Sei sulla pagina 1di 1

r REQUIREMENTS PROCUREMENT /REMARKS

1. Project Description' For projeets with floor areq servin,q os the project size pqrameter, the Gross
Floor Ares {GFA} must be specified and this must be consistent with tlie
sum of the fioor araas in the Praject Camptonents List
{item no. 19}
2. Environmental impact and Management The fallowingl must be indicated in the EIMP:
Plan* a) Source ofwater
b) Nearest receiving body ofwater
4 lmplementation af solid waste manogement
d) Compliance ta RA 6969
3. Abandonmentf Decommissioning/ lndicate the expected lifespan of the project (e.9. 10 years, lifetime, etc.)
Rehabilitation Plan' and ihe'planned activities to be conducted in the event that the project will
b e q bq ndo n ed, d ecantmi ssia ne d, o r r eh ab i itta ted
4. Geotagged photos ofproject site Pictures a must have GPS coordinates and date imprinted on the
photas subttritted. The date the photos wete takeil must be within 30 days
from the dute of ECt application

5. Topographic map of impactlaffected The prattided topographic map should encomposs afi area within 11 ktn
AIC AS
front tlte praject site
5. Certification from LGU on the The propotlent must pravide a dacument issued by the LGu indicating the
compatibility of proposed pr0iect Land Use Classificatian ofthe !ot{s) tvhere the prapased project is located.
existing land use plan (e.g. Zoning
Certificate, Locational Clearance, etc,J If tlte LandUse Classificatian is not campatible wtth the proposed activities
conducted in the project, an approved Certificate af Variance of land use
issued by the LGU must also be provided

7. Site Development Plan (SDPI andfor The SDP must indicate the labels antl measurements of the project
Vicilrity Map signed by registered camponeilts (e.9. buildings, swimming paols, open spaces, etc,). lt is advised
professionals ta include a tahulated summary of the components and thelr floor areo.s as
well.
The Praject Name, Location, and Prolsonent Naile in the SDP must be
conslstefit with the details tn the Project Description (item no. 1).

The following environmental compa,lents must be reflected in the SDP:


,) Materials Recovery Facili4t for solicl waste
b) Wastewater Treatment Fscility
c) RainwaterCatchment/CisternTank
d) Hazardous Waste Storage Facilig {if applicable)

B. Project/PlantLayoutsignedby Ihis is similar to the SDP hut ntust also includg the interior luyout afall the
registered professionals fioors of any muiti-story buildings, ifthere ard any,
/ Far poultry farm prajects, a standard of 1 f€ of enclosure per bird
must he
9, Schematic Diagram cf Wastewater tf e project
has the potential to generate wastewater {i.e. from
Treatment Facility IWTFJ processing/manufacturing operations, toitets, kitchens, etc.), provir)e a
Specifications/Design should haver schema-tie dtagram on haw th[s u]qstewater *zay be treatetl. For the
i. Daily Waslewater flow rate industry-specific wastewater pollutant parqmeters please be guided by
ii. Volumetric Capacity of WTF Table 8 of DAO 2A16-08.
iii. WTF Treatnrent Efficiency
lf not applicable, please provide a justification.

10. Schernatic Diagram of Air Pollutinn tf the project has the potential ta generate air pollution {e,g, thraugh
Control Facilify combustion of fuels using a generstor set, dust generatian due to crushing
operatiotls or heduy vehicular movement, etc.), provide a schemotic
diagram on haw the proponent plans to mitigate the air pollution
generated.

lf nat applicable, please provide a justification.

11. Organizational Charl in charge on The designation of a Pollution Control Afficer (PCO) for the project must be
environmental concerns indicaUd in the organizational chart