Sei sulla pagina 1di 1

SAP MRP Planning on SAP S/4 HANA

Training Duration - 5 Days


Duration Corresponding SAP Topics Coverage
Reference
Day 1 and Day 2 MRP Planning on SAP S/4 HANA o Outlining the Supply Chain Planning Process
o Outlining the Core Production Planning
Process

Material Requirements Planning Execution o Outlining Material Requirements Planning


o Setting Up the MRP Prerequisites
o Executing the MRP Run
o Setting Up the MRP Run
o Planning MRP Interactively
o Applying Firming Mechanisms

Day 3 Technical Processes of Requirements Planning o Calculating Net Requirements


o Applying Buffers in Net Requirements
Calculation
o Calculating Lot Sizes
o Selecting Procurement Types
o Setting Up Basic-Date Scheduling
o Setting Up Lead-Time Scheduling
o Selecting BOM and Routing

Day 4 MRP Results Processing and Evaluations o Comparing an MRP List and a
Stock/Requirements List
o Applying the Planning Table
o Identifying Exception Messages
o Applying Additional Evaluation Aids

Day 5 Additional MRP Processes o Applying Master Production Scheduling (MPS)


o Setting Up Long-Term Planning
o Executing Long-Term Planning
o Analyzing Multi-Site Planning
o Setting Up MRP Areas
o Applying MRP Areas

Potrebbero piacerti anche