different
age groups,
i.e. junior,
middle and
senior blocks

SITE PLAN
ARIAL VIEW OF THE SITE
SITE VIEW
DESIGN CONCEPT

BOLD AND DISTINCT

EFFICIENT LEARNING
SPACES

INTERACTIVE SPACES AND


OUTDOOR
SPORTS FACILITIES

GREEN AND
ENVIRONMENT
FRIENDLY

ARCHITECTURE
DESIGN CONCEPT

GREAT GREAT
LEARNING LEARNING
EXPERIENCE EXPERIENCE

EFFICIENT
NATURAL
PLANNING AND
HABITAT AND
USE OF COVERED
LANDSCAPE
SPACES

SEMI COVERED
SHELTERED
NATURAL
SPACES WITH
VENTILATION
MULTIPURPOSE
USES
CONCEPT/PHASE
(SITE)
PHASE-1

PHASE-I1
PHASE-II1

SITE CONCEPT
AREA BRIEF
PHASE BLOCK SPACE/FLOOR AREA (SQFT)
PHASE 1 JUNIOR SCHOOL GR. FLOOR 9719
FIRST FLOOR 11937
SECOND FLOOR 11937
THIRD FLOOR 12281

ADMIN/CAFE GR. FLOOR 1496


PHASE 1 TOTAL AREA=
47393

PHASE 2 MIDDLE SCHOOL GR. FLOOR 8654


FIRST FLOOR 11581
SECOND FLOOR 11581
THIRD FLOOR 11581

SENIOR SCHOOL GR. FLOOR 8654


FIRST FLOOR 11581
SECOND FLOOR 11581
THIRD FLOOR 11581

ADMIN BLOCK GR. FLOOR 3164

DINING BLOCK GR. FLOOR 7276


FIRST FLOOR 13207
(MULTIPURPOSE &
INDOOR GAME) 4962
SECOND FLOOR 4962
THIRD FLOOR (LIBRARY) PHASE 2 TOTAL AREA=
120458

TOTAL BUILT UP 167852 SQFT


AREA
CIRCULATION/
ZONING
CIRCULATION

8 6 5 10
2
7 1

9 11 3

1. STUDENTS DROP OFF/ 6. SENIOR SCHOOL


PICK UP 7.DINING+AUDITORIUM
2. PARENTS/STAFF 8. ADMIN
DROP OFF 9. SERVICES
3. JUNIOR SCHOOL 10. POOL AREA
4. KIDS PLAY AREA 11. SPORTS FIELD
5. MIDDLE SCHOOL
ZONING

ADMIN SENIOR MIDDLE POOL


BLOCK BLOCK BLOCK BLOCK

SPINE

DINING
JUNIOR
BLOCK
BLOCK
PHASE-I

DATE OF COMMENCEMENT:
MARCH 2011
DATE OF COMPLETION: FEBRUARY
2012
KEY PLAN (junior block)

JUNIOR BLOCK
EXTERNAL VIEW

INTERNAL VIEW
GROUND FLOOR PLAN
ATRIUM/CORRIDOR
FLOORING
PRINCIPAL ROOM(ceiling)
PRINCIPAL ROOM(layout)
RECEPTION(ceiling)
RECEPTION(layout)
FIRST FLOOR PLAN
CORRIDOR FLOORING
ART/CRAFT ROOM (ceiling)
ART/CRAFT ROOM (layout)
SECOND FLOOR PLAN
CORRIDOR FLOORING
MUSIC ROOM(ceiling)
MUSIC ROOM(layout)
DANCE ROOM(ceiling)
DANCE ROOM(layout)
KEY PLAN (pool block)

JUNIOR BLOCK
BASEMENT PLAN
GROUND FLOOR PLAN
VIEW OF BASKETBALL COURT

VIEW OF SWIMMING POOL


PHASE-II

DATE OF COMMENCEMENT:
JANUARY 2012
EXPECTED DATE OF COMPLETION:
JANUARY 2015
KEY PLAN (senior and
middle block)

SENIOR AND
MIDDLE
BLOCK
MIDDLE BLOCK

SENIOR BLOCK
GROUND FLOOR PLANS

MIDDLE
BLOCK

SENIOR
BLOCK
TYPICAL FLOOR PLANS(1st
and 2nd floor)

MIDDLE
BLOCK

SENIOR
BLOCK
SECTIONAL ELEVATION
THIRD FLOOR PLANS

MIDDLE
BLOCK

SENIOR
BLOCK
SITTING LAYOUTS
TYPICAL CLASS LAYOUT
TYPICAL CLASSROOM
FLOORING
TYPICAL CLASSROOM
CEILING
TYPICAL CLASSROOM
ELEVATION
INFIRMARY ROOM

INFIRMARY
ROOM

CROSS SECTION OF INFIRMARY ROOM


TYPICAL CLASSROOM
VIEW/FAADE ELEVATION
SITE PICTURES
PHASE-III

DATE OF COMMENCEMENT:
MARCH 2013
EXPECTED DATE OF COMPLETION:
DECEMBER 2015
KEY PLAN (admin and dining)

ADMIN
AND
DINING
VIEW OF ADMIN/DINING BLOCK UNDER
CONSTRUCTION, AS OF 27TH OCTOBER, 2014
BASEMENT PLAN

37 CARS
GROUND FLOOR PLAN

ADMIN BLOCK

DINING BLOCK
CAPACITY= 467
DINING LAYOUT PLAN
LIFT LOBBY
DINING AREA 520 SQM
KITCHEN AREA 210 SQM
TOTAL NO. OF SEATS= 467

KITCHEN

DINING HALL
ADMIN LAYOUT PLAN

OFFICE
WAITING OFFICE

CASHIER
ROOM

MEETING DOUBLE
ROOM HT. LOBBY
PRINCIPAL ENTRY
WAITING

CONFERENCE ROOM

RECEPTION
PRINCIPAL
ROOM

ENTRY
FIRST FLOOR PLAN

ADMIN BLOCK

DINING BLOCK
CAPACITY= 209
DINING LAYOUT PLAN

DINING & PANTRY AREA= 306 SQM


LIFT LOBBY
TOTAL NO. OF SEATS= 209

DINING AREA
SECOND FLOOR PLAN

MULTI-PURPOSE HALL
SEATING- 500 CAP.
SECOND FLOOR PLAN

MULTI-PURPOSE HALL
BASKETBALL COURT
SECOND FLOOR PLAN

MULTI-PURPOSE HALL
BADMINTON COURT
SECOND FLOOR PLAN

MULTI-PURPOSE HALL
VOLLEYBALL COURT
MULTI-PURPOSE HALL
SEATING LAYOUT PLAN
LIBRARY LAYOUT

ASSISTANT ASSISTANT
LIBRARIAN LIBRARIAN

READING
COMPUTER TABLES
AREA

READING
TABLES
THIRD FLOOR PLAN

GAME GALLERY

INDOOR SPORTS HALL


MULTI-PURPOSE HALL
THIRD FLOOR PLAN

HALL BENEATH
TERRACE PLAN
ELEVATIONS
ELEVATIONS
SECTIONS

LONGITUDINAL SECTION

SECTIONAL ELEVATION
SERVICES
AIR CONDITIONER

Cooling towers, making


the water contained chill
n passing it to refrigerants
and compressor

Air enters the compressor


and then to the
condenser and reaches
the air handling units

AC ducts circulate the


cool air from AHU to
all the areas
WATER SUPPLY AND TREATMENT

• PLANT ROOM ADJACENT TO POOL


• IT FEEDS THREE BLOCKS
• FIRE LINE CHARGED FROM PLANT ROOM.
• 5 OHT PROVIDED
• WATER IS RECHARGED
• WATER SOFTNER PROVIDED BECAUSE NO MC
SUPPLY TO SOFTEN BORE WELL WATER
• 175 KLD STP
WATER SUPPLY AND TREATMENT

Main water supply pipes Air washer on terrace

Grid of water pipes with Fire fighting system


sprinkles on ceiling in library
MATERIALS FOR FLOORING
SITE PICTURES
SITE PICTURES
THANK YOU